SlideShare a Scribd company logo
1 of 8
Download to read offline
1 | P a g e
CURRICULUM VITAE
Address : Perum Nusa Indah Blok D-4 No.3
Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam
HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com
Full Name : Irwan Syaputra, Amd
Place and Date of Birth : Medan, May 08th 1985
Sex : Male
Religion : Moslem
Status : Married
Height / Weight : 170 cm / 50 Kg
Graduated : Polytechnic of North Sumatera
Major : Electrical
IPK : 3.04
Nationality : Indonesian
Address : Perum Nusa Indah Blok D-4
No.3 Tnj Piayu Batam
Mobile Phone : +6285360400292
1992 - 1998: State Elementary School No. 064958 Medan
1998 - 2001: State Junior High School No.6 Medan
2001 - 2004: State Senior High School No.8 Medan
2005 - 2008: Polytechnic of Nort Sumatra, Eletric major
Concentration of Instrument and Controlling
 2016 till now
PT. Exabb Energy Nusantara with project Electrical and Contracting at
Ship Repair and Service As Site Supervisor Electrical and Instrument.
Job responsibilities as followed:
~ To ensure making schedules are meet plan owner and client.
~ assigning work and training employees.
~ Given more motivate electricians to increase their productivity and meet
work goals.
~ To ensure the proper maintenance of equipment, compliance with
electrical codes and adherence to safety regulations.
~ I has assist with electrical system installation, troubleshooting and repair
as needed.
~ Modify electrical systems and circuits if necessary.
~ as well as contributing to improved designs and manufacturing processes
are other common job functions.
~ In addition have administrative duties such as purchase supplies, ensure
adequate inventory, plan budgets, prioritize purchases, prepare cost estimates
and document their purchases.
Personal Details
Working
Experience
Education
Background
2 | P a g e
CURRICULUM VITAE
Address : Perum Nusa Indah Blok D-4 No.3
Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam
HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com
~I am also keep records of electrical operations, payrolls and timesheets.
Some electrical supervisors play a role in hiring, firing and evaluating
employees.
 2015 till 2016
PT. TPE Indonesia with name project is Yamal at Subcon PT SMOE
Indonesia as QC Electrical and Instrument.
Job responsibilities as followed :
~Performing and to do mechanical completion and pre-commissioning and
prepare to report the result activity as document Inspection project.
~Make sure and created Inspection Test Report and giving offering advice if any
abnormality and wrongly while build project with referring specification and
procedure project.
~Ensure and checking material specification and selection are met requirement
standard project.
~Ensure Electrical, Instrument, equipment are properly function during Testing
process.
~Scheduling and coordination with supervision should be tight deadline .
~Ensuring calibration instrument and electrical are calibrated certificate and have
while pre-commissioning and commissioning.
~Inspection processing Pulling cable, Dressing, Tagging process for power
cable, Control Cable, and Signal cable.
~Supporting Installation Cable Ladder routing and Sub cable way, bracket
panel, and Support for electrical equipment multiple.
~Supporting termination work such as cable glanding, connection, and tagging
process.
~Good knowledge Electrical Equipment such as Generator, Main Switch Board,
Distribution Board, Junction Box, Lighting, Switching, socket, Smock detector,
Starter panel, Control Panel, Motor pump, Blower, Frequency Driver and ETC.
~Have capabilities to used Multi Tester, Insulation Tester, Ampere Meter, Local
Area Network Tester and Phasa Tester.
~Good knowledge pre commissioning, Testing, and Commissioning process
such as Continuity Test (Looping check), Insulation Test, Starter Panel Control
Test, and Generator Load Test.
~Capability to reading Single Line Diagram, circuit electric installation, Wiring
Diagram MCB, DB, Control Starter Panel, Generator, Motor and Transformer,
Cable Ladder Routing and layout electrical equipment.
 2013 till 2015
PT. Ciba Vision Responsible position as Jr Engineer of Water
Treatment Plant System at Facility Department.
Job responsibilities as followed:
~Support production to getting yield target with maintain and supply distribution
3 | P a g e
CURRICULUM VITAE
Address : Perum Nusa Indah Blok D-4 No.3
Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam
HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com
USP (US pharmacopeia) water, UPW (ultra purified water), Saline with H2O2,
Saline with Copolymer, Saline Hydration and Saline Packaging system process.
~Ensure Facilities and water system utilities and other related function are
available and it are compliance state.
~Inspection and monitoring report to control pipes line distribution, Tanks
storage, UV Sterilize, UV chlorination and UV Ozone destruction, Control
Valves, Manual Valves, Pressure safety Valves, Pressure Indicator Transmitter,
Sensor Level Transmitter, Flow control Transmitter, Equipment, panel Control
PLC, Pumps Distribution, HMI display control, Vessel membrane ETC.
~Ensure timely Preventive Maintenance, Repair, Troubleshoot, Analyze and
calibration instrument, equipment and machine process.
~Perform to validation annual are implemented such as Installation
Qualification, Operational Qualification, Performance Qualification, pre-
commissioning, and Commissioning procedure.
~Make sure Safety and Maintenance Control procedure are performed
accordingly.
~Perform to establish corrective action and preventive action for analyzing,
