Project Summary
Stroke is the fifth-leading cause of death and the leading cause of adult
disability in the United States, as each year about 780,000 people have a
stroke or transient ischemic attack. Up to 90 percent of stroke survivors have
some functional deficit, resulting in 5 million (roughly the population of
South) living with sequelae of stroke that impact both health quality and
psychologically, particularly caregivers. Recurrent stroke occurs in 17 percent
of transient ischemic attacks and 18 percent of nondisabling strokes within 3
months; after 5 years, nearly a third have a recurrence, and mortality is
greater after a second stroke than the first (24-month survival rates: 48
percent versus 57 percent).
Stroke is complex, with multiple interacting risk factors (e.g., genetic;
hypertension; hypercholesterolemia; and lifestyle such as smoking, diet, and
exercise) that lead to the initial and recurrent strokes. Stroke patients and
their families deal with a high risk and cost acute disease state that often
results in significant functional and cognitive deficits and impacts physical
function, activities of daily living, and quality of life.
Patients face stroke impairments and complex risk of recurrence within a
current stroke care delivery system characterized by poor coordination and
inefficient care delivery. High-quality scientific evidence to identify the best
stroke care delivery system is lacking, despite years of work with guidelines,
American Stroke Association (Get With the Guidelines) certifications, and the
Joint Commission.
We completed a three year, $3.8 million Centers for Medicare-Medicaid
Innovations Award pilot that tested a novel stroke care delivery Integrated
Practice Unit (IPU) redesign that evolved with stakeholder input from
patients, caregivers, rehabilitation specialists, nurses, vascular neurologists,
patient advocacy groups, payers, and technology companies. It embraced
team-based care in-hospital and enhanced collaboration with
rehabilitation/skilled nursing facilities using telemedicine technology via a
redesign component, called Stroke Central. The IPU encompassed a one-year
continuum of stroke care from onset through 12-month follow-up in a home
or skilled nursing/rehabilitation facility–based program, called Stroke
Mobile, with a registered nurse and lay health educator team that visited the
patient and the caregiver’s/family’s home or facility to assess recovery,
medication compliance, and risk factor control with telemedicine that
facilitated access to multiple layers of care providers and was associated with
decreased hospital length of stay and readmissions, decreased recurrence
rates, and lower cost.
In this larger trial, 18 clinical sites will be randomized to either continue
comprehensive/primary stroke care or to reengineered Integrated Stroke
Practice Unit care. Results will be key for patients, caregivers, organizations,
payers, and policy makers to apply high-quality scientific evidence to the
decision, currently in equipoise, on how to best direct resources toward
implementing the most effective and efficient stroke care delivery systems
that enhance health outcomes for patients and caregivers.
Project Details
Principal Investigator
Kenneth Gaines, MD, MBA
Project Status
Awarded; Contract pending
Board Approval Date
August 2018
Organization
Vanderbilt University Medical Center
Project Type
Research Project
Funding Announcement
Pragmatic Clinical Studies to Evaluate Patient-Centered Outcomes
Project Budget *
$15,700,000
*All proposed projects, including requested budgets and project periods, are
approved subject to a programmatic and budget review by PCORI staff and
the negotiation of a formal award contract.
Page Last Updated:
August 22, 2018

More Related Content

What's hot

Patient-Reported Outcomes in Cancer Care - Zeena Nackerdien
Patient-Reported Outcomes in Cancer Care - Zeena NackerdienPatient-Reported Outcomes in Cancer Care - Zeena Nackerdien
Patient-Reported Outcomes in Cancer Care - Zeena NackerdienZeena Nackerdien
 
Patient Centered Medical Home (PCMH) is not a pill Kevin Grumbach 2013
Patient Centered Medical Home (PCMH)  is not a pill Kevin Grumbach 2013Patient Centered Medical Home (PCMH)  is not a pill Kevin Grumbach 2013
Patient Centered Medical Home (PCMH) is not a pill Kevin Grumbach 2013Paul Grundy
 
HIE Day- JCMR Overview June 2012
HIE Day- JCMR Overview June 2012HIE Day- JCMR Overview June 2012
HIE Day- JCMR Overview June 2012mihinpr
 
Soraya Ghebleh - Variation in Healthcare Delivery
Soraya Ghebleh - Variation in Healthcare DeliverySoraya Ghebleh - Variation in Healthcare Delivery
Soraya Ghebleh - Variation in Healthcare DeliverySoraya Ghebleh
 
Perceived caregiver financial barriers and asthma outcomes in urban elementar...
Perceived caregiver financial barriers and asthma outcomes in urban elementar...Perceived caregiver financial barriers and asthma outcomes in urban elementar...
Perceived caregiver financial barriers and asthma outcomes in urban elementar...Center for Managing Chronic Disease
 
Infographic MedKnowledge
Infographic MedKnowledgeInfographic MedKnowledge
Infographic MedKnowledgeJulie Igorevna
 
Young Adults with IBD: Disease Severity, Utilization and Practice in a Pediat...
Young Adults with IBD: Disease Severity, Utilization and Practice in a Pediat...Young Adults with IBD: Disease Severity, Utilization and Practice in a Pediat...
Young Adults with IBD: Disease Severity, Utilization and Practice in a Pediat...Leonard Davis Institute of Health Economics
 
