SOAKAWAYS AND FLOODING RISK – SLOPING SITES
Ground water around the soakaway could cause vaults to flood!!
Install a land-drain to prevent flooding of soakaway area.
700
900
1150
Hand clean
800150150
350
375
600
Splash back
2200
1640
Grab Rail Wooden Building
Drg. No. NS FA 011
Drawn: NJG
Date: 17/5/07 Scale: NTS
NatSol Ltd
Tel: 01686 412653
www.natsol.co.uk
1
NATSOL SITE LAYOUT, EXCAVATIONS AND URINE AND
RAINWATER SOAKAWAYS – see site layout and excavation drwgs
The drawings and instructions included with this guide show:-
1. The Site Layout for the COMPUS TWIN Full Access toilet
2. The required Excavations for Urine and Rainwater Soakaways
3. The method of installing or constructing these.
As levels of use, site conditions and local regulations will vary considerably, NatSol is unable to
provide site-specific design advice on disposal of urine from the toilet or rain from the roof.
These notes are provided as an illustration of typical requirements to allow the planning of an
installation but do not guarantee compliance or adequate performance for a given site. Whilst
the volumes discharged are generally too small to cause concern, Building Control and the
Environment Agency should have been consulted prior to installation.
Although volumes of urine or roof run-off are small under-sized soakaways in heavy soil or
where there is a high water table will fail. This could result in surface water backing up and
flowing into the compost chamber via the urine outlet. It is essential that this toilet is not
installed on sites which may become waterlogged or flooded at any time during the year
without first consulting NatSol to discuss possible solutions.
Roofwater
Ideally this should be collected in a water butt. However any overflow must be directed away
from the building foundations. It is usually recommended that the roof water is kept out of the
urine soakaway and directed to a separate soakaway. However, with the GRC soakaway unit it
may be acceptable to use it for rainwater too – please read the Checklist below to help decide.
If a separate soakaway is required for rain then a pit 600mm square by about 600mm deep filled
with broken bricks, or similar, to a depth of 500mm should suffice in all but the heaviest soil. See
fig 1. A layer of geotextile excludes soil and the pipe enters just beneath this. You may need to
buy additional 110mm fittings over and above those we supply.
Figure 1. Rainwater soakaway.
2
Urine
For most toilets we now supply this ready made GRC soakaway for urine.
Please examine these photographs and see the excavation drawings before installing.
3
Rainwater may enter the soakway only if the ground is free draining. See checklist below!
Excavate an area of ground measuring 1.3 m by 1.3m and 380mm deep. It should be no closer
than 1m from the side of the vaults and in a position that the urine exit pipe [on the RHS of the
vaults looking from the front] can be connected easily to the soakaway unit. If there is no room
on the RHS then make the excavation behind the toilet vaults. To have sufficient gradient on the
pipe the soakaway should be no further than 3m away on a flat site.
You will have to judge the precise excavation depth so that when you eventually backfill with soil
the finished ground level is just beneath the aluminium cover on the gully. The soakaway unit is
intentionally shallow so that the urine goes into the biologically active topsoil. The pipe from the
vaults should fall at not less than 1:60 and will only be a few inches beneath the ground.
Position the unit in the centre of the hole so that a 110mm underground pipe from the vaults can
connect to the brown 110mm pipe stub projecting through the near end of the unit shown above.
Place hardcore or left over aggregate to each side of the unit where the slots occur. Cover the
whole unit and the hardcore or aggregate with the geo-textile provided and cover with earth.
In some cases it may be acceptable for the rainwater to go to this soakaway as well. In which
case this should be arranged before backfilling – see below.
Checklist to decide on whether rainwater can go to the GRC soakaway too.
1. Only rainwater from the roof of a NatSol Compus Twin Full Access toilet could possibly
go to the soakaway. Rainwater from other buildings should not go to this soakaway.
2. The topsoil should be at least 350mm deep or the subsoil should be porous.
3. The site should not be permanently or intermittently water-logged or closer than 10m to
a watercourse or lake.
4. The site should not be in an area of heavy rainfall.
5. IF IN DOUBT CREATE A SEPARATE SOAKAWAY FOR RAIN.
If these conditions are satisfied then use a layout like one of those shown on the attached
drawing Excavations and connect the rain pipe into the spare hole in the end of the soakaway.
If the conditions are not satisfied then blank off the spare hole in the end of the soakaway with
the blanking plug provided, held in place with SIKAFlex. Then construct a separate soakaway
for rainwater as shown above.
Site constructed urine soakaway – if you don’t have a GRC one.
On some sites a urine soakaway constructed on site purely from hardcore may be more
appropriate – figure 2. This will have been agreed before supply of goods. If constructed it
should be shallow to allow dispersal and treatment in the biologically active topsoil. Length in
the region of 1.5m on permeable sites.
Fig 2. Site urine soakaway
SOAKAWAYS AND FLOODING RISK – SLOPING SITES
Ground water around the soakaway could cause vaults to flood!!
Install a land-drain to prevent flooding of soakaway area.
JOB NAME: _______________________________________
If no job name is filled in these instructions are only for
estimating and should not be used for installation.
NOTICE TO PURCHASERS AND INSTALLERS:
Some people consider it a matter of principle not to read instructions and
prefer the heroic approach of assembling something without being told
how to do it….!! NATSOL toilets are not difficult to install but failure to
read these instructions could prove very expensive - for you.
We advise clients not to pay their contractors until we have received
