Audit Expenses
Principles
 Audit Costs are primarily the following components:
 Audit Time
 Audit Day Rate for Audit Time
 Fees
 Travel Expenses
 Fees paid to BAN or R2 Solutions
 This presentation will not deal with Fees and Travel
Expenses in order to simplify the presentation
Audit Day Rate
 Audit Day Rate varies between Certification Body to
Certification Body
 The Audit Day Rate for this presentation will be $1,350
per audit day
Audit Time Determination
Principles
 To determine the Audit Time, guidance is provided by
IAF Mandatory Document 5 and Integrated Audits is
guidance is provided by Mandatory Document 11
 Each company and site has to be analyzed because
every company and site has different environmental and
health/safety complexities and risks
 Thus each company and site may have different audit
time depending on the specifics of the company and site.
 Please use this presentation examples as a general
examples, ask the Certification Bodies for a specific
quote including the amount of audit time
E-Stewards Determination of
Audit Time
 Simply put the Certification Body determines the ISO
14001 (Environmental) Audit time and then add 50% for
the additional e-Stewards time.
 Note the ISO 14001 Audit Time will vary because of the
specifics of the company and site.
Determination of R2 Time
 New requirements in R2 Code of Practices
 Round time up to the ½ day, from the calculations for this
presentation there was a 2 to 1 ratio where additional time
was added verses rounding rules.
 Determine the Environmental and Health/Safety Audit Time
(this is more time than used for e-Stewards)
 Time is either ISO 14001 and OHSAS 18001 Time or RIOS Time
 RIOS Time is normally less time than 14001/18001 Time
 Then add time for:
 R2
 Down Stream Vendors
 Campus-additional buildings
 Nonconformance’s
 Companies larger than 100 employees, add 1 day for each
additional 50 employees
Logic Cost Examples
 The Initial Cost Examples are for the original certification
which is the Stage 1 and 2 audits
 Surveillances are normally 1/3 the audit time of Stage
1/2 audit time plus the additional time for R2
 Recertification is normally 2/3 the audit time of Stage
1/2 except rounding rules plus the additional time for R2
 The modeling for these examples are simply modeled.
Audit time may be increased or reduced based upon the
specifics of the site.
 The Audit Day Rate used for these examples is $1,350
per day. The Audit Day Rate varies between Certification
Bodies
Cost Examples
 Site which has 1 to 5 employees who performs primarily
de-manufacturing:
 R2-ISO 14001/OHSAS 18001
Stage 1/2 Surveillances
Audit Days: 5 Audit Days: 2
Cost: $6,750 Costs: $2,750
 R2-RIOS
Stage 1/2 Surveillances
Audit Days: 4.5 Audit Days: 2.0
Cost: $6,075 Costs:$2,750
 e-Stewards
Stage 1/2 Surveillances
Audit Days: 3.0 Audit Days: 1.0
Cost: $4,050 Costs:$1,350
Cost Examples Assumptions
 Assumptions:
 Down Streams: Non R2:1-5
 Single Site/Not a Campus
 3 Minor Nonconformance’s
 Company/site not previously certified to ISO 14001
 Number of employees is the effective number of employees
Cost Examples
 Site which has less than 11-15 employees who performs
primarily de-manufacturing:
 R2-ISO 14001/OHSAS 18001
Stage 1/2 Surveillances
Audit Days:7.0 Audit Days: 3.0
Cost: $9,450 Costs: $4,050
 R2-RIOS
Stage 1/2 Surveillances
Audit Days: 6.0 Audit Days: 2.5
Cost: $8,100 Costs: $3,375
 e-Stewards
Stage 1/2 Surveillances
Audit Days:4.5 Audit Days:1.5
Cost: $6,075 Costs: $2,025
Cost Example Assumptions
 Assumptions:
 Down Streams: Non R2:1-5, R2:6-10
 Single Site/Not a Campus
 3 Minor Nonconformance’s
 Company/site not previously certified to ISO 14001
 Number of employees is the effective number of employees
Cost Examples
 Site which has less than 26-45 employees who performs
primarily de-manufacturing:
 R2-ISO 14001/OHSAS 18001
Stage 1/2 Surveillances
Audit Days: 8.5 Audit Days:3.5
Cost: $11,475 Costs: $4,725
 R2-RIOS
Stage 1/2 Surveillances
Audit Days: 6.5 Audit Days:3.0
Cost: $8,775 Costs:$4,050
 e-Stewards
Stage 1/2 Surveillances
Audit Days: 5.5 Audit Days: 2.0
Cost: $7,425 Costs:$2,700
Cost Example Assumptions
 Assumptions:
 Down Streams:R2:6-10 , Non R2:1-5
 Single Site/No Campus
 3 Minor Nonconformance’s
 Company/site not previously certified to ISO 14001
 Number of employees is the effective number of employees
Cost Examples
 Site which has 50-85 employees who performs primarily
de-manufacturing:
 R2-ISO 14001/OHSAS 18001
Stage 1/2 Surveillances
Audit Days: 12.0 Audit Days: 4.5
Cost: $16,200 Costs: $6,075
 R2-RIOS
Stage 1/2 Surveillances
Audit Days: 10.0 Audit Days: 4.0
Cost: $13,500 Costs: $5,400
 e-Stewards
Stage 1/2 Surveillances
Audit Days: 7.5 Audit Days: 2.5
Cost: $10,125 Costs: $3,375
Cost Example Assumptions
 Assumptions:
 Down Streams: R2:10-15, Non R2:6-10
 Single Site/No Campus
 3 Minor Nonconformance’s
 Company/site not previously certified to ISO 14001
 Number of employees is the effective number of employees
Cost Examples
 Site which has 86-100 employees who performs
primarily de-manufacturing:
 R2-ISO 14001/OHSAS 18001
Stage 1/2 Surveillances
Audit Days: 13.0 Audit Days: 5.0
Cost: $17,550 Costs: $6,750
 R2-RIOS
Stage 1/2 Surveillances
Audit Days: 10.5 Audit Days: 4.5
Cost: $14,175 Costs: $6,075
 e-Stewards
Stage 1/2 Surveillances
Audit Days: 8.5 Audit Days: 3.0
Cost: $11,475 Costs: $4,050
Cost Example Assumptions
 Assumptions:
 Down Streams:R2:10-15, Non R2: 6-10
 Single Site/No Campus
 5 Minor Nonconformance’s
 Company/site not previously certified to ISO 14001
 Number of employees is the effective number of employees
Cost Examples
 Site which has 300 employees who performs primarily
de-manufacturing:
 R2-ISO 14001/OHSAS 18001
Stage 1/2 Surveillances
Audit Days: 21.0 Audit Days: 8.0
Cost: $28,350 Costs:$10,800
 R2-RIOS
Stage 1/2 Surveillances
Audit Days: 17.5 Audit Days: 7.0
Cost:$23,625 Costs:$9,450
 e-Stewards
Stage 1/2 Surveillances
Audit Days:12 Audit Days:3
Cost:$16,200 Costs: $4,050
Cost Example Assumptions
 Assumptions:
 Down Streams:R2:15-20, Non R2:10-15
 Single Site/No Campus
 5 Minor Nonconformance’s
 Company/site not previously certified to ISO 14001
 Number of employees is the effective number of employees
Conclusions
 e-Stewards Audit Time (Audit Costs) from feedback from
Certification Bodies is a reasonable amount of time
 R2 for the R2:2013 Version has new guidelines for Audit
Time contained in the R2 Code of Practices which is
unproven.
 R2 Audit Time or Audit Costs are more expensive in
every situation