Using Patient Registries and Evidence-Based Guidelines to Overcome Declining ...
Using Patient Registries and Evidence-Based Guidelines to Overcome Declining ...Using Patient Registries and Evidence-Based Guidelines to Overcome Declining ...
Using Patient Registries and Evidence-Based Guidelines to Overcome Declining ...Phytel
 
Ketamine for Pre-Hospital Sedation in Excited Delirium
Ketamine for Pre-Hospital Sedation in Excited DeliriumKetamine for Pre-Hospital Sedation in Excited Delirium
Ketamine for Pre-Hospital Sedation in Excited DeliriumPSOW
 
presentation
presentationpresentation
presentationllmercer
 
medication reconciliation
medication reconciliationmedication reconciliation
medication reconciliationMissam Merchant
 
CHCF Decision Aid Upgrade Informational Webinar
CHCF Decision Aid Upgrade Informational WebinarCHCF Decision Aid Upgrade Informational Webinar
CHCF Decision Aid Upgrade Informational Webinarhealth2dev
 
Discussion on Health Information Exchange and Length of Stay-WHITE 2014
Discussion on Health Information Exchange and Length of Stay-WHITE 2014Discussion on Health Information Exchange and Length of Stay-WHITE 2014
Discussion on Health Information Exchange and Length of Stay-WHITE 2014Peiyin Hung
 

What's hot (20)

Patient-Reported Outcomes in Cancer Care - Zeena Nackerdien
Patient-Reported Outcomes in Cancer Care - Zeena NackerdienPatient-Reported Outcomes in Cancer Care - Zeena Nackerdien
Patient-Reported Outcomes in Cancer Care - Zeena Nackerdien
 
Patient Centered Medical Home (PCMH) is not a pill Kevin Grumbach 2013
Patient Centered Medical Home (PCMH)  is not a pill Kevin Grumbach 2013Patient Centered Medical Home (PCMH)  is not a pill Kevin Grumbach 2013
Patient Centered Medical Home (PCMH) is not a pill Kevin Grumbach 2013
 
HIE Day- JCMR Overview June 2012
HIE Day- JCMR Overview June 2012HIE Day- JCMR Overview June 2012
HIE Day- JCMR Overview June 2012
 
Soraya Ghebleh - Variation in Healthcare Delivery
Soraya Ghebleh - Variation in Healthcare DeliverySoraya Ghebleh - Variation in Healthcare Delivery
Soraya Ghebleh - Variation in Healthcare Delivery
 
Perceived caregiver financial barriers and asthma outcomes in urban elementar...
Perceived caregiver financial barriers and asthma outcomes in urban elementar...Perceived caregiver financial barriers and asthma outcomes in urban elementar...
Perceived caregiver financial barriers and asthma outcomes in urban elementar...
 
Infographic MedKnowledge
Infographic MedKnowledgeInfographic MedKnowledge
Infographic MedKnowledge
 
Young Adults with IBD: Disease Severity, Utilization and Practice in a Pediat...
Young Adults with IBD: Disease Severity, Utilization and Practice in a Pediat...Young Adults with IBD: Disease Severity, Utilization and Practice in a Pediat...
Young Adults with IBD: Disease Severity, Utilization and Practice in a Pediat...
 
Are Emergency Department Patient Sicker?
Are Emergency Department Patient Sicker?Are Emergency Department Patient Sicker?
Are Emergency Department Patient Sicker?
 
Clinical trials article
Clinical trials articleClinical trials article
Clinical trials article
 
Using Patient Registries and Evidence-Based Guidelines to Overcome Declining ...
Using Patient Registries and Evidence-Based Guidelines to Overcome Declining ...Using Patient Registries and Evidence-Based Guidelines to Overcome Declining ...
Using Patient Registries and Evidence-Based Guidelines to Overcome Declining ...
 
Medical errors
Medical errorsMedical errors
Medical errors
 
How the CCP Model Could Ensure Better Patient Care & Reduced Costs
How the CCP Model Could Ensure Better Patient Care & Reduced CostsHow the CCP Model Could Ensure Better Patient Care & Reduced Costs
How the CCP Model Could Ensure Better Patient Care & Reduced Costs
 
Ketamine for Pre-Hospital Sedation in Excited Delirium
Ketamine for Pre-Hospital Sedation in Excited DeliriumKetamine for Pre-Hospital Sedation in Excited Delirium
Ketamine for Pre-Hospital Sedation in Excited Delirium
 
Christie 2015 Resume
Christie 2015 ResumeChristie 2015 Resume
Christie 2015 Resume
 
presentation
presentationpresentation
presentation
 
medication reconciliation
medication reconciliationmedication reconciliation
medication reconciliation
 
CHCF Decision Aid Upgrade Informational Webinar
CHCF Decision Aid Upgrade Informational WebinarCHCF Decision Aid Upgrade Informational Webinar
CHCF Decision Aid Upgrade Informational Webinar
 
RML Rendezvous - Physician Assistants & Information Needs for Clinical Decisi...
RML Rendezvous - Physician Assistants & Information Needs for Clinical Decisi...RML Rendezvous - Physician Assistants & Information Needs for Clinical Decisi...
RML Rendezvous - Physician Assistants & Information Needs for Clinical Decisi...
 