a full set of installation photos a list of which is included.
These instructions must be passed on in full to the person who is actually
doing the installation at least a week in advance and they should inspect
the site in advance. (This applies even if a representative of NATSOL is going to
be on-site to supervise. You will be charged for supervision even if, as a result of
poor preparation by your installation team, nothing gets done. The presence of
NATSOL staff on site is not an excuse for the installation team to turn up ill equipped,
ill informed, under staffed and under skilled.)
We do not guarantee our products either in terms of durability of
components or correct function unless properly installed.
If you are an experienced installer of our toilets it’s still worth checking
through to see what’s new.
Contents:-
1. Copy of our letter to client
2. Basic requirements list – tools, machinery, personnel
3. List of photos to be returned to us before contractor gets paid
4. Risk assessment for installation
5. Site and soakaway instructions including drawings
6. Vault installation including site specific drawing
7. Building erection and fitting out
T 01686 412653
COPY OF LETTER TO CLIENT:
Dear Client……..
INSTALLATION PROCEDURE FOR COMPUS TWIN TOILETS
NatSol does not usually carry out installation of its products. We can offer supervision of installation
for an agreed fee should this be deemed essential. In most cases we hope to avoid supervision in
order to minimise costs.
We are, of course, very concerned that installations are carried out to a high standard. To ensure this
happens it is essential that you appoint a competent builder to carry out the work.
Installation typically requires a 4 tonne machine, or larger, to off-load the vaults from the delivery lorry,
to carry out excavation and to lower the vaults into the ground. Assembly of the vaults and building
requires general building skills and at least three persons on site not including anyone in a purely
supervisory role.
You should choose a contractor who is familiar with all relevant health and safety procedures for
the work involved and who will read our installation instructions and risk assessment thoroughly
before the installation day. The instructions tell the contractor what tools, equipment and materials
he/she must supply. It is essential the contractor turns up, properly equipped, on the day
arranged otherwise the delivery lorry will have to return to the depot with the vaults and you
will have to pay for a second delivery.
We can also assist in the following ways:-
1. In parts of the country where we know of a contractor experienced in installing our products
we will make their contact details known to you.
2. We ensure that full installation instructions are sent out in advance to contractors and are
available to discuss these in advance of installation.
3. With reasonable notice we are usually available by phone on the day of installation to answer
any questions that may arise.
Whether or not you use a contractor to complete your installation our product guarantee is
subject to us receiving a set of specified photographs as detailed on the reverse of this letter
as a way of assessing the quality of installation. This is not necessary in cases where NatSol has
supervised the entire installation process. We recommend that these photographs are checked by us
before you pay your contractor. The contractor should be informed by you in advance of the
intention to use photographs as a way of assessing the quality of their work.
Having said this it must be understood that the contract for the installation is between you, the client,
and the contractor and that if the product is badly installed NatSol cannot accept any responsibility
whatsoever unless it can be proven that components were missing at the time of delivery or were
defective.
Please contact us if you have concerns about any issues above.
Best wishes, Andrew Warren MD
NATSOL - COMPUS TWIN Full Access
SUMMARY OF MATERIALS, TOOLS AND PERSONNEL REQUIREMENTS –
Black items concern the vaults. Blue items concern the building erection and fitting out.
1. Materials required - NOT supplied by NATSOL:
a. 0.5 m3
of concrete as bedding layer for vaults [C20P to BS 5328 (1:2:4 mix)]
b. 0.5 m3
of concrete [as above] for haunching around base of vaults
c. additional 1m3 (2 tonnes) of concrete for haunching around base if heavy clay
d. additional soil pipe and fittings if required to reach desired soakaway site
e. silicone grease for pipe jointing
f. exterior finish for timber clad buildings – OS COLOR products recommended
2. General building tools & equipment including the following:
a. safety clothing â–ˇ
b. tape measure â–ˇ
c. marker spray â–ˇ
d. digger to excavate â–ˇ
e. machinery to unload 850kg from lorry and lower 650kg into ground â–ˇ
f. spades, shovels â–ˇ
g. concrete mixer [could be done by hand] â–ˇ
h. wheelbarrow â–ˇ
i. 50mm thick screed rails – 2 @ 2.5m long with pegs fixed at each end □
j. 2m long screeding bar â–ˇ
k. long spirit level â–ˇ
l. mastic gun â–ˇ
m. hammer â–ˇ
n. saw [for cutting plastic pipe] â–ˇ
o. ladder to assist with building erection â–ˇ
p. large flat bit screwdriver â–ˇ
q. powerful cordless drill or generator and drill â–ˇ
r. socket drives for cordless or spanners â–ˇ
s. drill bits for piloting timber or metal and plastic â–ˇ
t. small assortment of ZP woodscrews â–ˇ
3. Personnel & skills required for vault installation [approx time 4 hours]:
A machine operator, banksman and 1 or 2 others qualified in general building skills
particularly wet work. The vaults will need to be lifted using machinery and a “D” shackle.
The slings are supplied by NatSol but not the shackle.
4. Personnel & skills required to erect building [approx time 4 hours]:
General qualified building skills - 4 people for erection of frames and roof, then 2 for
finishing
5. Personnel & skills required to fit out [approx time 2 hours]:
General DIY or plumbing skills, 1 person is fine, 2 is useful.
Qualified electrician needed to connect fan on toilets with fan driven [as opposed to
passive] ventilation systems.
