A
SOFTWARE EXPOSITION
BY
CADconsult
CAD/Training/Civil/Infra-structures/BIM
www.cadconsultant.com
CADs in BIM
What determines your choice of software as a civil Engineer?
= Individual member? Whole structure? Materials (steel,
concrete, timber, etc), type of structure?
COMPUTER AIDED DESIGN SOFTWARES
Drafting
Modeling
Analyzes
Design
Detailing
BUILDING INFORMATION MODELLING
What it really means
 Building Information Modelling (BIM) is a collaborative way of working,
underpinned by the digital technologies which unlock more efficient
methods of designing, creating and maintaining our assets.
 BIM embeds key product and asset data and a 3 dimensional computer
model that can be used for effective management of information
throughout a project lifecycle – from earliest concept through to
operation.
BIM Workflow
BIM Players
BIM
PACKAGES/COMPA
NIES
AUTODE
SK
TRIMBLE/
CSC CSI RISA BENTELY and many
more
 Autodesk is no doubt the most popular CADS company whose software
span across all aspect of engineering as well as entertainment. Some of
its popular civil engineering softwares include:
AUTOCAD
INFRAWORKS
REVIT (ARCHITECTURE AND STRUCTURE)
ROBOT
AUTOCAD STRUCTURAL DETAILING
NAVISWORKS
INFRAWORKS
AUTOCAD CIVIL 3D
 TRIMBLE/CSC:
CSC ORION
CSC TEDDS
CSC FASTRAK
TEKLA STRUCTURES
TEKLA STRUCTURAL DESIGNER
TEKLA TEDDS
TEKLA CIVIL
PROTA STRUCTURE
 RISA: With RISA-3D you can rapidly design buildings, bridges, racks, tanks,
crane rails, stadiums, arenas, culverts, all types of industrial and
commercial structures and everything in between.
RISA FLOOR
RISA FOUNDATION
RISA 3D
RISA FOOT
RISA BASE
RISA TOWER
RISA 2D
RISA MANSORY
 BENTELY:
RAM: Ram steel, Ram concrete, Ram frame,
Ram foundation
STAAD: Staadpro, Staad foundation
MICROSTATION
BENTELY ARCHITECTURE
PROSTRUCTURES
OPEN RAIL
OPEN BRIDGE
 CSI:
ETABS
SAP2000
SAFE
CSI BRIDGE
PERFORM 3D
CSI COL
 MIDAS:
MIDAS CIVIL
MIDAS GEN
MIDAS/SDS
MIDAS/FE modeler
MIDAS/FX+
MIDAS/GTS
THANK
YOU
FOR
LISTENING

Computer Aided Design in Building Information Modeling

  • 1.
  • 2.
    What determines yourchoice of software as a civil Engineer? = Individual member? Whole structure? Materials (steel, concrete, timber, etc), type of structure? COMPUTER AIDED DESIGN SOFTWARES Drafting Modeling Analyzes Design Detailing
  • 3.
    BUILDING INFORMATION MODELLING Whatit really means  Building Information Modelling (BIM) is a collaborative way of working, underpinned by the digital technologies which unlock more efficient methods of designing, creating and maintaining our assets.  BIM embeds key product and asset data and a 3 dimensional computer model that can be used for effective management of information throughout a project lifecycle – from earliest concept through to operation.
  • 4.
  • 5.
  • 6.
  • 7.
     Autodesk isno doubt the most popular CADS company whose software span across all aspect of engineering as well as entertainment. Some of its popular civil engineering softwares include: AUTOCAD INFRAWORKS REVIT (ARCHITECTURE AND STRUCTURE) ROBOT AUTOCAD STRUCTURAL DETAILING NAVISWORKS INFRAWORKS AUTOCAD CIVIL 3D  TRIMBLE/CSC: CSC ORION CSC TEDDS CSC FASTRAK TEKLA STRUCTURES TEKLA STRUCTURAL DESIGNER TEKLA TEDDS TEKLA CIVIL PROTA STRUCTURE
  • 8.
     RISA: WithRISA-3D you can rapidly design buildings, bridges, racks, tanks, crane rails, stadiums, arenas, culverts, all types of industrial and commercial structures and everything in between. RISA FLOOR RISA FOUNDATION RISA 3D RISA FOOT RISA BASE RISA TOWER RISA 2D RISA MANSORY  BENTELY: RAM: Ram steel, Ram concrete, Ram frame, Ram foundation STAAD: Staadpro, Staad foundation MICROSTATION BENTELY ARCHITECTURE PROSTRUCTURES OPEN RAIL OPEN BRIDGE
  • 9.
     CSI: ETABS SAP2000 SAFE CSI BRIDGE PERFORM3D CSI COL  MIDAS: MIDAS CIVIL MIDAS GEN MIDAS/SDS MIDAS/FE modeler MIDAS/FX+ MIDAS/GTS
  • 10.