Beating the stroke challenge
Beating the stroke challengeBeating the stroke challenge
Beating the stroke challenge
 
Discussion on Health Information Exchange and Length of Stay-WHITE 2014
Discussion on Health Information Exchange and Length of Stay-WHITE 2014Discussion on Health Information Exchange and Length of Stay-WHITE 2014
Discussion on Health Information Exchange and Length of Stay-WHITE 2014
 

Similar to Comparative effectiveness randomized trial to improve stroke care delivery c3 fit_ coordinated coll

Health System and Beneficiary Costs Associated With Intensive End-of-Life Med...
Health System and Beneficiary Costs Associated With Intensive End-of-Life Med...Health System and Beneficiary Costs Associated With Intensive End-of-Life Med...
Health System and Beneficiary Costs Associated With Intensive End-of-Life Med...Δρ. Γιώργος K. Κασάπης
 
Reducing Stroke Readmissions in Acute Care Setting.docx
Reducing Stroke Readmissions in Acute Care Setting.docxReducing Stroke Readmissions in Acute Care Setting.docx
Reducing Stroke Readmissions in Acute Care Setting.docxdanas19
 
AJMC-02-15-Pande-e80
AJMC-02-15-Pande-e80AJMC-02-15-Pande-e80
AJMC-02-15-Pande-e80Julie Donahue
 
Population health management real time state-of-health analysis
Population health management real time state-of-health analysisPopulation health management real time state-of-health analysis
Population health management real time state-of-health analysispscisolutions
 
Dr. Anne Docimo Improving Healthcare payer provider collaboration final
Dr. Anne Docimo Improving Healthcare payer provider collaboration finalDr. Anne Docimo Improving Healthcare payer provider collaboration final
Dr. Anne Docimo Improving Healthcare payer provider collaboration finalInvestnet
 
Community Health Outcomes
Community Health OutcomesCommunity Health Outcomes
Community Health Outcomesnoelanif5
 
PARR-combined-predictive-model-final-report-dec06
PARR-combined-predictive-model-final-report-dec06PARR-combined-predictive-model-final-report-dec06
PARR-combined-predictive-model-final-report-dec06Nadya Filipova
 
Cross the Finish Line First
Cross the Finish Line FirstCross the Finish Line First
Cross the Finish Line FirstVitreosHealth
 
The Healthcare Team as the Healthcare Provider: A Different View of the Patie...
The Healthcare Team as the Healthcare Provider: A Different View of the Patie...The Healthcare Team as the Healthcare Provider: A Different View of the Patie...
The Healthcare Team as the Healthcare Provider: A Different View of the Patie...guesta14581
 
White Paper - Population Health
White Paper - Population HealthWhite Paper - Population Health
White Paper - Population HealthNextGen Healthcare
 
Partners’ Care Management Strategy: A 10-Year Journey
Partners’ Care Management Strategy: A 10-Year JourneyPartners’ Care Management Strategy: A 10-Year Journey
Partners’ Care Management Strategy: A 10-Year JourneyHealth Catalyst
 
Connected Care: Heightened Imperatives
Connected Care: Heightened ImperativesConnected Care: Heightened Imperatives
Connected Care: Heightened ImperativesCognizant
 
Peter L. Slavin, M.D., 2015 Leadership in Academic Medicine Lecture
Peter L. Slavin, M.D., 2015 Leadership in Academic Medicine LecturePeter L. Slavin, M.D., 2015 Leadership in Academic Medicine Lecture
Peter L. Slavin, M.D., 2015 Leadership in Academic Medicine Lectureuabsom
 
EVIDENCE-BASED CARESHEETAuthorsHillary Mennella, DNP
EVIDENCE-BASED CARESHEETAuthorsHillary Mennella, DNPEVIDENCE-BASED CARESHEETAuthorsHillary Mennella, DNP
EVIDENCE-BASED CARESHEETAuthorsHillary Mennella, DNPBetseyCalderon89
 

Similar to Comparative effectiveness randomized trial to improve stroke care delivery c3 fit_ coordinated coll (20)

Health System and Beneficiary Costs Associated With Intensive End-of-Life Med...
Health System and Beneficiary Costs Associated With Intensive End-of-Life Med...Health System and Beneficiary Costs Associated With Intensive End-of-Life Med...
Health System and Beneficiary Costs Associated With Intensive End-of-Life Med...
 
Psp.pptx
Psp.pptxPsp.pptx
Psp.pptx
 
Reducing Stroke Readmissions in Acute Care Setting.docx
Reducing Stroke Readmissions in Acute Care Setting.docxReducing Stroke Readmissions in Acute Care Setting.docx
Reducing Stroke Readmissions in Acute Care Setting.docx
 
Who patient safety program
Who patient safety programWho patient safety program
Who patient safety program
 
AJMC-02-15-Pande-e80
AJMC-02-15-Pande-e80AJMC-02-15-Pande-e80
AJMC-02-15-Pande-e80
 
Coordinated Care
Coordinated CareCoordinated Care
Coordinated Care
 
Population health management real time state-of-health analysis
Population health management real time state-of-health analysisPopulation health management real time state-of-health analysis
Population health management real time state-of-health analysis
 
Dr. Anne Docimo Improving Healthcare payer provider collaboration final
Dr. Anne Docimo Improving Healthcare payer provider collaboration finalDr. Anne Docimo Improving Healthcare payer provider collaboration final
Dr. Anne Docimo Improving Healthcare payer provider collaboration final
 