NB. The construction times mentioned above [points 3,4,5] are given in good faith but NatSol Ltd
cannot be held responsible for the additional cost incurred by installation times in excess of these or
for any other circumstances [e.g. delay in completion of the installation] which may arise as a result of
extended installation times.
CHECKLIST OF INSTALLATION PHOTOS TO BE SENT TO NATSOL BEFORE PAYING
YOUR CONTRACTOR IN ORDER TO OBTAIN OUR GUARANTEE
SOME OF THESE NEED TO BE TAKEN DURING THE INSTALLATION PROCESS
1. The excavation and the concrete screed levelled off.
2. The excavation for the soakaway.
3. The vaults in the ground but before the lid/floor section is fitted. This should show the urine
gutter in position and the SIKA mastic around the rim of the vaults.
4. SIKA pointing up the gap between the lid and the base of the vaults after the lid has been
fitted. From 2010 onwards it shouild be possible to take this picture after the building has been
erected - if that helps.
5. The soakaway in position before back-filling commences. This should include the pipe
connection from the vaults which must slope down [at a gradient of 1 in 60 minimum] to the
soakaway.
6. One of each elevation of the building from outside including, on at least one elevation, the full
height of vent pipe. Corner and roof flashings should be in place.
7. Two looking inside the cubicle showing both side walls with fixtures and fittings showing the
quality and completion of fitting out.
8. One of the urinal pipework.
9. One looking down the pedestal [with flash on] so that the urine separating plate and the soak
in the bottom of the vault are visible.
10. One into the active vault with the front cover removed showing the rake in place. The picture
should be taken at a low enough angle that it is possible to see the bottom of the stainless
steel urine separating plate over the urine collecting gutter.
11. One to confirm that the end of the urinal pipe does not block the urine gutter under the floor
but stops approx 60 to 100mm above the bottom of the urine gutter. Picture 7 might provide
this if the RH vault is used first.
1 2 3 4 5
6a 6b 6c 6d 7a 7b
8 9 10a 10b 11
You may wish to send us additional photographs but please limit the total to 20 unless a specific
problem has arisen with the installation which you need to illustrate.
NatSol The Compost Toilet Specialists
RISK ASSESSMENT FOR SITE INSTALLATION OF COMPUS TWIN TOILETS - Full Access Models
Original Date: 1/10/07 Carried out by: NatSol Ltd Signed:
Reviewed Date: 24/8/09 Carried out by: AW NatSol Ltd Signed:
Contractors additions Date: Carried out by: Signed:
Potential severity [S] Likelihood of occurrence [L] Risk [S x L]
Fatal/Major/Illness 3 Certain/More than likely 3 3, 6 or 9 High
Injury/Lost time disability injury 2 Reasonably likely 2 2 or 4 Medium
Minor injury or illness 1 or 0 Seldom/Very unlikely 1 or 0 1 or 0 Low
The risk levels shown below are the residual risk if safety precautions included in our installation instructions and shown below are adhered to.
Significant hazards Persons at risk. Existing controls Residual level of
risk
FURTHER ACTION REQ'D BY CONTRACTOR:
Name and location
of person/place at
risk
As described in the installation
instructions
Action: By whom: By date: Done
[tick]
1
Manhandling building sections
from lorry. Risk of dropping,
cuts or pinching.
Clients, volunteers
and contractors
High visibility safety clothing and
gloves and safety boots.
2 [S] x 1[L] = 2
2
Off-loading vaults from lorry
using machinery. Vaults weigh
approx 600kgs or 850kg if off-
loaded complete with lid. Risk
of dropping.
Contractors +
bystanders
Rope off area. High visibility safety
clothing and gloves, hard hats and
safety boots. Use appropriate
machine for load to be lifted. Correct
use of D shackle [to be supplied by
machinery operator] and slings
supplied by NatSol OR use forks on
machine if long enough. 3 [S] x 1[L] = 3
3
Use of machinery to excavate. Ditto + bystanders Rope off excavation area. Safety
clothing as 2 above. 3 [S] x 1[L] = 3
4
Use of cement to make
concrete - alkaline dust
Contractors +
bystanders
Use dust masks and gloves. If windy
use goggles. Keep bystanders clear. 2 [S] x 1[L] = 2 PTO
5
Lowering vaults into ground.
Risk of dropping.
Contractors +
bystanders
Keep operating area roped off. Safety
clothing as in 2 above. Use
appropriate machine for load to be
lifted. Correct use of D shackle [to be
supplied by machinery operator] and
slings supplied by NatSol.
3 [S] x 1[L] = 3
7
Fitting vault floor section. Contractors +
bystanders
As above + risk of finger pinching.
2 [S] x 1[L] = 2
6
Drilling of vault flanges. Dust
and use of electrical
equipment.
Contractors Use dust masks and eye protection.
Use cordless drill OR corded drill with
voltage and protection equipment
[e.g. trips] to meet all required site
standards. 1 [S] x 2[L] = 2
8
Sharp edges on metal building
sections
Contractors Use gloves and safety boots.
1 [S] x 2[L] = 2
9
Wind blowing building over
during erection
Contractors +
bystanders
Safety clothing as in 2 above.
Sufficient operatives to support
building sections manually. Use
props as necessary. Do not erect
building in strong winds. 2 [S] x 1[L] = 2
10
Wind blowing off roof before
fixing down.
Contractors +
bystanders
Hold roof down manually as soon as
it is in place and fix immediately. Do
not fit roof in strong winds. 3 [S] x 1[L] = 3
11
Use of ladder to lower vent pipe
into building
Contractors +
bystanders
Ladder to meet appropriate BS and
rest only on level well compacted
ground. Person appointed to support
ladder when in use. Not to be done
under windy conditions. Keep
bystanders clear. 3 [S] x 1[L] = 3
12 Fitting roof edge flashings. Contractors As above
2 [S] x 1[L] = 2
13
Painting - fumes and splashes
to eyes or skin. Depends on
type. Paint not supplied by
NatSol
Contractors Use gloves and other protective
clothing as seems necessary.
1 [S] x 1[L] = 1
700
900
1150
Hand clean
770150150
350
375
600
1640
2200
Grab Rail Metal Building
Drg. No. NS FA 012
Drawn: NJG
Date: 17/5/07 Scale: NTS
NatSol Ltd
Tel: 01686 412653
www.natsol.co.uk

