Page 4 Challenge	
  CAS_C00001	
  v4	
  
Challenge Title: Design and build of a manufacturing plant/system
for a three-pipe nested copper product (“tube-in-tube”)
Challenge ID: CAS_C00001 | Published: 19-06-2014 | Deadline: 25-08-2014
Helpdesk: Mangena Mhlabunzima | Phone: 060 830 0458 | Email: support@connectandsolve.co.za
Challenge Owner: An anonymous medium-sized
manufacturing enterprise.
Business Opportunity: To design and build a
manufacturing plant/system and develop the process to
manufacture a three-pipe nested copper product (“tube-
in-tube”).
Solution Maturity: The challenge owner is seeking a
manufacturing system, but in all likelihood most
responses will be for a design only. In this case,
respondents will have to convince the challenge owner
of the integrity of the design.
Delivery Timelines: Please note the timelines as listed
below in the Phases section. Also, short-listed
respondents will be required to submit a one-meter
sample length of a three-pipe nested product for testing
purposes.
Reward: In return, the reward could be either a fixed fee
for work done; or a royalty on sales of products
manufactured through the new plant; or a minority share
in the venture; or some combination of these, negotiated
between the parties.
Challenge Statement
The business opportunities are to design and build a manufacturing plant/system and develop the
process to manufacture a three-pipe nested copper product (“tube-in-tube”). The first prize would be if we
can access/acquire a fully operational turnkey manufacturing plant to become the core of a new
manufacturing facility with industrial applications. If this is not possible, a prototype design using accepted
design software and a credible proposal to back up the design will also suffice. It will be important to
indicate in the submission whether the design of the plant is the same or can be different, if the volume to
be produced varies from 20m per day to 500m per day (see Background section below).
Page 4 Challenge	
  CAS_C00001	
  v4	
  
Background
The challenge owner has come across a class of industrial applications, which requires the use of precisely
dimensioned nested pipes (“tube-in-tube”), the outer one of which is to be profiled in a particular manner. It
is anticipated that the initial demand for the nested piping product will be of the level of 20m per day,
growing to about 500m per day over three to five years. This is required for cost-efficient production at all
times while the market is growing.
Key Specifications
In lieu of the envisaged multiple industrial applications for the nested-pipe systems, the following minimum
specifications would have to be met:
v Focus on a manufacturing system and/or process for the manufacture of a three-pipe nested
product made entirely from high-quality copper;
v The dimensions of the ribbing (profiling) on the outer pipe should be within the following
tolerances:
o The height A of the ribbing should be at least 6mm;
o The rib thickness (B – C) of the ribbing should be 4mm or less;
o The gap C between ribs should be about 10mm.
v With regards to the three tight-fitting concentric pipes, the inner pipe is a standard 22mm SABS
Class 2 copper tube, whereas the second (middle) pipe must fit tightly on the inner pipe, and the
third (outer) pipe is ribbed on the outside and tightly fits on the second pipe (see specifications for
ribbing above);
v The nested three-pipe product must be produced as a continuous process after which it should be
cut into the appropriate lengths and the rib profile on the outer pipe must be continuous and non-
porous.
Possible Approaches
v All potential solutions that address the business opportunity, address or take account of the
statements in the business challenge, comply with the key specifications above, that meet the
criteria listed under evaluation criteria below, and that can be completed in the time frames as
listed, will be of interest.
A
B
C
Page 4 Challenge	
  CAS_C00001	
  v4	
  
Phases
v Phase 1: Evaluation and a shortlist of respondents by end August 2014.
v Phase 2: EVALUATION of shortlisted submissions will be completed by end September 2014.
v Phase 3: PROTOTYPE DEVELOPMENT and TESTING by end November 2014.
v Phase 4: Commissioning of the fully functional industrial plant manufactured by 1 March 2015.
Evaluation Criteria
The proposals received will be evaluated against the following criteria:
v Simplicity and ease of implementation;
v Potential for proprietary position;
v Respondents must be owners of IP or must state relationship with IP owner;
v Economic and scalable market potential;
v Cost-effectiveness of the solution;
v The respondent’s capabilities and related experience including that of the team; and
v Must include references of at least two previous and current projects in the last three years.
DISCLAIMER AND NON CONFIDENTIAL DISCLOSURE
By submitting a response you represent that the response does not and will not be deemed to contain any
confidential information of any kind whatsoever. The East London Industrial Development Zone SOC Ltd
(ELIDZ) or its representatives will not be held liable for loss of any IP. You also acknowledge that ELIDZ:
STP: Connect & Solve; the ELIDZ and its representatives reserve the sole and absolute right and discretion
to act upon all, some, or none of the responses received for this challenge.
	
