SlideShare a Scribd company logo
Mister/ Madame
I would like to thank you for an opportunity to present to you my
interest in employment with your company and present to you my
years of experience in the construction industry.
As my attached resume indicates, my background includes a leading
role for multi-million dollar aviation projects, co-generation power
plants, maximum correctional facilities, hospital facilities, and luxury
high-rise condominiums. I am experienced in the electrical,
mechanical, and plumbing fields, with knowledge in the structural,
architectural, and civil areas.
My working relationships with Owners, fellow employees, contractors
and design teams have proven to be an asset on all projects. I have
an extensive background in these fields and feel I would be a positive
addition to any team.
I am a very reliable person and enjoy very much what I do. I hope
that you would consider me for a position within your company and
grant me an opportunity to utilize my experiences and good work
ethics.
Richard P. St. Cyr
105 Mandarin Lane
Fruitland Park FL 34731
(352) 787-7395
(352) 250-4978
restcyr@aol.com
RESUME
Richard P. St. Cyr
105 Mandarin Lane
Fruitland Park FL 34731
352-787-7395 Home 352-250-4978 Cell
I have over 25 years of experience in supervising mechanical, electrical, and plumbing (MEP) projects and have extensive knowledge in
the structural, architectural, and civil engineering areas. I have led multimillion dollar projects for hospitals, correctional facilities,
airport terminals, high-rise condominiums, and power plants. Have an adept construction manager and inspector skills at leading
multiple contractors, complex teams of technicians and laborers. I am experienced with resolving requests for information (RFI’s).
I am a U. S. Air force Veteran who served in the Vietnam War and Honorably Discharged.
STV Incorporated
2/15 - Present LaGuardia International Airport Terminal C upgrade - MEP Coordinator
In conjunction with working at JFK, Delta Airlines assigned me to work at LaGuardia Airport Terminal C on the power upgrade project.
Installation of 3 new - 5kv substations, 2 - 480v switchgears as well as 1 mega watt standby generator for the 12 million dollar Delta
Airline power upgrade project. This project also involves overseeing the entire support infrastructure, fire alarm systems, and upgrade
for the BHS and BMS system upgrades. Upgrading of BHS includes but not limited to overseeing the installation of 4 TSA inline
screening units, diverters and pushers, bag slides, BHS monitoring systems, anti gridlock systems, fire alarm interface system, along
with testing and commissioning of the BHS/BMS interface. All of which have to be performed while airport operations are active.
2/11 - 2/15 Delta Air Lines JFK Terminal 4 Redevelopment Program Phase 1 & 2 - MEP Coordinator
Managing the MEP construction for the $750 million dollar redevelopment of Terminal 4 at JFK International Airport, in Queens, NY,
for Delta Air Lines. Oversaw the MEP Contractors for a 125,000 SF concourse expansion, multiple head-house expansions, and utility
infrastructure improvements. Coordinated the Terminal 4 Regional Jet Terminal Expansion Project which included an additional 11 Jet
Bridges of which I am directly overseeing the installation and commissioning. I am also the lead coordinator of 5 hydraulic elevators
and 5 escalators. In addition, I oversaw the new baggage handling conveyor system (BHS), including shutdowns and relocation of MEP
utilities of the existing baggage systems in coordination with JFK/IAT to avoid terminal operation disruptions. Responsibilities included
but not limited to BHS monitoring systems, emergency stop, baggage jamming systems, security monitoring systems (inline screening),
fire doors and deluge systems at fire rated BHS wall penetrations and insured minimum height clearances were maintained through
entire new BHS installation. I surveyed and oversaw the new routing of the fiber optic communication line between Terminals 2 and 4.
Skanska
7/08 - 11/10 Seminole County Jail Expansion - MEP Coordinator
Managed the MEP coordination for four buildings as part of a $30 million expansion of the county jail in Sanford, FL, for Seminole
County. Directed all MEP work performed in a 3-story housing unit, intake/release building, central energy plant, and active
kitchen/laundry building. Coordinated with security personnel to schedule work in the active facility and reconciled contract design
issues with the design team.
12/07 - 7/08 Parish Medical Center Catheterization Laboratory Expansion - MEP Superintendent
Managed the utility tie-ins from the active hospital building to the new $4.5 million catheterization lab expansion in Titusville, FL. We
scheduled and coordinated the MEP subcontractors with the structural and architectural contractor. Oversaw the MEP,
telecommunications, data system, medical gas, nurse call system, and fire alarm system.
7/07 - 12/07 Port St. John Medical Center - MEP Coordinator
Developed a status assessment of all MEP systems provided by the MEP general contractor for the $27 million construction of an
outpatient medical facility in Port St. John, FL. Coordinated the MEP installation for the on-schedule completion of the project, which
was certified LEED Silver.
2/06 - 7/07 Colonial High School Ninth Grade Center - Superintendent/MEP
Managed the MEP installation and start up of two new academic and science centers at a $31 million educational facility in Orlando,
designed to ease crowding at the main high school. The scope included a state-of-the-art athletic center and central utility plant, along
with the renovation of the art center medical lab, administration building, and cafeteria. I created the punch list and assisted with the
project close-out for this LEED certified project.
Dooley Mack
11/05 - 1/06 Steam Plant and Railway Condominiums - Superintendent/MEP Coordinator
Directed field operations for the $30 million conversion of a 1950s-era art-deco steam plant in Key West, FL into 19 condominium
units, along with the $20 million conversion of three adjacent buildings into 48 units.
2