PATIENT SAFETY.ppsx
PATIENT SAFETY.ppsxPATIENT SAFETY.ppsx
PATIENT SAFETY.ppsx
 
Community Health Outcomes
Community Health OutcomesCommunity Health Outcomes
Community Health Outcomes
 
PARR-combined-predictive-model-final-report-dec06
PARR-combined-predictive-model-final-report-dec06PARR-combined-predictive-model-final-report-dec06
PARR-combined-predictive-model-final-report-dec06
 
Cross the Finish Line First
Cross the Finish Line FirstCross the Finish Line First
Cross the Finish Line First
 
The Healthcare Team as the Healthcare Provider: A Different View of the Patie...
The Healthcare Team as the Healthcare Provider: A Different View of the Patie...The Healthcare Team as the Healthcare Provider: A Different View of the Patie...
The Healthcare Team as the Healthcare Provider: A Different View of the Patie...
 
White Paper - Population Health
White Paper - Population HealthWhite Paper - Population Health
White Paper - Population Health
 
effects of-interactive-patient-smartphone
effects of-interactive-patient-smartphoneeffects of-interactive-patient-smartphone
effects of-interactive-patient-smartphone
 
Innovation Profile
Innovation ProfileInnovation Profile
Innovation Profile
 
Partners’ Care Management Strategy: A 10-Year Journey
Partners’ Care Management Strategy: A 10-Year JourneyPartners’ Care Management Strategy: A 10-Year Journey
Partners’ Care Management Strategy: A 10-Year Journey
 
Connected Care: Heightened Imperatives
Connected Care: Heightened ImperativesConnected Care: Heightened Imperatives
Connected Care: Heightened Imperatives
 
Peter L. Slavin, M.D., 2015 Leadership in Academic Medicine Lecture
Peter L. Slavin, M.D., 2015 Leadership in Academic Medicine LecturePeter L. Slavin, M.D., 2015 Leadership in Academic Medicine Lecture
Peter L. Slavin, M.D., 2015 Leadership in Academic Medicine Lecture
 
EVIDENCE-BASED CARESHEETAuthorsHillary Mennella, DNP
EVIDENCE-BASED CARESHEETAuthorsHillary Mennella, DNPEVIDENCE-BASED CARESHEETAuthorsHillary Mennella, DNP
EVIDENCE-BASED CARESHEETAuthorsHillary Mennella, DNP
 

More from Marilyn Mann

Marilyn mann slides for qcor 2018 final
Marilyn mann slides for qcor 2018 finalMarilyn mann slides for qcor 2018 final
Marilyn mann slides for qcor 2018 finalMarilyn Mann
 
ODYSSEY Outcomes: Cardiovascular Outcomes with Alirocumab after ACS
ODYSSEY Outcomes: Cardiovascular Outcomes with Alirocumab after ACSODYSSEY Outcomes: Cardiovascular Outcomes with Alirocumab after ACS
ODYSSEY Outcomes: Cardiovascular Outcomes with Alirocumab after ACSMarilyn Mann
 
2016 hope 3 cognitive outcomes slides
2016 hope 3 cognitive outcomes slides2016 hope 3 cognitive outcomes slides
2016 hope 3 cognitive outcomes slidesMarilyn Mann
 
Pcsk9 loss of-function genetic variant is associated with pre-diabetes and di...
Pcsk9 loss of-function genetic variant is associated with pre-diabetes and di...Pcsk9 loss of-function genetic variant is associated with pre-diabetes and di...
Pcsk9 loss of-function genetic variant is associated with pre-diabetes and di...Marilyn Mann
 
Alirocumab effect on new-onset or worsening diabetes, blood glucose, and HbA1c.
Alirocumab effect on new-onset or worsening diabetes, blood glucose, and HbA1c.Alirocumab effect on new-onset or worsening diabetes, blood glucose, and HbA1c.
Alirocumab effect on new-onset or worsening diabetes, blood glucose, and HbA1c.Marilyn Mann
 
Complaint in hdl v johnson and dent
Complaint in hdl v johnson and dentComplaint in hdl v johnson and dent
Complaint in hdl v johnson and dentMarilyn Mann
 
Center Scope Fall 2014
Center Scope Fall 2014Center Scope Fall 2014
Center Scope Fall 2014Marilyn Mann
 
Circ cardiovasc qual outcomes 2013 sep 6(5) 507 8, figure
Circ cardiovasc qual outcomes 2013 sep 6(5) 507 8, figureCirc cardiovasc qual outcomes 2013 sep 6(5) 507 8, figure
Circ cardiovasc qual outcomes 2013 sep 6(5) 507 8, figureMarilyn Mann
 
Ph rma principlesforresponsibleclinicaltrialdatasharing
Ph rma principlesforresponsibleclinicaltrialdatasharingPh rma principlesforresponsibleclinicaltrialdatasharing
Ph rma principlesforresponsibleclinicaltrialdatasharingMarilyn Mann
 
Ezzahti sijbrands mulder roeters van lennep familial hypercholesterolemia new...
Ezzahti sijbrands mulder roeters van lennep familial hypercholesterolemia new...Ezzahti sijbrands mulder roeters van lennep familial hypercholesterolemia new...
Ezzahti sijbrands mulder roeters van lennep familial hypercholesterolemia new...Marilyn Mann
 
