SlideShare a Scribd company logo
10/06/2015 11:47CV
Reported by : Ahmed_Barakatcv Page 1 of 4
NATIONALITY
AHMED BARAKAT HASSAN IBRAHIM MOHAMED
EG
LANGUAGES
AB and EN Fluent
EDUCATION AND PROFESSIONAL QUALIFICATION
BSC , ELECTRICAL , SHEROUK , 2012
ELECTRICALMember of the Egyptian Syndicate of Since 2012
1970
1992
1976
1993
1934
Projects
05/03/2015
28/08/2014
10/07/2014
26/06/2014
08/05/2014
From To
21/05/2015
15/01/2015
21/08/2014
26/06/2014
15/05/2014
M Month
2.4
3.2
1.2
0.1
0.2
Tot M Month
241.2
127.9
469.2
19.3
30.6
1.00%
2.53%
0.26%
0.47%
0.72%
% RoleProj No
CAIRO INTERNATIONAL MEDICAL CITY
ABC EGYPT NEW HEADQUARTERS
EMAL ADMINISTRATIVE COMPLEX
ENGINEERING SCHEMATIC DESIGN FOR ABC BANK
HEADQUARTERS
GOLF COMMUNITY 1B (GC1B) - KING ABDULLAH
ECONOMIC CITY
On a land area of 138,258m2, the medical city includes the hospital's main building (footprint area of 14,720m2), an academic research center, a psychiatric unit, a wellness park, a
hotel, a wellness resort, a health club, a medical mall, and staff accommodation units. ECG's scope encompasses the design of the hospital's main building. With a built-up area of
73,600m2, the 360-bed hospital comprises a two-level basement, a ground floor, and four upper floors.
ABC Bank has acquired a skeleton building designed to function as an administration building. They aim to modify the design to serve as a new headquarter for the Bank in Egypt.
The building is located within the New Cairo area, East of Cairo, Egypt on a land area of 7,250 sqm. The building comprises of 2 underground basements and 6 floors with a total built
up area of about 28,00 sqm.
EMAL Administrative Complex is built on a plot area of 68,000m2 and comprises 12 buildings that include an administrative building (G+1), reception building (G+1), mosque, and
ancillary buildings.
The project aims to serve as ABC Bank New Headquarters. The building comprises of two underground basements and six floors with a total BUA of 28,000 m2. ATSP shall carryout
the concept design and ECG, as their Sub Consultant, shall carryout the Schematic design.
GC-1B (207,000 m2) is a premium low-density residential development and is centrally located between all currently active development components. The infrastructure works design
to GC1B is complete. However due to changing from developing villas to selling plots, AlMurooj GC1B has been re-master-planned and ECG shall provide VE, redesign and detailed
design services for the GC1B infrastructure.
Over 3 Years of Experience with ECG in..........
Task M Month %
-
DATE OF BIRTH
17/10/1989
EXPERIENCE
10/06/2015 11:47CV
Reported by : Ahmed_Barakatcv Page 2 of 4
2017
1933
1971
1600
1607
1711
1839
1543
1277
1884
Projects
08/05/2014
10/04/2014
06/02/2014
28/11/2013
14/11/2013
14/11/2013
07/11/2013
19/09/2013
06/06/2013
06/06/2013
From To
15/05/2014
10/04/2014
05/03/2015
29/01/2015
05/03/2015
12/12/2013
07/11/2013
19/09/2013
11/07/2013
05/06/2014
M Month
0.1
0.2
2.6
2.1
4.0
0.5
0.2
0.1
0.4
1.6
Tot M Month
5.5
54.2
81.5
274.9
266.9
215.5
28.4
219.4
2936.9
194.9
1.82%
0.39%
3.15%
0.77%
1.50%
0.24%
0.63%
0.05%
0.01%
0.84%
% RoleProj No
MODIFICATION OF THE LIFT STATION DETAILED DESIGN,
AL TALAH GARDENS
BEACH COMMUNITY 2 (BC2) - KING ABDULLAH
ECONOMIC CITY
AL-MUROOJ PRIMARY INFRASTRUCTURE DESIGN &
CONSTRUCTION SUPERVISION
SECOND INTEGRATED SEWERAGE AND SANITATION
INFRASTRUCTURE PROJECT ISSIP 2 -
BEYTI PLANT EXTENSION
GENERAL INVESTIGATION BUILDING IN KUWAIT
PORTO TARTOUS (SOUTHERN AND MIDDLE AREAS)
Al-Marasem International Hospital
Hyde Park
HOTEL AND MALL FOR DAR AL ESHARA
Al Talah Gardens was designed prior to updating KAEC overall master plan. Thus, it was designed with a mindset of total autonomy. The sanitary holding tank was designed to