AMEC Construction Management Formerly Morse Diesel International
9/04 - 11/05 NYSE Generators - Senior Superintendent
Directed field operations in a $70 million retrofit design consisting of four standby generators on top of the New York Stock Exchange
(NYSE) in Manhattan. Coordinated the steel construction that supports the generators and its apparatus. The installation had to be
performed without interrupting NYSE operations. Was responsible for supervision of iron workers, carpenters, roofers, sheet metal
mechanics, plumbers, pipe fitters, electricians, and a general labor force. The total labor averaged 60 persons per week. I attended
weekly meetings with the owners, design team, and contractors.
7/04 - 9/04 Fordham Towers Renovation - MEP Superintendent
Directed the MEP component for the $170 million renovation of a 50-story high-rise in Chicago, which was flooded due to faulty
plumbing. Oversaw the demolition of all interiors that were damaged by the flooding, such as flooring, cabinets, drywall, electrical
fixtures, and other unit requirements. Coordinated all finishes to completion in the allotted time frame. Supervised 20 plumbers, 15
electricians, 6 carpenters, 10 painters, 5 flooring mechanics, and 4 general laborers.
8/03 - 7/04 San Francisco County Replacement Jail No. 3 - MEP Superintendent
Completed a late contract with numerous coordination, damages, and design issues for a $150 million jail replacement in San Francisco.
Identified damages, the reasons for them, and implemented repairs. Authored field work directives, RFI’s, and back charge notices, also
coordinated work schedules, supervised 100 electricians and technicians, and scheduled electrical inspections.
5/03 - 8/03 George Bush Intercontinental Airport Terminal E - MEP Superintendent
I managed the installation, testing, and commissioning of life safety systems, security systems, electrical distribution, and installation of
Motor Control Panels (MCP) for the BHS systems for the $210 million new concourse at George Bush International Airport in Houston
TX. I supervised 150 electricians, 20 technicians, and 25 laborers representing four contractors during the expedited, 2-phase
construction. Supervised 87 electricians, 15 plumbers, and 6 building management systems technicians under 2 contractors. Coordinated
with the Port Authority of New York and New Jersey (PANYNJ) on critical design and code issues. Directed contractors in an
emergency situation when the fire sprinkler piping burst and flooded the baggage handling area. The damaged pipe was isolated and the
area secured. All of the work was performed while the airport was in operation and without interference to airport functions.
3/03 - 05/03 Continental Airlines Global Gateway - MEP Superintendent
Managed the completion of the punch list and commissioned electrical and security systems to open the new $180 million customs and
immigration facility at Newark Liberty International Airport in Newark, NJ for Continental Airlines. The project provided 24 passenger
jet-ways along with Federal Investigative Services (FIS) and Immigration and Naturalization Service (INS) facilities, which included
conveyors, escalators, power and lighting, systems for fire protection, fire alarm, and building security interface.
1/00 - 3/03 PANYNJ JFK Construction of Terminal 4 - Electrical Superintendent
Scheduled reviews, wrote progress reports, coordinated contracts with related contractors, and negotiated payment of work change
orders for the new $1.1 billion dollar Terminal 4 project at JFK International Airport in Queens NY for the Port Authority of New York
and New Jersey (PANYNJ). Coordinated with engineers to solve design discrepancies. Oversaw the testing of the fire alarm,
communications, and high-voltage distribution systems along with electrical and security operations. Wrote RFI’s, field reviews, and
deficiency reports. Coordinated schedule impact work with the owner and facility management, and resolved inspection and code issues
with PANYNJ. Supervised 160 electricians under 3 contractors, and 25 technicians for the building management and fire alarm and
security systems.
Morse Diesel International
7/99 - 1/00 FBOP Pollock Federal Correctional Complex - Electrical Superintendent
Reviewed product submittals, inspections, and testing of electrical and security apparatus for a $110 million federal maximum security
penitentiary and emergency medical facility in Pollock, LA, for the Federal Bureau of Prisons (FBOP). Coordinated schedules and
answered RFI’s, wrote field reviews and deficiency reports, and coordinated 75 electricians and 10 security technicians.
2/98 - 7/99 NYSDCS Upstate Correctional Facility NY - Electrical Superintendent
Oversaw the electrical, life safety, and security systems for inmate housing, medical, and support facilities at a $150 million maximum
security prison in Malone, NY, for the New York State Department of Correctional Services (NYSDCS). Scheduled labor and
materials, verified that the work was performed on schedule, and reviewed pay requisitions. Performed electrical inspections and
supervised 155 electricians under two different contractors and 25 security and communication technicians.
3
10/97 - 2/98 FBOP Victorville Federal Correctional Complex CA - Electrical Superintendent
Provided excavation and installation of power and signal underground duct banks and temporary electrical services for the construction
of a $110 million medical facility and medium detention correctional facility in Victorville, CA, for the Federal Bureau of Prisons
(FBOP). Oversaw the slab-on-grade conduit installation and witness generator factory testing. Inspected switch gears, panel
installations, fire alarms, public address, and CCTV systems. Also provided scheduling, submittals, RFI responses, and interpreted
specifications and drawings.
1/97 - 10/97 FBOP Coleman Federal Correctional Complex FL - MEP Superintendent/General Superintendent
Oversaw the MEP installation for the $75 million construction of a female, minimum security federal prison in Coleman, FL, for the
Federal Bureau of Prisons (FBOP). Inspected switch board and transfer switches, along with all aspects of plumbing, drywall,