Ema q & a on mipomersen march 2013
Ema q & a on mipomersen march 2013Ema q & a on mipomersen march 2013
Ema q & a on mipomersen march 2013Marilyn Mann
 
Ema scientific conclusions and grounds for refusal of mipomersen
Ema scientific conclusions and grounds for refusal of mipomersenEma scientific conclusions and grounds for refusal of mipomersen
Ema scientific conclusions and grounds for refusal of mipomersenMarilyn Mann
 
Oxman et al a surrealistic mega analysis of redisorganization theories
Oxman et al a surrealistic mega analysis of redisorganization theoriesOxman et al a surrealistic mega analysis of redisorganization theories
Oxman et al a surrealistic mega analysis of redisorganization theoriesMarilyn Mann
 
Glasziou taking healthcare interventions from trial to practice
Glasziou taking healthcare interventions from trial to practiceGlasziou taking healthcare interventions from trial to practice
Glasziou taking healthcare interventions from trial to practiceMarilyn Mann
 
Ioannidis why science is not necessarily self correcting
Ioannidis why science is not necessarily self correctingIoannidis why science is not necessarily self correcting
Ioannidis why science is not necessarily self correctingMarilyn Mann
 
Cer symposium 2012_ioannidis
Cer symposium 2012_ioannidisCer symposium 2012_ioannidis
Cer symposium 2012_ioannidisMarilyn Mann
 
Ema q & a on mipomersen
Ema q & a on mipomersenEma q & a on mipomersen
Ema q & a on mipomersenMarilyn Mann
 
Involveconference2 121120053215-phpapp02
Involveconference2 121120053215-phpapp02Involveconference2 121120053215-phpapp02
Involveconference2 121120053215-phpapp02Marilyn Mann
 
Workshop report ema 2012 nov 22, access to data
Workshop report ema 2012 nov 22, access to dataWorkshop report ema 2012 nov 22, access to data
Workshop report ema 2012 nov 22, access to dataMarilyn Mann
 

More from Marilyn Mann (20)

Marilyn mann slides for qcor 2018 final
Marilyn mann slides for qcor 2018 finalMarilyn mann slides for qcor 2018 final
Marilyn mann slides for qcor 2018 final
 
ODYSSEY Outcomes: Cardiovascular Outcomes with Alirocumab after ACS
ODYSSEY Outcomes: Cardiovascular Outcomes with Alirocumab after ACSODYSSEY Outcomes: Cardiovascular Outcomes with Alirocumab after ACS
ODYSSEY Outcomes: Cardiovascular Outcomes with Alirocumab after ACS
 
2016 hope 3 cognitive outcomes slides
2016 hope 3 cognitive outcomes slides2016 hope 3 cognitive outcomes slides
2016 hope 3 cognitive outcomes slides
 
Pcsk9 loss of-function genetic variant is associated with pre-diabetes and di...
Pcsk9 loss of-function genetic variant is associated with pre-diabetes and di...Pcsk9 loss of-function genetic variant is associated with pre-diabetes and di...
Pcsk9 loss of-function genetic variant is associated with pre-diabetes and di...
 
Alirocumab effect on new-onset or worsening diabetes, blood glucose, and HbA1c.
Alirocumab effect on new-onset or worsening diabetes, blood glucose, and HbA1c.Alirocumab effect on new-onset or worsening diabetes, blood glucose, and HbA1c.
Alirocumab effect on new-onset or worsening diabetes, blood glucose, and HbA1c.
 
Complaint in hdl v johnson and dent
Complaint in hdl v johnson and dentComplaint in hdl v johnson and dent
Complaint in hdl v johnson and dent
 
Center Scope Fall 2014
Center Scope Fall 2014Center Scope Fall 2014
Center Scope Fall 2014
 
Improve it slides
Improve it slidesImprove it slides
Improve it slides
 
Circ cardiovasc qual outcomes 2013 sep 6(5) 507 8, figure
Circ cardiovasc qual outcomes 2013 sep 6(5) 507 8, figureCirc cardiovasc qual outcomes 2013 sep 6(5) 507 8, figure
Circ cardiovasc qual outcomes 2013 sep 6(5) 507 8, figure
 
Ph rma principlesforresponsibleclinicaltrialdatasharing
Ph rma principlesforresponsibleclinicaltrialdatasharingPh rma principlesforresponsibleclinicaltrialdatasharing
Ph rma principlesforresponsibleclinicaltrialdatasharing
 
Ezzahti sijbrands mulder roeters van lennep familial hypercholesterolemia new...
Ezzahti sijbrands mulder roeters van lennep familial hypercholesterolemia new...Ezzahti sijbrands mulder roeters van lennep familial hypercholesterolemia new...
Ezzahti sijbrands mulder roeters van lennep familial hypercholesterolemia new...
 
