Project Analysis
9/9/2022
ASSOSA UNIVERSITY
SCHOOL OF POST GRADUATE STUDIES
DEPARTMENT OF MANAGEMENT
MASTER OF BUSINESS ADMINISTRATION
WEEK END PROGRAM
UNIT - III
PROJECT IDENTIFICATION
3.1 Pre – Identification
“Pre – Identification” is an important prelude to project identification. This
pre – identifications stage involves surveying, reviewing, inventorying
and analysis of strategies and policies, natural resources data and socio
– economic information. It is a very important phase in project planning.
Unfortunately, it is an aspect of planning, which is either, almost totally
ignored or for which inadequate resources are provided in most developing
countries.
There are a number of reasons:
 First, and perhaps most important of all, is sheer ignorance – an
ignorance of need and ignorance of cost – effective ways of
carrying the research, surveys, inventorying of resources and
integrating and analyzing the information.
 Second, such work tends to be regarded as an expensive overhead
cost and therefore expendable in difficult times of budgetary.
 Third, a lot of the work has tended to be time consuming, people
cannot wait for results and do not consider it important to even
start it.
Nowadays, modern technology is revolutionizing the survey methods and
the means for carrying out synthesis and analysis, speeding up some
processes, reducing the costs of others and providing new ways of looking
at things.
A good data being a prerequisite to sound project formulation and the
analysis of data identifying gaps and throwing up ideas for possible
projects, project identification must be carried out also within a frame –
work of national, regional and sectoral development (including pricing,
taxation and subsidy) policies otherwise much time and effort might be
wasted in identifying and preparing projects which would be reflected on
policy grounds or which might turn out to be unfeasible because of, for
example, a tax and subsidy policy.
Thus, those who are responsible for identifying projects need to be aware of
accepted strategies and policies and also be in a position to feed back
information to those who are responsible for formulating policies.
3.2 Project Identification
The search for promising project ideas is the first step towards establishing
a successful venture. The key to success lies in getting into the right
business at the right time. The objective is to identify investment
opportunities, which are prima facie feasible and promising and which
merit further examination and appraisal.
Project identification consists in finding projects, which could
contribute towards achieving specified development objectives. In
principle, project identification should be an integral part of the macro
– planning exercise, with sectoral information and strategies as the main
source of project ideas.
In practice, however, projects do not always derive from national and
sectoral plans. Instead, they may originate from several sources.
Irrespective of their origin, project ideas should, in general, aim at
overcoming constraints on the national development effort, be they
Project Analysis
9/9/2022 2
material, human or institutional constraints, or at meeting unsatisfied needs,
and demand for goods and services.
Constraints, needs and demand should be interpreted broadly to include, for
example, foreign exchange constraints that might indicate the need to
undertake projects for export promotion or import substitution.
The variety of projects makes it impossible to prepare an exhaustive list of
sources from where project ideas emanate; much depend on the experience
and imaginative of those entrusted with the task of initiating development
project.
In general, one can distinguish two levels where project ideas are born: The
macro – level and the micro – level.
At the macro – level, project ideas emerge from:
1. National policies, strategies and priorities as may be enunciated
by government from time to time;
2. National, sectoral, sub – sectoral or regional plans and strategies
supplemented by special studies, sometimes called opportunity
studies, conducted with the explicit aimof translation national and
sectoral, sub– sectoral and regional programs into specific
projects;
3. General surveys, resource potential surveys, regional studies,
master plan and statistical publications, which indicate directly or
indirectly investment opportunities.
4. Constraints on the development process due to shortage of
essential infrastructure facilities, problems in the balance of
payments, etc.
5. Government decision to correct social and regional inequalities or
to satisfy basic needs of the people through development projects.
6. A possible external threat that necessitates projects aiming at
achieving, for example, self – sufficiency in basic material,
energy, transportation, etc.
7. Unusual events such as droughts, floods, earth – quakes,
hostilities, etc.,
8. Government decisions to create project-implementing capacity in
such areas as construction, etc.
9. At the macro – level, project ideas can also originate from
multilateral or bilateral development agencies and as a result of
regional or international agreements in which the country
participate.
10. In addition, individual inspiration, institutions, workshops, and
development experiences of other countries may point to some
interesting project ideas.
At the micro – level, the variety of sources is equally broad. Project ideas
emanate from:
1. The identification of unsatisfied demand or needs.
2. The existence of unused or underutilized natural or human
resources and the perception of opportunities for their efficient
use.
3. The need to remove shortages in essential materials, services or
facilities that constrain development efforts;
4. The initiative of private or public enterprises in response to
incentives provided by the government;
5. The necessity to complement or expand investments previously
undertaken.
6. The desire of local groups or organization to enhance their
economic status and improve their welfare.
7. Analyze the performance of existing industries
8. Examine the inputs and outputs of various industries
9. Review imports and exports
10. Look at the suggestions of financial institutions and development
agencies
11. Investigate local materials and resources
12. Analyze Economic and Social Trends
13. Study new Technological Development
14. Draw clues from consumption abroad
Project Analysis
9/9/2022 3
15. Explore the possibility of reviving sick units
16. Attend Trade fairs
17. Project proposals could also originate from foreign firms either in
response to government investment incentives or because they
consider production within the country a better way to secure a
substantial share of the domestic market for their products.
3.3 Screening potentially promising ideas
Once a list of project ideas has been put forward, the first step is to select
one or more of them as potentially promising. This, calls for a quick
preliminary screening by experienced professionals who could also modify
some of the proposals. At this stage, the screening criteria are vague and
rough, that becomes specific and refined as project planning advances.
During the preliminary screening to eliminate ideas, which prima facie are
not promising, it is required to look into the aspects such as:
 Compatibility with the promoter
 Consistency with government priorities
 Availability of inputs
 Adequacy of market
 Reasonableness of costs
 Acceptability of risk level
During preliminary selection, the analyst should eliminate project proposals
that:
- Are technically unsound and risky;
- Have no market for the output;
- Have inadequate supply of inputs;
- Are very costly in relation to benefits;
- Assume over – ambitious sales and profitability.
Obviously, since the criteria tend to be somewhat nebulous, much depends
on the experience and sense of objectivity of the professionals applying
them. It is, however, necessary to conduct this screening, even with
indistinct criteria, in order to reduce to a manageable number the project
alternatives to which more work and time will be devoted. Indeed, project
planning can be viewed as a process of elimination, i.e. elimination of
interior alternatives.
As a result of the preliminary screening exercise, a project profile, an
opportunity study report, or an identification study report, as appropriate, is
prepared showing which project alternatives should be rejected and which
ones may be advanced to the next stage.