casework, and food service equipment. Verified products used in all construction and consulted on RFI’s to solve problems identified
by the contractors. Produced daily work reports and provided closeout of punch lists created by architects, engineers, and FBOP
personnel. Also managed the prefabricated shop to provide raceways, distribution panels, and various other support systems.
T. I. C Corporation
03/96 - 12/96 Tampa Electric Polk Power Station FL - Electrical Superintendent
Monitored various controls and instruments in the hot gas clean-up system for Tampa Electric’s $750 million coal gasification operation
in Polk County, FL. I was a startup electrician for power distribution, communication, uninterruptible power supply (UPS), heat trace
and freeze protection, and security systems. I supervised 50 electricians.
Fluor Daniels Service Corp.
01/96 - 03/96 Procter & Gamble Paper Plant Renovation GA - General Foreman
Managed the layout and installation of conduit for a $30 million renovation of a paper manufacturing plant in Georgia. Inspected
various circuits for paper producing machinery.
H. B. Zachery Co.
10/95 - 12/95 Stanton Power Plant Pre-Ignition Systems Rehabilitation FL - Lead Electrician
Responsible for the termination and troubleshooting of the pre-ignition systems for a coal gasification plant.
Epic Constructors Inc.
08/95 - 10/95 Port Everglades Power Plant Control Room Upgrade - Startup Technician
Overhauled the control room of a power plant in Fort Lauderdale, FL, to convert it from analog to digital operation. This required a
plant shutdown while the work was performed. Installed conduit and cable for the fuel management and ignition systems. Managed and
coordinated the plant startup.
H. B. Zachery Company of FL
06/95 - 08/95 TECO Power Plant Renovation - Startup Technician
Provided terminating distributed control system (DCS) and input/output (I/O) cabinets, high-potting, and high-voltage switches gear and
breaker systems for a power plant in Bartow, FL. Was part of the commissioning team for operations of the plant’s electrical systems.
This included motor control center (MCC), programmable logic controller (PLC), and various control instrumentation systems.
Davis Electric
11/94 - 5/95 Mulberry Ethanol Power Plant Renovation - Startup Technician
Delivered the set up and layout of 277-volt, 203-volt, and 110-volt lighting for the interior and exterior of an ethanol power plant in
Mulberry, FL, which was shut down for maintenance. Was part of the startup team for operations of the electrical systems of the plant,
which included motor control center (MCC), programmable logic controller (PLC), and different control instrumentations. Was part of
a team that coordinated shut downs, renovation of work, and startup of generation system.
Merrit Electric
6/94 - 11/94 Cane Island Power Park Turbine Installation - Electrical Superintendent
Set up uninterruptible power supply (UPS) systems, installed batteries for UPS systems, and laid out a 50-ton hoist for a gas turbine
installation at a turbine power plant in Intercession City, FL. Installed the duct bank for switchyard operation and installed and
terminated distribution control systems (DCS).
P. P. M.
5/94 - 6/94 Port Everglades Power Plant Restoration - Lead Electrician
Provided cable pulling and termination of controls systems for the restoration of an oil generation power plant control room in Fort
Lauderdale, FL, after a fire in the boiler. Performed layout and installation of instruments for recorders and control valves.
4
Williams Construction
3/94 - 5-94 Coleman Federal Prison
Ran prefab shop for conduit runs, panel building and assorted production operation for the construction of a federal prison.
Zurn/Nepco
10/93 - 3/94 Ridge Generating Station Renovation - Foreman/Electrician
Delivered layout, fabrication, and installation of conduit systems for a waste-to-energy (WTE) plant in Auburndale, FL. Terminated the
distribution control system (DCS), instrumentation, and plant controls systems. Was also a startup team member.
T. I C.
9/93 - 10/93 University of Florida Power Plant Renovation - Startup Technician
Installed conduit and pulled conductors for a small power plant at the University of Florida, also provided startup controls systems and
terminated alarm systems, including fire, carbon monoxide detection, and other types of fail-safe detection systems.
Florida Industrial Electric
5/93 - 9/93 Co-Generation Plant Construction - Electrician
Termination of ABB control systems for the construction of a 120-megawatt natural-gas-fired, combined-cycle cogeneration facility in
Orlando. Was also on the startup team.
Zurn/Nepco
8/92 - 5/93 Lake Cogen Plant Renovation - Electrician
Layout and installation of conduit with offsets and saddles at various degrees for the power plant of a fruit processing plant in Umatilla,
Florida. Terminated motors, heaters, and thermostats for various electrical equipment, and installed cable trays for low voltage systems.
Royal Aluminum Industrial Maintenance
5/92 - 8/92 Electrician
Performed electrical maintenance on industrial machines including photo cells, service lines, and various limit switches, relays, and time
delays for an aluminum manufacturing company in Leesburg, FL.
G&O Systems Conveyor Systems Maintenance -
3/89 - 2/91 Foreman/Electrician
Laid out commercial and industrial conveyors for airport baggage systems, food processing plants, bottling companies, and mining
operations located throughout the State of Florida, was responsible for the set-up of intermediate motor drives, gear reducing systems,
and the electrical wiring of power and systems controls. Installed alarm systems, assisted in programming logic controllers, and set up
interlock wiring for separate zone jamming operations. Worked on projects for the Orlando International Airport baggage handling
system, Godden Gem Citrus plant food processing conveyors, Coca Cola plant in Lakeland, Florida Rock Mining Inc. in Umatilla, and
various other manufacturing plants requiring conveyors for assembly lines. I also built entire conveyor systems on site and performed
total system startup.

