Project Management Methodology
To better meet customer expectations, improve the quality and delivery of service, and continue building trust
across campus, ITS has developed a new framework for all projects that are over 80 hours. The Project
Management methodology provides staff with a consistent process—and supporting documents—for planning,
executing and tracking ITS projects. The methodology outlined here provides a framework for projects requiring
more than 80 hours of work, but the templates can be used with any project if staff members find them helpful.

The project management methodology has seven phases. Each phase has supporting documents to help with
planning and execution. These are living documents and are meant to be updated as needed during the course
of a project; in fact, each project phase includes updating the documents from the previous phase.

By using this methodology, ITS projects will be more predictable, and ITS will be able to set and adhere to clear
expectations both internally and externally. In addition, the methodology will allow ITS to gather consistent
information from project to project, predict timelines and outcomes more exactly, and engage in a continuous
improvement process.

Project Framework
The overall project framework is outlined in the ITS Project Framework document. Use this document as a
guideline for projects.

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmiits-project-framework

Project Document Templates
The following templates are for use as deliverables are completed in each phase of the project framework.

Phase 1: Plan


Project Charter
CMMAAO Pvt. Ltd. PMI Project Management Certification Program

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmiproject-charter-v1b



Communication Plan

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmiproject-communication-planv1c



Project Plan Guidelines

Link for to download Template:-

http://www.slideshare.net/mission_vishvas/cmmaao-pmiproject-plan-guide

Phase 2: Requirements


Research Summary and Recommendations

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmiresearch-summary-andrecommendations-v1b

Phase 3: Design


Design Blueprint

Link for to download Template:-
CMMAAO Pvt. Ltd. PMI Project Management Certification Program

http://www.slideshare.net/mission_vishvas/cmmaao-pmidesign-blueprint-v1b



Test Plan

Link for to download Template:-

http://www.slideshare.net/mission_vishvas/cmmaao-pmitest-plan-v1b



Deployment Plan

Link for to download Template:-

http://www.slideshare.net/mission_vishvas/cmmaao-pmideployment-plan-v1b



Go Live Checklist

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmigo-live-checklist-v1b

Phase 4: Build


There is no required documentation for the build phase.

Phase 5: Test


Test Closure Memo

Link for to download Template:-
CMMAAO Pvt. Ltd. PMI Project Management Certification Program
http://www.slideshare.net/mission_vishvas/cmmaao-pmitest-closure-memo-v1b

Phase 6: Deploy


Customer Readiness Signoff

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmicustomer-readiness-signoff-v1b



Lifecycle Management Plan

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmilifecycle-management-plan-v1b


Service Level Agreement (SLA) (Reference only - SLAs are created and edited via the web)

Phase 7: Lifecycle Management


Service Retirement Assessment

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmi01service-retirement-assessment



Service Retirement Charter

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmi02-service-retirement-charter
CMMAAO Pvt. Ltd. PMI Project Management Certification Program



Service Retirement Governance Recommendation

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmi03-service-retirement-governancerecommendation



Lessons Learned

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmilessons-learned-v1b

Supplemental Materials


Project Status

Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmisupplemental-project-status-v1b

More Related Content

Viewers also liked

Glen Millar Presentation
Glen Millar PresentationGlen Millar Presentation
Glen Millar Presentation
Gerry Darby
 
Area de Tecnología e Informática en el ITIZ
Area de Tecnología e Informática en el ITIZArea de Tecnología e Informática en el ITIZ
Area de Tecnología e Informática en el ITIZ
YesidSuarez021002
 
Technol2
Technol2Technol2
Technol2
Lauren
 
Remedies
RemediesRemedies
Remedies
1010187098
 
Skipping class- Muckrakers
Skipping class- MuckrakersSkipping class- Muckrakers
Skipping class- Muckrakers
carmody60311
 
Co operation agreement
Co operation agreementCo operation agreement
Co operation agreement
Fernando Carrera
 
Osha_First aid kit_hackers
Osha_First aid kit_hackersOsha_First aid kit_hackers
Osha_First aid kit_hackers
Ouh Acoy
 