More Related Content

Similar to CONTENT 3.doc

project Ch 3.ppt which talks about project preparation
project Ch 3.ppt which talks about project preparationproject Ch 3.ppt which talks about project preparation
project Ch 3.ppt which talks about project preparationGetachewAbera3
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 
Project identification
Project  identificationProject  identification
Project identificationVasanth Rvk
 
4 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 04 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 0Ly Smith
 
Project Management Notes 1
Project Management Notes 1Project Management Notes 1
Project Management Notes 1Golam Bitonsir
 
Project management essentials in developing and emerging markets by Ivo Arrey...
Project management essentials in developing and emerging markets by Ivo Arrey...Project management essentials in developing and emerging markets by Ivo Arrey...
Project management essentials in developing and emerging markets by Ivo Arrey...ivo arrey
 
MIDLANDS STATE Project management _notes
MIDLANDS  STATE  Project management _notesMIDLANDS  STATE  Project management _notes
MIDLANDS STATE Project management _notesKudzai Chibarinya
 
evaluating project proposal, group assignment.docx
evaluating project proposal, group assignment.docxevaluating project proposal, group assignment.docx
evaluating project proposal, group assignment.docxHrUethicsAnticorrupt
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET Journal
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisalAmandaBvera
 
Entrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.pptEntrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.pptRenuLamba8
 
L2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxL2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxbettymakuve1
 
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGE
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGEEFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGE
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGEEmils Pulmanis
 

Similar to CONTENT 3.doc (20)

project Ch 3.ppt which talks about project preparation
project Ch 3.ppt which talks about project preparationproject Ch 3.ppt which talks about project preparation
project Ch 3.ppt which talks about project preparation
 
Phases of Management.ppt
Phases of Management.pptPhases of Management.ppt
Phases of Management.ppt
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 
Project identification
Project  identificationProject  identification
Project identification
 
Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...
 
Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...
 
4 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 04 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 0
 
Project Management Notes 1
Project Management Notes 1Project Management Notes 1
Project Management Notes 1
 
Investment Programming
Investment ProgrammingInvestment Programming
Investment Programming
 
CIB8942.pdf
CIB8942.pdfCIB8942.pdf
CIB8942.pdf
 
Project Development
Project Development Project Development
Project Development
 
Project management essentials in developing and emerging markets by Ivo Arrey...
Project management essentials in developing and emerging markets by Ivo Arrey...Project management essentials in developing and emerging markets by Ivo Arrey...
Project management essentials in developing and emerging markets by Ivo Arrey...
 