More Related Content

Viewers also liked

Ed Trombley's Resume 2016
Ed Trombley's Resume 2016Ed Trombley's Resume 2016
Ed Trombley's Resume 2016
Edmond Trombley
 
Leviticus 11 commentary
Leviticus 11 commentaryLeviticus 11 commentary
Leviticus 11 commentary
GLENN PEASE
 
CV
CVCV
Dean Boyle Resume Superintendent final
Dean Boyle Resume Superintendent finalDean Boyle Resume Superintendent final
Dean Boyle Resume Superintendent final
Dean Boyle
 
Jahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - RJahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - R
Ian Jahn
 
Resume
ResumeResume
Resume
Floyd Woody
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
kkirruu
 
Updated Resume.doc
Updated Resume.docUpdated Resume.doc
Updated Resume.doc
SHANE LECHMAN
 
YANNIS D.MERTIKAS CV
YANNIS D.MERTIKAS CVYANNIS D.MERTIKAS CV
YANNIS D.MERTIKAS CV
Yannis Mertikas
 
CV_SR_IND1
CV_SR_IND1CV_SR_IND1
CV_SR_IND1
Swakshar Ray
 
Chad Knight Resume April 2016 (1) (1)
Chad Knight Resume April 2016 (1) (1)Chad Knight Resume April 2016 (1) (1)
Chad Knight Resume April 2016 (1) (1)
Chad Knight
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017
LinkedIn
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
Leslie Samuel
 

Viewers also liked (13)

Ed Trombley's Resume 2016
Ed Trombley's Resume 2016Ed Trombley's Resume 2016
Ed Trombley's Resume 2016
 
Leviticus 11 commentary
Leviticus 11 commentaryLeviticus 11 commentary
Leviticus 11 commentary
 
CV
CVCV
CV
 
Dean Boyle Resume Superintendent final
Dean Boyle Resume Superintendent finalDean Boyle Resume Superintendent final
Dean Boyle Resume Superintendent final
 
Jahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - RJahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - R
 
Resume
ResumeResume
Resume
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
 
Updated Resume.doc
Updated Resume.docUpdated Resume.doc
Updated Resume.doc
 
YANNIS D.MERTIKAS CV
YANNIS D.MERTIKAS CVYANNIS D.MERTIKAS CV
YANNIS D.MERTIKAS CV
 
CV_SR_IND1
CV_SR_IND1CV_SR_IND1
CV_SR_IND1
 
Chad Knight Resume April 2016 (1) (1)
Chad Knight Resume April 2016 (1) (1)Chad Knight Resume April 2016 (1) (1)
Chad Knight Resume April 2016 (1) (1)
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Similar to Combine cover letter and resume

Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
Jack Dickerson
 
ShostMike_MEP.docx 3
ShostMike_MEP.docx 3ShostMike_MEP.docx 3
ShostMike_MEP.docx 3
mike shost
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
Paul Blaetz
 
Bret Miller's Resume 2015
Bret Miller's Resume  2015Bret Miller's Resume  2015
Bret Miller's Resume 2015
Bret Miller
 
Electrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - CopyElectrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - Copy
Michael Roesch
 
Resume
ResumeResume
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
Robert Eschenburg
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
Stan Fraley
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
Sher Chuhan
 
Powell_Bill_2014
Powell_Bill_2014Powell_Bill_2014
Powell_Bill_2014
Bill Powell, CHST
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016
Pedro Rosario
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
Randy Seperak
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
Lee Riopel
 
Richard L Berry Resume 2016
Richard L Berry Resume 2016Richard L Berry Resume 2016
Richard L Berry Resume 2016
Rick Berry
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pm
Tom Hinton
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
Ilyas Ahsan
 
Bruce Drake Resume and Certifications
Bruce Drake Resume and CertificationsBruce Drake Resume and Certifications
Bruce Drake Resume and Certifications
Bruce Drake
 
Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Resume R_McCray FEB 2016
Resume R_McCray FEB 2016
Robert McCray
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
Derek Dhonau
 
Project Experience
Project ExperienceProject Experience
Project Experience
Richard Dixon
 

Similar to Combine cover letter and resume (20)

Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
ShostMike_MEP.docx 3
ShostMike_MEP.docx 3ShostMike_MEP.docx 3
ShostMike_MEP.docx 3
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
Bret Miller's Resume 2015
Bret Miller's Resume  2015Bret Miller's Resume  2015
Bret Miller's Resume 2015
 
Electrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - CopyElectrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - Copy
 
Resume
ResumeResume
Resume
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Powell_Bill_2014
Powell_Bill_2014Powell_Bill_2014
Powell_Bill_2014
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
Richard L Berry Resume 2016
Richard L Berry Resume 2016Richard L Berry Resume 2016
Richard L Berry Resume 2016
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pm
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
 
Bruce Drake Resume and Certifications
Bruce Drake Resume and CertificationsBruce Drake Resume and Certifications
Bruce Drake Resume and Certifications
 
Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Resume R_McCray FEB 2016
Resume R_McCray FEB 2016
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Project Experience
Project ExperienceProject Experience
Project Experience
 