investigating and identifies possible the root causes of the problem and even
trouble happening with used Fishbone Analysis (Machine, Method, Material,
Man, Environment and Process) and Five Why Analysis.
~Ensure spare part consumption are available during PM and repair with control
registration part and request for quotation ordering part.
~Perform to repair, analysis, trouble shooting and handling machine such as
Pump, Valve, Solenoid, Compressor Air, Ciller Supply and Boiler Machine,
HMI(Display Touch Screen Indicator) control, PLC Siemens and Allen Bradley,
sensor and mechanism machine process with referenced standard operating
procedure (SOP) and Quality requirement.
~Ensure chemicals consumption (Hydrogen Peroxide, Sodium Hypo-chloride,
Sodium Hydrochloride, Hydrochloride Acid, Sodium Chloride, Copolymer,
Sodium Borate, Boride Acid, Di Basic and Mono Basic ) are using with
appropriate and has follow instruction as MSDS requirement.
~Conduct to key performance index with referred to getting better target than
previously.
~Monitor and update machine performance report as Overall Equipment
Effectiveness.
~Ensure and Comply to implemented are relevant ISO 9001 (Quality product
standard) and ISO 14001 (Environment management standard)
~Conduct to on the job training for new hires and retraining as and when deemed
necessary.
 2012 till 2013
PT.EPSON Responsible position as Electrical Maintenance of IK-
Department.
Job responsibilities as followed:
~Support production in line for remodeling, new model introduction and
rework procedure.
4 | P a g e
CURRICULUM VITAE
Address : Perum Nusa Indah Blok D-4 No.3
Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam
HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com
~Monitoring and update performance record with reduce down time during
production processed.
~Repair, Analyze and Troubleshooting problem and defect product and
machine level.
~Analyze, modification and improvement PLC program as error alert while
instrument, Equipment, and mechanism machine performing.
~Conduct to Kaizen improvement as high increase machine efficiency and
effectiveness.
~Support to Engineering to test analysis failure production process and
product while running processed.
~Comply to implement all related quality requirement ISO 9001.
 2010 till 2012
PT Panasonic Electronic Device Responsible Position as Electrical
Maintenance of Production Engineering.
Job responsibilities as followed:
~Support production in line process with start flow from Blasting M/C,
Stacking Element, Bending and Cutting , Welding, Molding, Curing,
Inspection and Sealing product.
~Monitoring and update performance record with reduce down time during
production processed.
~Repair, Analyze and Troubleshooting problem and defect product and
machine level.
~Alignment and Adjustment CAM Follower positioning , chuck, Die cutting
and mechanism machine.
~Conduct to improvement as high increase machine efficiency and
effectiveness.
~Support to Engineering to test analysis failure production process and
product while running processed.
~Repair and Troubleshooting Equipment testing, sensor, solenoid, power
supply, Laser body marking, electric control.
~Comply to implement all related quality requirement ISO 9001.
 2008 till 2010
PT.ADD-PLUS Technologies Indonesia as Electrical Technician
At Engineering Department – Kenwood Division.
Job Responsibilities as followed:
~Support production in Line setup for model change, new model introduction
and rework procedure.
~Detect, Indentify and Troubleshoot defect and problem at Process, Product,
Equipments, and Machine level.
5 | P a g e
CURRICULUM VITAE
Address : Perum Nusa Indah Blok D-4 No.3
Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam
HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com
~Repair defects and establish effective corrective and preventive actions.
~Monitor and improve equipment, instrument, and machine performance.
~Conduct preventive maintenance and technical audits.
~Maintain and perform housekeeping practices.
~Promote safety and good working environment.
~Conduct on the job training for new hires and retraining as and when deemed
necessary.
~Comply to and implement all relevant ISO 9001 requirement and standards.
 2005 till 2007
Teacher course private for elementary and junior high student.
 2005
Test of English for International Communication of Polytechnic Nort
Sumatra.
 2003-2004
Computer Course at INTel Com (Information Technolagies Computer)
Medan.
 1999-2000
English Course at Grand Student English medan.
 2007
Installation LAN and Web Design Workshop of Electronic stars
Generation.
 2013
Electrical and Instrument Inspector at Offshore Technology Institute.
 2005
Participant on recognition activity and matriculate stock purchasing at
Polytechnic of North Sumatra
 2006
Activity committee programs islamic stock purchasing Polytechnic of Nort
Sumatra
 2007
Education seminar student committee Polytechnic of Nort Sumatra
 2007
Education
Informal
Training and
Committee
6 | P a g e
CURRICULUM VITAE
Address : Perum Nusa Indah Blok D-4 No.3
Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam
HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com
social faith and blood donor for help talasemia’s patient as executor chairman
 2009
RMNI(remaja mesjid nurul iman) Leadership training one Bintan's industrial
park
 young woman juvenile gathering islamic as Common secretary periode 2005-2006
 Electronic Moslem Communitty (EMC) as Common Secretary Polytechnic of
Nort Sumatra Periode 2006-2007
