CommonKADS
Context Models
Organization Model
Task Model
Agent Model
Context models 2
Knowledge always functions
within an organizational context
■  Why context modelling?
■  Role of aspect models: organization, task, and agent
models
■  Steps and techniques in knowledge-oriented business
analysis
■  Illustrations: ice-cream case study, housing case study
Context models 3
Why context modeling?
■  Often difficult to identify profitable use of (knowledge)
technology
■  Laboratory is different from the ''real'' world
■  Acceptability to users very important
■  Fielding into ongoing process not self evident
■  Often not clear what additional measures to take
Context models 4
Goals for context modeling
■  Identify problems and opportunities
■  Decide about solutions and their feasibility
■  Improve tasks and task-related knowledge
■  Plan for needed organizational changes
Context models 5
Role of knowledge systems
■  "automation" is not the right way to look at KSs
■  tasks are usually too complex
■  much better view: KS as process-improvement tool
■  typical role of KS: active intelligent assistant
Context models 6
■  Step 1: Carry out a scoping and feasibility study
➤  Tool: Organization Model (OM)
■  Step 2: Carry out impact and improvement study
➤  Tool: Task and Agent Models (TM, AM)
■  zooming in/refinement of organization model
■  Each study consists of an analysis part and a
“constructive” decision-making part
Context modelling process
Context models 7
Step 1: scoping and feasibility
study
■  Step 1a: analysis
➤  Identify problem/opportunity areas and potential solutions
➤  Put them into a wider organizational perspective.
■  Step 1b: synthesis
➤  Decide about economic, technical and project feasibility
➤  Select the most promising focus area and target solution.
Context models 8
Step 2: impacts and
improvements study
■  Step 2a: analysis
➤  study interrelationships between the task, agents involved,
and use of knowledge for successful performance
➤  what improvements may be achieved here?
■  Step 2b: synthesis
➤  Decide about organizational measures and task changes,
➤  Ensure organizational acceptance and integration of a
knowledge system solution
Context models 9
Three context models
■  scope and feasibility study
➤  organization model (OM)
➤  description and analysis of the broader organizational
environment
■  impacts and improvements study
➤  task model (TM) and agent model (AM)
➤  more focused and detailed
➤  zooms in on the relevant part of the organization
➤  TM: tasks plus knowledge directly related to the target
problem
➤  AM: agents involved in TM tasks
Context models 10
Worksheets
■  Modeling process supported by worksheets
➤  Organization model: 5 worksheets
➤  Task model: 2 worksheets
➤  Agent model: 1 worksheet
➤  Summary: 1 worksheet
■  Act as checklist and information archive
■  Should be used flexibly
Context models 11
How to analyze a knowledge-
intensive organization?
■  describe organization aspects:
➤  opportunity/problems portfolio
➤  business context, goals, strategy
➤  internal organization:
–  structure
–  processes
–  people (staff: functional roles)
–  power and culture
–  resources (knowledge, support systems, equipment,…)
■  do this for both current and future organization
➤  comparison, and first decisions on where to go
Context models 12
Worksheets
Organization Model
Org anization	
  Model
P roblems	
  
&
Opportunities
General
Context
(Mission,
S trategy,
E nvironment,
CS F's,...)
P otential
S olutions
OM-­‐1 OM-­‐2
Organization
Focus	
  Area
Description:
S tructure
P rocess
P eople
Culture	
  &	
  P ower
Resources
K nowledge
OM-­‐3 OM-­‐4
P rocess
Breakdown
K nowledge
Assets
Context models 13
OM-1: problem /opportunity
identification
■  shortlist of perceived problems/opportunities
■  organizational context = invariant part
➤  mission, vision, goals of the organization
➤  important external factors
➤  strategy of the organization, value chain
■  list possible solutions
➤  for the perceived problems and opportunities
➤  compatible with organizational context.
■  techniques: interviews, brainstorming
Context models 14
Case Study: Ice-cream
product development
■  Unilever food/personal care industry worldwide
■  First analysis step by worksheet OM-1:
➤  Perceived problem/opportunity issues:
–  Speed-up time to market of new ice-cream products
–  Leverage best-practice knowledge throughout the company
➤  Vision: P roduct
formulation
P roduction
processes
	
  	
  Manufacturing	
  	
  
P roduct	
  properties
(physical,	
  sensory)
Marketing
C onsumer
preferences
F eedback	
  learning	
  loop	
  
Context models 15
OM-1 for Housing
Organization Model Problems and Opportunities
Worksheet OM-1
Problems and
opportunities
assessment takes too much time
not sufficient time for urgent cases
Organizational
context
Mission: transparency of procedure, clear
applicant responsibility
External actors: local council, public
opinion, national regulations, …
Strategy: broaden scope of market
Solutions 1.  Automated assessment system &
2.  Training program for assessors to be
come urgency handlers
Context models 16
Case: “Housing”
■  Local government institution is responsible for
assignment of rental houses to applicants
■  Transparent assignment procedure
➤  two-weekly magazine with house offers
➤  publication of results
■  Partially automated process
■  Existing databases of applicants and residences
Context models 17
Problem & opportunity
■  Two sides of the same coin
■  Opportunity:
➤  a part of the business process in which it might be useful to
introduce knowledge technology
■  Problem:
➤  an opportunity, that is currently being perceived as a
problem in the organization
Context models 18
Organization boundary
■  Sometimes difficult to define the scope of what is “the
organization”
■  Example in the housing domain:
➤  baseline organization: assignment office
➤  includes applicants?
