CURRICULUM VITAE
PERSONAL DETAILS
NAME : Buenrostro Karanja Antony
YEAR OF BIRTH : 15th March, 1986
NATIONALITY : Kenyan
ID CARD NO : 25198554
GENDER : Male
MARITAL STATUS : Single
RELIGION : Christian
LANGUAGE : English / Kiswahili
PROFESSION : Mechanical Engineer
ADDRESS NO : 18920 – 00500 G.P.O, Nairobi
PHONE NO : +254 722 486 967 / +254 733 486 967
EMAIL : bwenty361@gmail.com / bwenty361@yahoo.com
PERSONAL PROFILE
To be a hardworking, self-motivated and innovative with sound analytical and problem solving skills and results
oriented person with an attitude for self-driven and good organization to work under all kind of conditions with
minimal supervision.
CAREER OBJECTIVE
To be an outstanding Mechanical Engineer who can strategize, execute and evaluate everyday challenges
associate with engineering as well as with other disciplines. Be a rational thinking, resilient, self-principled
and highly motivated upcoming manager ready to exploit my potential and abilities in the field of
Engineering. To build an integrated career in a result oriented organisation that that will allow me to apply
my Engineering skills to innovate and invent ways of making work easier and increasing production by
fulfilling a business-critical role of utilizing my full potential and continuous professional development in
engineering and technology, achieving the set goals.
ACADEMIC QUALIFICATION
21st November, 2006 – 7th December, 2012: UNIVERSITY OF NAIROBI
Bsc. Mechanical and Manufacturing Engineering,
Second class (lower)
MAJOR AREAS OF STUDY
 Thermodynamics and Heat Transfer
 Mechanics of Machines
 Mechanical Engineering Designs
 Solid and Structural Mechanics
 Fluid Mechanics
 Engineering Materials Science
 Engineering drawing
 Industrial management
24th May, 2012: CERTIFICATE IN COMPUTER AIDED DESIGN/ MANUFACTURE {AUTOCAD}
ZETECH COLLEGE
16th September, 2009: CERTIFICATE IN BUSINESS MANAGEMENT
THE KENYA ISNTITUTE OF MANAGEMENT (KIMs)
2002 to 2005: KENYA CERTIFICATE OF SECONDARY SCHOOL EDUCATION {KCSE}
CHEMILIL SUGAR ACADEMY
Grade: B (plain)
1998 to 2001: KENYA CERTIFICATE OF PRIMARY SCHOOL EDUCATION {KCPE}
ST. GEORGE MUTHAITI ACADEMY
Grade: 399 marks out of 500 marks.
PROFESSIONAL CERTIFICATION
Bachelor degree in Bsc. Mechanical and Manufacturing Engineering - University of Nairobi
Computer Aided Design/Computer Aided Manufacture (AutoCAD) - Zetech College
Certificate in Business Management - Kenya Institute of Management {KIMS}
Microsoft Computer packages in ms office.
Have over 5 years valid driving license with a good experience with Kenyan roads and more so with the Nairobi
central business road network and its neighbours.
EXPERIENCE RECORD
May, 2014 – to date: GAMMA DELTA EASTERN AFRICA LTD
SERVICE ENGINEER
Specific Duties/Responsibilities
 Appointment/Nomination/Interview for projects, receipt of project briefs from project
managers/architects, receipt of project drawings in project initiation.
 Involved in project planning, designing and the tender process.
 Preparation and sending out tender award letter sand holding the handover meeting in the
construction handover and initiation.
 Engaged in the project construction process and supervision.
 Preparation for the project closure process, handover, defects liability and archiving.
Projects
 I&M Bank – Thika, Kitale, Yaya Centre branch and I&M Tower, 12th Floor and 13th Floor.
 Tealand Properties, Apartments Kericho.
 Kiambu Shopping Mall.
 SRK Properties, apartments Nairobi.
February, 2014 – May, 2014: HALL EQUATORIAL LTD
PROJECT ENGINEER
Specific Duties/Responsibilities
 Design of Mechanical Ventilation (HVAC) Systems.
 Preparation of Mechanical ventilation and air conditioning service technical drawings.
 Preparation of Bills of Quantities for Projects.
 Costing of projects and participating in the tendering process as well as negotiating for the
best prices with clients.