accommodate the flows of the full community development for 2 full days; however, the design did not take into consideration the construction phasing of Talah Gardens.
Al Murooj is a premium low-density residential development and is centrally located between all currently active development components in KAEC. BC2 is part of Al Murooj having a
land area of 678,254 m2.
Al-Murooj is located within King Abdullah Economic City (KAEC) on a land area of approximately 4,600,000m2, including TH1, TH4, BC1, BC2, GC1C, GC1B, GC, and TC communities.
ECG shall review the existing primary infrastructure designs comprising roads, water, wastewater, storm drainage, electrical, and telecomm works with a VE exercise and redesign,
including technical specifications and BOQs up to tender documents.
The project comprised the three main components: 1) provision of sanitation systems (networks and centralized/ decentralized wastewater treatment plants) within selected drainage
sub-basins; 2) institutional development and capacity building; 3) increase awareness on improved hygiene and sanitation.
The project comprises the design, construction management, and supervision of four production buildings and a filling area, each with a ground floor, mezzanine, and a roof with a
footprint of 10,750m2, as well as 3 warehouse buildings for raw materials with a footprint of 5,650m2, including all electromechanical and infrastructural works.
The overall goal of the project is to construct the General Investigation Department in West Abu-Fatira industrial area for the Ministry of Interior in Kuwait, the parcel occupies an area
of 20,000m2.
With a total built-up area of 21,120m2, the project scope comprised design of Building R3 with 16 floors (core and shell), master plan and urban design as well as site wide
infrastructure for the south and middle zones.
With a built-up area of 30,000m2, the 200-bed general hospital comprises a surgical department with an Intensive Care Unit, Labor/Delivery department, Intensive Care Unit, Coronary
Angioplasty Department, Endoscopy, Emergency, Physical Therapy Department, and outpatient clinics, in addition to a high-tech X-ray department and laboratories. Supporting
departments at the hospital include a central kitchen, laundry, morgue, sterilization unit , and administrative offices.
The project is a unique residential and commercial development over 6.3 million m2. The development comprises luxury villas townhouses 2, 4 and 6 plex units), apartments, retail
centers, 72 m high commercial/office towers, a golf course, a golf club, a sports and health center, and community facilities.
The project comprised design development, detailed design and review of shop drawings. The 5-stars Hotel contains 2B+G+ 7 typical floors, the mall is G+2T.
Task M Month %
10/06/2015 11:47CV
Reported by : Ahmed_Barakatcv Page 3 of 4
1950
Projects
17/04/2014
From To
17/04/2014
M Month
0.1
Tot M Month
49.4 0.10%
% RoleProj No
MADINAH DEVELOPMENT AUTHORITY'S HEADQUARTERS
The project scope comprises developing conceptual design and preliminary design for Madinah Development Authority's Headquarter Building with two basements, ground floor and
six above ground floors.
Others
1821
1850
1789
1761
1859
1740
1716
1770
1802
Projects
23/05/2013
18/04/2013
21/03/2013
07/03/2013
07/03/2013
17/01/2013
06/12/2012
25/10/2012
11/10/2012
From To
31/10/2013
09/05/2013
28/03/2013
07/03/2013
21/03/2013
18/04/2013
06/12/2012
27/12/2012
18/10/2012
M Month
2.5
0.8
0.4
0.2
0.4
1.9
0.0
1.2
0.1
Tot M Month
98.9
5224.1
312.5
219.5
22.3
209.6
323.1
1274.0
61.6
2.57%
0.02%
0.11%
0.10%
1.84%
0.89%
0.01%
0.09%
0.23%
% RoleProj No
MOUNTAIN VIEW HYDE PARK
QATAR EMIRI NAVAL FORCES BASE BUILDINGS
PACKAGE
AUDITORIUM IN RAS LAFFAN INDUSTRIAL CITY
ESTABLISHING OF SUEZ POWER PLANT (CAPACITY 650
MEGAWATTS)
MAGRABI MEDICAL CENTER IN MUSCAT
