http://clextra.com

1    Management   Strategic   Where is the cash     Critical to any organisation espeicially in its
     Accounting                                     growth phase is liquidity. Cash can be hidden in
     ref : AA01                                     obsoloscent inventory, receivables, bad-debt,
                                                    non-performing assets, patents, long-term
                                                    deposits, market-cap., employee talent, retail
                                                    stock, shrinkage mis-match ... you need to be able
                                                    to track everything on a daily basis.

2    Management   Strategic   MACS                  Management Accounting and Control System :
     Accounting
     ref : AA02
3    Management   Strategic   CRIP                  Cost, Revenue, Investment or Profit-centre
     Accounting                                     management with drill-down in all functional
     ref : AA03                                     areas including; Assets; IPR; People; etc.

4    Management   Strategic   Distributed           Disparate groups and intent can be brought into
     Accounting               Budgeting.            one consolidated budget for a future period of
     ref : AA04                                     planning.

5    Management   Strategic   Demand Planning.      Obtain field and soft information and numbers on
     Accounting                                     future requirements from territories and
     ref : AA05                                     individuals ranging in the 10;s to 1000;s. For
                                                    example how many syringes would be required
                                                    next year; how much spares should we stock; how
                                                    many graduate-engineers can we recruit.

6    Management   Strategic   Balanced Scorecard    Allows Financial; Customer; Learning & Growth
     Accounting                                     & Internal Perspectives on every measure or
     ref : AA06                                     metrics within the Organisation enable within the
                                                    product.

7    Management   Strategic   Ratios                From the 300 metrics or directly Financial ratios
     Accounting                                     can be obtained as and when required.
     ref : AA07                                     Comparison with 2 leading competitors can also
                                                    be viewed constantly.

8    Management   Strategic   Ratios 20-of-300      Important-20 of the above 300 can be isolated and
     Accounting                                     compared with any other ratio as a separate
     ref : AA08                                     section.

9    Management   Strategic   Financial Ratios      Key 34 ratios as of any given date can be entererd
     Accounting                                     and managed manually.
     ref : AA09
10   Management   Strategic   Activity Based        Comprehensive ABC Financial Practice across
     Accounting               Costing               Teams Tasks, Trading, Manufacturing and-or
     ref : AA10                                     Individuals

11   Management   Tactical    Chart of Accounts     Internal Financial Chart of Accounts can be
     Accounting                                     mapped to any other Chart of Accounts to ensure
     ref : AB01                                     focus.

12   Management   Tactical    Intangibles           Information can be costed, rated, appreciated or
     Accounting               Information Costing   depreciated and retained online.
     ref : AB02
13   Management   Tactical    Activity Based        Standard ABC Financial Practice across Teams
     Accounting               Pricing               Tasks and-or Individuals
     ref : AB04
14   Management   Tactical    Indent Management     Raise indents from Inventory data. External
     Accounting               System                supplier or customer access optional. Self-service
     ref : AB05                                     optional.

15   Management   Tactical    GRIFF Feature         Standard in-built forms user-definable table of
     Accounting                                     rows and columns for user-definable periodic
     ref : AB06                                     data capture for any Assembly Line or Machine
                                                    Process. Overlay of GRILL feature for real-time
                                                    quick analytics and user-feedback.

16   Management   Tactical    CIOQ Feature          Customer forms for Calibration, Input, Output
     Accounting                                     and Quality for periodic data-capture from
     ref : AB07                                     Assembly or other Production lines.
http://clextra.com

17   Management   Operations   Metrics. - maximum   300 = 10 x 6 x 5 Dimensions; each with. I. Target
     Accounting                300                  established; ii. Current Reality and iii. Gap -
     ref : AC01                                     Tangible or Intangible; iv. Up-Communication; v.
                                                    Down-Communication; a. Assigned to; b. Altert
                                                    Messaging; c. Date; d. Priority; e. Drill-down :
                                                    Time-Series, Collated etc.

18   Management   Operations   End-of-Day Feature   After establishing all related paratmeters - a
     Accounting                                     user-customisable single-form entry to collect
     ref : AC02                                     End-of-day Financial; Inventory; Volume-flow;
                                                    Usage and other data on a regular-periodic basis.

19   Management   Operations   Subscriptions        Activation and usability of upto 99
     Accounting                Management           custom-defined Services for millions of
     ref : AC03                                     subscribers customers suppliers students or
                                                    patients.

20   My Clextra   Tactical     Our Enterprise       Yours but for your team, group, others can see
     ref : BB01                Diary-Calendar       your schedule they can setup meetings with and
                                                    for you etc.

21   My Clextra   Tactical     My Cashflow          Manage Enterprise, Team or Personal Cash-flow
     ref : BB02                                     over the next 4 months

22   My Clextra   Tactical     My Competenices      You are the best judge of your current skill-sets
     ref : BB03                and Skills           and competencies. Self-Service of these that
                                                    Others in the Organisation can view to leverage
                                                    for Enterprise Benefit.

23   My Clextra   Tactical     My Travel            Local and Outstation Travel log sheets, soft-copy
     ref : BB04                                     and filing for approval and re-imbursement.

24   My Clextra   Tactical     My Reports           Filing of Sales Call, Service Call and other
     ref : BB05                                     Reporting that you need for yourself and
                                                    submitted to the Enterprise as your record of
                                                    on-going work.

25   My Clextra   Operations   My clextra           Featuers to access and view only Menus, Modules,
     ref : BC01                                     Areals and Links relevant to your use of clextra.

26   My Clextra   Operations   My                   Usual set of Personal clock, calendar, diary, notes
     ref : BC02                Diary-Calendar-Des   etc.
                               ktop
27   My Clextra   Operations   My ToDo and Next     Assign yourself action points. Mark them to
     ref : BC03                Course of Action     another. Have them mark this back to you. They
                                                    mark their activities to you.

28   My Clextra   Operations   My Nokia and         Import Outlook, Outlook Express or Nokia CSV
     ref : BC04                Microsoft Contacts   email IDs and Contacts and manage them in
                                                    clextra.

29   My Clextra   Operations   My Bank Accounts     Manage a copy of your Savings Bank Account or
     ref : BC05                                     other related Cash Ledgers

30   My Clextra   Operations   My Classifieds       Place, manage and communcate Personal
     ref : BC06                                     Classifeds within the Platform

31   My Clextra   Operations   My Priorities        Career Planning and focus on your Job
     ref : BC07                                     Description what you have set out to achieve

32   My Clextra   Operations   Behavioural MySelf   A suite of Behavioural, Intelligence and Skills
     ref : BC08                                     Assessments to get to know yourself better.

33   My Clextra   Operations   My Leave Record      Manage your attendance, Leave Record. Time
     ref : BC09                                     Sheets. Time and Materials
http://clextra.com

34   My Clextra      Operations   My Cupboard           Online repostiory of all your filed documents
     ref : BC10                                         within the Enterprise

35   Delivery        Strategic    Performance           Combining Time-Series with Time-Series
     Manufacturing                Analytics             Analysis.
     ref : CA01
36   Delivery        Strategic    Cash Location         Using the PLM - Product Lifecycle Management
     Manufacturing                                      feature track Product-Brand-Model wise lock of
     ref : CA02                                         cash, inventory, receivables and related fixed or
                                                        liquid assets.

37   Delivery        Strategic    Product Costing       Product-Brand-Model wise costing - fixed and
     Manufacturing                                      variable cost spreads.
     ref : CA03
38   Delivery        Strategic    Team or               Team-wise; Seat-wise; Project or Product Brand
     Manufacturing                Product-Line          Model wise profitablity with fixed and variable
     ref : CA04                   Profitablity          costs; sales planning and actual data factored in.

39   Delivery        Strategic    Quality Data          Pull upto 9 Quality parameters per-Person;
     Manufacturing                Analytics             Model; Product; Brand; Asset; Equipment;
     ref : CA05                                         Production-Line and get consolidate figures;
                                                        comparison and analytics linked to the
                                                        Time-Series Feature.

40   Delivery        Strategic    Inventory Analytics   Whether a Wholesaler, Distributor, Retailer or
     Manufacturing                                      Manufacture where is the cash in Inventory -
     ref : CA06                                         what is on order - Demand and Supply - Costing -
                                                        Obsoloscence - Under and over-stocked items;
                                                        Brands and Planning have all to be seen together
                                                        to make meaningful decisions.

41   Delivery        Strategic    Consignment           Comprehensive Solution when the entire
     Manufacturing                Inventory             inventory is owned by the Enterprise. Eg.
     ref : CA07                                         Lanudry handling in a hotel or hospital -
                                                        inventory of tools in a Service Garage or Kit for
                                                        Security Staff.

42   Delivery        Strategic    Stockout              The real cost of stock-out … when a retail or
     Manufacturing                Monitoring            OEM customer does not get what they want from
     ref : CA08                                         you -can affect your very existence. Planning for,
                                                        not reacting to exceptions, matching demand to
                                                        supply, shortening supply-cycles, tracking costs
                                                        may be the very essence of your business.

43   Delivery        Strategic    Inventory Morph       From bill-of-material transactions or other
     Manufacturing                                      manufacturing, production or value-addition
     ref : CA09                                         inventory value, weight or units can be changed
                                                        according to H.Pine 6-types of modularity.

44   Delivery        Strategic    ROI on Assets         Return on Investment on Plant and Machinery,
     Manufacturing                                      Production Lines, Tools and Dies. Risk Analytics.
     ref : CA10
45   Delivery        Strategic    Carry-In Services     Car Garages, high-end Consumer Goods,
     Manufacturing                Solution              Jewellery, Art, Antiques brought in for Servicing.
     ref : CA11                                         Inventory of assets, parts, people costs,
                                                        consumables and time on expensive equipment,
                                                        plant and machinery needs to monitored.
                                                        Accetpacne and Delivery, accounting,
                                                        documentation, collections are related financials
                                                        are extremely important.

46   Delivery        Strategic    On-Site Services      Construction, Apartments, Utitlities, Landscapes,
     Manufacturing                Solution              Complexes require routine maintenaqnce.
     ref : CA12                                         Suplply from an Inventory of assets, parts, people
                                                        costs, consumables and time on expensive
                                                        equipment, plant and machinery needs to
                                                        monitored. Accetpacne and Delivery, accounting,
                                                        documentation, collections are related financials
                                                        are extremely important.

47   Delivery        Tactical     Continuous            On-going work; tasks; projects; process; systems
     Manufacturing                Services. SLA;s       with any customer linked to a Team and
     ref : CB01                                         Individual measures.
http://clextra.com

48   Delivery        Tactical     OEE.               Overall Equipment Effectiveness. Essentially a
     Manufacturing                                   Manufacturing Metrics Model; it can be used to
     ref : CB02                                      monitor and connect people performance related
                                                     to expensive equipment; plants & machinery;
                                                     work stations; etc.

49   Delivery        Tactical     OEE Periodic       Overall Equipment Effectiveness of Production
     Manufacturing                                   Lines on Availability, Performance and Quality at
     ref : CB03                                      regular periodic intervals .. Monthly, weekly or
                                                     daily.

50   Delivery        Tactical     OEE Hourly         Overall Equipment Effectiveness of Production
     Manufacturing                Real-Time          Lines on Availability, Performance and Quality
     ref : CB04                                      real-time hourly, dashboard for each
                                                     Equipment-Line, 3-shifts etc.

51   Delivery        Tactical     OEE Performers.    OEE Performers. While OEE is great if you are
     Manufacturing                                   machine dependent; most often; A talented
     ref : CB05                                      worker with a machine; An industrious Manager
                                                     with a shopfloor; or Great Leader of a plant; is
                                                     able to produce substantially more given the same
                                                     inputs as the other guy. Find `em.

52   Delivery        Tactical     Hour Series        While the Time-Series can be used for end-of-day;
     Manufacturing                                   week; month etc. data capture; the hour allows
     ref : CB06                                      168 end-of-hour manual; semi-automated or
                                                     automated entry-input. These may be Production
                                                     targets; walk-in of people; traffic flow; Quality
                                                     errors; Energy utilisation or any conceivable
                                                     data-capture.

53   Delivery        Tactical     Defect and QC      Manage item-wise; defect-wise; stage-wise costs
     Manufacturing                                   related to waste; redundancy; sales-returns;
     ref : CB07                                      defects or any other Quality parameter internal
                                                     or external.

54   Delivery        Tactical     Bill of Material   Master of Bill of Material for Manufacturing,
     Manufacturing                Masters            Recipe or Formulation for Process and
     ref : CB08                                      Production Industries.

55   Delivery        Tactical     Bill of Material   Transaction based on the master, calculations can
     Manufacturing                Transactions       be automatically posted to Stock transactions.
     ref : CB09
56   Delivery        Tactical     Indented Bill of   For complex Bill of Materials, Recipes,
     Manufacturing                Materials          Formulations etc. a structured breakup from
     ref : CB10                                      Inventory using the clextra GiCA method upto 5
                                                     levels such as Module Block Sement.

57   Delivery        Operations   dITTo.             Our word for bringing the Individual,Team and
     Manufacturing                                   Task into your organisation at an integrated
     ref : CC01                                      centre. (Acronym of ditto = clextra Individual
                                                     Task Team Organisation).

58   Delivery        Operations   Tasks breakdown.   Entire organisation or ALL departments,
     Manufacturing                                   divisions, cost or profit centres into ONE SET of
     ref : CC02                                      tasks of 2x2; 3x3; 4x4; 5x5; 6x6; 7x7; 8x8; 9x9 OR
                                                     a 10x10 matrix.

59   Delivery        Operations   Sub-Tasks          Unlimited number of steps in each pre-defined
     Manufacturing                breakdown          task assigned to individual workers or executives
     ref : CC03                                      covering dates - time - delivery - quality for each
                                                     step including where it lies currently and
                                                     comments to remove bottlenecks.

60   Delivery        Operations   DQTCS. On Tasks    Delivery. Quality. Time. Cost & Security measure
     Manufacturing                                   for each and all above tasks.
     ref : CC04
61   Delivery        Operations   DQTCS on           Delivery. Quality. Time. Cost & Security measure
     Manufacturing                sub-Task           for each and all the steps or sub-tasks.
     ref : CC05
http://clextra.com

62   Delivery        Operations   Time Series :         Allows daily; weekly; monthly direct-data-entry
     Manufacturing                Inventory             or automated or semi-automated input from
     ref : CC06                                         other systems for Inventory Items issues and
                                                        Receipts.

63   Delivery        Operations   Batch-wise            Compare batch-wise Delivery-Quality-Time and
     Manufacturing                comparison            Cost Target vs Actual. Assign accountability and
     ref : CC07                                         monitor efficiency and achievers.

64   Delivery        Operations   Workflow Tracking     Docket or Ticket tracking of any batch or
     Manufacturing                                      Product or Brand or Model or Order against
     ref : CC08                                         pre-defined date; Quality; Cost or Time-taken.

65   Delivery        Operations   Cycle Steps -         Step token. Step by step accoutability. Step level
     Manufacturing                Manufacturing         Delivery, Quantity, Cost and Delivery target and
     ref : CC09                                         actual.

66   Delivery        Operations   End-of-Day Feature    End-of-day from any number of individuals or
     Manufacturing                                      store-wise or any-other collection of inventory
     ref : CC10                                         related data from across the world if required.

67   Delivery        Operations   Time Accounting       If your business model is primarily based on
     Manufacturing                                      T&M Time and Materials this is a full
     ref : CC11                                         comprehensive scalable option for all your Time
                                                        Accounting needs at individual; team; Account or
                                                        Corporate Level.

68   Delivery        Operations   Digital Assets        Inventory of Digital Assets - including eCash
     Manufacturing                                      equivalent operational establishment, access,
     ref : CC12                                         utilisation, controls and accounting.

69   Delivery        Operations   Order Management      Manage and monitor orders from Order
     Manufacturing                                      Acceptance to Planning, Assigning, Scheduling,
     ref : CC13                                         Assigning, Delivery and Follow-up.

70   Delivery        Operations   Jobs Management       Work Orders Management and Machine
     Manufacturing                                      Allocation.
     ref : CC14
71   Delivery        Operations   Jobs Scheduling       Job scheduling on start dates, capacity of
     Manufacturing                                      machines.
     ref : CC15
72   Delivery        Operations   Personal -            Unstructured Time and Workflow Scheduling for
     Manufacturing                Enterprise            self-service and self-time Management and
     ref : CC16                   Scheduling            Enterprise Work Scheduling such as Service
                                                        Garages etc.

73   Delivery        Operations   Statistical Process   Basic chart for Quality based on sample data
     Manufacturing                Control               collected per hour. Mean, maximum, minimum,
     ref : CC17                                         graph display.

74   Delivery        Operations   Digital Shopfloor     Distributed Shopfloor Whiteboards with
     Manufacturing                Whiteboard            centralised individual control on display and
     ref : CC17                                         time. For operative instructions, performance and
                                                        quality feedback, motivation, employee
                                                        engagement or any other HR objectives.

75   Data Capture    Strategic    Knowledge Capture     Due to IT maturity, Cost and Time implications,
     ref : DA01                                         Security and Audit concerns, access controls,
                                                        system-response-time OR fear of the Internet ..
                                                        You may find clextra to be the least-cost;
                                                        quickest-response; easiest-to-deploy knowledge
                                                        Management resource available in the Global
                                                        Market.

76   Data Capture    Strategic    Knowledge Capture     Sales Planning. Demand Forecasting. Advanced
     ref : DA02                   - Sales               Planning Systems.
http://clextra.com

77   Data Capture   Strategic    Knowledge Capture     Comprehensive Performance Management
     ref : DA03                  - HR                  System.

78   Data Capture   Strategic    Knowledge Capture     Reducing Inventory. Increasing Inventory Turns.
     ref : DA04                  - Inventory           Product Lifecycle Management.

79   Data Capture   Strategic    Knowledge Capture     Risk Management.
     ref : DA05                  - Finance
80   Data Capture   Strategic    Knowledge Capture     Optimisation.
     ref : DA06                  - Logistics
81   Data Capture   Strategic    Knowledge Capture     Knowledge Repository and Management related
     ref : DA07                  - Other               to any other industry or applications such as in
                                                       Pharma. Medical, Retail, Education, TeleComm.
                                                       Agro. Manufacturing; Services Delivery or
                                                       Digital Content.

82   Data Capture   Tactical     Information           Due to IT maturity, Cost and Time implications,
     ref : DB01                  Capture               Security and Audit concerns, access controls,
                                                       system-response-time OR fear of the Internet ..
                                                       You may prefer to use clextra as your
                                                       Information Collation and Analytical tool instead
                                                       of or along with an SAP, Oracle, IBM or other
                                                       ERP Module or add-on.

83   Data Capture   Tactical     Information           Budget vs Actual Data. Gap Analysis
     ref : DB02                  Capture - Sales
84   Data Capture   Tactical     Information           Performance Appraisal. 360 degree feedback
     ref : DB03                  Capture - HR          access. Tanigible vs Intangible Information issues.
                                                       Competencies Modelling. Collaborative
                                                       Communications.

85   Data Capture   Tactical     Information           Tracking profitable Products.
     ref : DB04                  Capture - Inventory
86   Data Capture   Tactical     Information           Risk Metrics component data. Cash movement.
     ref : DB05                  Capture - Finance     New risks. Closure of existing risks. NPA metrics.

87   Data Capture   Tactical     Information           Scheduling. Analytics. Field and Logs
     ref : DB06                  Capture - Logistics   Information. RFID data Analytics.

88   Data Capture   Tactical     Information           Information related to any other industry or
     ref : DB07                  Capture - Other       applications such as in Pharma. Medical, Retail,
                                                       Education, TeleComm. Agro. Manufacturing;
                                                       Services Delivery or Digital Content.

89   Data Capture   Operations   Data Capture          Due to IT maturity, Cost and Time implications,
     ref : DC01                                        Security and Audit concerns, access controls,
                                                       system-response-time OR fear of the Internet ..
                                                       You may prefer to use clextra as your Data
                                                       Capture tool for SAP, Oracle, IBM or other ERP
                                                       Applications.

90   Data Capture   Operations   Data Capture -        Forecasting by obtaing data from the field or
     ref : DC02                  Sales                 other sources. Multiple location, multiple
                                                       product, varied employee-force; limited Internet
                                                       access etc. Availability of RFID or POS or
                                                       Inventory related data.

91   Data Capture   Operations   Data Capture - HR     Early stages in Employee Information
     ref : DC03                                        availability. Talent and Skills Assessment.
                                                       Performance Data. Availability of System logs.
                                                       Equipment data. RFID etc.

92   Data Capture   Operations   Data Capture -        RFID data. Physical Audits. End-of-day Stock
     ref : DC04                  Inventory             Positions. Daily consumption, Issues or Receipts.
                                                       Stock-out Management.
http://clextra.com

93    Data Capture   Operations   Data Capture -        End-of-day data capture. Budget Management.
      ref : DC05                  Finance               Expenses Controls. Cash Transaction Individual
                                                        Authorisation.

94    Data Capture   Operations   Data Capture -        RFID data. Field-force data-gathering.
      ref : DC06                  Logistics
95    Data Capture   Operations   Data Capture -        Data related to any other industry or applications
      ref : DC07                  Other                 such as in Pharma. Medical, Retail, Education,
                                                        TeleComm. Agro. Manufacturing; Services
                                                        Delivery or Digital Content.

96    Risk and       Strategic    Risk Strategy         Assessing, Designing, Initiating, Deploying,
      Security                                          Monitoring and Managing a Risk and Security
      ref : EA01                                        Practice is an extremely aspect of the Strategic
                                                        Direction your organisation takes. clextra
                                                        provides insights into how to go about it.

97    Risk and       Tactical     Risk Tactical         Risk vs Reward, caution, known and quantified
      Security                    Management            investments and returns, force majeure instances,
      ref : EB01                                        insurance cover, prioritising protection,
                                                        protecting expensive assets, key-employees,
                                                        establishing barriers against competitive invasion
                                                        are ALL decisions to be taken based on available
                                                        information.

98    Risk and       Tactical     Insurance Tracker     Assets Vehicles Movable and immovable
      Security                                          properties are insured. Appropriate
      ref : EB02                                        documentation attached. Dates tracked.

99    Risk and       Operations   Risk Operational      Every transaction, action, decision, asset
      Security                    Management            involving tangible and intangible factors can be
      ref : EC01                                        levelled and a Cost, Threat, Vulnerability and
                                                        Statistical percentage of possible occurrence
                                                        assigned. This is a first step to allow Tactical
                                                        decision making and Strategic Direction to be
                                                        established.

100   Risk and       Operations   Staff Risk Rating -   Perhaps controversial and used with extreme
      Security                    Ranking               caution any and all staff can be rated and-or
      ref : EC02                                        ranked on CTC Exposure and Threat on current
                                                        Enterprise Accountability.

101   Finance and    Strategic    Management            The bottomline ... of ideas. Problems. Solutions.
      Accounting.                 Models                Talent. Skills. The individual ... in a team ... in
      ref : FA01                                        your firm ... in an industry ... in your society. ...
                                                        complex concepts like Financial Ratios; IPR &
                                                        Assets; Risk Management; M&As

102   Finance and    Strategic    IPR, Patent &         Manage any and all internal Information assets
      Accounting.                 Information Assets    including; books; reports; trade secrets;
      ref : FA02                                        know-how and processes; DVDs; CD-ROMs;
                                                        Software licences.

103   Finance and    Strategic    Investment Centre     Against Chart of Accounts and-or Management
      Accounting.                 Management            Accounting and Control Systems monitor
      ref : FA03                                        portolios; assets; dividends; share-accounts and
                                                        other Capital and Investment profiles.

104   Finance and    Strategic    Profit Centre         Against Chart of Accounts and-or Management
      Accounting.                 Management            Accounting and Control Systems monitor
      ref : FA04                                        Revenue and Expenditure on an on-going basis
                                                        with individual and-or team accountability.

105   Finance and    Strategic    Sponsorship           An internal or external person (Default is the
      Accounting.                                       CEO) eventually accountable for every Team
      ref : FA05                                        Performance and commercial fit into the
                                                        organisation.

106   Finance and    Strategic    Chart of Accounts     Financial accounting and country-specific
      Accounting.                                       statutory adherence has to be integrated with
      ref : FA06                                        Management Operational Controls and coding
                                                        systems.
http://clextra.com

107   Finance and   Strategic   Chart of Accounts     Apart from the core clextra COA it can be used to
      Accounting.               Integration           as Master Data Management for Multiple
      ref : FA07                                      Financial Accounting Systems key-search and
                                                      integration.

108   Finance and   Strategic   Cost Centre           Against Chart of Accounts and-or Management
      Accounting.               Management            Accounting and Control Systems monitor budgets
      ref : FA08                                      and expenditure on an on-going basis with
                                                      individual and-or team accountability.

109   Finance and   Strategic   Cost Cutting          Assess Expenses. Prioritise. Select and decide.
      Accounting.               Exercise              Assign to people. Set targets and deadlines.
      ref : FA09                                      Monitor and Manage. Rate quantity and quality.
                                                      Take corrective action - make mid-course
                                                      corrections.

110   Finance and   Strategic   Expenses              Budget, Actual, Approvals any and all
      Accounting.               Management            procurement controls, management and
      ref : FA10                                      monitoring.

111   Finance and   Strategic   Cash Flow             Strategic Coorporate Upto 3 months ahead on 10
      Accounting.                                     major heads of outflow and inflow.
      ref : FA11
112   Finance and   Strategic   Liquidity             For an individual firm or portfolio of firms or
      Accounting.               Dashboard             individual wealth cash parameters from Equity,
      ref : FA12                                      debt to assets and intangibles with a visual
                                                      representation of as of date status.

113   Finance and   Strategic   Firms SWOT            Dealing with certain Business Enterprises is risky
      Accounting.                                     - whether a Customer or Supplier. This also
      ref : FA13                                      changes from time to time. You can quatify risk
                                                      with metrics OR use a Strengths Weaknesses
                                                      Opportunities and Threats with every firm in
                                                      your database.

114   Finance and   Strategic   Contacts SWOT         Most Business Risk is created by individuals.
      Accounting.                                     Apart from risk metrics you can manage a
      ref : FA14                                      Strengths Weaknesses Opportunities and Threats
                                                      related to every Contact whether Supplier
                                                      Customer or Intermeidiary related to any aspect
                                                      of your Business.

115   Finance and   Strategic   Financial Ratios of   Any number of firms key 34 ratios on any given
      Accounting.               Firms                 date. Also future date forecast or planned ratios
      ref : FA15                                      as a target for simulation, ERM, ALM and
                                                      related applications.

116   Finance and   Tactical    Cash Flow             Tactical Cashflow for any indiviudal head upto 3
      Accounting.               individual            months ahead on 10 major heads of outflow and
      ref : FB01                                      inflow.

117   Finance and   Tactical    Tangible Assets       Each asset Initial to current cost can be
      Accounting.               Management            maintained online and centrally. Equipment,
      ref : FB02                                      Plant & Machinery

118   Finance and   Tactical    Off-Balance Sheet     Patents; utilisation and Royalty income tracking.
      Accounting.               Assets Management     Internal patent regime development. IPR
      ref : FB03                                      management

119   Finance and   Tactical    Global Books of       Cross-Calendar & Cross-Currency reporting.
      Accounting.               Accounts              Comparison and Performance Monitoring of
      ref : FB04                                      Companies; Divisions & SBUs

120   Finance and   Tactical    Transactions          Manage the information check-points for any
      Accounting.               Checklist             kind of transaction, any volume, any industry.
      ref : FB05                                      From Driving Licence Issue to Employee Exit
                                                      control; Customer Order Processing;
                                                      Interviewing and Reference Checks; Statutory
                                                      Audits to Bill of Materials availability prior to
                                                      manufacture.

121   Finance and   Tactical    Store-wise            State taxes applicable to every-item at
      Accounting.               Item-wise Taxes       every-store. Management of a consolidated Tax
      ref : FB06                                      applicable to each item.
http://clextra.com

122   Finance and   Tactical     Cycle Steps -         User-definable steps with Delivery; Cost;
      Accounting.                Finance               Calendar-Time and Quality Target and Actual
      ref : FB07                                       for any process. Example; Loan sanctions;
                                                       Risk-Assessment; Land-procurement; Customer
                                                       payments; Receivable and Payable cycles etc.

123   Finance and   Tactical     Account               Employee or Customer Account related
      Accounting.                Management            pre-billing day-book equivalent information
      ref : FB08                 Internal              management. Upto 9 parallel accounts each with
                                                       upto 9 heads and unlimited per-day transactions.

124   Finance and   Tactical     Account               Customer, Supplier or any other Account related
      Accounting.                Management            pre-billing day-book equivalent information
      ref : FB09                 External              management. Upto 9 parallel accounts each with
                                                       upto 9 heads and unlimited per-day transactions.

125   Finance and   Tactical     QC Costing            Costs involved in Quality Assurance and Quality
      Accounting.                                      Control are usually hidden and not properly
      ref : FB10                                       monitored and perhaps not factored into most
                                                       Finance, Operational and Product or Project
                                                       Costing.

126   Finance and   Tactical     Quicker Cash          Support for SWIFT, IBAN, EFT, NEFT and
      Accounting.                Collection            RTGS to help financial flows quicker through
      ref : FB11                                       your entire Enterprise

127   Finance and   Tactical     Quicker Cash          Support for SWIFT, IBAN, EFT, NEFT and
      Accounting.                Disbursement          RTGS to help financial flows quicker through
      ref : FB12                                       your entire Enterprise allowing Suppliers to give
                                                       preference to your orders over your competition.

128   Finance and   Operations   Capex Spread          Corporate spread of CAPEX overheads expenses
      Accounting.                Management            or indirect costs over Locations - Seats - Stores -
      ref : FC01                                       Teams etc.

129   Finance and   Operations   Time Series.          Spares, Stock & Inventory. Therefore; monitor
      Accounting.                Generic.              distributed stocking; A class items; -of ABC
      ref : FC02                                       inventory-; Daily, weekly or monthly; Receipts,
                                                       Issues, Stores Ledger, Consumption etc.

130   Finance and   Operations   Communications on     Communications for each of these 300 metrics
      Accounting.                every Metric          Two-way perception of such gaps. Boss
      ref : FC03                                       perception number (+4 to -4) and comment of this
                                                       metric achievement. Subordinate perception
                                                       number (+4 to -4) and comment of this metric.

131   Finance and   Operations   Time Series :         Allows daily; weekly; monthly direct-data-entry
      Accounting.                Incremental           or automated or semi-automated input from
      ref : FC04                 customised            other systems.

132   Finance and   Operations   Time Series : OEE     Allows daily; weekly; monthly direct-data-entry
      Accounting.                Linked                or automated or semi-automated input from
      ref : FC05                                       other systems.

133   Finance and   Operations   Time Series : Fixed   Allows daily; weekly; monthly direct-data-entry
      Accounting.                                      or automated or semi-automated input from
      ref : FC06                                       other systems.

134   Finance and   Operations   Time Series :         Allows daily; weekly; monthly direct-data-entry
      Accounting.                Financial COA         or automated or semi-automated input from
      ref : FC07                 based                 other systems against a standard Financial
                                                       Accounting Chart of Accounts.

135   Finance and   Operations   Time Series :         On any single Time Series. Analysis; Comparison
      Accounting.                Graphs                subject to Technical feasibility and specific needs.
      ref : FC08
136   Finance and   Operations   Inventory Books of    Inventory : Multiple Location, Stores Ledgers,
      Accounting.                Accounts              Consumption, Receipts, Issues.
      ref : FC09
http://clextra.com

137   Finance and      Operations   Basic Bookkeeping     Accounting. Multiple Location. General Ledger.
      Accounting.                                         Sub-Ledgers.
      ref : FC10
138   Finance and      Operations   Receivables -         Time Series Based. Invoiced. Collected.
      Accounting.                   Collections           Outstanding. Received. Bad Debt etc.
      ref : FC11
139   Finance and      Operations   Bank-Cash Book        Bank and-or Cash Entries and sub-ledgers for
      Accounting.                                         each Login-I Login-2 or Partners
      ref : FC12
140   Finance and      Operations   eCash                 For applications such as Video on Demand;
      Accounting.                                         Music downloads; Digital Television subscription;
      ref : FC13                                          pre-paid Mobile payment a complete solution for
                                                          paperless pure electronic digital Assets Inventory,
                                                          Issue, Sales, Management, Monitoring,
                                                          Accounting and Audit.

141   Finance and      Operations   Local Travel          Local conveyance Sheet Management.
      Accounting.                   Accounting            Self-Service and potential to move to
      ref : FC14                                          full-electronic Management of Local Travel.

142   Finance and      Operations   Payables              Enter - import Master information on all
      Accounting.                   Monitoring            payables as Invoices. If available scan upload
      ref : FC15                                          images or soft-copies. Make persons accountable
                                                          for this expenditure. Monitor and manage
                                                          payables.

143   Finance and      Operations   Invoicing             Recommended for low to medium volumes of
      Accounting.                                         invoices with medium to high value, intensive
      ref : FC16                                          follow-up involving multi-location, multi-person
                                                          follow-up. Especially if it involves long-cycles of
                                                          follow-up. PDF generated soft-copy is
                                                          automatically available for storage and
                                                          forwarding

144   Finance and      Operations   Delivery Notes        Linked to specific Invoices as above hard-copy
      Accounting.                                         Delivery notes from generated PDF-soft copies.
      ref : FC17
145   Finance and      Operations   Pass book             Personal Savings Bank or equivalent Bank Book
      Accounting.                                         for any Login-I, Login-2 or other users within any
      ref : FC18                                          system.

146   Finance and      Operations   Financial Templates   Statutory documents and templates
      Accounting.                                         user-definable and upload of internal and
      ref : FC19                                          external Financial due-dilligence and other
                                                          documents for Financial Management,
                                                          Accoutning, Bookkeeping or any other
                                                          organisational purpose.

147   Finance and      Operations   Legal Templates       Statutory documents and templates
      Accounting.                                         user-definable and upload of current documents,
      ref : FC20                                          contracts, NDAs, MOUs and similar templates
                                                          used in the organisation.

148   Finance and      Operations   Statutory Templates   Statutory documents and templates of current
      Accounting.                                         Excise, Labour, Income Tax, Sales Tax and
      ref : FC21                                          similar statutory forms relevant to your business,
                                                          uploaded and maintained in any number of
                                                          user-definable categories and unlimited
                                                          documents under each category.

149   Administration   Strategic    Expenses Budgeting    Zero-based or past-year based Budget Planning.
      and MRO                                             Target and Actual. Quarter-Month-Weekly or
      ref : HA01                                          Daily Monitoring.

150   Administration   Strategic    Complex Dockets       When a support ticket requires extended periods
      and MRO                       Management            of time to understand. Related documentation.
      ref : HA02                                          Incurs costs and Bill of Materials. Different skills
                                                          form various team members etc. eg. Software
                                                          Support. Carry-in-Maintenance etc.
http://clextra.com

151   Administration   Strategic    Simple Dockets      Simple registry of complaints for monitoring and
      and MRO                       Management          control. Assignment and follow-up.
      ref : HA03
152   Administration   Strategic    Workflow iflow      Up to 99 user definable up to 3 accountable
      and MRO                                           persons self-service Help Desk for any size of firm
      ref : HA04                                        for any industry with dates for follow-up metrics
                                                        reminders etc.

153   Administration   Tactical     Non-plan,           Non-Plane Requests : System of self-service.
      and MRO                       beyond-Budget       Matrix option. (Mark to Team-Leader OR
      ref : HB01                    Requests            One-Person). 2-level Escalation. Dual or Triple
                                                        Authorisation if required. Login Message Alert.

154   Administration   Tactical     Firms Forms         Every Institution uses forms. The current format
      and MRO                                           can be made into PDFs or DOCs and placed
      ref : HB02                                        on-line centrally for anyone to download / print
                                                        and use when required.

155   Administration   Tactical     Firms Forms         Use the clextra-Learning Photos feature to create
      and MRO                       Training            screen-shots and train-explain how your froms
      ref : HB03                                        should be filled.

156   Administration   Tactical     Documentation       For extensive documentation across subscribers,
      and MRO                       Checklist           portfolios. If electronic that OR all steps allows
      ref : HB04                                        upload and click-view to pre-defined internal and
                                                        external logins in the clextra system.