Examen modelo-im-unc 1
Examen modelo-im-unc 1Examen modelo-im-unc 1
Examen modelo-im-unc 1mariab310
 
S7 cendana-doc-id-v.1
S7 cendana-doc-id-v.1S7 cendana-doc-id-v.1
S7 cendana-doc-id-v.1
Maz Dicky Rt
 
Sales to Delivery Automation at Powell Industries - A Case Study
Sales to Delivery Automation at Powell Industries - A Case StudySales to Delivery Automation at Powell Industries - A Case Study
Sales to Delivery Automation at Powell Industries - A Case Study
p6academy
 
notforsale
notforsalenotforsale
notforsale
irvingb323
 
Introduction to query rewriting optimisation with dependencies
Introduction to query rewriting optimisation with dependenciesIntroduction to query rewriting optimisation with dependencies
Introduction to query rewriting optimisation with dependencies
Mariano Rodriguez-Muro
 
Obras analisadas: EVT
Obras analisadas: EVTObras analisadas: EVT
Obras analisadas: EVT
ccurvos
 
Fotoalbum nieuwjaarsbijeenkomst 2014 Zorgbelang Brabant
Fotoalbum nieuwjaarsbijeenkomst 2014 Zorgbelang BrabantFotoalbum nieuwjaarsbijeenkomst 2014 Zorgbelang Brabant
Fotoalbum nieuwjaarsbijeenkomst 2014 Zorgbelang Brabant
Zorgbelang Brabant
 
Elevate Landscape May 2016
Elevate Landscape May 2016Elevate Landscape May 2016
Elevate Landscape May 2016
Ann McLean
 
Fosiles biologia
Fosiles biologiaFosiles biologia
Fosiles biologia
lizbeth bustos mosqueda
 
1 2-3-business-opportunity-presentation en (1)
1 2-3-business-opportunity-presentation en (1)1 2-3-business-opportunity-presentation en (1)
1 2-3-business-opportunity-presentation en (1)
sheliad50
 
SEO Presentation - Read
SEO Presentation - ReadSEO Presentation - Read
SEO Presentation - Read
Search Influence
 
Presentation1
Presentation1Presentation1
Presentation1
Nur Hazira Azahari
 
Testing can be fun! Intercomputer GS
Testing can be fun! Intercomputer GSTesting can be fun! Intercomputer GS
Testing can be fun! Intercomputer GS
Nataly Veremeeva
 

Viewers also liked (20)

Glen Millar Presentation
Glen Millar PresentationGlen Millar Presentation
Glen Millar Presentation
 
Area de Tecnología e Informática en el ITIZ
Area de Tecnología e Informática en el ITIZArea de Tecnología e Informática en el ITIZ
Area de Tecnología e Informática en el ITIZ
 
Technol2
Technol2Technol2
Technol2
 
Remedies
RemediesRemedies
Remedies
 
Skipping class- Muckrakers
Skipping class- MuckrakersSkipping class- Muckrakers
Skipping class- Muckrakers
 
Co operation agreement
Co operation agreementCo operation agreement
Co operation agreement
 
Osha_First aid kit_hackers
Osha_First aid kit_hackersOsha_First aid kit_hackers
Osha_First aid kit_hackers
 
Examen modelo-im-unc 1
Examen modelo-im-unc 1Examen modelo-im-unc 1
Examen modelo-im-unc 1
 
S7 cendana-doc-id-v.1
S7 cendana-doc-id-v.1S7 cendana-doc-id-v.1
S7 cendana-doc-id-v.1
 
Sales to Delivery Automation at Powell Industries - A Case Study
Sales to Delivery Automation at Powell Industries - A Case StudySales to Delivery Automation at Powell Industries - A Case Study
Sales to Delivery Automation at Powell Industries - A Case Study
 
notforsale
notforsalenotforsale
notforsale
 
Introduction to query rewriting optimisation with dependencies
Introduction to query rewriting optimisation with dependenciesIntroduction to query rewriting optimisation with dependencies
Introduction to query rewriting optimisation with dependencies
 
