COST OVERRUN WITH
CASE STUDIES
Efforts by
Pushkar Lunkad AP17022
Vaishnavi Bharne AP17059
Reshma Reddy AP17042
Vibhali Wankar AP17054
Khushboo Patel AP17069
Aanchal Ramtekkar AP17075
What is Cost Overrun?
A cost overrun, also known as a cost
increase, underrated or budget overrun, involves
unexpected costs incurred in excess of budgeted amounts
due to an underestimation of the actual cost during
budgeting
General Information
• Client: MSRDC
• Contractor: HCC
• Commenced:2000
• Planned Completion: 2005
• Opened: 2010
• Delay: 5 Years
• Estimated cost: 371+255+22 =648 cr
• Final Cost: 1653.25 cr
• % Increased:155%
Bandra-Worli Sea Link
Causes of Cost Overrun
• Consultant for project and design management was ineffective.
• Technical changes bought up by new consultant- Rs 70 Cr.
• Changes in “Arch bridge” to “Cable stay”.
• Government commitment Rs 580 Cr but provided only Rs 100 Cr till June 2007.
• Rs 12.8 Cr they didn’t charged for stoppage of work.
• Issues related to rehabilitation
• Delay in environmental clearances
• Contract disputes and court cases
General Information
• Client: State of New South Wales
• Design By: Jorn Utzon
• Commenced:1959
• Planned Completion:1963
• Opened:1973
• Delay:10Years
• Estimated cost:AUS $7 million
• Final Cost: AUS $102 million
• % Increased:1400%
Opera House Sydney
Causes of Costoverun
• Designs were only partially completed.
• Methods to construct the proposed roof structure was not known
initially.
• No project manager was appointed resulting in lack of project
evaluation.
• New architect named Peter Hall was appointed in place of Jorn
Utzon resulting in changes in original design.
• Some sections of the opera house were even built then later demoli
-shed, re‐designed and built again.
General Information
• Client: The Secretary of State for Scotland until 31 May 1999. Thereafter
the project transferred to the Corporate Body
• Contractor: Bovis homes group
• Commenced: 1999
• Planned Completion: 2001
• Opened: 2004
• Delay: 3 Years
• Planned cost: £50m
• Final Cost: £414m
• % Increased cost: 730%
Scotish Parliament
Causes of Costoverun
• Communication problems with the involved project teams and
political intervention.
• Client requirement of additional usable area of 4000 sq.metres.
• Client changed from Scottish office to Scottish parliament
cooperate body.
• Both architects used to work from their own cities.
• High level design development.
General Information
• Client: BMRCL
• Contractor: ITD-Cem India (Phase-1)
• Commenced: 2005
• Planned Completion: 2010
• Opened: 18 June 2017
• Delay: 7 Years
• Planned cost: 5400 cr
• Final Cost: 11609 cr
• % Increased cost: 214.98
Namma Metro
Causes of Costoverun
• Lack of co-ordination between state agencies and metro authorities.
• Wrong estimation.
• Land acquisition .
• Delay in providing design.
• Escalation of cost of land.
• Escalation cost of material.
Conclusion
Stages Issues
Pre-planning • Delay in Regulatory Approvals
• Unavailability/delayed availability of funds
• Land/site handover
• Local and Social Issue
Planning and design • Ineffective Procurement Planning.
• Design/scope change.
• Delay in decision making.
Execution and monitoring • Weak/ineffective project planning &
monitoring
• Lack of Integration Management in Project
Planning
• Unavailability/delayed availability of funds
Closure and Handover • Contractual disputes
• Finishing Work.
References
• http://www.ptmfonline.com/doc/Newsletter/PTMF-E-
News_Letter_December_2011.pdf
• http://www.pmi.org.in/downloads/PMI_KPMG_2013.pdf
• https://en.wikipedia.org/wiki/Bandra–Worli_Sea_Link
• https://ocw.mit.edu/courses/civil-and-environmental-engineering/1-011-
project-evaluation-spring-2011/projects/MIT1_011S11_proj_ex01.pdf
• https://en.wikipedia.org/wiki/Scottish_Parliamen
• english.bmrc.co.in/
Thank You

More Related Content

Similar to cost overuns in construction industry

Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Management
grahamelanders
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
Rajabdeen Amjath
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
Sanjeewa Mahawedage
 
Steve fraser managing director fbe presentation
Steve fraser managing director fbe presentationSteve fraser managing director fbe presentation
Steve fraser managing director fbe presentation
FBE Manchester
 
Clean Water Facility Update
Clean Water Facility UpdateClean Water Facility Update
Clean Water Facility Update
Jackie Dagger
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings Program
University of Minnesota
 
Municipalization Overview
Municipalization OverviewMunicipalization Overview
Municipalization Overview
Emily Sandoval
 
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Granit Architects
 
8. Stakeholder Presentation.pptx
8. Stakeholder Presentation.pptx8. Stakeholder Presentation.pptx
8. Stakeholder Presentation.pptx
ssuser6e7da0
 