Combine cover letter and resume

  • 1. Mister/ Madame I would like to thank you for an opportunity to present to you my interest in employment with your company and present to you my years of experience in the construction industry. As my attached resume indicates, my background includes a leading role for multi-million dollar aviation projects, co-generation power plants, maximum correctional facilities, hospital facilities, and luxury high-rise condominiums. I am experienced in the electrical, mechanical, and plumbing fields, with knowledge in the structural, architectural, and civil areas. My working relationships with Owners, fellow employees, contractors and design teams have proven to be an asset on all projects. I have an extensive background in these fields and feel I would be a positive addition to any team. I am a very reliable person and enjoy very much what I do. I hope that you would consider me for a position within your company and grant me an opportunity to utilize my experiences and good work ethics. Richard P. St. Cyr 105 Mandarin Lane Fruitland Park FL 34731 (352) 787-7395 (352) 250-4978 restcyr@aol.com
  • 2. RESUME Richard P. St. Cyr 105 Mandarin Lane Fruitland Park FL 34731 352-787-7395 Home 352-250-4978 Cell I have over 25 years of experience in supervising mechanical, electrical, and plumbing (MEP) projects and have extensive knowledge in the structural, architectural, and civil engineering areas. I have led multimillion dollar projects for hospitals, correctional facilities, airport terminals, high-rise condominiums, and power plants. Have an adept construction manager and inspector skills at leading multiple contractors, complex teams of technicians and laborers. I am experienced with resolving requests for information (RFI’s). I am a U. S. Air force Veteran who served in the Vietnam War and Honorably Discharged. STV Incorporated 2/15 - Present LaGuardia International Airport Terminal C upgrade - MEP Coordinator In conjunction with working at JFK, Delta Airlines assigned me to work at LaGuardia Airport Terminal C on the power upgrade project. Installation of 3 new - 5kv substations, 2 - 480v switchgears as well as 1 mega watt standby generator for the 12 million dollar Delta Airline power upgrade project. This project also involves overseeing the entire support infrastructure, fire alarm systems, and upgrade for the BHS and BMS system upgrades. Upgrading of BHS includes but not limited to overseeing the installation of 4 TSA inline screening units, diverters and pushers, bag slides, BHS monitoring systems, anti gridlock systems, fire alarm interface system, along with testing and commissioning of the BHS/BMS interface. All of which have to be performed while airport operations are active. 2/11 - 2/15 Delta Air Lines JFK Terminal 4 Redevelopment Program Phase 1 & 2 - MEP Coordinator Managing the MEP construction for the $750 million dollar redevelopment of Terminal 4 at JFK International Airport, in Queens, NY, for Delta Air Lines. Oversaw the MEP Contractors for a 125,000 SF concourse expansion, multiple head-house expansions, and utility infrastructure improvements. Coordinated the Terminal 4 Regional Jet Terminal Expansion Project which included an additional 11 Jet Bridges of which I am directly overseeing the installation and commissioning. I am also the lead coordinator of 5 hydraulic elevators and 5 escalators. In addition, I oversaw the new baggage handling conveyor system (BHS), including shutdowns and relocation of MEP utilities of the existing baggage systems in coordination with JFK/IAT to avoid terminal operation disruptions. Responsibilities included but not limited to BHS monitoring systems, emergency stop, baggage jamming systems, security monitoring systems (inline screening), fire doors and deluge systems at fire rated BHS wall penetrations and insured minimum height clearances were maintained through entire new BHS installation. I surveyed and oversaw the new routing of the fiber optic communication line between Terminals 2 and 4. Skanska 7/08 - 11/10 Seminole County Jail Expansion - MEP Coordinator Managed the MEP coordination for four buildings as part of a $30 million expansion of the county jail in Sanford, FL, for Seminole County. Directed all MEP work performed in a 3-story housing unit, intake/release building, central energy plant, and active kitchen/laundry building. Coordinated with security personnel to schedule work in the active facility and reconciled contract design issues with the design team. 12/07 - 7/08 Parish Medical Center Catheterization Laboratory Expansion - MEP Superintendent Managed the utility tie-ins from the active hospital building to the new $4.5 million catheterization lab expansion in Titusville, FL. We scheduled and coordinated the MEP subcontractors with the structural and architectural contractor. Oversaw the MEP, telecommunications, data system, medical gas, nurse call system, and fire alarm system. 7/07 - 12/07 Port St. John Medical Center - MEP Coordinator Developed a status assessment of all MEP systems provided by the MEP general contractor for the $27 million construction of an outpatient medical facility in Port St. John, FL. Coordinated the MEP installation for the on-schedule completion of the project, which was certified LEED Silver. 2/06 - 7/07 Colonial High School Ninth Grade Center - Superintendent/MEP Managed the MEP installation and start up of two new academic and science centers at a $31 million educational facility in Orlando, designed to ease crowding at the main high school. The scope included a state-of-the-art athletic center and central utility plant, along with the renovation of the art center medical lab, administration building, and cafeteria. I created the punch list and assisted with the project close-out for this LEED certified project. Dooley Mack 11/05 - 1/06 Steam Plant and Railway Condominiums - Superintendent/MEP Coordinator Directed field operations for the $30 million conversion of a 1950s-era art-deco steam plant in Key West, FL into 19 condominium units, along with the $20 million conversion of three adjacent buildings into 48 units.