Obras analisadas: EVT
Obras analisadas: EVTObras analisadas: EVT
Obras analisadas: EVT
 
Fotoalbum nieuwjaarsbijeenkomst 2014 Zorgbelang Brabant
Fotoalbum nieuwjaarsbijeenkomst 2014 Zorgbelang BrabantFotoalbum nieuwjaarsbijeenkomst 2014 Zorgbelang Brabant
Fotoalbum nieuwjaarsbijeenkomst 2014 Zorgbelang Brabant
 
Elevate Landscape May 2016
Elevate Landscape May 2016Elevate Landscape May 2016
Elevate Landscape May 2016
 
Fosiles biologia
Fosiles biologiaFosiles biologia
Fosiles biologia
 
1 2-3-business-opportunity-presentation en (1)
1 2-3-business-opportunity-presentation en (1)1 2-3-business-opportunity-presentation en (1)
1 2-3-business-opportunity-presentation en (1)
 
SEO Presentation - Read
SEO Presentation - ReadSEO Presentation - Read
SEO Presentation - Read
 
Presentation1
Presentation1Presentation1
Presentation1
 
Testing can be fun! Intercomputer GS
Testing can be fun! Intercomputer GSTesting can be fun! Intercomputer GS
Testing can be fun! Intercomputer GS
 

Similar to Cmmaao pvt-ltd-pmi

Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
David Pedreno
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
David Pedreno
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
Siwawong Wuttipongprasert
 
Information Systems CapstoneCo.docx
Information Systems CapstoneCo.docxInformation Systems CapstoneCo.docx
Information Systems CapstoneCo.docx
jaggernaoma
 
Pmi lexicon
Pmi lexiconPmi lexicon
Pmi lexicon
Priyesh Paul
 
Brochure PlanningPackage.com
Brochure PlanningPackage.comBrochure PlanningPackage.com
Brochure PlanningPackage.com
mkhilauria
 
PM
PMPM
Master Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.comMaster Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.com
GAFM Academy of Project Management ® - ISO 29990 Certified International Board of Standards
 
Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1
PMI_IREP_TP
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM
Divante
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM
Mati Polak
 
OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016
Tomi Ogunjobi
 
Saravanan_Sambantham_TPM
Saravanan_Sambantham_TPMSaravanan_Sambantham_TPM
Saravanan_Sambantham_TPM
shravansam
 
AN INNOVATIVE SQA SERVICE MATURITY MODEL USING CMMI AND ITIL
AN INNOVATIVE SQA SERVICE MATURITY MODEL USING CMMI AND ITIL AN INNOVATIVE SQA SERVICE MATURITY MODEL USING CMMI AND ITIL
AN INNOVATIVE SQA SERVICE MATURITY MODEL USING CMMI AND ITIL
cscpconf
 
project management plan.pptx
project management plan.pptxproject management plan.pptx
project management plan.pptx
Nimra zaman
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
wkyra78
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
James (JD) Dimas
 
Carden carrieresume2016
Carden carrieresume2016Carden carrieresume2016
Carden carrieresume2016
Carrie Carden
 

Similar to Cmmaao pvt-ltd-pmi (19)

Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Information Systems CapstoneCo.docx
Information Systems CapstoneCo.docxInformation Systems CapstoneCo.docx
Information Systems CapstoneCo.docx
 
Pmi lexicon
Pmi lexiconPmi lexicon
Pmi lexicon
 
Brochure PlanningPackage.com
Brochure PlanningPackage.comBrochure PlanningPackage.com
Brochure PlanningPackage.com
 
PM
PMPM
PM
 
Master Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.comMaster Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.com
 
Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM
 
OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016
 
Saravanan_Sambantham_TPM
Saravanan_Sambantham_TPMSaravanan_Sambantham_TPM
Saravanan_Sambantham_TPM
 