➤  includes rental agencies?
■  Decide on variant and invariant parts
➤  invariant parts are assumed to be stable from the
development point of view
Context models 19
OM-2: variant aspects
■  refers to a single problem-opportunity area of OM-1
■  describes the subpart of the organization involved
■  describes the aspects that might change or be
affected by a knowledge-system solution
Context models 20
Variant aspects OM-2 (1)
■  structure
➤  structure chart of departments, groups, units
■  process
➤  decomposed into tasks plus dependencies
➤  detailed in Worksheet OM-3
■  people
➤  staff members involved as actors or stakeholders
–  decision makers, providers, users, customers
➤  not "actual" people but functional roles
Context models 21
Variant aspects OM-2 (2)
■  resources
➤  information systems
➤  equipment and materials
➤  non-knowledge skills and competencies.
■  knowledge
➤  special resource in this context
➤  detailed in Worksheet OM-4
■  culture and power
➤  "unwritten rules of the game”, styles of working and
communicating, informal relationships
Context models 22
OM-2: ice-cream organization
analysis
■  Example part of OM-2 analysis:
➤  Structure
General
director
Technical
director
Finance
director
Personnel
director
Marketing
& Sales
director
Information
& IT
management
Logistics
management
Technical Dept.
management
Development Dept.
management
Manufacturing
management
Ice Cream
development
Quality
assurance
Packaging
design
Coldstore
& Warehouse
management
Context models 23
Structure & people “Housing”
directorate
director
deputy	
  director
policy
department
statistical	
  analyst
staff	
  member
residence	
  
assig nment
data	
  entry
assigner
computer
support
D B	
  administrator
system	
  analyst
public
service
magazine	
  editor
magazine	
  producer
information	
  officer
Context models 24
Process “Housing”
primary
proces s
s econdary
proces s
data	
  entry
of	
  applications
magazine
production
application
assessment
residence
assignment
statistical
analysis
policy
information
:residence
assignments
	
  	
  
Context models 25
Remainder of OM-2 for
“Housing”
Organization model Variant aspects: Worksheet OM-2
Resources Existing database of applicants and residences
Priority calculator for computing a priority list
of applicants for a residence.
Knowledge Assessment criteria: knowledge for judging
correctness of individual applications
Assignment rules: knowledge used for
selecting an applicant for a particular house.
Urgency rules: special rules and regulations for
urgent cases (e.g., handicapped people).
Culture & power Hierarchical organization
Employees view the future with some trepidation
Management style: history as civil servant
Context models 26
OM-3: Process Breakdown
■  Key element => described in more detail
■  Fill-in for each task in the Process description
■  OM-3 elements:
➤  Task: name + identifier
➤  Performed by: agent (People or Resource)
➤  Where?: location in Structure
➤  Knowledge required: list of Knowledge assets
➤  Knowledge-intensive?: yes/no
➤  Significance: qualitative value, e.g. five-point scale
Context models 27
OM-3 example: breakdown of
ice-cream process
■  In ice-cream product development the main
subprocesses are:
➤  product idea generation
➤  feasibility phase
➤  production and sales planning
➤  implementation and role-out
➤  post-launch review
■  All subprocesses are knowledge-intensive, but
feasibility and planning phases in particular
Context models 28
Example OM-3 for “Housing”
Task Performed by Where Knowledge
asset(s)
KI? Signifi-
cance
1. Magazine
production
Magazine
editor
Public service - No 3
2. Data entry
applications
Data typist /
automated
telephone
Residence
assignment
- No 2
3. Application
assessment
Assigner Residence
assignment
Assessment
criteria
Yes 5
4. Residence
assignment
Assigner Residence
Assignment
Assignment &
urgency rules
Yes 5
Context models 29
OM-4: Knowledge Assets
■  details the "Knowledge" element of OM-2
■  coarse-grained description
➤  refined in task model and knowledge model
■  elements:
➤  Knowledge Asset: Name (OM-3)
➤  Possessed by: Agent (OM-3)
➤  Used in: Task ID (OM-3)
➤  Right Form? Right Place? Right Time? Right Quality?
–  yes/no + comments
Context models 30
OM-4: knowledge assets for
ice-cream business process
Context models 31
Knowledge asset “Housing”
■  Knowledge asset:
➤  “general residence-application norms”
■  right form?
➤  no, should be also in electronic form
■  right place, time, quality?
➤  yes
Context models 32
Feasibility document contents
■  One copy of Worksheet OM-1
■  For each problem/opportunity area: OM-2
■  For each task: OM-3
■  For each knowledge asset: OM-4
■  For each suggested solution: decision to "automate"
yes/no plus reasons
➤  Worksheet OM-5: checklist for this decision
■  Proposed actions
Context models 33
Business Feasibility
■  expected benefits
➤  tangible (economic) and intangible
■  expected added value
■  expected costs
■  comparison to possible alternative solutions
■  organizational changes required
■  economic and business risks and uncertainties
Context models 34
Technical Feasibility
■  complexity of knowledge/reasoning process
➤  availability of state-of-the-art methods
➤  has it been done before?