  • 3. 2 AMEC Construction Management Formerly Morse Diesel International 9/04 - 11/05 NYSE Generators - Senior Superintendent Directed field operations in a $70 million retrofit design consisting of four standby generators on top of the New York Stock Exchange (NYSE) in Manhattan. Coordinated the steel construction that supports the generators and its apparatus. The installation had to be performed without interrupting NYSE operations. Was responsible for supervision of iron workers, carpenters, roofers, sheet metal mechanics, plumbers, pipe fitters, electricians, and a general labor force. The total labor averaged 60 persons per week. I attended weekly meetings with the owners, design team, and contractors. 7/04 - 9/04 Fordham Towers Renovation - MEP Superintendent Directed the MEP component for the $170 million renovation of a 50-story high-rise in Chicago, which was flooded due to faulty plumbing. Oversaw the demolition of all interiors that were damaged by the flooding, such as flooring, cabinets, drywall, electrical fixtures, and other unit requirements. Coordinated all finishes to completion in the allotted time frame. Supervised 20 plumbers, 15 electricians, 6 carpenters, 10 painters, 5 flooring mechanics, and 4 general laborers. 8/03 - 7/04 San Francisco County Replacement Jail No. 3 - MEP Superintendent Completed a late contract with numerous coordination, damages, and design issues for a $150 million jail replacement in San Francisco. Identified damages, the reasons for them, and implemented repairs. Authored field work directives, RFI’s, and back charge notices, also coordinated work schedules, supervised 100 electricians and technicians, and scheduled electrical inspections. 5/03 - 8/03 George Bush Intercontinental Airport Terminal E - MEP Superintendent I managed the installation, testing, and commissioning of life safety systems, security systems, electrical distribution, and installation of Motor Control Panels (MCP) for the BHS systems for the $210 million new concourse at George Bush International Airport in Houston TX. I supervised 150 electricians, 20 technicians, and 25 laborers representing four contractors during the expedited, 2-phase construction. Supervised 87 electricians, 15 plumbers, and 6 building management systems technicians under 2 contractors. Coordinated with the Port Authority of New York and New Jersey (PANYNJ) on critical design and code issues. Directed contractors in an emergency situation when the fire sprinkler piping burst and flooded the baggage handling area. The damaged pipe was isolated and the area secured. All of the work was performed while the airport was in operation and without interference to airport functions. 3/03 - 05/03 Continental Airlines Global Gateway - MEP Superintendent Managed the completion of the punch list and commissioned electrical and security systems to open the new $180 million customs and immigration facility at Newark Liberty International Airport in Newark, NJ for Continental Airlines. The project provided 24 passenger jet-ways along with Federal Investigative Services (FIS) and Immigration and Naturalization Service (INS) facilities, which included conveyors, escalators, power and lighting, systems for fire protection, fire alarm, and building security interface. 1/00 - 3/03 PANYNJ JFK Construction of Terminal 4 - Electrical Superintendent Scheduled reviews, wrote progress reports, coordinated contracts with related contractors, and negotiated payment of work change orders for the new $1.1 billion dollar Terminal 4 project at JFK International Airport in Queens NY for the Port Authority of New York and New Jersey (PANYNJ). Coordinated with engineers to solve design discrepancies. Oversaw the testing of the fire alarm, communications, and high-voltage distribution systems along with electrical and security operations. Wrote RFI’s, field reviews, and deficiency reports. Coordinated schedule impact work with the owner and facility management, and resolved inspection and code issues with PANYNJ. Supervised 160 electricians under 3 contractors, and 25 technicians for the building management and fire alarm and security systems. Morse Diesel International 7/99 - 1/00 FBOP Pollock Federal Correctional Complex - Electrical Superintendent Reviewed product submittals, inspections, and testing of electrical and security apparatus for a $110 million federal maximum security penitentiary and emergency medical facility in Pollock, LA, for the Federal Bureau of Prisons (FBOP). Coordinated schedules and answered RFI’s, wrote field reviews and deficiency reports, and coordinated 75 electricians and 10 security technicians. 2/98 - 7/99 NYSDCS Upstate Correctional Facility NY - Electrical Superintendent Oversaw the electrical, life safety, and security systems for inmate housing, medical, and support facilities at a $150 million maximum security prison in Malone, NY, for the New York State Department of Correctional Services (NYSDCS). Scheduled labor and materials, verified that the work was performed on schedule, and reviewed pay requisitions. Performed electrical inspections and supervised 155 electricians under two different contractors and 25 security and communication technicians.
  • 4. 3 10/97 - 2/98 FBOP Victorville Federal Correctional Complex CA - Electrical Superintendent Provided excavation and installation of power and signal underground duct banks and temporary electrical services for the construction of a $110 million medical facility and medium detention correctional facility in Victorville, CA, for the Federal Bureau of Prisons (FBOP). Oversaw the slab-on-grade conduit installation and witness generator factory testing. Inspected switch gears, panel installations, fire alarms, public address, and CCTV systems. Also provided scheduling, submittals, RFI responses, and interpreted specifications and drawings. 