 Supervision of fabrication, installation and maintenance as well as providing technical advice to
the technical teams in areas that are challenging.
 Schedule for routine maintenance of the HVAC equipment for Hotels, Banks, Hospitals and
domestic housing.
Projects
 Radisson blue hotel, Upper hills, Nairobi.
 M P Shah Hospital, Parklands, Nairobi.
 University of Nairobi, Kisumu campus.
DECEMBER, 2012 – FEBRUARY, 2014: JK TRANSPORTER LTD
LOGISTIC MANAGER
Specific Duties/Responsibilities
 Supervision on all trucks to enable timely delivery of goods and in the best condition.
 Introduced personnel trainee on advance driving.
 Worksheet to monitor fuel, cargo, truck repair and maintaining.
 Random truck checks.
IBERAFRICA LTD
INDUSTRIAL ATTACHMENT
Specific Duties/Responsibilities
 Preventive maintenance
 Programmed maintenance
 Corrective maintenance
AMBITION
To work under a registered engineer and become a competent registered mechanical and
manufacturing engineer
To further my management skills by joining a management school and major in project management at
postgraduate level and also master in Msc. Mechanical and manufacturing Engineering.
To attain optimal contribution to the society and pursue much within my area of jurisdiction for improvement
therein in my career doing my best at all times for the benefit of all the parties involved.
HOBBIES
Martial art and gym
Watching sports especially football
Listening to music and swimming
REFEREES
1. DICK OMONDI NDIEWO
R. Engineer (KERB) Mechanical Engineer
IBERAFRICA POWER (EA) LTD, (gas Natural Fenosa Group)
Tel: (+254) 733 617 285
P.O. Box 32443-00600,
NAIROBI, KENYA
2. STRAALEN OKWIRI NAGILA
PROJECT ENGINEER
HALLS EQUATORIAL LTD
Tel: (+254) 724 787 513
Email: straalennagila@ymail.com
P.O. Box 30197-00100,
NAIROBI, KENYA
3. PETER MUIA
SERVICE ENGINEER
GAMMA DELTA EAST AFRICA LTD
TEL: (+254) 724 443 729
Email: muia_7@yahoo.com
P.O. Box 14739 – 00800,
NAIROBI, KENYA

Curriculum Vitae - Antony Buenrostro

  • 1.
    CURRICULUM VITAE PERSONAL DETAILS NAME: Buenrostro Karanja Antony YEAR OF BIRTH : 15th March, 1986 NATIONALITY : Kenyan ID CARD NO : 25198554 GENDER : Male MARITAL STATUS : Single RELIGION : Christian LANGUAGE : English / Kiswahili PROFESSION : Mechanical Engineer ADDRESS NO : 18920 – 00500 G.P.O, Nairobi PHONE NO : +254 722 486 967 / +254 733 486 967 EMAIL : bwenty361@gmail.com / bwenty361@yahoo.com PERSONAL PROFILE To be a hardworking, self-motivated and innovative with sound analytical and problem solving skills and results oriented person with an attitude for self-driven and good organization to work under all kind of conditions with minimal supervision. CAREER OBJECTIVE To be an outstanding Mechanical Engineer who can strategize, execute and evaluate everyday challenges associate with engineering as well as with other disciplines. Be a rational thinking, resilient, self-principled and highly motivated upcoming manager ready to exploit my potential and abilities in the field of Engineering. To build an integrated career in a result oriented organisation that that will allow me to apply my Engineering skills to innovate and invent ways of making work easier and increasing production by fulfilling a business-critical role of utilizing my full potential and continuous professional development in engineering and technology, achieving the set goals.
  • 2.
    ACADEMIC QUALIFICATION 21st November,2006 – 7th December, 2012: UNIVERSITY OF NAIROBI Bsc. Mechanical and Manufacturing Engineering, Second class (lower) MAJOR AREAS OF STUDY  Thermodynamics and Heat Transfer  Mechanics of Machines  Mechanical Engineering Designs  Solid and Structural Mechanics  Fluid Mechanics  Engineering Materials Science  Engineering drawing  Industrial management 24th May, 2012: CERTIFICATE IN COMPUTER AIDED DESIGN/ MANUFACTURE {AUTOCAD} ZETECH COLLEGE 16th September, 2009: CERTIFICATE IN BUSINESS MANAGEMENT THE KENYA ISNTITUTE OF MANAGEMENT (KIMs) 2002 to 2005: KENYA CERTIFICATE OF SECONDARY SCHOOL EDUCATION {KCSE} CHEMILIL SUGAR ACADEMY Grade: B (plain) 1998 to 2001: KENYA CERTIFICATE OF PRIMARY SCHOOL EDUCATION {KCPE} ST. GEORGE MUTHAITI ACADEMY Grade: 399 marks out of 500 marks.