MIDLANDS STATE Project management _notes
MIDLANDS  STATE  Project management _notesMIDLANDS  STATE  Project management _notes
MIDLANDS STATE Project management _notes
 
evaluating project proposal, group assignment.docx
evaluating project proposal, group assignment.docxevaluating project proposal, group assignment.docx
evaluating project proposal, group assignment.docx
 
1 ch1
1 ch11 ch1
1 ch1
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
 
Entrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.pptEntrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.ppt
 
L2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxL2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptx
 
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGE
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGEEFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGE
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGE
 

More from selam49

Yom_DATA MANAGEMENT.ppt
Yom_DATA MANAGEMENT.pptYom_DATA MANAGEMENT.ppt
Yom_DATA MANAGEMENT.pptselam49
 
Stata Training_EEA.ppt
Stata Training_EEA.pptStata Training_EEA.ppt
Stata Training_EEA.pptselam49
 
Performance appraisal CH.7.ppt
Performance appraisal CH.7.pptPerformance appraisal CH.7.ppt
Performance appraisal CH.7.pptselam49
 
Integration and maintenance chapter-9.ppt
Integration and maintenance chapter-9.pptIntegration and maintenance chapter-9.ppt
Integration and maintenance chapter-9.pptselam49
 
Compensation ch 8.ppt
Compensation ch 8.pptCompensation ch 8.ppt
Compensation ch 8.pptselam49
 
CH-1&2-introduction-of-hrm...ppt
CH-1&2-introduction-of-hrm...pptCH-1&2-introduction-of-hrm...ppt
CH-1&2-introduction-of-hrm...pptselam49
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docselam49
 
CONTENT 2.doc
CONTENT 2.docCONTENT 2.doc
CONTENT 2.docselam49
 
MBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docMBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docselam49
 
MBA UNIT 6.pptx
MBA UNIT 6.pptxMBA UNIT 6.pptx
MBA UNIT 6.pptxselam49
 
MBA UNIT 5.pptx
MBA UNIT 5.pptxMBA UNIT 5.pptx
MBA UNIT 5.pptxselam49
 
MBA UNIT 4.pptx
MBA UNIT 4.pptxMBA UNIT 4.pptx
MBA UNIT 4.pptxselam49
 
MBA UNIT 3.pptx
MBA UNIT 3.pptxMBA UNIT 3.pptx
MBA UNIT 3.pptxselam49
 
MBA UNIT 2.pptx
MBA UNIT 2.pptxMBA UNIT 2.pptx
MBA UNIT 2.pptxselam49
 
MBA UNIT 1.pptx
MBA UNIT 1.pptxMBA UNIT 1.pptx
MBA UNIT 1.pptxselam49
 
Chapter 3 Final.ppt
Chapter 3 Final.pptChapter 3 Final.ppt
Chapter 3 Final.pptselam49
 
Chapter 2 Final.ppt
Chapter 2 Final.pptChapter 2 Final.ppt
Chapter 2 Final.pptselam49
 
Chapter 1 Final.ppt
Chapter 1 Final.pptChapter 1 Final.ppt
Chapter 1 Final.pptselam49
 
Leadership for RRS - 2014.pdf
Leadership for RRS - 2014.pdfLeadership for RRS - 2014.pdf
Leadership for RRS - 2014.pdfselam49
 
BSC for Refugees and Returnees Service Ginbot 2014.pptx
BSC for Refugees and Returnees Service Ginbot 2014.pptxBSC for Refugees and Returnees Service Ginbot 2014.pptx
BSC for Refugees and Returnees Service Ginbot 2014.pptxselam49
 

More from selam49 (20)

Yom_DATA MANAGEMENT.ppt
Yom_DATA MANAGEMENT.pptYom_DATA MANAGEMENT.ppt
Yom_DATA MANAGEMENT.ppt
 
Stata Training_EEA.ppt
Stata Training_EEA.pptStata Training_EEA.ppt
Stata Training_EEA.ppt
 
Performance appraisal CH.7.ppt
Performance appraisal CH.7.pptPerformance appraisal CH.7.ppt
Performance appraisal CH.7.ppt
 
Integration and maintenance chapter-9.ppt
Integration and maintenance chapter-9.pptIntegration and maintenance chapter-9.ppt
Integration and maintenance chapter-9.ppt
 