UNIVERSAL GROUP OFFICE BUILDING
SOLVAY SODIUM CARBONATE PLANT - SHAHRAZAD
PHASE 2 PROJECT
GENERAL DIRECTORATE OF MILITARY WORKS (GDMW)
RIYADH MEDICAL COMPLEX
HACIENDA WHITE-INFRASTRUCTURE WORKS
The project comprises 200 feddans of land in Hyde Park to be developed as a mixed use development. ECG scope encompasses the design of infrastructure (irrigation network,
water network, wastewater network, sewage network, fire protection network, outdoor Electrical Distribution system, street lighting system, and telephone network); Roads network
in addition to Car Parking and facility buildings.
With a land area of 34,230m2 and built-up area of 3,500m2, the project comprises an auditorium/multipurpose hall, exhibition hall, VIP reception area, warming kitchen, and staff
offices.
Civil works for a 650MW power plant (Contract 102). The project comprises power generation facilities (boiler structure, STG, control building, and stack); auxiliary facilities (water
treatment, circulating water, fire protection, water tanks, and wastewater facility); ancillary facilities (warehouse and workshop, office building, security offices, fire protection
station, mosque, guard dormitory, and guard towers).
With a total floor area of 761m2, the project aims to design and construct an extension to the ground floor of the Magrabi Hospital building. The new extension comprises operation
theatres for LASIK operations, pre- and post-operation wards, Central Sterile Supply Department (CSSD), male wards, female wards, nursing support facilities, doctors lounge,
receptions, toilets, and administration offices.
An office building located on a total land area of 5,256m2 in 6th of October City comprising one basement with a total area of 3,800m2, ground floor and two typical floors with a total
area of 6,600m2. The foot print of the building is about 40% of the land area.
The project comprises the installation of a new distillation line and a new concentration column, together with the revamping of the absorption sector (including an ammonia-receiving
station) and rationalization of the water-cooling sector to increase the production capacity from 130,000 tons/year to 200,000 tons/year.
ECG scope of work included detailed design of the Core Medical Hospital and Emergency Medical Center, Oncology Hospital and Outpatient Clinic, Polyclinic and Day Surgery, Central
Laboratory, Pharmacy, Medical Administration Building and Conference Center, parking structure, infrastructure design for medical and service zone, infrastructure design for main
roads of residential and university zones and utilities buildings.
The project comprises villas, town houses, hotels and malls spread over an area of 700,000m2.
Task M Month
Task M Month
%
%
10/06/2015 11:47CV
Reported by : Ahmed_Barakatcv Page 4 of 4
0040
Projects
20/09/2012
From To
21/05/2015
M Month
8.3
Tot M Month
101681.6 0.01%
% RoleProj No
..
Proposal From To M Month Total M Month % RoleProp No
Task M Month %
TRAINING COURSES
YearCourse Location
Revit MEP 2012
Lightning Protection
Conveyance System Principles
Focus on What's Important Using SIMARIS Software
Protection of MV Transformers
ETAP
Soft Starters
LED Concepts & Applications
LED Concepts & Relux Software
Power Factor & Harmonics
LEED GA (V4) Preparation Course
Earthling & Lighting Systems
Lighting Control
Optimization of Main Distribution Board- MDB
Indoor & Outdoor Lighting Fixtures
2013
2014
2014
2014
2014
2014
2014
2014
2014
2014
2015
2015
2015
2015
2015
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EG
4.48%
1.54%
3.6
22.8
0.2
0.4
19/06/2014
08/11/2012
19/06/2014
25/10/2012
8688
7456
ENGINEERING SERVICES FOR EPC CONTRACT FOR SCHLUMBERGER
INTEGRATION BASE IN 6TH O
CARGO AND MRO FACILITIES AT MUSCAT INTERNATIONAL AND
SALALAH AIRPORTS