■  critical aspects involved?
➤  time, quality, needed resources
■  measurable success factors
➤  tests for validity, quality and performance
■  complexity of user/system interaction
➤  availability of state-of-the-art methods
Context models 35
Project Feasibility
■  commitment from the agents and stakeholders
■  availability of resources in terms of time, budget,
equipment, staff
■  availablity of required knowledge and other
competencies
■  realistic expectations
■  adequate project organization and external
communication
Context models 36
Proposed Actions
■  recommended concrete steps for action
➤  List of focus areas
➤  Target solution for focus area
➤  Expected results and benefits
➤  Required project actions
➤  When to reconsider?
Context models 37
OM-5: feasibility decision document
for ice-cream example
■  Business, technical and project feasibility
■  Proposed actions for solution direction
• Ice-cream case study:
• Clarification of knowledge bottlenecks achieved
• Different knowledge improvement scenarios outlined
• Requirements for technical and project feasibility stated
• Proposed actions:
• Prioritize knowledge improvement scenarios as next step
• ….
Context models 38
Feasibility “Housing”
■  Automation of “application assignment”
➤  feasible from all perspectives
■  Actions
➤  application construction
➤  job changes within assignment department
➤  provide additional training
➤  consider also resource transfer to computer dept.
Context models 39
Case: social security services
(SSS)
■  Problem-opportunity-context: see book
■  Problem:
laws and regulations are so complex
=> long time to reach a decision => backlog
=> social uproar => headlines in the papers
■  Solution (a priori formulated by SSS management):
knowledge system stores the legal decision-making knowledge
=> backlog reduced
Context models 40
SSS scope and feasibility
decision making
■  Context analysis: see book
■  Solution: "KS for solving backlog problem"
➤  Business feasibility
–  does not solve the problem as main task load is in archiving
–  requires organizational changes
–  status of people will change
➤  Technical/project feasibility
–  state-of-the-art work
➤  Proposed actions
–  redirect the project to simplify procedures for archiving and
reporting.
Context models 41
Next step of context modelling:
zooming in on tasks
■  Task = subpart of a business process
■  goal-oriented value-adding activity
■  handles inputs and delivers desired outputs
➤  in a structured and controlled way
■  consumes resources;
■  requires (and provides) knowledge/skills
■  adheres to quality and performance criteria
■  carried out by responsible and accountable agents
Context models 42
Task Model aspects
Knowledge and"
Competences"
Objects"
Structure"
(Data)!
Time and"
Control!
Performance"
and Quality"
Resources"
Agents"
Goal and"
Value"
(Sub)Function"
and Flow"
TASK
MODEL!
Managerial!
View!
Information
Systems (3D)
View!
Context models 43
TM-1: Task Analysis
■  zoom in on a task
➤  more detailed description than OM-3
■  link to BPR/BPA methods
➤  task is part of business process
■  link to SE analysis model
➤  dependency and flow
➤  data, function, control view on task
Context models 44
Task description: internal
■  data dependency and data flow
➤  preceding task, follow-up tasks
■  objects handled
➤  simple information model
■  timing & control
➤  frequency, duration, when performed
■  constraints: pre- and post-conditions
Context models 45
TM-1: Top-level task model
■  Fill in TM components (see TM Figure)
–  Example: task decomposition and flow of feasibility phase
–  Gives first-cut version for task layer of knowledge model
Marketing
brief
D evelop
product
concept
P roduct
description
P roduce
product
prototypes
P roduct
prototypes
C arry	
  out
prototype	
  tests
D iscuss
results	
  with
marketing
(Iteratively)	
  R evise
product	
  description
and/or	
  prototypes
F inal
product
s pecification
Context models 46
Data flow “Housing”
applicant
rental
agency
(external)
actor
data	
  entry
checking
assessment
assign
valid
applications
assignments
database	
  of
residences	
  &
applicants processing
function
data	
  store
data	
  flow
Legend
free	
  residence
relevant
applications
application
data
application
application
assignment
Context models 47
Control flow “Housing”
data	
  entry
checking	
  
as s es s ing
application	
  received	
  
before	
  deadline
[data	
  =	
  incorrect]
[decision	
  =	
  eligible]
[decision	
  =	
  not	
  eligible]
[data	
  =	
  correct]
garbage	
  bin
further
processing
Context models 48
Task description: external
■  goal and value
■  agents involved
■  knowledge:
➤  list of knowledge items further detailed in TM-2
■  other competencies and skills
■  resources
➤  refinement of OM-2
■  quality and performance:
➤  yardsticks for measuring task execution
Context models 49
TM-2:
knowledge item description
■  Possessed by: Agent
■  Used in:Task ID
■  Domain
➤  specialist field, discipline, branch of science or engineering,
professional community
■  Indicate nature, form and availability of knowledge
➤  tick if bottleneck
Context models 50
Characterizations of
knowledge items
■  Nature
➤  formal, rigorous; empirical, quantitative; heuristic, rules of
thumb, .....
■  Form
➤  mind, paper, electronic, action skill, ...