Ema q & a on mipomersen march 2013
Ema q & a on mipomersen march 2013Ema q & a on mipomersen march 2013
Ema q & a on mipomersen march 2013
 
Ema scientific conclusions and grounds for refusal of mipomersen
Ema scientific conclusions and grounds for refusal of mipomersenEma scientific conclusions and grounds for refusal of mipomersen
Ema scientific conclusions and grounds for refusal of mipomersen
 
Oxman et al a surrealistic mega analysis of redisorganization theories
Oxman et al a surrealistic mega analysis of redisorganization theoriesOxman et al a surrealistic mega analysis of redisorganization theories
Oxman et al a surrealistic mega analysis of redisorganization theories
 
Glasziou taking healthcare interventions from trial to practice
Glasziou taking healthcare interventions from trial to practiceGlasziou taking healthcare interventions from trial to practice
Glasziou taking healthcare interventions from trial to practice
 
Ioannidis why science is not necessarily self correcting
Ioannidis why science is not necessarily self correctingIoannidis why science is not necessarily self correcting
Ioannidis why science is not necessarily self correcting
 
Cer symposium 2012_ioannidis
Cer symposium 2012_ioannidisCer symposium 2012_ioannidis
Cer symposium 2012_ioannidis
 
Ema q & a on mipomersen
Ema q & a on mipomersenEma q & a on mipomersen
Ema q & a on mipomersen
 
Involveconference2 121120053215-phpapp02
Involveconference2 121120053215-phpapp02Involveconference2 121120053215-phpapp02
Involveconference2 121120053215-phpapp02
 
Workshop report ema 2012 nov 22, access to data
Workshop report ema 2012 nov 22, access to dataWorkshop report ema 2012 nov 22, access to data
Workshop report ema 2012 nov 22, access to data
 

Recently uploaded

PT MANAGEMENT OF URINARY INCONTINENCE.pptx
PT MANAGEMENT OF URINARY INCONTINENCE.pptxPT MANAGEMENT OF URINARY INCONTINENCE.pptx
PT MANAGEMENT OF URINARY INCONTINENCE.pptxdrtabassum4
 
World Hypertension Day 17th may 2024 ppt
World Hypertension Day 17th may 2024 pptWorld Hypertension Day 17th may 2024 ppt
World Hypertension Day 17th may 2024 pptdesktoppc
 
Introducing VarSeq Dx as a Medical Device in the European Union
Introducing VarSeq Dx as a Medical Device in the European UnionIntroducing VarSeq Dx as a Medical Device in the European Union
Introducing VarSeq Dx as a Medical Device in the European UnionGolden Helix
 
Gauri Gawande(9) Constipation Final.pptx
Gauri Gawande(9) Constipation Final.pptxGauri Gawande(9) Constipation Final.pptx
Gauri Gawande(9) Constipation Final.pptxgauripg8
 
Cardiac Impulse: Rhythmical Excitation and Conduction in the Heart
Cardiac Impulse: Rhythmical Excitation and Conduction in the HeartCardiac Impulse: Rhythmical Excitation and Conduction in the Heart
Cardiac Impulse: Rhythmical Excitation and Conduction in the HeartMedicoseAcademics
 
Cas 28578-16-7 PMK ethyl glycidate ( new PMK powder) best suppler
Cas 28578-16-7 PMK ethyl glycidate ( new PMK powder) best supplerCas 28578-16-7 PMK ethyl glycidate ( new PMK powder) best suppler
Cas 28578-16-7 PMK ethyl glycidate ( new PMK powder) best supplerSherrylee83
 
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale nowSherrylee83
 
CNN-based plastic waste detection system
CNN-based plastic waste detection systemCNN-based plastic waste detection system
CNN-based plastic waste detection systemBOHRInternationalJou1
 
The Orbit & its contents by Dr. Rabia I. Gandapore.pptx
The Orbit & its contents by Dr. Rabia I. Gandapore.pptxThe Orbit & its contents by Dr. Rabia I. Gandapore.pptx
The Orbit & its contents by Dr. Rabia I. Gandapore.pptxDr. Rabia Inam Gandapore
 
Scientificity and feasibility study of non-invasive central arterial pressure...
Scientificity and feasibility study of non-invasive central arterial pressure...Scientificity and feasibility study of non-invasive central arterial pressure...
Scientificity and feasibility study of non-invasive central arterial pressure...Catherine Liao
 
linearity concept of significance, standard deviation, chi square test, stude...
linearity concept of significance, standard deviation, chi square test, stude...linearity concept of significance, standard deviation, chi square test, stude...
linearity concept of significance, standard deviation, chi square test, stude...KavyasriPuttamreddy
 
Compare home pulse pressure components collected directly from home
Compare home pulse pressure components collected directly from homeCompare home pulse pressure components collected directly from home
Compare home pulse pressure components collected directly from homeCatherine Liao
 
Book Trailer: PGMEE in a Nutshell (CEE MD/MS PG Entrance Examination)
Book Trailer: PGMEE in a Nutshell (CEE MD/MS PG Entrance Examination)Book Trailer: PGMEE in a Nutshell (CEE MD/MS PG Entrance Examination)
Book Trailer: PGMEE in a Nutshell (CEE MD/MS PG Entrance Examination)Dr. Aryan (Anish Dhakal)
 
Effects of vaping e-cigarettes on arterial health
Effects of vaping e-cigarettes on arterial healthEffects of vaping e-cigarettes on arterial health
Effects of vaping e-cigarettes on arterial healthCatherine Liao
 