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
BuiltEnvironmentUBM
 
Dan brooks dowsett trident bc green prop tech lcbb 27 june 2017
Dan brooks dowsett trident bc green prop tech lcbb 27 june 2017Dan brooks dowsett trident bc green prop tech lcbb 27 june 2017
Dan brooks dowsett trident bc green prop tech lcbb 27 june 2017
Matt Tudge
 
Item # 7 - PPT WGI + Budget Amendment
Item # 7 - PPT WGI + Budget AmendmentItem # 7 - PPT WGI + Budget Amendment
Item # 7 - PPT WGI + Budget Amendment
ahcitycouncil
 
Lessons from RE:FIT - a public sector Energy Performance Contract Framework ...
Lessons from RE:FIT -  a public sector Energy Performance Contract Framework ...Lessons from RE:FIT -  a public sector Energy Performance Contract Framework ...
Lessons from RE:FIT - a public sector Energy Performance Contract Framework ...
EMEX
 
Random
RandomRandom
CBI Property Breakfast Seminar: Gordon McCreath
CBI Property Breakfast Seminar: Gordon McCreathCBI Property Breakfast Seminar: Gordon McCreath
CBI Property Breakfast Seminar: Gordon McCreath
Confederation of British Industry
 
CBI Property Breakfast Seminar - Gordon McCreath
CBI Property Breakfast Seminar - Gordon McCreathCBI Property Breakfast Seminar - Gordon McCreath
CBI Property Breakfast Seminar - Gordon McCreath
guestc888a5
 
Education Sponne
Education SponneEducation Sponne
Education Sponne
Terry Cattle
 
Cookham Wood Lean & Mean Jane Foulkes
Cookham Wood  Lean & Mean Jane FoulkesCookham Wood  Lean & Mean Jane Foulkes
Cookham Wood Lean & Mean Jane Foulkes
Association for Project Management
 
Akhil Resume 10.06.2015new
Akhil Resume 10.06.2015newAkhil Resume 10.06.2015new
Akhil Resume 10.06.2015new
AKHIL MISHRA
 
Manufacturing (food)
Manufacturing  (food)Manufacturing  (food)
Manufacturing (food)
AlastairJack83
 

Similar to cost overuns in construction industry (20)

Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Management
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
Steve fraser managing director fbe presentation
Steve fraser managing director fbe presentationSteve fraser managing director fbe presentation
Steve fraser managing director fbe presentation
 
Clean Water Facility Update
Clean Water Facility UpdateClean Water Facility Update
Clean Water Facility Update
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings Program
 
Municipalization Overview
Municipalization OverviewMunicipalization Overview
Municipalization Overview
 
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
 
8. Stakeholder Presentation.pptx
8. Stakeholder Presentation.pptx8. Stakeholder Presentation.pptx
8. Stakeholder Presentation.pptx
 
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
 
Dan brooks dowsett trident bc green prop tech lcbb 27 june 2017
Dan brooks dowsett trident bc green prop tech lcbb 27 june 2017Dan brooks dowsett trident bc green prop tech lcbb 27 june 2017
Dan brooks dowsett trident bc green prop tech lcbb 27 june 2017
 
Item # 7 - PPT WGI + Budget Amendment
Item # 7 - PPT WGI + Budget AmendmentItem # 7 - PPT WGI + Budget Amendment
Item # 7 - PPT WGI + Budget Amendment
 
Lessons from RE:FIT - a public sector Energy Performance Contract Framework ...
Lessons from RE:FIT -  a public sector Energy Performance Contract Framework ...Lessons from RE:FIT -  a public sector Energy Performance Contract Framework ...
Lessons from RE:FIT - a public sector Energy Performance Contract Framework ...
 
Random
RandomRandom
Random
 
CBI Property Breakfast Seminar: Gordon McCreath
CBI Property Breakfast Seminar: Gordon McCreathCBI Property Breakfast Seminar: Gordon McCreath
CBI Property Breakfast Seminar: Gordon McCreath
 
CBI Property Breakfast Seminar - Gordon McCreath
CBI Property Breakfast Seminar - Gordon McCreathCBI Property Breakfast Seminar - Gordon McCreath
CBI Property Breakfast Seminar - Gordon McCreath
 
Education Sponne
Education SponneEducation Sponne
Education Sponne
 
Cookham Wood Lean & Mean Jane Foulkes
Cookham Wood  Lean & Mean Jane FoulkesCookham Wood  Lean & Mean Jane Foulkes
Cookham Wood Lean & Mean Jane Foulkes
 
Akhil Resume 10.06.2015new
Akhil Resume 10.06.2015newAkhil Resume 10.06.2015new
Akhil Resume 10.06.2015new
 
Manufacturing (food)
Manufacturing  (food)Manufacturing  (food)
Manufacturing (food)
 

Recently uploaded

RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
 
skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)
Mohammad Al-Dhahabi
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
Steve Thomason
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
blueshagoo1
 
Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
Iris Thiele Isip-Tan
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
National Information Standards Organization (NISO)
 