■  Availability
➤  limitations in time, space, access, quality, form
Context models 51
TM-2: Detailing of knowledge
items & bottlenecks
Ice-cream case:
■  Knowledge item:
consumer desires
■  Bottlenecks exist in:
➤  Nature: incomplete, tacit,
hard to verify
➤  Form: in mind of marketers
only
➤  Availability: limitations in
space and quality
Context models 52
Agent Model
■  OM and TM => process/task perspective
■  AM: perspective of individual agents
➤  staff, software systems
■  large part: rearrangement of information already in
other worksheets
➤  just a single worksheet
■  agent view useful for judging impact
➤  See attitude matrix
■  important input for communication model
Context models 53
Agent Worksheet AM-1:
the “assigner” agent
Name Assigner
Organization Residence-assignment department
Involved In 3. Application assessment
4. Residence assignment
Communicates with Database
Priority calculator
Knowledge Assessment criteria
Assignment rules
Urgency rules
Other competencies Ability to handle problematic non-standard
cases
Responsibilities
& constraints
Make sure that people are treated equally (no
favors). This has been a problem in the past
Context models 54
Final step: impacts and and
improvements document
■  checklist in Worksheet OTA-1
■  measures for improvement accompany development
work
■  major issues for decision making:
➤  organizational changes recommended
➤  measures for specific tasks and/or workers
➤  improvements regarding use and availability of knowledge
➤  is the expected result sufficient?
➤  future directions
Context models 55
Impacts and Changes (1):
Organization as a whole
■  Structure
■  Process
■  Resources
■  People
■  Knowledge
■  Culture and Power
Context models 56
Impacts and Changes (2):
Task/Agent-Specific
■  comparison: future/current models
■  impact and change types:
➤  task lay-out
➤  needed resources
➤  performance and quality criteria
➤  staffing, involved agents
➤  individual positions, responsibilities, authority, constraints in task
execution
➤  knowledge and competencies
➤  communication
Context models 57
Proposed Actions
■  improvements/changes in organization
■  accompanying measures
➤  training, facilities
■  further project action
■  when to reconsider
Context models 58
OTA-1: impacts and
improvements decisions
■  Ice-cream case: processing scenario ranks best
■  Proposed actions:
–  Develop processing KBS module
–  Archive past formulations
–  Structured knowledge management for knowledge sharing
Context models 59
Stakeholder-driven approach in
Unilever PARIS ice-cream project
Identify stakeholders
and project sponsors
Interview the
stakeholders
Develop factory
assessment approach
Assess factories
System storyboards
Follow-up
project plan
& agreement
Feasibility study results
Context models 60
Actors and stakeholders:
attitudes and commitments
■  Important guideline: always consider attitudes of
actors and stakeholders toward changes
■  Ask yourself: is there a sufficient basis to successfully
carry through proposed changes?
–  Technique: stakeholder attitude matrix
–  (EMS case, IEEE Intell. Syst. 1997)
Stakeholder/Solution SQ I II III IV V VI
Hospital specialist - + + + + + +
General Practitioner o + o - - - -
EMS personnel o + + + + - -
Consumer - + + + + o +
(SQ = status quo)
Context models 61
Attitude matrix: internal
Sponsor/Solutions SQ I II III IV V VI
Manager - - + o + - -
System manager - o o o + o o
Dispatcher - - + + o - -
Paramedic - o + + + + -
Driver - o o o o + +
Consumer - + + + + + +
Context models 62
Summary
■  Organizational aspects: critical success factor
■  Envisaged systems must be well-integrated
■  Step 1: portfolio of solutions+ feasibility
➤  organization model
➤  feasibility document
■  Step 2: zoom in and assess changes/measures
➤  task, knowledge item, and agent descriptions
➤  plan for organizational changes
■  Context analysis is wider applicable
Context models 63
Overall process of business
analysis in KE&M
Refine
[If	
  infeasible]
OM-­‐1
worksheet:
problems,
solutions,
context
OM-­‐2
worksheet:
description	
  of
organization
focus	
  area
OM-­‐4
worksheet:
knowledge
assets
OM-­‐3
worksheet:
process
breakdown
OM-­‐5
worksheet:
Judge
Feasibility
(Decision
Document)
TM-­‐1
worksheet:
task
analysis
TM-­‐2
worksheet:
knowledge	
  item
analysis
AM-­‐1
worksheet:
agent
model
OTA-­‐1
worksheet:
Assess	
  	
  Impacts	
  &	
  Changes
(Decision	
  Document)
Refine
Integrate
Integrate
[If	
  feasible]
Integrate,
comparing	
  both	
  the
old	
  and	
  new	
  situations
Start
Stop
Context
Analysis
Ready
Context models 64
Exercise: knowledge workshop
■  Management group discussions, structured by using
worksheets OM1-5, TM1-2, OTA-1, as a self-assessment
instrument for management in own area of responsibility
■  Used by, e.g., Unilever and Dutch Tax Authority
■  In particular:
➤  Focus on valuable business area or process, sketch the workflow
of this process, and list problem/opportunity portfolio
➤  Identify the knowledge assets of importance to this process
➤  Investigate whether there exists bottlenecks here (OM-4, TM-2)
➤  Devise possible solutions and analyze their feasibility
–  Problem/cause/solution QFD-type matrices
–  Stakeholder attitude matrices
➤  Take follow-up managerial action

CommonKADS context models

  • 1.