More Related Content

What's hot

Final crypts version
Final crypts versionFinal crypts version
Final crypts versionDawnLong18
 
Wall water feature installation instruction manual for the reflection creek a...
Wall water feature installation instruction manual for the reflection creek a...Wall water feature installation instruction manual for the reflection creek a...
Wall water feature installation instruction manual for the reflection creek a...Patrick Maloy
 
Catalog of Marine Rubber Fender
Catalog of Marine Rubber FenderCatalog of Marine Rubber Fender
Catalog of Marine Rubber FenderVicky Zhao
 
Catalog of Dredging Pipeline
Catalog of Dredging PipelineCatalog of Dredging Pipeline
Catalog of Dredging PipelineVicky Zhao
 
F1036 Filtration Apparatus
F1036 Filtration ApparatusF1036 Filtration Apparatus
F1036 Filtration ApparatusStephen Martinelli
 
Ess SynLok Photo Install Guide
Ess SynLok Photo Install Guide Ess SynLok Photo Install Guide
Ess SynLok Photo Install Guide James Little
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1Elsayed Amer
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Garry Pepper
 

What's hot (11)

Final crypts version
Final crypts versionFinal crypts version
Final crypts version
 
Installation Instructions Butterfly Valve
Installation Instructions Butterfly ValveInstallation Instructions Butterfly Valve
Installation Instructions Butterfly Valve
 
Wall water feature installation instruction manual for the reflection creek a...
Wall water feature installation instruction manual for the reflection creek a...Wall water feature installation instruction manual for the reflection creek a...
Wall water feature installation instruction manual for the reflection creek a...
 
Catalog of Marine Rubber Fender
Catalog of Marine Rubber FenderCatalog of Marine Rubber Fender
Catalog of Marine Rubber Fender
 
Catalog of Dredging Pipeline
Catalog of Dredging PipelineCatalog of Dredging Pipeline
Catalog of Dredging Pipeline
 
F1036 Filtration Apparatus
F1036 Filtration ApparatusF1036 Filtration Apparatus
F1036 Filtration Apparatus
 
Ess SynLok Photo Install Guide
Ess SynLok Photo Install Guide Ess SynLok Photo Install Guide
Ess SynLok Photo Install Guide
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
RAIN WATER HARVESTING SYSTEMS
RAIN WATER HARVESTING SYSTEMSRAIN WATER HARVESTING SYSTEMS
RAIN WATER HARVESTING SYSTEMS
 
SOS brochure
SOS brochureSOS brochure
SOS brochure
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
 

Similar to Compost Toilets Design & Access Statement

1.Enviro Span Installation Guide
1.Enviro Span Installation Guide1.Enviro Span Installation Guide
1.Enviro Span Installation GuideMike Rae
 
How to carry out a percolation test
How to carry out a percolation testHow to carry out a percolation test
How to carry out a percolation testRainwaterharvesting
 
Neptune solutions brochure
Neptune solutions brochure Neptune solutions brochure
Neptune solutions brochure Micheal Mullvihill
 
Mini Pipe Sprayer
 Mini Pipe Sprayer Mini Pipe Sprayer
Mini Pipe Sprayer3M
 
Avalon Log Homes Construction Manual 2011
Avalon Log Homes Construction Manual 2011Avalon Log Homes Construction Manual 2011
Avalon Log Homes Construction Manual 2011Avalon Log Homes
 
Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Micheal Mullvihill
 
Operation & maintenance 2011
Operation & maintenance 2011Operation & maintenance 2011
Operation & maintenance 2011Abdul Hakeem S.K.
 
How to Fit Hardwood Flooring
How to Fit Hardwood FlooringHow to Fit Hardwood Flooring
How to Fit Hardwood FlooringBritish Hardwoods
 
40 x 220 Pole Tent Installation Instructions
40 x 220 Pole Tent Installation Instructions40 x 220 Pole Tent Installation Instructions
40 x 220 Pole Tent Installation Instructionscelinatent
 
Sample Home Inspection Report
Sample Home Inspection ReportSample Home Inspection Report
Sample Home Inspection Reporttspargo
 
40 x 160 Pole Tent Installation Instructions
40 x 160 Pole Tent Installation Instructions40 x 160 Pole Tent Installation Instructions
40 x 160 Pole Tent Installation Instructionscelinatent
 
Catch basin or di
Catch basin or diCatch basin or di
Catch basin or dilinn172
 
40 x 260 Pole Tent Installation Instructions
40 x 260 Pole Tent Installation Instructions40 x 260 Pole Tent Installation Instructions
40 x 260 Pole Tent Installation Instructionscelinatent
 
The Ulitmate Guide to Installing a Rooflight in Your Home
The Ulitmate Guide to Installing a Rooflight in Your HomeThe Ulitmate Guide to Installing a Rooflight in Your Home
The Ulitmate Guide to Installing a Rooflight in Your HomeHitech Rooflights
 
Prefabricated Vertical Drains (PVD) method statement
Prefabricated Vertical Drains  (PVD) method statementPrefabricated Vertical Drains  (PVD) method statement
Prefabricated Vertical Drains (PVD) method statementKhaza Ahmed Palash
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insituLingWei11
 
30 x 165 Pole Tent Installation Instructions
30 x 165 Pole Tent Installation Instructions30 x 165 Pole Tent Installation Instructions
30 x 165 Pole Tent Installation Instructionscelinatent
 
30 x 90 Pole Tent Installation Instructions
30 x 90 Pole Tent Installation Instructions30 x 90 Pole Tent Installation Instructions
30 x 90 Pole Tent Installation Instructionscelinatent
 

Similar to Compost Toilets Design & Access Statement (20)

1.Enviro Span Installation Guide
1.Enviro Span Installation Guide1.Enviro Span Installation Guide
1.Enviro Span Installation Guide
 
How to carry out a percolation test
How to carry out a percolation testHow to carry out a percolation test
How to carry out a percolation test
 
Neptune solutions brochure
Neptune solutions brochure Neptune solutions brochure
Neptune solutions brochure
 
Mini Pipe Sprayer
 Mini Pipe Sprayer Mini Pipe Sprayer
Mini Pipe Sprayer
 
Avalon Log Homes Construction Manual 2011
Avalon Log Homes Construction Manual 2011Avalon Log Homes Construction Manual 2011
Avalon Log Homes Construction Manual 2011
 
Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Neptune solutions brochure may 2017
Neptune solutions brochure may 2017
 
Operation & maintenance 2011
Operation & maintenance 2011Operation & maintenance 2011
Operation & maintenance 2011
 
STORAGE: Key factors in bin usage
STORAGE: Key factors in bin usageSTORAGE: Key factors in bin usage
STORAGE: Key factors in bin usage
 
How to Fit Hardwood Flooring
How to Fit Hardwood FlooringHow to Fit Hardwood Flooring
How to Fit Hardwood Flooring
 
40 x 220 Pole Tent Installation Instructions
40 x 220 Pole Tent Installation Instructions40 x 220 Pole Tent Installation Instructions
40 x 220 Pole Tent Installation Instructions
 
Sample Home Inspection Report
Sample Home Inspection ReportSample Home Inspection Report
Sample Home Inspection Report
 
40 x 160 Pole Tent Installation Instructions
40 x 160 Pole Tent Installation Instructions40 x 160 Pole Tent Installation Instructions
40 x 160 Pole Tent Installation Instructions
 
Concreting work
Concreting workConcreting work
Concreting work
 
Catch basin or di
Catch basin or diCatch basin or di
Catch basin or di
 
40 x 260 Pole Tent Installation Instructions
40 x 260 Pole Tent Installation Instructions40 x 260 Pole Tent Installation Instructions
40 x 260 Pole Tent Installation Instructions
 
The Ulitmate Guide to Installing a Rooflight in Your Home
The Ulitmate Guide to Installing a Rooflight in Your HomeThe Ulitmate Guide to Installing a Rooflight in Your Home
The Ulitmate Guide to Installing a Rooflight in Your Home
 
Prefabricated Vertical Drains (PVD) method statement
Prefabricated Vertical Drains  (PVD) method statementPrefabricated Vertical Drains  (PVD) method statement
Prefabricated Vertical Drains (PVD) method statement
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
 
30 x 165 Pole Tent Installation Instructions
30 x 165 Pole Tent Installation Instructions30 x 165 Pole Tent Installation Instructions
30 x 165 Pole Tent Installation Instructions
 
30 x 90 Pole Tent Installation Instructions
30 x 90 Pole Tent Installation Instructions30 x 90 Pole Tent Installation Instructions
30 x 90 Pole Tent Installation Instructions
 

More from Susy Feltham

Water Play Area Outline Layout
Water Play Area Outline LayoutWater Play Area Outline Layout
Water Play Area Outline LayoutSusy Feltham
 
Turf Roof Planting Detail
Turf Roof Planting DetailTurf Roof Planting Detail
Turf Roof Planting DetailSusy Feltham
 
Swale Detail
Swale DetailSwale Detail
Swale DetailSusy Feltham
 
Play Area Mound Detail
Play Area Mound Detail Play Area Mound Detail
Play Area Mound Detail Susy Feltham
 
Fitness Zone Completion Photos
Fitness Zone Completion PhotosFitness Zone Completion Photos
Fitness Zone Completion PhotosSusy Feltham
 
Community Garden Planting Plan and completed photos
Community Garden Planting Plan and completed photosCommunity Garden Planting Plan and completed photos
Community Garden Planting Plan and completed photosSusy Feltham
 
Garden Magic 2009 Display
Garden Magic 2009 DisplayGarden Magic 2009 Display
Garden Magic 2009 DisplaySusy Feltham
 
Park Interpretation Board Design
Park Interpretation Board DesignPark Interpretation Board Design
Park Interpretation Board DesignSusy Feltham
 
Pond Planting Areas & Hide
Pond Planting Areas & HidePond Planting Areas & Hide
Pond Planting Areas & HideSusy Feltham
 
Cliffe Castle Vegetable Beds Completed
Cliffe Castle Vegetable Beds CompletedCliffe Castle Vegetable Beds Completed
Cliffe Castle Vegetable Beds CompletedSusy Feltham
 

More from Susy Feltham (10)

Water Play Area Outline Layout
Water Play Area Outline LayoutWater Play Area Outline Layout
Water Play Area Outline Layout
 
Turf Roof Planting Detail
Turf Roof Planting DetailTurf Roof Planting Detail
Turf Roof Planting Detail
 
Swale Detail
Swale DetailSwale Detail
Swale Detail
 
Play Area Mound Detail
Play Area Mound Detail Play Area Mound Detail
Play Area Mound Detail
 
Fitness Zone Completion Photos
Fitness Zone Completion PhotosFitness Zone Completion Photos
Fitness Zone Completion Photos
 
Community Garden Planting Plan and completed photos
Community Garden Planting Plan and completed photosCommunity Garden Planting Plan and completed photos
Community Garden Planting Plan and completed photos
 
Garden Magic 2009 Display
Garden Magic 2009 DisplayGarden Magic 2009 Display
Garden Magic 2009 Display
 
Park Interpretation Board Design
Park Interpretation Board DesignPark Interpretation Board Design
Park Interpretation Board Design
 
Pond Planting Areas & Hide
Pond Planting Areas & HidePond Planting Areas & Hide
Pond Planting Areas & Hide
 
Cliffe Castle Vegetable Beds Completed
Cliffe Castle Vegetable Beds CompletedCliffe Castle Vegetable Beds Completed
Cliffe Castle Vegetable Beds Completed
 

Recently uploaded

VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiVIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiSuhani Kapoor
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...home
 
PODSCAPE - Brochure 2023_ prefab homes in Bangalore India
PODSCAPE - Brochure 2023_ prefab homes in Bangalore IndiaPODSCAPE - Brochure 2023_ prefab homes in Bangalore India
PODSCAPE - Brochure 2023_ prefab homes in Bangalore IndiaYathish29
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonDelhi Call girls
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightDelhi Call girls
 