More Related Content

Similar to Cost Comparison of e-Stewards and R2 Certification

Co pq juran
Co pq juranCo pq juran
Co pq juranmruger
 
Cost of-poor-quality - juran institute
Cost of-poor-quality - juran instituteCost of-poor-quality - juran institute
Cost of-poor-quality - juran instituteManish Chaurasia
 
BlueScape & Coto Consulting Update to ISO 14001:2015 Webinar 092116
BlueScape & Coto Consulting Update to ISO 14001:2015 Webinar 092116BlueScape & Coto Consulting Update to ISO 14001:2015 Webinar 092116
BlueScape & Coto Consulting Update to ISO 14001:2015 Webinar 092116BlueScape
 
EMS 14001:2015 Awareness and Auditor Training Presentation
EMS 14001:2015 Awareness and Auditor Training  PresentationEMS 14001:2015 Awareness and Auditor Training  Presentation
EMS 14001:2015 Awareness and Auditor Training PresentationCertification Consultant
 
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.pptCost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.pptssuser5f2474
 
Cost of-poor-quality
Cost of-poor-qualityCost of-poor-quality
Cost of-poor-qualitydenmas831
 
14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviewsssusereb347d
 
Costof quality
Costof qualityCostof quality
Costof qualityOmnex Inc.
 