More Related Content

Similar to cv

Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingHazem Mahdy
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAEJp Nath
 
Ahmed mahmoud reda
Ahmed mahmoud redaAhmed mahmoud reda
Ahmed mahmoud reda
Ahmad Reda
 
Osama Mohamed Ali El kordi
Osama Mohamed Ali El kordiOsama Mohamed Ali El kordi
Osama Mohamed Ali El kordiOsama Elkordy
 
CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1ASHRAF NAZME
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
Ayman Mitkees
 
Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016
Hossam A.Aziz
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18
Mauritz Kruger
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed Fergany
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 
Suryaa homes l zone New Delhi Dwarka
Suryaa homes l zone New Delhi DwarkaSuryaa homes l zone New Delhi Dwarka
Suryaa homes l zone New Delhi Dwarka
Group 3 realtors
 
Suryaa homes L ZONE DWARKA NEW DELHI
Suryaa homes L ZONE DWARKA NEW DELHISuryaa homes L ZONE DWARKA NEW DELHI
Suryaa homes L ZONE DWARKA NEW DELHI
Group 3 realtors
 

Similar to cv (20)

Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
CV
CVCV
CV
 
CV
CVCV
CV
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
Ahmed mahmoud reda
Ahmed mahmoud redaAhmed mahmoud reda
Ahmed mahmoud reda
 
Osama Mohamed Ali El kordi
Osama Mohamed Ali El kordiOsama Mohamed Ali El kordi
Osama Mohamed Ali El kordi
 
Hala Resume
Hala ResumeHala Resume
Hala Resume
 
CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
1 Essam CV
1 Essam CV1 Essam CV
1 Essam CV
 
Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016
 
Erwin Mendoza CV
Erwin Mendoza CVErwin Mendoza CV
Erwin Mendoza CV
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
NASEER CV JUNE 2015
NASEER CV JUNE 2015NASEER CV JUNE 2015
NASEER CV JUNE 2015
 
Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed fergany CV 2642016
Ahmed fergany CV 2642016
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
Suryaa homes l zone New Delhi Dwarka
Suryaa homes l zone New Delhi DwarkaSuryaa homes l zone New Delhi Dwarka
Suryaa homes l zone New Delhi Dwarka
 
Suryaa homes L ZONE DWARKA NEW DELHI
Suryaa homes L ZONE DWARKA NEW DELHISuryaa homes L ZONE DWARKA NEW DELHI
Suryaa homes L ZONE DWARKA NEW DELHI
 

