1
CIVIL PROCEDURE

  Readings
  I. Text Books
  1. D.F. Mulla, Code of Civil Procedure 1908: in 2
  volumes. A practitioner’s book to be used carefully
  because some of the principles do not apply in
  Tanzania.
  2. Rao and Chitaley Code of Civil Procedure: in 3
  volumes
  3. Bullen and Leaks Precedents on Pleadings edited
  by I.H. Jacob Suitable for practice – drafting.
  4. I.H. Jacob Chitty’s Queens Bench Forms. It gives
  method of drafting and interrogating. It covers many
  things except Plaints.


  5. Lord EVERSHED Atkins Court Forms 33Volumes
  very relevant to students.
  6. Odgers On Pleadings
Shaukut Mahmood the Code of Civil Procedure 1908
  7. Flemming Civil Procedure – America book.
  8. Spry Civil Procedure in East Africa
  II. Statutes


                            2
CIVIL PROCEDURE

Civil Procedure Is a procedure of litigation before the
Courts in civil matters. It does not give any litigant a
right but it enacts a procedure through which a right
can be obtained.
It is a Procedural law unlike Substantive law which
gives a right to a litigant.

Functions of Civil Procedure
It helps resolve the arguments presented from the
parties. Civil Procedure helps in making availability of
right clear through procedural rules.
Procedural law assures you that the rights given by
the substantial law are obtainable.
The Civil Procedure Code of Tanzania is divided into
two parts:
1. The Main Act
2. The Schedules

In Tanzania the Schedules are regarded as part of the
Act – which is a departure from the general rule of
interpretation that, neither schedules nor preambles
are part of the Act.

Construction of the Civil Procedure Code
Since Civil Procedure is adjectival law and a way of
facilitating administration of justice or rather the way
through which a right is obtained, the provisions of
Civil Procedure Code should be given the literal
meaning.


                            3
All rules of procedure must be geared at speedy
ending of litigations and at a lower cost. Procedure is
a servant – which should facilitate and not hinder the
administration of justice.
IRON AND STEEL WARES V C.W.MARTY & CO. (1956)
23 3ACA 175, 177.
Procedural statutes must be interpreted liberally. This
position is illustrated in KENDAL V HAMILTON (1878)4
AC 504 at page 525:
“Procedure is but a machinery of the law after all, the
channel and means whereby is administered and
justice reached. It strangely departs from its proper
office when in place of facilitating it is permitted to
obstruct and even extinguish legal rights and thus
made to govern where it ought to subserve.”
Procedural Statutes should not be construed in such a
technical way that will make the court fall to do
substantial justice between the parties.

Preliminaries           to          Litigation
In any litigation of a civil nature there must be two
things co-existing:
1. Parties 2. A dispute
NB: Not all disputes go to court but only those which
are contested.
The claimant must present a demand note upon the
prospective defendant – in East Africa it is called a
Letter of Demand.

A LETTER OF DEMAND: Is a letter presented to the
prospective defendant by the prospective plaintiff
laying down the claims by the prospective plaintiff

                           4
against the prospective defendant and demanding a
remedy at the threat of being sued. There is no a
prescribed form of a letter of demand provided it
provides the necessary information.
Three things in a Letter of Demand:
1. Concise statement of claim - which should
contain particulars sufficient for the prospective
defendant to know what is required by him.
2. That letter should contain a clear and
unambiguous demand that the claim should remain
good.
3. The letter should prescribe a limitation period
normally 14 days within which the claim should be
met or else legal proceedings may be instituted
without any further notice. This is what has made the
letter be referred to as a notice with an intention to
sue.

NB. The Civil Procedure Code does not provide for a
letter of demand. It is provided for in the Advocates’
Remunerations and Taxation of Costs Rules GN 193 of
1924 under Rule 61 it is provided as follows:
      “If the Plaintiff in any action has not given the
defendant notice of his intention to sue, and the
defendant pays the amount claimed or found to be
due, at or before the first hearing no advocate’s fee
will be allowed       except on the special orders of
the judge."




                           5
JURISDICTION
Section 13 of the Civil Procedure Code provides that –
every suit should be instituted in the Court of the
lowest grade competent to try it.

What is Jurisdiction?
Is the power to hear and determine matters which
are litigated before a tribunal. Jurisdiction is a
question of law – a creature of statute e.g. in
Tanzania the High Court is established by the
Constitution and the subordinate courts are
established by the Magistrates Court Act, No. 2 of
1984. Jurisdiction is determined before the beginning
of the proceedings.
Refer the case of Anisminic Case – which is just
persuasive for Tanzania.

TYPES OF JURISDICTION
1. Territorial Jurisdiction
Every court has a limited area is i.e. geographical area
– in which it operates. This is provided by statute
establishing that court and in some cases by the
subsidiary legislation.
In Tanzania there is only one court having jurisdiction
over the whole country, this is the High Court of
Tanzania.
There are two High Courts in the United Republic of
Tanzania. These are – the High Court of the United
Republic of Tanzania and the High Court of Zanzibar.
The two High Courts have concurrent jurisdiction.


                            6
Note: The High Court of the United Republic has no
jurisdiction over matters of Zanzibar       but     over
matters arising from the mainland, except over
matters relating to election. The High Court of
Zanzibar has no jurisdiction over election petitions
arising from the Mainland but for matters of petition
      arising from the House of Representatives.
The High Court of the United Republic of Tanzania has
several registries. However the High Court has no
territorial limit.
The High Court Registries Rules give guidance on the
procedure of filing a case in registry in which the case
arises, or the area where the parties reside. There is
an exception to this rule depending on the
circumstances of the case therefore, a case can be
filed in any registry but it will be transferred to its
proper registry.

District Court
Territorial jurisdiction of a District Court is the
boundaries for which the district is established.
Refer the Magistrates’ Courts Act, 1984.
Note: That there are two types of District
Magistrates. Those designated as Civil Magistrates -
who are entitled to hear civil cases. And those not
designated to hear civil cases.

Resident Magistrate’s Courts
Magistrates of the RM’s Courts have a wider
jurisdiction. Their territorial jurisdiction is the region
in which that court is established.
Refer the Magistrates’ Court Act, 1984.

                             7
Primary Courts
Territorial jurisdiction of Primary Court is limited to
the district where it is established.
Eg. the Primary Court Manzese is the Primary Court of
Kinondoni at Manzese.
Jurisdiction in respect of Immovable Property
The court in which area the property is situated has
jurisdiction over the property. In claims relating to
immovable property the party can chose between
where the claim arose and the area where the other
party voluntarily resides and/or works for gain.
Primary Court has unlimited jurisdiction over
property held under customary law and in matters of
Islamic Law.

2. Exclusive Jurisdiction
This is jurisdiction vested in a particular court in
exclusion of any other court. This jurisdiction is
normally vested in that court by a statute e.g.
Workmen’s Compensation Ordinance which vests
exclusive original jurisdiction over matters relating to
the Ordinance to the District Court; and the Rent
Restriction Act(REPEALED & LAND ACT CAP 113 IS IN
EXISTANCE) which grants exclusive original
jurisdiction over matters relating to landlord and
tenant to the Housing Tribunal.

3. Concurrent Jurisdiction
Courts are said to exercise concurrent jurisdiction
when they can exercise original jurisdiction over the
same matter.