  • 3.
    PROFESSIONAL CERTIFICATION Bachelor degreein Bsc. Mechanical and Manufacturing Engineering - University of Nairobi Computer Aided Design/Computer Aided Manufacture (AutoCAD) - Zetech College Certificate in Business Management - Kenya Institute of Management {KIMS} Microsoft Computer packages in ms office. Have over 5 years valid driving license with a good experience with Kenyan roads and more so with the Nairobi central business road network and its neighbours. EXPERIENCE RECORD May, 2014 – to date: GAMMA DELTA EASTERN AFRICA LTD SERVICE ENGINEER Specific Duties/Responsibilities  Appointment/Nomination/Interview for projects, receipt of project briefs from project managers/architects, receipt of project drawings in project initiation.  Involved in project planning, designing and the tender process.  Preparation and sending out tender award letter sand holding the handover meeting in the construction handover and initiation.  Engaged in the project construction process and supervision.  Preparation for the project closure process, handover, defects liability and archiving. Projects  I&M Bank – Thika, Kitale, Yaya Centre branch and I&M Tower, 12th Floor and 13th Floor.  Tealand Properties, Apartments Kericho.  Kiambu Shopping Mall.  SRK Properties, apartments Nairobi. February, 2014 – May, 2014: HALL EQUATORIAL LTD PROJECT ENGINEER Specific Duties/Responsibilities  Design of Mechanical Ventilation (HVAC) Systems.  Preparation of Mechanical ventilation and air conditioning service technical drawings.
  • 4.
     Preparation ofBills of Quantities for Projects.  Costing of projects and participating in the tendering process as well as negotiating for the best prices with clients.  Supervision of fabrication, installation and maintenance as well as providing technical advice to the technical teams in areas that are challenging.  Schedule for routine maintenance of the HVAC equipment for Hotels, Banks, Hospitals and domestic housing. Projects  Radisson blue hotel, Upper hills, Nairobi.  M P Shah Hospital, Parklands, Nairobi.  University of Nairobi, Kisumu campus. DECEMBER, 2012 – FEBRUARY, 2014: JK TRANSPORTER LTD LOGISTIC MANAGER Specific Duties/Responsibilities  Supervision on all trucks to enable timely delivery of goods and in the best condition.  Introduced personnel trainee on advance driving.  Worksheet to monitor fuel, cargo, truck repair and maintaining.  Random truck checks. IBERAFRICA LTD INDUSTRIAL ATTACHMENT Specific Duties/Responsibilities  Preventive maintenance  Programmed maintenance  Corrective maintenance AMBITION To work under a registered engineer and become a competent registered mechanical and manufacturing engineer To further my management skills by joining a management school and major in project management at postgraduate level and also master in Msc. Mechanical and manufacturing Engineering. To attain optimal contribution to the society and pursue much within my area of jurisdiction for improvement therein in my career doing my best at all times for the benefit of all the parties involved.
  • 5.
    HOBBIES Martial art andgym Watching sports especially football Listening to music and swimming REFEREES 1. DICK OMONDI NDIEWO R. Engineer (KERB) Mechanical Engineer IBERAFRICA POWER (EA) LTD, (gas Natural Fenosa Group) Tel: (+254) 733 617 285 P.O. Box 32443-00600, NAIROBI, KENYA 2. STRAALEN OKWIRI NAGILA PROJECT ENGINEER HALLS EQUATORIAL LTD Tel: (+254) 724 787 513 Email: straalennagila@ymail.com P.O. Box 30197-00100, NAIROBI, KENYA 3. PETER MUIA SERVICE ENGINEER GAMMA DELTA EAST AFRICA LTD TEL: (+254) 724 443 729 Email: muia_7@yahoo.com P.O. Box 14739 – 00800, NAIROBI, KENYA