cv

  • 1. 10/06/2015 11:47CV Reported by : Ahmed_Barakatcv Page 1 of 4 NATIONALITY AHMED BARAKAT HASSAN IBRAHIM MOHAMED EG LANGUAGES AB and EN Fluent EDUCATION AND PROFESSIONAL QUALIFICATION BSC , ELECTRICAL , SHEROUK , 2012 ELECTRICALMember of the Egyptian Syndicate of Since 2012 1970 1992 1976 1993 1934 Projects 05/03/2015 28/08/2014 10/07/2014 26/06/2014 08/05/2014 From To 21/05/2015 15/01/2015 21/08/2014 26/06/2014 15/05/2014 M Month 2.4 3.2 1.2 0.1 0.2 Tot M Month 241.2 127.9 469.2 19.3 30.6 1.00% 2.53% 0.26% 0.47% 0.72% % RoleProj No CAIRO INTERNATIONAL MEDICAL CITY ABC EGYPT NEW HEADQUARTERS EMAL ADMINISTRATIVE COMPLEX ENGINEERING SCHEMATIC DESIGN FOR ABC BANK HEADQUARTERS GOLF COMMUNITY 1B (GC1B) - KING ABDULLAH ECONOMIC CITY On a land area of 138,258m2, the medical city includes the hospital's main building (footprint area of 14,720m2), an academic research center, a psychiatric unit, a wellness park, a hotel, a wellness resort, a health club, a medical mall, and staff accommodation units. ECG's scope encompasses the design of the hospital's main building. With a built-up area of 73,600m2, the 360-bed hospital comprises a two-level basement, a ground floor, and four upper floors. ABC Bank has acquired a skeleton building designed to function as an administration building. They aim to modify the design to serve as a new headquarter for the Bank in Egypt. The building is located within the New Cairo area, East of Cairo, Egypt on a land area of 7,250 sqm. The building comprises of 2 underground basements and 6 floors with a total built up area of about 28,00 sqm. EMAL Administrative Complex is built on a plot area of 68,000m2 and comprises 12 buildings that include an administrative building (G+1), reception building (G+1), mosque, and ancillary buildings. The project aims to serve as ABC Bank New Headquarters. The building comprises of two underground basements and six floors with a total BUA of 28,000 m2. ATSP shall carryout the concept design and ECG, as their Sub Consultant, shall carryout the Schematic design. GC-1B (207,000 m2) is a premium low-density residential development and is centrally located between all currently active development components. The infrastructure works design to GC1B is complete. However due to changing from developing villas to selling plots, AlMurooj GC1B has been re-master-planned and ECG shall provide VE, redesign and detailed design services for the GC1B infrastructure. Over 3 Years of Experience with ECG in.......... Task M Month % - DATE OF BIRTH 17/10/1989 EXPERIENCE
  • 2. 10/06/2015 11:47CV Reported by : Ahmed_Barakatcv Page 2 of 4 2017 1933 1971 1600 1607 1711 1839 1543 1277 1884 Projects 08/05/2014 10/04/2014 06/02/2014 28/11/2013 14/11/2013 14/11/2013 07/11/2013 19/09/2013 06/06/2013 06/06/2013 From To 15/05/2014 10/04/2014 05/03/2015 29/01/2015 05/03/2015 12/12/2013 07/11/2013 19/09/2013 11/07/2013 05/06/2014 M Month 0.1 0.2 2.6 2.1 4.0 0.5 0.2 0.1 0.4 1.6 Tot M Month 5.5 54.2 81.5 274.9 266.9 215.5 28.4 219.4 2936.9 194.9 1.82% 0.39% 3.15% 0.77% 1.50% 0.24% 0.63% 0.05% 0.01% 0.84% % RoleProj No MODIFICATION OF THE LIFT STATION DETAILED DESIGN, AL TALAH GARDENS BEACH COMMUNITY 2 (BC2) - KING ABDULLAH ECONOMIC CITY AL-MUROOJ PRIMARY INFRASTRUCTURE DESIGN & CONSTRUCTION SUPERVISION SECOND INTEGRATED SEWERAGE AND SANITATION INFRASTRUCTURE PROJECT ISSIP 2 - BEYTI PLANT EXTENSION GENERAL INVESTIGATION BUILDING IN KUWAIT PORTO TARTOUS (SOUTHERN AND MIDDLE AREAS) Al-Marasem International Hospital Hyde Park HOTEL AND MALL FOR DAR AL ESHARA Al Talah Gardens was designed prior to updating KAEC overall master plan. Thus, it was designed with a mindset of total autonomy. The sanitary holding tank was designed to accommodate the flows of the full community development for 2 