 Member of activity unit moslem studet(UKMI) Polytechnic of Nort Sumatra
Period of 2006-2007
 Social department chairman and prosperous of college student executive (BEM)
Polytechnic of Nort Sumatra at year 2006-2007
 Installing the Application Program and Operating System Microsoft Windows
 Able to operate Internet (e-mail, browsing, chat and download)
 Able to operate Eagle Application Program for Scematic Work Band and
Disign Electronic Divice circuit
 I have capability to operate Digital Equipment (Signal Generator, Modulation
Analyzer, Audio Analyzer, Frequency Counter, Spectrum Analyzer,
Multifunction Tester)
 Able to operate MATLAB Program to control and synchronize interface device
 Able to use, troubleshoot, modification and operate the PLC (Programmable
Logic Control)
Keyence, Mitsubishi, Allen Bready, Omron and Siemens Application
 Language English written and spoken
 Set up RB (Robo) 6 Axis
 Repair defect and troubleshoot defect and problems at process, product,
equipment and machine level
 Conduct preventive maintenance and technical plan scheduling
 Fluid control pneumatic
 Good knowledge of Instrument and Equipment as Pump Motor, Pressure, Flow,
Valve, Piping and leveling system
 Installation cable (wiring)
 Set up, Installation and remodeling new machines, Instruments and Equipments
 Modification and Improvement Electrical and control system
 Good knowledge I/O termination electrical panel
 Good Leadership and manage to subordinate structure
 Good Knowledge Cable Gland and Junction Box
Organization
Experience
Capabilities
Qualification
7 | P a g e
CURRICULUM VITAE
Address : Perum Nusa Indah Blok D-4 No.3
Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam
HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com
 Able to Read and understood of Electrical Schematic Diagram
 Knowledge of the Standard Project and Specification
 Knowledge of the Electrical Safety and Inspection process
 Knowledge of the Installation and Commissioning process
 Water Treatment System Onshore Project Batam since 2012-2013
This system to build by Veolia base on requirement specification project with
description as followed:
1.Water Incoming goes to Tank Storage as City Water
2.Dist Filter process with product specification count particle < 25
3.Softener System to produce soft water and Hardness has specification < 1.5
ppm (part per million)
4.Uflex Filtration system to getting silt density index < 2
5.UF product storage to Filtered Tank with conductivity value < 200 uS/Cm
With UV Chlorination to reduce chlorine residue
6.Orion II 8000 system are consist of RO (Reverse Osmosis) system, CDI
(Deionizer) system, UV sterilize and Final Filter 0.2 micron.
7.USP water system is product from DI goes to storage tank and make process
treatment with UV Ozone destruction, Final filter 0.2 micron and Mixed Bed
to maintain conductivity value < 1.5 uS/Cm.
8.Electrical and Instrument have controlling used PLC Siemens and HMI
display to monitor and control sequence process.
9.Validation Execution document such as IQP (Installation Qualification),
OQP (Operational Qualification) and PQP (Performance Qualification).
 HAV 3P and Nasuno project since 2011-2012
This system establish to produce Ink Cartridge Epson product with
description responsible as followed:
1.Setup I/O Bus Keyence application as KV 5500 main board processor unit,
Power unit KV-U7,KV-B16X, KV-C32X,KV-B16RC and ect.
2.Setup Instrument such as weighing scale, pressure regulator, Hephafilter,
HMI, Checker device, sensor CKD, Cylinder and Solenoid.
3.Setup and Install tubing pressure and re-winding process
4.Setup and install electrical panel such as power supply, CB and MCB,
Relay, Contactor circuit and termination process.
5.Wiring and Tagging process
6.Install Cable Gland and Tray cable
7. Test and Commissioning function process
Overhaul and Improvement Stacking Machine from type three to four
Since 2011
Project
Involvement
8 | P a g e
CURRICULUM VITAE
Address : Perum Nusa Indah Blok D-4 No.3
Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam
HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com
This project to increment and develop machine process from three step to four
step with added chuck and stacking machine, description responsible as
followed:
1.Setup and install chuck alignment machine
2.Added Input and Output control analog to PLC Omron
3.Install Wiring and Air Tubing pressure
4.Test and commissioning to make sure functional each part after installation
process has finish.
New product Introduction with Handy Talky Communication
Since 2009
This project as Excellence product at Kenwood company within competitor
communication application who constitute required market with description
responsible as followed:
1.Setup and install instrument to measure value such as Audio Analyzer.
Spectrum Analyzer, Oscilloscope, Frequency Analyzer, Modulation analyzer,
Power Supply and Aeroflex Analyzer
2.Calibration power setting and make sure value still within specification
3.Analyze, troubleshoot and solving problem device and instrument process
4.Reporting and to presentation result of this project
5.Reevalution and commissioning project installation during process passage
this project
6.Install application software visual basic to measurement device and product
7.To perform Functional test and rectify electrical and instrument process
Here with my qualification skill, experience and best performance. I want
taking apart to growth up and to more benefit your company’s
Thus these CV’s list I created with the truth. Thanks for your attention .
Kind Regards
Irwan Syaputra, Amd