                            8
4. Pecuniary Jurisdiction
 Refer to Magistrates Courts Act, 1984.
All courts except the High Court are courts of limited
jurisdiction.
Note:
-1- The Magistrates Courts Act provides for
unlimited jurisdiction over Islamic & Customary Law
to Primary Courts but the Act does not provide
      specifically for exclusive jurisdiction over civil
matters related to Islamic     and Customary Law.
-2- Under the MCA all civil proceedings in respect of
Islamic and Customary law must be commenced in
primary court unless the Republic or the President is a
party or the High Court has granted leave to the
parties to       otherwise    commence       the   civil
proceedings.
-3- A primary court has no jurisdiction to civil case
unless customary law is a applicable or the
proceedings are for the recovery of civil debts of
interest due to the United Republic of Tanzania or
Local Authorities.

THINGS TO CONSIDER BEFORE INSTITUTION A SUIT.
1. Subject matter for the suit –
Whether movable or immovable.
Movable Property –the suit most be field in the court
within which the subject      matter is situated.
Immovable property – where the property is suited.
Refer section 13 of the CPC
Pecuniary jurisdiction.
The place where the defendant resides or works for
gain.

                            9
NB: Suit may either follow the defendant or the
cause of action.
A company may be sued or sue where there is head
office or branch or sub-office of the company.

Authorities
1. Francis Mwijage v Boniface Kabalemeza (1968)
HCD n. 341
2. Sheikh Kassim Suleman v Ayubu Kamgila (1968)
HCD n. 79
3. Walumu Jilala v John Mongo (1968) HCD n. 81
4. Edward Kalemela v Muyebe Rwenjege (1968)
HCD n. 80

2. RES JUDICATA
Is a Common Law doctrine included in the Civil
Procedure Code. It has two elements Res meaning
matter and judicata meaning already adjudicated.
Res judicata – bars subsequent litigations involving
matters substantially and directly the same between
the same parties or parties claiming on the same
thing.
-Res Judicata applies only to civil litigations.
The doctrine of Res judicata is based on two well
known maxims of Common law.
1. interest reipubicae est ut sit finis litium i.e. it is in
the public interest that there be an end to litigation.
2. nemo debet bis vexari pro aedem causa i.e. no
one should be in jeopardy twice on the same ground.



                             10
Elements of Res Judicata
Refer Section 9 of the CPC
1. There must exist two suits – one finally and
conclusively determined and another pending.
2. These suits must be before courts of competent
jurisdiction.
3. These suits must have been between same
parties – or parties claiming under the same title.
4. The matters that are directly and substantially in
issue between the parties in the pending suit must
have also been directly and substantially in issue in
the previously decided suit.

Effect of the doctrine
A person cannot raise an allegation which has
previously been decided against him by a court of
competent jurisdiction. A Judgement may be assailed
by an appeal where a right of appeal exists, or by
applying to have the judgment set aside where it was
obtained fraudulently or collusively.
See: R.V. Hatchings (1881), 6 QB 300.

3. PARTIES TO SUIT
In every civil litigation there has to be a minimum of
two parties opposing each other in respect of a
dispute. In other words there has to be a lis inter
parte with litis contestatio
The two parties to a suit are PLAINTIFF and
DEFENDANT.
Plaintiff is the party who has a right to relief against
the other party (defendant). The right of relief should
not be a moral right but a legal right.

                           11
In simple civil suit there is a single plaintiff and a
single defendant while in a complex suit there are
various parties.

Parties to a Civil Suit
1. Proper Party
Is that party without whom no effective decree can
be issued? His presence is necessary because the
court must either give a relief or a decree against
him. Proper parties are parties who must be before
the court.

2. Necessary Party
Is the one whose presence in court is desirable but
whose absence does not render the decree
ineffective Eg. In nuisance suit over a flow of sewage
– a decree against the tenant can be affected through
the landlord. The tenant is therefore a proper party
because he will bring the landlord - he is therefore
not a necessary party but a proper party and the
landlord the necessary party.
The person who will be compelled to do what is
sought is the necessary party.

JOINDER OF PARTIES
General Principle: The CPC does not compel a party to
combine the parties in pursuance of their rights nor
does it prohibit joinder of the parties.

Joinder of Plaintiffs
Order 1 rule 1 CPC provides – More than one plaintiff
can sue against one or more defendants if the right to

                          12
relief claimed by them arises out of the same act or
transaction or a series of acts or transactions and if
separate suits were brought, common questions of
law or fact may arise.
Refer: Yowana Kahere V. Lunjo Estates Ltd [1959] EA
319
      Kanani V. Desai Uganda High Court Civil Case No.
469/1953

Points to Consider In Joinder of Plaintiffs
These are just practical and not legal considerations
1. Parties (co-plaintiffs) must have common
interests. Where it is likely to differ in interests it is
advisable that each plaintiff should sue separately.
2. Co-plaintiffs should be represented by the same
advocate to avoid prejudice to parties.
3. Joinder of plaintiffs shortens the conclusion of
the case.
4. It is less expensive to sue jointly than separately
in terms of mobilizing the parties and witnesses.
5. Suing jointly does not require presentation of
third party notice against some of the plaintiffs.
6. Where the defendant is successful against some
of the plaintiffs, there is a real likelihood that the
successful plaintiff will be found to be jointly liable to
the defendant.

Cause of action
Means all the facts which have to be proved by
plaintiff in order to be entitled to a relief or the facts
which are going to be proved in the court in order to
obtain relief.

                            13
Joinder of Plaintiffs
The test is whether the plaintiffs are jointly interested
in the same subject matter.
See: BOLTON V SALIM KAMBI [1958] EA 360
The Plaintiff sued under Cap. 360 for damages on his
own behalf as the dependant of his deceased son and
at the same time he sued as the administrator of the
estate of his deceased son. The issue was whether
there was a proper joinder of plaintiffs. It was held
that there was nothing wrong for a person to sue in a
dual capacity.

Joinder of Defendants
Rule 3 of Order 1
It is not necessary that every defendant should be
interested as to all the reliefs claimed in any suit
against him. The rule does not require that all
questions of law or fact must be common to all the
parties. It is sufficient that there is a common
question either of law or of fact.

ILLUSTRATIONS
1. A brought a suit against B, C, D and E for
recovery of certain documents of title and the goods
in suit were his property; that defendant B obtained
from him the documents of title relating thereto by
fraud and made them over to defendant C; that
defendant C wrongfully dealt with them and sold the
goods to defendants D and E; that D and E claimed to
retain the goods and documents of title.


                            14
Held: The right to relief against each of the
defendants is based upon the same act, namely, the
alleged fraud of B, and this is so notwithstanding the
fact that there may have been subsequent acts or
transactions in which the different defendants are
individually concerned and which may enable them to
raise distinct defences. If different suits were
instituted, at least one common question of fact
would arise, namely the exact nature of the act
imputed to B, which would have to be investigated,
presumably on the same evidence separately
adduced in several suits.
 2. A holder of 100 shares in a company, brought an
action against the company, its several directors and
promoters and executors of a deceased director and
promoter, as against the company’s cancellation of
the allotment to him of his shares and return of his
money by paid him with interest, damages as against
the defendants other than the company and
rectification of the company’s register of members by
the removal of his name therefrom. He alleged that
he had applied for the shares upon the faith of, and
induced by the misrepresentations contained in the
prospectus issued by and with the authority of the
defendants (other than the company and executors)
and of the deceased.
Held: In substance, the shareholder has one
grievance, call it a cause of action or what you like,
and in substance he has one complaint, and all the
persons he sues, have according to him, been guilty
of conduct which gives him a right to relief in respect


                           15
of one thing which they have done, namely issuing of
the prospectus.
See also the case of Thomas V. Moore (1918) IKB 555
per Lawrence, J.
‘that the court has discretion as to allowing the
joinder of the defendants and that as there was a
common question of fact to be tried………….the court
would in exercise of that discretion allow the two
defendants to be joined in one action. As a General
Rule: where claims by or against different parties
involve or may involve a common question of fact
being against different parties of sufficient
importance in proportion to the rest of action to
render it desirable that the whole of the matters
should be disposed of at the same time, then it will
allow the joinder of plaintiffs or defendants subject to
its discretion as to how the action should be brought.
It should be noted that joinder of the parties and
causes of action is discretionary in the sense that if
they are joined there is no absolute right to have
them struck out but it is discretionary in the court to
do so.’

