2. Pretreatment Vessel
Lack of Maintenance
No effluent-all solids
Field still taking effluent
No clarified effluent
Condition of the Field
3. A person shall not use a cesspool for sewage
disposal. R18-9-A309A 4
4. Conventional Onsite
General Permit 1.09 before
2001
General Permit 4.02 after
2001
Why is this important?
Because there is an effluent screen
5.
6. Evaluation of Actual Flow 6 F
Septic Tank’s daily design flow is determined as follows: R18-9-A314 4.
Based on Bedroom Count and fixture count
7. • No person shall
discharge sewage or
wastewater that
contains sewage
from an on-site
wastewater
treatment facility
except under an
Aquifer Protection
Permit issued by the
Director.
R18-9-A309
14. Liquid Level- Normal 8C
Depending on the precast, levels will be different, by
the gallons, so you need to measure the level.
Most Important question on the form
Normal - Below Normal - Above Normal - Not Determined
15. Inlet Baffle with 2 inch drop at
invert of the inlet. Proper, but very
rare! R18-9-A314 1 f. 8 K I
40. BAFFLES
OFF PLUMB
When we need to send a photo to the
customer to show then the issue with the
baffle, we place our measuring stick plumb.
You can see the degree it is off 90.
If it is not @ 90, there is a problem, it is: