STRATEGIC PLAN
    2012-2016




ROTARY CLUB OF COCHIN LANDS END
Core Values
Rotary’s core values represent the guiding principles of the organization’s culture, including what guides members’ priorities and actions within the organization.
Values are an increasingly important component in strategic planning because they drive the intent and direction of the organization’s leadership.

Service
We believe that our service activities and programs bring about greater world understanding and peace. Service is a major element of our mission. Through the
plans and actions of individual clubs, we create a culture of service throughout our organization that provides unparalleled satisfaction for those who serve.

Fellowship
We believe that individual efforts focus on individual needs, but combined efforts serve humanity. The power of combined efforts knows no limitation, multiplies
resources, and broadens our lives and perspectives. Fellowship leads to tolerance and transcends racial, national, and other boundaries.

Diversity
We believe Rotary unifies all people internationally behind the ideal of service. We encourage diversity of vocations within our membership and in our activities
and service work. A club that reflects its business and professional community is a club with a key to its future.

Integrity
We are committed to and expect accountability from our leaders and fellow members, both in the results of our efforts and in the processes we use to accomplish
our goals. We adhere to high ethical and professional standards in our work and personal relationships. We are fair and respectful in our interactions, and we
conscientiously steward the resources entrusted to us.

Leadership
We are a global fellowship of individuals who are leaders in their fields of endeavor. We believe in the importance of leadership development and in leadership as
a quality of our members. As Rotarians, we are leaders in implementing our core values.


All of these core values are reflected in the Object of Rotary and The Four-Way Test, which we use in our daily lives. They inspire us to foster and support the
ideal of service for developing and maintaining high ethical standards in human relations.



                                                                                                                                  ROTARY CLUB OF COCHIN LANDS END
1. Club goals to support and strengthen the club and its members
We will:
  Foster club innovation and flexibility
  Participate in a variety of service activities
  Promote membership diversity
  Improve member retention and recruitment
  Encourage strategic planning at the club level
  Maintain an open budget to facilitate project planning

2. Club goals to Focus and Increase Humanitarian Service
We will:
  Help to eradicate polio
  Increase sustainable service focused on
  New Generation Programs and
  The Rotary Foundationʼs six areas of focus
  Increase collaboration and connection with other organizations
  Create significant projects both locally and internationally

3. Club goals to Enhance Public Image and Awareness
We will:
  Unify image and brand awareness
  Publicize action orientated service
  Promote core values
  Emphasize vocational service
  Promote networking opportunities and signature activities

4. Club goals to Provide Timely Advise to members via the budget
We will:
  Prepare the Annual Budget prior to each changeover meeting
  Review the budget and accounts at board meetings monthly
  Keep members informed about fund raising results and disbursements on a regular basis
  Link all projects to a fund raising activity or event
  Expect project leaders to provide an estimated budget at the beginning of each financial year or prior to the commencement of a project
  Large projects will be expected to appoint a project treasurer other that the club treasurer to manage accountsand expenditure prior,
  during and after the projectʼs completion.
  All disbursements of funds must be approved by the board prior to any announcement

                                                                                                              ROTARY CLUB OF COCHIN LANDS END
Mission
        To provide business, professional, and
    community leaders an opportunity for service to
    others in order to benefit our community and to
    promote high ethical standards, fellowship, and
                  goodwill world wide.

                     Vision
The Rotary Club of Cochin Lands End will continue to be
 the premier Service Club for our community's service
   minded leaders of all ages, who enjoy each other's
company, have fun working together, and are committed
                  to the Rotary motto
            "Service Above Self"
                                              ROTARY CLUB OF COCHIN LANDS END
LEADERSHIP PLAN
    2012-2016             CORE TEAM
                                2012-2016
                          Leadership Chairman
                              Rtn.PP.Cherian.P.C.

                               PRESIDENT
                  Rtn.Jayasankar.K.                   2012-13
                  Rtn.Dr.A.V.Jose                     2013-14
                  Rtn.Ramdas Parakkat                 2014-15
                  Rtn.Deepak Kamalasanan              2015-16

                                  Advisors
                  Rtn.PP.Dr.Nibit Purkyastha.
                  Rtn.PP.Anilkumar.K.V.
                  Rtn.PP.Krishnamoorthy Dharmarajan
                  Rtn.Chandiroor Vijayan


 ROTARY CLUB OF COCHIN LANDS END
1. PROGRAMS SUPPORT AND STRENGTHEN OUR CLUB.
         Outcome                                     Action                                Responsibility         Performance Indicator

Innovation and flexibility    New ideas presented will be welcomed and decided           Membership              Records kept of suggestions
fostered.                    upon quickly by the Board.                                 Development and         along with Board decisions.
                                                                                        Retention Committee     Club member informed of
                             Short picnic by the club members with family to            Chairman                board decisions promptly.
                             create more interaction and bonding friendship.
                                                                                        Club Service Director
                             Guest Speakers engaged based on member
                             interest and their contributions to community.

Membership Diversity         Friends of Rotary program developed - members              Membership              2 Younger
promoted.                    can bring their friends for Speaker Meetings, After        Development and         Professionals under 45
                             some meetings if their friend is interested club can       Retention Committee
                             induct them to membership.                                 Chairman



Member Retention             Reasons for members leaving the club obtained.             Membership              Exit interviews carried by
                             Number leaving and reasons on record.                      Development and         selected board members.
                                                                                        Retention Committee
                             Meet them at their work place or residence to know their   Chairman
                             problems.


Leaders Developed            Potential leaders developed and mentored for future        The Board and all       Executive positions
                             positions at both the club and district levels             members                 shadowed at club level
                                                                                                                3 members on
                             Members encouraged to attend at least one                                          District committees.
                             District seminar or event every year.                                              Core Team selected for
                                                                                                                2012-2016.

Looking Out for Each Other   Every week one member to be selected to phone              Club Service Director   Reports to all members at
                             other members to attend that meeting.                                              the weekly meeting, if a
                                                                                                                member of family members
                             Club member or a family member encouraged to                                       is ill or if on leave.
                             contact the President or Club Service Director by                                  Hospital and home visits if
                             phone/mail , if they are ill or need to take leave.                                needed.
                                                                                                                 ROTARY CLUB OF COCHIN LANDS END
2. TO FOCUS ON AND INCREASE HUMANITARIAN SERVICE
         Outcome                                   Action                                Responsibility        Performance Indicator

Polio eradicated          Members support the Rotary Foundation                       Pulse Polio Committee India no longer Polio
                                                                                      Chairman              endemic country. Only
                          Participate in all National Immunisation Days in our                              Pakistan/Afganistan/Nigeria
                          country and if possible in other countries.                 International Service is polio endemic.
                                                                                      Director
                          Immunisation facility at our Community                                            US$ 3000 paid this year to
                          Development Center.                                                               TRF.

Increase sustainable      Start Rotakids, Interact and Roatract Clubs in the          CORE TEAM              Based on youths participation.
service focused on        community within two years.Youth programs like
New Generation Programs   Youth Speaks, Youth Photographer, Youth Writer to           New Generations
                          be conducted every year on a continuting basis as a         Director
                          club youth project. RYLA, Career Guidance Centre
                          and Give Life (Become an organ donor) Projects.
                          New Generation Youth Projects to be discussed and           CORE TEAM              Exit interviews carried by
                          finalised preferably on a long terms basis as a project of                          selected board members.
                          the club on a continuing basis. A community Peace           New Generation
                          Forum is planned for the year at our Community              Director               Report by the Assistant
                          Development Center.                                                                Governor.

                          Projects to be discussed and finalised preferably on a       CORE TEAM              Exit interviews carried by
                          long terms basis as a project of the club on a continuing                          selected board members.
                          basis.Matching Grant may be utilised.                       Community Service
                                                                                      Director               Report by the Assistant
                          Medical Camps, Regular Clinics planned at our                                      Governor.
                          Community Development Center

                          Projects to be discussed and finalised preferably on a       CORE TEAM              Exit interviews carried by
                          long terms basis as a project of the club on a continuing                          selected board members.
                          basis.Matching Grant may be utilised.                       Community Service
                          Drinking Water, Hygiene & Sanitation, Community Toilets     Director               Report by the Assistant
                          projects.                                                                          Governor.



                                                                                                              ROTARY CLUB OF COCHIN LANDS END
2. TO FOCUS ON AND INCREASE HUMANITARIAN SERVICE
         Outcome                                      Action                                Responsibility         Performance Indicator

                             Projects to be discussed and finalised preferably on a       CORE TEAM               Exit interviews carried by
                             long terms basis as a project of the club on a continuing                           selected board members.
                             basis. Matching Grant may be utilised.                      Community Service
                                                                                         Director                Report by the Assistant
                             Health Checkup for Mother and Child.                                                Governor.
                             Immunisation Center for Children.

                             Projects to be discussed and finalised preferably on a       CORE TEAM               Exit interviews carried by
                             long terms basis as a project of the club on a continuing                           selected board members.
                             basis. Matching Grant may be utilised.                      New Horizons Director
                             Computer Training for Students.                                                     Report by the Assistant
                             Vocational Training for Women.                                                      Governor.
                             Women Empowerment.

                             Projects to be discussed and finalised preferably on a       CORE TEAM               Exit interviews carried by
                             long terms basis as a project of the club on a continuing                           selected board members.
                             basis. Matching Grant may be utilised.                      Vocational Service
                             Youth Exchange Program - Group Study Exchange               Director                Report by the Assistant
                             Micro Credit Projects.                                                              Governor.
                             Community Projects for Employment Generation.
                             Community Help Center.
                             Rotary Community Festival every year.

The Club collaborates and    Join hands with other organisations engaged in              CORE TEAM               Exit interviews carried by
is connected to other        community service like Heart Foundation, Kidney                                     selected board members.
organisations                Foundation, Organ Donation, Eye Banks and Blood             Community Service
                             Banks. Matching Grant may be utilised.                      Director                Report by the Assistant
                                                                                                                 Governor.
                             RCC to be formed in the community.

International Projects       Collaborate with a Club in other countries to do Matching   CORE TEAM               Exit interviews carried by
                             Grant Projects                                                                      selected board members.
                                                                                         International Service   Reports from the District
                                                                                         Director                Administration.


                                                                                                                  ROTARY CLUB OF COCHIN LANDS END
3. TO ENHANCE THE PUBLIC IMAGE AND AWARENESS OF ROTARY
         Outcome                                      Action                                Responsibility         Performance Indicator

Brand Awareness raised       Club Website, Twitter and Facebook updated regularly.       CORE TEAM               Exit interviews carried by
                             Links to other clubs and organisations promoted on                                  selected board members.
                             Twitter and Facebook                                        Web Master
                                                                                                                 Report by the District
                             Members to use Rotary Logo and Four Way Test in their       New Horizons Director   Officials and other clubs.
                             website, emails, stationery, vehicles, etc.Even in
                             Company signage and billboards.

                             Club Bulletins, News Letters, Invitations, Stationery,      CORE TEAM               Exit interviews carried by
                             Shirts/T-Shirts, Companies Diaries, compliments, etc.                               selected board members.
                             to carry Rotary Logo and/or Four Way West.                  New Horizons Director
                                                                                                                 Report by the District
                             ROTARY COMMUNITY DEVELOPMENT CENTER                                                 Officials and other clubs.
                             planned.

Vocational Service           All members of the club in their meeting in October will    CORE TEAM               Exit interviews carried by
promoted                     take oath on the Rotary Code of Conduct. They will                                  selected board members.
                             display the same in their place of work.                    Vocational Service
                                                                                         Director                Report by the District
                             A Vocational Excellence Award will be given by the Club                             Officials and other clubs.
                             to a person of vocational stature.

                             Vocational visit to members organisation is encouraged.

FUND RAISING                 Club will decide a Fund Raising Project every year          CORE TEAM               Exit interviews carried by
                             to support the club community service.                                              selected board members.
                                                                                         Community Service
                             Club to form a Charitable Trust for Funds Raising           Director                Report by the District
                             and for community service projects.                                                 Officials and other clubs.


Leadership Skills Training   Every year the club will conduct training classes for the   CORE TEAM               Exit interviews carried by
                             members to improve their leadership skills.                                         selected board members.

                                                                                                                 Reports from the District
                                                                                                                 Administration.

                                                                                                                  ROTARY CLUB OF COCHIN LANDS END
CLUB GOALS - Budget

#                     Area           2012-13      2013-14      2014-15                2015-16

1   Retention of Members               90%          90%          90%                    90%

2   Addition of Members                20%          20%          20%                    20%

3   Lady Members                        1            2            3                      4

4   TRF                             US$.3000     US$.3000     US$.3000               US$.3000

5   Fund Raising for Projects       Rs.100,000   Rs.500,000   Rs.750,000            Rs.750,000

6   Matching Grant Projects

    District Grants                    Nil          Nil          Nil                     Nil

    Global Grants                      Nil       US$.50,000   US$.75,000            US$.75,000

    Packaged Grants                    Nil          Nil          Nil                     ?




                                                                           ROTARY CLUB OF COCHIN LANDS END
As a Rotarian, I will

ROTARY CODE OF CONDUCT   1. Exemplify the core value of integrity in all behaviors and activities

                         2. Use my vocational experience and talents to serve in Rotary

                         3. Conduct all of my personal, business, and professional affairs ethically,
                            encouraging and fostering high ethical standards as an example to others

                         4. Be fair in all dealings with others and treat them with the respect due to
                            them as fellow human beings

                         5. Promote recognition and respect for all occupations which are useful to
                            society

                         6. Offer my vocational talents: to provide opportunities for young people,
                            to work for the relief of the special needs of others, and to improve the
                            quality of life in my community

                         7. Honor the trust that Rotary and fellow Rotarians provide and not do
                            anything that will bring disfavor or reflect adversely on Rotary or fellow
                            Rotarians

                         8. Not seek from a fellow Rotarian a privilege or advantage not normally
                            accorded others in a business or professional relationship



ROTARY CLUB OF COCHIN LANDS END
The Four-Way Test




                      For Rotary, The Four-Way Test is the cornerstone of all action.
                      It has been for years, and it will be in the future.
                      Of the things we think, say or do

                      1. IS IT THE TRUTH?
                      2. IS IT FAIR TO ALL CONCERNED?
                      3. WILL IT BUILD GOODWILL AND BETTER FRIENDSHIPS?
                      4. WILL IT BE BENEFICIAL TO ALL CONCERNED?




ROTARY CLUB OF COCHIN LANDS END

Cochin lands end strategic plan 2012 2016

  • 1.
    STRATEGIC PLAN 2012-2016 ROTARY CLUB OF COCHIN LANDS END
  • 2.
    Core Values Rotary’s corevalues represent the guiding principles of the organization’s culture, including what guides members’ priorities and actions within the organization. Values are an increasingly important component in strategic planning because they drive the intent and direction of the organization’s leadership. Service We believe that our service activities and programs bring about greater world understanding and peace. Service is a major element of our mission. Through the plans and actions of individual clubs, we create a culture of service throughout our organization that provides unparalleled satisfaction for those who serve. Fellowship We believe that individual efforts focus on individual needs, but combined efforts serve humanity. The power of combined efforts knows no limitation, multiplies resources, and broadens our lives and perspectives. Fellowship leads to tolerance and transcends racial, national, and other boundaries. Diversity We believe Rotary unifies all people internationally behind the ideal of service. We encourage diversity of vocations within our membership and in our activities and service work. A club that reflects its business and professional community is a club with a key to its future. Integrity We are committed to and expect accountability from our leaders and fellow members, both in the results of our efforts and in the processes we use to accomplish our goals. We adhere to high ethical and professional standards in our work and personal relationships. We are fair and respectful in our interactions, and we conscientiously steward the resources entrusted to us. Leadership We are a global fellowship of individuals who are leaders in their fields of endeavor. We believe in the importance of leadership development and in leadership as a quality of our members. As Rotarians, we are leaders in implementing our core values. All of these core values are reflected in the Object of Rotary and The Four-Way Test, which we use in our daily lives. They inspire us to foster and support the ideal of service for developing and maintaining high ethical standards in human relations. ROTARY CLUB OF COCHIN LANDS END
  • 3.
    1. Club goalsto support and strengthen the club and its members We will: Foster club innovation and flexibility Participate in a variety of service activities Promote membership diversity Improve member retention and recruitment Encourage strategic planning at the club level Maintain an open budget to facilitate project planning 2. Club goals to Focus and Increase Humanitarian Service We will: Help to eradicate polio Increase sustainable service focused on New Generation Programs and The Rotary Foundationʼs six areas of focus Increase collaboration and connection with other organizations Create significant projects both locally and internationally 3. Club goals to Enhance Public Image and Awareness We will: Unify image and brand awareness Publicize action orientated service Promote core values Emphasize vocational service Promote networking opportunities and signature activities 4. Club goals to Provide Timely Advise to members via the budget We will: Prepare the Annual Budget prior to each changeover meeting Review the budget and accounts at board meetings monthly Keep members informed about fund raising results and disbursements on a regular basis Link all projects to a fund raising activity or event Expect project leaders to provide an estimated budget at the beginning of each financial year or prior to the commencement of a project Large projects will be expected to appoint a project treasurer other that the club treasurer to manage accountsand expenditure prior, during and after the projectʼs completion. All disbursements of funds must be approved by the board prior to any announcement ROTARY CLUB OF COCHIN LANDS END
  • 4.
    Mission To provide business, professional, and community leaders an opportunity for service to others in order to benefit our community and to promote high ethical standards, fellowship, and goodwill world wide. Vision The Rotary Club of Cochin Lands End will continue to be the premier Service Club for our community's service minded leaders of all ages, who enjoy each other's company, have fun working together, and are committed to the Rotary motto "Service Above Self" ROTARY CLUB OF COCHIN LANDS END
  • 5.
    LEADERSHIP PLAN 2012-2016 CORE TEAM 2012-2016 Leadership Chairman Rtn.PP.Cherian.P.C. PRESIDENT Rtn.Jayasankar.K. 2012-13 Rtn.Dr.A.V.Jose 2013-14 Rtn.Ramdas Parakkat 2014-15 Rtn.Deepak Kamalasanan 2015-16 Advisors Rtn.PP.Dr.Nibit Purkyastha. Rtn.PP.Anilkumar.K.V. Rtn.PP.Krishnamoorthy Dharmarajan Rtn.Chandiroor Vijayan ROTARY CLUB OF COCHIN LANDS END