157   Administration   Operations   Complaints          System of self-service. Matrix option. (Mark to
      and MRO                                           Team-Leader OR One-Person). 2-level
      ref : HC01                                        Escalation. Dual or Triple Authorisation if
                                                        required. Login Message Alert.

158   Administration   Operations   Consumables         System of self-service. Matrix option. (Mark to
      and MRO                       Requests            Team-Leader OR One-Person). 2-level
      ref : HC02                                        Escalation. Dual or Triple Authorisation if
                                                        required. Login Message Alert.

159   Administration   Operations   Customer Gifts      Matrix option. (Mark to Team-Leader OR
      and MRO                       Requests            One-Person). 2-level Escalation. Dual or Triple
      ref : HC03                                        Authorisation if required. Login Message Alert.

160   Administration   Operations   Grievances          System of self-service. Matrix option. (Mark to
      and MRO                       Management          Team-Leader OR One-Person). 2-level
      ref : HC04                                        Escalation. Dual or Triple Authorisation if
                                                        required. Login Message Alert.

161   Administration   Operations   Suggestions         System of self-service. Matrix option. (Mark to
      and MRO                       Management          Team-Leader OR One-Person). 2-level
      ref : HC05                                        Escalation. Dual or Triple Authorisation if
                                                        required. Login Message Alert.

162   Administration   Operations   Leave Application   System of self-service. Matrix option. (Mark to
      and MRO                       Approvals           Team-Leader OR One-Person). 2-level
      ref : HC06                                        Escalation. Dual or Triple Authorisation if
                                                        required. Login Message Alert. Does not track
                                                        leave accounting automatically.

163   Administration   Operations   Leave               System of self-service viewer and upto 4
      and MRO                       Administration      categories of Leave. Annual opening and closing
      ref : HC07                                        balance etc., linked to attendance and payroll.

164   Administration   Operations   Muster Role         System of per-hour, job-type with job-rates
      and MRO                       Management          Muster role per week adminstration incl. Options
      ref : HC08                                        of overtime rates.

165   Administration   Operations   Loan Sanction       Matrix option. (Mark to Team-Leader OR
      and MRO                       Requests            One-Person). 2-level Escalation. Dual or Triple
      ref : HC09                                        Authorisation if required. Login Message Alert.
                                                        Does NOT track quantum, accounting etc.
                                                        automatically.
http://clextra.com

166   Administration   Operations   Materials Out        System of self-service. Matrix option. (Mark to
      and MRO                       Requests             Team-Leader OR One-Person). 2-level
      ref : HC10                                         Escalation. Dual or Triple Authorisation if
                                                         required. Login Message Alert.

167   Administration   Operations   Other Requests       System of self-service. Matrix option. (Mark to
      and MRO                                            Team-Leader OR One-Person). 2-level
      ref : HC11                                         Escalation. Dual or Triple Authorisation if
                                                         required. Login Message Alert.

168   Administration   Operations   Petty Cash &         Matrix option. (Mark to Team-Leader OR
      and MRO                       Advances Requests    One-Person). 2-level Escalation. Dual or Triple
      ref : HC12                                         Authorisation if required. Login Message Alert.
                                                         Does NOT include accounting automatically

169   Administration   Operations   Problems faced       System of self-service. Matrix option. (Mark to
      and MRO                                            Team-Leader OR One-Person). 2-level
      ref : HC13                                         Escalation. Dual or Triple Authorisation if
                                                         required. Login Message Alert.

170   Administration   Operations   Small sub-contract   System of self-service. Matrix option. (Mark to
      and MRO                       Requests             Team-Leader OR One-Person). 2-level
      ref : HC14                                         Escalation. Dual or Triple Authorisation if
                                                         required. Login Message Alert.

171   Administration   Operations   Guest House          System of self-service. Matrix option. (Mark to
      and MRO                       Requests             Team-Leader OR One-Person). 2-level
      ref : HC15                                         Escalation. Dual or Triple Authorisation if
                                                         required. Login Message Alert.

172   Administration   Operations   Training Schedules   System of self-service. Matrix option. (Mark to
      and MRO                       and Requests         Team-Leader OR One-Person). 2-level
      ref : HC16                                         Escalation. Dual or Triple Authorisation if
                                                         required. Login Message Alert.

173   Administration   Operations   Travel Requests      System of self-service. Matrix option. (Mark to
      and MRO                                            Team-Leader OR One-Person). 2-level
      ref : HC17                                         Escalation. Dual or Triple Authorisation if
                                                         required. Login Message Alert.

174   Administration   Operations   Courier Dispatch     Outbound Mail-Stop
      and MRO                       Request
      ref : HC18
175   Administration   Operations   Conference Room      Multi-Location, comprehensive
      and MRO                                            Conference-Training Room Booking Solution
      ref : HC19
176   Administration   Operations   Helpdesk             Support functions and the management of them
      and MRO                                            cheaply; quickly and effectively is the cornerstone
      ref : HC20                                         to a firms organisational and individual
                                                         productivity. This feature alone can save
                                                         significant dollars for you.

177   Administration   Operations   Official IN          System and Methodoloogy for Centralised
      and MRO                       Correspondence       Register for ALL EXTERAL correspondence
      ref : HC21                                         INTO the company. Use in tandem with eDMS
                                                         binning systems for a soft copy storage for remote
                                                         and archival usage.

178   Administration   Operations   Official OUT         System and Methodoloogy for Centralised
      and MRO                       Correspondence       Register for ALL EXTERAL correspondence
      ref : HC22                                         FROM the company. Essentially a Registre for
                                                         ANY and EACH out-going correspondence.
                                                         Soft-copy upload of the orignal to a central
                                                         repository for remote access and archive.

179   Administration   Operations   My Diary             Personal Diary; including To-Do; Appointments;
      and MRO                                            Calendar; Holidays; Events, Self-Alerts etc. Any
      ref : HC23                                         date - time based reminder and follow-up activity.
http://clextra.com

180   Administration   Operations   Gate Pass             eSlip and non-paper based each Gate Pass and
      and MRO                                             Visitor Movement System and Record-Keeping.
      ref : HC24
181   Administration   Operations   Gate Materials        eDocument and non-paper based each Gate
      and MRO                                             Materials IN and OUT record-keeping,
      ref : HC25                                          approvals, tracking, audit

182   Administration   Operations   Time Scheduling       Enterprise and-or Individual Calendar and Time
      and MRO                                             based listing of jobs. Allows individual planning
      ref : HC26                                          and Enterprise consolidation. Colloabration
                                                          allows everyone to see and know what the
                                                          schedule of another person is scheduled to do
                                                          even if at a completely different location.

183   Administration   Operations   Operational           Any number of locations and any number of
      and MRO                       Equipment             devices and any number of items with each.
      ref : HC27                    Monitoring            Dates from and to for usage. AND-OR target
                                                          quantity and actual quantity of usage. Eg.
                                                          Printing consumables. Photo-copier maintenance.
                                                          Replacement of mechanical moving parts etc.

184   Business         Strategic    Corporate IQ and      Assess the current Intelligence and Emotional
      Intelligence                  EQ                    Quotient of your Firm. Available Talent;
      ref : IA01                                          Skill-Sets; Cost of Information; Patents; IPR;
                                                          Leadership; Assets; Cash. Assess Psychometrics;
                                                          Change acceptance; Resistance; Psychological
                                                          Damage; Culture & Community Factors.

185   Business         Strategic    Snapshot of Metrics   Snapshot of all - 300 - metrics each month. (or
      Intelligence                                        weekly or daily or quarterly).
      ref : IA02
186   Business         Strategic    Business Goal         Mission, Vision, Quality & HR Policies. Maps to
      Intelligence                  Alignment             Teams and/or Individuals. Linked to Roles;
      ref : IA03                                          Skill-Sets; Standards and Actual Performance.

187   Business         Strategic    MBSP Break-up         Any domain break-down into Modules, Blocks,
      Intelligence                                        Segments, Pages and Units using the EiCA
      ref : IA04                                          process.

188   Business         Tactical     Snapshot of           Snapshot of every 25-units of data-bits; eg. Salary
      Intelligence                  Information           Slips each month. Assessments this quarter.
      ref : IB01                    sub-sets
189   Business         Tactical     Trends                Visual display of time-series trends of daily;
      Intelligence                                        weekly; monthly; quarterly; annual and even
      ref : IB04                                          hourly data.

190   Business         Operations   Vision and Mission    Constantly convey the Corporate Visions and
      Intelligence                                        Mission to all employees; using Push and Pull
      ref : IC01                                          communications.

191   Business         Operations   Quality Policy and    Constantly convey the Quality Policy to all
      Intelligence                  Metrics               employees; using Push and Pull communications.
      ref : IC02
192   Business         Operations   HR Policy and         Constantly convey People Policies to all
      Intelligence                  Metrics               employees; using Push and Pull communications.
      ref : IC03
193   Business         Operations   IT and Security       Constantly convey Information Management and
      Intelligence                  Policy and Metrics    Security Policies and concerns to all employees;
      ref : IC04                                          using Push and Pull communications.

194   Business         Operations   Press Releases        Corporate Press Releases; Public Relations
      Intelligence                                        Documents. Press Cuttings.
      ref : IC05
195   Business         Operations   clextra SEARCH        clextra Search is a unique approach to searching.
      Intelligence                                        While a search-engine allows a single line
      ref : IC06                                          interface others offers pull-down cirteria lists. In
                                                          clextra you are presented a page of creiteria to
                                                          select one-click for the required listings. You can
                                                          arrive at the same thing from different ways OR
                                                          view an information line from different search
                                                          perspectives.
http://clextra.com

196   Business          Operations   clextra REPORT        Most clextra Reports are an edit-list; consolidate
      Intelligence                                         summary or extensive list. Each are column
      ref : IC07                                           sortable within the report. Most reports offer a
                                                           Personal-Memory for from and to dates. Several
                                                           reports offer user-definable Grills. Colour limits
                                                           of fields instantly viewable as GOOD or BAD.

197   Business          Operations   clextra               An online Information based system browser type
      Intelligence                   PRINT-DISTRIBU        local print-out is always possible. For statutory
      ref : IC08                     TE                    and related printing in PDF format is available.
                                                           To save costs and time relevant documents are
                                                           best PDF or otherwise previewd and can be
                                                           distributed by placing in a user-cupboard OR
                                                           distributed with standard email OR used within
                                                           documents such as Targetted Direct email
                                                           Marketing.

198   HR                Strategic    Change Facilitation   Change Management. Slow or fast track.
      Collaboration -                                      Management decides the pace. You could launch
      Teams                                                the whole product; or better still; allow it to grow
      ref : JA01                                           biologically. Enter at key-points or weak-points at
                                                           different levels in the organisation and allow it to
                                                           flourish and grow.

199   HR                Strategic    Teams; sub-Teams      Teams Focus. Entire organisation or ALL
      Collaboration -                and Task-Forces       departments, manpower strength into ONE SET
      Teams                                                of teams; of 2x2; 3x3; 4x4; 5x5; 6x6; 7x7; 8x8; 9x9
      ref : JA02                                           OR a 10x10 matrix - each with 1 to 999 possible
                                                           members.

200   HR                Strategic    Team Composition -    Tangible Skills and Competencies of Individuals
      Collaboration -                Skills                required to work together to complete a task.
      Teams
      ref : JA03
201   HR                Strategic    Team Composition -    Roles within teams and Behavioural skills as in
      Collaboration -                Behavioural           Belbin Roles, De Bono Thinking Hats or De Bono
      Teams                                                Action Shoes.
      ref : JA04
202   HR                Strategic    Systems Thinking      Plan for each and all teams as an independent
      Collaboration -                                      system. Relationship and inter-dependence with
      Teams                                                other teams or Systems. Roles, SWOT, finance
      ref : JA05                                           etc. of each system. Profit, Cost, Revenue or
                                                           Investment centres etc.

203   HR                Tactical     Random                Cupboard Feature. Company-wide bibliography
      Collaboration -                attachments           of Information; Reports and emails. At-will;
      Teams                                                upload your documents for viewing. Upload
      ref : JB01                                           free-will documents for your Team Members to
                                                           access. Organization can make available these for
                                                           your use.

204   HR                Tactical     Timely attachments    Cupboard Feature. Organised company-wide
      Collaboration -                                      bibliography of Information; Reports and emails.
      Teams                                                Against a Time-Series; upload your documents
      ref : JB02                                           for viewing. Upload documents for your Team
                                                           Members to access. Organization can make
                                                           available Time-Series attached documents for
                                                           your use.

205   HR                Tactical     Team Self-Service.    Built and by default self-service; allows lower
      Collaboration -                                      costs and less manpower for IT; HR and
      Teams                                                Management overheads. Save annual costs 10 to
      ref : JB03                                           12 people for every 400-1000 people you or your
                                                           customers employ.

206   HR                Tactical     Team SWOT             Manage SWOT. The Strengths, Weaknesses,
      Collaboration -                                      Opportunities and Threats for every Team.
      Teams
      ref : JB04
207   HR                Tactical     Team Sponsor.         Team Sponsor. Every team has a sponsor;
      Collaboration -                                      internal customer or Mentor. By default this is
      Teams                                                the CEO to ensure a - score-card - approach and
      ref : JB05                                           whole-purpose intent for every team.
http://clextra.com

208   HR                Tactical     Communities            At login-1 and/or login-2 grouping of specific
      Collaboration -                                       individuals to achieve specific objectives.
      Teams                                                 Community of Evangelists; Features Teams;
      ref : JB06                                            Task-force … call it what you will.

209   HR                Tactical     Team Dynamics          Each team has a Leader; a No.2 and a
      Collaboration -                                       clextra-Tech-co-ordinator. Each team also has a
      Teams                                                 Sponsor or Mentor. Also every individual can
      ref : JB07                                            have upto 3 superiors. For example; Reporting to
                                                            … Admin. Head and Tech.Supervisor. All this
                                                            allows for dynamic and practical Leadership.

210   HR                Tactical     Teams - 26 x 70 -      Allows 26 sets of 70 teams - with unlimited
      Collaboration -                1820 Teams             member under each.
      Teams
      ref : JB08
211   HR                Tactical     Units - Taskforces -   Apart and in-addition to Teams any number of
      Collaboration -                Households             employees can be grouped together as a Project -
      Teams                                                 Feature or Campaign Team … termed unit within
      ref : JB09                                            clextra. Task-forces to achieve specific goals.
                                                            When customer facing households - Modalities
                                                            when Patient facing - Segmentation when
                                                            Insurance Facing - Instruments when Banking
                                                            facing etc.

212   HR                Tactical     Tasks Assignment       Quick and ad-hoc assignment of work to Team
      Collaboration -                                       members or others allowing them access to these
      Teams                                                 as reminders and reverting on task status.
      ref : JB10                                            Available on individual login. Allows priority and
                                                            queue prioritisation. This is apart from
                                                            individual To Do List available in the Diary.

213   HR                Tactical     Discussion Board       Initate a topic and have any and all follow-up
      Collaboration -                                       quick thoughts on this topic. An internet IRC or
      Teams                                                 chat equiovalent.
      ref : JB11
214   HR                Operations   Belbin Team Roles      Establish any and all 9 roles for individual
      Collaboration -                                       members in every team.
      Teams
      ref : JC01
215   HR                Operations   Team Collaboration     Team (or Individual) Collaboration on Problems
      Collaboration -                                       & Solutions. Tangible and Intangible Reward &
      Teams                                                 Recognition linked to the stating; using and
      ref : JC02                                            rating of Problems & Solutions. We refer to this
                                                            module as CoPaS.

216   HR                Operations   Individual             Individual (or team) Collaboration on Problems
      Collaboration -                Collaboration          & Solutions. Tangible and Intangible Reward &
      Teams                                                 Recognition linked to the stating; using and
      ref : JC03                                            rating of Problems & Solutions. We refer to this
                                                            module as CoPaS.

217   HR                Operations   Timely attachments     Cupboard Feature. Share time-series based
      Collaboration -                                       documents sent to you with the organisaton (or
      Teams                                                 Team members)
      ref : JC04
218   HR                Operations   Random                 Cupboard Feature. Share random documents
      Collaboration -                attachments            sent to you with the organisaton (or Team
      Teams                                                 members)
      ref : JC05
219   HR                Operations   Business-Purpose       The whole firm. (or in a large company, whole
      Collaboration -                Skill-Set              division or department) decides a maximum of 25
      Teams                                                 skill-sets that are essential to the success of the
      ref : JC06                                            organisation. You detail these. These we refer to
                                                            as the AVA-Skill-Sets.

220   HR                Operations   Team Skill-Set         Each of the individual and Business Purpose
      Collaboration -                Sigma                  skill-sets map into the Team that they belong or
      Teams                                                 have been assigned to.
      ref : JC07
221   HR                Operations   Team                   Team Inter-Personal Assessments. Ist level
      Collaboration -                Inter-Personal         opinions of each other. Big-5 Team opinion. Note
      Teams                          Assessments            team combinations should be stable; ie.
      ref : JC08                                            TEAM-CHAIRS have to be initialised and held
                                                            for a period of time (one-quarter suggested) for
                                                            this module to be effective.
http://clextra.com

222   HR                Operations   Team opinion.         Team opinion. In-depth, more time-spent,
      Collaboration -                In-depth FFM          analysed intra-team perception building on the
      Teams                                                above quick-fire perception. This is based on the
      ref : JC09                                           Big-5 or Five Factor Model.

223   HR HCM and        Strategic    Onet Support          International standard and System for HR work
      Finance                                              styles, jobs, tasks, activities etc.
      ref : KA01
224   HR HCM and        Strategic    Compensation          Allows upto 12 compensation levels; map these
      Finance                        Management            onto each Grade from an unlimited number of
      ref : KA02                                           compensation sets. Customise for each individual
                                                           / employee. Variety of CTC Reports

225   HR HCM and        Strategic    CTC Analysis &        Individual, Group, Grade, sub-Group wise Cost
      Finance                        Planning              to Company Analyses and Planning.
      ref : KA03
226   HR HCM and        Strategic    Time and Materials    If T&M based -CTC on billable and non-billable.
      Finance                                              Per-person cost and chargeable rates.
      ref : KA04
227   HR HCM and        Strategic    Attrition Analysis    Attrition is Expensive. The intangible and hidden
      Finance                                              costs of replacement affect bottomlines
      ref : KA05                                           significantly. Little or no attention is paid to this
                                                           important area because there was no tool to do so
                                                           - till clextra.

228   HR HCM and        Tactical     Incentive & Bonus     Plan best-case; worst-case and most-likely annual
      Finance                        Planning              incentive / bonus pay-outs. Compare with actual
      ref : KB01                                           the next year.

229   HR HCM and        Tactical     Manpower Planning     Plan country-wide or Global Manpower
      Finance                                              Requirements linked to skill-sets; line and staff
      ref : KB02                                           requirements matching; budget and actual.

230   HR HCM and        Tactical     Attrition             Rating on desire to retain and period of time over
      Finance                        Management            which this retention is desired. Ranking and
      ref : KB03                     Metrics               Rating Report on this.

231   HR HCM and        Operations   Incentive & Bonus     Incentives and Bonus Administration using cash
      Finance                        Administration        and-or points. Assign as rewards or recognition.
      ref : KC01                                           Reduce as dis-incentive. Redeem as and when
                                                           required. Escalationa and approval options.

232   HR Training       Strategic    Training              From Induction to regular on-going Training
      Learning                       Effectiveness         Effectiveness. Campaign specific or one-off.
      ref : LA01                                           Complete Training Process as an Intervention.

233   HR Training       Strategic    Learning              Establish Corporate, Group and Invidudal
      Learning                       Organisation          quantified Learning Goals and Communicate
      ref : LA02                                           these to all users. Potential for Distance Learning
                                                           establishments. Subscribed Learniing etc.

234   HR Training       Strategic    Touch Screen          Touch and play any digital clip after selecting
      Learning                       Audio-Video Kiosk     Module Block Segment and Page. Cataloging
      ref : LA03                                           System for uploading and distributed - central
                                                           storage of ANY media. Learning Sets linked to
                                                           clextra LMS AVA and Syllabus for advanced
                                                           Learning and Teaching Applications.

235   HR Training       Tactical     Syllabus - Database   Organised into the MBSP clextra-Process format.
      Learning                                             Exact control on Learning or Training;
      ref : LB01                                           person-wise; team-collated and oriented towards
                                                           Market Demands and Supply; Numbers and
                                                           Customer requirements.

236   HR Training       Tactical     Syllabus - Freeform   More realistic free-form managed syllabus.
      Learning                                             Supports 25 core-sets and up to 20 sub-sets under
      ref : LB02                                           each of them.
http://clextra.com

237   HR Training   Operations   Crash-MBA             Built-in Crash MBA. (Single-use read-only
      Learning                                         courtesy (C) Casper Abraham)
      ref : LC01
238   HR Training   Operations   Management            Background Learning & Information of
      Learning                   Reading               Performance Appraisal, Training Effectiveness,
      ref : LC02                                       Psychometric Assessments< Motivation etc.

239   HR Training   Operations   Metrics Basics        Basic Information on Financial Ratios, Metrics,
      Learning                                         Measurements, Systems & Process such as
      ref : LC03                                       six-sigma, Balanced Scorecard, COPC, HR Best
                                                       Practices etc.

240   HR Training   Operations   Whitepapers :         Relevant and related Whitepapers on People
      Learning                   clextra and           Testing; Team Collaboration etc.
      ref : LC04                 Industry.
241   HR Training   Operations   Learning Photos       An innovative Learning Concept based on the
      Learning                                         belief that A picture is worth a thousand words;
      ref : LC05                                       and anyway modern man based on TV and lack
                                                       of time; learns instantly based on visual recall and
                                                       recognition. A wonderful mass-communication
                                                       tool.

242   HR Training   Operations   Learning Photos       Unlimited layers of 2x100 photos; (ie. 200,000
      Learning                   Plus                  plus) for different layers of Learning Photos.
      ref : LC06
243   HR Training   Operations   Training              Calendar Management. Particpants. Pre and Post
      Learning                   Administration        Assessment Tracking. Pre-event and Post-event
      ref : LC07                                       Communications. Conference Room bookings.
                                                       Faculty rostering etc.

244   HR Training   Operations   Structured Content    Upto 25 domains integrated with all other clextra
      Learning                                         Modules. Up to 999 sub-domains. Each domain
      ref : LC08                                       can have upto 99 learning objectives. Each
                                                       objective has multimedia options, an expert, notes
                                                       and attachements and Assessment.

245   HR Training   Operations   Content Delivery      Any and all convergent multimedia structured
      Learning                                         storage. With real-time streaming and cached
      ref : LC09                                       download upload customisable syllabus to
                                                       individual syllabus.

246   HR Training   Operations   Learning              With each domain and sub-domain user-definable
      Learning                   Assessment            and completely online deployment of convergent
      ref : LC10                                       multimedia Assessment.

247   HR People     Strategic    Competency         Assess, Rate, Model and Map to Marketing,
      Potential                  Mapping Structured Planning, Demand and Supply all available
      ref : MA01                                    Talent linked to Performance; tangible and
                                                    intangible; Behaviour; Soft-Skills at a Strategic,
                                                    Tactical and or Operative Level, depending on
                                                    HR Maturity within your organisation.

248   HR People     Strategic    Competency            Self-service obtain a list of current activities.
      Potential                  Mapping Freeform      Create a Job-Description from this and related
      ref : MA02                                       information gathering. Rating by upto 3 superiors
                                                       or colleagues.

249   HR People     Strategic    Talent Management     Identify and Track Talent and Achievers amongst
      Potential                                        the Talented. Create communities; Task-Forces;
      ref : MA03                                       and Special-Rewards for retention and alignment
                                                       to Organisational Culture.

250   HR People     Strategic    Employee RISK         Using sub-metrics of Cost-to-company or Team
      Potential                  Metrics               or Assets responsibility; Vulnerability and Threat
      ref : MA04                                       to this.

251   HR People     Strategic    Learning              Harnessing & Managing; Individual & Team
      Potential                  Organization.         Problems & Solutions; Team and individual
      ref : MA05                                       internal & external communications;
                                                       Past-Current-and Future Assessment Gaps &
                                                       (you manually) analysis. Managing training as an
                                                       Intervention.
http://clextra.com

252   HR People    Strategic    Leadership              Leadership Development. Identification. List.
      Potential                 Development.            Assess. Appraisal. Feedback. Mentor. Mintzberg
      ref : MA06                                        Model. Level-based time-action targets. Internal
                                                        Grades. Allows from 1 to 12 Levels of Grades for
                                                        Organisational Development.

253   HR People    Strategic    Leadership              Track-record monitoring. Leadership
      Potential                 Identification          Assessment; Behavioural Testing; 360 degree
      ref : MA07                                        feedback; Decision Making Metrics etc.

254   HR People    Tactical     Competency              Create and manage a matrix of upto 25,000
      Potential                 Modelling               competencies, skill-sets, role-sets or job-functions.
      ref : MB01
255   HR People    Tactical     Mentor                  A unique concept in Professional Mentoring.
      Potential                 Management              Keeping in touch on Performance and Soft
      ref : MB02                                        Information; including behavioural side issues.

256   HR People    Tactical     Teams Costing           Teams Costing. Establish a Revenue; Cost; Profit
      Potential                                         & Capex %age, number for each Team.
      ref : MB03
257   HR People    Tactical     Managers                Track, monitor and mentor the performance of
      Potential                 Assessment              all levels of Managers.
      ref : MB04
258   HR People    Tactical     Team Leaders            Track, monitor and mentor the performance of
      Potential                 Assessment              all levels of all current and potential Team
      ref : MB05                                        Leaders.

259   HR People    Tactical     Task Skill-Set.         Business Purpose skill-sets map into all Tasks
      Potential                                         Tasks may require more than 1 person at
      ref : MB06                                        different levels. This can assist in MANPOWER
                                                        PLANNING and identifying TRAINING GAPS
                                                        to meet Business Purpose.

260   HR People    Tactical     Team Succession         Every team has a nominated i. Leader; ii. No2; iii.
      Potential                                         IT coordinator and iii. Sponsor/Mentor This
      ref : MB07                                        provides for Leadership Development; Successor
                                                        Management; Redundancy; Attrition Controls;
                                                        Techno-phobia solution; Ownership and Team
                                                        Success.

261   HR People    Operations   Competency              Exhaustive Repository of all tasks, skills,
      Potential                 Assessment              activities, actions, knowhow, paid-for work.
      ref : MC01
262   HR People    Operations   Competency Rating       Rating and Ranking of competencies based on 1,2
      Potential                                         or 3 assessors for each and every Competency.
      ref : MC02
263   HR People    Operations   Corporate               Based on the above 25; you assume that not more
      Potential                 Competencies            than 4; essentially 1 or 2 are the hot-skills of every
      ref : MC03                AVA-25                  individual, whatever their level. Choose these.

264   HR People    Operations   Individual Skill-Sets   Alignment of key-skill and 4-hot skills can be
      Potential                 Hot-4                   rated as a 0,1,2,3 or 4 called the TPA (Technical
      ref : MC04                                        Point Average) for that individual in that skill.

265   HR People    Operations   Individual Skill-Sets   Individual top-16 skills can be rated as a 0,1,2,3
      Potential                 Hot-16                  or 4 and linked to Training and Learning
      ref : MC05                                        Syllabus

266   HR People    Operations   Individual Skill-Set    Focus. For each of the above rated 4-hot skills;
      Potential                 Weight                  you can add a weight. This is a percentage and
      ref : MC06                                        could be 100% of his/her time spent on that; OR
                                                        100% motivated or 100% useful for job-purpose
                                                        etc. CHOOSE ONE METHOD/MODEL for
                                                        weight.

267   HR People    Operations   Talent Metric           Obtains a maximum of 4 points; with e.g..
      Potential                 EPA-4 Weights           25%-50%-25% weights for Self-Boss-Mentor
      ref : MC07                                        assessment on a specific set of parameters.
                                                        Partially 360 degree.
http://clextra.com

268   HR People     Operations   Talent Metric EPA     Set on a Maximum of 10 for each employee; based
      Potential                  Indices               on maximum of 12 Levels/Grades of a company;
      ref : MC08                                       on Qualifications; Experience; Attitude; Intuition
                                                       & Feel etc.

269   HR People     Operations   Lominger              Lominger 67 + Stoppers-Stallers 19 system of
      Potential                  Competencies          Selection and 360 degree Rating of upto 3
      ref : MC09                                       Superiors with a range of online Analytics and
                                                       Reporting.

270   HR            Strategic    BP - Goal             HR Best Practice 1 : Communicate business
      Performance                Communication         direction and goals. Communicate Corporate and
      ref : NA01                                       Invidual goals. Set stretch limits.

271   HR            Strategic    BP : Involve and      HR Best Practice 2 : Involve employees and act on
      Performance                Act on Suggestions    their suggestions A collaborative environement
      ref : NA02                                       allowing decision making; degrees of
                                                       transparency; controls and checks and balances.

272   HR            Strategic    BP : Provide          HR Best Practice 3 : Provide meaningful benefits.
      Performance                Meaningful Benefits   Listen to what really mattters to every employee
      ref : NA03                                       and then plan your rewards and recognition and
                                                       incentives schems.

273   HR            Strategic    BP : Reward High      HR Best Practice 4 : Reward high performers.
      Performance                Performers            Know who is really achieving what you need to
      ref : NA04                                       achieve and then reward thos tangible and
                                                       intangible metrics.

274   HR            Strategic    BP : Growth and       HR Best Practice 5 : Provide growth and
      Performance                advancement           advancement opportunities. Have a plan. Decide
      ref : NA05                                       and place in those positions those who are going
                                                       to achieve that plan.

275   HR            Strategic    Performance           A comprehensive Enterprise-wide System;
      Performance                Management            provides a choice of Performance methods for
      ref : NA06                 System                different needs and worker-levels; also allows
                                                       customisable add-on Performance methods and
                                                       models.

276   HR            Strategic    Vision-Mission        From the vision set numbers; align these to
      Performance                Alignment             Teams; Divisions; Profit Centres; Teams and/or
      ref : NA07                                       individuals.

277   HR            Strategic    Organisational        From an Organisational Design and Chart;
      Performance                Design                specify Roles & Responsibilities for Teams; Profit
      ref : NA08                                       Centres; Individuals or other resources.

278   HR            Strategic    Organisational        From an Organisational defined role individual
      Performance                Roles and Job         roles can be customised; up to 15 parameters with
      ref : NA09                 Design                individual metrics and option of 360 degree
                                                       appraisal.

279   HR            Strategic    Roles Library         For your entire organisation you can manage a
      Performance                                      Library of ALL roles. Import and Export them
      ref : NA10                                       into clextra with every OD change - M&A -
                                                       Re-structuring or Accountability mapping.

280   HR            Strategic    Performance           Report from some of the essential performance
      Performance                Summary Report        indicators on a single page.
      ref : NA11
281   HR            Strategic    Staff Incentives      Establish a system set targets collect and drill
      Performance                Administration        down actuals to manage Sales or Support Staff
      ref : NA12                                       Incentives administration.

282   HR            Tactical     Individual Metrics    Top-down Assignment of Corporate 300.
      Performance                                      Bottom-up collation of grass-root numbers.
      ref : NB01
http://clextra.com

283   HR              Tactical     Accountability          Fix accountability, responsible and authority
      Performance                                          including Roles with any Executive.
      ref : NB02                                           Communication on roles can be as transparent as
                                                           you wish throughout the organisation.

284   HR              Tactical     Employees               clextra DAPA for Employee Affinity-Loyalty
      Performance                  Incentives              Points Accounting System to motivate; recognise
      ref : NB03                   Management              and reward Performing Employees.

285   HR              Tactical     CoPaS Reward            System to recognise and reward Employees who
      Performance                  System                  are innovative and spend time to help and provide
      ref : NB04                                           constructive help; support and solutions to their
                                                           colleagues.

286   HR              Tactical     Job Design and          For every individual set and manage Job
      Performance                  Specifications          Specifications. Self-view; others-view OR all-view.
      ref : NB05
287   HR              Operations   Performance             Quick and simple Performance-Behaviour
      Performance                  Quick-Indices           Performance-Motivation General-Index - Speed
      ref : NC01                                           vs Errors - Top Performer with comparisons
                                                           Team-wise - Level-wise - Unit-wise.

288   HR              Operations   Performance             Mass-Recruitment People Performance. Specific
      Performance                  dPipeline               numbers and measures; up to 10 assessed at up to
      ref : NC02                                           10 touch points. Typical for Fresher in the 1st 2
                                                           years of a career. This we call the dPipeLine
                                                           feature.

289   HR              Operations   Performance QBR         Quarterly Business Review. Simple
      Performance                  on 4,6 or 12 factors.   Senior-People Performance; on 1 key-parameter;
      ref : NC03                                           each quarter. This is from within the PM-HR
                                                           system.

290   HR              Operations   Performance             Performance Appraisal Feedback
      Performance                  Appraisal Feedback
      ref : NC04
291   HR              Operations   Worker                  Standard Supervisory 7-point; 4-level
      Performance                  Performance             Performance Appraisal for every worker.
      ref : NC05                   Appraisal
292   HR              Operations   Individual Role in      Every individual role within a workflow or
      Performance                  Organisation            process in the organisation can be clearly defined
      ref : NC06                                           and posted with varying degrees of transparency.
                                                           Up to 15 roles supported.

293   HR              Operations   360 Degree              Self, Superior and upto 8 peers can provide 360
      Performance                  Feedback                degree feedback on a 5-scale factor; for each of up
      ref : NC07                                           to 15 roles. Role based feedback.

294   HR              Operations   270 Degree-like         Self, Superior and Mentor. 3-way on the EPA-4
      Performance                  3-way Feedback          13 parameters. Weighted for each of these 3
      ref : NC08                                           appraisers.

295   HR              Operations   Employee                Employee Satisfaction Survey. Regular and
      Performance                  Satisfaction Survey     consistent Employee Satisfaction Survey can be
      ref : NC09                                           executed right through the organisation. Also
                                                           available, the Employee as a Customer
                                                           satisfaction survey.

296   HR Operations   Strategic    Forward Resource        Current to years ahead planning and status of HR
      ref : OA01                   Planning                resources allocation to Clients - targets and
                                                           actuals with cost and quality parameters.

297   HR Operations   Tactical     CV Miner                Search on administrator or self-managed CVs
      ref : OB01                                           using upto 9 key words throughout your entire
                                                           bank of CVs

298   HR Operations   Operations   Payroll Options         Standard Payroll for India. - Customised for any
      ref : OC01                                           other country. Monthly Stipend. Piece-rate or
                                                           Per-Hour Payments.
http://clextra.com

299   HR Operations   Operations   Payroll Export       Export a Spreadsheet. Templates for format
      ref : OC02                                        calculation on Grades, Locations, Gender etc.

300   HR Operations   Operations   Payroll Import       After modifications and fine-tuning of a
      ref : OC03                                        previously exported Spreadsheet or CSV from
                                                        any other HR or Payroll Application, import this
                                                        into clextra. All calculations assumed completed.

301   HR Operations   Operations   Payroll Payslip      From archived and imported files individual
      ref : OC04                   Distribution         Payslips can be generated and previewed. Now set
                                                        a flag; and the same files are distributed to all
                                                        individuals by placement of files in their
                                                        individual e-Cupboards.

302   HR Operations   Operations   Payroll Reporting    Standard statutory Monthly forms such as
      ref : OC05                                        Income Tax, ESI, PF-FPF; ELID; Bank Advice
                                                        can be generated and archived. From earlier
                                                        stored archives history reports are available.

303   HR Operations   Operations   Payroll Overtime     Job based Individual Overtime Sheets,
      ref : OC06                   and Loss of Pay      Administration, Payment and Management. Loss
                                                        of Pay days, calculations and reporting.

304   HR Operations   Operations   Payroll Deductions   Upto 15 columns of deduction and 6 columsn of
      ref : OC07                                        manual deduction per month management.

305   HR Operations   Operations   Payroll Perks        Upto 6 perquisities based on allowance for each.
      ref : OC08                                        Any excess is deducted after monthly
                                                        due-payments are entered.

306   HR Operations   Operations   Snapshots            Archive of information of 1000+ people map at
      ref : OC09                                        any given time for future historical retrieval.

307   HR Operations   Operations   CV Manager           Curriculum Vitae - Bio-data Corporate Managed
      ref : OC10                                        Format or Self-Service, Corporate and/or Own
                                                        up-to-date management and access of a
                                                        comprehensive Resume of every employee in the
                                                        organisation.