TL 9000 Today & Benefit of PDR
TL 9000 Today & Benefit of PDRTL 9000 Today & Benefit of PDR
TL 9000 Today & Benefit of PDRQuEST Forum
 
Internal Audit Check List
Internal Audit Check List Internal Audit Check List
Internal Audit Check List Hands On Quality
 
ISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyArantico Ltd
 
Finding the ROI in Your Quality System
Finding the ROI in Your Quality SystemFinding the ROI in Your Quality System
Finding the ROI in Your Quality SystemNorthwest Analytics
 
Addressing the High Cost of Quality
Addressing the High Cost of QualityAddressing the High Cost of Quality
Addressing the High Cost of QualityEase Inc.
 
Costofquality
Costofquality Costofquality
Costofquality VarunRao78
 
Save Time And Money Through Enterprise Audit Management Final Presented
Save Time And Money Through Enterprise Audit Management   Final PresentedSave Time And Money Through Enterprise Audit Management   Final Presented
Save Time And Money Through Enterprise Audit Management Final PresentedChadKymal
 
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Kevin Perry
 

Similar to Cost Comparison of e-Stewards and R2 Certification (20)

Cost of Poor Quality.pdf
Cost of Poor Quality.pdfCost of Poor Quality.pdf
Cost of Poor Quality.pdf
 
Co pq juran
Co pq juranCo pq juran
Co pq juran
 
Cost of Poor Quality.pdf
Cost of Poor Quality.pdfCost of Poor Quality.pdf
Cost of Poor Quality.pdf
 
Cost of-poor-quality - juran institute
Cost of-poor-quality - juran instituteCost of-poor-quality - juran institute
Cost of-poor-quality - juran institute
 
COST OF QUALITY
COST OF QUALITYCOST OF QUALITY
COST OF QUALITY
 
BlueScape & Coto Consulting Update to ISO 14001:2015 Webinar 092116
BlueScape & Coto Consulting Update to ISO 14001:2015 Webinar 092116BlueScape & Coto Consulting Update to ISO 14001:2015 Webinar 092116
BlueScape & Coto Consulting Update to ISO 14001:2015 Webinar 092116
 
EMS 14001:2015 Awareness and Auditor Training Presentation
EMS 14001:2015 Awareness and Auditor Training  PresentationEMS 14001:2015 Awareness and Auditor Training  Presentation
EMS 14001:2015 Awareness and Auditor Training Presentation
 
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.pptCost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
 
Cost of-poor-quality
Cost of-poor-qualityCost of-poor-quality
Cost of-poor-quality
 
14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews
 
Costof quality
Costof qualityCostof quality
Costof quality
 
TL 9000 Today & Benefit of PDR
TL 9000 Today & Benefit of PDRTL 9000 Today & Benefit of PDR
TL 9000 Today & Benefit of PDR
 
Internal Audit Check List
Internal Audit Check List Internal Audit Check List
Internal Audit Check List
 
ISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management Journey
 
Finding the ROI in Your Quality System
Finding the ROI in Your Quality SystemFinding the ROI in Your Quality System
Finding the ROI in Your Quality System
 
Addressing the High Cost of Quality
Addressing the High Cost of QualityAddressing the High Cost of Quality
Addressing the High Cost of Quality
 
Costofquality
Costofquality Costofquality
Costofquality
 
Save Time And Money Through Enterprise Audit Management Final Presented
Save Time And Money Through Enterprise Audit Management   Final PresentedSave Time And Money Through Enterprise Audit Management   Final Presented
Save Time And Money Through Enterprise Audit Management Final Presented
 
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
 
What is ISO?
What is ISO?What is ISO?
What is ISO?
 