MASONRY -Building Technology and Construction
MASONRY -Building Technology and ConstructionMASONRY -Building Technology and Construction
MASONRY -Building Technology and Constructionmbermudez3
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...Suhani Kapoor
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...Amil baba
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 

Recently uploaded (20)

VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiVIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
PODSCAPE - Brochure 2023_ prefab homes in Bangalore India
PODSCAPE - Brochure 2023_ prefab homes in Bangalore IndiaPODSCAPE - Brochure 2023_ prefab homes in Bangalore India
PODSCAPE - Brochure 2023_ prefab homes in Bangalore India
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
MASONRY -Building Technology and Construction
MASONRY -Building Technology and ConstructionMASONRY -Building Technology and Construction
MASONRY -Building Technology and Construction
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 

Compost Toilets Design & Access Statement

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. SOAKAWAYS AND FLOODING RISK – SLOPING SITES Ground water around the soakaway could cause vaults to flood!! Install a land-drain to prevent flooding of soakaway area.
  • 7.
  • 8.
  • 9. 700 900 1150 Hand clean 800150150 350 375 600 Splash back 2200 1640 Grab Rail Wooden Building Drg. No. NS FA 011 Drawn: NJG Date: 17/5/07 Scale: NTS NatSol Ltd Tel: 01686 412653 www.natsol.co.uk
  • 10.
  • 11. 1 NATSOL SITE LAYOUT, EXCAVATIONS AND URINE AND RAINWATER SOAKAWAYS – see site layout and excavation drwgs The drawings and instructions included with this guide show:- 1. The Site Layout for the COMPUS TWIN Full Access toilet 2. The required Excavations for Urine and Rainwater Soakaways 3. The method of installing or constructing these. As levels of use, site conditions and local regulations will vary considerably, NatSol is unable to provide site-specific design advice on disposal of urine from the toilet or rain from the roof. These notes are provided as an illustration of typical requirements to allow the planning of an installation but do not guarantee compliance or adequate performance for a given site. Whilst the volumes discharged are generally too small to cause concern, Building Control and the Environment Agency should have been consulted prior to installation. Although volumes of urine or roof run-off are small under-sized soakaways in heavy soil or where there is a high water table will fail. This could result in surface water backing up and flowing into the compost chamber via the urine outlet. It is essential that this toilet is not installed on sites which may become waterlogged or flooded at any time during the year without first consulting NatSol to discuss possible solutions. Roofwater Ideally this should be collected in a water butt. However any overflow must be directed away from the building foundations. It is usually recommended that the roof water is kept out of the urine soakaway and directed to a separate soakaway. However, with the GRC soakaway unit it may be acceptable to use it for rainwater too – please read the Checklist below to help decide. If a separate soakaway is required for rain then a pit 600mm square by about 600mm deep filled with broken bricks, or similar, to a depth of 500mm should suffice in all but the heaviest soil. See fig 1. A layer of geotextile excludes soil and the pipe enters just beneath this. You may need to buy additional 110mm fittings over and above those we supply. Figure 1. Rainwater soakaway.
  • 12. 2 Urine For most toilets we now supply this ready made GRC soakaway for urine. Please examine these photographs and see the excavation drawings before installing.
  • 13. 3 Rainwater may enter the soakway only if the ground is free draining. See checklist below! Excavate an area of ground measuring 1.3 m by 1.3m and 380mm deep. It should be no closer than 1m from the side of the vaults and in a position that the urine exit pipe [on the RHS of the vaults looking from the front] can be connected easily to the soakaway unit. If there is no room on the RHS then make the excavation behind the toilet vaults. To have sufficient gradient on the pipe the soakaway should be no further than 3m away on a flat site. You will have to judge the precise excavation depth so that when you eventually backfill with soil the finished ground level is just beneath the aluminium cover on the gully. The soakaway unit is intentionally shallow so that the urine goes into the biologically active topsoil. The pipe from the vaults should fall at not less than 1:60 and will only be a few inches beneath the ground. Position the unit in the centre of the hole so that a 110mm underground pipe from the vaults can connect to the brown 110mm pipe stub projecting through the near end of the unit shown above. Place hardcore or left over aggregate to each side of the unit where the slots occur. Cover the whole unit and the hardcore or aggregate with the geo-textile provided and cover with earth. In some cases it may be acceptable for the rainwater to go to this soakaway as well. In which case this should be arranged before backfilling – see below. Checklist to decide on whether rainwater can go to the GRC soakaway too. 1. Only rainwater from the roof of a NatSol Compus Twin Full Access toilet could possibly go to the soakaway. Rainwater from other buildings should not go to this soakaway. 2. The topsoil should be at least 350mm deep or the subsoil should be porous. 3. The site should not be permanently or intermittently water-logged or closer than 10m to a watercourse or lake. 4. The site should not be in an area of heavy rainfall. 5. IF IN DOUBT CREATE A SEPARATE SOAKAWAY FOR RAIN. If these conditions are satisfied then use a layout like one of those shown on the attached drawing Excavations and connect the rain pipe into the spare hole in the end of the soakaway. If the conditions are not satisfied then blank off the spare hole in the end of the soakaway with the blanking plug provided, held in place with SIKAFlex. Then construct a separate soakaway for rainwater as shown above. Site constructed urine soakaway – if you don’t have a GRC one. On some sites a urine soakaway constructed on site purely from hardcore may be more appropriate – figure 2. This will have been agreed before supply of goods. If constructed it should be shallow to allow dispersal and treatment in the biologically active topsoil. Length in the region of 1.5m on permeable sites. Fig 2. Site urine soakaway