The plaintiff can at his option join as parties all or any
of the persons jointly or severally liable on any
contract including parties to bills of exchange,
hundies and promissory notes. See: Order I Rule 6
CPC.

If the Plaintiff is in doubt as to the person from whom
he is to obtain redress, he may join two or more
defendants in order that the question as to which of

                            16
the defendants is liable, and to what extent may be
determined as between all parties. See: Order I Rule 7
CPC.

Under Which Circumstances Can You Join the
Defendants?
1. In joining defendants one has to look at the
connection between the defendant and the cause of
action. See: Order I Rule 3 CPC
2. Rights to relief must arise out of the same act or
transaction
3. If separate suits are brought against the
defendants there would be common question(s) of
law.
Authorities
i)      PETER COMPANY LIMITED V. MANGALJI &
OTHERS [1964] EA80.81

ii)     THE BANK OF INDIA V. AMBAL SHAH &
OTHERS [1965] EA 18
“Although the word ‘same’ must govern the words
‘series of acts or transactions’ it is not necessary that
all defendants should be interested in the relief
claimed in the suit but it is necessary that there must
be a ‘cause of action’ in which all the defendants are
more or less interested although the relief asked
against them may vary:”
Reference should be made to Section 111 of the
Evidence Act, 1967. That, the plaintiff must prove the
case against the defendant or all the defendants on
balance of probability.


                            17
REPRESENTATIVE SUITS (GROUP ACTIONS) - Order I
Rule 8 CPC
Where several plaintiffs claim a right to relief against
one defendant or several defendants jointly and such
persons have the same interest in the subject matter
of the suit then a member of them may sue on behalf
of all.
They are actions normally filed against a public or a
particular social group, trade union, local authority or
in declaratory actions against the Government.
The persons suing are known as Representatives.
Before they file the suit they must first obtain a
representation order by filing an Application
(chamber summons) and Notice must be given in
Mass Newspaper to invite objections.
If there is no objection the court will grant the
Representation Order. Judgment given out of a
representative suit shall bind all the parties.

EFFECT OF JOINDER OF DEFENDANTS
Addition of defendant necessitates amendment of
the pleadings in order to incorporate the new
defendant into the action and he must be served with
a copy of the pleadings.
NB: Addition of defendant is subject to the Law of
Limitation.
Order I Rule 12: Where there is a joinder of parties
whether plaintiffs or defendants, some of them will
be allowed to appear, plead and conduct the case on
behalf of the others.


                           18
Where there is more than one plaintiff or defendant,
the parties may appoint one of them to proceed on
behalf of the others provided the authorization must
be in writing and signed by the parties. The parties
not appearing in court will be bound by the decision
of the court.

THIRD PARTY PROCEDURE – Order I Rule 14 CPC
A procedure under which a party who is not an
original party to the proceedings is brought to the suit
and thereby made a party to the suit. The third party
is neither a plaintiff nor a defendant.
It is a procedure which enables the court to make
orders in favour of the defendant against the third
party when the defendant is found liable to the
plaintiff.
In effect it is a procedure which enables the court to
entertain two suits simultaneously thereby saving
time and reduce costs of litigation.
This procedure is available to the defendant only.
The relevant provisions for Third party Procedure are
Paras (a), (b) and (c) of rule 15 of Order I of the CPC.
In the Case of Bhamji Laxman limited V. National Sisal
Authority & the NBC. High Court Civil Case No.60 of
1993 (DSM).
Mwaikasu J., stated in the said case that:

“At this juncture let it be pointed out that a Third
Party Notice is for all    practical purposes, a form of
a claim by the defendant instituted against the third
party, for the relief’s sought. As the defendant’s claim
against the third party hinge on the nature of the

                           19
claim of the plaintiff against the defendant, it is for
a fair and just adjudication of the dispute imperative
that the third party should be supplied with sufficient
facts as to make him       know adequately the nature
of the claim as to be in a position to prepare a proper
and adequate defense. The need for such sufficient
facts to enable      the third party identify the nature
of the claim comes to the fore when one        reads
Rule 17 of Order 1 of the CPC.”

Conditions For Third Party Proceedings
The applicant must establish that he is entitled to
contribution or indemnity.
Refer: Parry V. Carson “In order to bring himself
within the ambit of Order 1 Rule 14 the applicant
must show upon the face of the pleadings and upon
his supporting affidavit that he would be entitled to
indemnity from the third party in respect of the
amount which the plaintiff claims from him in the
event of that claim be successful.”
Refer also:     WALUSIMBI V. A.G (U) [1959] EA 223
           RMINGHAM & DISTRICT LAND CO. V.
LONDON NORTH                                  WESTERN
RAILWAY CO. (1887) 34 Ch. D.261
           WYNE V. TEMPEST [1897] 1Ch.110 at 113
per Chitty, J;
“A right to indemnity may arise under express or
implied contract or by reason of an obligation from
the relation of the parties, such an obligation arises in
equity from the relation of the parties when two
trustees are liable for a breach of trust and one has
applied the trust fund to his own use; in that case the

                            20
trustee who has so dis-applied the fund is liable to
indemnify his co-trustee; so where a man has
requested another to hold as a trustee for him shares
upon which there is liability for calls or the like the
trustee is entitled to an indemnity not merely out of
the trust property but by the cestui que trust i.e. the
beneficiary.”
Note: - The right to indemnity is a contractual right
while the right to contribution is an equitable right.
     - Joint tortfeasor has a duty to contribution
against his co-tortfeasor.

LIMIT OF THIRD PARTY PROCEDURE
Edward Kirondoke Kaggwa V. Castapereira [1963] EA
213
“Third Party Procedure is limited to claims to
contribution or indemnity only and it cannot be
extended to a right for damages.”
Refer – Insurance Claims.
Overseas Touring Road Services V. Africa Produce
Agency [1962] EA      190, 191.

HOW TO INSTITUTE THIRD PARTY PROCEEDINGS
Order I Rule 14(2) CPC
The defendant desiring to issue a third party notice
must file an application to Court for leave to issue the
third party notice. The application has to be made ex
parte supported by an affidavit. The affidavit will
disclose the grounds upon which the application is
made. It must disclose a cause of action.
-    Once there has been service to the Third Party ,
he becomes a party to the proceedings

                           21
-     The Third Party is liable when the defendant is
liable when the defendant is liable to plaintiff.
-     The Third Party can not challenge the plaintiff’s
case but he may defend himself against the
defendant. i.e. pointing out that the defendant is not
entitled to any contribution or indemnity.