308   HR Operations   Operations   Time Sheets.         Time Sheets. This Week; Last Week and Next
      ref : OC11                                        Week Time-sheets; based on hours of input; and
                                                        custom-defined set of up to 99 possible activities.
                                                        Collation across a Team and based on from and
                                                        to dates for any period.

309   HR Operations   Operations   ID Card              Combine Corporate Logo, Photo, Signature,
      ref : OC12                                        Level, Access onto one on-line ID Card

310   HR Operations   Operations   Multimedia           Photographs of all employees and individuals
      ref : OC13                   Photographs          within the organisation; all can view. Can allow
                                                        self-upload.

311   HR Operations   Operations   Multimedia           Signature of all employees and individuals within
      ref : OC14                   Signature            the organisation; only authorised persons can see
                                                        this stored signature.

312   HR Operations   Operations   Multimedia           Voice-Clip of all Agents. Customers can also
      ref : OC15                   Voice-Clip           listen and comment, choose or request based on
                                                        this.

313   HR Operations   Operations   Multimedia Images    Each individual can manage his or her own set of
      ref : OC16                                        visuals with thumbnails. This feature can be used
                                                        for information gathering - screen shots - training
                                                        others - learning or any other conceivable use.

314   HR Operations   Operations   Individual           Over 1000+ possible bits of information about
      ref : OC17                   Information.1000+    every individual. Financial; Personality;
                                                        Personal; Psychometric; Abilities;
                                                        Like-Dislikes-Priorities; Family;
                                                        Hobbies-Interests; Contact Details; Attainment;
                                                        Attitudes; Performance; Current-assignment;
                                                        History; Grievances-Suggestions; Failures;
                                                        Risk-factors.
http://clextra.com

315   HR Operations     Operations   People Work          Physical Workstation Location of a person, based
      ref : OC18                     Location Finder      on schematic.

316   HR Operations     Operations   Person Geographic    Establish a Geographic region, Shopfloor or
      ref : OC19                     Locator              Premises schematic and track persons.

317   HR Operations     Operations   Person in Process    Establish a Workflow or Process schematic and
      ref : OC20                     Locator              track accountable Staff with this.

318   HR Operations     Operations   Organisational       Allows 12 internal grades AND 9 access Levels.
      ref : OC21                     Grades               1=Employee; 2=Advanced usage Employee;
                                                          3=Team Leader; 4=Data-Entry; 5=Partner
                                                          Manager; 6=IT-coordinator; 7=CFO,COO,CHO;
                                                          8=CEO; 9=SuperUser (only to set-up).

319   HR Operations     Operations   Shifts Timings and   Shifts Timings Information for each Employee;
      ref : OC22                     Days-off             including days off.

320   HR Operations     Operations   Attendance           Assume all attend. Flag only absentees. Linked to
      ref : OC23                     MANUAL               Leave Records Administration. Can be linked to
                                                          Permissions and Decision Making.

321   HR Operations     Operations   Attendance           Requires networked thin-client or PC with
      ref : OC24                     semi-automated       browser access as a Punched-Clock IN and OUT
                                                          system for Attendance.

322   HR Operations     Operations   Attendance           Subject to Technical & Geographic Feasibility
      ref : OC25                     Automated            and preferable availability of Technology such as
                                                          RFID Tags; list all employees present; absent; etc.

323   HR Operations     Operations   Access Control       Subject to availability of RFID based Access
      ref : OC26                                          Control Systems and Infrastructure Deployment.

324   HR Operations     Operations   Absence - Presence   Subject to Technical & Geographic Feasibility
      ref : OC27                                          and preferable availability of Technology such as
                                                          RFID Tags; list all employees present; absent; etc.

325   HR Operations     Operations   Whiteboard           Shopfloor or Workstation specific Display on
      ref : OC28                                          Monitor-Display with custom specific Worki
                                                          Instructions and/or other periodic or other
                                                          central server managed and distributed
                                                          communications.

326   HR Operations     Operations   Designations         Pre-configured, random OR User-defined to
      ref : OC29                                          allow grouping, searching, comparison and usage
                                                          across the entire system.

327   HR Operations     Operations   Certifications       Pre-defined List of Certifications OR free-form
      ref : OC30                                          user-definable Certifications

328   HR Operations     Operations   Qualifications       Pre-defined List of Qualifications OR free-form
      ref : OC31                                          user-definable Qualifications

329   HR                Strategic    Organisation         Assess current Organisation Culture. Discover
      Pyschometrics                  Culture              gaps between desire and current perceptions; set
      and Interaction                                     change and evolution practices to facilitate
      ref : PA01                                          change

330   HR                Strategic    Psychometrics        Report from some of the essential behaviour
      Pyschometrics                  Summary Report       indicators on a single page.
      and Interaction
      ref : PA02
331   HR                Tactical     Off-line             At additional each, individual cost; however with
      Pyschometrics                  Assessments          scores and end-use availability from and within
      and Interaction                OPTIONAL             the product. IQ; analyzed IQ; Creative; Motor
      ref : PB01                                          Skills; Leadership Potential; Humour etc.
http://clextra.com

332   HR                Tactical     On-line               Available to every employee / individual; this can
      Pyschometrics                  Assessments.          include; Stress; Likes-Dislikes; Priorities;
      and Interaction                Performance           Common Sense; Integrity; Personality; OCD
      ref : PB02                                           -Obsessive Compulsive Disorder-; SDIS
                                                           (Self-Destructive Intelligence Syndrome) etc.

333   HR                Tactical     On-line               Options of self; bi-directional; 3-way or 360
      Pyschometrics                  Assessments.          degree. More than 10 multi-system options.
      and Interaction                Models
      ref : PB03
334   HR                Tactical     Pre TO Post           Summary and Raw Scores; retained from
      Pyschometrics                  Recruitment           pre-recruitment right through the career of an
      and Interaction                Connectivity          employee on ALL ASSESSMENTS. Technical;
      ref : PB04                                           Performance; Appraisal; Psychometrics at all
                                                           dates and touch-points of the employees career.

335   HR                Tactical     On-line               Stress; Likes-Dislikes; Priorities; Common Sense;
      Pyschometrics                  Assessments.          Integrity; Personality; OCD -Obsessive
      and Interaction                Behaviour             Compulsive Disorder-; SDIS (Self-Destructive
      ref : PB05                                           Intelligence Syndrome) etc.

336   HR                Tactical     On-line Team          Intra-team dynamics, linked to 360 degree
      Pyschometrics                  Assessments           feedback, likes and dislikes, team SWOT etc.
      and Interaction
      ref : PB06
337   HR                Tactical     On-line 360 degree    Self, 180, 270 and 360 degree feedback on
      Pyschometrics                  Feedback              intangible and Behavioural parameters on several
      and Interaction                                      of the Appraisal options.
      ref : PB07
338   HR                Tactical     Performers Gallery.   Performers Gallery. Even the best talent and
      Pyschometrics                                        achievers need recognition. Options on Performer
      and Interaction                                      of the Day; the week; month and Year as a
      ref : PB08                                           Gallery.

339   HR                Tactical     Opinion Poll          Current Poll for everyone in the Organisation.
      Pyschometrics                                        Useful as a change management agent.
      and Interaction
      ref : PB09
340   HR                Tactical     Counselling           Individual requests; pleas; grievances;
      Pyschometrics                                        suggestions; ideas; thoughts; desires can be
      and Interaction                                      placed and retrieved within the system.
      ref : PB10                                           Responsible authorities can react to this. Clinical
                                                           assistance where required can be considered.

341   HR                Tactical     BARS                  User-definable Behavioural Anchor Rating Scales
      Pyschometrics                                        on most aspects of tangible and intangible metrics
      and Interaction                                      and inputs throughout the use of Psychometric
      ref : PB11                                           and other Assessments.

342   HR                Tactical     Employee Profiling    Up to 50 client-defianble parameters of
      Pyschometrics                                        Employees along Geographic; Demographic or
      and Interaction                                      Psycho graphic segments.
      ref : PB12
343   HR                Operations   Lucky Gallery         Life is not fair; including; business and the
      Pyschometrics                                        environment. Lucky person of the Day; Week;
      and Interaction                                      Month OR Year; based on any CHANGE
      ref : PC01                                           MANAGEMENT criteria. Daily Cash; monthly
                                                           conveyance-fares; Annual bonus; weekly Lunch
                                                           coupons.

344   HR                Operations   My mood today         FUN. My face for the day. View all those who
      Pyschometrics                                        have entered, all employees, one of 9 potential
      and Interaction                                      facial expression or faces of the day.
      ref : PC02
345   HR                Operations   Good Deed             Set of the latest 16 good deeds done to you, by
      Pyschometrics                                        another person. Self-Managed
      and Interaction
      ref : PC03
346   HR                Operations   Thought for the Day   A single thought for every-day; on request and on
      Pyschometrics                                        every-logout enhances character development.
      and Interaction
      ref : PC04
http://clextra.com

347   HR                Operations   Jukebox             Upto 40 MIDI or MP3 music files for
      Pyschometrics                                      individual-listening.
      and Interaction
      ref : PC05
348   HR                Operations   Uploadable Photos   Upload Photos; Corporate & Personal (however
      Pyschometrics                  Gallery             moderated towards Organisation Objectives)
      and Interaction
      ref : PC06
349   HR                Operations   Transaction 360     As a Transaction for pre-defined set of upto 3
      Pyschometrics                  degree              superiors any number of peers typically 8 and any
      and Interaction                                    and all subordinates of your as 1 - 2 or 3 Superior
      ref : PC07                                         … Employee Satisfaction Survey OR any other
                                                         custom survey or opinion or poll or survey
                                                         adminstration online.

350   HR                Operations   Stimulus and        Self-Service and supported ideas of using stimulus
      Pyschometrics                  Motivation          periodically for motivation at any point during a
      and Interaction                                    calendary year.
      ref : PC08
351   HR                Operations   Team Stimulus and   Team or Group supported ideas of using stimulus
      Pyschometrics                  Moitvation          periodically for motivation at any point during a
      and Interaction                                    calendary year.
      ref : PC09
352   HR                Operations   Biases              Self-Service of understanding and biases.
      Pyschometrics
      and Interaction
353   HR
      ref : PC10        Operations   Team Biases         Team or Group understanding and biases.
      Pyschometrics
      and Interaction
354   Documentation
      ref : PC11        Strategic    Documentation       Extensive documentation on Strategic Models;
      Management                     Management          customisable weights; variety of grouping;
      ref : QA01                                         viewing data from different perspectives;
                                                         graphing etc.

355   Documentation     Strategic    Research            Research related documentation and tracking
      Management                     Management          such as legal cases, clinical research, market
      ref : QA02                                         research, company information tracking, complex
                                                         patient records, market research, business
                                                         analytics, insurance claims research, large
                                                         documentation projects etc.

356   Documentation     Tactical     Documentation       Checklists on documentation. Transaction and
      Management                     Workflow            workflow on Documentation. Accountability and
      ref : QB01                                         Quality of Documentation. Library of
                                                         documenation. Actual storage of documentation.
                                                         Access control to documentation. Commercial
                                                         exploiation of document usage and subscription.
                                                         And more ....

357   Documentation     Tactical     Centralised         Scan form Centrralised Documents and Forms
      Management                     Documents           Management. Bin and Downloadable forms for
      ref : QB02                     Manager             print. electronic Documents filing by individual;
                                                         team or group with read-access for each member;
                                                         regular-periodic documentation. Library-like
                                                         access; controls and usage.

358   Documentation     Tactical     Unstructured        Scan or if available catalogue and place a
      Management                     Documentation       document associated with ANY physical asset,
      ref : QB03                                         inventory, vehicle, supplier, csutomer, employee,
                                                         patient - people, place or thing. User-definable
                                                         20+ categories; 20+ documents in each.

359   Documentation     Operations   Checklist related   User-defined checklists with an associated
      Management                     Documentation       single-document at each step for every employee,
      ref : QC02                                         asset, case, customer, supplier in a database.

360   Documentation     Operations   Fresher             Structured framework Plus mininal content A to
      Management                     Documentation       Y - 25 sets linked to clextra AVA - upto 5
      ref : QC03                                         tree-levels of organised content targeted towards
                                                         organised and structured learning - especially for
                                                         Induction early teaching Visual Aids and Content
                                                         Management.

361   Documentation     Operations   Refresh             Structured framework ONLY A to Y - 25 sets
      Management                     Documentation       linked to clextra AVA - upto 5 tree-levels of
      ref : QC04                                         organised content targeted towards more
                                                         un-structured learning - especially for mid-career
                                                         and self-Learning Visual Aids and Content
                                                         Management.
http://clextra.com

362   Documentation   Operations   Topical               Typically 12 Topics and 12 subjects or sub-topics
      Management                   Documenation          of Document binning storage and retrieval
      ref : QC05                                         against for any Organisation, Employee,
                                                         Customer or Supplier.

363   Documentation   Operations   PMap                  If similar documentation - upto 25 - for every
      Management                   Documentation         individual or asset in a database, this feature is
      ref : QC06                                         useful. Example … scan,copy of everyones
                                                         Passport first page or scanned filled-in
                                                         Income-Tax form etc.

364   Documentation   Operations   Irregular             Long list of any type of documents linked and
      Management                   Documentation         associated with one individual, asset, case,
      ref : QC07                   Cupboard              employee, organisatin, customer or supplier.

365   Documentation   Operations   Regular               Periodic list of documents - ie. weekly, monthly
      Management                   Documentation         daily etc. linked and associated with one
      ref : QC08                   Cupboard              individual, asset, case, employee, organisation,
                                                         customer or supplier.

366   Documentation   Operations   Inventory             Upto 5-user definable documents for every item.
      Management                   Documentation         These 5 could be Bill of Materials, Quality
      ref : QC09                                         Process, Packing List, Installation Instructions
                                                         etc.

367   Documentation   Operations   Sales                 Upto 3-user definable documents for every item;
      Management                   Documentation         eg. Technical Specifications, Style Catalogue,
      ref : QC10                                         User Manual etc.

368   Documentation   Operations   Statutory             All Payroll related annexures and attachments as
      Management                   Documentation -       PDF soft-copy. Eg. India PF-FPF, ESIC, IT,
      ref : QC11                   Payroll               Monthly Statement etc.

369   Documentation   Operations   Statutory             Soft copy of all incoming or outgoing Invoices,
      Management                   Documentation -       Delivery Notes etc.
      ref : QC12                   Financial
370   CRM,            Strategic    Marketing Metrics     Design, Implement, Adminster, Modify and
      Marketing and                                      Manage Marketing metrics, ratios,
      Sales                                              key-performance indicators and measures.
      ref : RA01                                         Compare with 2 leading Competitors.

371   CRM,            Strategic    Brand Metrics         Design, Establish, Implement, Adminster, Modify
      Marketing and                                      and Manage metrics for each important Brand in
      Sales                                              your Portfolio. Compare with 2 leading
      ref : RA02                                         competitors.

372   CRM,            Strategic    After Market          Annual Plan; Capacity; Prorurement; Sales-Plan;
      Marketing and                Planning              Warranty; AMC; Installed Base. Corporate
      Sales                                              Accountability for Numbers. Manufacturing;
      ref : RA03                                         Trade; Discrete Goods or Process Industries.

373   CRM,            Strategic    Product Portfolio     Dimension your entrie Product Portfolio into 3
      Marketing and                Dimensioning          dimensions. eg. Product-line; Demographics and
      Sales                                              Models. Track with a Bsuiness Model such as a
      ref : RA04                                         BCG Matrix.

374   CRM,            Strategic    Customer              Single model of 10 internationally accepted
      Marketing and                Satisfaction Survey   consumer service parameters.
      Sales
      ref : RA05
375   CRM,            Strategic    Product Brand         For each product in the portfolio track
      Marketing and                Positioning Maps      pre-market or advertising communications
      Sales                                              percepetions with after-market and reality
      ref : RA06                                         perceptions. Data potentially from Market
                                                         Research and Customer Satisfaction Surveys.

376   CRM,            Strategic    Competitor Brand      Against each product in your portolio track
      Marketing and                Position              competitor brand positioning against
      Sales                                              user-definable perceptions. Data may come from
      ref : RA07                                         Market Research, Industry and Competitor
                                                         Analysis.
http://clextra.com

377   CRM,            Strategic   Assortment           Matching Demand to Supply means having a
      Marketing and               Analytics            clear idea of your current Planned and Available
      Sales                                            inventory stock at any given time. Any which
      ref : RA08                                       wise, cost, profit, convertibility, risk etc. on every
                                                       aspect high-lighted. Collaborative and integrated
                                                       data-collation.

378   CRM,            Strategic   Assortment           No can predict the future. Extra-polating past
      Marketing and               Planning             data into the future is an option. Push using
      Sales                                            internal constraints and expertise or Pull by
      ref : RA09                                       listening to customers allows an integrated
                                                       collaborative Advanced Planning System using
                                                       clextra.

379   CRM,            Strategic   Display Signage      Instant large reach mass customised
      Marketing and               Solution             communications for Corporate, Education, Public
      Sales                                            reach 24x7x365 reach. It is the New Media - after
      ref : RA10                                       TV and Press.

380   CRM,            Strategic   Product SWOT         All and every item in Inventory Strength
      Marketing and                                    Weaknesses Opportunities and Threats detail
      Sales                                            related to internal and external positive and
      ref : RA11                                       negative parameters to build an effective brand
                                                       portfolio.

381   CRM,            Strategic   Media Sales          Complete solution to manage dsiplay signage
      Marketing and                                    order booking across a large number of
      Sales                                            co-ordinators to a large number of displays.
      ref : RA12                                       Self-service options can also be configured.

382   CRM,            Strategic   Customer             Customer - Subscriber - Patient - Student - Major
      Marketing and               Information System   Accounts - Wholesaler any paying client
      Sales                                            comprehensive and user-definable Information
      ref : RA13                                       Management System. Options of self-service;
                                                       co-ordinator or out-sourced Management.

383   CRM,            Strategic   SLA Management       Place Service Level Agreement Metrics; set levels
      Marketing and                                    and targets; assign accountability; track actual;
      Sales                                            compare; observe trends.
      ref : RA14
384   CRM,            Strategic   Customer Risk        Receivables. Particularly against long-cycle time
      Marketing and               Metrics              borrowings and mortgages.
      Sales
      ref : RA15
385   CRM,            Strategic   Out-Sourcing         Out-Sourcing Access. Your Customer can access
      Marketing and               Access.              single and several components of many parts of
      Sales                                            your clextra information. Example; External
      ref : RA16                                       Training Vendor can enter Assessment
                                                       Information; Medical Doctor can enter medical
                                                       data; Audit Agency or CPA-CA can enter
                                                       financial data or ratings.

386   CRM,            Strategic   Secondary Sales      Break-up of Product-wise Channel-wise upto 3
      Marketing and               Solution             teirs of Inventory related item quantities.
      Sales
      ref : RA17
387   CRM,            Strategic   CRM Incentives       Establish a system set targets collect and drill
      Marketing and               Administration       down actuals to manage Distributor and Retailer
      Sales                                            Incentives administration.
      ref : RA18
388   CRM,            Tactical    Customer Affinity    clextra DAPA for Customer Affinity-Loyalty
      Marketing and               Programme            Points Accounting System to motivate; recognise
      Sales                                            and reward Profitable Customer Contacts and -
      ref : RB01                                       or Firms

389   CRM,            Tactical    Customer Rating      Quick Indices on custom-definable Loyalty vs
      Marketing and               System               Spending; Speed of decisions vs Profit etc.
      Sales
      ref : RB02
390   CRM,            Tactical    Revenue Centre       Against Chart of Accounts and-or Management
      Marketing and               Management           Accounting and Control Systems monitor
      Sales                                            Revenue; Income or Sales on an on-going basis
      ref : RB03                                       with individual and-or team accountability.
http://clextra.com

391   CRM,            Tactical     Customer Installed    Customer installed base of all products.
      Marketing and                Base                  Warranty; AMC and out-of AMC details.
      Sales                                              Retailer codes.
      ref : RB04
392   CRM,            Tactical     Product List          List of all Products-Models-Styles manufactured;
      Marketing and                                      out-sourced or traded by the company.
      Sales
      ref : RB05
393   CRM,            Tactical     Contact               Assign employees to a Firm and upto 9 individual
      Marketing and                Management            contacts within. Record, review and track all
      Sales                                              communications between firms employees and
      ref : RB06                                         each and all contacts in the targeted
                                                         customer-contacted firm.

394   CRM,            Tactical     Sales Budgeting       Establish Line-wise; Region-wsie; Team-wise
      Marketing and                                      and-or Individual wise targets. Collaborative
      Sales                                              totals; Demand and Supply with links to
      ref : RB07                                         Production or purchased capacity and
                                                         availability.

395   CRM,            Tactical     Sales Forecasting     Collaborative forecasting accumulating figures
      Marketing and                                      over Product-Lines; Regions; Teams and
      Sales                                              Individuals.
      ref : RB08
396   CRM,            Tactical     Sales              Track actuals against targets. 2-way
      Marketing and                Target-Achievement communication to understand and correct gaps.
      Sales                        Monitoring         Attrition; succession and portfolio change-over
      ref : RB09                                      Planning; Management and Monitoring.

397   CRM,            Tactical     Sales Incentive &     Plan best-case; worst-case and most-likely annual
      Marketing and                Bonus Planning        incentive / bonus pay-outs. Compare with actual
      Sales                                              the next year.
      ref : RB10
398   CRM,            Tactical     POS Integration       Standard; barcode or RFID Point-of-Sale
      Marketing and                                      Cash-Registers and PC data-file online or batch
      Sales                                              imports and integration with all other aspects of
      ref : RB11                                         Business.

399   CRM,            Tactical     End-of-Day Feature    End-of-day from any number of individuals or
      Marketing and                                      store-wise or any-other collection of Sales related
      Sales                                              data from across the world if required.
      ref : RB12
400   CRM,            Tactical     Sales Consolidation   Consolidate sales across all Revenue Centres and
      Marketing and                                      compare against Sales Targets; Budgets;
      Sales                                              Individual; Team and Location Performances.
      ref : RB13
401   CRM,            Tactical     Sales Dashboard       Graphical representation of top-10 revenue-lines
      Marketing and                                      from top-10 regions. Budget vs Actual
      Sales                                              Year-to-date, Quarter-to-date or Month-to-date.
      ref : RB14                                         Visible to ALL with a login.

402   CRM,            Tactical     Customer-Base         Up to 50 client-defianble parameters of
      Marketing and                Profiling             Consumers along Geographic; Demographic or
      Sales                                              Psycho graphic segments.
      ref : RB15
403   CRM,            Tactical     Guest Manager         Walkin, Visitor, Guest Book at any Receiption.
      Marketing and                                      Repeat visitors, Potential or Existing Customers,
      Sales                                              Vendors, Investors, Well-wisher Information
      ref : RB16                                         System Binning and Integrated Management.

404   CRM,            Tactical     Display Signage       Centralised management of large number of
      Marketing and                                      outlets and large number of realtime display
      Sales                                              systems - TV or PC-Monitor Video, Audio,
      ref : RB17                                         Animation, Text ticker. Messaging, Promotions,
                                                         Advertisements, Consumer or Employee
                                                         communications. Public advisory. Distance
                                                         Learning.

405   CRM,            Operations   Contact               Using an existing database of International or
      Marketing and                Information.          local Firms; enter and manage up to 9
      Sales                                              key-persons with all contact data about them
      ref : RC01                                         from the product. Limited to information it is
                                                         NOT a CRM. Any dates; follow-up; add-on
                                                         information has to be managed manually by you.
http://clextra.com

406   CRM,            Operations   Time Series. Sales.   Monitor field Sales Force and all such numbers
      Marketing and                                      generated. Contacts; Calls Made; Orders;
      Sales                                              Billing; Collections; Lost Orders; Competition
      ref : RC02                                         Numbers.

407   CRM,            Operations   Households            If consumer or sales oriented. If Corporate
      Marketing and                                      alternate to and in addition to teams as units.
      Sales                                              Communications to these; separate
      ref : RC03                                         grouped-information relevant to this as a unit. A
                                                         household or unit any group of employees within
                                                         the firm.

408   CRM,            Operations   Sales Transactions    Strategic and Tactical System. Data-entry and
      Marketing and                                      automation subject to technical feasibility and
      Sales                                              availability of existing Sales-Product-Invoicing
      ref : RC04                                         System.

409   CRM,            Operations   Contact Employee      Customer contact summary communications
      Marketing and                Communications        between any assigned employees and contacts in a
      Sales                                              firm is centrally archived.
      ref : RC05
410   CRM,            Operations   Contact Pain-point    Customer contact business-pain points and
      Marketing and                Registration          related information can be centrally archived for
      Sales                                              access by Senior Management to quote for
      ref : RC06                                         generate additional business from existing
                                                         contacts.

411   CRM,            Operations   Sales Records and     For higher value purchases such as industrial
      Marketing and                Purchase History      goods home durables where a record of every
      Sales                                              individual purchase is maintained and utilised for
      ref : RC07                                         contact and customer lifecycle revenue and profit
                                                         generation.

412   CRM,            Operations   Time Series           Against each periodic and individual value
      Marketing and                Comment               optional comment to monitor intangible reasons
      Sales                                              for a spike or trough in the data available to all
      ref : RC08                                         authorised personnel.

413   CRM,            Operations   Customer Enquiries    Linked to the Customer Affinity-Loyalty
      Marketing and                Database              programme any stock-out or related enquiry
      Sales                                              from a Customer can be recorded. This can be
      ref : RC09                                         later exported or independently analysed for
                                                         Planning and Product Development

414   CRM,            Operations   Loyalty Card          Integrated and comprehensive Affinity card
      Marketing and                                      Management. Linked to Finance and Accoutning;
      Sales                                              Products - Brands and Models; Campaign-wise;
      ref : RC10                                         Agency Access; Customer self-service option;
                                                         downloadable catalogues; Communications etc.

415   CRM,            Operations   Sales Call Reports    Remote 24x7x365 Sales Call Reporting System.
      Marketing and                                      Calendar based. Self-Service. Escalation. Macro
      Sales                                              or micro-level Cost and Time - Budget vs Actual.
      ref : RC11
416   CRM,            Operations   Service Call Reports Remote 24x7x365 Service Call Report System.
      Marketing and                                     Calendar based. Self-Service. Escalation. Macro
      Sales                                             or micro-level Cost and Time - Budget vs Actual.
      ref : RC12
417   CRM,            Operations   Product Training -    Central product-wise Repository of related
      Marketing and                Distance Learning     documents, multimedia files and Suggested
      Sales                                              Training Syllabus for Self-Learning and-or
      ref : RC13                                         Mentored distance Learning.

418   CRM,            Operations   Sales Training -      Using a training syllabus, learning gap analysis,
      Marketing and                Distance Learning     multimedia file availability, on-line mentoring
      Sales                                              and remote 24x7 distance content delivery.
      ref : RC14
419   CRM,            Operations   Slideshow Kiosk       If a front-end PC Client, Push any set of
      Marketing and                                      Power-Point like slides can be covnerted and
      Sales                                              uploaded for continous playback.
      ref : RC15
http://clextra.com

420   CRM,            Operations   Multimedia           If a front-end PC Cleint, Push upto 40 MP3 or
      Marketing and                Jukebox              MIDI music or voice files at any given time for
      Sales                                             selection and playback connectivity. Example
      ref : RC16                                        Top-40 Ring-tones etc.

421   CRM,            Operations   Todo Manager         Aissgn an activity to yourself or to any other in
      Marketing and                                     the firm. Add an attachment. It could be about
      Sales                                             an external contact and/or Firm or Institution.
      ref : RC17                                        Dates and Priorities are visible in colour-code.

422   CRM,            Operations   Next course of       An extract from the Todo Manager to help in
      Marketing and                Action               consensus in most External situations in terms of
      Sales                                             what should be the next course of action on what
      ref : RC18                                        date.

423   CRM,            Operations   Display Signage      Adminstration, management, monitoring, billing,
      Marketing and                                     Creative and Managed Services options.
      Sales
      ref : RC19
424   CRM,            Operations   Sales Quotations     Sales Quotes from existing Inventory items and
      Marketing and                                     pricing. Create baskets. Use pre-entered Contact
      Sales                                             Information and manage any number of quotes
      ref : RC20                                        prior to closing a Sales Order.

425   CRM,            Operations   Customer             Consumer and User Perception and ratings for
      Marketing and                Perception           each and above his-her OWN tasks as in a TQPM
      Sales                                             matrix. Customer Direct Access can be enable or
      ref : RC21                                        disabled.

426   CRM,            Operations   Time Series.         Support. Therefore; monitor Internal;
      Marketing and                Support.             out-sourced or Field Service Forces and all such
      Sales                                             numbers generated.
      ref : RC22
427   CRM,            Operations   Time Series.         Accountable Support. Therefore; monitor
      Marketing and                Services Revenue     Internal; out-sourced or Field Service Forces and
      Sales                                             all such numbers generated.
      ref : RC23
428   CRM,            Operations   Supplier Owners      Between Stores - Premises - Location for Time -
      Marketing and                                     Cost and Distance to assist Logistics Planning and
      Sales                                             Cost Management
      ref : RC24
429   CRM,            Operations   Any type of Task     Projects. Jobs, Orders, Tasks usually with a
      Marketing and                                     Start-Date and End-Date. Finite. Including Costs
      Sales                                             & Estimation. Can also be used for continuous
      ref : RC25                                        Services.

430   CRM,            Operations   FAQs for Beginners   Frequently Asked Questions. Setup and make
      Marketing and                                     available 100 sets of upto 100 questions and
      Sales                                             answers for each on any topic or function.
      ref : RC26
431   CRM,            Operations   FAQs for Advanced    Frequently Asked Questions. Setup and make
      Marketing and                Users                available 100 sets of upto 100 questions and
      Sales                                             answers for each on any topic or function.
      ref : RC27
432   CRM,            Operations   Orders               Customer facing. Soft-copy of Purchase orders,
      Marketing and                Management           Status on Delivery, Scheduling etc. PDF Invoice.
      Sales                                             PDF Delivery Note. Accountability. Collections
      ref : RC28                                        tracking. Avallability of all related
                                                        Documentation

433   SCM and         Strategic    Stockflow            Similar to cashflow based on physical Receipts
      Procurement                  Corporate            and Issues SINGLE-ENTRY per Day, Week or
      ref : SA01                                        Month periods and a range of + or - periods at the
                                                        Corporate macro Strategic Level for each and
                                                        every Item.

434   SCM and         Strategic    Supplier             Vendor; Supplier; Retailer or Distributor -
      Procurement                  Information System   Comprehensive user-definable information on
      ref : SA02                                        any and all Suppliers. Options of self-service,
                                                        co-ordinator or out-sourced Information
                                                        Management.
http://clextra.com

435   SCM and       Strategic    Supplier SLA           Place Service Level Agreement Metrics; set levels
      Procurement                Management             and targets; assign accountability; track actual;
      ref : SA03                                        compare; observe trends.

436   SCM and       Strategic    Out-Sourcing           Out-Sourcing Access. Your Vendor can access
      Procurement                Access.                single and several components of many parts of
      ref : SA04                                        your clextra information. Example; External
                                                        Training Vendor can enter Assessment
                                                        Information; Medical Doctor can enter medical
                                                        data; Audit Agency or CPA-CA can enter
                                                        financial data or ratings.

437   SCM and       Strategic    Supplier RISK          Vendor Rating. Metrics against Delivery-Days,
      Procurement                Metrics                Quality, Time-to-deliver and or Cost.
      ref : SA05
438   SCM and       Strategic    SCM Incentives         Establish a system set targets collect and drill
      Procurement                Administration         down actuals to manage Supplier Incentives
      ref : SA06                                        Administration as a part of your Vendor
                                                        Management Programme

439   SCM and       Tactical     Stockflow Store        Similar to cashflow based on physical Receipts
      Procurement                                       and Issues SINGLE-ENTRY Day, Week or
      ref : SB01                                        Month periods and a range of + or - periods at the
                                                        Corporate macro Strategic Level for each and
                                                        every Item at every Location or Store.

440   SCM and       Tactical     Inventory              Tactical and Strategic use for ABC-XYZ-Costing
      Procurement                Financials             Accountability - Transparency - Process
      ref : SB02                                        adherence - Decision Quality etc.

441   SCM and       Tactical     Inventory Retail       Stock Management Planning - Ordering -
      Procurement                and Trade              non-sell-able - Sales Returns - Hourly, Daily,
      ref : SB03                                        Weekly, Monthly tracking of volumes.

442   SCM and       Tactical     Inventory              Stock; of Components; Work in Progress and
      Procurement                Manufacturing          Finished Goods. Warranty - AMC and
      ref : SB04                                        out-of-warranty tracking.

443   SCM and       Tactical     Inventory Agro.        Stock Management Planning - Ordering -
      Procurement                Industry               non-sell-able - Sales Returns - Hourly, Daily,
      ref : SB05                                        Weekly, Monthly tracking of volumes.

444   SCM and       Tactical     Cycle Steps -          Item-wise Store-wise upto 40 individually
      Procurement                Inventory              programmable steps converting targets and
      ref : SB06                                        actual for Delivery - Time taken - Quality - Cost
                                                        and Capacity - Quantity factors.

445   SCM and       Tactical     Cycle Steps - People   User-definable steps with Delivery; Cost;
      Procurement                                       Calendar-Time and Quality Target and Actuals
      ref : SB07                                        for any process. Example; Recruitment;
                                                        Promotion; Appraisal; Retrenchment etc.

446   SCM and       Tactical     Affinity Programme     clextra DAPA for Vendors and other Contractors
      Procurement                Vendors                Affinity-Loyalty Points Accounting System to
      ref : SB08                                        motivate; recognise and reward Achieving
                                                        Supplier Contacts and - or Firms

447   SCM and       Tactical     Vendor Rating          Quick Indices on custom-definable Quality vs
      Procurement                System                 Cost; Speed vs Quality etc.
      ref : SB09
448   SCM and       Operations   Stockflow              Pre-posting any day multiple entries on
      Procurement                pre-Accounting         user-configurable parameters for any item in any
      ref : SC01                                        location. Usable as Sales Purchase Reject Waste
                                                        Sold Bought Sales-Return daybook.

449   SCM and       Operations   Inventory              ONLY IF RFID installed …. Automated tracking
      Procurement                Transactions           of Sales Items out of Stores.
      ref : SC02
http://clextra.com

450   SCM and       Operations   Inventory Physical    Dimensions and Weights to plan Storage and
      Procurement                Features              Movement.
      ref : SC03
451   SCM and       Operations   Tables                Between Stores - Premises - Location for Time -
      Procurement                                      Cost and Distance to assist Logistics Planning and
      ref : SC04                                       Cost Management

452   SCM and       Operations   Customer Owners       People work for people. People in firms may be a
      Procurement                                      customer; supplier; Agent; Trader; Driver;
      ref : SC05                                       Competitor; Distributor; etc. Relationship-based
                                                       general information on this individual is linked to
                                                       several modules in clextra.

453   SCM and       Operations   End-of-Day Feature    End-of-day from any number of individuals or
      Procurement                                      store-wise or any-other collection of procurement
      ref : SC06                                       related data from across the world if required.

454   SCM and       Operations   Orders                Vendor facing. PDF Purchase orders.
      Procurement                Management            Accountability. Status, Deliveies and Payment
      ref : SC07                                       tracking.. Accountability. Avallability of all
                                                       related Documentation.

455   SCM and       Operations   Vendor Specific       Custom forms for addiitional Industry specific
      Procurement                Forms                 comparison and information related to Suppliers
      ref : SC08                                       or Supplier Firms.

456   IT MIS EDP    Strategic    Alternate Access      Alternate technologies. Subject to technical
      ref : TA01                 technologies.         feasibility in your geographic locations and range
                                                       of service providers; we have wireless; mobile;
                                                       cellphone; PDA; Data-logging; and other means
                                                       of acquiring and dissemination information from
                                                       and to clextra.

457   IT MIS EDP    Strategic    Periodic Checklists   Security and Business Continuity is a matter of
      ref : TA02                                       Good Practice. Automated; semi-automated or
                                                       manual check-lists for Daily; Weekly; Monthly;
                                                       Quarterly accountability. Delivery; Quality; Time
                                                       and Costs for any and all System Administrations
                                                       Tasks.