  

More Related Content

Viewers also liked

Beautiful Photos
Beautiful PhotosBeautiful Photos
Beautiful Photos
Jaing Lai
 
Taller de formulas 1
Taller de formulas 1Taller de formulas 1
Taller de formulas 1
Tannia Vásquez
 
N045038690
N045038690N045038690
N045038690
IJERA Editor
 
Os Fênomenos de Hydesville
Os Fênomenos de HydesvilleOs Fênomenos de Hydesville
Os Fênomenos de Hydesville
Helio Cruz
 
ESTANCIA EN TEHUACÁN
ESTANCIA EN TEHUACÁNESTANCIA EN TEHUACÁN
ESTANCIA EN TEHUACÁN
Roberto Varela Hdez
 
Acciones Caie 2009
Acciones Caie 2009Acciones Caie 2009
Acciones Caie 2009
omaser
 
W04505116121
W04505116121W04505116121
W04505116121
IJERA Editor
 
Smau milano 2013 giovanni cattani
Smau milano 2013 giovanni cattaniSmau milano 2013 giovanni cattani
Smau milano 2013 giovanni cattaniSMAU
 
Mitä globalisaatio tekee työlle ja taloudelle?
Mitä globalisaatio tekee työlle ja taloudelle?Mitä globalisaatio tekee työlle ja taloudelle?
Mitä globalisaatio tekee työlle ja taloudelle?
teppoeskelinen
 
Oportunidades para refazer
Oportunidades para refazerOportunidades para refazer
Oportunidades para refazer
Helio Cruz
 
Las increibles Posibilidades de Excel con Internet
Las increibles Posibilidades de Excel con InternetLas increibles Posibilidades de Excel con Internet
Las increibles Posibilidades de Excel con InternetJFKSOFT CORP.
 
美的欣賞
美的欣賞美的欣賞
美的欣賞Jaing Lai
 
一分鐘掌握7大護心秘訣
一分鐘掌握7大護心秘訣一分鐘掌握7大護心秘訣
一分鐘掌握7大護心秘訣
Jaing Lai
 
Artigo 03A PARTICIPAÇÃO DO JOVEM NA PERSPECTIVA DO MATERIALISMO HISTÓRICO.
Artigo 03A PARTICIPAÇÃO DO JOVEM NA PERSPECTIVA DO MATERIALISMO HISTÓRICO.Artigo 03A PARTICIPAÇÃO DO JOVEM NA PERSPECTIVA DO MATERIALISMO HISTÓRICO.
Artigo 03A PARTICIPAÇÃO DO JOVEM NA PERSPECTIVA DO MATERIALISMO HISTÓRICO.
Emerson Sill
 
Aprenentatge Servei
Aprenentatge ServeiAprenentatge Servei
Aprenentatge Servei
Esperanza
 
Planos sabrinadâniele 1ºsem-ok
Planos sabrinadâniele 1ºsem-okPlanos sabrinadâniele 1ºsem-ok
Planos sabrinadâniele 1ºsem-ok
Kleriton Franklin
 
Presentacion 21 Octube Auditorio
Presentacion 21 Octube AuditorioPresentacion 21 Octube Auditorio
Presentacion 21 Octube Auditoriomafca
 

Viewers also liked (20)

01 11 10
01 11 1001 11 10
01 11 10
 
Beautiful Photos
Beautiful PhotosBeautiful Photos
Beautiful Photos
 
Taller de formulas 1
Taller de formulas 1Taller de formulas 1
Taller de formulas 1
 
N045038690
N045038690N045038690
N045038690
 
Os Fênomenos de Hydesville
Os Fênomenos de HydesvilleOs Fênomenos de Hydesville
Os Fênomenos de Hydesville
 