  • 2.
    Context models 2 Knowledgealways functions within an organizational context ■  Why context modelling? ■  Role of aspect models: organization, task, and agent models ■  Steps and techniques in knowledge-oriented business analysis ■  Illustrations: ice-cream case study, housing case study
  • 3.
    Context models 3 Whycontext modeling? ■  Often difficult to identify profitable use of (knowledge) technology ■  Laboratory is different from the ''real'' world ■  Acceptability to users very important ■  Fielding into ongoing process not self evident ■  Often not clear what additional measures to take
  • 4.
    Context models 4 Goalsfor context modeling ■  Identify problems and opportunities ■  Decide about solutions and their feasibility ■  Improve tasks and task-related knowledge ■  Plan for needed organizational changes
  • 5.
    Context models 5 Roleof knowledge systems ■  "automation" is not the right way to look at KSs ■  tasks are usually too complex ■  much better view: KS as process-improvement tool ■  typical role of KS: active intelligent assistant
  • 6.
    Context models 6 ■ Step 1: Carry out a scoping and feasibility study ➤  Tool: Organization Model (OM) ■  Step 2: Carry out impact and improvement study ➤  Tool: Task and Agent Models (TM, AM) ■  zooming in/refinement of organization model ■  Each study consists of an analysis part and a “constructive” decision-making part Context modelling process
  • 7.
    Context models 7 Step1: scoping and feasibility study ■  Step 1a: analysis ➤  Identify problem/opportunity areas and potential solutions ➤  Put them into a wider organizational perspective. ■  Step 1b: synthesis ➤  Decide about economic, technical and project feasibility ➤  Select the most promising focus area and target solution.
  • 8.
    Context models 8 Step2: impacts and improvements study ■  Step 2a: analysis ➤  study interrelationships between the task, agents involved, and use of knowledge for successful performance ➤  what improvements may be achieved here? ■  Step 2b: synthesis ➤  Decide about organizational measures and task changes, ➤  Ensure organizational acceptance and integration of a knowledge system solution
  • 9.
    Context models 9 Threecontext models ■  scope and feasibility study ➤  organization model (OM) ➤  description and analysis of the broader organizational environment ■  impacts and improvements study ➤  task model (TM) and agent model (AM) ➤  more focused and detailed ➤  zooms in on the relevant part of the organization ➤  TM: tasks plus knowledge directly related to the target problem ➤  AM: agents involved in TM tasks
  • 10.
    Context models 10 Worksheets ■ Modeling process supported by worksheets ➤  Organization model: 5 worksheets ➤  Task model: 2 worksheets ➤  Agent model: 1 worksheet ➤  Summary: 1 worksheet ■  Act as checklist and information archive ■  Should be used flexibly
  • 11.
    Context models 11 Howto analyze a knowledge- intensive organization? ■  describe organization aspects: ➤  opportunity/problems portfolio ➤  business context, goals, strategy ➤  internal organization: –  structure –  processes –  people (staff: functional roles) –  power and culture –  resources (knowledge, support systems, equipment,…) ■  do this for both current and future organization ➤  comparison, and first decisions on where to go
  • 12.
    Context models 12 Worksheets OrganizationModel Org anization  Model P roblems   & Opportunities General Context (Mission, S trategy, E nvironment, CS F's,...) P otential S olutions OM-­‐1 OM-­‐2 Organization Focus  Area Description: S tructure P rocess P eople Culture  &  P ower Resources K nowledge OM-­‐3 OM-­‐4 P rocess Breakdown K nowledge Assets
  • 13.
    Context models 13 OM-1:problem /opportunity identification ■  shortlist of perceived problems/opportunities ■  organizational context = invariant part ➤  mission, vision, goals of the organization ➤  important external factors ➤  strategy of the organization, value chain ■  list possible solutions ➤  for the perceived problems and opportunities ➤  compatible with organizational context. ■  techniques: interviews, brainstorming
  • 14.
    Context models 14 CaseStudy: Ice-cream product development ■  Unilever food/personal care industry worldwide ■  First analysis step by worksheet OM-1: ➤  Perceived problem/opportunity issues: –  Speed-up time to market of new ice-cream products –  Leverage best-practice knowledge throughout the company ➤  Vision: P roduct formulation P roduction processes    Manufacturing     P roduct  properties (physical,  sensory) Marketing C onsumer preferences F eedback  learning  loop  
  • 15.
    Context models 15 OM-1for Housing Organization Model Problems and Opportunities Worksheet OM-1 Problems and opportunities assessment takes too much time not sufficient time for urgent cases Organizational context Mission: transparency of procedure, clear applicant responsibility External actors: local council, public opinion, national regulations, … Strategy: broaden scope of market Solutions 1.  Automated assessment system & 2.  Training program for assessors to be come urgency handlers
  • 16.
    Context models 16 Case:“Housing” ■  Local government institution is responsible for assignment of rental houses to applicants ■  Transparent assignment procedure ➤  two-weekly magazine with house offers ➤  publication of results ■  Partially automated process ■  Existing databases of applicants and residences
  • 17.