  • 6.
    1. PROGRAMS SUPPORTAND STRENGTHEN OUR CLUB. Outcome Action Responsibility Performance Indicator Innovation and flexibility New ideas presented will be welcomed and decided Membership Records kept of suggestions fostered. upon quickly by the Board. Development and along with Board decisions. Retention Committee Club member informed of Short picnic by the club members with family to Chairman board decisions promptly. create more interaction and bonding friendship. Club Service Director Guest Speakers engaged based on member interest and their contributions to community. Membership Diversity Friends of Rotary program developed - members Membership 2 Younger promoted. can bring their friends for Speaker Meetings, After Development and Professionals under 45 some meetings if their friend is interested club can Retention Committee induct them to membership. Chairman Member Retention Reasons for members leaving the club obtained. Membership Exit interviews carried by Number leaving and reasons on record. Development and selected board members. Retention Committee Meet them at their work place or residence to know their Chairman problems. Leaders Developed Potential leaders developed and mentored for future The Board and all Executive positions positions at both the club and district levels members shadowed at club level 3 members on Members encouraged to attend at least one District committees. District seminar or event every year. Core Team selected for 2012-2016. Looking Out for Each Other Every week one member to be selected to phone Club Service Director Reports to all members at other members to attend that meeting. the weekly meeting, if a member of family members Club member or a family member encouraged to is ill or if on leave. contact the President or Club Service Director by Hospital and home visits if phone/mail , if they are ill or need to take leave. needed. ROTARY CLUB OF COCHIN LANDS END
  • 7.
    2. TO FOCUSON AND INCREASE HUMANITARIAN SERVICE Outcome Action Responsibility Performance Indicator Polio eradicated Members support the Rotary Foundation Pulse Polio Committee India no longer Polio Chairman endemic country. Only Participate in all National Immunisation Days in our Pakistan/Afganistan/Nigeria country and if possible in other countries. International Service is polio endemic. Director Immunisation facility at our Community US$ 3000 paid this year to Development Center. TRF. Increase sustainable Start Rotakids, Interact and Roatract Clubs in the CORE TEAM Based on youths participation. service focused on community within two years.Youth programs like New Generation Programs Youth Speaks, Youth Photographer, Youth Writer to New Generations be conducted every year on a continuting basis as a Director club youth project. RYLA, Career Guidance Centre and Give Life (Become an organ donor) Projects. New Generation Youth Projects to be discussed and CORE TEAM Exit interviews carried by finalised preferably on a long terms basis as a project of selected board members. the club on a continuing basis. A community Peace New Generation Forum is planned for the year at our Community Director Report by the Assistant Development Center. Governor. Projects to be discussed and finalised preferably on a CORE TEAM Exit interviews carried by long terms basis as a project of the club on a continuing selected board members. basis.Matching Grant may be utilised. Community Service Director Report by the Assistant Medical Camps, Regular Clinics planned at our Governor. Community Development Center Projects to be discussed and finalised preferably on a CORE TEAM Exit interviews carried by long terms basis as a project of the club on a continuing selected board members. basis.Matching Grant may be utilised. Community Service Drinking Water, Hygiene & Sanitation, Community Toilets Director Report by the Assistant projects. Governor. ROTARY CLUB OF COCHIN LANDS END
  • 8.
    2. TO FOCUSON AND INCREASE HUMANITARIAN SERVICE Outcome Action Responsibility Performance Indicator Projects to be discussed and finalised preferably on a CORE TEAM Exit interviews carried by long terms basis as a project of the club on a continuing selected board members. basis. Matching Grant may be utilised. Community Service Director Report by the Assistant Health Checkup for Mother and Child. Governor. Immunisation Center for Children. Projects to be discussed and finalised preferably on a CORE TEAM Exit interviews carried by long terms basis as a project of the club on a continuing selected board members. basis. Matching Grant may be utilised. New Horizons Director Computer Training for Students. Report by the Assistant Vocational Training for Women. Governor. Women Empowerment. Projects to be discussed and finalised preferably on a