APPEARANCE
Three Modes of Appearance
1. Personal Appearance
A party in law is entitled to enter appearance
personally except where it is a corporation.
Corporations can only appear by an advocate.
Iboos Petrol Station V. Blackstone Utility 1955 KLR 20
A Corporation aggregate has got two types of agents.
Agent for ministerial/administrative purposes i.e.
manager to cleaner. Agent for Legal purposes who
must be an advocate.
NB: A Company’s Secretary though a lawyer is not an
agent.
Section 3 of the Advocates Ordinance Cap. 341 define
an advocate as a person whose name appears in the
Roll of Advocates.
TLCs Act, 1971 - TLC advocates cannot act where
their employers are not involved.
Zuberi Gigi V. The Returning Officer 1974 LRT n.52 – A
State Attorney is an advocate only when he is acting
on behalf of the State.

2. By As Advocate Duly Instructed
W. V. Commissioner of Income Tax [1973] EA 187
defines who an advocate is. To be duly instructed an

                           22
advocate must be able to answer all the material
questions relating to the suit.
     Clients verify this by signing the pleadings.
See: KIWANUKA & CO V. WALUGEMBE [1969] EA 660
        BUGERERE COFFEE GROWERS V. SSEBBADUKA
[197O] EA 147
            KAFUMA V. KIMBOWA HUILDERS &
CONTACTORS [1974] EA 91

3.   By Recognized Agent
     A recognized agent is a person who holds power
of attorney.
     A power of attorney is a document/instrument
by which a person empowers another person to
represent him or act in his stead for certain purposes.
     The person so appointed becomes an Agent of
the Principal.

Order III rule I CPC provides:
     “Any appearance, application or act in or to any
court, required or authorized by law to be made or
done by a party in such court, may, except where
otherwise expressly provided by any law for the time
being in force, be made or done by the party in
person or by his recognized agent or by an advocate
duly appointed to act on behalf or, where the
Attorney-General is a party, by a public officer duly
authorized by him in that behalf. Provided that any
such appearance shall, if the court so directs, be
made by the party in person.”
In the case of Hans Nagorsen V.BP Tanzania Ltd.
High Court Civil Case No. 239 of 1987 (DSM Registry)

                           23
Hans was authorized only to settle the claim against
the Defendant and not to act as authorized agent in
terms of the provisions of Order III rule I of the CPC.
Instead Hans Nagorsen filed a suit as the Attorney of
the Plaintiff.
Kyando J, held:
“I would readily agree that authorization to settle a
claim is not the same thing as authorization to
appear, apply or do any act in or to any court within
the meaning of those words as used in Order III rule l
of CPC. As I see it, Mr. Nargosen was authorized to
negotiate settlements out of court, of the claim. He
certainly was not, by the above letter, authorized to
institute a suit or suits. The institution of the present
suit by him was done without authority or power
therefore.”

It was also stated in the above case that. “Where a
party is unable to sign the pleading it may be signed
by any person duly authorized by him to sign or to
sue or defend on his behalf.”

In another case, Amirah Ahmed Jaffer V. Abdulrasul
Ahmed JAFFER & 2 Others. High Court Misc. Civil Case
No.48 of 1992 (DSM).
Mapigano J, stated as follows:
“As every lawyer perfectly understands, a power of
attorney is a formal instrument by which one person
empowers another to represent him or act in his
stead for certain purposes. Under Order III rule 2 (a)
of CPC a grantee of such powers is competent to go
to law and make application on behalf of the grantor,

                            24
providing that the instrument gives him such
authority, and I am acutely aware that the terms of
such instrument should receive a strict construction
as giving only such authority as it confers expressly or
by necessary implication.”

The trial Judge went on to say:
“By the same token where the principal himself
makes or does an application, appearance or act, his
attorney has no locus.”

INSTITUTION OF SUITS
Section 22 and Order IV of CPC
SUIT – Is a proceeding of a civil nature which has
been commenced by the presentation of a plaint or in
any other manner which has been prescribed by the
rules made under the Civil Procedure Code. Refer –
Mansion House Ltd V. Wilkinson (1945) EACA 98.
The word ‘plaint’ has no statutory interpretation.
It can however be defined to be “a memorandum
presented to court by a claimant setting forth his
reasons of complaint and the relief he is seeking from
the court. So as to be a plaint it has to comply with
the rules of pleadings as provided under Orders VI
and VIII of the Code.”

WHO MAY COMMENCE CIVIL PROCEEDINGS
Any person whose legal right has been infringed upon
has a right to bring a suit against the
infringer/intruder.
Order III Rule 1


                           25
Any act which may be done by a party to the
proceedings may be done by his agent or advocate
duly instructed.
As a general rule a plaint must be presented by the
plaintiff himself or by the person duly authorized.
Presentation of the plaint must be physical. The same
must be physically presented to the Officer of the
court authorized, a plaint cannot be presented by
post, telegram etc. See Order IV Rule 1 CPC.

TIME AND PLACE OF PRESENTATION OF THE PLAINT
There is no specific provision for time and place of
presentation of the plaint. Presentation can be made
at any time and place provided it has been presented
to the authorized person.
This saves time as once the party delays to file his
plaint he has got to apply to the Minister for Justice
for extension of time.
WHEN IS A SUIT TAKEN TO BE FILED
A suit is taken to have been filed when the necessary
court fees have been paid. Presentation of the plaint
has to be coupled with the payment of fees i.e. the
plaint must be accompanied by an official receipt
evidencing payment of the necessary fees. As for
payment of the fees by cheque, date of filing is not
the date when the cheque is signed but when it has
been honoured by the bank and therefore although it
is presented any time and place the plaintiff must pay
and get the receipt.
See: RATAN JAYAKISAN SHUKLA V. BAPU HIRAJI
KWILO AIR (V.24) Bomb.25
The judge stated:

                          26
“The Judge can accept a plaint at any hour he chooses
though outside office hours and at any place he
chooses and I see no reason to doubt that the Clerk of
the court who is a duly constituted officer of the
court with power to accept a plaint can accept that
plaint outside office hours and outside the court
building although I don’t, for a moment, the clerk is
bound to accept out of the court hours.”
See also PILLAI V. AMIR SALUB & ORS AIR Vol.1 [1914-
Mad.488]
Note: under the Court Fees Rules, Rule 8 allows the
court to grant leave to sue in forma pauperis. In
SINGH V. SINGH AIR 1937 Oush.452 it was stated that
‘….merely filing an application for leave to sue in
forma pauperis, though it is accompanied by the
plaint, does not amount to the institution of the suit
there cannot be any suit or plaint before the court
until the application to sue in forma pauperis is
granted.
A PLAINT must contain precise and concise statement
of the claim against the defendant, it has to disclose a
cause of action against the defendant, and it has also
to be verified by the plaintiff.
The same applies to all other pleadings.
SUMMONS - ORDER V CPC
Order V Rule 1 – Once a suit has been filed it is the
duty of the court to summon the defendant.
What is a Summons? It is a process (document) of
the court addressed to the defendant informing him
that a suit has been instituted against him and
requiring him to submit to the jurisdiction of the
court either by filing a written statement of defence

                           27
(WSD) within the specified period in the summons or
to enter appearance before the court for the
purposes of receiving the directions of the court on a
date specified in the summons.
PURPOSE OF SUMMONS
The procedure conforms with the rules of natural
justice that no party should be condemned unheard.
It gives the defendant an opportunity to be heard.
TYPES OF SUMMONS
There are two types of summons.
1. Summons to appear
2. Summons to file a Written Statement of Defence
(WSD)

NB: Summons to appear are normally issued by the
High Court. Summons to file WSD is invariably issued
by Subordinate Courts.
Mandatory (Basic) Requirements of a Summons
1. Under Order V Rule 2 a summons must be signed
by a Judge or a Magistrate or any other Officer
appointed by the Chief Justice for such purposes.
2. It must bear the seal of the court.
What is a seal? It is a metal endorsement on a
document. The High Court is the only court in
Tanzania with such a seal. However, rubber stamp
may be a valid seal as the endorsement seal.
     See: SATCHU V. A.G [1960] EA 508 and BAWMAN
V NADIOPE [1968] EA 306. There is a rebuttable
presumption that the person signing the     summons
has the authority to do so. One cannot inquire as to
the authenticity of the signature at the time of
service.