    Context models 17 Problem& opportunity ■  Two sides of the same coin ■  Opportunity: ➤  a part of the business process in which it might be useful to introduce knowledge technology ■  Problem: ➤  an opportunity, that is currently being perceived as a problem in the organization
  • 18.
    Context models 18 Organizationboundary ■  Sometimes difficult to define the scope of what is “the organization” ■  Example in the housing domain: ➤  baseline organization: assignment office ➤  includes applicants? ➤  includes rental agencies? ■  Decide on variant and invariant parts ➤  invariant parts are assumed to be stable from the development point of view
  • 19.
    Context models 19 OM-2:variant aspects ■  refers to a single problem-opportunity area of OM-1 ■  describes the subpart of the organization involved ■  describes the aspects that might change or be affected by a knowledge-system solution
  • 20.
    Context models 20 Variantaspects OM-2 (1) ■  structure ➤  structure chart of departments, groups, units ■  process ➤  decomposed into tasks plus dependencies ➤  detailed in Worksheet OM-3 ■  people ➤  staff members involved as actors or stakeholders –  decision makers, providers, users, customers ➤  not "actual" people but functional roles
  • 21.
    Context models 21 Variantaspects OM-2 (2) ■  resources ➤  information systems ➤  equipment and materials ➤  non-knowledge skills and competencies. ■  knowledge ➤  special resource in this context ➤  detailed in Worksheet OM-4 ■  culture and power ➤  "unwritten rules of the game”, styles of working and communicating, informal relationships
  • 22.
    Context models 22 OM-2:ice-cream organization analysis ■  Example part of OM-2 analysis: ➤  Structure General director Technical director Finance director Personnel director Marketing & Sales director Information & IT management Logistics management Technical Dept. management Development Dept. management Manufacturing management Ice Cream development Quality assurance Packaging design Coldstore & Warehouse management
  • 23.
    Context models 23 Structure& people “Housing” directorate director deputy  director policy department statistical  analyst staff  member residence   assig nment data  entry assigner computer support D B  administrator system  analyst public service magazine  editor magazine  producer information  officer
  • 24.
    Context models 24 Process“Housing” primary proces s s econdary proces s data  entry of  applications magazine production application assessment residence assignment statistical analysis policy information :residence assignments    
  • 25.
    Context models 25 Remainderof OM-2 for “Housing” Organization model Variant aspects: Worksheet OM-2 Resources Existing database of applicants and residences Priority calculator for computing a priority list of applicants for a residence. Knowledge Assessment criteria: knowledge for judging correctness of individual applications Assignment rules: knowledge used for selecting an applicant for a particular house. Urgency rules: special rules and regulations for urgent cases (e.g., handicapped people). Culture & power Hierarchical organization Employees view the future with some trepidation Management style: history as civil servant
  • 26.
    Context models 26 OM-3:Process Breakdown ■  Key element => described in more detail ■  Fill-in for each task in the Process description ■  OM-3 elements: ➤  Task: name + identifier ➤  Performed by: agent (People or Resource) ➤  Where?: location in Structure ➤  Knowledge required: list of Knowledge assets ➤  Knowledge-intensive?: yes/no ➤  Significance: qualitative value, e.g. five-point scale
  • 27.
    Context models 27 OM-3example: breakdown of ice-cream process ■  In ice-cream product development the main subprocesses are: ➤  product idea generation ➤  feasibility phase ➤  production and sales planning ➤  implementation and role-out ➤  post-launch review ■  All subprocesses are knowledge-intensive, but feasibility and planning phases in particular
  • 28.
    Context models 28 ExampleOM-3 for “Housing” Task Performed by Where Knowledge asset(s) KI? Signifi- cance 1. Magazine production Magazine editor Public service - No 3 2. Data entry applications Data typist / automated telephone Residence assignment - No 2 3. Application assessment Assigner Residence assignment Assessment criteria Yes 5 4. Residence assignment Assigner Residence Assignment Assignment & urgency rules Yes 5
  • 29.
    Context models 29 OM-4:Knowledge Assets ■  details the "Knowledge" element of OM-2 ■  coarse-grained description ➤  refined in task model and knowledge model ■  elements: ➤  Knowledge Asset: Name (OM-3) ➤  Possessed by: Agent (OM-3) ➤  Used in: Task ID (OM-3) ➤  Right Form? Right Place? Right Time? Right Quality? –  yes/no + comments
  • 30.
    Context models 30 OM-4:knowledge assets for ice-cream business process
  • 31.
    Context models 31 Knowledgeasset “Housing” ■  Knowledge asset: ➤  “general residence-application norms” ■  right form? ➤  no, should be also in electronic form ■  right place, time, quality? ➤  yes
  • 32.
    Context models 32 Feasibilitydocument contents ■  One copy of Worksheet OM-1 ■  For each problem/opportunity area: OM-2 ■  For each task: OM-3 ■  For each knowledge asset: OM-4 ■  For each suggested solution: decision to "automate" yes/no plus reasons ➤  Worksheet OM-5: checklist for this decision ■  Proposed actions
  • 33.
    Context models 33 BusinessFeasibility ■  expected benefits ➤  tangible (economic) and intangible ■  expected added value ■  expected costs ■  comparison to possible alternative solutions ■  organizational changes required ■  economic and business risks and uncertainties
  • 34.