CORE TEAM Exit interviews carried by long terms basis as a project of the club on a continuing selected board members. basis. Matching Grant may be utilised. Vocational Service Youth Exchange Program - Group Study Exchange Director Report by the Assistant Micro Credit Projects. Governor. Community Projects for Employment Generation. Community Help Center. Rotary Community Festival every year. The Club collaborates and Join hands with other organisations engaged in CORE TEAM Exit interviews carried by is connected to other community service like Heart Foundation, Kidney selected board members. organisations Foundation, Organ Donation, Eye Banks and Blood Community Service Banks. Matching Grant may be utilised. Director Report by the Assistant Governor. RCC to be formed in the community. International Projects Collaborate with a Club in other countries to do Matching CORE TEAM Exit interviews carried by Grant Projects selected board members. International Service Reports from the District Director Administration. ROTARY CLUB OF COCHIN LANDS END
  • 9.
    3. TO ENHANCETHE PUBLIC IMAGE AND AWARENESS OF ROTARY Outcome Action Responsibility Performance Indicator Brand Awareness raised Club Website, Twitter and Facebook updated regularly. CORE TEAM Exit interviews carried by Links to other clubs and organisations promoted on selected board members. Twitter and Facebook Web Master Report by the District Members to use Rotary Logo and Four Way Test in their New Horizons Director Officials and other clubs. website, emails, stationery, vehicles, etc.Even in Company signage and billboards. Club Bulletins, News Letters, Invitations, Stationery, CORE TEAM Exit interviews carried by Shirts/T-Shirts, Companies Diaries, compliments, etc. selected board members. to carry Rotary Logo and/or Four Way West. New Horizons Director Report by the District ROTARY COMMUNITY DEVELOPMENT CENTER Officials and other clubs. planned. Vocational Service All members of the club in their meeting in October will CORE TEAM Exit interviews carried by promoted take oath on the Rotary Code of Conduct. They will selected board members. display the same in their place of work. Vocational Service Director Report by the District A Vocational Excellence Award will be given by the Club Officials and other clubs. to a person of vocational stature. Vocational visit to members organisation is encouraged. FUND RAISING Club will decide a Fund Raising Project every year CORE TEAM Exit interviews carried by to support the club community service. selected board members. Community Service Club to form a Charitable Trust for Funds Raising Director Report by the District and for community service projects. Officials and other clubs. Leadership Skills Training Every year the club will conduct training classes for the CORE TEAM Exit interviews carried by members to improve their leadership skills. selected board members. Reports from the District Administration. ROTARY CLUB OF COCHIN LANDS END
  • 10.
    CLUB GOALS -Budget # Area 2012-13 2013-14 2014-15 2015-16 1 Retention of Members 90% 90% 90% 90% 2 Addition of Members 20% 20% 20% 20% 3 Lady Members 1 2 3 4 4 TRF US$.3000 US$.3000 US$.3000 US$.3000 5 Fund Raising for Projects Rs.100,000 Rs.500,000 Rs.750,000 Rs.750,000 6 Matching Grant Projects District Grants Nil Nil Nil Nil Global Grants Nil US$.50,000 US$.75,000 US$.75,000 Packaged Grants Nil Nil Nil ? ROTARY CLUB OF COCHIN LANDS END
  • 11.
    As a Rotarian,I will ROTARY CODE OF CONDUCT 1. Exemplify the core value of integrity in all behaviors and activities 2. Use my vocational experience and talents to serve in Rotary 3. Conduct all of my personal, business, and professional affairs ethically, encouraging and fostering high ethical standards as an example to others 4. Be fair in all dealings with others and treat them with the respect due to them as fellow human beings 5. Promote recognition and respect for all occupations which are useful to society 6. Offer my vocational talents: to provide opportunities for young people, to work for the relief of the special needs of others, and to improve the quality of life in my community 7. Honor the trust that Rotary and fellow Rotarians provide and not do anything that will bring disfavor or reflect adversely on Rotary or fellow Rotarians 8. Not seek from a fellow Rotarian a privilege or advantage not normally accorded others in a business or professional relationship ROTARY CLUB OF COCHIN LANDS END
  • 12.
    The Four-Way Test For Rotary, The Four-Way Test is the cornerstone of all action. It has been for years, and it will be in the future. Of the things we think, say or do 1. IS IT THE TRUTH? 2. IS IT FAIR TO ALL CONCERNED? 3. WILL IT BUILD GOODWILL AND BETTER FRIENDSHIPS? 4. WILL IT BE BENEFICIAL TO ALL CONCERNED? ROTARY CLUB OF COCHIN LANDS END