AN INNOVATIVE SQA SERVICE MATURITY MODEL USING CMMI AND ITIL
AN INNOVATIVE SQA SERVICE MATURITY MODEL USING CMMI AND ITIL AN INNOVATIVE SQA SERVICE MATURITY MODEL USING CMMI AND ITIL
AN INNOVATIVE SQA SERVICE MATURITY MODEL USING CMMI AND ITIL
 
project management plan.pptx
project management plan.pptxproject management plan.pptx
project management plan.pptx
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
 
Carden carrieresume2016
Carden carrieresume2016Carden carrieresume2016
Carden carrieresume2016
 

More from Resume_Presales_7yrsEXP_VishvasYadav

Resume template 19
Resume template 19Resume template 19
Resume template 18-cmmaao-pmi
Resume template 18-cmmaao-pmiResume template 18-cmmaao-pmi
Resume template 18-cmmaao-pmi
Resume_Presales_7yrsEXP_VishvasYadav
 
Resume template 18
Resume template 18Resume template 18
Resume template 17
Resume template 17Resume template 17
Resume template 16
Resume template 16Resume template 16
Resume template 15
Resume template 15Resume template 15
Resume template 13
Resume template 13Resume template 13
Resume template 12
Resume template 12Resume template 12
Resume template 11
Resume template 11Resume template 11
Resume template 10
Resume template 10Resume template 10
Resume template 9
Resume template 9Resume template 9
Resume template 8
Resume template 8Resume template 8
Resume template 7
Resume template 7Resume template 7
Resume template 5
Resume template 5Resume template 5
Resume template 4
Resume template 4Resume template 4
Resume template 3
Resume template 3Resume template 3
Resume template 2
Resume template 2Resume template 2
Resume template 1
Resume template 1Resume template 1
Pmi pmp-resume template-8
Pmi pmp-resume template-8Pmi pmp-resume template-8
Pmi pmp-resume template-8
Resume_Presales_7yrsEXP_VishvasYadav
 
Pmp pmi-resume template19
Pmp pmi-resume template19Pmp pmi-resume template19
Pmp pmi-resume template19
Resume_Presales_7yrsEXP_VishvasYadav
 

More from Resume_Presales_7yrsEXP_VishvasYadav (20)

Resume template 19
Resume template 19Resume template 19
Resume template 19
 
Resume template 18-cmmaao-pmi
Resume template 18-cmmaao-pmiResume template 18-cmmaao-pmi
Resume template 18-cmmaao-pmi
 
Resume template 18
Resume template 18Resume template 18
Resume template 18
 
Resume template 17
Resume template 17Resume template 17
Resume template 17
 
Resume template 16
Resume template 16Resume template 16
Resume template 16
 
Resume template 15
Resume template 15Resume template 15
Resume template 15
 
Resume template 13
Resume template 13Resume template 13
Resume template 13
 
Resume template 12
Resume template 12Resume template 12
Resume template 12
 
Resume template 11
Resume template 11Resume template 11
Resume template 11
 
Resume template 10
Resume template 10Resume template 10
Resume template 10
 
Resume template 9
Resume template 9Resume template 9
Resume template 9
 
Resume template 8
Resume template 8Resume template 8
Resume template 8
 
Resume template 7
Resume template 7Resume template 7
Resume template 7
 
Resume template 5
Resume template 5Resume template 5
Resume template 5
 
Resume template 4
Resume template 4Resume template 4
Resume template 4
 
Resume template 3
Resume template 3Resume template 3
Resume template 3
 
Resume template 2
Resume template 2Resume template 2
Resume template 2
 
Resume template 1
Resume template 1Resume template 1
Resume template 1
 
Pmi pmp-resume template-8
Pmi pmp-resume template-8Pmi pmp-resume template-8
Pmi pmp-resume template-8
 
Pmp pmi-resume template19
Pmp pmi-resume template19Pmp pmi-resume template19
Pmp pmi-resume template19
 

Recently uploaded

Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
obriengroupinc04
 
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
Cambridge Product Management Network
 
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdfPDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
HajeJanKamps
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
IMG_20240615_091110.pdf dpboss guessing
IMG_20240615_091110.pdf dpboss  guessingIMG_20240615_091110.pdf dpboss  guessing
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
Rbc Rbcua
 