                          28
3. A summons must be accompanied by another
document. Order V Rule 3 of CPC - to enable the
defendant know the nature of the suit relating to the
summons. The Plaintiff must produce enough copies
for all the defendants.
APPEARANCE
Appearance by the defendant means the defendant’s
submission to the court and his intention to defend
his case.
EAP & T V. M/S TERRAZO PAVIORS [1973] LTR 58
 “Appearance under the Code means attendance in
person or by an advocate in court on the date stated
in the summons which is also the date of hearing.
Once the defendant is present, either in person or by
an advocate when the case is called up that is
sufficient appearance.”
Methods of Serving Summons
The general principle is that service of summons
should be made upon the defendant himself
personally.
The person who does the delivery of the summons is
the Court Process Server or the Court Bailiff (Officer
of the court specifically appointed for purposes of
serving processes of the court). Refer: Order V Rules 9
to 15 CPC.
Exceptions to the general principle:
1. Where the defendant has an agent authorized to
receive summons the summons will be served on the
agent.
2. Where the suit relates to any business or work
and the defendant does not reside within the


                           29
jurisdiction of the court then service may be made on
the Manager of the business.
3. Where the suit relates to immovable property
service of the summons must be made to the agent
with authority to deal with that property.
4. Where the defendant cannot be found, nor has
an agent or authority to receive summons then the
summons may be served on any adult member of the
household except the servant.
Proof of Service of Summons
Order V Rule 16 CPC
The person who receives the summons must
acknowledge receipt by signing on the original
summons which is then returned to the court and he
retains the copy. Where the party refuses to receive
the summons the Process - Server leaves the copy
aside and swears on the affidavit that the bearer has
refused to receive the summons and that a copy
thereof has been left on him. Witnesses’ addresses
may also be mentioned.
Where the defendant or his agent cannot be found
and no adult member of the family leave of the court
is sought to have a copy of the summons affixed at
the place which is known to be the defendant’s last
place of aboard.
Substituted Service (in substitution of personal
service) Order V Rule 20 CPC          The rules relating
the substituted service are exception to Rule 12 of
Order V in that they allow service of the summons by
a method which directly does not involve the
defendant. A plaintiff desiring to serve the defendant
with substituted service must get leave of the court.

                           30
He must apply by showing grounds and reasons for
this. Substituted service is done by publication in the
newspapers or by affixing the copy of the summons
at the court - house or at a public place where pubic
notices are given.
Note: Substitution of summons does not include
copy of the plaint. The copy of    the plaint will
remain in the registry and the defendant will be free
to go     there to collect it.
Other Forms of Service of Summons
Service by Post
Order V Rule 21 CPC
It is secured on application by the plaintiff. The
application is made orally on the mention date. Such
order is granted only upon the court being satisfied
that personal service will entail unreasonable delay.
Such a summons must be by registered mail. See
Order V Rule 30. The defendant will be required to
sign on the original summons as acknowledgement
and return the same to the court.       The defendant
may write a letter to the court to acknowledge
receipt of the summons.
Service outside the jurisdiction of the Court but
within Tanzania
Order V Rule 22 CPC
The court which issues a summons to the defendant
who resides outside its jurisdiction sends the original
summons and a copy to the court having jurisdiction
in the area the defendant is known to reside. e.g. The
RM in DSM sends summons and a copy to the RM in
Mbeya.


                           31
Note: This applies only to subordinate courts. A
subordinate court cannot send a summons to the
High Court.
When a summons is received by that court it is served
in the normal way. This court then returns to the
court which issued the summons the original
summons signed by the defendant with a covering
letter stating how the same was served.
Where the defendant resides within the jurisdiction
of Zanzibar the court may either send it by post or
physically by Officer of the court. Alternatively the
court may send it directly to the subordinate court in
Zanzibar.

If the defendant is in Prison the summons will be sent
through the Officer – In -Charge of the Prison
together with the copy of the plaint.

If the defendant is a member of the Armed Forces
then the summons is sent to his Commanding Officer
who has the duty to send the copy to the defendant
and return the original signed by the defendant.
Where the defendant is an employee in the Civil
Service then he may be served through his superior.

Service of Summons to Defendant outside Tanzania
There are two categories of countries.
1. Kenya, Uganda, Malawi and Zambia. These have
specific agreement with Tanzania as to service of civil
processes. Summons to these countries is served by:
i)      Post – registered mail where the address of
the defendant is known.

                           32
ii)     Directly to the court of that country with
jurisdiction over the place where the defendant
resides. On receipt the court will receive it as if it was
its own summons.
iii)    By the plaintiff or his agent sending the
summons personally with permission of the court.

2. Other Countries than those mentioned above.
These falls into two categories: –
1. Countries which Tanzania has agreement
(conventions) as to service
    of civil processes.
 2. Those countries which Tanzania has no agreement.

Where we have conventions the service is in
accordance with the agreement. Regardless of this
summons may be served by post or through the court
of that country. In Tanzania the Magistrate prepares
the summons, sends it with the plaint to the High
Court, for translation where the country is not an
English speaking country. The Registrar of the High
Court then sends it to the Principal Secretary of the
Ministry of Foreign Affairs which will prepare a
document to be sent to that foreign country.
Service through the foreign court will be as effectual
as our own Local Courts.

PLEADINGS
What is Pleading?
It is a legal term which connotes the presentation of
ones claim (case) before the court.
Generally, pleadings comprise of two things;

                            33
1. The documents which are presented before the
court in preparation of the suit. These documents lay
bare the material facts of the case.
2. The process of preparing the documents.

Order VI Rule 1 defines pleadings as the plaint, the
written statement of defence and the reply to the
written statement of defence and any other
document produced to court for the purpose of
preparing the suit.

The definition is not exhaustive. Pleadings also
include the process of preparing the documents
which lays bare the facts of the case and it includes
the documents themselves. In other words pleading
is an art of preparing the documents and on the other
hand it is the product of this art.

Functions of Pleadings
Pleadings serve three purposes:

i)         Pleadings inform the court about the
nature of the parties’ case by identifying the area of
controversy between the parties.
ii)        Pleadings serve the purposes of bringing
the parties to the issue. i.e. they establish litis
contestation
iii)       Pleadings put the dispute on record. They
define the area upon which the decision of the court
is sought and they put those areas in court. Once
there is decision the matter becomes res judicata.