1/97 - 10/97 FBOP Coleman Federal Correctional Complex FL - MEP Superintendent/General Superintendent Oversaw the MEP installation for the $75 million construction of a female, minimum security federal prison in Coleman, FL, for the Federal Bureau of Prisons (FBOP). Inspected switch board and transfer switches, along with all aspects of plumbing, drywall, casework, and food service equipment. Verified products used in all construction and consulted on RFI’s to solve problems identified by the contractors. Produced daily work reports and provided closeout of punch lists created by architects, engineers, and FBOP personnel. Also managed the prefabricated shop to provide raceways, distribution panels, and various other support systems. T. I. C Corporation 03/96 - 12/96 Tampa Electric Polk Power Station FL - Electrical Superintendent Monitored various controls and instruments in the hot gas clean-up system for Tampa Electric’s $750 million coal gasification operation in Polk County, FL. I was a startup electrician for power distribution, communication, uninterruptible power supply (UPS), heat trace and freeze protection, and security systems. I supervised 50 electricians. Fluor Daniels Service Corp. 01/96 - 03/96 Procter & Gamble Paper Plant Renovation GA - General Foreman Managed the layout and installation of conduit for a $30 million renovation of a paper manufacturing plant in Georgia. Inspected various circuits for paper producing machinery. H. B. Zachery Co. 10/95 - 12/95 Stanton Power Plant Pre-Ignition Systems Rehabilitation FL - Lead Electrician Responsible for the termination and troubleshooting of the pre-ignition systems for a coal gasification plant. Epic Constructors Inc. 08/95 - 10/95 Port Everglades Power Plant Control Room Upgrade - Startup Technician Overhauled the control room of a power plant in Fort Lauderdale, FL, to convert it from analog to digital operation. This required a plant shutdown while the work was performed. Installed conduit and cable for the fuel management and ignition systems. Managed and coordinated the plant startup. H. B. Zachery Company of FL 06/95 - 08/95 TECO Power Plant Renovation - Startup Technician Provided terminating distributed control system (DCS) and input/output (I/O) cabinets, high-potting, and high-voltage switches gear and breaker systems for a power plant in Bartow, FL. Was part of the commissioning team for operations of the plant’s electrical systems. This included motor control center (MCC), programmable logic controller (PLC), and various control instrumentation systems. Davis Electric 11/94 - 5/95 Mulberry Ethanol Power Plant Renovation - Startup Technician Delivered the set up and layout of 277-volt, 203-volt, and 110-volt lighting for the interior and exterior of an ethanol power plant in Mulberry, FL, which was shut down for maintenance. Was part of the startup team for operations of the electrical systems of the plant, which included motor control center (MCC), programmable logic controller (PLC), and different control instrumentations. Was part of a team that coordinated shut downs, renovation of work, and startup of generation system. Merrit Electric 6/94 - 11/94 Cane Island Power Park Turbine Installation - Electrical Superintendent Set up uninterruptible power supply (UPS) systems, installed batteries for UPS systems, and laid out a 50-ton hoist for a gas turbine installation at a turbine power plant in Intercession City, FL. Installed the duct bank for switchyard operation and installed and terminated distribution control systems (DCS). P. P. M. 5/94 - 6/94 Port Everglades Power Plant Restoration - Lead Electrician Provided cable pulling and termination of controls systems for the restoration of an oil generation power plant control room in Fort Lauderdale, FL, after a fire in the boiler. Performed layout and installation of instruments for recorders and control valves.
  • 5. 4 Williams Construction 3/94 - 5-94 Coleman Federal Prison Ran prefab shop for conduit runs, panel building and assorted production operation for the construction of a federal prison. Zurn/Nepco 10/93 - 3/94 Ridge Generating Station Renovation - Foreman/Electrician Delivered layout, fabrication, and installation of conduit systems for a waste-to-energy (WTE) plant in Auburndale, FL. Terminated the distribution control system (DCS), instrumentation, and plant controls systems. Was also a startup team member. T. I C. 9/93 - 10/93 University of Florida Power Plant Renovation - Startup Technician Installed conduit and pulled conductors for a small power plant at the University of Florida, also provided startup controls systems and terminated alarm systems, including fire, carbon monoxide detection, and other types of fail-safe detection systems. Florida Industrial Electric 5/93 - 9/93 Co-Generation Plant Construction - Electrician Termination of ABB control systems for the construction of a 120-megawatt natural-gas-fired, combined-cycle cogeneration facility in Orlando. Was also on the startup team. Zurn/Nepco 8/92 - 5/93 Lake Cogen Plant Renovation - Electrician Layout and installation of conduit with offsets and saddles at various degrees for the power plant of a fruit processing plant in Umatilla, Florida. Terminated motors, heaters, and thermostats for various electrical equipment, and installed cable trays for low voltage systems. Royal Aluminum Industrial Maintenance 5/92 - 8/92 Electrician Performed electrical maintenance on industrial machines including photo cells, service lines, and various limit switches, relays, and time delays for an aluminum manufacturing company in Leesburg, FL. G&O Systems Conveyor Systems Maintenance - 3/89 - 2/91 Foreman/Electrician Laid out commercial and industrial conveyors for airport baggage systems, food processing plants, bottling companies, and mining operations located throughout the State of Florida, was responsible for the set-up of intermediate motor drives, gear reducing systems, and the electrical wiring of power and systems controls. Installed alarm systems, assisted in programming logic controllers, and set up interlock wiring for separate zone jamming operations. Worked on projects for the Orlando International Airport baggage handling system, Godden Gem Citrus plant food processing conveyors, Coca Cola plant in Lakeland, Florida Rock Mining Inc. in Umatilla, and various other manufacturing plants requiring conveyors for assembly lines. I also built entire conveyor systems on site and performed total system startup.