Recently uploaded

AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAnitaRaj43
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimaginedpanagenda
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Paige Cruz
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityVictorSzoltysek
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMKumar Satyam
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightSafe Software
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024Lorenzo Miniero
 
How to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfHow to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfdanishmna97
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform EngineeringMarcus Vechiato
 
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...ScyllaDB
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...FIDO Alliance
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGDSC PJATK
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...panagenda
 
Top 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development CompaniesTop 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development CompaniesTopCSSGallery
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxFIDO Alliance
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxFIDO Alliance
 
Vector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptxVector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptxjbellis
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...ScyllaDB
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewDianaGray10
 
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdfFrisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdfAnubhavMangla3
 

Recently uploaded (20)

AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and Insight
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024
 
How to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfHow to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cf
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform Engineering
 
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Top 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development CompaniesTop 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development Companies
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptx
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Vector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptxVector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptx
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overview
 
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdfFrisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
 

Cost Comparison of e-Stewards and R2 Certification

  • 2. Principles  Audit Costs are primarily the following components:  Audit Time  Audit Day Rate for Audit Time  Fees  Travel Expenses  Fees paid to BAN or R2 Solutions  This presentation will not deal with Fees and Travel Expenses in order to simplify the presentation
  • 3. Audit Day Rate  Audit Day Rate varies between Certification Body to Certification Body  The Audit Day Rate for this presentation will be $1,350 per audit day
  • 4. Audit Time Determination Principles  To determine the Audit Time, guidance is provided by IAF Mandatory Document 5 and Integrated Audits is guidance is provided by Mandatory Document 11  Each company and site has to be analyzed because every company and site has different environmental and health/safety complexities and risks  Thus each company and site may have different audit time depending on the specifics of the company and site.  Please use this presentation examples as a general examples, ask the Certification Bodies for a specific quote including the amount of audit time
  • 5. E-Stewards Determination of Audit Time  Simply put the Certification Body determines the ISO 14001 (Environmental) Audit time and then add 50% for the additional e-Stewards time.  Note the ISO 14001 Audit Time will vary because of the specifics of the company and site.
  • 6. Determination of R2 Time  New requirements in R2 Code of Practices  Round time up to the ½ day, from the calculations for this presentation there was a 2 to 1 ratio where additional time was added verses rounding rules.  Determine the Environmental and Health/Safety Audit Time (this is more time than used for e-Stewards)  Time is either ISO 14001 and OHSAS 18001 Time or RIOS Time  RIOS Time is normally less time than 14001/18001 Time  Then add time for:  R2  Down Stream Vendors  Campus-additional buildings  Nonconformance’s  Companies larger than 100 employees, add 1 day for each additional 50 employees