                          34
NB: Every party in civil litigation is entitled to know
the      nature       of      the      case      against
him.
Thorp V. Holdworth (1876) 3 Ch. D. 637,639 (Leading
Case)
“The whole object of pleading is to bring the parties
to an issue and the whole meaning of the rules was to
prevent the issue being enlarged which would
prevent either party from knowing when the cause
came on for trial, what the real point to be discussed
and decided was. In fact, the whole meaning of the
system is to narrow the parties to definite issues and
thereby to diminish expense as delayed especially as
regards the amount of testimony required at the
hearing.”
See also Palmer V. Gudagni [1906] 2Ch. 494,497
Esso Petroleum Co. Ltd V. Southport Corpn. [1939/59]
AC 218,238
“The function of pleading is to give fair notice of the
case which has to be met so that the opposing party
may direct evidence to the issues disclosed by them.”
 Joseph Marco V. Pascal Rweyemamu (1977) LRT 59
Zalkha Binti Moh’d Juma Mazige [1970] HCD 132
N.J. Amin Ltd. V.B. Patel Co. Ltd. [1969] HCD 17

Note:
1. Only matters which are in dispute between the
parties should be the subject of decision by the court.
2. The purpose of pleadings is not to set out the
whole case. Pleadings are not evidence. They
comprise only of the allegations to be supported by
evidence.

                           35
3. Pleadings relate to material facts only and not the
law. Material facts are those which constitute the
cause of action. They constitute a right and the
infringement of that right and the consequence of the
infringement of that right.
4. As a general rule you do not plead particulars.
There are certain exceptions to this rule e.g. in
Negligence [which is a very wide tort], in fraudulent
cases – you must specify the nature of the fraudulent
behaviour, Misrepresentation, Undue influence,
Breach of Trust, Willful default. In all these actions
the party pleading them must give the particulars.
Refer Order VI CPC and the case of Northwestern Salt
Co. Ltd.

Certainty & Particularity in Pleading
The question of certainty was brought up in the case
of William V. Wilcox 112 ER 857,863. The case gives
tactics to be used in pleading.
The CJ said:
      “The certainty or particularity of pleading is
directed not to the disclosure of the case of a party
but to informing the court, the jury and the opponent
of the specific proposition for which it contains and a
scarcely important objects that bringing the parties to
issue on a single and certain point avoiding prolixity
and uncertainty which would very probably arise
from stating all the steps which lead up to that point.”
According to the case there are two categories of
facts
1. The material facts          2. The subordinate facts


                           36
Material facts:
These are those facts which lay out the cause of
action.

Subordinate facts:
These are those facts which may properly be called
evidence.

In the process of pleading you are required to plead
the material facts and not the subordinate facts.
See: Gautret V. Egerton 1867 LR 2CP 371, 374
      Lumb V. Bealimont 49 LR 772
      Millington V. Lorring 43 LT 657
The Nature of Pleading Certain Facts
Under Rule 6 - where a condition precedent is
alleged, the facts disclosing such condition have got
to be specifically pleaded.
Under Rule 8 - where a contract is illegal, a bare
denial will relate to existence of the illegality.
Under Rule 10 - where a state of mind is pleaded it is
enough to allege that state of mind, e.g. malice or
knowledge.
Rule 13 - you do not plead law because law is a
matter of judicial notice.
Subsequent pleading cannot raise new grounds.
A pleading which is not signed is a defective pleading
as it is required by the Rule 14 to be signed by the
party himself or his advocate or where the party is
absent from the jurisdiction of the court or where he
is unable to sign, by a duly authorized person.
The requirement of signatures is a requirement of
law; however the absence of signature is not fatal to

                          37
the proceedings. Therefore, where a pleading is not
signed, the defect may be curable by allowing the
party to sign.
Where a party applies to have a signature on his
pleading, the court will freely grant that application.
Rule 15 - demands that all pleadings have to be
verified.

What is verification?
It is a statement by a pleader showing that he has full
knowledge of what is pleaded and indicates his bona
fide of what he has pleaded.
Verification is a mandatory requirement.
Under Rule 15(2) - the party verifying must verify to
the different paragraphs separately and show which
are verified according to his knowledge, belief and
information.
E.g.

VERIFICATION
I. XY, being the plaintiff in the above named suit do
hereby state that all that is stated in paras 1 to 5
above is there to in the best of my own knowledge,
what is stated in paras 6 and 7 is there to the best of
my belief and what is stated in para 8 is there to the
information supplied to me by the Dean of Students.
DATED at Dar es Salaam this……….day of November,
1988.


……………………………………….
PLAINTIFF

                           38
A plaint which is not signed/ verified is ineffective and
  therefore the Officer of the court may reject it.
  The object of verification is to fix responsibility on the
  party pleading and to prevent false pleadings being
  recklessly filed or false allegations recklessly made.

  STRICKING OUT OF PLEADINGS

  Order VI Rule 16 empowers a court at any of the
  proceeding to strike out or amend any matter in the
  pleadings which according to it are offensive.

     Situations in which striking out of pleadings may be
     ordered:-
  I.      Where the pleadings or certain parts of the
     pleadings are unnecessary i.e. for being prolix.
 II.      When the court is of the opinion that such
     pleadings do embarrass the opponent eg. where the
     pleadings are so ambiguous that your opponent will
     be unable to understand them.
III.      Where the court is of the impression that the
     pleadings tend to prejudice that opposite party.
IV.       Where the court is of the opinion that the
     pleadings will tend to delay a fair trial.

  NB. The provision of Order VI Rule 3 must be read
  together with the provisions of Order VI Rule 16 and
  the case of N.J. Amin V. B. Patel & Co. Ltd    [1969]
  HCD 17.
  In the case of Knowles V. Roberts 1883 38 Ch. D 263 it
  was observed that courts should not dictate to the

                              39
parties how they should frame their case. However,
this is subject to the limitation that the parties must
not offend against the rules which have been laid
down by the law.
“ Where a party to civil proceedings alleges a
scandalous matter it will be struck out only when it is
irrelevant, however , not every indecent or offensive
is not material is to be considered as scandalous….”
If the scandalous matter is relevant it will not be
struck out.

AMENDMENT OF PLEADINGS
As a general principle courts have discretion to order
amendment of the pleadings at any stage. Order VI
Rule 17 can be employed at any stage before
judgment but it is advisable to effect them earlier
because it may be detrimental to parties.
See the case of Motohov V. Auto Garage Ltd [1971]
HCD 81 per Biron J,
“The making of amendments is not merely a matter
of the power of court but it is a duty so that
substantive justice will be made.”
Although Order VI Rule 17 is a permissive provision
the High Court has interpreted the conditions as
mandatory.
In Tanzania amendments are the duty of the court.
The party seeking amendment is the one to pay the
costs of amendment.
Endevain V. Cohen (1889)43 Ch. D. 187
Clarapede V. Commercial Union Association (1883)
32 WR 262.


                           40
When an inconvenience is suffered by a party can be
assessed in monetary terms and therefore attorned
by the court for the interest of determining it the
court will allow amendment.
Although amendment will freely be granted an
advocate will suffer the costs.          A professional
lawyer should not make an application to amend
pleadings.
Principle: The court will allow amendment when the
inconvenience caused can be assessed in monetary
terms to compensate the opposite party.
Shivji V. Pallegrino
The amendments are ordered only for the purposes
of making the existing pleadings clear. They are made
to elaborate the cause of action pleaded.
Amendment will not be awarded where the effect of
granting it will be to introduce a new course of action.
Also an effect of amendment is not to substitute the
cause of action for a new cause of action
Therefore, Order VI rule 16 cannot be used where
through negligence a party has failed to join causes of
action where he could have done so in the beginning.
When an order for amendment is granted the party
who has been allowed to amend must do so within 14
days. If he cannot do so he cannot amend his
pleadings unless he is allowed an extension of time by
the court.