ESTANCIA EN TEHUACÁN
ESTANCIA EN TEHUACÁNESTANCIA EN TEHUACÁN
ESTANCIA EN TEHUACÁN
 
Acciones Caie 2009
Acciones Caie 2009Acciones Caie 2009
Acciones Caie 2009
 
W04505116121
W04505116121W04505116121
W04505116121
 
Smau milano 2013 giovanni cattani
Smau milano 2013 giovanni cattaniSmau milano 2013 giovanni cattani
Smau milano 2013 giovanni cattani
 
Mitä globalisaatio tekee työlle ja taloudelle?
Mitä globalisaatio tekee työlle ja taloudelle?Mitä globalisaatio tekee työlle ja taloudelle?
Mitä globalisaatio tekee työlle ja taloudelle?
 
Regional Dishes
Regional DishesRegional Dishes
Regional Dishes
 
Oportunidades para refazer
Oportunidades para refazerOportunidades para refazer
Oportunidades para refazer
 
Las increibles Posibilidades de Excel con Internet
Las increibles Posibilidades de Excel con InternetLas increibles Posibilidades de Excel con Internet
Las increibles Posibilidades de Excel con Internet
 
美的欣賞
美的欣賞美的欣賞
美的欣賞
 
一分鐘掌握7大護心秘訣
一分鐘掌握7大護心秘訣一分鐘掌握7大護心秘訣
一分鐘掌握7大護心秘訣
 
Artigo 03A PARTICIPAÇÃO DO JOVEM NA PERSPECTIVA DO MATERIALISMO HISTÓRICO.
Artigo 03A PARTICIPAÇÃO DO JOVEM NA PERSPECTIVA DO MATERIALISMO HISTÓRICO.Artigo 03A PARTICIPAÇÃO DO JOVEM NA PERSPECTIVA DO MATERIALISMO HISTÓRICO.
Artigo 03A PARTICIPAÇÃO DO JOVEM NA PERSPECTIVA DO MATERIALISMO HISTÓRICO.
 
Aprenentatge Servei
Aprenentatge ServeiAprenentatge Servei
Aprenentatge Servei
 
Planos sabrinadâniele 1ºsem-ok
Planos sabrinadâniele 1ºsem-okPlanos sabrinadâniele 1ºsem-ok
Planos sabrinadâniele 1ºsem-ok
 
Presentacioalehoop2011 2
Presentacioalehoop2011 2Presentacioalehoop2011 2
Presentacioalehoop2011 2
 
Presentacion 21 Octube Auditorio
Presentacion 21 Octube AuditorioPresentacion 21 Octube Auditorio
Presentacion 21 Octube Auditorio
 

Similar to Connect andsolve c00001 ikusasa_2014jul01_2243

Value Propositions - CDMA meeting 2006
Value Propositions - CDMA meeting 2006Value Propositions - CDMA meeting 2006
Value Propositions - CDMA meeting 2006Sudhir Hublikar
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish Murugesan
 
Clampco Products, Inc. - Diesel Progress Supplier Connection
Clampco Products, Inc. - Diesel Progress Supplier ConnectionClampco Products, Inc. - Diesel Progress Supplier Connection
Clampco Products, Inc. - Diesel Progress Supplier Connection
dieselpub
 
Forecasting Steel
Forecasting SteelForecasting Steel
Forecasting Steel
Alessandro Colombi
 
METROLAB ENGINEERING PVT. LTD.
METROLAB ENGINEERING PVT. LTD.METROLAB ENGINEERING PVT. LTD.
METROLAB ENGINEERING PVT. LTD.Yogesh AMTE
 
Best Practices for Improving the PCB Supply Chain: Part II
Best Practices for Improving the PCB Supply Chain: Part IIBest Practices for Improving the PCB Supply Chain: Part II
Best Practices for Improving the PCB Supply Chain: Part II
Cheryl Tulkoff
 
Project report
Project reportProject report
Project reportDolly Roy
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET Journal
 
2014 Kingsmill Product Catalogue (Edition 6)
2014 Kingsmill Product Catalogue (Edition 6)2014 Kingsmill Product Catalogue (Edition 6)
2014 Kingsmill Product Catalogue (Edition 6)
Thorne & Derrick International
 