Cardiovascular Physiology - Regulation of Cardiac Pumping
Cardiovascular Physiology - Regulation of Cardiac PumpingCardiovascular Physiology - Regulation of Cardiac Pumping
Cardiovascular Physiology - Regulation of Cardiac PumpingMedicoseAcademics
 
TEST BANK For Wong’s Essentials of Pediatric Nursing, 11th Edition by Marilyn...
TEST BANK For Wong’s Essentials of Pediatric Nursing, 11th Edition by Marilyn...TEST BANK For Wong’s Essentials of Pediatric Nursing, 11th Edition by Marilyn...
TEST BANK For Wong’s Essentials of Pediatric Nursing, 11th Edition by Marilyn...kevinkariuki227
 
Antiplatelets in IHD, Dose Duration, DAPT vs SAPT
Antiplatelets in IHD, Dose Duration, DAPT vs SAPTAntiplatelets in IHD, Dose Duration, DAPT vs SAPT
Antiplatelets in IHD, Dose Duration, DAPT vs SAPTAkashGanganePatil1
 
A thorough review of supernormal conduction.pptx
A thorough review of supernormal conduction.pptxA thorough review of supernormal conduction.pptx
A thorough review of supernormal conduction.pptxSergio Pinski
 
ANATOMY OF THE LOWER URINARY TRACT AND MALE [Autosaved] [Autosaved].pptx
ANATOMY OF THE LOWER URINARY TRACT AND MALE [Autosaved] [Autosaved].pptxANATOMY OF THE LOWER URINARY TRACT AND MALE [Autosaved] [Autosaved].pptx
ANATOMY OF THE LOWER URINARY TRACT AND MALE [Autosaved] [Autosaved].pptxBright Chipili
 
Anuman- An inference for helpful in diagnosis and treatment
Anuman- An inference for helpful in diagnosis and treatmentAnuman- An inference for helpful in diagnosis and treatment
Anuman- An inference for helpful in diagnosis and treatmentabdeli bhadarva
 

Recently uploaded (20)

PT MANAGEMENT OF URINARY INCONTINENCE.pptx
PT MANAGEMENT OF URINARY INCONTINENCE.pptxPT MANAGEMENT OF URINARY INCONTINENCE.pptx
PT MANAGEMENT OF URINARY INCONTINENCE.pptx
 
World Hypertension Day 17th may 2024 ppt
World Hypertension Day 17th may 2024 pptWorld Hypertension Day 17th may 2024 ppt
World Hypertension Day 17th may 2024 ppt
 
Introducing VarSeq Dx as a Medical Device in the European Union
Introducing VarSeq Dx as a Medical Device in the European UnionIntroducing VarSeq Dx as a Medical Device in the European Union
Introducing VarSeq Dx as a Medical Device in the European Union
 
Gauri Gawande(9) Constipation Final.pptx
Gauri Gawande(9) Constipation Final.pptxGauri Gawande(9) Constipation Final.pptx
Gauri Gawande(9) Constipation Final.pptx
 
Cardiac Impulse: Rhythmical Excitation and Conduction in the Heart
Cardiac Impulse: Rhythmical Excitation and Conduction in the HeartCardiac Impulse: Rhythmical Excitation and Conduction in the Heart
Cardiac Impulse: Rhythmical Excitation and Conduction in the Heart
 
Cas 28578-16-7 PMK ethyl glycidate ( new PMK powder) best suppler
Cas 28578-16-7 PMK ethyl glycidate ( new PMK powder) best supplerCas 28578-16-7 PMK ethyl glycidate ( new PMK powder) best suppler
Cas 28578-16-7 PMK ethyl glycidate ( new PMK powder) best suppler
 
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now
 
CNN-based plastic waste detection system
CNN-based plastic waste detection systemCNN-based plastic waste detection system
CNN-based plastic waste detection system
 
The Orbit & its contents by Dr. Rabia I. Gandapore.pptx
The Orbit & its contents by Dr. Rabia I. Gandapore.pptxThe Orbit & its contents by Dr. Rabia I. Gandapore.pptx
The Orbit & its contents by Dr. Rabia I. Gandapore.pptx
 
Scientificity and feasibility study of non-invasive central arterial pressure...
Scientificity and feasibility study of non-invasive central arterial pressure...Scientificity and feasibility study of non-invasive central arterial pressure...
Scientificity and feasibility study of non-invasive central arterial pressure...
 
linearity concept of significance, standard deviation, chi square test, stude...
linearity concept of significance, standard deviation, chi square test, stude...linearity concept of significance, standard deviation, chi square test, stude...
linearity concept of significance, standard deviation, chi square test, stude...
 
Compare home pulse pressure components collected directly from home
Compare home pulse pressure components collected directly from homeCompare home pulse pressure components collected directly from home
Compare home pulse pressure components collected directly from home
 
Book Trailer: PGMEE in a Nutshell (CEE MD/MS PG Entrance Examination)
Book Trailer: PGMEE in a Nutshell (CEE MD/MS PG Entrance Examination)Book Trailer: PGMEE in a Nutshell (CEE MD/MS PG Entrance Examination)
Book Trailer: PGMEE in a Nutshell (CEE MD/MS PG Entrance Examination)
 
Effects of vaping e-cigarettes on arterial health
Effects of vaping e-cigarettes on arterial healthEffects of vaping e-cigarettes on arterial health
Effects of vaping e-cigarettes on arterial health
 
Cardiovascular Physiology - Regulation of Cardiac Pumping
Cardiovascular Physiology - Regulation of Cardiac PumpingCardiovascular Physiology - Regulation of Cardiac Pumping
Cardiovascular Physiology - Regulation of Cardiac Pumping
 
TEST BANK For Wong’s Essentials of Pediatric Nursing, 11th Edition by Marilyn...
TEST BANK For Wong’s Essentials of Pediatric Nursing, 11th Edition by Marilyn...TEST BANK For Wong’s Essentials of Pediatric Nursing, 11th Edition by Marilyn...
TEST BANK For Wong’s Essentials of Pediatric Nursing, 11th Edition by Marilyn...
 