                           41
PLAINT
Order VII CPC.
A plaint is a court document, it should contain a title.
What comprises of the title of a plaint? Refer: Rule 1
(a) (b) & (c).The name of the court, the number of the
case and the names of the parties.
In the body of the plaint the first paragraph should
contain the description of the plaintiff. Where there is
more than one plaintiff, each plaintiff will be
described in his own paragraph. The second
paragraph will contain the description of the
defendant. Where there is more than one defendant,
each will be described in separate paragraph.

The main body of the plaint will constitute the facts
which show the cause of action.

Towards the end of the plaint there should be a
statement to the effect that a claim has been made
and the defendant has refused to accede to it.

There has to be a paragraph towards the end to show
that the court has jurisdiction. This is followed by
prayer for reliefs. See: Rule 2.
Note: that a relief not prayed cannot be granted.
At the end of the prayer of relief there must be a
signature of the plaintiff or any person entitled by
the law. Then comes verification which should be
signed at the left hand corner by an Advocate or
Magistrate.



                           42
Normally there is no specific type of paper to use but
the practice is – pleadings are written in light green
paper which is less than 800 grams.
In England, there is a rule – it must be an A4 paper. In
Tanzania it must be in a foolscap.

General notes on Plaint.
-    The names together with the description and the
place of residence or place of business must be set
out in the title part of the plaint.
-    If the plaintiff is unable to give the full name of
the defendant it is better to state in the body of plaint
that, in spite of his best endeavor, the plaintiff could
not ascertain the full name of the defendant.
-    A corporation must sue or be sued in its full
corporate name.
-    Partners may be sued in the firm’s name.
-    The capacity in which the plaintiff sues or the
defendant is being sued ordinarily be set out in the
body of the plaint.
-    Dual capacity, as where the plaintiff sues in a
representative capacity as also in his own right should
be clearly stated.
-    Rule 1 (b) and (c) of Order VII requires that the
place of the plaintiff or the defendant is to be stated
in the plaint. It does not say anything about the place
where the plaintiff or the defendant carries on
business or personally works for gain.
-    Place of residence however, can only apply to
person actions. It cannot apply to a firm, corporation
or government.


                            43
Even in personal actions the place where a party
carries on a business or personally works for gain may
be, and often is stated instead of his place of
residence.
In case of registered company, the place where the
registered office of the company is situated or where
any of the branch offices of the company is situated.
The body of the plaint should be divided into
paragraphs and consecutively numbered.
Dates, sums and numbers should be expressed in
figure. See: Order VI Rule 2.

RETURN AND REJECTION OF PLAINT.

RETURN OF PLAINT
A plaint is return to the person who filed it in a wrong
court i.e court with no jurisdiction.
The return is made, either at the presentation of the
plaint or at the time of hearing. Only a judge or
magistrate has power to return a plaint.
It is a judicial act in the sense that the judge or the
magistrate must give reasons for the return and these
must be recorded.

Order VII Rule 10(2) the wrong court has no power to
dismiss the suit. You do not have jurisdiction to
entertain the suit therefore you do not have power to
dismiss the suit.
The proper approach is not to dismiss it but to return
it to the proper court.
This exercise may be at any stage of the suit. It
depends upon the time the court discovers.

                           44
REJECT OF THE PLAINT
     Order VII Rule 11
      There are three circumstances under which a court
     may reject a plaint:
  I.      Where the plaint does not disclose a cause of
     action.
 II.      Where it appears to the court that the claim is
     under-valued. After the court has given power to the
     plaintiff to value it properly and the plaintiff has
     declined to do so.
III.      Where on the face of the plaint the suit appears
     to be barred under any law. Eg. The Law of Limitation
     Act, Security of Employment, res judicata, res sub
     judice, etc.
     The flexible approach of courts of Tanzania has
     resulted into the amendment of rule 11 by GN
     228/1971. Under the amendments the Chief Justice
     used his power of making rules under section 81CPC
     to add a proviso to rule 11 which states: “Provided
     that where the court is of the opinion that, by
     allowing an amendment the plaint will disclose a
     cause of action, the court may order an amendment
     instead of rejecting the plaint.” The implication is that
     When the court rejects the plaint it must state that
     the reasons for so doing as this order are appellable.
     Rejection of a plaint is not a decision of the case on
     merits and therefore the doctrine of res judicata will
     not apply Rule 13 Order VIII.
     A rejection of the plaint under this rule does not
     operate by itself as a bar to the plaintiff against filing


                                45
a fresh suit on the same subject matter and of the
same parties.

DOCUMENTS TO BE RELIED UPON BY THE PLAINTIFF
IN A PLAINT
There are two documents:
1. Those which form the basis of the claim.
2. Those which form the evidence to support the
plaintiff’s claim.
Those documents which form the basis of the claim
will be annexed to the plaint but those which form
the evidence need not be annexed to the plaint.
Those in category 1 must be in the parties’ power of
possession.
A list of those documents which are not in the power
of possession of the party and which will be used in
evidence may be annexed to the plaint or listed at the
foot of the plaint.
Consequences of not disclosing the documents
The party proposing to rely on the documents cannot
produce them in court unless granted leave of the
court.
Although those documents will be inadmissible they
may assist in cross-examination. Order Vii Rule 18(2).
The principle of contingent cumulation – requires a
party to plead every remedy/cause of action which is
available however contradictory.
Eg. I never ran him over.
Even if I ran him over, which is denied, I was not
negligent.
Even if the court finds me liable for running him over I
was not negligent.

                           46
Even if I ran him over, and even if I was negligent,
which is denied, the defendant was contributory
negligent.
NB. The contradictions are allowed because they help
frame the issue.
The Principle of Preclusion says that the party cannot
lead evidence on anything which was not pleaded. If
one does not plead it he is precluded from leading
evidence on it.

WRITTEN STATEMENT OF DEFENCE
Written Statement of Defense is a pleading presented
by the defendant intended to traverse the allegations
written on the plaint.
Two occasions under which the defendant may
present the WSD
Once the defendant has been given a summons to
appear he does not have the need to do anything and
he cannot be penalized for not filing WSD.
      Under order VIII rule 1 a defendant summoned
to appear may file a WSD      to shorten the time of
litigation.
When a summons to file WSD has been issued the
defendant is required to file the WSD on or before
the date indicated.
      The day of filing WSD is the day of hearing and
not the day of mention. However the court has
power to extend the period of filing WSD.

Contents of WSD
Order VIII rule 2. WSD should contain all facts which
will show that the plaintiff’s suit is not maintainable.

                           47
These may be questions of fact eg failure of
consideration or questions of law. Eg res judicata,
limitation, illegality etc.

General rule
Each and every allegation in the plaint has got to be
traversed/opposed.
Allegations denied or admitted must be specifically
stated in the WSD.
Each paragraph of the plaint should be denied
separately. Several words are used in traversing e.g.
para (i) and (ii) are admitted. They are normally the
addresses. You cannot deny the defendant’s address
but yours. Eg incases where you are not using the
address of the advocate.
Para (iii) is denied. Even if there was a contract, which
is denied, there was a failure of consideration.
Para (iv) is denied. Even if there was a contract and
consideration, which is denied, the defendant asserts
that the contractual amounts were paid.