458   IT MIS EDP    Tactical     Information           Technology. The best - and avoiding the worst - of
      ref : TB01                 Technology            open standards and proprietary systems. Flexible
                                 Consulting            with parameterisation; integration with any other
                                                       system. Transaction driven. Print; Screen &
                                                       Graphic Reporting Engines. Browser, Internet,
                                                       Intranet, Extranet, XML, ODBC. Mobile & Fixed
                                                       access.

459   IT MIS EDP    Tactical     Hosting Options       From experiences of provided solutions to firms
      ref : TB02                                       such as GE; HP; iflex; HealthScribe; Sonata &
                                                       ITC; etc. Choice of Intranet; Extranet; or
                                                       Internet; VPN, software and hardware firewalls;
                                                       India OR USA centric.

460   IT MIS EDP    Tactical     Integration with      Theoretically clextra can work with; in place of;
      ref : TB03                 existing Apps         before or after any other software system;
                                                       including; SAP; PeopleSoft; Siebel; Oracle; IBM;
                                                       HP; or Proprietary HR; Financial; Production;
                                                       or Logistics System. Please indicate to initiate a
                                                       dialogue in this area with us.

461   IT MIS EDP    Tactical     PC Penetration        PC Penetration. The PC penetration or Number
      ref : TB04                 Consulting            of employees to PC;s ratio can be very low. You
                                                       can use any Cyber-Cafe or Internet Parlour; or
                                                       establish clextra kiosks to allow quick and easy
                                                       access.

462   IT MIS EDP    Tactical     Time Series.          Measures. Daily. Weekly. Monthly. Quarterly.
      ref : TB05                 Field-gather          Annual Can be used for Sales. Customer Support;
                                                       Daily Production figures; Stocking norms;
                                                       Software FPAs or LOC. BPO & Call centres
                                                       COPC; Quality metrics. Customer Usage etc
http://clextra.com

463   IT MIS EDP   Tactical     Information           All spreadsheets, documents, schematics,
      ref : TB06                Bibliography          electronic documents can be catalogued and
                                                      stored person-wise online.

464   IT MIS EDP   Tactical     Information Costing   A first step to IPR Management; categorise, sort
      ref : TB07                                      and price all important information within the
                                                      organisation; place individual responsibility;
                                                      track usage etc.

465   IT MIS EDP   Tactical     Decision Quality      Create Checklists of Touch-Points for every
      ref : TB08                                      key-decision you wish to track in every or any
                                                      transaction in the organisation. Assigned to one
                                                      key-accountable individual. Track each decision
                                                      on a Rating of 9 - high to 1 - low

466   IT MIS EDP   Operations   Search. Within a      Within a clextra-Pattern-Map Set for random
      ref : TC01                person-1000+          key-words and retrieve Employee Records linked
                                                      to this.

467   IT MIS EDP   Operations   Housekeeping          Daily automated OR manual option of backup of
      ref : TC02                                      all data.

468   IT MIS EDP   Operations   Import. Batch mode    Take-in any external available data into clextra.
      ref : TC03                or Real-Time          Subject to Technical Feasibility and Accepted
                                                      Order Specifications

469   IT MIS EDP   Operations   Export. Batch mode    Export any available data out of clextra for use
      ref : TC04                or Real-Time          with other packages. Subject to Technical
                                                      Feasibility and Accepted Order Specifications

470   IT MIS EDP   Operations   Library System        Preferably with RFID; librarian-less trust based
      ref : TC05                                      automated Library system. Supports and includes
                                                      DVD; CD; Video; Film; Reports etc.

471   IT MIS EDP   Operations   Quarks Feature        Any - Every week all 168 hour end-of-hour post of
      ref : TC06                                      aggregate average count etc.

472   IT MIS EDP   Operations   clextra Sources       The main Pmap fields allows a field that specifies
      ref : TC07                                      the source of that data. For example keyboard
                                                      entry; real-time from another ERP or other
                                                      application etc.

473   IT MIS EDP   Operations   Program allow-deny    Any single link can be individually allowed or
      ref : TC08                                      denied for access to any one or group of
                                                      individuals. This can over-ride earlier and
                                                      general set-up.

474   IT MIS EDP   Operations   Auto import           Being a real-time application - given appropriate
      ref : TC09                                      permissions and access tools - just placing data
                                                      into pre-configured and pre-specified directory
                                                      -paths in clextra will import the data into clextra.

475   IT MIS EDP   Operations   Graphics              Time Series Comparisons with a Line-Chart;
      ref : TC10                                      Bar; Pie and other graph types.

476   IT MIS EDP   Operations   Report Generator      Essentially a Screen Browser based Information
      ref : TC11                                      Viewing System clextra does not foresee
                                                      hard-copy printing. However the rengine Report
                                                      Generation Module allows users configurable
                                                      Reports.

477   IT MIS EDP   Operations   Input Forms           To ease keyboard data-entry; fields from several
      ref : TC12                                      clextra databases and tables can be custom
                                                      configured to be made into one-form. This can
                                                      also be made accessible to specific individuals
                                                      such as when out-sourced for data-entry.

478   IT MIS EDP   Operations   Search                Search Breaker is a unique approach to
      ref : TC13                                      searching. While a search-engine allows a single
                                                      line interface others offers pull-down cirteria lists.
                                                      In clextra you are presented a page of creiteria to
                                                      select one-click for the required listings.
http://clextra.com

479   IT MIS EDP      Operations   Search-List-Compa    A unique design approach in clextra allows most
      ref : TC14                   re                   information to short-listed first from a
                                                        Search-Breaker choice allowing slicing and
                                                        diciing of the same data from different user
                                                        view-points.

480   IT MIS EDP      Operations   Remote Support       A range of options and in-built Systems,
      ref : TC15                                        Programs, Controls, Checks and Balances for
                                                        Remote and Virutal Support.

481   IT MIS EDP      Operations   Campaign Feature     Campaign or Service Plan. This code across all
      ref : TC16                                        modules allow a Plan or Campaign based search
                                                        retrieval and grouping of any part of most
                                                        information within clextra.

482   Warehousing     Strategic    Warehousing and      Options for inventory 3PL, 4PL or 5PL managed.
      and Logistics                VMI                  RFID and Internet enable; remote 24x7x365 focus
      ref : UA01                                        on India for physical delivery and logistics with
                                                        Global Information access.

483   Warehousing     Strategic    Vehicle Servicing    Car and other Service Garages require a unique
      and Logistics                Solution             flow of acquiring returning vehicles. Staff are
      ref : UA02                                        accountable; inventory is used; tools are
                                                        distributed; expensive plant and machinery has to
                                                        be charged. Accounting is automated.

484   Warehousing     Strategic    Geographic           When thousands or millions of pieces of your
      and Logistics                Inventory Solution   expensive assets are spread across a city, state,
      ref : UA03                                        country or internationally you need to know and
                                                        track every piece of deployed equipment or asset.
                                                        While Google or Mapquest gives you a real-world
                                                        it has still to be code-mapped into legacy or new
                                                        IT systems. clextra provides a framework for this.

485   Warehousing     Tactical     Commute Travel       Local commute; travel logistics. Bus Schedules;
      and Logistics                Logistics            Timings; Self-Services; anywhere-access; with
      ref : UB01                                        sub-contract access.

486   Warehousing     Tactical     Locations of Stock   Many will admit they do not know where there
      and Logistics                                     physical stock is. clextra provides a
      ref : UB02                                        comprehensive solution for finger-tip; one-click
                                                        away know-how on Stock whereabouts across the
                                                        organisation.

487   Warehousing     Tactical     Vehicle Known        Apartment Towers and Commercial Complexes
      and Logistics                Parking - Tracking   match of Parking slots to Owners-Tenants or
      ref : UB03                                        Businesses and also of Drivers etc. Gate
                                                        movement IN and OUT linke to availability of
                                                        RFID or other Technology.

488   Warehousing     Tactical     Vehicle Unknown      Free Parking Camp Sites Controlled areas count
      and Logistics                Parking - Tracking   and basic information on Parking slots and of
      ref : UB04                                        Drivers etc. Gate movement IN and OUT linke to
                                                        availability of RFID or other Technology.

489   Warehousing     Operations   Location to          Distance; Cost per kg; Time taken from any one
      and Logistics                Location Tables      location or store to any other.
      ref : UC01
490   Warehousing     Operations   Checklists           Checklists for accountability; Delivery; Quality;
      and Logistics                                     Time and Costs incurred for Packing Slips;
      ref : UC02                                        Installation; Delivery; Documentation; Payments;
                                                        Collection etc.

491   Warehousing     Operations   Docket Tracking      Product Maintenance; Helpdesk; Software
      and Logistics                                     Support; Medical Diagnostics Procedures; Plant
      ref : UC03                                        Maintenance; Equipment Servicing; any industry
                                                        especially with more than 10 steps; involving
                                                        more than 1 person; and spread over time and/or
                                                        geographical locations.

492   Warehousing     Operations   Physical Assets      Physical Location of Assets and Equipment.
      and Logistics                Locator              Premises, FloorPlan etc.
      ref : UC05
http://clextra.com

493   Warehousing     Operations   Assets in Process    Track an asset within a Workflow or Schematic
      and Logistics                Locator              Chart.
      ref : UC06
494   Warehousing     Operations   Location of Assets   Many will admit they do not know where there
      and Logistics                                     physical assets are. clextra provides a
      ref : UC07                                        comprehensive solution for finger-tip; one-click
                                                        away know-how on Assets whereabouts across the
                                                        organisation. RFID and other technologies are
                                                        required for Mobile assets.

495   Warehousing     Operations   Locations of         Many will admit they do not know where there
      and Logistics                Premises             Business presence is. clextra provides a
      ref : UC08                                        comprehensive solution for finger-tip; one-click
                                                        away know-how on Physical
                                                        Location-Premises-Stores etc. whereabouts across
                                                        the organisation.

496   Warehousing     Operations   Outstation Travel    People travel as a plus and minus of Logistics.
      and Logistics                                     Travel Sheets Accounting and Management.
      ref : UC09
497   Warehousing     Operations   GPS                  Interface between GPS or UTM Maps to
      and Logistics                Map-Information      Databases Information Workflow Checklists etc.
      ref : UC10                   System               Manual and Automated options.

498   Warehousing     Operations   From and To          Information between any 2 important points -
      and Logistics                information          especially when 1000s of points - can be
      ref : UC11                                        maintained visually with a data interface.

499   Workflow and    Strategic    Integrated Project   Make or Buy, Time-Sheets, Finance, Budgeting,
      Communication                Environment          Chart of Accounting, Expenses Control, Bill of
      s                                                 Materials, Manufacturing Tracking, Out-source
      ref : VA01                                        management.

500   Workflow and    Strategic    Project              User-definable Account Groups. Daily, Weekly or
      Communication                Management           Monthly Targets spreadsheet generation.
      s                            Budgeting            Automated pull or manual entry of Perido to Date
      ref : VA02                                        and Period data. Gap calculator. Universal and
                                                        Familiar spreadsheet interface.

501   Workflow and    Strategic    Project              For every Project or Task upto 9 stages of
      Communication                Management           estimation each with upto 3 levels of Grouping.
      s                            Estimation
      ref : VA03
502   Workflow and    Strategic    Project Work         Methodology and Tool to design, create, maintain
      Communication                Break-down           and use Project Workbreakdown Structures
      s                            Structure            using dICA and-or d-ITT-o.
      ref : VA04
503   Workflow and    Strategic    Project Components   Track all related information regarding
      Communication                                     Resources, Time, Money and Scope.
      s
      ref : VA05
504   Workflow and    Tactical     Project Estimation   Upto 9 points of Estimation with user-definable
      Communication                                     Heads. Can be linked to Budgets, Actuals and
      s                                                 WBS
      ref : VB01
505   Workflow and    Tactical     Project Tasks        Pre, In and Post Project tangible and intangible
      Communication                Evaluation           evaluation of ten key user-definable metrics.
      s
      ref : VB02
506   Workflow and    Tactical     Project clextra      Any user-definable visuals and links to most
      Communication                Artworks Feature     aspects of any part of any Project for ease-ofuse
      s                                                 and macro or micro management.
      ref : VB03
507   Workflow and    Tactical     Project Risk         Quantified risk against any and all aspects of a
      Communication                Metrics              Project.
      s
      ref : VB04
508   Workflow and    Operations   Project              Setup project and groups of projects, establish
      Communication                Documentation        unlimited Documents against each.
      s                            Directory
      ref : VC01
http://clextra.com

509   Workflow and    Operations   Project             Project and/or Task related Documentation.
      Communication                Documentation on    Options of Directory type, Correspondence.
      s                            Tasks               User-definable 10x10 or more Topical any filetype
      ref : VC02                                       centrali repository. Learning and Training
                                                       related content. Forms and Templates.

510   Workflow and    Operations   INFRASTRUCTUR       For Networked Enterprise solutions for
      Communication                E                   Blackboard, Whiteboard, Paintings, Photographs
      s                                                etc. Servers, Networking, Wireless, Bandwidth
      ref : VC03                                       etc. available as single-point FULL solution on
                                                       request.

511   Workflow and    Operations   Whiteboard          Centrally remote managed individual kiosk-type
      Communication                                    one-way display of Shopfloor Information,
      s                                                Instructions Sheets, Production Dashboards or
      ref : VC04                                       any PPT slide presentation like visual in
                                                       formation.

512   Workflow and    Operations   Blackboard          Centrally remote managed individual kiosk-type
      Communication                                    one-way Digital TV or Minotor display
      s                                                of.Business, Guest, Employee, Visitor, Patient
      ref : VC05                                       information. Real-Time Signage. Full solution
                                                       owned, leased, monthly subscription or
                                                       pay-per-use options.

513   Workflow and    Operations   Paintings           Centrally remote managed individual kiosk-type
      Communication                                    one-way Digital TV or Minotor display
      s                                                of.Paintings - Royalty free or Owned-Purchased
      ref : VC06                                       by you Full solution owned, leased, monthly
                                                       subscription or pay-per-use options.

514   Workflow and    Operations   Photographs         Centrally remote managed individual kiosk-type
      Communication                                    one-way Digital TV or Minotor display of
      s                                                Photographs - Royalty free or Owned by you Full
      ref : VC07                                       solution owned, leased, monthly subscription or
                                                       pay-per-use options.

515   Workflow and    Operations   eCatalogue          Centrally remote managed individual kiosk-type
      Communication                                    one-way Shopfloor Digital TV or Minotor display
      s                                                of Retail Items from Inventory. Full solution
      ref : VC08                                       owned, leased, monthly subscription or
                                                       pay-per-use options.

516   Project         Strategic    Infrastructure      An internet-intranet-extranet 24x7 collaborative
      Management                                       environment is established when clextra is
      ref : WA01                                       deployed.

517   Project         Strategic    Stakeholders        Investors; Employees; Customers and Supplier
      Management                                       communications can be integrated or kept
      ref : WA02                                       separate.

518   Project         Strategic    Brand Development   Allows dual-branding and development of your
      Management                                       own Service-Lines or Service-Brands
      ref : WA03
519   Project         Strategic    Values              Open architecture; based on Trust;
      Management                                       Transparency; encouraging dialogue as the only
      ref : WA04                                       means to resolve differences in culture;
                                                       work-styles; goals and objectives.

520   Project         Strategic    User Support        CxO level Consulting and Mentoring support and
      Management                                       services to ensure your own and clextra goals are
      ref : WA05                                       achieved.

521   Project         Strategic    Customer Response   Walkin customers at Retail Stores; Call-centres;
      Management                                       Tech-Support or Major Account help-desks can
      ref : WA06                                       record Product-wise feedback, response,
                                                       enquiries for every customer. This can be
                                                       centrally or nominated-person responded to by
                                                       email OR phone in the most appropriate way.
                                                       This is a part of the Affinity - Loyalty Card
                                                       Module of clextra.

522   Project         Strategic    TDEM                Complete solution.
      Management                                       Product-Services-Strategy-Tactical to Operations
      ref : WA07                                       for a one-off or continuous Targetted Direct
                                                       eMail Marketing Programme.
http://clextra.com

523   Project      Strategic    Alert System          On login - deMail and/or Alerts. Subject to local
      Management                                      and international Service Providers clextra
      ref : WA08                                      supports SMS and GRPS mobile interactive text
                                                      communications.

524   Project      Strategic    Workflow Strategic    Options on a range of featues linked to cash time
      Management                                      and ROE ROI on ay aspect of your business.
      ref : WA09
525   Project      Tactical     Portal                Provides a portal allowing access to any and all
      Management                                      other IT Products and Services.
      ref : WB01
526   Project      Tactical     Storage and Archive Centralised Corporate Storage of all written -
      Management                                    messaged communications.
      ref : WB02
527   Project      Tactical     Help                  Tactical what-if scenarios from alternate
      Management                Documentation on      mirror-instances; planning; forecassting; target
      ref : WB03                Models                vs actual comparisons on Delivery; Quality; Cost
                                                      and Time

528   Project      Tactical     User Support          Tactical on-going functional support which are
      Management                                      out-sourced or consulting specific to HR;
      ref : WB04                                      Finance; Sales; Marketing; Delivery;
                                                      Manufacturing or Trouble-shooting as availed of.

529   Project      Tactical     House Magazine        View current and past issue. Uploaded and
      Management                                      managed from a central single location.
      ref : WB05
530   Project      Tactical     Corporate             View current and past issue. Uploaded and
      Management                Newsletter            managed from a central single location.
      ref : WB06                                      Customer self-service OR OR mailing list OR
                                                      electronic mailing services are separate features
                                                      or additional service.

531   Project      Tactical     Minutes of Meetings   Collaborative minutes of meetings recorded and
      Management                                      managed by the creator. View at any time by all
      ref : WB07                                      members who attended. Agenda for a meeting can
                                                      be sent and made available to this group with the
                                                      same document. Attachment option for more
                                                      complex Minutes or pre-defined template
                                                      formats.

532   Project      Tactical     Workflow Tactical     Options on a range of featues linked to cash time
      Management                                      and quality from Production Lines Teams and
      ref : WB08                                      Individual make or buy and other areas for pre,
                                                      during and post order decision making.

533   Project      Operations   Privacy and           Works independent of conventional email
      Management                Security              avoiding its pitfalls and problems. Access and
      ref : WC01                                      controls on a need-to-have and need-to-basis only.

534   Project      Operations   Multimedia            Visual access; use-of-colour;
      Management                                      text-voice-broadband; mobile; wireless and
      ref : WC02                                      emerging technologies.

535   Project      Operations   Context-related       Topic and context specific communications
      Management                                      forcing precise and focussed communications.
      ref : WC03
536   Project      Operations   Help                  Extensive and detailed documentation for actual
      Management                Documentation on      step-by-step howto for import; export setup.
      ref : WC04                Logic
537   Project      Operations   User Support          Immediate presence Support Executives or
      Management                                      Operators and technical 24x7x365 support via
      ref : WC05                                      emal; clextra Bouquets and Brickbats response
                                                      system and Pedro Customer Call Management.

538   Project      Operations   Communications.       Internal email; to teams or up to 12 allowed
      Management                Internal …            Grades. Subject to availability of existing
      ref : WC06                                      infrastructure & technical feasibility. Archive of
                                                      all such communications.
http://clextra.com

539   Project           Operations   Communications.        External email; to teams or up to 12 allowed
      Management                     External …             Grades. Subject to available ISPs & Service
      ref : WC07                                            Providers offer and technical feasibility. Archive
                                                            of all such communications.

540   Project           Operations   Communications.        Cell-mobile Phone SMS messaging to teams or up
      Management                     Cell-mob …             to 12 allowed Grades. Subject to available ISPs &
      ref : WC08                                            Service Providers offer and technical feasibility.
                                                            Archive of all such communications.

541   Project           Operations   Notice Board           Set of the last 16 Notices. Corporate Notice
      Management                                            Board.
      ref : WC09
542   Project           Operations   Corporate Diary        Corporate holidays; Events; Schedules; Training
      Management                                            calendar etc. Individually accessible
      ref : WC10
543   Project           Operations   Personal Classifieds   Place, View and Manage personal classifieds of
      Management                                            upto 9 categories. Buy, Sell or Other.
      ref : WC11
544   Project           Operations   Mailing Labels         Print hard-copy addresses for postal mail to
      Management                                            Employees, Customers, Vendors or Contact
      ref : WC12                                            Firms for Pre-sale, in-sale or post-sale
                                                            communications.

545   Project           Operations   MailMerge - HTML       Manage HTML mail merge facility for internal
      Management                                            lists or external lists. Useful for Subscriber or
      ref : WC13                                            Customer Communications, Letters to vendors,
                                                            Distance Learning Communications etc.

546   Project           Operations   MailMerge - PDF        Manage PDF mail merge facility for internal lists
      Management                                            placed automatically into individual clextra
      ref : WC14                                            cupboards. Uses include; Appraisal Letters or
                                                            Compensation Letters to each Employee etc. PDF
                                                            is forwarded, stored and/or printed as required.

547   Project           Operations   MailMerge -            Use clextra to manage and export lists for use
      Management                     Integration            with standard Word Processing Packages for
      ref : WC15                                            printing or creating custom word-processing
                                                            documents.

548   Project           Operations   Soft Copy              Centraliseed scan of all Corporate documents.
      Management                     Document               Bin them to the appropriate Individual, Team or
      ref : WC16                     Management             Workflow Checklist for one-oint single file central
                                                            access control and administration.

549   Project           Operations   Workflow               Day to day - where technical feasible - minute to
      Management                     Operational            minute operational dashboards alerts on any
      ref : WC17                                            aspect of your business across loations regions
                                                            and time-zones.

550   Project           Operations   WBS                    Work Breaddown Structure. Format any
      Management                                            complex Project or Domain areas into 5 levels of
      ref : WC18                                            managable trer-like lists using the clextra
                                                            structured Module-Block-Segment approach.

551   Technologies      Strategic    Open Source            Open Source potential integration import-export
      and Integration                                       to any electronic platform including major ERP
      ref : XA01                                            packages AND most existing functional LEGACY
                                                            packages.

552   Technologies      Strategic    RFID                   RFID Enable across the package to support
      and Integration                                       16-char EPC or other standards for Product;
      ref : XA02                                            People or Asset tags.

553   Technologies      Strategic    Thin-Client            Thin-Clients and Server-Technologies reduce
      and Integration                                       TCO - Total Cost of Ownership quite
      ref : XA03                                            dramatically. clextra is an ideal Software
                                                            Compoent in this Solution.
http://clextra.com

554   Technologies      Strategic    Internet              Brings all the advantages of the internet - intranet
      and Integration                                      - extranet - with adequate safeguards against the
      ref : XA04                                           dis-advantages. Allows only known users with
                                                           specific 2-levels of login.

555   Technologies      Strategic    Browser               Brings all the ubiquitous benefits of using any
      and Integration                                      browser - all access including System
      ref : XA05                                           Administration from a web-browser interface.

556   Technologies      Strategic    unix                  Standard open operating system allows modular
      and Integration                                      development dis-aggregated add-ons; device
      ref : XA06                                           independence; hardware add-ons; remote
                                                           communications; uptime; least-baby-sitting of all
                                                           operating systems.

557   Technologies      Strategic    Technologies          The future now. Integrated RFID; thin-client;
      and Integration                                      wireless access any-device add-on.
      ref : XA07
558   Technologies      Strategic    clextra CAM           Using the Customer Applications Menu feature -
      and Integration                Feature               every and ALL local, intranet or external
      ref : XA08                                           customer applications can have a link within
                                                           dexra - making it your ONLY Portal with all the
                                                           access controls available including dual-system
                                                           logon.

559   Technologies      Strategic    dPay Payment          clextra Payment Gateway. In and outflow of
      and Integration                Gateway               ePayments; credit or debit; pre-paid or pos-paid;
      ref : XA09                                           cash or bank; inflow and outflow controls
                                                           trhough secure systems and process, encryption
                                                           and verification options; choice of vendors;
                                                           banks. Subject to technical dfeasibility and
                                                           risk-acceptance of key-stakeholders.

560   Technologies      Strategic    DON Feature           Online forms can be integrated from a new
      and Integration                                      independent webpage OR linked to your existing
      ref : XA10                                           Websites to any existing clextra application or
                                                           module as a custom-configured feature.

561   Technologies      Tactical     Grill Feature         Apply pre-stored and customisable grill to view
      and Integration                                      data especially Time-Series from a variety of
      ref : XB01                                           analytical perspectives.

562   Technologies      Tactical     User Definable Help   You can create and define your own help for each
      and Integration                                      of these within your package.
      ref : XB02
563   Technologies      Tactical     Bouquets and          This is a feedback link available on every menu to
      and Integration                Brickbats             allow any and all users to provide immediate
      ref : XB03                                           feedback to dexttra and your personnel on any
                                                           problems; suggestions; feedback; complaints;
                                                           non-functionality etc.This should be seen FIRST
                                                           by your nominee and then referred to your
                                                           clextra Channel Partner.

564   Technologies      Tactical     Pedro                 Pedro - the customer support mascot offers
      and Integration                                      24x7x365 remote quick-response support.
      ref : XB04
565   Technologies      Tactical     Tunnel Feature        Allows shift from one clextra installation instance
      and Integration                                      to another without logging in again.
      ref : XB05
566   Technologies      Tactical     Import-Export         Import-export and potential real-time - definitely
      and Integration                                      batch - to an TCP/IP device logged information.
      ref : XB06
567   Technologies      Tactical     Easy import-export    DIY - Do-it-yourself CSV; HTML and XLS batch
      and Integration                                      import-export to any application including major
      ref : XB07                                           ERP packages.

568   Technologies      Operations   Memory                Level I and-or Level 2 individual short-term
      and Integration                                      memory remembers the last usage of several
      ref : XC01                                           features.
http://clextra.com

569   Technologies      Operations   Single Sign-on        To enhance usability and ease of use once
      and Integration                                      established allows by-passing the 2-layer login
      ref : XC02                                           feature.

570   Technologies      Operations   Single Menu           Once established and if only a few access are
      and Integration                                      required for the organisation - a simple single
      ref : XC03                                           menu ONLY can be turned on for the entire
                                                           installation instance.

571   Technologies      Operations   Words Feature         Every industry has different words for the same
      and Integration                                      thing. Patient or Student or Customer. Doctor or
      ref : XC04                                           Manager etc. Use words in clextra specific to your
                                                           industry across the package.

572   Technologies      Operations   Touch & Feel.         With nice-to-have-details such as pre-loaded
      and Integration                Ergonomics            templates; models; and a Thought-for -the-day on
      ref : XC05                                           every logout.

573   Technologies      Operations   Extensive About,      Help. Extensive inbuilt background information
      and Integration                Help & Usage          and reading. Context related help; and even
      ref : XC06                                           user-definable help. Once you have established
                                                           your metrics.

574   Technologies      Operations   Response &            Nobody is perfect. If there is anything we can do
      and Integration                Feedback to clextra   to help, suggestions, feedback, bricks and
      ref : XC07                                           bouquets you can send them to us with an every
                                                           menu-screen option of an R.S.V.P.

575   Technologies      Operations   Equipment interface TCI-IP, RS-232C; X-25 etc.Interface to
      and Integration                                    equipment such as XML, DICOM standards in
      ref : XC08                                         Healthcare etc,

576   Technologies      Operations   Instrumentation       Gauges; graphs; visuals and alerts to monitor any
      and Integration                Dashboard             equipment activity on-demand - at browser
      ref : XC09                                           load-time.

577   Technologies      Operations   Real-time Presence    RFID - Subject to Technical & Geographic
      and Integration                on Shopfloor          Feasibility and availability of Technology such as
      ref : XC10                                           RFID Tags; list all employees present; absent; etc.

578   Technologies      Operations   ODX Feature           Import any spreadsheet with heads and multiple
      and Integration                                      rows - Data Sheet. Convert each to individual
      ref : XC11                                           PDFs and place in individual cupboards
                                                           completely automated. Eg. Monthly Customer
                                                           billing, Canteen Usage, Payslips, Medical Record
                                                           etc.

579   Technologies      Operations   Secuirty Camera       Any number of locations upto 200 cameras in
      and Integration                                      each thumbnail cab be brought to bring last
      ref : XC12                                           frame-capture or real-time video depending on
                                                           IPTV bandwidth and infrastructure deployed.

580   Technologies      Operations   clextra diofta        Query clextra from a handheld or text-browser
      and Integration                                      device on a range of keywords and return text
      ref : XC13                                           data, voice, visuals and related multimedia
                                                           information from a centralised or de-centralised
                                                           information system.

581   BASE Access       Strategic    Strategic Decisions   Take decisions on internal Transparency levels;
      and                                                  Culture direction; Mission Alignment; Vendor
      Information                                          Dependence; fixed and variable costs; and all
      ref : YA01                                           related Commercial and consequent Risk factors.

582   BASE Access       Strategic    Vendor Self-Service   Need to use and access; communications;
      and                                                  data-entry; 24x7 remote; consultants and
      Information                                          out-sourcing collaboration.
      ref : YA02
583   BASE Access       Strategic    Customer              Need to use and access; communications;
      and                            Self-Service          data-entry; 24x7 remote; consultants and
      Information                                          out-sourcing collaboration.
      ref : YA03
http://clextra.com

584   BASE Access   Strategic    Dual-System           A unique design in clextra allows a dual-system
      and                                              login. Employees are different from Customers.
      Information                                      Vendors from Clients; Doctors from
      ref : YA04                                       Administrators; Nurses from Patients etc. It
                                                       provides significant advantages when you
                                                       implement this.

585   BASE Access   Strategic    clextra               Each and all of the moduels as Strategic Tactical
      and                        Configurator          or Operational can be activated de-activated
      Information                                      selected configured and managed with varying
      ref : YA05                                       degrees of automation. This is the clextra
                                                       Configurator.

586   BASE Access   Tactical     Management            Every employee using current employee ID
      and                        Self-Service          and/or clextra ID can login and use all features
      Information                                      relevant to an an individual.
      ref : YB01
587   BASE Access   Tactical     Vendor Self-Service   Need to use and access; communications;
      and                                              data-entry; 24x7 remote; consultants and
      Information                                      out-sourcing collaboration.
      ref : YB02
588   BASE Access   Tactical     Customer              Need to use and access; communications;
      and                        Self-Service          data-entry; 24x7 remote; consultants and
      Information                                      out-sourcing collaboration.
      ref : YB03
589   BASE Access   Tactical     Soft Information -    Beyond the call of duty; potential; talent;
      and                        Employees             capacity; decides where they will take your
      Information                                      business in the coming years. Allow your
      ref : YB04                                       employees to handle soft-information as a
                                                       self-service.

590   BASE Access   Tactical     Soft Information -    It is easier to follow than lead. Leaders with
      and                        Manager-Leaders       Psychological Damages can Damage your Brands
      Information                                      and your Company itself. It is the Soft
      ref : YB05                                       Information that matters.

591   BASE Access   Tactical     Soft Information -    The more you know about your Customer as a
      and                        Customers             Group of Individual Buyers your success rates are
      Information                                      going to increase logarithmically. Your
      ref : YB06                                       black-book on Customers.

592   BASE Access   Tactical     Soft Information -    Knowing your vendor well is the key to
      and                        Vendors               Supply-Chain-Management Fundamentals.
      Information
      ref : YB07
593   BASE Access   Tactical     Soft Information -    Security systems depend on early warning of
      and                        Visitors-Guests       Friend-or-Foe. Signals, patterns & intuition.
      Information                                      Easy, comfortable access to those who deserve
      ref : YB08                                       and absolute IRON GATES for those NOT
                                                       deserving; requires plenty of Soft Information.

594   BASE Access   Tactical     Facing Setup          Every clextra instance is typically employee
      and                                              Facing. However, it can also be set to Customer;
      Information                                      Vendor; Patient; Student; Doctor; Asset; Patent;
      ref : YB09                                       Subcriber or any other-Face independently or in
                                                       parallel.

595   BASE Access   Operations   Employee              Every manager or Team Leader; subject to
      and                        Self-Service          set-up; has access to ALL information on his or
      Information                                      her Team Members and other engaged; activated
      ref : YC01                                       and access-allowed clextra Modules.

596   BASE Access   Operations   Vendor Self-Service   Need to use and access; communications;
      and                                              data-entry; 24x7 remote; consultants and
      Information                                      out-sourcing collaboration.
      ref : YC02
597   BASE Access   Operations   Customer              Need to use and access; communications;
      and                        Self-Service          data-entry; 24x7 remote; consultants and
      Information                                      out-sourcing collaboration.
      ref : YC03
http://clextra.com

598   BASE Access   Operations   clextra            Single graphic interface menu to access most
      and                        Manufacturing      relevant modules related to Manufacturing and
      Information                Bouquet            Order Processing and Tracking
      ref : YC04
599   BASE Access   Operations   clextra CRM        Single graphic interface menu to access most
      and                        Bouquet            relevant modules related to a Customer Enquiry,
      Information                                   contacts and Tracking follow-up
      ref : YC05
600   BASE Access   Operations   clextra PMS        Single graphic interface menu to access most
      and                        Bouquet            relevant modules related to a full cycle of
      Information                                   Employee as a Performance Management System.
      ref : YC06
601   BASE Access   Operations   clextra LMS        Single graphic interface menu to access most
      and                        Bouquet            relevant modules related to a full cycle for
      Information                                   Training and Learning using most salient features
      ref : YC07                                    of the clextra Platform

602   Content and   Strategic    Content Strategy   In an era of information overload deciding what
      Verticals                                     information learning and teaching is required by
      ref : ZA01                                    your entire workforce to mmet your business or
                                                    organisation goals. Manpower planning and
                                                    establishing the strategy for this.

603   Content and   Strategic    INTRANET           Base login and options on links menus to access
      Verticals                  PORTAL             MOST other applications within the Corporate
      ref : ZA02                                    Intranet. Access to external Vendors and
                                                    Customers for self-service etc.

604   Content and   Strategic    RETAIL             Retail Management Accounting and Control
      Verticals                                     Systems and Solution : Industry Level Solution
      ref : ZA03                                    vertical from Strategy to Operational Software
                                                    Tools and Automation Integration. Horizontal
                                                    across Sourcing; Inventory; People; Finance;
                                                    Cash-flows; Brand-Assortment and Profitable
                                                    lines. Risk Management. CPFR.

605   Content and   Strategic    AGRO               Agriculture Management Accounting and
      Verticals                                     Control Systems and Solution : Seed to Market.
      ref : ZA04
606   Content and   Strategic    SERVICES           Services Management Accounting and Control
      Verticals                                     Systems and Solution. Top-level metrics on
      ref : ZA05                                    Service-Levels with drill down to detailed
                                                    per-person per-station per-measure
                                                    data-collection hourly; daily; weekly; monthly or
                                                    quarterly across any number of
                                                    customer-accounts.

607   Content and   Strategic    LEGAL              Small and Medium Lawfirms complete solution
      Verticals                                     for a collaborative environment to manage cases,
      ref : ZA07                                    communications, follow-up, accouting, domain
                                                    knowledge, documentation repository, tracking,
                                                    research etc.

608   Content and   Strategic    TRADE              Trading Activity Management Accounting and
      Verticals                                     Control Systems and Solution :
      ref : ZA07
609   Content and   Strategic    DIGITAL            Digital Content Management Accounting and
      Verticals                  CONTENT            Control Systems and Solution :
      ref : ZA08                 MANAGEMENT
610   Content and   Strategic    BANKING MACS       Basel-II Principles; Post-dated-Cheques;
      Verticals                                     micro-Finance Management, Risk-Metrics;
      ref : ZA09                                    Verification; Checklists; Step-Cycles.

611   Content and   Strategic    INSURANCE          Insurance Premia, Agent Information; Incentives
      Verticals                  MACS               Planning; Risk Metrics; Portfolio Management;
      ref : ZA10                                    AR, AP, Procurement, Cashflow, Forecasting,
                                                    Budget etc.

612   Content and   Strategic    HEALTHCARE         Administrators; Business Metrics; Doctors;
      Verticals                  MACS               Patient History; Case History; multi-modality;
      ref : ZA11                                    whole-health approach. Third-party insurers;
                                                    nursing access; multimedia electronic records;
                                                    DICOM file imports
http://clextra.com

613   Content and   Strategic   TELECOMM        Subscriber information black-book; Campaigns
      Verticals                                 and Plans; Demographics; Psychographics and
      ref : ZA12                                Geographic information. Automation-interface to
                                                Equipment. Out-sourced Modules-Components
                                                Management. Digital paperless eCash Vouchers
                                                for pre-paid mobile services.