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
ISONIKELtd
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
PennapaKeavsiri
 
High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15
advik4387
 
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
concepsionchomo153
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
ZevinAttisha
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
RedSeer
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
➑➌➋➑➒➎➑➑➊➍
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
my Pandit
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
IPLTech Electric
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka ResultsKalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Satta Matka Dpboss Kalyan Matka Results
 

Recently uploaded (20)

Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
 
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
 
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdfPDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
IMG_20240615_091110.pdf dpboss guessing
IMG_20240615_091110.pdf dpboss  guessingIMG_20240615_091110.pdf dpboss  guessing
IMG_20240615_091110.pdf dpboss guessing
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
 
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
 
High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15
 
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka ResultsKalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
 

Cmmaao pvt-ltd-pmi

  • 1. CMMAAO Pvt. Ltd. PMI Project Management Certification Program Project Management Methodology To better meet customer expectations, improve the quality and delivery of service, and continue building trust across campus, ITS has developed a new framework for all projects that are over 80 hours. The Project Management methodology provides staff with a consistent process—and supporting documents—for planning, executing and tracking ITS projects. The methodology outlined here provides a framework for projects requiring more than 80 hours of work, but the templates can be used with any project if staff members find them helpful. The project management methodology has seven phases. Each phase has supporting documents to help with planning and execution. These are living documents and are meant to be updated as needed during the course of a project; in fact, each project phase includes updating the documents from the previous phase. By using this methodology, ITS projects will be more predictable, and ITS will be able to set and adhere to clear expectations both internally and externally. In addition, the methodology will allow ITS to gather consistent information from project to project, predict timelines and outcomes more exactly, and engage in a continuous improvement process. Project Framework The overall project framework is outlined in the ITS Project Framework document. Use this document as a guideline for projects. Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmiits-project-framework Project Document Templates The following templates are for use as deliverables are completed in each phase of the project framework. Phase 1: Plan  Project Charter
  • 2. CMMAAO Pvt. Ltd. PMI Project Management Certification Program Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmiproject-charter-v1b  Communication Plan Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmiproject-communication-planv1c  Project Plan Guidelines Link for to download Template:- http://www.slideshare.net/mission_vishvas/cmmaao-pmiproject-plan-guide Phase 2: Requirements  Research Summary and Recommendations Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmiresearch-summary-andrecommendations-v1b Phase 3: Design  Design Blueprint Link for to download Template:-
  • 3. CMMAAO Pvt. Ltd. PMI Project Management Certification Program http://www.slideshare.net/mission_vishvas/cmmaao-pmidesign-blueprint-v1b  Test Plan Link for to download Template:- http://www.slideshare.net/mission_vishvas/cmmaao-pmitest-plan-v1b  Deployment Plan Link for to download Template:- http://www.slideshare.net/mission_vishvas/cmmaao-pmideployment-plan-v1b  Go Live Checklist Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmigo-live-checklist-v1b Phase 4: Build  There is no required documentation for the build phase. Phase 5: Test  Test Closure Memo Link for to download Template:-
  • 4. CMMAAO Pvt. Ltd. PMI Project Management Certification Program http://www.slideshare.net/mission_vishvas/cmmaao-pmitest-closure-memo-v1b Phase 6: Deploy  Customer Readiness Signoff Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmicustomer-readiness-signoff-v1b  Lifecycle Management Plan Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmilifecycle-management-plan-v1b  Service Level Agreement (SLA) (Reference only - SLAs are created and edited via the web) Phase 7: Lifecycle Management  Service Retirement Assessment Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmi01service-retirement-assessment  Service Retirement Charter Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmi02-service-retirement-charter
  • 5. CMMAAO Pvt. Ltd. PMI Project Management Certification Program  Service Retirement Governance Recommendation Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmi03-service-retirement-governancerecommendation  Lessons Learned Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmilessons-learned-v1b Supplemental Materials  Project Status Link for to download Template:http://www.slideshare.net/mission_vishvas/cmmaao-pmisupplemental-project-status-v1b