More Related Content

What's hot (20)

CV. dedy
CV. dedyCV. dedy
CV. dedy
 
carlo_resume
carlo_resumecarlo_resume
carlo_resume
 
new updated RESUME
new updated RESUME new updated RESUME
new updated RESUME
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year Exp
 
new jun resume1
new jun resume1new jun resume1
new jun resume1
 
Dw cv
Dw cvDw cv
Dw cv
 
Muthuselvan Bio
Muthuselvan BioMuthuselvan Bio
Muthuselvan Bio
 
Up-to-Date Leonel resume
Up-to-Date Leonel resumeUp-to-Date Leonel resume
Up-to-Date Leonel resume
 
Resume 25.09.15
Resume 25.09.15Resume 25.09.15
Resume 25.09.15
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
PQC & Testing
PQC & TestingPQC & Testing
PQC & Testing
 
Ogbonnaya Okoro CV
Ogbonnaya Okoro  CVOgbonnaya Okoro  CV
Ogbonnaya Okoro CV
 
RESUME zulkhairul intrument
RESUME zulkhairul intrumentRESUME zulkhairul intrument
RESUME zulkhairul intrument
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance Technician
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 
ElectricalInstrumentation Engineer
ElectricalInstrumentation EngineerElectricalInstrumentation Engineer
ElectricalInstrumentation Engineer
 
MATUSALEM pdf
MATUSALEM pdfMATUSALEM pdf
MATUSALEM pdf
 
My Resume
My Resume My Resume
My Resume
 
engineer asif resume
engineer asif resumeengineer asif resume
engineer asif resume
 

Viewers also liked

CURRICULUM VITAE- Saut Hutapea
CURRICULUM VITAE- Saut HutapeaCURRICULUM VITAE- Saut Hutapea
CURRICULUM VITAE- Saut HutapeaSAUT HUTAPEA
 
20,000 leagues under the sea through postcards
20,000 leagues under the sea through postcards20,000 leagues under the sea through postcards
20,000 leagues under the sea through postcardsbleahey214
 
Убийство музы, или как творить без вдохновения
Убийство музы, или как творить без вдохновенияУбийство музы, или как творить без вдохновения
Убийство музы, или как творить без вдохновенияРуслан Гильманов
 
Audioboom brian leahey
Audioboom brian leaheyAudioboom brian leahey
Audioboom brian leaheybleahey214
 
Tăng huyết áp “kẻ giết người số một”
Tăng huyết áp “kẻ giết người số một”Tăng huyết áp “kẻ giết người số một”
Tăng huyết áp “kẻ giết người số một”dewayne660
 
SGB_Impact-Report_2015_digit
SGB_Impact-Report_2015_digitSGB_Impact-Report_2015_digit
SGB_Impact-Report_2015_digitDavid Zhou
 
Poultry feed ingredients
Poultry feed ingredientsPoultry feed ingredients
Poultry feed ingredientsmubashar iqbal
 
garyrossC.V(1)(1)
garyrossC.V(1)(1)garyrossC.V(1)(1)
garyrossC.V(1)(1)gary ross
 
Poultry feed ingredients
Poultry feed ingredientsPoultry feed ingredients
Poultry feed ingredientsmubashar iqbal
 
Becoming_a_Fearless_Reader
Becoming_a_Fearless_ReaderBecoming_a_Fearless_Reader
Becoming_a_Fearless_ReaderJennifer Jackson
 
CURRICULUM VITAE engels
CURRICULUM VITAE engelsCURRICULUM VITAE engels
CURRICULUM VITAE engelsNynke Hartman
 