614   Content and   Strategic   EDUCATION and   Teacher-Mentor and Student database; Syllabus
      Verticals                 CONTENT         Management; Hourly usage Billing Management.
      ref : ZA13                                24x7 Remote access. Learning and/or Training
                                                Styles. Excellent for Distance Learning
                                                Institutions. Teacher feedback on Studen
                                                Progress. Mentor access.

615   Content and   Strategic   Verification    Verification services for pre-paid Telecomm,
      Verticals                 Services        Homeland Security, Financial risk investments or
      ref : ZA14                                other consumer documenation plus verification
                                                archive, audit and retrieval for multi-locational
                                                mutlit-utitlity agency access.

616   Content and   Strategic   Card database   Post smartcard or other ID card supply
      Verticals                 Services        after-market services, subscription management,
      ref : ZA15                                authentication and verification, payment history,
                                                personal information system etc.

617   Content and   Strategic   ERM             Enterprise Risk Management measures and
      Verticals                                 metrics across all tangible and intangible assets
      ref : ZA16                                and aspects of the business.

618   Content and   Strategic   EDGE            Edge : Secondary Market; Competitive
      Verticals                                 Information; Industry comparison; Global
      ref : ZA17                                tariffs; ratios and metrics across HR; Finance;
                                                Logistics; Materials; Sales; Purchase; Customers;
                                                Vendors etc.

619   Content and   Strategic   VALUE           Valuation : non-Listed companies desirous of
      Verticals                                 increasing their Valuation. Financial and
      ref : ZA18                                Management Accounting; Team Development;
                                                Patents; IPR; investor relationships;
                                                transparency; etc.

620   Content and   Strategic   CRM             Identifying, Knowing, Maintaining a contact and
      Verticals                                 return on investment profile of every small or
      ref : ZA19                                large account linked to Product Lifecycle
                                                Returns.

621   Content and   Strategic   SCM             Modules to -Plan-Source-Make-Delivery-Return
      Verticals                                 with options for Strategic Tactical and
      ref : ZA20                                Operational Business Processes.

622   Content and   Strategic   PLM             Product Lifecycle Management. Combines
      Verticals                                 Planning; Stock; Installed Base and Cash
      ref : ZA21                                deployed assigning them to individual
                                                responsibility.

623   Content and   Strategic   EAI             Enterpris Applications Integration assumes a
      Verticals                                 mature organisation with a range of solutions
      ref : ZA22                                already in place. However the need is to proect
                                                investments and integrate existings applications.
                                                clextra is an ideal tool to achieve this.

624   Content and   Strategic   ERP             Catch-all word for Large Software Solutions …
      Verticals                                 everyone has an ERP few deliver. clextra is an
      ref : ZA23                                ERP that delivers.

625   Content and   Strategic   BI              Business Intelligence is akin to Human
      Verticals                                 Intellgience or Military Intelligence. Constantly
      ref : ZA24                                gathering, sifting and storing information for the
                                                ONE time you will need it. Alternately
                                                Dashboards, Cuhing, Analytics, Grills and Bands
                                                are features offered by clextra to study existing
                                                data after IMPORT or EXPORT of available
                                                information.
http://clextra.com

626   Content and   Strategic   KM                    The essence of knowledge is in applying it. clextra
      Verticals                                       is a true to its promise Knowledge Management
      ref : ZA25                                      Solution applicabel to any Enterprise whatever its
                                                      size.

627   Content and   Strategic   Display Signage       Comprehensive Solution. Server Side, Client Side,
      Verticals                 Solution              Systems, Methods, Hardware, Software,
      ref : ZA26                                      Operations, Wired, wireless, scalable, outdoor,
                                                      indoor, home, office, internal or external
                                                      customers etc.

628   Content and   Strategic   Rail Ticketing        Indian Railways, Metro, Automatic Fare
      Verticals                 Solutions             Collection, Integrated with Kiosks, Point of Sale
      ref : ZA27                                      Systems, legacy PCs or Thin-Clients etc.

629   Content and   Strategic   Road Transport        Primarily back-end integration of any and all
      Verticals                 Ticketing Solutions   existing applications with as-needed deployment
      ref : ZA28                                      where gaps in solutions exist.

630   Content and   Strategic   Kiosks-ATM,cash,P     Networked integration of digital, IP wired or
      Verticals                 OS Integration        wireless self-aware devices central re-concilliation
      ref : ZA29                                      virtual to physical inventory synchronisation,
                                                      dervice alerts, routine reporting, multple user
                                                      bases etc.

631   Content and   Strategic   Kiosks-ATM,cash,P     Networked integration of digital, IP wired or
      Verticals                 OS Uptime Services    wireless self-aware devices central re-concilliation
      ref : ZA30                                      virtual to physical inventory synchronisation,
                                                      dervice alerts, routine reporting, multple user
                                                      bases etc.

632   Content and   Strategic   PRAY model for        People Risk Assessment and Yeild. Systems of
      Verticals                 People Risk           metrics to manage any and all persons that any
      ref : ZA31                                      firm interacts with in a Business, Social or
                                                      Community Environment.

633   Content and   Tactical    Content Operations    Establish role based syllabus. Customise this for
      Verticals                                       individuals. Set learning goals. Establish a
      ref : ZB01                                      training calendar. Setup subject wise mentoring.
                                                      Handle this with distance learning. 24x7x365
                                                      training exists today.

634   Content and   Tactical    Boutique Services     Whether integrated or external; one-off or
      Verticals                                       on-going; on-site or off-shore involving; any
      ref : ZB02                                      industry for all functions; 10 or 500 employees
                                                      Boutique; niche and speciality services
                                                      organisations can bring un-believable cost-savings
                                                      for their customers thereby increasing their
                                                      profits.

635   Content and   Tactical    HRIS to HCM           Human Capital Management. People work for
      Verticals                                       People. Without people anything else in Business
      ref : ZB03                                      in incomprehensible. The clextra approach to
                                                      Human Resources and People.

636   Content and   Tactical    Finance               Everything in money terms. Activity; idea; action;
      Verticals                                       time; people; materials; brand; product; teams;
      ref : ZB04                                      seats; cash … The clextra approach to Finance
                                                      using Metrics; Ratios and Costs.

637   Content and   Tactical    Manufacturing         Overall Equipment Effectiveness. Periodic
      Verticals                                       assessment Production Targets and Actual
      ref : ZB05                                      Process Improvement. Quality Metrics. Wastage
                                                      controls. Product-Lifecycle Management Tactical
                                                      Decision Making.

638   Content and   Tactical    Warehouse             End to end multi-location Warehouse and
      Verticals                 Management            Inventory Management full-scope Information
      ref : ZB06                                      and Technology Solution options and Services.
http://clextra.com

639   Content and   Tactical   Logistics             People and things are in different places at
      Verticals                                      different times - they keep moving or have to be
      ref : ZB07                                     known; moved; tracked; costed and Expenses
                                                     managed. The clextra approach to Logistics.

640   Content and   Tactical   Trade or              Periodic assessment Production Targets and
      Verticals                ancillary-manufactu   Actual Process Improvement. Quality Metrics.
      ref : ZB08               ring                  Wastage controls. Product-Lifecycle Management
                                                     Tactical Decision Making. Supplier Ratings; Risk
                                                     Metrics.

641   Content and   Tactical   eCash                 Complete electronic solution for electronic cash
      Verticals                                      management such as pre-paid Vouchers for
      ref : ZB09                                     TeleComm Mobile Services. Payment for Video
                                                     on Demand, Reports downloads, Picture Storage
                                                     etc.

642   Content and   Tactical   Verification          System and Administration including Risk
      Verticals                                      metrics on Distributors, Retailers and
      ref : ZB10                                     Subscribers, Customers. Full-system of
                                                     checklists. Soft-copy storage of documents,
                                                     photss, mutlimedia components, accountability,
                                                     out-sourced management.

643   Content and   Tactical   Marketing and         Portfolio Maps. BCG Matrix. Perception Maps.
      Verticals                Brands                Lead competitor metrics Tracking.
      ref : ZB11                                     Product-Lifecycle Management

644   Content and   Tactical   Sales                 Target Setting. Incentives Planning. Points and
      Verticals                                      Cash options.
      ref : ZB12
645   Content and   Tactical   Communications        Full-system of batch and real-time
      Verticals                                      communications. Messaging; chat; email,
      ref : ZB13                                     attachments; archive; targetted direct email etc.

646   Content and   Tactical   Service Garage        Complete Solution for a Vehicle Services Garage.
      Verticals                                      Intake and Release of Vehicles. Inventory. Tooks
      ref : ZB14                                     tracking. Capx. And OpEx usage. Work
                                                     Assignment and Flow. Billing. Collections.
                                                     Vehicle History.

647   Content and   Tactical   EY Behavioural        In partnership and if an Ernst and Young, Cap
      Verticals                Matrix                Gemini customer 26 point Behvarioual
      ref : ZB15                                     Assessment for employees across the organisation.
                                                     Self-Service and/or Moderated.

648   Content and   Tactical   Gallup Q12            In partnership and if a Gallup customer, 12-point
      Verticals                                      Employee Satisfaction survey across the
      ref : ZB16                                     organisation. Self-Service and/or Moderated.

649   Content and   Tactical   CHRS Competency       CHRS method of Competency Total Solution.
      Verticals                Mapping               Usually with a field Workshop and always
      ref : ZB17                                     Moderated in Self-Service Mode. Upto 2
                                                     Superiors Rating. High integrity of data and
                                                     related Employee Competencies and Skills.

650   Content and   Tactical   APARTMENT             Front-end, Middleware and Back-end for
      Verticals                COMPLEX               end-to-end Convergence. Digital TV, digital
      ref : ZB18               SOLUTION              Audio, Live and Stored, Telephony, Intercom,
                                                     Home security and surveiilance, Metering,
                                                     eCommerce, Subscription Management, Tenant
                                                     Information System, Tenant Profiling, Garage
                                                     Management etc.

651   Content and   Tactical   COMMERCIAL            Front-end, Middleware and Back-end for
      Verticals                COMPLEX               end-to-end Convergence. for Digital Surveillance
      ref : ZB19               SOLUTION              Cameras, TV, Telephony, Utility Metering,
                                                     Budgeting, Facilities Management, Tenant
                                                     Information System, Tenant Profiling, Vehicle
                                                     Access and Information System etc.

652   Content and   Tactical   Performance           Complete Solution for Mandatory Performance
      Verticals                Appraisal for PSEs    Appraisal for Middle Management in India
      ref : ZB20                                     Public Sector Enterprises.
http://clextra.com

653   Content and   Operations   Content              Actual content. Standard repository comes with a
      Verticals                  Management           full license purchase of clextra. Your repositories
      ref : ZC01                                      can be placed as either for Fresher OR Refresher.

654   Content and   Operations   Competition          Track competitor sales; secondary sales;
      Verticals                  Tracking             after-market information; access to field-sales
      ref : ZC02                                      and third-party agency out-sourced
                                                      data-gathering. Gather text intelligence on
                                                      troughs and spikes.

655   Content and   Operations   Performance          Mandatory Performance Appraisal for Top
      Verticals                  Appraisal for PSEs   Management in India Public Sector Enterprises.
      ref : ZC03
656   Content and   Operations   Post-Dated           Personal Loan Portfolio Management. Cars;
      Verticals                  Cheques.             Houses Mortgages; Personal Loans; scan
      ref : ZC04                 ISO-PORRI            cheques; aged; plan cash-flows etc.
                                                      Internet-Secure-and-Outsourced Portfolio of
                                                      Regular Receivables Information.

657   Content and   Operations   Digital Content      Inventory and catalogue of soft-copy online
      Verticals                  Delivery             encrypted files. User or co-ordinator selected,
      ref : ZC05                                      payment options inclue pre or post-paid - other
                                                      options subject to payment gateway availability -
                                                      subscription and subscriber information system
                                                      with access controls and automation options
                                                      including RFID and mifare.

658   Content and   Operations   RSS Feed             RSS Online Feed of user-definable Groups and
      Verticals                  Management           links. Extracted and formatted to be relevant.
      ref : ZC06                                      Option to mix and push into Display Signage
                                                      Applications.

659   Content and   Operations   Voicemail Solution   Integrate with VOIP or web-based comprehensive
      Verticals                                       IP based Voice Mail. To one or more Admin.,
      ref : ZC07                                      Staff or Customer and/or Supplier one-point
                                                      voice communications.

660   Content and   Operations   Videomail Solution   Audio-Vidoe mail communications to one or more
      Verticals                                       Admin. Staff, Customers or Suppliers. Useful for
      ref : ZC08                                      training, learning, saving on travel costs.
                                                      Convergent multimedia broadband solution.

661   Content and   Operations   i3s Solution         Integrated Safety, Security and Surveillance.
      Verticals                                       Bibliography, storage and retrieval of any and all
      ref : ZC09                                      routine, events and alerts information across
                                                      1000s of cameras, sensors of integrated
                                                      broadband digital covergent content.

662   Content and   Operations   QSR Solution         Quick Service Restaurants : Espcially for chains
      Verticals                                       using Tablets connected to Central Servers.
      ref : ZC10                                      Payment Gateways; central Procurement; HR,
                                                      Finance etc. Comprehsnesive Single-Point
                                                      Solution.