Antiplatelets in IHD, Dose Duration, DAPT vs SAPT
Antiplatelets in IHD, Dose Duration, DAPT vs SAPTAntiplatelets in IHD, Dose Duration, DAPT vs SAPT
Antiplatelets in IHD, Dose Duration, DAPT vs SAPT
 
A thorough review of supernormal conduction.pptx
A thorough review of supernormal conduction.pptxA thorough review of supernormal conduction.pptx
A thorough review of supernormal conduction.pptx
 
ANATOMY OF THE LOWER URINARY TRACT AND MALE [Autosaved] [Autosaved].pptx
ANATOMY OF THE LOWER URINARY TRACT AND MALE [Autosaved] [Autosaved].pptxANATOMY OF THE LOWER URINARY TRACT AND MALE [Autosaved] [Autosaved].pptx
ANATOMY OF THE LOWER URINARY TRACT AND MALE [Autosaved] [Autosaved].pptx
 
Anuman- An inference for helpful in diagnosis and treatment
Anuman- An inference for helpful in diagnosis and treatmentAnuman- An inference for helpful in diagnosis and treatment
Anuman- An inference for helpful in diagnosis and treatment
 

Comparative effectiveness randomized trial to improve stroke care delivery c3 fit_ coordinated coll

  • 1. Comparative Effectiveness Randomized Trial to Improve Stroke Care Delivery: C3FIT: Coordinated, Collaborative, Comprehensive, Family-Based, Integrated, and Technology- Enabled Care Project Summary Stroke is the fifth-leading cause of death and the leading cause of adult disability in the United States, as each year about 780,000 people have a stroke or transient ischemic attack. Up to 90 percent of stroke survivors have some functional deficit, resulting in 5 million (roughly the population of South) living with sequelae of stroke that impact both health quality and psychologically, particularly caregivers. Recurrent stroke occurs in 17 percent of transient ischemic attacks and 18 percent of nondisabling strokes within 3 months; after 5 years, nearly a third have a recurrence, and mortality is greater after a second stroke than the first (24-month survival rates: 48 percent versus 57 percent). Stroke is complex, with multiple interacting risk factors (e.g., genetic; hypertension; hypercholesterolemia; and lifestyle such as smoking, diet, and exercise) that lead to the initial and recurrent strokes. Stroke patients and their families deal with a high risk and cost acute disease state that often results in significant functional and cognitive deficits and impacts physical function, activities of daily living, and quality of life. Patients face stroke impairments and complex risk of recurrence within a
  • 2. current stroke care delivery system characterized by poor coordination and inefficient care delivery. High-quality scientific evidence to identify the best stroke care delivery system is lacking, despite years of work with guidelines, American Stroke Association (Get With the Guidelines) certifications, and the Joint Commission. We completed a three year, $3.8 million Centers for Medicare-Medicaid Innovations Award pilot that tested a novel stroke care delivery Integrated Practice Unit (IPU) redesign that evolved with stakeholder input from patients, caregivers, rehabilitation specialists, nurses, vascular neurologists, patient advocacy groups, payers, and technology companies. It embraced team-based care in-hospital and enhanced collaboration with rehabilitation/skilled nursing facilities using telemedicine technology via a redesign component, called Stroke Central. The IPU encompassed a one-year continuum of stroke care from onset through 12-month follow-up in a home or skilled nursing/rehabilitation facility–based program, called Stroke Mobile, with a registered nurse and lay health educator team that visited the patient and the caregiver’s/family’s home or facility to assess recovery, medication compliance, and risk factor control with telemedicine that facilitated access to multiple layers of care providers and was associated with decreased hospital length of stay and readmissions, decreased recurrence rates, and lower cost. In this larger trial, 18 clinical sites will be randomized to either continue comprehensive/primary stroke care or to reengineered Integrated Stroke Practice Unit care. Results will be key for patients, caregivers, organizations, payers, and policy makers to apply high-quality scientific evidence to the decision, currently in equipoise, on how to best direct resources toward implementing the most effective and efficient stroke care delivery systems that enhance health outcomes for patients and caregivers. Project Details
  • 3. Principal Investigator Kenneth Gaines, MD, MBA Project Status Awarded; Contract pending Board Approval Date August 2018 Organization Vanderbilt University Medical Center Project Type Research Project Funding Announcement Pragmatic Clinical Studies to Evaluate Patient-Centered Outcomes Project Budget * $15,700,000 *All proposed projects, including requested budgets and project periods, are approved subject to a programmatic and budget review by PCORI staff and the negotiation of a formal award contract. Page Last Updated: August 22, 2018