  • 7. Logic Cost Examples  The Initial Cost Examples are for the original certification which is the Stage 1 and 2 audits  Surveillances are normally 1/3 the audit time of Stage 1/2 audit time plus the additional time for R2  Recertification is normally 2/3 the audit time of Stage 1/2 except rounding rules plus the additional time for R2  The modeling for these examples are simply modeled. Audit time may be increased or reduced based upon the specifics of the site.  The Audit Day Rate used for these examples is $1,350 per day. The Audit Day Rate varies between Certification Bodies
  • 8. Cost Examples  Site which has 1 to 5 employees who performs primarily de-manufacturing:  R2-ISO 14001/OHSAS 18001 Stage 1/2 Surveillances Audit Days: 5 Audit Days: 2 Cost: $6,750 Costs: $2,750  R2-RIOS Stage 1/2 Surveillances Audit Days: 4.5 Audit Days: 2.0 Cost: $6,075 Costs:$2,750  e-Stewards Stage 1/2 Surveillances Audit Days: 3.0 Audit Days: 1.0 Cost: $4,050 Costs:$1,350
  • 9. Cost Examples Assumptions  Assumptions:  Down Streams: Non R2:1-5  Single Site/Not a Campus  3 Minor Nonconformance’s  Company/site not previously certified to ISO 14001  Number of employees is the effective number of employees
  • 10. Cost Examples  Site which has less than 11-15 employees who performs primarily de-manufacturing:  R2-ISO 14001/OHSAS 18001 Stage 1/2 Surveillances Audit Days:7.0 Audit Days: 3.0 Cost: $9,450 Costs: $4,050  R2-RIOS Stage 1/2 Surveillances Audit Days: 6.0 Audit Days: 2.5 Cost: $8,100 Costs: $3,375  e-Stewards Stage 1/2 Surveillances Audit Days:4.5 Audit Days:1.5 Cost: $6,075 Costs: $2,025
  • 11. Cost Example Assumptions  Assumptions:  Down Streams: Non R2:1-5, R2:6-10  Single Site/Not a Campus  3 Minor Nonconformance’s  Company/site not previously certified to ISO 14001  Number of employees is the effective number of employees
  • 12. Cost Examples  Site which has less than 26-45 employees who performs primarily de-manufacturing:  R2-ISO 14001/OHSAS 18001 Stage 1/2 Surveillances Audit Days: 8.5 Audit Days:3.5 Cost: $11,475 Costs: $4,725  R2-RIOS Stage 1/2 Surveillances Audit Days: 6.5 Audit Days:3.0 Cost: $8,775 Costs:$4,050  e-Stewards Stage 1/2 Surveillances Audit Days: 5.5 Audit Days: 2.0 Cost: $7,425 Costs:$2,700
  • 13. Cost Example Assumptions  Assumptions:  Down Streams:R2:6-10 , Non R2:1-5  Single Site/No Campus  3 Minor Nonconformance’s  Company/site not previously certified to ISO 14001  Number of employees is the effective number of employees
  • 14. Cost Examples  Site which has 50-85 employees who performs primarily de-manufacturing:  R2-ISO 14001/OHSAS 18001 Stage 1/2 Surveillances Audit Days: 12.0 Audit Days: 4.5 Cost: $16,200 Costs: $6,075  R2-RIOS Stage 1/2 Surveillances Audit Days: 10.0 Audit Days: 4.0 Cost: $13,500 Costs: $5,400  e-Stewards Stage 1/2 Surveillances Audit Days: 7.5 Audit Days: 2.5 Cost: $10,125 Costs: $3,375
  • 15. Cost Example Assumptions  Assumptions:  Down Streams: R2:10-15, Non R2:6-10  Single Site/No Campus  3 Minor Nonconformance’s  Company/site not previously certified to ISO 14001  Number of employees is the effective number of employees
  • 16. Cost Examples  Site which has 86-100 employees who performs primarily de-manufacturing:  R2-ISO 14001/OHSAS 18001 Stage 1/2 Surveillances Audit Days: 13.0 Audit Days: 5.0 Cost: $17,550 Costs: $6,750  R2-RIOS Stage 1/2 Surveillances Audit Days: 10.5 Audit Days: 4.5 Cost: $14,175 Costs: $6,075  e-Stewards Stage 1/2 Surveillances Audit Days: 8.5 Audit Days: 3.0 Cost: $11,475 Costs: $4,050
  • 17. Cost Example Assumptions  Assumptions:  Down Streams:R2:10-15, Non R2: 6-10  Single Site/No Campus  5 Minor Nonconformance’s  Company/site not previously certified to ISO 14001  Number of employees is the effective number of employees
  • 18. Cost Examples  Site which has 300 employees who performs primarily de-manufacturing:  R2-ISO 14001/OHSAS 18001 Stage 1/2 Surveillances Audit Days: 21.0 Audit Days: 8.0 Cost: $28,350 Costs:$10,800  R2-RIOS Stage 1/2 Surveillances Audit Days: 17.5 Audit Days: 7.0 Cost:$23,625 Costs:$9,450  e-Stewards Stage 1/2 Surveillances Audit Days:12 Audit Days:3 Cost:$16,200 Costs: $4,050
  • 19. Cost Example Assumptions  Assumptions:  Down Streams:R2:15-20, Non R2:10-15  Single Site/No Campus  5 Minor Nonconformance’s  Company/site not previously certified to ISO 14001  Number of employees is the effective number of employees
  • 20. Conclusions  e-Stewards Audit Time (Audit Costs) from feedback from Certification Bodies is a reasonable amount of time  R2 for the R2:2013 Version has new guidelines for Audit Time contained in the R2 Code of Practices which is unproven.  R2 Audit Time or Audit Costs are more expensive in every situation