Viewers also liked (12)

CURRICULUM VITAE- Saut Hutapea
CURRICULUM VITAE- Saut HutapeaCURRICULUM VITAE- Saut Hutapea
CURRICULUM VITAE- Saut Hutapea
 
20,000 leagues under the sea through postcards
20,000 leagues under the sea through postcards20,000 leagues under the sea through postcards
20,000 leagues under the sea through postcards
 
Убийство музы, или как творить без вдохновения
Убийство музы, или как творить без вдохновенияУбийство музы, или как творить без вдохновения
Убийство музы, или как творить без вдохновения
 
Audioboom brian leahey
Audioboom brian leaheyAudioboom brian leahey
Audioboom brian leahey
 
Tăng huyết áp “kẻ giết người số một”
Tăng huyết áp “kẻ giết người số một”Tăng huyết áp “kẻ giết người số một”
Tăng huyết áp “kẻ giết người số một”
 
SGB_Impact-Report_2015_digit
SGB_Impact-Report_2015_digitSGB_Impact-Report_2015_digit
SGB_Impact-Report_2015_digit
 
Poultry feed ingredients
Poultry feed ingredientsPoultry feed ingredients
Poultry feed ingredients
 
Guide paraguay
Guide paraguayGuide paraguay
Guide paraguay
 
garyrossC.V(1)(1)
garyrossC.V(1)(1)garyrossC.V(1)(1)
garyrossC.V(1)(1)
 
Poultry feed ingredients
Poultry feed ingredientsPoultry feed ingredients
Poultry feed ingredients
 
Becoming_a_Fearless_Reader
Becoming_a_Fearless_ReaderBecoming_a_Fearless_Reader
Becoming_a_Fearless_Reader
 
CURRICULUM VITAE engels
CURRICULUM VITAE engelsCURRICULUM VITAE engels
CURRICULUM VITAE engels
 

Similar to Curriculum Vitae 3

Similar to Curriculum Vitae 3 (20)

Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Erry Sudewo's CV
Erry Sudewo's CVErry Sudewo's CV
Erry Sudewo's CV
 
FILTHER RIEOALEX
FILTHER RIEOALEXFILTHER RIEOALEX
FILTHER RIEOALEX
 
RESUME for Data Center Facility Maintenance
RESUME for Data Center Facility MaintenanceRESUME for Data Center Facility Maintenance
RESUME for Data Center Facility Maintenance
 
CV Sudarmaji
CV Sudarmaji CV Sudarmaji
CV Sudarmaji
 
Resume_Altaf
Resume_AltafResume_Altaf
Resume_Altaf
 
salvador file pdf
salvador file pdfsalvador file pdf
salvador file pdf
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Jose_resume 1
 
muru_resume_Oct 2016
muru_resume_Oct 2016muru_resume_Oct 2016
muru_resume_Oct 2016
 
muru_resume_Oct 2016
muru_resume_Oct 2016muru_resume_Oct 2016
muru_resume_Oct 2016
 
Facility management in Electircal in shopping mall and high rise buildings
Facility management in Electircal in shopping mall and high rise buildingsFacility management in Electircal in shopping mall and high rise buildings
Facility management in Electircal in shopping mall and high rise buildings
 
E&I QAQC Rajakumar Velayuthan
E&I QAQC  Rajakumar VelayuthanE&I QAQC  Rajakumar Velayuthan
E&I QAQC Rajakumar Velayuthan
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
Shyamnath updated Resume
Shyamnath updated ResumeShyamnath updated Resume
Shyamnath updated Resume
 
Bangun CV
Bangun CVBangun CV
Bangun CV
 
Mochamad Kholik - CV
Mochamad Kholik - CVMochamad Kholik - CV
Mochamad Kholik - CV
 
Resume GM (2)
Resume GM (2)Resume GM (2)
Resume GM (2)
 
English lanuange resume
English lanuange resumeEnglish lanuange resume
English lanuange resume
 
Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)
 