full days; however, the design did not take into consideration the construction phasing of Talah Gardens. Al Murooj is a premium low-density residential development and is centrally located between all currently active development components in KAEC. BC2 is part of Al Murooj having a land area of 678,254 m2. Al-Murooj is located within King Abdullah Economic City (KAEC) on a land area of approximately 4,600,000m2, including TH1, TH4, BC1, BC2, GC1C, GC1B, GC, and TC communities. ECG shall review the existing primary infrastructure designs comprising roads, water, wastewater, storm drainage, electrical, and telecomm works with a VE exercise and redesign, including technical specifications and BOQs up to tender documents. The project comprised the three main components: 1) provision of sanitation systems (networks and centralized/ decentralized wastewater treatment plants) within selected drainage sub-basins; 2) institutional development and capacity building; 3) increase awareness on improved hygiene and sanitation. The project comprises the design, construction management, and supervision of four production buildings and a filling area, each with a ground floor, mezzanine, and a roof with a footprint of 10,750m2, as well as 3 warehouse buildings for raw materials with a footprint of 5,650m2, including all electromechanical and infrastructural works. The overall goal of the project is to construct the General Investigation Department in West Abu-Fatira industrial area for the Ministry of Interior in Kuwait, the parcel occupies an area of 20,000m2. With a total built-up area of 21,120m2, the project scope comprised design of Building R3 with 16 floors (core and shell), master plan and urban design as well as site wide infrastructure for the south and middle zones. With a built-up area of 30,000m2, the 200-bed general hospital comprises a surgical department with an Intensive Care Unit, Labor/Delivery department, Intensive Care Unit, Coronary Angioplasty Department, Endoscopy, Emergency, Physical Therapy Department, and outpatient clinics, in addition to a high-tech X-ray department and laboratories. Supporting departments at the hospital include a central kitchen, laundry, morgue, sterilization unit , and administrative offices. The project is a unique residential and commercial development over 6.3 million m2. The development comprises luxury villas townhouses 2, 4 and 6 plex units), apartments, retail centers, 72 m high commercial/office towers, a golf course, a golf club, a sports and health center, and community facilities. The project comprised design development, detailed design and review of shop drawings. The 5-stars Hotel contains 2B+G+ 7 typical floors, the mall is G+2T. Task M Month %
  • 3. 10/06/2015 11:47CV Reported by : Ahmed_Barakatcv Page 3 of 4 1950 Projects 17/04/2014 From To 17/04/2014 M Month 0.1 Tot M Month 49.4 0.10% % RoleProj No MADINAH DEVELOPMENT AUTHORITY'S HEADQUARTERS The project scope comprises developing conceptual design and preliminary design for Madinah Development Authority's Headquarter Building with two basements, ground floor and six above ground floors. Others 1821 1850 1789 1761 1859 1740 1716 1770 1802 Projects 23/05/2013 18/04/2013 21/03/2013 07/03/2013 07/03/2013 17/01/2013 06/12/2012 25/10/2012 11/10/2012 From To 31/10/2013 09/05/2013 28/03/2013 07/03/2013 21/03/2013 18/04/2013 06/12/2012 27/12/2012 18/10/2012 M Month 2.5 0.8 0.4 0.2 0.4 1.9 0.0 1.2 0.1 Tot M Month 98.9 5224.1 312.5 219.5 22.3 209.6 323.1 1274.0 61.6 2.57% 0.02% 0.11% 0.10% 1.84% 0.89% 0.01% 0.09% 0.23% % RoleProj No MOUNTAIN VIEW HYDE PARK QATAR EMIRI NAVAL FORCES BASE BUILDINGS PACKAGE AUDITORIUM IN RAS LAFFAN INDUSTRIAL CITY ESTABLISHING OF SUEZ POWER PLANT (CAPACITY 650 MEGAWATTS) MAGRABI MEDICAL CENTER