  • 14.
  • 15.
  • 16. SOAKAWAYS AND FLOODING RISK – SLOPING SITES Ground water around the soakaway could cause vaults to flood!! Install a land-drain to prevent flooding of soakaway area.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. JOB NAME: _______________________________________ If no job name is filled in these instructions are only for estimating and should not be used for installation. NOTICE TO PURCHASERS AND INSTALLERS: Some people consider it a matter of principle not to read instructions and prefer the heroic approach of assembling something without being told how to do it….!! NATSOL toilets are not difficult to install but failure to read these instructions could prove very expensive - for you. We advise clients not to pay their contractors until we have received a full set of installation photos a list of which is included. These instructions must be passed on in full to the person who is actually doing the installation at least a week in advance and they should inspect the site in advance. (This applies even if a representative of NATSOL is going to be on-site to supervise. You will be charged for supervision even if, as a result of poor preparation by your installation team, nothing gets done. The presence of NATSOL staff on site is not an excuse for the installation team to turn up ill equipped, ill informed, under staffed and under skilled.) We do not guarantee our products either in terms of durability of components or correct function unless properly installed. If you are an experienced installer of our toilets it’s still worth checking through to see what’s new. Contents:- 1. Copy of our letter to client 2. Basic requirements list – tools, machinery, personnel 3. List of photos to be returned to us before contractor gets paid 4. Risk assessment for installation 5. Site and soakaway instructions including drawings 6. Vault installation including site specific drawing 7. Building erection and fitting out T 01686 412653
  • 23. COPY OF LETTER TO CLIENT: Dear Client…….. INSTALLATION PROCEDURE FOR COMPUS TWIN TOILETS NatSol does not usually carry out installation of its products. We can offer supervision of installation for an agreed fee should this be deemed essential. In most cases we hope to avoid supervision in order to minimise costs. We are, of course, very concerned that installations are carried out to a high standard. To ensure this happens it is essential that you appoint a competent builder to carry out the work. Installation typically requires a 4 tonne machine, or larger, to off-load the vaults from the delivery lorry, to carry out excavation and to lower the vaults into the ground. Assembly of the vaults and building requires general building skills and at least three persons on site not including anyone in a purely supervisory role. You should choose a contractor who is familiar with all relevant health and safety procedures for the work involved and who will read our installation instructions and risk assessment thoroughly before the installation day. The instructions tell the contractor what tools, equipment and materials he/she must supply. It is essential the contractor turns up, properly equipped, on the day arranged otherwise the delivery lorry will have to return to the depot with the vaults and you will have to pay for a second delivery. We can also assist in the following ways:- 1. In parts of the country where we know of a contractor experienced in installing our products we will make their contact details known to you. 2. We ensure that full installation instructions are sent out in advance to contractors and are available to discuss these in advance of installation. 3. With reasonable notice we are usually available by phone on the day of installation to answer any questions that may arise. Whether or not you use a contractor to complete your installation our product guarantee is subject to us receiving a set of specified photographs as detailed on the reverse of this letter as a way of assessing the quality of installation. This is not necessary in cases where NatSol has supervised the entire installation process. We recommend that these photographs are checked by us before you pay your contractor. The contractor should be informed by you in advance of the intention to use photographs as a way of assessing the quality of their work. Having said this it must be understood that the contract for the installation is between you, the client, and the contractor and that if the product is badly installed NatSol cannot accept any responsibility whatsoever unless it can be proven that components were missing at the time of delivery or were defective. Please contact us if you have concerns about any issues above. Best wishes, Andrew Warren MD
  • 24. NATSOL - COMPUS TWIN Full Access SUMMARY OF MATERIALS, TOOLS AND PERSONNEL REQUIREMENTS – Black items concern the vaults. Blue items concern the building erection and fitting out. 1. Materials required - NOT supplied by NATSOL: a. 0.5 m3 of concrete as bedding layer for vaults [C20P to BS 5328 (1:2:4 mix)] b. 0.5 m3 of concrete [as above] for haunching around base of vaults c. additional 1m3 (2 tonnes) of concrete for haunching around base if heavy clay d. additional soil pipe and fittings if required to reach desired soakaway site e. silicone grease for pipe jointing f. exterior finish for timber clad buildings – OS COLOR products recommended 2. General building tools & equipment including the following: a. safety clothing â–ˇ b. tape measure â–ˇ c. marker spray â–ˇ d. digger to excavate â–ˇ e. machinery to unload 850kg from lorry and lower 650kg into ground â–ˇ f. spades, shovels â–ˇ g. concrete mixer [could be done by hand] â–ˇ h. wheelbarrow â–ˇ i. 50mm thick screed rails – 2 @ 2.5m long with pegs fixed at each end â–ˇ j. 2m long screeding bar â–ˇ k. long spirit level â–ˇ l. mastic gun â–ˇ m. hammer â–ˇ n. saw [for cutting plastic pipe] â–ˇ o. ladder to assist with building erection â–ˇ p. large flat bit screwdriver â–ˇ q. powerful cordless drill or generator and drill â–ˇ r. socket drives for cordless or spanners â–ˇ s. drill bits for piloting timber or metal and plastic â–ˇ t. small assortment of ZP woodscrews â–ˇ 3. Personnel & skills required for vault installation [approx time 4 hours]: A machine operator, banksman and 1 or 2 others qualified in general building skills particularly wet work. The vaults will need to be lifted using machinery and a “D” shackle. The slings are supplied by NatSol but not the shackle. 4. Personnel & skills required to erect building [approx time 4 hours]: General qualified building skills - 4 people for erection of frames and roof, then 2 for finishing 5. Personnel & skills required to fit out [approx time 2 hours]: General DIY or plumbing skills, 1 person is fine, 2 is useful. Qualified electrician needed to connect fan on toilets with fan driven [as opposed to passive] ventilation systems. NB. The construction times mentioned above [points 3,4,5] are given in good faith but NatSol Ltd cannot be held responsible for the additional cost incurred by installation times in excess of these or for any other circumstances [e.g. delay in completion of the installation] which may arise as a result of extended installation times.