Curriculum Vitae 3

  • 1. 1 | P a g e CURRICULUM VITAE Address : Perum Nusa Indah Blok D-4 No.3 Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com Full Name : Irwan Syaputra, Amd Place and Date of Birth : Medan, May 08th 1985 Sex : Male Religion : Moslem Status : Married Height / Weight : 170 cm / 50 Kg Graduated : Polytechnic of North Sumatera Major : Electrical IPK : 3.04 Nationality : Indonesian Address : Perum Nusa Indah Blok D-4 No.3 Tnj Piayu Batam Mobile Phone : +6285360400292 1992 - 1998: State Elementary School No. 064958 Medan 1998 - 2001: State Junior High School No.6 Medan 2001 - 2004: State Senior High School No.8 Medan 2005 - 2008: Polytechnic of Nort Sumatra, Eletric major Concentration of Instrument and Controlling  2016 till now PT. Exabb Energy Nusantara with project Electrical and Contracting at Ship Repair and Service As Site Supervisor Electrical and Instrument. Job responsibilities as followed: ~ To ensure making schedules are meet plan owner and client. ~ assigning work and training employees. ~ Given more motivate electricians to increase their productivity and meet work goals. ~ To ensure the proper maintenance of equipment, compliance with electrical codes and adherence to safety regulations. ~ I has assist with electrical system installation, troubleshooting and repair as needed. ~ Modify electrical systems and circuits if necessary. ~ as well as contributing to improved designs and manufacturing processes are other common job functions. ~ In addition have administrative duties such as purchase supplies, ensure adequate inventory, plan budgets, prioritize purchases, prepare cost estimates and document their purchases. Personal Details Working Experience Education Background
  • 2. 2 | P a g e CURRICULUM VITAE Address : Perum Nusa Indah Blok D-4 No.3 Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com ~I am also keep records of electrical operations, payrolls and timesheets. Some electrical supervisors play a role in hiring, firing and evaluating employees.  2015 till 2016 PT. TPE Indonesia with name project is Yamal at Subcon PT SMOE Indonesia as QC Electrical and Instrument. Job responsibilities as followed : ~Performing and to do mechanical completion and pre-commissioning and prepare to report the result activity as document Inspection project. ~Make sure and created Inspection Test Report and giving offering advice if any abnormality and wrongly while build project with referring specification and procedure project. ~Ensure and checking material specification and selection are met requirement standard project. ~Ensure Electrical, Instrument, equipment are properly function during Testing process. ~Scheduling and coordination with supervision should be tight deadline . ~Ensuring calibration instrument and electrical are calibrated certificate and have while pre-commissioning and commissioning. ~Inspection processing Pulling cable, Dressing, Tagging process for power cable, Control Cable, and Signal cable. ~Supporting Installation Cable Ladder routing and Sub cable way, bracket panel, and Support for electrical equipment multiple. ~Supporting termination work such as cable glanding, connection, and tagging process. ~Good knowledge Electrical Equipment such as Generator, Main Switch Board, Distribution Board, Junction Box, Lighting, Switching, socket, Smock detector, Starter panel, Control Panel, Motor pump, Blower, Frequency Driver and ETC. ~Have capabilities to used Multi Tester, Insulation Tester, Ampere Meter, Local Area Network Tester and Phasa Tester. ~Good knowledge pre commissioning, Testing, and Commissioning process such as Continuity Test (Looping check), Insulation Test, Starter Panel Control Test, and Generator Load Test. ~Capability to reading Single Line Diagram, circuit electric installation, Wiring Diagram MCB, DB, Control Starter Panel, Generator, Motor and Transformer, Cable Ladder Routing and layout electrical equipment.  2013 till 2015 PT. Ciba Vision Responsible position as Jr Engineer of Water Treatment Plant System at Facility Department. Job responsibilities as followed: ~Support production to getting yield target with maintain and supply distribution
  • 3. 3 | P a g e CURRICULUM VITAE Address : Perum Nusa Indah Blok D-4 No.3 Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com USP (US pharmacopeia) water, UPW (ultra purified water), Saline with H2O2, Saline with Copolymer, Saline Hydration and Saline Packaging system process. ~Ensure Facilities and water system utilities and other related function are available and it are compliance state. ~Inspection and monitoring report to control pipes line distribution, Tanks storage, UV Sterilize, UV chlorination and UV Ozone destruction, Control Valves, Manual Valves, Pressure safety Valves, Pressure Indicator Transmitter, Sensor Level Transmitter, Flow control Transmitter, Equipment, panel Control PLC, Pumps Distribution, HMI display control, Vessel membrane ETC. ~Ensure timely Preventive Maintenance, Repair, Troubleshoot, Analyze and calibration instrument, equipment and machine process. ~Perform to validation annual are implemented such as Installation Qualification, Operational Qualification, Performance Qualification, pre- commissioning, and Commissioning procedure. ~Make sure Safety and Maintenance Control procedure are performed accordingly. ~Perform to establish corrective action and preventive action for analyzing, investigating and identifies possible the