IN MUSCAT UNIVERSAL GROUP OFFICE BUILDING SOLVAY SODIUM CARBONATE PLANT - SHAHRAZAD PHASE 2 PROJECT GENERAL DIRECTORATE OF MILITARY WORKS (GDMW) RIYADH MEDICAL COMPLEX HACIENDA WHITE-INFRASTRUCTURE WORKS The project comprises 200 feddans of land in Hyde Park to be developed as a mixed use development. ECG scope encompasses the design of infrastructure (irrigation network, water network, wastewater network, sewage network, fire protection network, outdoor Electrical Distribution system, street lighting system, and telephone network); Roads network in addition to Car Parking and facility buildings. With a land area of 34,230m2 and built-up area of 3,500m2, the project comprises an auditorium/multipurpose hall, exhibition hall, VIP reception area, warming kitchen, and staff offices. Civil works for a 650MW power plant (Contract 102). The project comprises power generation facilities (boiler structure, STG, control building, and stack); auxiliary facilities (water treatment, circulating water, fire protection, water tanks, and wastewater facility); ancillary facilities (warehouse and workshop, office building, security offices, fire protection station, mosque, guard dormitory, and guard towers). With a total floor area of 761m2, the project aims to design and construct an extension to the ground floor of the Magrabi Hospital building. The new extension comprises operation theatres for LASIK operations, pre- and post-operation wards, Central Sterile Supply Department (CSSD), male wards, female wards, nursing support facilities, doctors lounge, receptions, toilets, and administration offices. An office building located on a total land area of 5,256m2 in 6th of October City comprising one basement with a total area of 3,800m2, ground floor and two typical floors with a total area of 6,600m2. The foot print of the building is about 40% of the land area. The project comprises the installation of a new distillation line and a new concentration column, together with the revamping of the absorption sector (including an ammonia-receiving station) and rationalization of the water-cooling sector to increase the production capacity from 130,000 tons/year to 200,000 tons/year. ECG scope of work included detailed design of the Core Medical Hospital and Emergency Medical Center, Oncology Hospital and Outpatient Clinic, Polyclinic and Day Surgery, Central Laboratory, Pharmacy, Medical Administration Building and Conference Center, parking structure, infrastructure design for medical and service zone, infrastructure design for main roads of residential and university zones and utilities buildings. The project comprises villas, town houses, hotels and malls spread over an area of 700,000m2. Task M Month Task M Month % %
  • 4. 10/06/2015 11:47CV Reported by : Ahmed_Barakatcv Page 4 of 4 0040 Projects 20/09/2012 From To 21/05/2015 M Month 8.3 Tot M Month 101681.6 0.01% % RoleProj No .. Proposal From To M Month Total M Month % RoleProp No Task M Month % TRAINING COURSES YearCourse Location Revit MEP 2012 Lightning Protection Conveyance System Principles Focus on What's Important Using SIMARIS Software Protection of MV Transformers ETAP Soft Starters LED Concepts & Applications LED Concepts & Relux Software Power Factor & Harmonics LEED GA (V4) Preparation Course Earthling & Lighting Systems Lighting Control Optimization of Main Distribution Board- MDB Indoor & Outdoor Lighting Fixtures 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 2015 2015 2015 2015 2015 EG EG EG EG EG EG EG EG EG EG EG EG EG EG EG 4.48% 1.54% 3.6 22.8 0.2 0.4 19/06/2014 08/11/2012 19/06/2014 25/10/2012 8688 7456 ENGINEERING SERVICES FOR EPC CONTRACT FOR SCHLUMBERGER INTEGRATION BASE IN 6TH O CARGO AND MRO FACILITIES AT MUSCAT INTERNATIONAL AND SALALAH AIRPORTS