  • 25. CHECKLIST OF INSTALLATION PHOTOS TO BE SENT TO NATSOL BEFORE PAYING YOUR CONTRACTOR IN ORDER TO OBTAIN OUR GUARANTEE SOME OF THESE NEED TO BE TAKEN DURING THE INSTALLATION PROCESS 1. The excavation and the concrete screed levelled off. 2. The excavation for the soakaway. 3. The vaults in the ground but before the lid/floor section is fitted. This should show the urine gutter in position and the SIKA mastic around the rim of the vaults. 4. SIKA pointing up the gap between the lid and the base of the vaults after the lid has been fitted. From 2010 onwards it shouild be possible to take this picture after the building has been erected - if that helps. 5. The soakaway in position before back-filling commences. This should include the pipe connection from the vaults which must slope down [at a gradient of 1 in 60 minimum] to the soakaway. 6. One of each elevation of the building from outside including, on at least one elevation, the full height of vent pipe. Corner and roof flashings should be in place. 7. Two looking inside the cubicle showing both side walls with fixtures and fittings showing the quality and completion of fitting out. 8. One of the urinal pipework. 9. One looking down the pedestal [with flash on] so that the urine separating plate and the soak in the bottom of the vault are visible. 10. One into the active vault with the front cover removed showing the rake in place. The picture should be taken at a low enough angle that it is possible to see the bottom of the stainless steel urine separating plate over the urine collecting gutter. 11. One to confirm that the end of the urinal pipe does not block the urine gutter under the floor but stops approx 60 to 100mm above the bottom of the urine gutter. Picture 7 might provide this if the RH vault is used first. 1 2 3 4 5 6a 6b 6c 6d 7a 7b 8 9 10a 10b 11 You may wish to send us additional photographs but please limit the total to 20 unless a specific problem has arisen with the installation which you need to illustrate.
  • 26. NatSol The Compost Toilet Specialists RISK ASSESSMENT FOR SITE INSTALLATION OF COMPUS TWIN TOILETS - Full Access Models Original Date: 1/10/07 Carried out by: NatSol Ltd Signed: Reviewed Date: 24/8/09 Carried out by: AW NatSol Ltd Signed: Contractors additions Date: Carried out by: Signed: Potential severity [S] Likelihood of occurrence [L] Risk [S x L] Fatal/Major/Illness 3 Certain/More than likely 3 3, 6 or 9 High Injury/Lost time disability injury 2 Reasonably likely 2 2 or 4 Medium Minor injury or illness 1 or 0 Seldom/Very unlikely 1 or 0 1 or 0 Low The risk levels shown below are the residual risk if safety precautions included in our installation instructions and shown below are adhered to. Significant hazards Persons at risk. Existing controls Residual level of risk FURTHER ACTION REQ'D BY CONTRACTOR: Name and location of person/place at risk As described in the installation instructions Action: By whom: By date: Done [tick] 1 Manhandling building sections from lorry. Risk of dropping, cuts or pinching. Clients, volunteers and contractors High visibility safety clothing and gloves and safety boots. 2 [S] x 1[L] = 2 2 Off-loading vaults from lorry using machinery. Vaults weigh approx 600kgs or 850kg if off- loaded complete with lid. Risk of dropping. Contractors + bystanders Rope off area. High visibility safety clothing and gloves, hard hats and safety boots. Use appropriate machine for load to be lifted. Correct use of D shackle [to be supplied by machinery operator] and slings supplied by NatSol OR use forks on machine if long enough. 3 [S] x 1[L] = 3 3 Use of machinery to excavate. Ditto + bystanders Rope off excavation area. Safety clothing as 2 above. 3 [S] x 1[L] = 3 4 Use of cement to make concrete - alkaline dust Contractors + bystanders Use dust masks and gloves. If windy use goggles. Keep bystanders clear. 2 [S] x 1[L] = 2 PTO
  • 27. 5 Lowering vaults into ground. Risk of dropping. Contractors + bystanders Keep operating area roped off. Safety clothing as in 2 above. Use appropriate machine for load to be lifted. Correct use of D shackle [to be supplied by machinery operator] and slings supplied by NatSol. 3 [S] x 1[L] = 3 7 Fitting vault floor section. Contractors + bystanders As above + risk of finger pinching. 2 [S] x 1[L] = 2 6 Drilling of vault flanges. Dust and use of electrical equipment. Contractors Use dust masks and eye protection. Use cordless drill OR corded drill with voltage and protection equipment [e.g. trips] to meet all required site standards. 1 [S] x 2[L] = 2 8 Sharp edges on metal building sections Contractors Use gloves and safety boots. 1 [S] x 2[L] = 2 9 Wind blowing building over during erection Contractors + bystanders Safety clothing as in 2 above. Sufficient operatives to support building sections manually. Use props as necessary. Do not erect building in strong winds. 2 [S] x 1[L] = 2 10 Wind blowing off roof before fixing down. Contractors + bystanders Hold roof down manually as soon as it is in place and fix immediately. Do not fit roof in strong winds. 3 [S] x 1[L] = 3 11 Use of ladder to lower vent pipe into building Contractors + bystanders Ladder to meet appropriate BS and rest only on level well compacted ground. Person appointed to support ladder when in use. Not to be done under windy conditions. Keep bystanders clear. 3 [S] x 1[L] = 3 12 Fitting roof edge flashings. Contractors As above 2 [S] x 1[L] = 2 13 Painting - fumes and splashes to eyes or skin. Depends on type. Paint not supplied by NatSol Contractors Use gloves and other protective clothing as seems necessary. 1 [S] x 1[L] = 1
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35. 700 900 1150 Hand clean 770150150 350 375 600 1640 2200 Grab Rail Metal Building Drg. No. NS FA 012 Drawn: NJG Date: 17/5/07 Scale: NTS NatSol Ltd Tel: 01686 412653 www.natsol.co.uk