root causes of the problem and even trouble happening with used Fishbone Analysis (Machine, Method, Material, Man, Environment and Process) and Five Why Analysis. ~Ensure spare part consumption are available during PM and repair with control registration part and request for quotation ordering part. ~Perform to repair, analysis, trouble shooting and handling machine such as Pump, Valve, Solenoid, Compressor Air, Ciller Supply and Boiler Machine, HMI(Display Touch Screen Indicator) control, PLC Siemens and Allen Bradley, sensor and mechanism machine process with referenced standard operating procedure (SOP) and Quality requirement. ~Ensure chemicals consumption (Hydrogen Peroxide, Sodium Hypo-chloride, Sodium Hydrochloride, Hydrochloride Acid, Sodium Chloride, Copolymer, Sodium Borate, Boride Acid, Di Basic and Mono Basic ) are using with appropriate and has follow instruction as MSDS requirement. ~Conduct to key performance index with referred to getting better target than previously. ~Monitor and update machine performance report as Overall Equipment Effectiveness. ~Ensure and Comply to implemented are relevant ISO 9001 (Quality product standard) and ISO 14001 (Environment management standard) ~Conduct to on the job training for new hires and retraining as and when deemed necessary.  2012 till 2013 PT.EPSON Responsible position as Electrical Maintenance of IK- Department. Job responsibilities as followed: ~Support production in line for remodeling, new model introduction and rework procedure.
  • 4. 4 | P a g e CURRICULUM VITAE Address : Perum Nusa Indah Blok D-4 No.3 Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com ~Monitoring and update performance record with reduce down time during production processed. ~Repair, Analyze and Troubleshooting problem and defect product and machine level. ~Analyze, modification and improvement PLC program as error alert while instrument, Equipment, and mechanism machine performing. ~Conduct to Kaizen improvement as high increase machine efficiency and effectiveness. ~Support to Engineering to test analysis failure production process and product while running processed. ~Comply to implement all related quality requirement ISO 9001.  2010 till 2012 PT Panasonic Electronic Device Responsible Position as Electrical Maintenance of Production Engineering. Job responsibilities as followed: ~Support production in line process with start flow from Blasting M/C, Stacking Element, Bending and Cutting , Welding, Molding, Curing, Inspection and Sealing product. ~Monitoring and update performance record with reduce down time during production processed. ~Repair, Analyze and Troubleshooting problem and defect product and machine level. ~Alignment and Adjustment CAM Follower positioning , chuck, Die cutting and mechanism machine. ~Conduct to improvement as high increase machine efficiency and effectiveness. ~Support to Engineering to test analysis failure production process and product while running processed. ~Repair and Troubleshooting Equipment testing, sensor, solenoid, power supply, Laser body marking, electric control. ~Comply to implement all related quality requirement ISO 9001.  2008 till 2010 PT.ADD-PLUS Technologies Indonesia as Electrical Technician At Engineering Department – Kenwood Division. Job Responsibilities as followed: ~Support production in Line setup for model change, new model introduction and rework procedure. ~Detect, Indentify and Troubleshoot defect and problem at Process, Product, Equipments, and Machine level.
  • 5. 5 | P a g e CURRICULUM VITAE Address : Perum Nusa Indah Blok D-4 No.3 Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com ~Repair defects and establish effective corrective and preventive actions. ~Monitor and improve equipment, instrument, and machine performance. ~Conduct preventive maintenance and technical audits. ~Maintain and perform housekeeping practices. ~Promote safety and good working environment. ~Conduct on the job training for new hires and retraining as and when deemed necessary. ~Comply to and implement all relevant ISO 9001 requirement and standards.  2005 till 2007 Teacher course private for elementary and junior high student.  2005 Test of English for International Communication of Polytechnic Nort Sumatra.  2003-2004 Computer Course at INTel Com (Information Technolagies Computer) Medan.  1999-2000 English Course at Grand Student English medan.  2007 Installation LAN and Web Design Workshop of Electronic stars Generation.  2013 Electrical and Instrument Inspector at Offshore Technology Institute.  2005 Participant on recognition activity and matriculate stock purchasing at Polytechnic of North Sumatra  2006 Activity committee programs islamic stock purchasing Polytechnic of Nort Sumatra  2007 Education seminar student committee Polytechnic of Nort Sumatra  2007 Education Informal Training and Committee