Compensation ch 8.ppt
Compensation ch 8.pptCompensation ch 8.ppt
Compensation ch 8.ppt
 
CH-1&2-introduction-of-hrm...ppt
CH-1&2-introduction-of-hrm...pptCH-1&2-introduction-of-hrm...ppt
CH-1&2-introduction-of-hrm...ppt
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.doc
 
CONTENT 2.doc
CONTENT 2.docCONTENT 2.doc
CONTENT 2.doc
 
MBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docMBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.doc
 
MBA UNIT 6.pptx
MBA UNIT 6.pptxMBA UNIT 6.pptx
MBA UNIT 6.pptx
 
MBA UNIT 5.pptx
MBA UNIT 5.pptxMBA UNIT 5.pptx
MBA UNIT 5.pptx
 
MBA UNIT 4.pptx
MBA UNIT 4.pptxMBA UNIT 4.pptx
MBA UNIT 4.pptx
 
MBA UNIT 3.pptx
MBA UNIT 3.pptxMBA UNIT 3.pptx
MBA UNIT 3.pptx
 
MBA UNIT 2.pptx
MBA UNIT 2.pptxMBA UNIT 2.pptx
MBA UNIT 2.pptx
 
MBA UNIT 1.pptx
MBA UNIT 1.pptxMBA UNIT 1.pptx
MBA UNIT 1.pptx
 
Chapter 3 Final.ppt
Chapter 3 Final.pptChapter 3 Final.ppt
Chapter 3 Final.ppt
 
Chapter 2 Final.ppt
Chapter 2 Final.pptChapter 2 Final.ppt
Chapter 2 Final.ppt
 
Chapter 1 Final.ppt
Chapter 1 Final.pptChapter 1 Final.ppt
Chapter 1 Final.ppt
 
Leadership for RRS - 2014.pdf
Leadership for RRS - 2014.pdfLeadership for RRS - 2014.pdf
Leadership for RRS - 2014.pdf
 
BSC for Refugees and Returnees Service Ginbot 2014.pptx
BSC for Refugees and Returnees Service Ginbot 2014.pptxBSC for Refugees and Returnees Service Ginbot 2014.pptx
BSC for Refugees and Returnees Service Ginbot 2014.pptx
 

Recently uploaded

VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyTyöeläkeyhtiö Elo
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Commonwealth
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...makika9823
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spiritegoetzinger
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneCall girls in Ahmedabad High profile
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfGale Pooley
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spirit
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 