Clextra functional listing

  • 1.
    http://clextra.com 1 Management Strategic Where is the cash Critical to any organisation espeicially in its Accounting growth phase is liquidity. Cash can be hidden in ref : AA01 obsoloscent inventory, receivables, bad-debt, non-performing assets, patents, long-term deposits, market-cap., employee talent, retail stock, shrinkage mis-match ... you need to be able to track everything on a daily basis. 2 Management Strategic MACS Management Accounting and Control System : Accounting ref : AA02 3 Management Strategic CRIP Cost, Revenue, Investment or Profit-centre Accounting management with drill-down in all functional ref : AA03 areas including; Assets; IPR; People; etc. 4 Management Strategic Distributed Disparate groups and intent can be brought into Accounting Budgeting. one consolidated budget for a future period of ref : AA04 planning. 5 Management Strategic Demand Planning. Obtain field and soft information and numbers on Accounting future requirements from territories and ref : AA05 individuals ranging in the 10;s to 1000;s. For example how many syringes would be required next year; how much spares should we stock; how many graduate-engineers can we recruit. 6 Management Strategic Balanced Scorecard Allows Financial; Customer; Learning & Growth Accounting & Internal Perspectives on every measure or ref : AA06 metrics within the Organisation enable within the product. 7 Management Strategic Ratios From the 300 metrics or directly Financial ratios Accounting can be obtained as and when required. ref : AA07 Comparison with 2 leading competitors can also be viewed constantly. 8 Management Strategic Ratios 20-of-300 Important-20 of the above 300 can be isolated and Accounting compared with any other ratio as a separate ref : AA08 section. 9 Management Strategic Financial Ratios Key 34 ratios as of any given date can be entererd Accounting and managed manually. ref : AA09 10 Management Strategic Activity Based Comprehensive ABC Financial Practice across Accounting Costing Teams Tasks, Trading, Manufacturing and-or ref : AA10 Individuals 11 Management Tactical Chart of Accounts Internal Financial Chart of Accounts can be Accounting mapped to any other Chart of Accounts to ensure ref : AB01 focus. 12 Management Tactical Intangibles Information can be costed, rated, appreciated or Accounting Information Costing depreciated and retained online. ref : AB02 13 Management Tactical Activity Based Standard ABC Financial Practice across Teams Accounting Pricing Tasks and-or Individuals ref : AB04 14 Management Tactical Indent Management Raise indents from Inventory data. External Accounting System supplier or customer access optional. Self-service ref : AB05 optional. 15 Management Tactical GRIFF Feature Standard in-built forms user-definable table of Accounting rows and columns for user-definable periodic ref : AB06 data capture for any Assembly Line or Machine Process. Overlay of GRILL feature for real-time quick analytics and user-feedback. 16 Management Tactical CIOQ Feature Customer forms for Calibration, Input, Output Accounting and Quality for periodic data-capture from ref : AB07 Assembly or other Production lines.
  • 2.
    http://clextra.com 17 Management Operations Metrics. - maximum 300 = 10 x 6 x 5 Dimensions; each with. I. Target Accounting 300 established; ii. Current Reality and iii. Gap - ref : AC01 Tangible or Intangible; iv. Up-Communication; v. Down-Communication; a. Assigned to; b. Altert Messaging; c. Date; d. Priority; e. Drill-down : Time-Series, Collated etc. 18 Management Operations End-of-Day Feature After establishing all related paratmeters - a Accounting user-customisable single-form entry to collect ref : AC02 End-of-day Financial; Inventory; Volume-flow; Usage and other data on a regular-periodic basis. 19 Management Operations Subscriptions Activation and usability of upto 99 Accounting Management custom-defined Services for millions of ref : AC03 subscribers customers suppliers students or patients. 20 My Clextra Tactical Our Enterprise Yours but for your team, group, others can see ref : BB01 Diary-Calendar your schedule they can setup meetings with and for you etc. 21 My Clextra Tactical My Cashflow Manage Enterprise, Team or Personal Cash-flow ref : BB02 over the next 4 months 22 My Clextra Tactical My Competenices You are the best judge of your current skill-sets ref : BB03 and Skills and competencies. Self-Service of these that Others in the Organisation can view to leverage for Enterprise Benefit. 23 My Clextra Tactical My Travel Local and Outstation Travel log sheets, soft-copy ref : BB04 and filing for approval and re-imbursement. 24 My Clextra Tactical My Reports Filing of Sales Call, Service Call and other ref : BB05 Reporting that you need for yourself and submitted to the Enterprise as your record of on-going work. 25 My Clextra Operations My clextra Featuers to access and view only Menus, Modules, ref : BC01 Areals and Links relevant to your use of clextra. 26 My Clextra Operations My Usual set of Personal clock, calendar, diary, notes ref : BC02 Diary-Calendar-Des etc. ktop 27 My Clextra Operations My ToDo and Next Assign yourself action points. Mark them to ref : BC03 Course of Action another. Have them mark this back to you. They mark their activities to you. 28 My Clextra Operations My Nokia and Import Outlook, Outlook Express or Nokia CSV ref : BC04 Microsoft Contacts email IDs and Contacts and manage them in clextra. 29 My Clextra Operations My Bank Accounts Manage a copy of your Savings Bank Account or ref : BC05 other related Cash Ledgers 30 My Clextra Operations My Classifieds Place, manage and communcate Personal ref : BC06 Classifeds within the Platform 31 My Clextra Operations My Priorities Career Planning and focus on your Job ref : BC07 Description what you have set out to achieve 32 My Clextra Operations Behavioural MySelf A suite of Behavioural, Intelligence and Skills ref : BC08 Assessments to get to know yourself better. 33 My Clextra Operations My Leave Record Manage your attendance, Leave Record. Time ref : BC09 Sheets. Time and Materials
  • 3.
    http://clextra.com 34 My Clextra Operations My Cupboard Online repostiory of all your filed documents ref : BC10 within the Enterprise 35 Delivery Strategic Performance Combining Time-Series with Time-Series Manufacturing Analytics Analysis. ref : CA01 36 Delivery Strategic Cash Location Using the PLM - Product Lifecycle Management Manufacturing feature track Product-Brand-Model wise lock of ref : CA02 cash, inventory, receivables and related fixed or liquid assets. 37 Delivery Strategic Product Costing Product-Brand-Model wise costing - fixed and Manufacturing variable cost spreads. ref : CA03 38 Delivery Strategic Team or Team-wise; Seat-wise; Project or Product Brand Manufacturing Product-Line Model wise profitablity with fixed and variable ref : CA04 Profitablity costs; sales planning and actual data factored in. 39 Delivery Strategic Quality Data Pull upto 9 Quality parameters per-Person; Manufacturing Analytics Model; Product; Brand; Asset; Equipment; ref : CA05 Production-Line and get consolidate figures; comparison and analytics linked to the Time-Series Feature. 40 Delivery Strategic Inventory Analytics Whether a Wholesaler, Distributor, Retailer or Manufacturing Manufacture where is the cash in Inventory - ref : CA06 what is on order - Demand and Supply - Costing - Obsoloscence - Under and over-stocked items; Brands and Planning have all to be seen together to make meaningful decisions. 41 Delivery Strategic Consignment Comprehensive Solution when the entire Manufacturing Inventory inventory is owned by the Enterprise. Eg. ref : CA07 Lanudry handling in a hotel or hospital - inventory of tools in a Service Garage or Kit for Security Staff. 42 Delivery Strategic Stockout The real cost of stock-out … when a retail or Manufacturing Monitoring OEM customer does not get what they want from ref : CA08 you -can affect your very existence. Planning for, not reacting to exceptions, matching demand to supply, shortening supply-cycles, tracking costs may be the very essence of your business. 43 Delivery Strategic Inventory Morph From bill-of-material transactions or other Manufacturing manufacturing, production or value-addition ref : CA09 inventory value, weight or units can be changed according to H.Pine 6-types of modularity. 44 Delivery Strategic ROI on Assets Return on Investment on Plant and Machinery, Manufacturing Production Lines, Tools and Dies. Risk Analytics. ref : CA10 45 Delivery Strategic Carry-In Services Car Garages, high-end Consumer Goods, Manufacturing Solution Jewellery, Art, Antiques brought in for Servicing. ref : CA11 Inventory of assets, parts, people costs, consumables and time on expensive equipment, plant and machinery needs to monitored. Accetpacne and Delivery, accounting, documentation, collections are related financials are extremely important. 46 Delivery Strategic On-Site Services Construction, Apartments, Utitlities, Landscapes, Manufacturing Solution Complexes require routine maintenaqnce. ref : CA12 Suplply from an Inventory of assets, parts, people costs, consumables and time on expensive equipment, plant and machinery needs to monitored. Accetpacne and Delivery, accounting, documentation, collections are related financials are extremely important. 47 Delivery Tactical Continuous On-going work; tasks; projects; process; systems Manufacturing Services. SLA;s with any customer linked to a Team and ref : CB01 Individual measures.
  • 4.
    http://clextra.com 48 Delivery Tactical OEE. Overall Equipment Effectiveness. Essentially a Manufacturing Manufacturing Metrics Model; it can be used to ref : CB02 monitor and connect people performance related to expensive equipment; plants & machinery; work stations; etc. 49 Delivery Tactical OEE Periodic Overall Equipment Effectiveness of Production Manufacturing Lines on Availability, Performance and Quality at ref : CB03 regular periodic intervals .. Monthly, weekly or daily. 50 Delivery Tactical OEE Hourly Overall Equipment Effectiveness of Production Manufacturing Real-Time Lines on Availability, Performance and Quality ref : CB04 real-time hourly, dashboard for each Equipment-Line, 3-shifts etc. 51 Delivery Tactical OEE Performers. OEE Performers. While OEE is great if you are Manufacturing machine dependent; most often; A talented ref : CB05 worker with a machine; An industrious Manager with a shopfloor; or Great Leader of a plant; is able to produce substantially more given the same inputs as the other guy. Find `em. 52 Delivery Tactical Hour Series While the Time-Series can be used for end-of-day; Manufacturing week; month etc. data capture; the hour allows ref : CB06 168 end-of-hour manual; semi-automated or automated entry-input. These may be Production targets; walk-in of people; traffic flow; Quality errors; Energy utilisation or any conceivable data-capture. 53 Delivery Tactical Defect and QC Manage item-wise; defect-wise; stage-wise costs Manufacturing related to waste; redundancy; sales-returns; ref : CB07 defects or any other Quality parameter internal or external. 54 Delivery Tactical Bill of Material Master of Bill of Material for Manufacturing, Manufacturing Masters Recipe or Formulation for Process and ref : CB08 Production Industries. 55 Delivery Tactical Bill of Material Transaction based on the master, calculations can Manufacturing Transactions be automatically posted to Stock transactions. ref : CB09 56 Delivery Tactical Indented Bill of For complex Bill of Materials, Recipes, Manufacturing Materials Formulations etc. a structured breakup from ref : CB10 Inventory using the clextra GiCA method upto 5 levels such as Module Block Sement. 57 Delivery Operations dITTo. Our word for bringing the Individual,Team and Manufacturing Task into your organisation at an integrated ref : CC01 centre. (Acronym of ditto = clextra Individual Task Team Organisation). 58 Delivery Operations Tasks breakdown. Entire organisation or ALL departments, Manufacturing divisions, cost or profit centres into ONE SET of ref : CC02 tasks of 2x2; 3x3; 4x4; 5x5; 6x6; 7x7; 8x8; 9x9 OR a 10x10 matrix. 59 Delivery Operations Sub-Tasks Unlimited number of steps in each pre-defined Manufacturing breakdown task assigned to individual workers or executives ref : CC03 covering dates - time - delivery - quality for each step including where it lies currently and comments to remove bottlenecks. 60 Delivery Operations DQTCS. On Tasks Delivery. Quality. Time. Cost & Security measure Manufacturing for each and all above tasks. ref : CC04 61 Delivery Operations DQTCS on Delivery. Quality. Time. Cost & Security measure Manufacturing sub-Task for each and all the steps or sub-tasks. ref : CC05
  • 5.
    http://clextra.com 62 Delivery Operations Time Series : Allows daily; weekly; monthly direct-data-entry Manufacturing Inventory or automated or semi-automated input from ref : CC06 other systems for Inventory Items issues and Receipts. 63 Delivery Operations Batch-wise Compare batch-wise Delivery-Quality-Time and Manufacturing comparison Cost Target vs Actual. Assign accountability and ref : CC07 monitor efficiency and achievers. 64 Delivery Operations Workflow Tracking Docket or Ticket tracking of any batch or Manufacturing Product or Brand or Model or Order against ref : CC08 pre-defined date; Quality; Cost or Time-taken. 65 Delivery Operations Cycle Steps - Step token. Step by step accoutability. Step level Manufacturing Manufacturing Delivery, Quantity, Cost and Delivery target and ref : CC09 actual. 66 Delivery Operations End-of-Day Feature End-of-day from any number of individuals or Manufacturing store-wise or any-other collection of inventory ref : CC10 related data from across the world if required. 67 Delivery Operations Time Accounting If your business model is primarily based on Manufacturing T&M Time and Materials this is a full ref : CC11 comprehensive scalable option for all your Time Accounting needs at individual; team; Account or Corporate Level. 68 Delivery Operations Digital Assets Inventory of Digital Assets - including eCash Manufacturing equivalent operational establishment, access, ref : CC12 utilisation, controls and accounting. 69 Delivery Operations Order Management Manage and monitor orders from Order Manufacturing Acceptance to Planning, Assigning, Scheduling, ref : CC13 Assigning, Delivery and Follow-up. 70 Delivery Operations Jobs Management Work Orders Management and Machine Manufacturing Allocation. ref : CC14 71 Delivery Operations Jobs Scheduling Job scheduling on start dates, capacity of Manufacturing machines. ref : CC15 72 Delivery Operations Personal - Unstructured Time and Workflow Scheduling for Manufacturing Enterprise self-service and self-time Management and ref : CC16 Scheduling Enterprise Work Scheduling such as Service Garages etc. 73 Delivery Operations Statistical Process Basic chart for Quality based on sample data Manufacturing Control collected per hour. Mean, maximum, minimum, ref : CC17 graph display. 74 Delivery Operations Digital Shopfloor Distributed Shopfloor Whiteboards with Manufacturing Whiteboard centralised individual control on display and ref : CC17 time. For operative instructions, performance and quality feedback, motivation, employee engagement or any other HR objectives. 75 Data Capture Strategic Knowledge Capture Due to IT maturity, Cost and Time implications, ref : DA01 Security and Audit concerns, access controls, system-response-time OR fear of the Internet .. You may find clextra to be the least-cost; quickest-response; easiest-to-deploy knowledge Management resource available in the Global Market. 76 Data Capture Strategic Knowledge Capture Sales Planning. Demand Forecasting. Advanced ref : DA02 - Sales Planning Systems.
  • 6.
    http://clextra.com 77 Data Capture Strategic Knowledge Capture Comprehensive Performance Management ref : DA03 - HR System. 78 Data Capture Strategic Knowledge Capture Reducing Inventory. Increasing Inventory Turns. ref : DA04 - Inventory Product Lifecycle Management. 79 Data Capture Strategic Knowledge Capture Risk Management. ref : DA05 - Finance 80 Data Capture Strategic Knowledge Capture Optimisation. ref : DA06 - Logistics 81 Data Capture Strategic Knowledge Capture Knowledge Repository and Management related ref : DA07 - Other to any other industry or applications such as in Pharma. Medical, Retail, Education, TeleComm. Agro. Manufacturing; Services Delivery or Digital Content. 82 Data Capture Tactical Information Due to IT maturity, Cost and Time implications, ref : DB01 Capture Security and Audit concerns, access controls, system-response-time OR fear of the Internet .. You may prefer to use clextra as your Information Collation and Analytical tool instead of or along with an SAP, Oracle, IBM or other ERP Module or add-on. 83 Data Capture Tactical Information Budget vs Actual Data. Gap Analysis ref : DB02 Capture - Sales 84 Data Capture Tactical Information Performance Appraisal. 360 degree feedback ref : DB03 Capture - HR access. Tanigible vs Intangible Information issues. Competencies Modelling. Collaborative Communications. 85 Data Capture Tactical Information Tracking profitable Products. ref : DB04 Capture - Inventory 86 Data Capture Tactical Information Risk Metrics component data. Cash movement. ref : DB05 Capture - Finance New risks. Closure of existing risks. NPA metrics. 87 Data Capture Tactical Information Scheduling. Analytics. Field and Logs ref : DB06 Capture - Logistics Information. RFID data Analytics. 88 Data Capture Tactical Information Information related to any other industry or ref : DB07 Capture - Other applications such as in Pharma. Medical, Retail, Education, TeleComm. Agro. Manufacturing; Services Delivery or Digital Content. 89 Data Capture Operations Data Capture Due to IT maturity, Cost and Time implications, ref : DC01 Security and Audit concerns, access controls, system-response-time OR fear of the Internet .. You may prefer to use clextra as your Data Capture tool for SAP, Oracle, IBM or other ERP Applications. 90 Data Capture Operations Data Capture - Forecasting by obtaing data from the field or ref : DC02 Sales other sources. Multiple location, multiple product, varied employee-force; limited Internet access etc. Availability of RFID or POS or Inventory related data. 91 Data Capture Operations Data Capture - HR Early stages in Employee Information ref : DC03 availability. Talent and Skills Assessment. Performance Data. Availability of System logs. Equipment data. RFID etc. 92 Data Capture Operations Data Capture - RFID data. Physical Audits. End-of-day Stock ref : DC04 Inventory Positions. Daily consumption, Issues or Receipts. Stock-out Management.
  • 7.
    http://clextra.com 93 Data Capture Operations Data Capture - End-of-day data capture. Budget Management. ref : DC05 Finance Expenses Controls. Cash Transaction Individual Authorisation. 94 Data Capture Operations Data Capture - RFID data. Field-force data-gathering. ref : DC06 Logistics 95 Data Capture Operations Data Capture - Data related to any other industry or applications ref : DC07 Other such as in Pharma. Medical, Retail, Education, TeleComm. Agro. Manufacturing; Services Delivery or Digital Content. 96 Risk and Strategic Risk Strategy Assessing, Designing, Initiating, Deploying, Security Monitoring and Managing a Risk and Security ref : EA01 Practice is an extremely aspect of the Strategic Direction your organisation takes. clextra provides insights into how to go about it. 97 Risk and Tactical Risk Tactical Risk vs Reward, caution, known and quantified Security Management investments and returns, force majeure instances, ref : EB01 insurance cover, prioritising protection, protecting expensive assets, key-employees, establishing barriers against competitive invasion are ALL decisions to be taken based on available information. 98 Risk and Tactical Insurance Tracker Assets Vehicles Movable and immovable Security properties are insured. Appropriate ref : EB02 documentation attached. Dates tracked. 99 Risk and Operations Risk Operational Every transaction, action, decision, asset Security Management involving tangible and intangible factors can be ref : EC01 levelled and a Cost, Threat, Vulnerability and Statistical percentage of possible occurrence assigned. This is a first step to allow Tactical decision making and Strategic Direction to be established. 100 Risk and Operations Staff Risk Rating - Perhaps controversial and used with extreme Security Ranking caution any and all staff can be rated and-or ref : EC02 ranked on CTC Exposure and Threat on current Enterprise Accountability. 101 Finance and Strategic Management The bottomline ... of ideas. Problems. Solutions. Accounting. Models Talent. Skills. The individual ... in a team ... in ref : FA01 your firm ... in an industry ... in your society. ... complex concepts like Financial Ratios; IPR & Assets; Risk Management; M&As 102 Finance and Strategic IPR, Patent & Manage any and all internal Information assets Accounting. Information Assets including; books; reports; trade secrets; ref : FA02 know-how and processes; DVDs; CD-ROMs; Software licences. 103 Finance and Strategic Investment Centre Against Chart of Accounts and-or Management Accounting. Management Accounting and Control Systems monitor ref : FA03 portolios; assets; dividends; share-accounts and other Capital and Investment profiles. 104 Finance and Strategic Profit Centre Against Chart of Accounts and-or Management Accounting. Management Accounting and Control Systems monitor ref : FA04 Revenue and Expenditure on an on-going basis with individual and-or team accountability. 105 Finance and Strategic Sponsorship An internal or external person (Default is the Accounting. CEO) eventually accountable for every Team ref : FA05 Performance and commercial fit into the organisation. 106 Finance and Strategic Chart of Accounts Financial accounting and country-specific Accounting. statutory adherence has to be integrated with ref : FA06 Management Operational Controls and coding systems.
  • 8.
    http://clextra.com 107 Finance and Strategic Chart of Accounts Apart from the core clextra COA it can be used to Accounting. Integration as Master Data Management for Multiple ref : FA07 Financial Accounting Systems key-search and integration. 108 Finance and Strategic Cost Centre Against Chart of Accounts and-or Management Accounting. Management Accounting and Control Systems monitor budgets ref : FA08 and expenditure on an on-going basis with individual and-or team accountability. 109 Finance and Strategic Cost Cutting Assess Expenses. Prioritise. Select and decide. Accounting. Exercise Assign to people. Set targets and deadlines. ref : FA09 Monitor and Manage. Rate quantity and quality. Take corrective action - make mid-course corrections. 110 Finance and Strategic Expenses Budget, Actual, Approvals any and all Accounting. Management procurement controls, management and ref : FA10 monitoring. 111 Finance and Strategic Cash Flow Strategic Coorporate Upto 3 months ahead on 10 Accounting. major heads of outflow and inflow. ref : FA11 112 Finance and Strategic Liquidity For an individual firm or portfolio of firms or Accounting. Dashboard individual wealth cash parameters from Equity, ref : FA12 debt to assets and intangibles with a visual representation of as of date status. 113 Finance and Strategic Firms SWOT Dealing with certain Business Enterprises is risky Accounting. - whether a Customer or Supplier. This also ref : FA13 changes from time to time. You can quatify risk with metrics OR use a Strengths Weaknesses Opportunities and Threats with every firm in your database. 114 Finance and Strategic Contacts SWOT Most Business Risk is created by individuals. Accounting. Apart from risk metrics you can manage a ref : FA14 Strengths Weaknesses Opportunities and Threats related to every Contact whether Supplier Customer or Intermeidiary related to any aspect of your Business. 115 Finance and Strategic Financial Ratios of Any number of firms key 34 ratios on any given Accounting. Firms date. Also future date forecast or planned ratios ref : FA15 as a target for simulation, ERM, ALM and related applications. 116 Finance and Tactical Cash Flow Tactical Cashflow for any indiviudal head upto 3 Accounting. individual months ahead on 10 major heads of outflow and ref : FB01 inflow. 117 Finance and Tactical Tangible Assets Each asset Initial to current cost can be Accounting. Management maintained online and centrally. Equipment, ref : FB02 Plant & Machinery 118 Finance and Tactical Off-Balance Sheet Patents; utilisation and Royalty income tracking. Accounting. Assets Management Internal patent regime development. IPR ref : FB03 management 119 Finance and Tactical Global Books of Cross-Calendar & Cross-Currency reporting. Accounting. Accounts Comparison and Performance Monitoring of ref : FB04 Companies; Divisions & SBUs 120 Finance and Tactical Transactions Manage the information check-points for any Accounting. Checklist kind of transaction, any volume, any industry. ref : FB05 From Driving Licence Issue to Employee Exit control; Customer Order Processing; Interviewing and Reference Checks; Statutory Audits to Bill of Materials availability prior to manufacture. 121 Finance and Tactical Store-wise State taxes applicable to every-item at Accounting. Item-wise Taxes every-store. Management of a consolidated Tax ref : FB06 applicable to each item.
  • 9.
    http://clextra.com 122 Finance and Tactical Cycle Steps - User-definable steps with Delivery; Cost; Accounting. Finance Calendar-Time and Quality Target and Actual ref : FB07 for any process. Example; Loan sanctions; Risk-Assessment; Land-procurement; Customer payments; Receivable and Payable cycles etc. 123 Finance and Tactical Account Employee or Customer Account related Accounting. Management pre-billing day-book equivalent information ref : FB08 Internal management. Upto 9 parallel accounts each with upto 9 heads and unlimited per-day transactions. 124 Finance and Tactical Account Customer, Supplier or any other Account related Accounting. Management pre-billing day-book equivalent information ref : FB09 External management. Upto 9 parallel accounts each with upto 9 heads and unlimited per-day transactions. 125 Finance and Tactical QC Costing Costs involved in Quality Assurance and Quality Accounting. Control are usually hidden and not properly ref : FB10 monitored and perhaps not factored into most Finance, Operational and Product or Project Costing. 126 Finance and Tactical Quicker Cash Support for SWIFT, IBAN, EFT, NEFT and Accounting. Collection RTGS to help financial flows quicker through ref : FB11 your entire Enterprise 127 Finance and Tactical Quicker Cash Support for SWIFT, IBAN, EFT, NEFT and Accounting. Disbursement RTGS to help financial flows quicker through ref : FB12 your entire Enterprise allowing Suppliers to give preference to your orders over your competition. 128 Finance and Operations Capex Spread Corporate spread of CAPEX overheads expenses Accounting. Management or indirect costs over Locations - Seats - Stores - ref : FC01 Teams etc. 129 Finance and Operations Time Series. Spares, Stock & Inventory. Therefore; monitor Accounting. Generic. distributed stocking; A class items; -of ABC ref : FC02 inventory-; Daily, weekly or monthly; Receipts, Issues, Stores Ledger, Consumption etc. 130 Finance and Operations Communications on Communications for each of these 300 metrics Accounting. every Metric Two-way perception of such gaps. Boss ref : FC03 perception number (+4 to -4) and comment of this metric achievement. Subordinate perception number (+4 to -4) and comment of this metric. 131 Finance and Operations Time Series : Allows daily; weekly; monthly direct-data-entry Accounting. Incremental or automated or semi-automated input from ref : FC04 customised other systems. 132 Finance and Operations Time Series : OEE Allows daily; weekly; monthly direct-data-entry Accounting. Linked or automated or semi-automated input from ref : FC05 other systems. 133 Finance and Operations Time Series : Fixed Allows daily; weekly; monthly direct-data-entry Accounting. or automated or semi-automated input from ref : FC06 other systems. 134 Finance and Operations Time Series : Allows daily; weekly; monthly direct-data-entry Accounting. Financial COA or automated or semi-automated input from ref : FC07 based other systems against a standard Financial Accounting Chart of Accounts. 135 Finance and Operations Time Series : On any single Time Series. Analysis; Comparison Accounting. Graphs subject to Technical feasibility and specific needs. ref : FC08 136 Finance and Operations Inventory Books of Inventory : Multiple Location, Stores Ledgers, Accounting. Accounts Consumption, Receipts, Issues. ref : FC09
  • 10.
    http://clextra.com 137 Finance and Operations Basic Bookkeeping Accounting. Multiple Location. General Ledger. Accounting. Sub-Ledgers. ref : FC10 138 Finance and Operations Receivables - Time Series Based. Invoiced. Collected. Accounting. Collections Outstanding. Received. Bad Debt etc. ref : FC11 139 Finance and Operations Bank-Cash Book Bank and-or Cash Entries and sub-ledgers for Accounting. each Login-I Login-2 or Partners ref : FC12 140 Finance and Operations eCash For applications such as Video on Demand; Accounting. Music downloads; Digital Television subscription; ref : FC13 pre-paid Mobile payment a complete solution for paperless pure electronic digital Assets Inventory, Issue, Sales, Management, Monitoring, Accounting and Audit. 141 Finance and Operations Local Travel Local conveyance Sheet Management. Accounting. Accounting Self-Service and potential to move to ref : FC14 full-electronic Management of Local Travel. 142 Finance and Operations Payables Enter - import Master information on all Accounting. Monitoring payables as Invoices. If available scan upload ref : FC15 images or soft-copies. Make persons accountable for this expenditure. Monitor and manage payables. 143 Finance and Operations Invoicing Recommended for low to medium volumes of Accounting. invoices with medium to high value, intensive ref : FC16 follow-up involving multi-location, multi-person follow-up. Especially if it involves long-cycles of follow-up. PDF generated soft-copy is automatically available for storage and forwarding 144 Finance and Operations Delivery Notes Linked to specific Invoices as above hard-copy Accounting. Delivery notes from generated PDF-soft copies. ref : FC17 145 Finance and Operations Pass book Personal Savings Bank or equivalent Bank Book Accounting. for any Login-I, Login-2 or other users within any ref : FC18 system. 146 Finance and Operations Financial Templates Statutory documents and templates Accounting. user-definable and upload of internal and ref : FC19 external Financial due-dilligence and other documents for Financial Management, Accoutning, Bookkeeping or any other organisational purpose. 147 Finance and Operations Legal Templates Statutory documents and templates Accounting. user-definable and upload of current documents, ref : FC20 contracts, NDAs, MOUs and similar templates used in the organisation. 148 Finance and Operations Statutory Templates Statutory documents and templates of current Accounting. Excise, Labour, Income Tax, Sales Tax and ref : FC21 similar statutory forms relevant to your business, uploaded and maintained in any number of user-definable categories and unlimited documents under each category. 149 Administration Strategic Expenses Budgeting Zero-based or past-year based Budget Planning. and MRO Target and Actual. Quarter-Month-Weekly or ref : HA01 Daily Monitoring. 150 Administration Strategic Complex Dockets When a support ticket requires extended periods and MRO Management of time to understand. Related documentation. ref : HA02 Incurs costs and Bill of Materials. Different skills form various team members etc. eg. Software Support. Carry-in-Maintenance etc.
  • 11.
    http://clextra.com 151 Administration Strategic Simple Dockets Simple registry of complaints for monitoring and and MRO Management control. Assignment and follow-up. ref : HA03 152 Administration Strategic Workflow iflow Up to 99 user definable up to 3 accountable and MRO persons self-service Help Desk for any size of firm ref : HA04 for any industry with dates for follow-up metrics reminders etc. 153 Administration Tactical Non-plan, Non-Plane Requests : System of self-service. and MRO beyond-Budget Matrix option. (Mark to Team-Leader OR ref : HB01 Requests One-Person). 2-level Escalation. Dual or Triple Authorisation if required. Login Message Alert. 154 Administration Tactical Firms Forms Every Institution uses forms. The current format and MRO can be made into PDFs or DOCs and placed ref : HB02 on-line centrally for anyone to download / print and use when required. 155 Administration Tactical Firms Forms Use the clextra-Learning Photos feature to create and MRO Training screen-shots and train-explain how your froms ref : HB03 should be filled. 156 Administration Tactical Documentation For extensive documentation across subscribers, and MRO Checklist portfolios. If electronic that OR all steps allows ref : HB04 upload and click-view to pre-defined internal and external logins in the clextra system. 157 Administration Operations Complaints System of self-service. Matrix option. (Mark to and MRO Team-Leader OR One-Person). 2-level ref : HC01 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 158 Administration Operations Consumables System of self-service. Matrix option. (Mark to and MRO Requests Team-Leader OR One-Person). 2-level ref : HC02 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 159 Administration Operations Customer Gifts Matrix option. (Mark to Team-Leader OR and MRO Requests One-Person). 2-level Escalation. Dual or Triple ref : HC03 Authorisation if required. Login Message Alert. 160 Administration Operations Grievances System of self-service. Matrix option. (Mark to and MRO Management Team-Leader OR One-Person). 2-level ref : HC04 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 161 Administration Operations Suggestions System of self-service. Matrix option. (Mark to and MRO Management Team-Leader OR One-Person). 2-level ref : HC05 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 162 Administration Operations Leave Application System of self-service. Matrix option. (Mark to and MRO Approvals Team-Leader OR One-Person). 2-level ref : HC06 Escalation. Dual or Triple Authorisation if required. Login Message Alert. Does not track leave accounting automatically. 163 Administration Operations Leave System of self-service viewer and upto 4 and MRO Administration categories of Leave. Annual opening and closing ref : HC07 balance etc., linked to attendance and payroll. 164 Administration Operations Muster Role System of per-hour, job-type with job-rates and MRO Management Muster role per week adminstration incl. Options ref : HC08 of overtime rates. 165 Administration Operations Loan Sanction Matrix option. (Mark to Team-Leader OR and MRO Requests One-Person). 2-level Escalation. Dual or Triple ref : HC09 Authorisation if required. Login Message Alert. Does NOT track quantum, accounting etc. automatically.
  • 12.
    http://clextra.com 166 Administration Operations Materials Out System of self-service. Matrix option. (Mark to and MRO Requests Team-Leader OR One-Person). 2-level ref : HC10 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 167 Administration Operations Other Requests System of self-service. Matrix option. (Mark to and MRO Team-Leader OR One-Person). 2-level ref : HC11 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 168 Administration Operations Petty Cash & Matrix option. (Mark to Team-Leader OR and MRO Advances Requests One-Person). 2-level Escalation. Dual or Triple ref : HC12 Authorisation if required. Login Message Alert. Does NOT include accounting automatically 169 Administration Operations Problems faced System of self-service. Matrix option. (Mark to and MRO Team-Leader OR One-Person). 2-level ref : HC13 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 170 Administration Operations Small sub-contract System of self-service. Matrix option. (Mark to and MRO Requests Team-Leader OR One-Person). 2-level ref : HC14 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 171 Administration Operations Guest House System of self-service. Matrix option. (Mark to and MRO Requests Team-Leader OR One-Person). 2-level ref : HC15 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 172 Administration Operations Training Schedules System of self-service. Matrix option. (Mark to and MRO and Requests Team-Leader OR One-Person). 2-level ref : HC16 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 173 Administration Operations Travel Requests System of self-service. Matrix option. (Mark to and MRO Team-Leader OR One-Person). 2-level ref : HC17 Escalation. Dual or Triple Authorisation if required. Login Message Alert. 174 Administration Operations Courier Dispatch Outbound Mail-Stop and MRO Request ref : HC18 175 Administration Operations Conference Room Multi-Location, comprehensive and MRO Conference-Training Room Booking Solution ref : HC19 176 Administration Operations Helpdesk Support functions and the management of them and MRO cheaply; quickly and effectively is the cornerstone ref : HC20 to a firms organisational and individual productivity. This feature alone can save significant dollars for you. 177 Administration Operations Official IN System and Methodoloogy for Centralised and MRO Correspondence Register for ALL EXTERAL correspondence ref : HC21 INTO the company. Use in tandem with eDMS binning systems for a soft copy storage for remote and archival usage. 178 Administration Operations Official OUT System and Methodoloogy for Centralised and MRO Correspondence Register for ALL EXTERAL correspondence ref : HC22 FROM the company. Essentially a Registre for ANY and EACH out-going correspondence. Soft-copy upload of the orignal to a central repository for remote access and archive. 179 Administration Operations My Diary Personal Diary; including To-Do; Appointments; and MRO Calendar; Holidays; Events, Self-Alerts etc. Any ref : HC23 date - time based reminder and follow-up activity.
  • 13.
    http://clextra.com 180 Administration Operations Gate Pass eSlip and non-paper based each Gate Pass and and MRO Visitor Movement System and Record-Keeping. ref : HC24 181 Administration Operations Gate Materials eDocument and non-paper based each Gate and MRO Materials IN and OUT record-keeping, ref : HC25 approvals, tracking, audit 182 Administration Operations Time Scheduling Enterprise and-or Individual Calendar and Time and MRO based listing of jobs. Allows individual planning ref : HC26 and Enterprise consolidation. Colloabration allows everyone to see and know what the schedule of another person is scheduled to do even if at a completely different location. 183 Administration Operations Operational Any number of locations and any number of and MRO Equipment devices and any number of items with each. ref : HC27 Monitoring Dates from and to for usage. AND-OR target quantity and actual quantity of usage. Eg. Printing consumables. Photo-copier maintenance. Replacement of mechanical moving parts etc. 184 Business Strategic Corporate IQ and Assess the current Intelligence and Emotional Intelligence EQ Quotient of your Firm. Available Talent; ref : IA01 Skill-Sets; Cost of Information; Patents; IPR; Leadership; Assets; Cash. Assess Psychometrics; Change acceptance; Resistance; Psychological Damage; Culture & Community Factors. 185 Business Strategic Snapshot of Metrics Snapshot of all - 300 - metrics each month. (or Intelligence weekly or daily or quarterly). ref : IA02 186 Business Strategic Business Goal Mission, Vision, Quality & HR Policies. Maps to Intelligence Alignment Teams and/or Individuals. Linked to Roles; ref : IA03 Skill-Sets; Standards and Actual Performance. 187 Business Strategic MBSP Break-up Any domain break-down into Modules, Blocks, Intelligence Segments, Pages and Units using the EiCA ref : IA04 process. 188 Business Tactical Snapshot of Snapshot of every 25-units of data-bits; eg. Salary Intelligence Information Slips each month. Assessments this quarter. ref : IB01 sub-sets 189 Business Tactical Trends Visual display of time-series trends of daily; Intelligence weekly; monthly; quarterly; annual and even ref : IB04 hourly data. 190 Business Operations Vision and Mission Constantly convey the Corporate Visions and Intelligence Mission to all employees; using Push and Pull ref : IC01 communications. 191 Business Operations Quality Policy and Constantly convey the Quality Policy to all Intelligence Metrics employees; using Push and Pull communications. ref : IC02 192 Business Operations HR Policy and Constantly convey People Policies to all Intelligence Metrics employees; using Push and Pull communications. ref : IC03 193 Business Operations IT and Security Constantly convey Information Management and Intelligence Policy and Metrics Security Policies and concerns to all employees; ref : IC04 using Push and Pull communications. 194 Business Operations Press Releases Corporate Press Releases; Public Relations Intelligence Documents. Press Cuttings. ref : IC05 195 Business Operations clextra SEARCH clextra Search is a unique approach to searching. Intelligence While a search-engine allows a single line ref : IC06 interface others offers pull-down cirteria lists. In clextra you are presented a page of creiteria to select one-click for the required listings. You can arrive at the same thing from different ways OR view an information line from different search perspectives.
  • 14.
    http://clextra.com 196 Business Operations clextra REPORT Most clextra Reports are an edit-list; consolidate Intelligence summary or extensive list. Each are column ref : IC07 sortable within the report. Most reports offer a Personal-Memory for from and to dates. Several reports offer user-definable Grills. Colour limits of fields instantly viewable as GOOD or BAD. 197 Business Operations clextra An online Information based system browser type Intelligence PRINT-DISTRIBU local print-out is always possible. For statutory ref : IC08 TE and related printing in PDF format is available. To save costs and time relevant documents are best PDF or otherwise previewd and can be distributed by placing in a user-cupboard OR distributed with standard email OR used within documents such as Targetted Direct email Marketing. 198 HR Strategic Change Facilitation Change Management. Slow or fast track. Collaboration - Management decides the pace. You could launch Teams the whole product; or better still; allow it to grow ref : JA01 biologically. Enter at key-points or weak-points at different levels in the organisation and allow it to flourish and grow. 199 HR Strategic Teams; sub-Teams Teams Focus. Entire organisation or ALL Collaboration - and Task-Forces departments, manpower strength into ONE SET Teams of teams; of 2x2; 3x3; 4x4; 5x5; 6x6; 7x7; 8x8; 9x9 ref : JA02 OR a 10x10 matrix - each with 1 to 999 possible members. 200 HR Strategic Team Composition - Tangible Skills and Competencies of Individuals Collaboration - Skills required to work together to complete a task. Teams ref : JA03 201 HR Strategic Team Composition - Roles within teams and Behavioural skills as in Collaboration - Behavioural Belbin Roles, De Bono Thinking Hats or De Bono Teams Action Shoes. ref : JA04 202 HR Strategic Systems Thinking Plan for each and all teams as an independent Collaboration - system. Relationship and inter-dependence with Teams other teams or Systems. Roles, SWOT, finance ref : JA05 etc. of each system. Profit, Cost, Revenue or Investment centres etc. 203 HR Tactical Random Cupboard Feature. Company-wide bibliography Collaboration - attachments of Information; Reports and emails. At-will; Teams upload your documents for viewing. Upload ref : JB01 free-will documents for your Team Members to access. Organization can make available these for your use. 204 HR Tactical Timely attachments Cupboard Feature. Organised company-wide Collaboration - bibliography of Information; Reports and emails. Teams Against a Time-Series; upload your documents ref : JB02 for viewing. Upload documents for your Team Members to access. Organization can make available Time-Series attached documents for your use. 205 HR Tactical Team Self-Service. Built and by default self-service; allows lower Collaboration - costs and less manpower for IT; HR and Teams Management overheads. Save annual costs 10 to ref : JB03 12 people for every 400-1000 people you or your customers employ. 206 HR Tactical Team SWOT Manage SWOT. The Strengths, Weaknesses, Collaboration - Opportunities and Threats for every Team. Teams ref : JB04 207 HR Tactical Team Sponsor. Team Sponsor. Every team has a sponsor; Collaboration - internal customer or Mentor. By default this is Teams the CEO to ensure a - score-card - approach and ref : JB05 whole-purpose intent for every team.
  • 15.
    http://clextra.com 208 HR Tactical Communities At login-1 and/or login-2 grouping of specific Collaboration - individuals to achieve specific objectives. Teams Community of Evangelists; Features Teams; ref : JB06 Task-force … call it what you will. 209 HR Tactical Team Dynamics Each team has a Leader; a No.2 and a Collaboration - clextra-Tech-co-ordinator. Each team also has a Teams Sponsor or Mentor. Also every individual can ref : JB07 have upto 3 superiors. For example; Reporting to … Admin. Head and Tech.Supervisor. All this allows for dynamic and practical Leadership. 210 HR Tactical Teams - 26 x 70 - Allows 26 sets of 70 teams - with unlimited Collaboration - 1820 Teams member under each. Teams ref : JB08 211 HR Tactical Units - Taskforces - Apart and in-addition to Teams any number of Collaboration - Households employees can be grouped together as a Project - Teams Feature or Campaign Team … termed unit within ref : JB09 clextra. Task-forces to achieve specific goals. When customer facing households - Modalities when Patient facing - Segmentation when Insurance Facing - Instruments when Banking facing etc. 212 HR Tactical Tasks Assignment Quick and ad-hoc assignment of work to Team Collaboration - members or others allowing them access to these Teams as reminders and reverting on task status. ref : JB10 Available on individual login. Allows priority and queue prioritisation. This is apart from individual To Do List available in the Diary. 213 HR Tactical Discussion Board Initate a topic and have any and all follow-up Collaboration - quick thoughts on this topic. An internet IRC or Teams chat equiovalent. ref : JB11 214 HR Operations Belbin Team Roles Establish any and all 9 roles for individual Collaboration - members in every team. Teams ref : JC01 215 HR Operations Team Collaboration Team (or Individual) Collaboration on Problems Collaboration - & Solutions. Tangible and Intangible Reward & Teams Recognition linked to the stating; using and ref : JC02 rating of Problems & Solutions. We refer to this module as CoPaS. 216 HR Operations Individual Individual (or team) Collaboration on Problems Collaboration - Collaboration & Solutions. Tangible and Intangible Reward & Teams Recognition linked to the stating; using and ref : JC03 rating of Problems & Solutions. We refer to this module as CoPaS. 217 HR Operations Timely attachments Cupboard Feature. Share time-series based Collaboration - documents sent to you with the organisaton (or Teams Team members) ref : JC04 218 HR Operations Random Cupboard Feature. Share random documents Collaboration - attachments sent to you with the organisaton (or Team Teams members) ref : JC05 219 HR Operations Business-Purpose The whole firm. (or in a large company, whole Collaboration - Skill-Set division or department) decides a maximum of 25 Teams skill-sets that are essential to the success of the ref : JC06 organisation. You detail these. These we refer to as the AVA-Skill-Sets. 220 HR Operations Team Skill-Set Each of the individual and Business Purpose Collaboration - Sigma skill-sets map into the Team that they belong or Teams have been assigned to. ref : JC07 221 HR Operations Team Team Inter-Personal Assessments. Ist level Collaboration - Inter-Personal opinions of each other. Big-5 Team opinion. Note Teams Assessments team combinations should be stable; ie. ref : JC08 TEAM-CHAIRS have to be initialised and held for a period of time (one-quarter suggested) for this module to be effective.
  • 16.
    http://clextra.com 222 HR Operations Team opinion. Team opinion. In-depth, more time-spent, Collaboration - In-depth FFM analysed intra-team perception building on the Teams above quick-fire perception. This is based on the ref : JC09 Big-5 or Five Factor Model. 223 HR HCM and Strategic Onet Support International standard and System for HR work Finance styles, jobs, tasks, activities etc. ref : KA01 224 HR HCM and Strategic Compensation Allows upto 12 compensation levels; map these Finance Management onto each Grade from an unlimited number of ref : KA02 compensation sets. Customise for each individual / employee. Variety of CTC Reports 225 HR HCM and Strategic CTC Analysis & Individual, Group, Grade, sub-Group wise Cost Finance Planning to Company Analyses and Planning. ref : KA03 226 HR HCM and Strategic Time and Materials If T&M based -CTC on billable and non-billable. Finance Per-person cost and chargeable rates. ref : KA04 227 HR HCM and Strategic Attrition Analysis Attrition is Expensive. The intangible and hidden Finance costs of replacement affect bottomlines ref : KA05 significantly. Little or no attention is paid to this important area because there was no tool to do so - till clextra. 228 HR HCM and Tactical Incentive & Bonus Plan best-case; worst-case and most-likely annual Finance Planning incentive / bonus pay-outs. Compare with actual ref : KB01 the next year. 229 HR HCM and Tactical Manpower Planning Plan country-wide or Global Manpower Finance Requirements linked to skill-sets; line and staff ref : KB02 requirements matching; budget and actual. 230 HR HCM and Tactical Attrition Rating on desire to retain and period of time over Finance Management which this retention is desired. Ranking and ref : KB03 Metrics Rating Report on this. 231 HR HCM and Operations Incentive & Bonus Incentives and Bonus Administration using cash Finance Administration and-or points. Assign as rewards or recognition. ref : KC01 Reduce as dis-incentive. Redeem as and when required. Escalationa and approval options. 232 HR Training Strategic Training From Induction to regular on-going Training Learning Effectiveness Effectiveness. Campaign specific or one-off. ref : LA01 Complete Training Process as an Intervention. 233 HR Training Strategic Learning Establish Corporate, Group and Invidudal Learning Organisation quantified Learning Goals and Communicate ref : LA02 these to all users. Potential for Distance Learning establishments. Subscribed Learniing etc. 234 HR Training Strategic Touch Screen Touch and play any digital clip after selecting Learning Audio-Video Kiosk Module Block Segment and Page. Cataloging ref : LA03 System for uploading and distributed - central storage of ANY media. Learning Sets linked to clextra LMS AVA and Syllabus for advanced Learning and Teaching Applications. 235 HR Training Tactical Syllabus - Database Organised into the MBSP clextra-Process format. Learning Exact control on Learning or Training; ref : LB01 person-wise; team-collated and oriented towards Market Demands and Supply; Numbers and Customer requirements. 236 HR Training Tactical Syllabus - Freeform More realistic free-form managed syllabus. Learning Supports 25 core-sets and up to 20 sub-sets under ref : LB02 each of them.
  • 17.
    http://clextra.com 237 HR Training Operations Crash-MBA Built-in Crash MBA. (Single-use read-only Learning courtesy (C) Casper Abraham) ref : LC01 238 HR Training Operations Management Background Learning & Information of Learning Reading Performance Appraisal, Training Effectiveness, ref : LC02 Psychometric Assessments< Motivation etc. 239 HR Training Operations Metrics Basics Basic Information on Financial Ratios, Metrics, Learning Measurements, Systems & Process such as ref : LC03 six-sigma, Balanced Scorecard, COPC, HR Best Practices etc. 240 HR Training Operations Whitepapers : Relevant and related Whitepapers on People Learning clextra and Testing; Team Collaboration etc. ref : LC04 Industry. 241 HR Training Operations Learning Photos An innovative Learning Concept based on the Learning belief that A picture is worth a thousand words; ref : LC05 and anyway modern man based on TV and lack of time; learns instantly based on visual recall and recognition. A wonderful mass-communication tool. 242 HR Training Operations Learning Photos Unlimited layers of 2x100 photos; (ie. 200,000 Learning Plus plus) for different layers of Learning Photos. ref : LC06 243 HR Training Operations Training Calendar Management. Particpants. Pre and Post Learning Administration Assessment Tracking. Pre-event and Post-event ref : LC07 Communications. Conference Room bookings. Faculty rostering etc. 244 HR Training Operations Structured Content Upto 25 domains integrated with all other clextra Learning Modules. Up to 999 sub-domains. Each domain ref : LC08 can have upto 99 learning objectives. Each objective has multimedia options, an expert, notes and attachements and Assessment. 245 HR Training Operations Content Delivery Any and all convergent multimedia structured Learning storage. With real-time streaming and cached ref : LC09 download upload customisable syllabus to individual syllabus. 246 HR Training Operations Learning With each domain and sub-domain user-definable Learning Assessment and completely online deployment of convergent ref : LC10 multimedia Assessment. 247 HR People Strategic Competency Assess, Rate, Model and Map to Marketing, Potential Mapping Structured Planning, Demand and Supply all available ref : MA01 Talent linked to Performance; tangible and intangible; Behaviour; Soft-Skills at a Strategic, Tactical and or Operative Level, depending on HR Maturity within your organisation. 248 HR People Strategic Competency Self-service obtain a list of current activities. Potential Mapping Freeform Create a Job-Description from this and related ref : MA02 information gathering. Rating by upto 3 superiors or colleagues. 249 HR People Strategic Talent Management Identify and Track Talent and Achievers amongst Potential the Talented. Create communities; Task-Forces; ref : MA03 and Special-Rewards for retention and alignment to Organisational Culture. 250 HR People Strategic Employee RISK Using sub-metrics of Cost-to-company or Team Potential Metrics or Assets responsibility; Vulnerability and Threat ref : MA04 to this. 251 HR People Strategic Learning Harnessing & Managing; Individual & Team Potential Organization. Problems & Solutions; Team and individual ref : MA05 internal & external communications; Past-Current-and Future Assessment Gaps & (you manually) analysis. Managing training as an Intervention.
  • 18.
    http://clextra.com 252 HR People Strategic Leadership Leadership Development. Identification. List. Potential Development. Assess. Appraisal. Feedback. Mentor. Mintzberg ref : MA06 Model. Level-based time-action targets. Internal Grades. Allows from 1 to 12 Levels of Grades for Organisational Development. 253 HR People Strategic Leadership Track-record monitoring. Leadership Potential Identification Assessment; Behavioural Testing; 360 degree ref : MA07 feedback; Decision Making Metrics etc. 254 HR People Tactical Competency Create and manage a matrix of upto 25,000 Potential Modelling competencies, skill-sets, role-sets or job-functions. ref : MB01 255 HR People Tactical Mentor A unique concept in Professional Mentoring. Potential Management Keeping in touch on Performance and Soft ref : MB02 Information; including behavioural side issues. 256 HR People Tactical Teams Costing Teams Costing. Establish a Revenue; Cost; Profit Potential & Capex %age, number for each Team. ref : MB03 257 HR People Tactical Managers Track, monitor and mentor the performance of Potential Assessment all levels of Managers. ref : MB04 258 HR People Tactical Team Leaders Track, monitor and mentor the performance of Potential Assessment all levels of all current and potential Team ref : MB05 Leaders. 259 HR People Tactical Task Skill-Set. Business Purpose skill-sets map into all Tasks Potential Tasks may require more than 1 person at ref : MB06 different levels. This can assist in MANPOWER PLANNING and identifying TRAINING GAPS to meet Business Purpose. 260 HR People Tactical Team Succession Every team has a nominated i. Leader; ii. No2; iii. Potential IT coordinator and iii. Sponsor/Mentor This ref : MB07 provides for Leadership Development; Successor Management; Redundancy; Attrition Controls; Techno-phobia solution; Ownership and Team Success. 261 HR People Operations Competency Exhaustive Repository of all tasks, skills, Potential Assessment activities, actions, knowhow, paid-for work. ref : MC01 262 HR People Operations Competency Rating Rating and Ranking of competencies based on 1,2 Potential or 3 assessors for each and every Competency. ref : MC02 263 HR People Operations Corporate Based on the above 25; you assume that not more Potential Competencies than 4; essentially 1 or 2 are the hot-skills of every ref : MC03 AVA-25 individual, whatever their level. Choose these. 264 HR People Operations Individual Skill-Sets Alignment of key-skill and 4-hot skills can be Potential Hot-4 rated as a 0,1,2,3 or 4 called the TPA (Technical ref : MC04 Point Average) for that individual in that skill. 265 HR People Operations Individual Skill-Sets Individual top-16 skills can be rated as a 0,1,2,3 Potential Hot-16 or 4 and linked to Training and Learning ref : MC05 Syllabus 266 HR People Operations Individual Skill-Set Focus. For each of the above rated 4-hot skills; Potential Weight you can add a weight. This is a percentage and ref : MC06 could be 100% of his/her time spent on that; OR 100% motivated or 100% useful for job-purpose etc. CHOOSE ONE METHOD/MODEL for weight. 267 HR People Operations Talent Metric Obtains a maximum of 4 points; with e.g.. Potential EPA-4 Weights 25%-50%-25% weights for Self-Boss-Mentor ref : MC07 assessment on a specific set of parameters. Partially 360 degree.
  • 19.
    http://clextra.com 268 HR People Operations Talent Metric EPA Set on a Maximum of 10 for each employee; based Potential Indices on maximum of 12 Levels/Grades of a company; ref : MC08 on Qualifications; Experience; Attitude; Intuition & Feel etc. 269 HR People Operations Lominger Lominger 67 + Stoppers-Stallers 19 system of Potential Competencies Selection and 360 degree Rating of upto 3 ref : MC09 Superiors with a range of online Analytics and Reporting. 270 HR Strategic BP - Goal HR Best Practice 1 : Communicate business Performance Communication direction and goals. Communicate Corporate and ref : NA01 Invidual goals. Set stretch limits. 271 HR Strategic BP : Involve and HR Best Practice 2 : Involve employees and act on Performance Act on Suggestions their suggestions A collaborative environement ref : NA02 allowing decision making; degrees of transparency; controls and checks and balances. 272 HR Strategic BP : Provide HR Best Practice 3 : Provide meaningful benefits. Performance Meaningful Benefits Listen to what really mattters to every employee ref : NA03 and then plan your rewards and recognition and incentives schems. 273 HR Strategic BP : Reward High HR Best Practice 4 : Reward high performers. Performance Performers Know who is really achieving what you need to ref : NA04 achieve and then reward thos tangible and intangible metrics. 274 HR Strategic BP : Growth and HR Best Practice 5 : Provide growth and Performance advancement advancement opportunities. Have a plan. Decide ref : NA05 and place in those positions those who are going to achieve that plan. 275 HR Strategic Performance A comprehensive Enterprise-wide System; Performance Management provides a choice of Performance methods for ref : NA06 System different needs and worker-levels; also allows customisable add-on Performance methods and models. 276 HR Strategic Vision-Mission From the vision set numbers; align these to Performance Alignment Teams; Divisions; Profit Centres; Teams and/or ref : NA07 individuals. 277 HR Strategic Organisational From an Organisational Design and Chart; Performance Design specify Roles & Responsibilities for Teams; Profit ref : NA08 Centres; Individuals or other resources. 278 HR Strategic Organisational From an Organisational defined role individual Performance Roles and Job roles can be customised; up to 15 parameters with ref : NA09 Design individual metrics and option of 360 degree appraisal. 279 HR Strategic Roles Library For your entire organisation you can manage a Performance Library of ALL roles. Import and Export them ref : NA10 into clextra with every OD change - M&A - Re-structuring or Accountability mapping. 280 HR Strategic Performance Report from some of the essential performance Performance Summary Report indicators on a single page. ref : NA11 281 HR Strategic Staff Incentives Establish a system set targets collect and drill Performance Administration down actuals to manage Sales or Support Staff ref : NA12 Incentives administration. 282 HR Tactical Individual Metrics Top-down Assignment of Corporate 300. Performance Bottom-up collation of grass-root numbers. ref : NB01
  • 20.
    http://clextra.com 283 HR Tactical Accountability Fix accountability, responsible and authority Performance including Roles with any Executive. ref : NB02 Communication on roles can be as transparent as you wish throughout the organisation. 284 HR Tactical Employees clextra DAPA for Employee Affinity-Loyalty Performance Incentives Points Accounting System to motivate; recognise ref : NB03 Management and reward Performing Employees. 285 HR Tactical CoPaS Reward System to recognise and reward Employees who Performance System are innovative and spend time to help and provide ref : NB04 constructive help; support and solutions to their colleagues. 286 HR Tactical Job Design and For every individual set and manage Job Performance Specifications Specifications. Self-view; others-view OR all-view. ref : NB05 287 HR Operations Performance Quick and simple Performance-Behaviour Performance Quick-Indices Performance-Motivation General-Index - Speed ref : NC01 vs Errors - Top Performer with comparisons Team-wise - Level-wise - Unit-wise. 288 HR Operations Performance Mass-Recruitment People Performance. Specific Performance dPipeline numbers and measures; up to 10 assessed at up to ref : NC02 10 touch points. Typical for Fresher in the 1st 2 years of a career. This we call the dPipeLine feature. 289 HR Operations Performance QBR Quarterly Business Review. Simple Performance on 4,6 or 12 factors. Senior-People Performance; on 1 key-parameter; ref : NC03 each quarter. This is from within the PM-HR system. 290 HR Operations Performance Performance Appraisal Feedback Performance Appraisal Feedback ref : NC04 291 HR Operations Worker Standard Supervisory 7-point; 4-level Performance Performance Performance Appraisal for every worker. ref : NC05 Appraisal 292 HR Operations Individual Role in Every individual role within a workflow or Performance Organisation process in the organisation can be clearly defined ref : NC06 and posted with varying degrees of transparency. Up to 15 roles supported. 293 HR Operations 360 Degree Self, Superior and upto 8 peers can provide 360 Performance Feedback degree feedback on a 5-scale factor; for each of up ref : NC07 to 15 roles. Role based feedback. 294 HR Operations 270 Degree-like Self, Superior and Mentor. 3-way on the EPA-4 Performance 3-way Feedback 13 parameters. Weighted for each of these 3 ref : NC08 appraisers. 295 HR Operations Employee Employee Satisfaction Survey. Regular and Performance Satisfaction Survey consistent Employee Satisfaction Survey can be ref : NC09 executed right through the organisation. Also available, the Employee as a Customer satisfaction survey. 296 HR Operations Strategic Forward Resource Current to years ahead planning and status of HR ref : OA01 Planning resources allocation to Clients - targets and actuals with cost and quality parameters. 297 HR Operations Tactical CV Miner Search on administrator or self-managed CVs ref : OB01 using upto 9 key words throughout your entire bank of CVs 298 HR Operations Operations Payroll Options Standard Payroll for India. - Customised for any ref : OC01 other country. Monthly Stipend. Piece-rate or Per-Hour Payments.
  • 21.
    http://clextra.com 299 HR Operations Operations Payroll Export Export a Spreadsheet. Templates for format ref : OC02 calculation on Grades, Locations, Gender etc. 300 HR Operations Operations Payroll Import After modifications and fine-tuning of a ref : OC03 previously exported Spreadsheet or CSV from any other HR or Payroll Application, import this into clextra. All calculations assumed completed. 301 HR Operations Operations Payroll Payslip From archived and imported files individual ref : OC04 Distribution Payslips can be generated and previewed. Now set a flag; and the same files are distributed to all individuals by placement of files in their individual e-Cupboards. 302 HR Operations Operations Payroll Reporting Standard statutory Monthly forms such as ref : OC05 Income Tax, ESI, PF-FPF; ELID; Bank Advice can be generated and archived. From earlier stored archives history reports are available. 303 HR Operations Operations Payroll Overtime Job based Individual Overtime Sheets, ref : OC06 and Loss of Pay Administration, Payment and Management. Loss of Pay days, calculations and reporting. 304 HR Operations Operations Payroll Deductions Upto 15 columns of deduction and 6 columsn of ref : OC07 manual deduction per month management. 305 HR Operations Operations Payroll Perks Upto 6 perquisities based on allowance for each. ref : OC08 Any excess is deducted after monthly due-payments are entered. 306 HR Operations Operations Snapshots Archive of information of 1000+ people map at ref : OC09 any given time for future historical retrieval. 307 HR Operations Operations CV Manager Curriculum Vitae - Bio-data Corporate Managed ref : OC10 Format or Self-Service, Corporate and/or Own up-to-date management and access of a comprehensive Resume of every employee in the organisation. 308 HR Operations Operations Time Sheets. Time Sheets. This Week; Last Week and Next ref : OC11 Week Time-sheets; based on hours of input; and custom-defined set of up to 99 possible activities. Collation across a Team and based on from and to dates for any period. 309 HR Operations Operations ID Card Combine Corporate Logo, Photo, Signature, ref : OC12 Level, Access onto one on-line ID Card 310 HR Operations Operations Multimedia Photographs of all employees and individuals ref : OC13 Photographs within the organisation; all can view. Can allow self-upload. 311 HR Operations Operations Multimedia Signature of all employees and individuals within ref : OC14 Signature the organisation; only authorised persons can see this stored signature. 312 HR Operations Operations Multimedia Voice-Clip of all Agents. Customers can also ref : OC15 Voice-Clip listen and comment, choose or request based on this. 313 HR Operations Operations Multimedia Images Each individual can manage his or her own set of ref : OC16 visuals with thumbnails. This feature can be used for information gathering - screen shots - training others - learning or any other conceivable use. 314 HR Operations Operations Individual Over 1000+ possible bits of information about ref : OC17 Information.1000+ every individual. Financial; Personality; Personal; Psychometric; Abilities; Like-Dislikes-Priorities; Family; Hobbies-Interests; Contact Details; Attainment; Attitudes; Performance; Current-assignment; History; Grievances-Suggestions; Failures; Risk-factors.
  • 22.
    http://clextra.com 315 HR Operations Operations People Work Physical Workstation Location of a person, based ref : OC18 Location Finder on schematic. 316 HR Operations Operations Person Geographic Establish a Geographic region, Shopfloor or ref : OC19 Locator Premises schematic and track persons. 317 HR Operations Operations Person in Process Establish a Workflow or Process schematic and ref : OC20 Locator track accountable Staff with this. 318 HR Operations Operations Organisational Allows 12 internal grades AND 9 access Levels. ref : OC21 Grades 1=Employee; 2=Advanced usage Employee; 3=Team Leader; 4=Data-Entry; 5=Partner Manager; 6=IT-coordinator; 7=CFO,COO,CHO; 8=CEO; 9=SuperUser (only to set-up). 319 HR Operations Operations Shifts Timings and Shifts Timings Information for each Employee; ref : OC22 Days-off including days off. 320 HR Operations Operations Attendance Assume all attend. Flag only absentees. Linked to ref : OC23 MANUAL Leave Records Administration. Can be linked to Permissions and Decision Making. 321 HR Operations Operations Attendance Requires networked thin-client or PC with ref : OC24 semi-automated browser access as a Punched-Clock IN and OUT system for Attendance. 322 HR Operations Operations Attendance Subject to Technical & Geographic Feasibility ref : OC25 Automated and preferable availability of Technology such as RFID Tags; list all employees present; absent; etc. 323 HR Operations Operations Access Control Subject to availability of RFID based Access ref : OC26 Control Systems and Infrastructure Deployment. 324 HR Operations Operations Absence - Presence Subject to Technical & Geographic Feasibility ref : OC27 and preferable availability of Technology such as RFID Tags; list all employees present; absent; etc. 325 HR Operations Operations Whiteboard Shopfloor or Workstation specific Display on ref : OC28 Monitor-Display with custom specific Worki Instructions and/or other periodic or other central server managed and distributed communications. 326 HR Operations Operations Designations Pre-configured, random OR User-defined to ref : OC29 allow grouping, searching, comparison and usage across the entire system. 327 HR Operations Operations Certifications Pre-defined List of Certifications OR free-form ref : OC30 user-definable Certifications 328 HR Operations Operations Qualifications Pre-defined List of Qualifications OR free-form ref : OC31 user-definable Qualifications 329 HR Strategic Organisation Assess current Organisation Culture. Discover Pyschometrics Culture gaps between desire and current perceptions; set and Interaction change and evolution practices to facilitate ref : PA01 change 330 HR Strategic Psychometrics Report from some of the essential behaviour Pyschometrics Summary Report indicators on a single page. and Interaction ref : PA02 331 HR Tactical Off-line At additional each, individual cost; however with Pyschometrics Assessments scores and end-use availability from and within and Interaction OPTIONAL the product. IQ; analyzed IQ; Creative; Motor ref : PB01 Skills; Leadership Potential; Humour etc.
  • 23.
    http://clextra.com 332 HR Tactical On-line Available to every employee / individual; this can Pyschometrics Assessments. include; Stress; Likes-Dislikes; Priorities; and Interaction Performance Common Sense; Integrity; Personality; OCD ref : PB02 -Obsessive Compulsive Disorder-; SDIS (Self-Destructive Intelligence Syndrome) etc. 333 HR Tactical On-line Options of self; bi-directional; 3-way or 360 Pyschometrics Assessments. degree. More than 10 multi-system options. and Interaction Models ref : PB03 334 HR Tactical Pre TO Post Summary and Raw Scores; retained from Pyschometrics Recruitment pre-recruitment right through the career of an and Interaction Connectivity employee on ALL ASSESSMENTS. Technical; ref : PB04 Performance; Appraisal; Psychometrics at all dates and touch-points of the employees career. 335 HR Tactical On-line Stress; Likes-Dislikes; Priorities; Common Sense; Pyschometrics Assessments. Integrity; Personality; OCD -Obsessive and Interaction Behaviour Compulsive Disorder-; SDIS (Self-Destructive ref : PB05 Intelligence Syndrome) etc. 336 HR Tactical On-line Team Intra-team dynamics, linked to 360 degree Pyschometrics Assessments feedback, likes and dislikes, team SWOT etc. and Interaction ref : PB06 337 HR Tactical On-line 360 degree Self, 180, 270 and 360 degree feedback on Pyschometrics Feedback intangible and Behavioural parameters on several and Interaction of the Appraisal options. ref : PB07 338 HR Tactical Performers Gallery. Performers Gallery. Even the best talent and Pyschometrics achievers need recognition. Options on Performer and Interaction of the Day; the week; month and Year as a ref : PB08 Gallery. 339 HR Tactical Opinion Poll Current Poll for everyone in the Organisation. Pyschometrics Useful as a change management agent. and Interaction ref : PB09 340 HR Tactical Counselling Individual requests; pleas; grievances; Pyschometrics suggestions; ideas; thoughts; desires can be and Interaction placed and retrieved within the system. ref : PB10 Responsible authorities can react to this. Clinical assistance where required can be considered. 341 HR Tactical BARS User-definable Behavioural Anchor Rating Scales Pyschometrics on most aspects of tangible and intangible metrics and Interaction and inputs throughout the use of Psychometric ref : PB11 and other Assessments. 342 HR Tactical Employee Profiling Up to 50 client-defianble parameters of Pyschometrics Employees along Geographic; Demographic or and Interaction Psycho graphic segments. ref : PB12 343 HR Operations Lucky Gallery Life is not fair; including; business and the Pyschometrics environment. Lucky person of the Day; Week; and Interaction Month OR Year; based on any CHANGE ref : PC01 MANAGEMENT criteria. Daily Cash; monthly conveyance-fares; Annual bonus; weekly Lunch coupons. 344 HR Operations My mood today FUN. My face for the day. View all those who Pyschometrics have entered, all employees, one of 9 potential and Interaction facial expression or faces of the day. ref : PC02 345 HR Operations Good Deed Set of the latest 16 good deeds done to you, by Pyschometrics another person. Self-Managed and Interaction ref : PC03 346 HR Operations Thought for the Day A single thought for every-day; on request and on Pyschometrics every-logout enhances character development. and Interaction ref : PC04
  • 24.
    http://clextra.com 347 HR Operations Jukebox Upto 40 MIDI or MP3 music files for Pyschometrics individual-listening. and Interaction ref : PC05 348 HR Operations Uploadable Photos Upload Photos; Corporate & Personal (however Pyschometrics Gallery moderated towards Organisation Objectives) and Interaction ref : PC06 349 HR Operations Transaction 360 As a Transaction for pre-defined set of upto 3 Pyschometrics degree superiors any number of peers typically 8 and any and Interaction and all subordinates of your as 1 - 2 or 3 Superior ref : PC07 … Employee Satisfaction Survey OR any other custom survey or opinion or poll or survey adminstration online. 350 HR Operations Stimulus and Self-Service and supported ideas of using stimulus Pyschometrics Motivation periodically for motivation at any point during a and Interaction calendary year. ref : PC08 351 HR Operations Team Stimulus and Team or Group supported ideas of using stimulus Pyschometrics Moitvation periodically for motivation at any point during a and Interaction calendary year. ref : PC09 352 HR Operations Biases Self-Service of understanding and biases. Pyschometrics and Interaction 353 HR ref : PC10 Operations Team Biases Team or Group understanding and biases. Pyschometrics and Interaction 354 Documentation ref : PC11 Strategic Documentation Extensive documentation on Strategic Models; Management Management customisable weights; variety of grouping; ref : QA01 viewing data from different perspectives; graphing etc. 355 Documentation Strategic Research Research related documentation and tracking Management Management such as legal cases, clinical research, market ref : QA02 research, company information tracking, complex patient records, market research, business analytics, insurance claims research, large documentation projects etc. 356 Documentation Tactical Documentation Checklists on documentation. Transaction and Management Workflow workflow on Documentation. Accountability and ref : QB01 Quality of Documentation. Library of documenation. Actual storage of documentation. Access control to documentation. Commercial exploiation of document usage and subscription. And more .... 357 Documentation Tactical Centralised Scan form Centrralised Documents and Forms Management Documents Management. Bin and Downloadable forms for ref : QB02 Manager print. electronic Documents filing by individual; team or group with read-access for each member; regular-periodic documentation. Library-like access; controls and usage. 358 Documentation Tactical Unstructured Scan or if available catalogue and place a Management Documentation document associated with ANY physical asset, ref : QB03 inventory, vehicle, supplier, csutomer, employee, patient - people, place or thing. User-definable 20+ categories; 20+ documents in each. 359 Documentation Operations Checklist related User-defined checklists with an associated Management Documentation single-document at each step for every employee, ref : QC02 asset, case, customer, supplier in a database. 360 Documentation Operations Fresher Structured framework Plus mininal content A to Management Documentation Y - 25 sets linked to clextra AVA - upto 5 ref : QC03 tree-levels of organised content targeted towards organised and structured learning - especially for Induction early teaching Visual Aids and Content Management. 361 Documentation Operations Refresh Structured framework ONLY A to Y - 25 sets Management Documentation linked to clextra AVA - upto 5 tree-levels of ref : QC04 organised content targeted towards more un-structured learning - especially for mid-career and self-Learning Visual Aids and Content Management.
  • 25.
    http://clextra.com 362 Documentation Operations Topical Typically 12 Topics and 12 subjects or sub-topics Management Documenation of Document binning storage and retrieval ref : QC05 against for any Organisation, Employee, Customer or Supplier. 363 Documentation Operations PMap If similar documentation - upto 25 - for every Management Documentation individual or asset in a database, this feature is ref : QC06 useful. Example … scan,copy of everyones Passport first page or scanned filled-in Income-Tax form etc. 364 Documentation Operations Irregular Long list of any type of documents linked and Management Documentation associated with one individual, asset, case, ref : QC07 Cupboard employee, organisatin, customer or supplier. 365 Documentation Operations Regular Periodic list of documents - ie. weekly, monthly Management Documentation daily etc. linked and associated with one ref : QC08 Cupboard individual, asset, case, employee, organisation, customer or supplier. 366 Documentation Operations Inventory Upto 5-user definable documents for every item. Management Documentation These 5 could be Bill of Materials, Quality ref : QC09 Process, Packing List, Installation Instructions etc. 367 Documentation Operations Sales Upto 3-user definable documents for every item; Management Documentation eg. Technical Specifications, Style Catalogue, ref : QC10 User Manual etc. 368 Documentation Operations Statutory All Payroll related annexures and attachments as Management Documentation - PDF soft-copy. Eg. India PF-FPF, ESIC, IT, ref : QC11 Payroll Monthly Statement etc. 369 Documentation Operations Statutory Soft copy of all incoming or outgoing Invoices, Management Documentation - Delivery Notes etc. ref : QC12 Financial 370 CRM, Strategic Marketing Metrics Design, Implement, Adminster, Modify and Marketing and Manage Marketing metrics, ratios, Sales key-performance indicators and measures. ref : RA01 Compare with 2 leading Competitors. 371 CRM, Strategic Brand Metrics Design, Establish, Implement, Adminster, Modify Marketing and and Manage metrics for each important Brand in Sales your Portfolio. Compare with 2 leading ref : RA02 competitors. 372 CRM, Strategic After Market Annual Plan; Capacity; Prorurement; Sales-Plan; Marketing and Planning Warranty; AMC; Installed Base. Corporate Sales Accountability for Numbers. Manufacturing; ref : RA03 Trade; Discrete Goods or Process Industries. 373 CRM, Strategic Product Portfolio Dimension your entrie Product Portfolio into 3 Marketing and Dimensioning dimensions. eg. Product-line; Demographics and Sales Models. Track with a Bsuiness Model such as a ref : RA04 BCG Matrix. 374 CRM, Strategic Customer Single model of 10 internationally accepted Marketing and Satisfaction Survey consumer service parameters. Sales ref : RA05 375 CRM, Strategic Product Brand For each product in the portfolio track Marketing and Positioning Maps pre-market or advertising communications Sales percepetions with after-market and reality ref : RA06 perceptions. Data potentially from Market Research and Customer Satisfaction Surveys. 376 CRM, Strategic Competitor Brand Against each product in your portolio track Marketing and Position competitor brand positioning against Sales user-definable perceptions. Data may come from ref : RA07 Market Research, Industry and Competitor Analysis.
  • 26.
    http://clextra.com 377 CRM, Strategic Assortment Matching Demand to Supply means having a Marketing and Analytics clear idea of your current Planned and Available Sales inventory stock at any given time. Any which ref : RA08 wise, cost, profit, convertibility, risk etc. on every aspect high-lighted. Collaborative and integrated data-collation. 378 CRM, Strategic Assortment No can predict the future. Extra-polating past Marketing and Planning data into the future is an option. Push using Sales internal constraints and expertise or Pull by ref : RA09 listening to customers allows an integrated collaborative Advanced Planning System using clextra. 379 CRM, Strategic Display Signage Instant large reach mass customised Marketing and Solution communications for Corporate, Education, Public Sales reach 24x7x365 reach. It is the New Media - after ref : RA10 TV and Press. 380 CRM, Strategic Product SWOT All and every item in Inventory Strength Marketing and Weaknesses Opportunities and Threats detail Sales related to internal and external positive and ref : RA11 negative parameters to build an effective brand portfolio. 381 CRM, Strategic Media Sales Complete solution to manage dsiplay signage Marketing and order booking across a large number of Sales co-ordinators to a large number of displays. ref : RA12 Self-service options can also be configured. 382 CRM, Strategic Customer Customer - Subscriber - Patient - Student - Major Marketing and Information System Accounts - Wholesaler any paying client Sales comprehensive and user-definable Information ref : RA13 Management System. Options of self-service; co-ordinator or out-sourced Management. 383 CRM, Strategic SLA Management Place Service Level Agreement Metrics; set levels Marketing and and targets; assign accountability; track actual; Sales compare; observe trends. ref : RA14 384 CRM, Strategic Customer Risk Receivables. Particularly against long-cycle time Marketing and Metrics borrowings and mortgages. Sales ref : RA15 385 CRM, Strategic Out-Sourcing Out-Sourcing Access. Your Customer can access Marketing and Access. single and several components of many parts of Sales your clextra information. Example; External ref : RA16 Training Vendor can enter Assessment Information; Medical Doctor can enter medical data; Audit Agency or CPA-CA can enter financial data or ratings. 386 CRM, Strategic Secondary Sales Break-up of Product-wise Channel-wise upto 3 Marketing and Solution teirs of Inventory related item quantities. Sales ref : RA17 387 CRM, Strategic CRM Incentives Establish a system set targets collect and drill Marketing and Administration down actuals to manage Distributor and Retailer Sales Incentives administration. ref : RA18 388 CRM, Tactical Customer Affinity clextra DAPA for Customer Affinity-Loyalty Marketing and Programme Points Accounting System to motivate; recognise Sales and reward Profitable Customer Contacts and - ref : RB01 or Firms 389 CRM, Tactical Customer Rating Quick Indices on custom-definable Loyalty vs Marketing and System Spending; Speed of decisions vs Profit etc. Sales ref : RB02 390 CRM, Tactical Revenue Centre Against Chart of Accounts and-or Management Marketing and Management Accounting and Control Systems monitor Sales Revenue; Income or Sales on an on-going basis ref : RB03 with individual and-or team accountability.
  • 27.
    http://clextra.com 391 CRM, Tactical Customer Installed Customer installed base of all products. Marketing and Base Warranty; AMC and out-of AMC details. Sales Retailer codes. ref : RB04 392 CRM, Tactical Product List List of all Products-Models-Styles manufactured; Marketing and out-sourced or traded by the company. Sales ref : RB05 393 CRM, Tactical Contact Assign employees to a Firm and upto 9 individual Marketing and Management contacts within. Record, review and track all Sales communications between firms employees and ref : RB06 each and all contacts in the targeted customer-contacted firm. 394 CRM, Tactical Sales Budgeting Establish Line-wise; Region-wsie; Team-wise Marketing and and-or Individual wise targets. Collaborative Sales totals; Demand and Supply with links to ref : RB07 Production or purchased capacity and availability. 395 CRM, Tactical Sales Forecasting Collaborative forecasting accumulating figures Marketing and over Product-Lines; Regions; Teams and Sales Individuals. ref : RB08 396 CRM, Tactical Sales Track actuals against targets. 2-way Marketing and Target-Achievement communication to understand and correct gaps. Sales Monitoring Attrition; succession and portfolio change-over ref : RB09 Planning; Management and Monitoring. 397 CRM, Tactical Sales Incentive & Plan best-case; worst-case and most-likely annual Marketing and Bonus Planning incentive / bonus pay-outs. Compare with actual Sales the next year. ref : RB10 398 CRM, Tactical POS Integration Standard; barcode or RFID Point-of-Sale Marketing and Cash-Registers and PC data-file online or batch Sales imports and integration with all other aspects of ref : RB11 Business. 399 CRM, Tactical End-of-Day Feature End-of-day from any number of individuals or Marketing and store-wise or any-other collection of Sales related Sales data from across the world if required. ref : RB12 400 CRM, Tactical Sales Consolidation Consolidate sales across all Revenue Centres and Marketing and compare against Sales Targets; Budgets; Sales Individual; Team and Location Performances. ref : RB13 401 CRM, Tactical Sales Dashboard Graphical representation of top-10 revenue-lines Marketing and from top-10 regions. Budget vs Actual Sales Year-to-date, Quarter-to-date or Month-to-date. ref : RB14 Visible to ALL with a login. 402 CRM, Tactical Customer-Base Up to 50 client-defianble parameters of Marketing and Profiling Consumers along Geographic; Demographic or Sales Psycho graphic segments. ref : RB15 403 CRM, Tactical Guest Manager Walkin, Visitor, Guest Book at any Receiption. Marketing and Repeat visitors, Potential or Existing Customers, Sales Vendors, Investors, Well-wisher Information ref : RB16 System Binning and Integrated Management. 404 CRM, Tactical Display Signage Centralised management of large number of Marketing and outlets and large number of realtime display Sales systems - TV or PC-Monitor Video, Audio, ref : RB17 Animation, Text ticker. Messaging, Promotions, Advertisements, Consumer or Employee communications. Public advisory. Distance Learning. 405 CRM, Operations Contact Using an existing database of International or Marketing and Information. local Firms; enter and manage up to 9 Sales key-persons with all contact data about them ref : RC01 from the product. Limited to information it is NOT a CRM. Any dates; follow-up; add-on information has to be managed manually by you.
  • 28.
    http://clextra.com 406 CRM, Operations Time Series. Sales. Monitor field Sales Force and all such numbers Marketing and generated. Contacts; Calls Made; Orders; Sales Billing; Collections; Lost Orders; Competition ref : RC02 Numbers. 407 CRM, Operations Households If consumer or sales oriented. If Corporate Marketing and alternate to and in addition to teams as units. Sales Communications to these; separate ref : RC03 grouped-information relevant to this as a unit. A household or unit any group of employees within the firm. 408 CRM, Operations Sales Transactions Strategic and Tactical System. Data-entry and Marketing and automation subject to technical feasibility and Sales availability of existing Sales-Product-Invoicing ref : RC04 System. 409 CRM, Operations Contact Employee Customer contact summary communications Marketing and Communications between any assigned employees and contacts in a Sales firm is centrally archived. ref : RC05 410 CRM, Operations Contact Pain-point Customer contact business-pain points and Marketing and Registration related information can be centrally archived for Sales access by Senior Management to quote for ref : RC06 generate additional business from existing contacts. 411 CRM, Operations Sales Records and For higher value purchases such as industrial Marketing and Purchase History goods home durables where a record of every Sales individual purchase is maintained and utilised for ref : RC07 contact and customer lifecycle revenue and profit generation. 412 CRM, Operations Time Series Against each periodic and individual value Marketing and Comment optional comment to monitor intangible reasons Sales for a spike or trough in the data available to all ref : RC08 authorised personnel. 413 CRM, Operations Customer Enquiries Linked to the Customer Affinity-Loyalty Marketing and Database programme any stock-out or related enquiry Sales from a Customer can be recorded. This can be ref : RC09 later exported or independently analysed for Planning and Product Development 414 CRM, Operations Loyalty Card Integrated and comprehensive Affinity card Marketing and Management. Linked to Finance and Accoutning; Sales Products - Brands and Models; Campaign-wise; ref : RC10 Agency Access; Customer self-service option; downloadable catalogues; Communications etc. 415 CRM, Operations Sales Call Reports Remote 24x7x365 Sales Call Reporting System. Marketing and Calendar based. Self-Service. Escalation. Macro Sales or micro-level Cost and Time - Budget vs Actual. ref : RC11 416 CRM, Operations Service Call Reports Remote 24x7x365 Service Call Report System. Marketing and Calendar based. Self-Service. Escalation. Macro Sales or micro-level Cost and Time - Budget vs Actual. ref : RC12 417 CRM, Operations Product Training - Central product-wise Repository of related Marketing and Distance Learning documents, multimedia files and Suggested Sales Training Syllabus for Self-Learning and-or ref : RC13 Mentored distance Learning. 418 CRM, Operations Sales Training - Using a training syllabus, learning gap analysis, Marketing and Distance Learning multimedia file availability, on-line mentoring Sales and remote 24x7 distance content delivery. ref : RC14 419 CRM, Operations Slideshow Kiosk If a front-end PC Client, Push any set of Marketing and Power-Point like slides can be covnerted and Sales uploaded for continous playback. ref : RC15
  • 29.
    http://clextra.com 420 CRM, Operations Multimedia If a front-end PC Cleint, Push upto 40 MP3 or Marketing and Jukebox MIDI music or voice files at any given time for Sales selection and playback connectivity. Example ref : RC16 Top-40 Ring-tones etc. 421 CRM, Operations Todo Manager Aissgn an activity to yourself or to any other in Marketing and the firm. Add an attachment. It could be about Sales an external contact and/or Firm or Institution. ref : RC17 Dates and Priorities are visible in colour-code. 422 CRM, Operations Next course of An extract from the Todo Manager to help in Marketing and Action consensus in most External situations in terms of Sales what should be the next course of action on what ref : RC18 date. 423 CRM, Operations Display Signage Adminstration, management, monitoring, billing, Marketing and Creative and Managed Services options. Sales ref : RC19 424 CRM, Operations Sales Quotations Sales Quotes from existing Inventory items and Marketing and pricing. Create baskets. Use pre-entered Contact Sales Information and manage any number of quotes ref : RC20 prior to closing a Sales Order. 425 CRM, Operations Customer Consumer and User Perception and ratings for Marketing and Perception each and above his-her OWN tasks as in a TQPM Sales matrix. Customer Direct Access can be enable or ref : RC21 disabled. 426 CRM, Operations Time Series. Support. Therefore; monitor Internal; Marketing and Support. out-sourced or Field Service Forces and all such Sales numbers generated. ref : RC22 427 CRM, Operations Time Series. Accountable Support. Therefore; monitor Marketing and Services Revenue Internal; out-sourced or Field Service Forces and Sales all such numbers generated. ref : RC23 428 CRM, Operations Supplier Owners Between Stores - Premises - Location for Time - Marketing and Cost and Distance to assist Logistics Planning and Sales Cost Management ref : RC24 429 CRM, Operations Any type of Task Projects. Jobs, Orders, Tasks usually with a Marketing and Start-Date and End-Date. Finite. Including Costs Sales & Estimation. Can also be used for continuous ref : RC25 Services. 430 CRM, Operations FAQs for Beginners Frequently Asked Questions. Setup and make Marketing and available 100 sets of upto 100 questions and Sales answers for each on any topic or function. ref : RC26 431 CRM, Operations FAQs for Advanced Frequently Asked Questions. Setup and make Marketing and Users available 100 sets of upto 100 questions and Sales answers for each on any topic or function. ref : RC27 432 CRM, Operations Orders Customer facing. Soft-copy of Purchase orders, Marketing and Management Status on Delivery, Scheduling etc. PDF Invoice. Sales PDF Delivery Note. Accountability. Collections ref : RC28 tracking. Avallability of all related Documentation 433 SCM and Strategic Stockflow Similar to cashflow based on physical Receipts Procurement Corporate and Issues SINGLE-ENTRY per Day, Week or ref : SA01 Month periods and a range of + or - periods at the Corporate macro Strategic Level for each and every Item. 434 SCM and Strategic Supplier Vendor; Supplier; Retailer or Distributor - Procurement Information System Comprehensive user-definable information on ref : SA02 any and all Suppliers. Options of self-service, co-ordinator or out-sourced Information Management.
  • 30.
    http://clextra.com 435 SCM and Strategic Supplier SLA Place Service Level Agreement Metrics; set levels Procurement Management and targets; assign accountability; track actual; ref : SA03 compare; observe trends. 436 SCM and Strategic Out-Sourcing Out-Sourcing Access. Your Vendor can access Procurement Access. single and several components of many parts of ref : SA04 your clextra information. Example; External Training Vendor can enter Assessment Information; Medical Doctor can enter medical data; Audit Agency or CPA-CA can enter financial data or ratings. 437 SCM and Strategic Supplier RISK Vendor Rating. Metrics against Delivery-Days, Procurement Metrics Quality, Time-to-deliver and or Cost. ref : SA05 438 SCM and Strategic SCM Incentives Establish a system set targets collect and drill Procurement Administration down actuals to manage Supplier Incentives ref : SA06 Administration as a part of your Vendor Management Programme 439 SCM and Tactical Stockflow Store Similar to cashflow based on physical Receipts Procurement and Issues SINGLE-ENTRY Day, Week or ref : SB01 Month periods and a range of + or - periods at the Corporate macro Strategic Level for each and every Item at every Location or Store. 440 SCM and Tactical Inventory Tactical and Strategic use for ABC-XYZ-Costing Procurement Financials Accountability - Transparency - Process ref : SB02 adherence - Decision Quality etc. 441 SCM and Tactical Inventory Retail Stock Management Planning - Ordering - Procurement and Trade non-sell-able - Sales Returns - Hourly, Daily, ref : SB03 Weekly, Monthly tracking of volumes. 442 SCM and Tactical Inventory Stock; of Components; Work in Progress and Procurement Manufacturing Finished Goods. Warranty - AMC and ref : SB04 out-of-warranty tracking. 443 SCM and Tactical Inventory Agro. Stock Management Planning - Ordering - Procurement Industry non-sell-able - Sales Returns - Hourly, Daily, ref : SB05 Weekly, Monthly tracking of volumes. 444 SCM and Tactical Cycle Steps - Item-wise Store-wise upto 40 individually Procurement Inventory programmable steps converting targets and ref : SB06 actual for Delivery - Time taken - Quality - Cost and Capacity - Quantity factors. 445 SCM and Tactical Cycle Steps - People User-definable steps with Delivery; Cost; Procurement Calendar-Time and Quality Target and Actuals ref : SB07 for any process. Example; Recruitment; Promotion; Appraisal; Retrenchment etc. 446 SCM and Tactical Affinity Programme clextra DAPA for Vendors and other Contractors Procurement Vendors Affinity-Loyalty Points Accounting System to ref : SB08 motivate; recognise and reward Achieving Supplier Contacts and - or Firms 447 SCM and Tactical Vendor Rating Quick Indices on custom-definable Quality vs Procurement System Cost; Speed vs Quality etc. ref : SB09 448 SCM and Operations Stockflow Pre-posting any day multiple entries on Procurement pre-Accounting user-configurable parameters for any item in any ref : SC01 location. Usable as Sales Purchase Reject Waste Sold Bought Sales-Return daybook. 449 SCM and Operations Inventory ONLY IF RFID installed …. Automated tracking Procurement Transactions of Sales Items out of Stores. ref : SC02