  • 6. 6 | P a g e CURRICULUM VITAE Address : Perum Nusa Indah Blok D-4 No.3 Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com social faith and blood donor for help talasemia’s patient as executor chairman  2009 RMNI(remaja mesjid nurul iman) Leadership training one Bintan's industrial park  young woman juvenile gathering islamic as Common secretary periode 2005-2006  Electronic Moslem Communitty (EMC) as Common Secretary Polytechnic of Nort Sumatra Periode 2006-2007  Member of activity unit moslem studet(UKMI) Polytechnic of Nort Sumatra Period of 2006-2007  Social department chairman and prosperous of college student executive (BEM) Polytechnic of Nort Sumatra at year 2006-2007  Installing the Application Program and Operating System Microsoft Windows  Able to operate Internet (e-mail, browsing, chat and download)  Able to operate Eagle Application Program for Scematic Work Band and Disign Electronic Divice circuit  I have capability to operate Digital Equipment (Signal Generator, Modulation Analyzer, Audio Analyzer, Frequency Counter, Spectrum Analyzer, Multifunction Tester)  Able to operate MATLAB Program to control and synchronize interface device  Able to use, troubleshoot, modification and operate the PLC (Programmable Logic Control) Keyence, Mitsubishi, Allen Bready, Omron and Siemens Application  Language English written and spoken  Set up RB (Robo) 6 Axis  Repair defect and troubleshoot defect and problems at process, product, equipment and machine level  Conduct preventive maintenance and technical plan scheduling  Fluid control pneumatic  Good knowledge of Instrument and Equipment as Pump Motor, Pressure, Flow, Valve, Piping and leveling system  Installation cable (wiring)  Set up, Installation and remodeling new machines, Instruments and Equipments  Modification and Improvement Electrical and control system  Good knowledge I/O termination electrical panel  Good Leadership and manage to subordinate structure  Good Knowledge Cable Gland and Junction Box Organization Experience Capabilities Qualification
  • 7. 7 | P a g e CURRICULUM VITAE Address : Perum Nusa Indah Blok D-4 No.3 Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com  Able to Read and understood of Electrical Schematic Diagram  Knowledge of the Standard Project and Specification  Knowledge of the Electrical Safety and Inspection process  Knowledge of the Installation and Commissioning process  Water Treatment System Onshore Project Batam since 2012-2013 This system to build by Veolia base on requirement specification project with description as followed: 1.Water Incoming goes to Tank Storage as City Water 2.Dist Filter process with product specification count particle < 25 3.Softener System to produce soft water and Hardness has specification < 1.5 ppm (part per million) 4.Uflex Filtration system to getting silt density index < 2 5.UF product storage to Filtered Tank with conductivity value < 200 uS/Cm With UV Chlorination to reduce chlorine residue 6.Orion II 8000 system are consist of RO (Reverse Osmosis) system, CDI (Deionizer) system, UV sterilize and Final Filter 0.2 micron. 7.USP water system is product from DI goes to storage tank and make process treatment with UV Ozone destruction, Final filter 0.2 micron and Mixed Bed to maintain conductivity value < 1.5 uS/Cm. 8.Electrical and Instrument have controlling used PLC Siemens and HMI display to monitor and control sequence process. 9.Validation Execution document such as IQP (Installation Qualification), OQP (Operational Qualification) and PQP (Performance Qualification).  HAV 3P and Nasuno project since 2011-2012 This system establish to produce Ink Cartridge Epson product with description responsible as followed: 1.Setup I/O Bus Keyence application as KV 5500 main board processor unit, Power unit KV-U7,KV-B16X, KV-C32X,KV-B16RC and ect. 2.Setup Instrument such as weighing scale, pressure regulator, Hephafilter, HMI, Checker device, sensor CKD, Cylinder and Solenoid. 3.Setup and Install tubing pressure and re-winding process 4.Setup and install electrical panel such as power supply, CB and MCB, Relay, Contactor circuit and termination process. 5.Wiring and Tagging process 6.Install Cable Gland and Tray cable 7. Test and Commissioning function process Overhaul and Improvement Stacking Machine from type three to four Since 2011 Project Involvement
  • 8. 8 | P a g e CURRICULUM VITAE Address : Perum Nusa Indah Blok D-4 No.3 Pos Code 29433 RW.22 Kel.Mangsang Kec.sei beduk Kota Batam HP. +6285360400292, e-mail : irwan.syaputra.el@gmail.com This project to increment and develop machine process from three step to four step with added chuck and stacking machine, description responsible as followed: 1.Setup and install chuck alignment machine 2.Added Input and Output control analog to PLC Omron 3.Install Wiring and Air Tubing pressure 4.Test and commissioning to make sure functional each part after installation process has finish. New product Introduction with Handy Talky Communication Since 2009 This project as Excellence product at Kenwood company within competitor communication application who constitute required market with description responsible as followed: 1.Setup and install instrument to measure value such as Audio Analyzer. Spectrum Analyzer, Oscilloscope, Frequency Analyzer, Modulation analyzer, Power Supply and Aeroflex Analyzer 2.Calibration power setting and make sure value still within specification 3.Analyze, troubleshoot and solving problem device and instrument process 4.Reporting and to presentation result of this project 5.Reevalution and commissioning project installation during process passage this project 6.Install application software visual basic to measurement device and product 7.To perform Functional test and rectify electrical and instrument process Here with my qualification skill, experience and best performance. I want taking apart to growth up and to more benefit your company’s Thus these CV’s list I created with the truth. Thanks for your attention . Kind Regards Irwan Syaputra, Amd