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
KTN
 
Airtronics Metal Products Overview - Precision Sheet Metal Manufacturer/Desig...
Airtronics Metal Products Overview - Precision Sheet Metal Manufacturer/Desig...Airtronics Metal Products Overview - Precision Sheet Metal Manufacturer/Desig...
Airtronics Metal Products Overview - Precision Sheet Metal Manufacturer/Desig...
guest1f814
 
PVC Pipes Manufacturing Plant Project Report 2024.pdf
PVC Pipes Manufacturing Plant Project Report 2024.pdfPVC Pipes Manufacturing Plant Project Report 2024.pdf
PVC Pipes Manufacturing Plant Project Report 2024.pdf
AlinaEllis1
 
Copper Tubes Manufacturing Plant Project Report.pdf
Copper Tubes Manufacturing Plant Project Report.pdfCopper Tubes Manufacturing Plant Project Report.pdf
Copper Tubes Manufacturing Plant Project Report.pdf
AlinaEllis1
 
Case Studies Ii
Case Studies IiCase Studies Ii
Case Studies Ii
jfjohnson6
 
Sixpack company profile
Sixpack  company profileSixpack  company profile
Sixpack company profile
SixPack Battery Technology Co, Ltd
 

Similar to Connect andsolve c00001 ikusasa_2014jul01_2243 (20)

Value Propositions - CDMA meeting 2006
Value Propositions - CDMA meeting 2006Value Propositions - CDMA meeting 2006
Value Propositions - CDMA meeting 2006
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
presentation
presentationpresentation
presentation
 
Clampco Products, Inc. - Diesel Progress Supplier Connection
Clampco Products, Inc. - Diesel Progress Supplier ConnectionClampco Products, Inc. - Diesel Progress Supplier Connection
Clampco Products, Inc. - Diesel Progress Supplier Connection
 
Forecasting Steel
Forecasting SteelForecasting Steel
Forecasting Steel
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
ABCCOM Profile1
ABCCOM Profile1ABCCOM Profile1
ABCCOM Profile1
 
METROLAB ENGINEERING PVT. LTD.
METROLAB ENGINEERING PVT. LTD.METROLAB ENGINEERING PVT. LTD.
METROLAB ENGINEERING PVT. LTD.
 
Best Practices for Improving the PCB Supply Chain: Part II
Best Practices for Improving the PCB Supply Chain: Part IIBest Practices for Improving the PCB Supply Chain: Part II
Best Practices for Improving the PCB Supply Chain: Part II
 
Project report
Project reportProject report
Project report
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
 
2014 Kingsmill Product Catalogue (Edition 6)
2014 Kingsmill Product Catalogue (Edition 6)2014 Kingsmill Product Catalogue (Edition 6)
2014 Kingsmill Product Catalogue (Edition 6)
 
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
 
Airtronics Metal Products Overview - Precision Sheet Metal Manufacturer/Desig...
Airtronics Metal Products Overview - Precision Sheet Metal Manufacturer/Desig...Airtronics Metal Products Overview - Precision Sheet Metal Manufacturer/Desig...
Airtronics Metal Products Overview - Precision Sheet Metal Manufacturer/Desig...
 
PVC Pipes Manufacturing Plant Project Report 2024.pdf
PVC Pipes Manufacturing Plant Project Report 2024.pdfPVC Pipes Manufacturing Plant Project Report 2024.pdf
PVC Pipes Manufacturing Plant Project Report 2024.pdf
 
Copper Tubes Manufacturing Plant Project Report.pdf
Copper Tubes Manufacturing Plant Project Report.pdfCopper Tubes Manufacturing Plant Project Report.pdf
Copper Tubes Manufacturing Plant Project Report.pdf
 
Case Studies Ii
Case Studies IiCase Studies Ii
Case Studies Ii
 
Sixpack company profile
Sixpack  company profileSixpack  company profile
Sixpack company profile
 

More from Centro de Informação de Negócios - CIN Moçambique

Wunschprofil merck advanced technologies final
Wunschprofil merck advanced technologies finalWunschprofil merck advanced technologies final
Wunschprofil merck advanced technologies final
Centro de Informação de Negócios - CIN Moçambique
 