CONTENT 3.doc

  • 1. Project Analysis 9/9/2022 ASSOSA UNIVERSITY SCHOOL OF POST GRADUATE STUDIES DEPARTMENT OF MANAGEMENT MASTER OF BUSINESS ADMINISTRATION WEEK END PROGRAM UNIT - III PROJECT IDENTIFICATION 3.1 Pre – Identification “Pre – Identification” is an important prelude to project identification. This pre – identifications stage involves surveying, reviewing, inventorying and analysis of strategies and policies, natural resources data and socio – economic information. It is a very important phase in project planning. Unfortunately, it is an aspect of planning, which is either, almost totally ignored or for which inadequate resources are provided in most developing countries. There are a number of reasons:  First, and perhaps most important of all, is sheer ignorance – an ignorance of need and ignorance of cost – effective ways of carrying the research, surveys, inventorying of resources and integrating and analyzing the information.  Second, such work tends to be regarded as an expensive overhead cost and therefore expendable in difficult times of budgetary.  Third, a lot of the work has tended to be time consuming, people cannot wait for results and do not consider it important to even start it. Nowadays, modern technology is revolutionizing the survey methods and the means for carrying out synthesis and analysis, speeding up some processes, reducing the costs of others and providing new ways of looking at things. A good data being a prerequisite to sound project formulation and the analysis of data identifying gaps and throwing up ideas for possible projects, project identification must be carried out also within a frame – work of national, regional and sectoral development (including pricing, taxation and subsidy) policies otherwise much time and effort might be wasted in identifying and preparing projects which would be reflected on policy grounds or which might turn out to be unfeasible because of, for example, a tax and subsidy policy. Thus, those who are responsible for identifying projects need to be aware of accepted strategies and policies and also be in a position to feed back information to those who are responsible for formulating policies. 3.2 Project Identification The search for promising project ideas is the first step towards establishing a successful venture. The key to success lies in getting into the right business at the right time. The objective is to identify investment opportunities, which are prima facie feasible and promising and which merit further examination and appraisal. Project identification consists in finding projects, which could contribute towards achieving specified development objectives. In principle, project identification should be an integral part of the macro – planning exercise, with sectoral information and strategies as the main source of project ideas. In practice, however, projects do not always derive from national and sectoral plans. Instead, they may originate from several sources. Irrespective of their origin, project ideas should, in general, aim at overcoming constraints on the national development effort, be they
  • 2. Project Analysis 9/9/2022 2 material, human or institutional constraints, or at meeting unsatisfied needs, and demand for goods and services. Constraints, needs and demand should be interpreted broadly to include, for example, foreign exchange constraints that might indicate the need to undertake projects for export promotion or import substitution. The variety of projects makes it impossible to prepare an exhaustive list of sources from where project ideas emanate; much depend on the experience and imaginative of those entrusted with the task of initiating development project. In general, one can distinguish two levels where project ideas are born: The macro – level and the micro – level. At the macro – level, project ideas emerge from: 1. National policies, strategies and priorities as may be enunciated by government from time to time; 2. National, sectoral, sub – sectoral or regional plans and strategies supplemented by special studies, sometimes called opportunity studies, conducted with the explicit aimof translation national and sectoral, sub– sectoral and regional programs into specific projects; 3. General surveys, resource potential surveys, regional studies, master plan and statistical publications, which indicate directly or indirectly investment opportunities. 4. Constraints on the development process due to shortage of essential infrastructure facilities, problems in the balance of payments, etc. 5. Government decision to correct social and regional inequalities or to satisfy basic needs of the people through development projects. 6. A possible external threat that necessitates projects aiming at achieving, for example, self – sufficiency in basic material, energy, transportation, etc. 7. Unusual events such as droughts, floods, earth – quakes, hostilities, etc., 8. Government decisions to create project-implementing capacity in such areas as construction, etc. 9. At the macro – level, project ideas can also originate from multilateral or bilateral development agencies and as a result of regional or international agreements in which the country participate. 10. In addition, individual inspiration, institutions, workshops, and development experiences of other countries may point to some interesting project ideas. At the micro – level, the variety of sources is equally broad. Project ideas emanate from: 1. The identification of unsatisfied demand or needs. 2. The existence of unused or underutilized natural or human resources and the perception of opportunities for their efficient use. 3. The need to remove shortages in essential materials, services or facilities that constrain development efforts; 4. The initiative of private or public enterprises in response to incentives provided by the government; 5. The necessity to complement or expand investments previously undertaken. 6. The desire of local groups or organization to enhance their economic status and improve their welfare. 7. Analyze the performance of existing industries 8. Examine the inputs and outputs of various industries 9. Review imports and exports 10. Look at the suggestions of financial institutions and development agencies 11. Investigate local materials and resources 12. Analyze Economic and Social Trends 13. Study new Technological Development 14. Draw clues from consumption abroad
  • 3. Project Analysis 9/9/2022 3 15. Explore the possibility of reviving sick units 16. Attend Trade fairs 17. Project proposals could also originate from foreign firms either in response to government investment incentives or because they consider production within the country a better way to secure a substantial share of the domestic market for their products. 3.3 Screening potentially promising ideas Once a list of project ideas has been put forward, the first step is to select one or more of them as potentially promising. This, calls for a quick preliminary screening by experienced professionals who could also modify some of the proposals. At this stage, the screening criteria are vague and rough, that becomes specific and refined as project planning advances. During the preliminary screening to eliminate ideas, which prima facie are not promising, it is required to look into the aspects such as:  Compatibility with the promoter  Consistency with government priorities  Availability of inputs  Adequacy of market  Reasonableness of costs  Acceptability of risk level During preliminary selection, the analyst should eliminate project proposals that: - Are technically unsound and risky; - Have no market for the output; - Have inadequate supply of inputs; - Are very costly in relation to benefits; - Assume over – ambitious sales and profitability. Obviously, since the criteria tend to be somewhat nebulous, much depends on the experience and sense of objectivity of the professionals applying them. It is, however, necessary to conduct this screening, even with indistinct criteria, in order to reduce to a manageable number the project alternatives to which more work and time will be devoted. Indeed, project planning can be viewed as a process of elimination, i.e. elimination of interior alternatives. As a result of the preliminary screening exercise, a project profile, an opportunity study report, or an identification study report, as appropriate, is prepared showing which project alternatives should be rejected and which ones may be advanced to the next stage.