    Context models 34 TechnicalFeasibility ■  complexity of knowledge/reasoning process ➤  availability of state-of-the-art methods ➤  has it been done before? ■  critical aspects involved? ➤  time, quality, needed resources ■  measurable success factors ➤  tests for validity, quality and performance ■  complexity of user/system interaction ➤  availability of state-of-the-art methods
  • 35.
    Context models 35 ProjectFeasibility ■  commitment from the agents and stakeholders ■  availability of resources in terms of time, budget, equipment, staff ■  availablity of required knowledge and other competencies ■  realistic expectations ■  adequate project organization and external communication
  • 36.
    Context models 36 ProposedActions ■  recommended concrete steps for action ➤  List of focus areas ➤  Target solution for focus area ➤  Expected results and benefits ➤  Required project actions ➤  When to reconsider?
  • 37.
    Context models 37 OM-5:feasibility decision document for ice-cream example ■  Business, technical and project feasibility ■  Proposed actions for solution direction • Ice-cream case study: • Clarification of knowledge bottlenecks achieved • Different knowledge improvement scenarios outlined • Requirements for technical and project feasibility stated • Proposed actions: • Prioritize knowledge improvement scenarios as next step • ….
  • 38.
    Context models 38 Feasibility“Housing” ■  Automation of “application assignment” ➤  feasible from all perspectives ■  Actions ➤  application construction ➤  job changes within assignment department ➤  provide additional training ➤  consider also resource transfer to computer dept.
  • 39.
    Context models 39 Case:social security services (SSS) ■  Problem-opportunity-context: see book ■  Problem: laws and regulations are so complex => long time to reach a decision => backlog => social uproar => headlines in the papers ■  Solution (a priori formulated by SSS management): knowledge system stores the legal decision-making knowledge => backlog reduced
  • 40.
    Context models 40 SSSscope and feasibility decision making ■  Context analysis: see book ■  Solution: "KS for solving backlog problem" ➤  Business feasibility –  does not solve the problem as main task load is in archiving –  requires organizational changes –  status of people will change ➤  Technical/project feasibility –  state-of-the-art work ➤  Proposed actions –  redirect the project to simplify procedures for archiving and reporting.
  • 41.
    Context models 41 Nextstep of context modelling: zooming in on tasks ■  Task = subpart of a business process ■  goal-oriented value-adding activity ■  handles inputs and delivers desired outputs ➤  in a structured and controlled way ■  consumes resources; ■  requires (and provides) knowledge/skills ■  adheres to quality and performance criteria ■  carried out by responsible and accountable agents
  • 42.
    Context models 42 TaskModel aspects Knowledge and" Competences" Objects" Structure" (Data)! Time and" Control! Performance" and Quality" Resources" Agents" Goal and" Value" (Sub)Function" and Flow" TASK MODEL! Managerial! View! Information Systems (3D) View!
  • 43.
    Context models 43 TM-1:Task Analysis ■  zoom in on a task ➤  more detailed description than OM-3 ■  link to BPR/BPA methods ➤  task is part of business process ■  link to SE analysis model ➤  dependency and flow ➤  data, function, control view on task
  • 44.
    Context models 44 Taskdescription: internal ■  data dependency and data flow ➤  preceding task, follow-up tasks ■  objects handled ➤  simple information model ■  timing & control ➤  frequency, duration, when performed ■  constraints: pre- and post-conditions
  • 45.
    Context models 45 TM-1:Top-level task model ■  Fill in TM components (see TM Figure) –  Example: task decomposition and flow of feasibility phase –  Gives first-cut version for task layer of knowledge model Marketing brief D evelop product concept P roduct description P roduce product prototypes P roduct prototypes C arry  out prototype  tests D iscuss results  with marketing (Iteratively)  R evise product  description and/or  prototypes F inal product s pecification
  • 46.
    Context models 46 Dataflow “Housing” applicant rental agency (external) actor data  entry checking assessment assign valid applications assignments database  of residences  & applicants processing function data  store data  flow Legend free  residence relevant applications application data application application assignment
  • 47.
    Context models 47 Controlflow “Housing” data  entry checking   as s es s ing application  received   before  deadline [data  =  incorrect] [decision  =  eligible] [decision  =  not  eligible] [data  =  correct] garbage  bin further processing
  • 48.
    Context models 48 Taskdescription: external ■  goal and value ■  agents involved ■  knowledge: ➤  list of knowledge items further detailed in TM-2 ■  other competencies and skills ■  resources ➤  refinement of OM-2 ■  quality and performance: ➤  yardsticks for measuring task execution
  • 49.
    Context models 49 TM-2: knowledgeitem description ■  Possessed by: Agent ■  Used in:Task ID ■  Domain ➤  specialist field, discipline, branch of science or engineering, professional community ■  Indicate nature, form and availability of knowledge ➤  tick if bottleneck
  • 50.
    Context models 50 Characterizationsof knowledge items ■  Nature ➤  formal, rigorous; empirical, quantitative; heuristic, rules of thumb, ..... ■  Form ➤  mind, paper, electronic, action skill, ... ■  Availability ➤  limitations in time, space, access, quality, form
  • 51.