Stack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 MicroprocessorStack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 Microprocessor
JomonJoseph58
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
zuzanka
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
PsychoTech Services
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
nitinpv4ai
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Henry Hollis
 
Standardized tool for Intelligence test.
Standardized tool for Intelligence test.Standardized tool for Intelligence test.
Standardized tool for Intelligence test.
deepaannamalai16
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
nitinpv4ai
 
Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
danielkiash986
 

Recently uploaded (20)

RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
 
skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)
 
A Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two HeartsA Visual Guide to 1 Samuel | A Tale of Two Hearts
A Visual Guide to 1 Samuel | A Tale of Two Hearts
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
 
Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
 
Stack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 MicroprocessorStack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 Microprocessor
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
 
Standardized tool for Intelligence test.
Standardized tool for Intelligence test.Standardized tool for Intelligence test.
Standardized tool for Intelligence test.
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
 
Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
 

cost overuns in construction industry

  • 1. COST OVERRUN WITH CASE STUDIES Efforts by Pushkar Lunkad AP17022 Vaishnavi Bharne AP17059 Reshma Reddy AP17042 Vibhali Wankar AP17054 Khushboo Patel AP17069 Aanchal Ramtekkar AP17075
  • 2. What is Cost Overrun? A cost overrun, also known as a cost increase, underrated or budget overrun, involves unexpected costs incurred in excess of budgeted amounts due to an underestimation of the actual cost during budgeting
  • 3. General Information • Client: MSRDC • Contractor: HCC • Commenced:2000 • Planned Completion: 2005 • Opened: 2010 • Delay: 5 Years • Estimated cost: 371+255+22 =648 cr • Final Cost: 1653.25 cr • % Increased:155% Bandra-Worli Sea Link
  • 4. Causes of Cost Overrun • Consultant for project and design management was ineffective. • Technical changes bought up by new consultant- Rs 70 Cr. • Changes in “Arch bridge” to “Cable stay”. • Government commitment Rs 580 Cr but provided only Rs 100 Cr till June 2007. • Rs 12.8 Cr they didn’t charged for stoppage of work. • Issues related to rehabilitation • Delay in environmental clearances • Contract disputes and court cases
  • 5. General Information • Client: State of New South Wales • Design By: Jorn Utzon • Commenced:1959 • Planned Completion:1963 • Opened:1973 • Delay:10Years • Estimated cost:AUS $7 million • Final Cost: AUS $102 million • % Increased:1400% Opera House Sydney
  • 6. Causes of Costoverun • Designs were only partially completed. • Methods to construct the proposed roof structure was not known initially. • No project manager was appointed resulting in lack of project evaluation. • New architect named Peter Hall was appointed in place of Jorn Utzon resulting in changes in original design. • Some sections of the opera house were even built then later demoli -shed, re‐designed and built again.
  • 7. General Information • Client: The Secretary of State for Scotland until 31 May 1999. Thereafter the project transferred to the Corporate Body • Contractor: Bovis homes group • Commenced: 1999 • Planned Completion: 2001 • Opened: 2004 • Delay: 3 Years • Planned cost: £50m • Final Cost: £414m • % Increased cost: 730% Scotish Parliament
  • 8. Causes of Costoverun • Communication problems with the involved project teams and political intervention. • Client requirement of additional usable area of 4000 sq.metres. • Client changed from Scottish office to Scottish parliament cooperate body. • Both architects used to work from their own cities. • High level design development.
  • 9. General Information • Client: BMRCL • Contractor: ITD-Cem India (Phase-1) • Commenced: 2005 • Planned Completion: 2010 • Opened: 18 June 2017 • Delay: 7 Years • Planned cost: 5400 cr • Final Cost: 11609 cr • % Increased cost: 214.98 Namma Metro
  • 10. Causes of Costoverun • Lack of co-ordination between state agencies and metro authorities. • Wrong estimation. • Land acquisition . • Delay in providing design. • Escalation of cost of land. • Escalation cost of material.
  • 11. Conclusion Stages Issues Pre-planning • Delay in Regulatory Approvals • Unavailability/delayed availability of funds • Land/site handover • Local and Social Issue Planning and design • Ineffective Procurement Planning. • Design/scope change. • Delay in decision making. Execution and monitoring • Weak/ineffective project planning & monitoring • Lack of Integration Management in Project Planning • Unavailability/delayed availability of funds Closure and Handover • Contractual disputes • Finishing Work.
  • 12. References • http://www.ptmfonline.com/doc/Newsletter/PTMF-E- News_Letter_December_2011.pdf • http://www.pmi.org.in/downloads/PMI_KPMG_2013.pdf • https://en.wikipedia.org/wiki/Bandra–Worli_Sea_Link • https://ocw.mit.edu/courses/civil-and-environmental-engineering/1-011- project-evaluation-spring-2011/projects/MIT1_011S11_proj_ex01.pdf • https://en.wikipedia.org/wiki/Scottish_Parliamen • english.bmrc.co.in/