  • 31.
    http://clextra.com 450 SCM and Operations Inventory Physical Dimensions and Weights to plan Storage and Procurement Features Movement. ref : SC03 451 SCM and Operations Tables Between Stores - Premises - Location for Time - Procurement Cost and Distance to assist Logistics Planning and ref : SC04 Cost Management 452 SCM and Operations Customer Owners People work for people. People in firms may be a Procurement customer; supplier; Agent; Trader; Driver; ref : SC05 Competitor; Distributor; etc. Relationship-based general information on this individual is linked to several modules in clextra. 453 SCM and Operations End-of-Day Feature End-of-day from any number of individuals or Procurement store-wise or any-other collection of procurement ref : SC06 related data from across the world if required. 454 SCM and Operations Orders Vendor facing. PDF Purchase orders. Procurement Management Accountability. Status, Deliveies and Payment ref : SC07 tracking.. Accountability. Avallability of all related Documentation. 455 SCM and Operations Vendor Specific Custom forms for addiitional Industry specific Procurement Forms comparison and information related to Suppliers ref : SC08 or Supplier Firms. 456 IT MIS EDP Strategic Alternate Access Alternate technologies. Subject to technical ref : TA01 technologies. feasibility in your geographic locations and range of service providers; we have wireless; mobile; cellphone; PDA; Data-logging; and other means of acquiring and dissemination information from and to clextra. 457 IT MIS EDP Strategic Periodic Checklists Security and Business Continuity is a matter of ref : TA02 Good Practice. Automated; semi-automated or manual check-lists for Daily; Weekly; Monthly; Quarterly accountability. Delivery; Quality; Time and Costs for any and all System Administrations Tasks. 458 IT MIS EDP Tactical Information Technology. The best - and avoiding the worst - of ref : TB01 Technology open standards and proprietary systems. Flexible Consulting with parameterisation; integration with any other system. Transaction driven. Print; Screen & Graphic Reporting Engines. Browser, Internet, Intranet, Extranet, XML, ODBC. Mobile & Fixed access. 459 IT MIS EDP Tactical Hosting Options From experiences of provided solutions to firms ref : TB02 such as GE; HP; iflex; HealthScribe; Sonata & ITC; etc. Choice of Intranet; Extranet; or Internet; VPN, software and hardware firewalls; India OR USA centric. 460 IT MIS EDP Tactical Integration with Theoretically clextra can work with; in place of; ref : TB03 existing Apps before or after any other software system; including; SAP; PeopleSoft; Siebel; Oracle; IBM; HP; or Proprietary HR; Financial; Production; or Logistics System. Please indicate to initiate a dialogue in this area with us. 461 IT MIS EDP Tactical PC Penetration PC Penetration. The PC penetration or Number ref : TB04 Consulting of employees to PC;s ratio can be very low. You can use any Cyber-Cafe or Internet Parlour; or establish clextra kiosks to allow quick and easy access. 462 IT MIS EDP Tactical Time Series. Measures. Daily. Weekly. Monthly. Quarterly. ref : TB05 Field-gather Annual Can be used for Sales. Customer Support; Daily Production figures; Stocking norms; Software FPAs or LOC. BPO & Call centres COPC; Quality metrics. Customer Usage etc
  • 32.
    http://clextra.com 463 IT MIS EDP Tactical Information All spreadsheets, documents, schematics, ref : TB06 Bibliography electronic documents can be catalogued and stored person-wise online. 464 IT MIS EDP Tactical Information Costing A first step to IPR Management; categorise, sort ref : TB07 and price all important information within the organisation; place individual responsibility; track usage etc. 465 IT MIS EDP Tactical Decision Quality Create Checklists of Touch-Points for every ref : TB08 key-decision you wish to track in every or any transaction in the organisation. Assigned to one key-accountable individual. Track each decision on a Rating of 9 - high to 1 - low 466 IT MIS EDP Operations Search. Within a Within a clextra-Pattern-Map Set for random ref : TC01 person-1000+ key-words and retrieve Employee Records linked to this. 467 IT MIS EDP Operations Housekeeping Daily automated OR manual option of backup of ref : TC02 all data. 468 IT MIS EDP Operations Import. Batch mode Take-in any external available data into clextra. ref : TC03 or Real-Time Subject to Technical Feasibility and Accepted Order Specifications 469 IT MIS EDP Operations Export. Batch mode Export any available data out of clextra for use ref : TC04 or Real-Time with other packages. Subject to Technical Feasibility and Accepted Order Specifications 470 IT MIS EDP Operations Library System Preferably with RFID; librarian-less trust based ref : TC05 automated Library system. Supports and includes DVD; CD; Video; Film; Reports etc. 471 IT MIS EDP Operations Quarks Feature Any - Every week all 168 hour end-of-hour post of ref : TC06 aggregate average count etc. 472 IT MIS EDP Operations clextra Sources The main Pmap fields allows a field that specifies ref : TC07 the source of that data. For example keyboard entry; real-time from another ERP or other application etc. 473 IT MIS EDP Operations Program allow-deny Any single link can be individually allowed or ref : TC08 denied for access to any one or group of individuals. This can over-ride earlier and general set-up. 474 IT MIS EDP Operations Auto import Being a real-time application - given appropriate ref : TC09 permissions and access tools - just placing data into pre-configured and pre-specified directory -paths in clextra will import the data into clextra. 475 IT MIS EDP Operations Graphics Time Series Comparisons with a Line-Chart; ref : TC10 Bar; Pie and other graph types. 476 IT MIS EDP Operations Report Generator Essentially a Screen Browser based Information ref : TC11 Viewing System clextra does not foresee hard-copy printing. However the rengine Report Generation Module allows users configurable Reports. 477 IT MIS EDP Operations Input Forms To ease keyboard data-entry; fields from several ref : TC12 clextra databases and tables can be custom configured to be made into one-form. This can also be made accessible to specific individuals such as when out-sourced for data-entry. 478 IT MIS EDP Operations Search Search Breaker is a unique approach to ref : TC13 searching. While a search-engine allows a single line interface others offers pull-down cirteria lists. In clextra you are presented a page of creiteria to select one-click for the required listings.
  • 33.
    http://clextra.com 479 IT MIS EDP Operations Search-List-Compa A unique design approach in clextra allows most ref : TC14 re information to short-listed first from a Search-Breaker choice allowing slicing and diciing of the same data from different user view-points. 480 IT MIS EDP Operations Remote Support A range of options and in-built Systems, ref : TC15 Programs, Controls, Checks and Balances for Remote and Virutal Support. 481 IT MIS EDP Operations Campaign Feature Campaign or Service Plan. This code across all ref : TC16 modules allow a Plan or Campaign based search retrieval and grouping of any part of most information within clextra. 482 Warehousing Strategic Warehousing and Options for inventory 3PL, 4PL or 5PL managed. and Logistics VMI RFID and Internet enable; remote 24x7x365 focus ref : UA01 on India for physical delivery and logistics with Global Information access. 483 Warehousing Strategic Vehicle Servicing Car and other Service Garages require a unique and Logistics Solution flow of acquiring returning vehicles. Staff are ref : UA02 accountable; inventory is used; tools are distributed; expensive plant and machinery has to be charged. Accounting is automated. 484 Warehousing Strategic Geographic When thousands or millions of pieces of your and Logistics Inventory Solution expensive assets are spread across a city, state, ref : UA03 country or internationally you need to know and track every piece of deployed equipment or asset. While Google or Mapquest gives you a real-world it has still to be code-mapped into legacy or new IT systems. clextra provides a framework for this. 485 Warehousing Tactical Commute Travel Local commute; travel logistics. Bus Schedules; and Logistics Logistics Timings; Self-Services; anywhere-access; with ref : UB01 sub-contract access. 486 Warehousing Tactical Locations of Stock Many will admit they do not know where there and Logistics physical stock is. clextra provides a ref : UB02 comprehensive solution for finger-tip; one-click away know-how on Stock whereabouts across the organisation. 487 Warehousing Tactical Vehicle Known Apartment Towers and Commercial Complexes and Logistics Parking - Tracking match of Parking slots to Owners-Tenants or ref : UB03 Businesses and also of Drivers etc. Gate movement IN and OUT linke to availability of RFID or other Technology. 488 Warehousing Tactical Vehicle Unknown Free Parking Camp Sites Controlled areas count and Logistics Parking - Tracking and basic information on Parking slots and of ref : UB04 Drivers etc. Gate movement IN and OUT linke to availability of RFID or other Technology. 489 Warehousing Operations Location to Distance; Cost per kg; Time taken from any one and Logistics Location Tables location or store to any other. ref : UC01 490 Warehousing Operations Checklists Checklists for accountability; Delivery; Quality; and Logistics Time and Costs incurred for Packing Slips; ref : UC02 Installation; Delivery; Documentation; Payments; Collection etc. 491 Warehousing Operations Docket Tracking Product Maintenance; Helpdesk; Software and Logistics Support; Medical Diagnostics Procedures; Plant ref : UC03 Maintenance; Equipment Servicing; any industry especially with more than 10 steps; involving more than 1 person; and spread over time and/or geographical locations. 492 Warehousing Operations Physical Assets Physical Location of Assets and Equipment. and Logistics Locator Premises, FloorPlan etc. ref : UC05
  • 34.
    http://clextra.com 493 Warehousing Operations Assets in Process Track an asset within a Workflow or Schematic and Logistics Locator Chart. ref : UC06 494 Warehousing Operations Location of Assets Many will admit they do not know where there and Logistics physical assets are. clextra provides a ref : UC07 comprehensive solution for finger-tip; one-click away know-how on Assets whereabouts across the organisation. RFID and other technologies are required for Mobile assets. 495 Warehousing Operations Locations of Many will admit they do not know where there and Logistics Premises Business presence is. clextra provides a ref : UC08 comprehensive solution for finger-tip; one-click away know-how on Physical Location-Premises-Stores etc. whereabouts across the organisation. 496 Warehousing Operations Outstation Travel People travel as a plus and minus of Logistics. and Logistics Travel Sheets Accounting and Management. ref : UC09 497 Warehousing Operations GPS Interface between GPS or UTM Maps to and Logistics Map-Information Databases Information Workflow Checklists etc. ref : UC10 System Manual and Automated options. 498 Warehousing Operations From and To Information between any 2 important points - and Logistics information especially when 1000s of points - can be ref : UC11 maintained visually with a data interface. 499 Workflow and Strategic Integrated Project Make or Buy, Time-Sheets, Finance, Budgeting, Communication Environment Chart of Accounting, Expenses Control, Bill of s Materials, Manufacturing Tracking, Out-source ref : VA01 management. 500 Workflow and Strategic Project User-definable Account Groups. Daily, Weekly or Communication Management Monthly Targets spreadsheet generation. s Budgeting Automated pull or manual entry of Perido to Date ref : VA02 and Period data. Gap calculator. Universal and Familiar spreadsheet interface. 501 Workflow and Strategic Project For every Project or Task upto 9 stages of Communication Management estimation each with upto 3 levels of Grouping. s Estimation ref : VA03 502 Workflow and Strategic Project Work Methodology and Tool to design, create, maintain Communication Break-down and use Project Workbreakdown Structures s Structure using dICA and-or d-ITT-o. ref : VA04 503 Workflow and Strategic Project Components Track all related information regarding Communication Resources, Time, Money and Scope. s ref : VA05 504 Workflow and Tactical Project Estimation Upto 9 points of Estimation with user-definable Communication Heads. Can be linked to Budgets, Actuals and s WBS ref : VB01 505 Workflow and Tactical Project Tasks Pre, In and Post Project tangible and intangible Communication Evaluation evaluation of ten key user-definable metrics. s ref : VB02 506 Workflow and Tactical Project clextra Any user-definable visuals and links to most Communication Artworks Feature aspects of any part of any Project for ease-ofuse s and macro or micro management. ref : VB03 507 Workflow and Tactical Project Risk Quantified risk against any and all aspects of a Communication Metrics Project. s ref : VB04 508 Workflow and Operations Project Setup project and groups of projects, establish Communication Documentation unlimited Documents against each. s Directory ref : VC01
  • 35.
    http://clextra.com 509 Workflow and Operations Project Project and/or Task related Documentation. Communication Documentation on Options of Directory type, Correspondence. s Tasks User-definable 10x10 or more Topical any filetype ref : VC02 centrali repository. Learning and Training related content. Forms and Templates. 510 Workflow and Operations INFRASTRUCTUR For Networked Enterprise solutions for Communication E Blackboard, Whiteboard, Paintings, Photographs s etc. Servers, Networking, Wireless, Bandwidth ref : VC03 etc. available as single-point FULL solution on request. 511 Workflow and Operations Whiteboard Centrally remote managed individual kiosk-type Communication one-way display of Shopfloor Information, s Instructions Sheets, Production Dashboards or ref : VC04 any PPT slide presentation like visual in formation. 512 Workflow and Operations Blackboard Centrally remote managed individual kiosk-type Communication one-way Digital TV or Minotor display s of.Business, Guest, Employee, Visitor, Patient ref : VC05 information. Real-Time Signage. Full solution owned, leased, monthly subscription or pay-per-use options. 513 Workflow and Operations Paintings Centrally remote managed individual kiosk-type Communication one-way Digital TV or Minotor display s of.Paintings - Royalty free or Owned-Purchased ref : VC06 by you Full solution owned, leased, monthly subscription or pay-per-use options. 514 Workflow and Operations Photographs Centrally remote managed individual kiosk-type Communication one-way Digital TV or Minotor display of s Photographs - Royalty free or Owned by you Full ref : VC07 solution owned, leased, monthly subscription or pay-per-use options. 515 Workflow and Operations eCatalogue Centrally remote managed individual kiosk-type Communication one-way Shopfloor Digital TV or Minotor display s of Retail Items from Inventory. Full solution ref : VC08 owned, leased, monthly subscription or pay-per-use options. 516 Project Strategic Infrastructure An internet-intranet-extranet 24x7 collaborative Management environment is established when clextra is ref : WA01 deployed. 517 Project Strategic Stakeholders Investors; Employees; Customers and Supplier Management communications can be integrated or kept ref : WA02 separate. 518 Project Strategic Brand Development Allows dual-branding and development of your Management own Service-Lines or Service-Brands ref : WA03 519 Project Strategic Values Open architecture; based on Trust; Management Transparency; encouraging dialogue as the only ref : WA04 means to resolve differences in culture; work-styles; goals and objectives. 520 Project Strategic User Support CxO level Consulting and Mentoring support and Management services to ensure your own and clextra goals are ref : WA05 achieved. 521 Project Strategic Customer Response Walkin customers at Retail Stores; Call-centres; Management Tech-Support or Major Account help-desks can ref : WA06 record Product-wise feedback, response, enquiries for every customer. This can be centrally or nominated-person responded to by email OR phone in the most appropriate way. This is a part of the Affinity - Loyalty Card Module of clextra. 522 Project Strategic TDEM Complete solution. Management Product-Services-Strategy-Tactical to Operations ref : WA07 for a one-off or continuous Targetted Direct eMail Marketing Programme.
  • 36.
    http://clextra.com 523 Project Strategic Alert System On login - deMail and/or Alerts. Subject to local Management and international Service Providers clextra ref : WA08 supports SMS and GRPS mobile interactive text communications. 524 Project Strategic Workflow Strategic Options on a range of featues linked to cash time Management and ROE ROI on ay aspect of your business. ref : WA09 525 Project Tactical Portal Provides a portal allowing access to any and all Management other IT Products and Services. ref : WB01 526 Project Tactical Storage and Archive Centralised Corporate Storage of all written - Management messaged communications. ref : WB02 527 Project Tactical Help Tactical what-if scenarios from alternate Management Documentation on mirror-instances; planning; forecassting; target ref : WB03 Models vs actual comparisons on Delivery; Quality; Cost and Time 528 Project Tactical User Support Tactical on-going functional support which are Management out-sourced or consulting specific to HR; ref : WB04 Finance; Sales; Marketing; Delivery; Manufacturing or Trouble-shooting as availed of. 529 Project Tactical House Magazine View current and past issue. Uploaded and Management managed from a central single location. ref : WB05 530 Project Tactical Corporate View current and past issue. Uploaded and Management Newsletter managed from a central single location. ref : WB06 Customer self-service OR OR mailing list OR electronic mailing services are separate features or additional service. 531 Project Tactical Minutes of Meetings Collaborative minutes of meetings recorded and Management managed by the creator. View at any time by all ref : WB07 members who attended. Agenda for a meeting can be sent and made available to this group with the same document. Attachment option for more complex Minutes or pre-defined template formats. 532 Project Tactical Workflow Tactical Options on a range of featues linked to cash time Management and quality from Production Lines Teams and ref : WB08 Individual make or buy and other areas for pre, during and post order decision making. 533 Project Operations Privacy and Works independent of conventional email Management Security avoiding its pitfalls and problems. Access and ref : WC01 controls on a need-to-have and need-to-basis only. 534 Project Operations Multimedia Visual access; use-of-colour; Management text-voice-broadband; mobile; wireless and ref : WC02 emerging technologies. 535 Project Operations Context-related Topic and context specific communications Management forcing precise and focussed communications. ref : WC03 536 Project Operations Help Extensive and detailed documentation for actual Management Documentation on step-by-step howto for import; export setup. ref : WC04 Logic 537 Project Operations User Support Immediate presence Support Executives or Management Operators and technical 24x7x365 support via ref : WC05 emal; clextra Bouquets and Brickbats response system and Pedro Customer Call Management. 538 Project Operations Communications. Internal email; to teams or up to 12 allowed Management Internal … Grades. Subject to availability of existing ref : WC06 infrastructure & technical feasibility. Archive of all such communications.
  • 37.
    http://clextra.com 539 Project Operations Communications. External email; to teams or up to 12 allowed Management External … Grades. Subject to available ISPs & Service ref : WC07 Providers offer and technical feasibility. Archive of all such communications. 540 Project Operations Communications. Cell-mobile Phone SMS messaging to teams or up Management Cell-mob … to 12 allowed Grades. Subject to available ISPs & ref : WC08 Service Providers offer and technical feasibility. Archive of all such communications. 541 Project Operations Notice Board Set of the last 16 Notices. Corporate Notice Management Board. ref : WC09 542 Project Operations Corporate Diary Corporate holidays; Events; Schedules; Training Management calendar etc. Individually accessible ref : WC10 543 Project Operations Personal Classifieds Place, View and Manage personal classifieds of Management upto 9 categories. Buy, Sell or Other. ref : WC11 544 Project Operations Mailing Labels Print hard-copy addresses for postal mail to Management Employees, Customers, Vendors or Contact ref : WC12 Firms for Pre-sale, in-sale or post-sale communications. 545 Project Operations MailMerge - HTML Manage HTML mail merge facility for internal Management lists or external lists. Useful for Subscriber or ref : WC13 Customer Communications, Letters to vendors, Distance Learning Communications etc. 546 Project Operations MailMerge - PDF Manage PDF mail merge facility for internal lists Management placed automatically into individual clextra ref : WC14 cupboards. Uses include; Appraisal Letters or Compensation Letters to each Employee etc. PDF is forwarded, stored and/or printed as required. 547 Project Operations MailMerge - Use clextra to manage and export lists for use Management Integration with standard Word Processing Packages for ref : WC15 printing or creating custom word-processing documents. 548 Project Operations Soft Copy Centraliseed scan of all Corporate documents. Management Document Bin them to the appropriate Individual, Team or ref : WC16 Management Workflow Checklist for one-oint single file central access control and administration. 549 Project Operations Workflow Day to day - where technical feasible - minute to Management Operational minute operational dashboards alerts on any ref : WC17 aspect of your business across loations regions and time-zones. 550 Project Operations WBS Work Breaddown Structure. Format any Management complex Project or Domain areas into 5 levels of ref : WC18 managable trer-like lists using the clextra structured Module-Block-Segment approach. 551 Technologies Strategic Open Source Open Source potential integration import-export and Integration to any electronic platform including major ERP ref : XA01 packages AND most existing functional LEGACY packages. 552 Technologies Strategic RFID RFID Enable across the package to support and Integration 16-char EPC or other standards for Product; ref : XA02 People or Asset tags. 553 Technologies Strategic Thin-Client Thin-Clients and Server-Technologies reduce and Integration TCO - Total Cost of Ownership quite ref : XA03 dramatically. clextra is an ideal Software Compoent in this Solution.
  • 38.
    http://clextra.com 554 Technologies Strategic Internet Brings all the advantages of the internet - intranet and Integration - extranet - with adequate safeguards against the ref : XA04 dis-advantages. Allows only known users with specific 2-levels of login. 555 Technologies Strategic Browser Brings all the ubiquitous benefits of using any and Integration browser - all access including System ref : XA05 Administration from a web-browser interface. 556 Technologies Strategic unix Standard open operating system allows modular and Integration development dis-aggregated add-ons; device ref : XA06 independence; hardware add-ons; remote communications; uptime; least-baby-sitting of all operating systems. 557 Technologies Strategic Technologies The future now. Integrated RFID; thin-client; and Integration wireless access any-device add-on. ref : XA07 558 Technologies Strategic clextra CAM Using the Customer Applications Menu feature - and Integration Feature every and ALL local, intranet or external ref : XA08 customer applications can have a link within dexra - making it your ONLY Portal with all the access controls available including dual-system logon. 559 Technologies Strategic dPay Payment clextra Payment Gateway. In and outflow of and Integration Gateway ePayments; credit or debit; pre-paid or pos-paid; ref : XA09 cash or bank; inflow and outflow controls trhough secure systems and process, encryption and verification options; choice of vendors; banks. Subject to technical dfeasibility and risk-acceptance of key-stakeholders. 560 Technologies Strategic DON Feature Online forms can be integrated from a new and Integration independent webpage OR linked to your existing ref : XA10 Websites to any existing clextra application or module as a custom-configured feature. 561 Technologies Tactical Grill Feature Apply pre-stored and customisable grill to view and Integration data especially Time-Series from a variety of ref : XB01 analytical perspectives. 562 Technologies Tactical User Definable Help You can create and define your own help for each and Integration of these within your package. ref : XB02 563 Technologies Tactical Bouquets and This is a feedback link available on every menu to and Integration Brickbats allow any and all users to provide immediate ref : XB03 feedback to dexttra and your personnel on any problems; suggestions; feedback; complaints; non-functionality etc.This should be seen FIRST by your nominee and then referred to your clextra Channel Partner. 564 Technologies Tactical Pedro Pedro - the customer support mascot offers and Integration 24x7x365 remote quick-response support. ref : XB04 565 Technologies Tactical Tunnel Feature Allows shift from one clextra installation instance and Integration to another without logging in again. ref : XB05 566 Technologies Tactical Import-Export Import-export and potential real-time - definitely and Integration batch - to an TCP/IP device logged information. ref : XB06 567 Technologies Tactical Easy import-export DIY - Do-it-yourself CSV; HTML and XLS batch and Integration import-export to any application including major ref : XB07 ERP packages. 568 Technologies Operations Memory Level I and-or Level 2 individual short-term and Integration memory remembers the last usage of several ref : XC01 features.
  • 39.
    http://clextra.com 569 Technologies Operations Single Sign-on To enhance usability and ease of use once and Integration established allows by-passing the 2-layer login ref : XC02 feature. 570 Technologies Operations Single Menu Once established and if only a few access are and Integration required for the organisation - a simple single ref : XC03 menu ONLY can be turned on for the entire installation instance. 571 Technologies Operations Words Feature Every industry has different words for the same and Integration thing. Patient or Student or Customer. Doctor or ref : XC04 Manager etc. Use words in clextra specific to your industry across the package. 572 Technologies Operations Touch & Feel. With nice-to-have-details such as pre-loaded and Integration Ergonomics templates; models; and a Thought-for -the-day on ref : XC05 every logout. 573 Technologies Operations Extensive About, Help. Extensive inbuilt background information and Integration Help & Usage and reading. Context related help; and even ref : XC06 user-definable help. Once you have established your metrics. 574 Technologies Operations Response & Nobody is perfect. If there is anything we can do and Integration Feedback to clextra to help, suggestions, feedback, bricks and ref : XC07 bouquets you can send them to us with an every menu-screen option of an R.S.V.P. 575 Technologies Operations Equipment interface TCI-IP, RS-232C; X-25 etc.Interface to and Integration equipment such as XML, DICOM standards in ref : XC08 Healthcare etc, 576 Technologies Operations Instrumentation Gauges; graphs; visuals and alerts to monitor any and Integration Dashboard equipment activity on-demand - at browser ref : XC09 load-time. 577 Technologies Operations Real-time Presence RFID - Subject to Technical & Geographic and Integration on Shopfloor Feasibility and availability of Technology such as ref : XC10 RFID Tags; list all employees present; absent; etc. 578 Technologies Operations ODX Feature Import any spreadsheet with heads and multiple and Integration rows - Data Sheet. Convert each to individual ref : XC11 PDFs and place in individual cupboards completely automated. Eg. Monthly Customer billing, Canteen Usage, Payslips, Medical Record etc. 579 Technologies Operations Secuirty Camera Any number of locations upto 200 cameras in and Integration each thumbnail cab be brought to bring last ref : XC12 frame-capture or real-time video depending on IPTV bandwidth and infrastructure deployed. 580 Technologies Operations clextra diofta Query clextra from a handheld or text-browser and Integration device on a range of keywords and return text ref : XC13 data, voice, visuals and related multimedia information from a centralised or de-centralised information system. 581 BASE Access Strategic Strategic Decisions Take decisions on internal Transparency levels; and Culture direction; Mission Alignment; Vendor Information Dependence; fixed and variable costs; and all ref : YA01 related Commercial and consequent Risk factors. 582 BASE Access Strategic Vendor Self-Service Need to use and access; communications; and data-entry; 24x7 remote; consultants and Information out-sourcing collaboration. ref : YA02 583 BASE Access Strategic Customer Need to use and access; communications; and Self-Service data-entry; 24x7 remote; consultants and Information out-sourcing collaboration. ref : YA03
  • 40.
    http://clextra.com 584 BASE Access Strategic Dual-System A unique design in clextra allows a dual-system and login. Employees are different from Customers. Information Vendors from Clients; Doctors from ref : YA04 Administrators; Nurses from Patients etc. It provides significant advantages when you implement this. 585 BASE Access Strategic clextra Each and all of the moduels as Strategic Tactical and Configurator or Operational can be activated de-activated Information selected configured and managed with varying ref : YA05 degrees of automation. This is the clextra Configurator. 586 BASE Access Tactical Management Every employee using current employee ID and Self-Service and/or clextra ID can login and use all features Information relevant to an an individual. ref : YB01 587 BASE Access Tactical Vendor Self-Service Need to use and access; communications; and data-entry; 24x7 remote; consultants and Information out-sourcing collaboration. ref : YB02 588 BASE Access Tactical Customer Need to use and access; communications; and Self-Service data-entry; 24x7 remote; consultants and Information out-sourcing collaboration. ref : YB03 589 BASE Access Tactical Soft Information - Beyond the call of duty; potential; talent; and Employees capacity; decides where they will take your Information business in the coming years. Allow your ref : YB04 employees to handle soft-information as a self-service. 590 BASE Access Tactical Soft Information - It is easier to follow than lead. Leaders with and Manager-Leaders Psychological Damages can Damage your Brands Information and your Company itself. It is the Soft ref : YB05 Information that matters. 591 BASE Access Tactical Soft Information - The more you know about your Customer as a and Customers Group of Individual Buyers your success rates are Information going to increase logarithmically. Your ref : YB06 black-book on Customers. 592 BASE Access Tactical Soft Information - Knowing your vendor well is the key to and Vendors Supply-Chain-Management Fundamentals. Information ref : YB07 593 BASE Access Tactical Soft Information - Security systems depend on early warning of and Visitors-Guests Friend-or-Foe. Signals, patterns & intuition. Information Easy, comfortable access to those who deserve ref : YB08 and absolute IRON GATES for those NOT deserving; requires plenty of Soft Information. 594 BASE Access Tactical Facing Setup Every clextra instance is typically employee and Facing. However, it can also be set to Customer; Information Vendor; Patient; Student; Doctor; Asset; Patent; ref : YB09 Subcriber or any other-Face independently or in parallel. 595 BASE Access Operations Employee Every manager or Team Leader; subject to and Self-Service set-up; has access to ALL information on his or Information her Team Members and other engaged; activated ref : YC01 and access-allowed clextra Modules. 596 BASE Access Operations Vendor Self-Service Need to use and access; communications; and data-entry; 24x7 remote; consultants and Information out-sourcing collaboration. ref : YC02 597 BASE Access Operations Customer Need to use and access; communications; and Self-Service data-entry; 24x7 remote; consultants and Information out-sourcing collaboration. ref : YC03
  • 41.
    http://clextra.com 598 BASE Access Operations clextra Single graphic interface menu to access most and Manufacturing relevant modules related to Manufacturing and Information Bouquet Order Processing and Tracking ref : YC04 599 BASE Access Operations clextra CRM Single graphic interface menu to access most and Bouquet relevant modules related to a Customer Enquiry, Information contacts and Tracking follow-up ref : YC05 600 BASE Access Operations clextra PMS Single graphic interface menu to access most and Bouquet relevant modules related to a full cycle of Information Employee as a Performance Management System. ref : YC06 601 BASE Access Operations clextra LMS Single graphic interface menu to access most and Bouquet relevant modules related to a full cycle for Information Training and Learning using most salient features ref : YC07 of the clextra Platform 602 Content and Strategic Content Strategy In an era of information overload deciding what Verticals information learning and teaching is required by ref : ZA01 your entire workforce to mmet your business or organisation goals. Manpower planning and establishing the strategy for this. 603 Content and Strategic INTRANET Base login and options on links menus to access Verticals PORTAL MOST other applications within the Corporate ref : ZA02 Intranet. Access to external Vendors and Customers for self-service etc. 604 Content and Strategic RETAIL Retail Management Accounting and Control Verticals Systems and Solution : Industry Level Solution ref : ZA03 vertical from Strategy to Operational Software Tools and Automation Integration. Horizontal across Sourcing; Inventory; People; Finance; Cash-flows; Brand-Assortment and Profitable lines. Risk Management. CPFR. 605 Content and Strategic AGRO Agriculture Management Accounting and Verticals Control Systems and Solution : Seed to Market. ref : ZA04 606 Content and Strategic SERVICES Services Management Accounting and Control Verticals Systems and Solution. Top-level metrics on ref : ZA05 Service-Levels with drill down to detailed per-person per-station per-measure data-collection hourly; daily; weekly; monthly or quarterly across any number of customer-accounts. 607 Content and Strategic LEGAL Small and Medium Lawfirms complete solution Verticals for a collaborative environment to manage cases, ref : ZA07 communications, follow-up, accouting, domain knowledge, documentation repository, tracking, research etc. 608 Content and Strategic TRADE Trading Activity Management Accounting and Verticals Control Systems and Solution : ref : ZA07 609 Content and Strategic DIGITAL Digital Content Management Accounting and Verticals CONTENT Control Systems and Solution : ref : ZA08 MANAGEMENT 610 Content and Strategic BANKING MACS Basel-II Principles; Post-dated-Cheques; Verticals micro-Finance Management, Risk-Metrics; ref : ZA09 Verification; Checklists; Step-Cycles. 611 Content and Strategic INSURANCE Insurance Premia, Agent Information; Incentives Verticals MACS Planning; Risk Metrics; Portfolio Management; ref : ZA10 AR, AP, Procurement, Cashflow, Forecasting, Budget etc. 612 Content and Strategic HEALTHCARE Administrators; Business Metrics; Doctors; Verticals MACS Patient History; Case History; multi-modality; ref : ZA11 whole-health approach. Third-party insurers; nursing access; multimedia electronic records; DICOM file imports
  • 42.
    http://clextra.com 613 Content and Strategic TELECOMM Subscriber information black-book; Campaigns Verticals and Plans; Demographics; Psychographics and ref : ZA12 Geographic information. Automation-interface to Equipment. Out-sourced Modules-Components Management. Digital paperless eCash Vouchers for pre-paid mobile services. 614 Content and Strategic EDUCATION and Teacher-Mentor and Student database; Syllabus Verticals CONTENT Management; Hourly usage Billing Management. ref : ZA13 24x7 Remote access. Learning and/or Training Styles. Excellent for Distance Learning Institutions. Teacher feedback on Studen Progress. Mentor access. 615 Content and Strategic Verification Verification services for pre-paid Telecomm, Verticals Services Homeland Security, Financial risk investments or ref : ZA14 other consumer documenation plus verification archive, audit and retrieval for multi-locational mutlit-utitlity agency access. 616 Content and Strategic Card database Post smartcard or other ID card supply Verticals Services after-market services, subscription management, ref : ZA15 authentication and verification, payment history, personal information system etc. 617 Content and Strategic ERM Enterprise Risk Management measures and Verticals metrics across all tangible and intangible assets ref : ZA16 and aspects of the business. 618 Content and Strategic EDGE Edge : Secondary Market; Competitive Verticals Information; Industry comparison; Global ref : ZA17 tariffs; ratios and metrics across HR; Finance; Logistics; Materials; Sales; Purchase; Customers; Vendors etc. 619 Content and Strategic VALUE Valuation : non-Listed companies desirous of Verticals increasing their Valuation. Financial and ref : ZA18 Management Accounting; Team Development; Patents; IPR; investor relationships; transparency; etc. 620 Content and Strategic CRM Identifying, Knowing, Maintaining a contact and Verticals return on investment profile of every small or ref : ZA19 large account linked to Product Lifecycle Returns. 621 Content and Strategic SCM Modules to -Plan-Source-Make-Delivery-Return Verticals with options for Strategic Tactical and ref : ZA20 Operational Business Processes. 622 Content and Strategic PLM Product Lifecycle Management. Combines Verticals Planning; Stock; Installed Base and Cash ref : ZA21 deployed assigning them to individual responsibility. 623 Content and Strategic EAI Enterpris Applications Integration assumes a Verticals mature organisation with a range of solutions ref : ZA22 already in place. However the need is to proect investments and integrate existings applications. clextra is an ideal tool to achieve this. 624 Content and Strategic ERP Catch-all word for Large Software Solutions … Verticals everyone has an ERP few deliver. clextra is an ref : ZA23 ERP that delivers. 625 Content and Strategic BI Business Intelligence is akin to Human Verticals Intellgience or Military Intelligence. Constantly ref : ZA24 gathering, sifting and storing information for the ONE time you will need it. Alternately Dashboards, Cuhing, Analytics, Grills and Bands are features offered by clextra to study existing data after IMPORT or EXPORT of available information.
  • 43.
    http://clextra.com 626 Content and Strategic KM The essence of knowledge is in applying it. clextra Verticals is a true to its promise Knowledge Management ref : ZA25 Solution applicabel to any Enterprise whatever its size. 627 Content and Strategic Display Signage Comprehensive Solution. Server Side, Client Side, Verticals Solution Systems, Methods, Hardware, Software, ref : ZA26 Operations, Wired, wireless, scalable, outdoor, indoor, home, office, internal or external customers etc. 628 Content and Strategic Rail Ticketing Indian Railways, Metro, Automatic Fare Verticals Solutions Collection, Integrated with Kiosks, Point of Sale ref : ZA27 Systems, legacy PCs or Thin-Clients etc. 629 Content and Strategic Road Transport Primarily back-end integration of any and all Verticals Ticketing Solutions existing applications with as-needed deployment ref : ZA28 where gaps in solutions exist. 630 Content and Strategic Kiosks-ATM,cash,P Networked integration of digital, IP wired or Verticals OS Integration wireless self-aware devices central re-concilliation ref : ZA29 virtual to physical inventory synchronisation, dervice alerts, routine reporting, multple user bases etc. 631 Content and Strategic Kiosks-ATM,cash,P Networked integration of digital, IP wired or Verticals OS Uptime Services wireless self-aware devices central re-concilliation ref : ZA30 virtual to physical inventory synchronisation, dervice alerts, routine reporting, multple user bases etc. 632 Content and Strategic PRAY model for People Risk Assessment and Yeild. Systems of Verticals People Risk metrics to manage any and all persons that any ref : ZA31 firm interacts with in a Business, Social or Community Environment. 633 Content and Tactical Content Operations Establish role based syllabus. Customise this for Verticals individuals. Set learning goals. Establish a ref : ZB01 training calendar. Setup subject wise mentoring. Handle this with distance learning. 24x7x365 training exists today. 634 Content and Tactical Boutique Services Whether integrated or external; one-off or Verticals on-going; on-site or off-shore involving; any ref : ZB02 industry for all functions; 10 or 500 employees Boutique; niche and speciality services organisations can bring un-believable cost-savings for their customers thereby increasing their profits. 635 Content and Tactical HRIS to HCM Human Capital Management. People work for Verticals People. Without people anything else in Business ref : ZB03 in incomprehensible. The clextra approach to Human Resources and People. 636 Content and Tactical Finance Everything in money terms. Activity; idea; action; Verticals time; people; materials; brand; product; teams; ref : ZB04 seats; cash … The clextra approach to Finance using Metrics; Ratios and Costs. 637 Content and Tactical Manufacturing Overall Equipment Effectiveness. Periodic Verticals assessment Production Targets and Actual ref : ZB05 Process Improvement. Quality Metrics. Wastage controls. Product-Lifecycle Management Tactical Decision Making. 638 Content and Tactical Warehouse End to end multi-location Warehouse and Verticals Management Inventory Management full-scope Information ref : ZB06 and Technology Solution options and Services.
  • 44.
    http://clextra.com 639 Content and Tactical Logistics People and things are in different places at Verticals different times - they keep moving or have to be ref : ZB07 known; moved; tracked; costed and Expenses managed. The clextra approach to Logistics. 640 Content and Tactical Trade or Periodic assessment Production Targets and Verticals ancillary-manufactu Actual Process Improvement. Quality Metrics. ref : ZB08 ring Wastage controls. Product-Lifecycle Management Tactical Decision Making. Supplier Ratings; Risk Metrics. 641 Content and Tactical eCash Complete electronic solution for electronic cash Verticals management such as pre-paid Vouchers for ref : ZB09 TeleComm Mobile Services. Payment for Video on Demand, Reports downloads, Picture Storage etc. 642 Content and Tactical Verification System and Administration including Risk Verticals metrics on Distributors, Retailers and ref : ZB10 Subscribers, Customers. Full-system of checklists. Soft-copy storage of documents, photss, mutlimedia components, accountability, out-sourced management. 643 Content and Tactical Marketing and Portfolio Maps. BCG Matrix. Perception Maps. Verticals Brands Lead competitor metrics Tracking. ref : ZB11 Product-Lifecycle Management 644 Content and Tactical Sales Target Setting. Incentives Planning. Points and Verticals Cash options. ref : ZB12 645 Content and Tactical Communications Full-system of batch and real-time Verticals communications. Messaging; chat; email, ref : ZB13 attachments; archive; targetted direct email etc. 646 Content and Tactical Service Garage Complete Solution for a Vehicle Services Garage. Verticals Intake and Release of Vehicles. Inventory. Tooks ref : ZB14 tracking. Capx. And OpEx usage. Work Assignment and Flow. Billing. Collections. Vehicle History. 647 Content and Tactical EY Behavioural In partnership and if an Ernst and Young, Cap Verticals Matrix Gemini customer 26 point Behvarioual ref : ZB15 Assessment for employees across the organisation. Self-Service and/or Moderated. 648 Content and Tactical Gallup Q12 In partnership and if a Gallup customer, 12-point Verticals Employee Satisfaction survey across the ref : ZB16 organisation. Self-Service and/or Moderated. 649 Content and Tactical CHRS Competency CHRS method of Competency Total Solution. Verticals Mapping Usually with a field Workshop and always ref : ZB17 Moderated in Self-Service Mode. Upto 2 Superiors Rating. High integrity of data and related Employee Competencies and Skills. 650 Content and Tactical APARTMENT Front-end, Middleware and Back-end for Verticals COMPLEX end-to-end Convergence. Digital TV, digital ref : ZB18 SOLUTION Audio, Live and Stored, Telephony, Intercom, Home security and surveiilance, Metering, eCommerce, Subscription Management, Tenant Information System, Tenant Profiling, Garage Management etc. 651 Content and Tactical COMMERCIAL Front-end, Middleware and Back-end for Verticals COMPLEX end-to-end Convergence. for Digital Surveillance ref : ZB19 SOLUTION Cameras, TV, Telephony, Utility Metering, Budgeting, Facilities Management, Tenant Information System, Tenant Profiling, Vehicle Access and Information System etc. 652 Content and Tactical Performance Complete Solution for Mandatory Performance Verticals Appraisal for PSEs Appraisal for Middle Management in India ref : ZB20 Public Sector Enterprises.
  • 45.
    http://clextra.com 653 Content and Operations Content Actual content. Standard repository comes with a Verticals Management full license purchase of clextra. Your repositories ref : ZC01 can be placed as either for Fresher OR Refresher. 654 Content and Operations Competition Track competitor sales; secondary sales; Verticals Tracking after-market information; access to field-sales ref : ZC02 and third-party agency out-sourced data-gathering. Gather text intelligence on troughs and spikes. 655 Content and Operations Performance Mandatory Performance Appraisal for Top Verticals Appraisal for PSEs Management in India Public Sector Enterprises. ref : ZC03 656 Content and Operations Post-Dated Personal Loan Portfolio Management. Cars; Verticals Cheques. Houses Mortgages; Personal Loans; scan ref : ZC04 ISO-PORRI cheques; aged; plan cash-flows etc. Internet-Secure-and-Outsourced Portfolio of Regular Receivables Information. 657 Content and Operations Digital Content Inventory and catalogue of soft-copy online Verticals Delivery encrypted files. User or co-ordinator selected, ref : ZC05 payment options inclue pre or post-paid - other options subject to payment gateway availability - subscription and subscriber information system with access controls and automation options including RFID and mifare. 658 Content and Operations RSS Feed RSS Online Feed of user-definable Groups and Verticals Management links. Extracted and formatted to be relevant. ref : ZC06 Option to mix and push into Display Signage Applications. 659 Content and Operations Voicemail Solution Integrate with VOIP or web-based comprehensive Verticals IP based Voice Mail. To one or more Admin., ref : ZC07 Staff or Customer and/or Supplier one-point voice communications. 660 Content and Operations Videomail Solution Audio-Vidoe mail communications to one or more Verticals Admin. Staff, Customers or Suppliers. Useful for ref : ZC08 training, learning, saving on travel costs. Convergent multimedia broadband solution. 661 Content and Operations i3s Solution Integrated Safety, Security and Surveillance. Verticals Bibliography, storage and retrieval of any and all ref : ZC09 routine, events and alerts information across 1000s of cameras, sensors of integrated broadband digital covergent content. 662 Content and Operations QSR Solution Quick Service Restaurants : Espcially for chains Verticals using Tablets connected to Central Servers. ref : ZC10 Payment Gateways; central Procurement; HR, Finance etc. Comprehsnesive Single-Point Solution.