    Context models 51 TM-2:Detailing of knowledge items & bottlenecks Ice-cream case: ■  Knowledge item: consumer desires ■  Bottlenecks exist in: ➤  Nature: incomplete, tacit, hard to verify ➤  Form: in mind of marketers only ➤  Availability: limitations in space and quality
  • 52.
    Context models 52 AgentModel ■  OM and TM => process/task perspective ■  AM: perspective of individual agents ➤  staff, software systems ■  large part: rearrangement of information already in other worksheets ➤  just a single worksheet ■  agent view useful for judging impact ➤  See attitude matrix ■  important input for communication model
  • 53.
    Context models 53 AgentWorksheet AM-1: the “assigner” agent Name Assigner Organization Residence-assignment department Involved In 3. Application assessment 4. Residence assignment Communicates with Database Priority calculator Knowledge Assessment criteria Assignment rules Urgency rules Other competencies Ability to handle problematic non-standard cases Responsibilities & constraints Make sure that people are treated equally (no favors). This has been a problem in the past
  • 54.
    Context models 54 Finalstep: impacts and and improvements document ■  checklist in Worksheet OTA-1 ■  measures for improvement accompany development work ■  major issues for decision making: ➤  organizational changes recommended ➤  measures for specific tasks and/or workers ➤  improvements regarding use and availability of knowledge ➤  is the expected result sufficient? ➤  future directions
  • 55.
    Context models 55 Impactsand Changes (1): Organization as a whole ■  Structure ■  Process ■  Resources ■  People ■  Knowledge ■  Culture and Power
  • 56.
    Context models 56 Impactsand Changes (2): Task/Agent-Specific ■  comparison: future/current models ■  impact and change types: ➤  task lay-out ➤  needed resources ➤  performance and quality criteria ➤  staffing, involved agents ➤  individual positions, responsibilities, authority, constraints in task execution ➤  knowledge and competencies ➤  communication
  • 57.
    Context models 57 ProposedActions ■  improvements/changes in organization ■  accompanying measures ➤  training, facilities ■  further project action ■  when to reconsider
  • 58.
    Context models 58 OTA-1:impacts and improvements decisions ■  Ice-cream case: processing scenario ranks best ■  Proposed actions: –  Develop processing KBS module –  Archive past formulations –  Structured knowledge management for knowledge sharing
  • 59.
    Context models 59 Stakeholder-drivenapproach in Unilever PARIS ice-cream project Identify stakeholders and project sponsors Interview the stakeholders Develop factory assessment approach Assess factories System storyboards Follow-up project plan & agreement Feasibility study results
  • 60.
    Context models 60 Actorsand stakeholders: attitudes and commitments ■  Important guideline: always consider attitudes of actors and stakeholders toward changes ■  Ask yourself: is there a sufficient basis to successfully carry through proposed changes? –  Technique: stakeholder attitude matrix –  (EMS case, IEEE Intell. Syst. 1997) Stakeholder/Solution SQ I II III IV V VI Hospital specialist - + + + + + + General Practitioner o + o - - - - EMS personnel o + + + + - - Consumer - + + + + o + (SQ = status quo)
  • 61.
    Context models 61 Attitudematrix: internal Sponsor/Solutions SQ I II III IV V VI Manager - - + o + - - System manager - o o o + o o Dispatcher - - + + o - - Paramedic - o + + + + - Driver - o o o o + + Consumer - + + + + + +
  • 62.
    Context models 62 Summary ■ Organizational aspects: critical success factor ■  Envisaged systems must be well-integrated ■  Step 1: portfolio of solutions+ feasibility ➤  organization model ➤  feasibility document ■  Step 2: zoom in and assess changes/measures ➤  task, knowledge item, and agent descriptions ➤  plan for organizational changes ■  Context analysis is wider applicable
  • 63.
    Context models 63 Overallprocess of business analysis in KE&M Refine [If  infeasible] OM-­‐1 worksheet: problems, solutions, context OM-­‐2 worksheet: description  of organization focus  area OM-­‐4 worksheet: knowledge assets OM-­‐3 worksheet: process breakdown OM-­‐5 worksheet: Judge Feasibility (Decision Document) TM-­‐1 worksheet: task analysis TM-­‐2 worksheet: knowledge  item analysis AM-­‐1 worksheet: agent model OTA-­‐1 worksheet: Assess    Impacts  &  Changes (Decision  Document) Refine Integrate Integrate [If  feasible] Integrate, comparing  both  the old  and  new  situations Start Stop Context Analysis Ready
  • 64.
    Context models 64 Exercise:knowledge workshop ■  Management group discussions, structured by using worksheets OM1-5, TM1-2, OTA-1, as a self-assessment instrument for management in own area of responsibility ■  Used by, e.g., Unilever and Dutch Tax Authority ■  In particular: ➤  Focus on valuable business area or process, sketch the workflow of this process, and list problem/opportunity portfolio ➤  Identify the knowledge assets of importance to this process ➤  Investigate whether there exists bottlenecks here (OM-4, TM-2) ➤  Devise possible solutions and analyze their feasibility –  Problem/cause/solution QFD-type matrices –  Stakeholder attitude matrices ➤  Take follow-up managerial action