Wunschprofil boehringer corporate, global compliance final
Wunschprofil boehringer corporate, global compliance finalWunschprofil boehringer corporate, global compliance final
Wunschprofil boehringer corporate, global compliance final
Centro de Informação de Negócios - CIN Moçambique
 

More from Centro de Informação de Negócios - CIN Moçambique (20)

Mozambique delegation profiles
Mozambique delegation profilesMozambique delegation profiles
Mozambique delegation profiles
 
DIA 2_ 04 diarios financeiros_em_mocambique_cgap_icc
DIA 2_ 04 diarios financeiros_em_mocambique_cgap_iccDIA 2_ 04 diarios financeiros_em_mocambique_cgap_icc
DIA 2_ 04 diarios financeiros_em_mocambique_cgap_icc
 
DIA 2_03 ligacao financeira nabard_india
DIA 2_03 ligacao financeira nabard_indiaDIA 2_03 ligacao financeira nabard_india
DIA 2_03 ligacao financeira nabard_india
 
DIA 3_02 ligacao financeira centenary bank uganda
DIA 3_02 ligacao financeira centenary bank ugandaDIA 3_02 ligacao financeira centenary bank uganda
DIA 3_02 ligacao financeira centenary bank uganda
 
DIA 2_01 mobile money_business_models_gsma
DIA 2_01 mobile money_business_models_gsmaDIA 2_01 mobile money_business_models_gsma
DIA 2_01 mobile money_business_models_gsma
 
DIA 1_04 agentes bancarios nabard_india
DIA 1_04 agentes bancarios nabard_indiaDIA 1_04 agentes bancarios nabard_india
DIA 1_04 agentes bancarios nabard_india
 
DIA 1_03 agentes bancarios fidelity bank ghana
DIA 1_03 agentes bancarios fidelity bank ghanaDIA 1_03 agentes bancarios fidelity bank ghana
DIA 1_03 agentes bancarios fidelity bank ghana
 
DIA 1_02 redes de agentes helix institute
DIA 1_02 redes de agentes  helix instituteDIA 1_02 redes de agentes  helix institute
DIA 1_02 redes de agentes helix institute
 
DIA 1_01 agentes _regulacao_banco central do brasil
DIA 1_01 agentes _regulacao_banco central do brasilDIA 1_01 agentes _regulacao_banco central do brasil
DIA 1_01 agentes _regulacao_banco central do brasil
 
Strategic business management_2015
Strategic business management_2015Strategic business management_2015
Strategic business management_2015
 
Strategic business management-application_2015_editable
Strategic business management-application_2015_editableStrategic business management-application_2015_editable
Strategic business management-application_2015_editable
 
Fact sheet itp psd 2015
Fact sheet itp psd 2015Fact sheet itp psd 2015
Fact sheet itp psd 2015
 
Agenda estudo pre embarque
Agenda estudo pre embarqueAgenda estudo pre embarque
Agenda estudo pre embarque
 
Ebola poster_a3_2014
Ebola poster_a3_2014Ebola poster_a3_2014
Ebola poster_a3_2014
 
Wunschprofil merck serono final
Wunschprofil merck serono finalWunschprofil merck serono final
Wunschprofil merck serono final
 
Wunschprofil merck advanced technologies final
Wunschprofil merck advanced technologies finalWunschprofil merck advanced technologies final
Wunschprofil merck advanced technologies final
 
Wunschprofil codema rauscher final
Wunschprofil codema rauscher finalWunschprofil codema rauscher final
Wunschprofil codema rauscher final
 
Wunschprofil boehringer corporate, global compliance final
Wunschprofil boehringer corporate, global compliance finalWunschprofil boehringer corporate, global compliance final
Wunschprofil boehringer corporate, global compliance final
 
Wunschprofil basf final
Wunschprofil basf finalWunschprofil basf final
Wunschprofil basf final
 
Wunschprofil sap final
Wunschprofil sap finalWunschprofil sap final
Wunschprofil sap final
 

Connect andsolve c00001 ikusasa_2014jul01_2243

  • 1. Page 4 Challenge  CAS_C00001  v4   Challenge Title: Design and build of a manufacturing plant/system for a three-pipe nested copper product (“tube-in-tube”) Challenge ID: CAS_C00001 | Published: 19-06-2014 | Deadline: 25-08-2014 Helpdesk: Mangena Mhlabunzima | Phone: 060 830 0458 | Email: support@connectandsolve.co.za Challenge Owner: An anonymous medium-sized manufacturing enterprise. Business Opportunity: To design and build a manufacturing plant/system and develop the process to manufacture a three-pipe nested copper product (“tube- in-tube”). Solution Maturity: The challenge owner is seeking a manufacturing system, but in all likelihood most responses will be for a design only. In this case, respondents will have to convince the challenge owner of the integrity of the design. Delivery Timelines: Please note the timelines as listed below in the Phases section. Also, short-listed respondents will be required to submit a one-meter sample length of a three-pipe nested product for testing purposes. Reward: In return, the reward could be either a fixed fee for work done; or a royalty on sales of products manufactured through the new plant; or a minority share in the venture; or some combination of these, negotiated between the parties. Challenge Statement The business opportunities are to design and build a manufacturing plant/system and develop the process to manufacture a three-pipe nested copper product (“tube-in-tube”). The first prize would be if we can access/acquire a fully operational turnkey manufacturing plant to become the core of a new manufacturing facility with industrial applications. If this is not possible, a prototype design using accepted design software and a credible proposal to back up the design will also suffice. It will be important to indicate in the submission whether the design of the plant is the same or can be different, if the volume to be produced varies from 20m per day to 500m per day (see Background section below).
  • 2. Page 4 Challenge  CAS_C00001  v4   Background The challenge owner has come across a class of industrial applications, which requires the use of precisely dimensioned nested pipes (“tube-in-tube”), the outer one of which is to be profiled in a particular manner. It is anticipated that the initial demand for the nested piping product will be of the level of 20m per day, growing to about 500m per day over three to five years. This is required for cost-efficient production at all times while the market is growing. Key Specifications In lieu of the envisaged multiple industrial applications for the nested-pipe systems, the following minimum specifications would have to be met: v Focus on a manufacturing system and/or process for the manufacture of a three-pipe nested product made entirely from high-quality copper; v The dimensions of the ribbing (profiling) on the outer pipe should be within the following tolerances: o The height A of the ribbing should be at least 6mm; o The rib thickness (B – C) of the ribbing should be 4mm or less; o The gap C between ribs should be about 10mm. v With regards to the three tight-fitting concentric pipes, the inner pipe is a standard 22mm SABS Class 2 copper tube, whereas the second (middle) pipe must fit tightly on the inner pipe, and the third (outer) pipe is ribbed on the outside and tightly fits on the second pipe (see specifications for ribbing above); v The nested three-pipe product must be produced as a continuous process after which it should be cut into the appropriate lengths and the rib profile on the outer pipe must be continuous and non- porous. Possible Approaches v All potential solutions that address the business opportunity, address or take account of the statements in the business challenge, comply with the key specifications above, that meet the criteria listed under evaluation criteria below, and that can be completed in the time frames as listed, will be of interest. A B C
  • 3. Page 4 Challenge  CAS_C00001  v4   Phases v Phase 1: Evaluation and a shortlist of respondents by end August 2014. v Phase 2: EVALUATION of shortlisted submissions will be completed by end September 2014. v Phase 3: PROTOTYPE DEVELOPMENT and TESTING by end November 2014. v Phase 4: Commissioning of the fully functional industrial plant manufactured by 1 March 2015. Evaluation Criteria The proposals received will be evaluated against the following criteria: v Simplicity and ease of implementation; v Potential for proprietary position; v Respondents must be owners of IP or must state relationship with IP owner; v Economic and scalable market potential; v Cost-effectiveness of the solution; v The respondent’s capabilities and related experience including that of the team; and v Must include references of at least two previous and current projects in the last three years. DISCLAIMER AND NON CONFIDENTIAL DISCLOSURE By submitting a response you represent that the response does not and will not be deemed to contain any confidential information of any kind whatsoever. The East London Industrial Development Zone SOC Ltd (ELIDZ) or its representatives will not be held liable for loss of any IP. You also acknowledge that ELIDZ: STP: Connect & Solve; the ELIDZ and its representatives reserve the sole and absolute right and discretion to act upon all, some, or none of the responses received for this challenge.