NB The technique of confession and avoidance is used
in writing the WSD in which the defendant
     Admits the existence of some facts but at the
same time avoids the legal consequences of the
existence of those facts.
Eg X admits the existence of a contract but there
were no vegetables, which is denied, the defendant
asserts that the vegetables were rotten and therefore
unfit for human consumption. Under Order VII rule 3
general denials are bad in law.


                            48
(x) Save as hereunder expressly admitted the
defendant denies each and every facts contained in
the plaint as if the same were set fort seriatim and
specifically traversed D paragraph help against the
presumption that whatever is not specifically and
denied is admitted.
Note: Although as a general rule a general denial is
not admissible, it is acceptable where there has been
already specific denial. Where there is not specific
denial, a general denial is inadmissible, and the
defendant will be taken to have admitted the rest.
Refer Warner V. Sampson [1959] All ER 120 at 123
per Denning; LJ
“It is used [general denial] in nearly every defence
that goes out from the temple [inns of court where
barristers operate from, in England] it comes at the
end the pleader has – early gone through……in the
statement of claim and dealt with them. Some he has
admitted, others he has denied. Whenever knows
there is a serious contest he takes no instructions on
a particular allegation he covers it by a general denial
of this kind so that he can, if need be, put the plaintiff
In this cross-suit the defendant will be required to
present a WSD into sections:
The Defence. 2. A statement of claim against the
plaintiff.
Although the plaintiff may not exercise his right to
reply he is duty bound to present a WSD to the
counter-claim.
Rule 12 provides – where a defendant has set up a
counter-claim the court may order separate trials
when it is in the opinion of the court that the

                            49
plaintiff’s claim and the defendant’s counter-claim
cannot be heard simultaneously.

Note: In counter-claim it is mandatory that the
plaintiff should file his reply.
       In Set-Off the plaintiff has an option of replying
or not.
When is a Suit Ready for Hearing?
This will depend on the case.
When there is no counter-claim or set-off the
pleadings are closed and the suit is deemed ready for
hearing once the plaintiff files a reply to the WSD.
When there is a set-off or counter-claim and the
plaintiff has in his reply raised a defence to such a set-
off or counter-claim pleadings will be deemed to be
closed and the suit ready for hearing after the
defendant has filed his reply to the reply.
Where he has already replied, rule 13 provides that,
no further pleading can be presented to the court
subsequent to the reply of the WSD other than a
defence to set-off or counter-claim without the leave
of the court.

Consequences of Failure to present a WSD or a
Defence to Counter-claim
There are different consequences depending on
different things:
The court may pronounce judgment against the
person who was supposed to present the defence. In
a case where the Summons was for appearing and he
has been given an order for appearing.


                            50
Where the summons was to file a WSD there are 2
consequences:
Where the claim is for a liquidated amount of money
which does not exceed T.Sh.1,000/= the plaintiff may
make an application to the court in writing for leave
to prove his case ex-parte by affidavit or by oral
evidence.
Where the amount exceeds 1,000/= and in any other
case the court may pronounce judgment after ex-
parte proof.

General Defences available in drafting a WSD
1. Accord & Satisfaction – in law of contract.
2. Acquiescence.
3. Conditions Precedent.
4. Custom and Usage.
5. Capacity.
6. Estoppel
7. Fraud
8. Illegality
9. Jurisdiction
10. Limitation
11. Laches [lashes] i.e. equitable limitation.
12. Misjoinder – of parties & of causes of action.
13. Non-joinder of parties & causes of action
14. Mistake
15. Notice –insuffiency of Notice
16. Payment
17. Penalty as opposed to damages
Defence under protest
18. Release
19. Rescission

                           51
20.   Remoteness of Damages
21.   Res Judicata
22.   Res Sub judice
23.   Set-Off
24.   Tender
25.   Undue Influence
26.   Duress
27.   Lack of Special Damages
28.   Waiver
29.   Want of Cause of Action.

NON-APPEARANCE
Read the provisions of Order IX, the case of EAP
&BTV. Terrazo, and Orders III and V.
The consequences of non-appearance of a party
differ depending on who does not appear.

Non-Appearance of the Defendant
When summons was not served and failure to serve
the summons was due to mistake of the plaintiff
either as a result of failing to pay court fees or his
failure to pay postal charges the suit is to be
dismissed. This is because there cannot be a suit
without parties.

Order IX Rule 2 – The court has power to dismiss the
suit on the first day of hearing. If by coincidence the
defendant is in court the court will not dismiss the
suit.
Where neither the plaintiff nor the defendant is in
court the court will dismiss the case. Order IX Rule 3.


                           52
The summons is returned unserved and the
defendant does not appear, it is the duty of the
plaintiff to apply for re-service. This application has to
be made within 3 months. If not within this period,
the court will dismiss the suit per Order IX Rule 5.

Exceptions
A suit may not be dismissed under rule 5 where the
plaintiff shows the court that the defendant in proof
of it at the trial, sometimes the pleader denies,
sometimes he does not admit each and every
allegation but whatever phrase is used it all comes
back to the same thing. The allegation has to be
regarded as if were specifically set out and traversed
seriatim. In other words it is traversed no more no
less. The effect of the traverse has been known to
generations of pleaders. It casts upon the plaintiff the
burden of proving the allegations denied. So this
general denial does no more than put the plaintiff
into proof.”

SET OFFS
In law of banking – one account can be used to set off
a debt in another account.
Generally: Is a mutual extinction of mutual debts in
which two people (defendant & plaintiff) stand
reciprocally as creditors and debtors.
Under the doctrine of Set Off: A defendant who
stands in a position of creditor to the plaintiff, has a
right to raise a defence of set off against the plaintiff.
“In case he is found liable to the plaintiff then the
sums that will be found owing to him from the

                            53
plaintiff should be set off against his liability to the
plaintiff.”
“What is owed by the plaintiff is cancelled by what
the plaintiff owes him.” In the final analysis he will be
required to pay the balance.

2 Types of Set Off
Legal Set Off & Equitable Set Off
A Legal Set Off exists when there is a liquidated sum
of money and the plaintiff must owe the defendant
the liquidated sum of money.
An Equitable Set Off – The amount owing is not
liquidated. It will be settled by adjudication.

The Whole Doctrine In Essence
It is found under Order VIII rule 6. It is a doctrine
under which here is an extinction of debts of which 2
persons are reciprocally debtors to one another.
The two debts are extinguished by creditor of which
these two people are creditors reciprocally to one
another.
Under the doctrine – a defendant in a suit for
recovery of money, who holds a position of creditor
against a plaintiff, may claim a set off against the
plaintiff.
5 Conditions to be met before Order VIII rule 6 comes
into operation:
The suit must be for recovery of money.
The defendant has to have the monetary claim
against the plaintiff           and this must be
recoverable claim. It it is a debt it must be due.


                            54
The defendant’s claim must be for a liquidated sum of
money.
Both parties must be in the same capacity – i.e.
Where the plaintiff is suing in a representative
capacity and owes the defendant a certain amount of
money in his personal capacity, that money cannot be
set off because the liability of the plaintiff to the
defendant is not in a representative capacity. The
defendant did not lend the money to the plaintiff’s
child.
  The sums sought to be set off should not exceed the
pecuniary limit of the court’s jurisdiction.

Note the following:
1. A set off in its nature is an independent action.
But for avoidance of multiplicity of suits there should
not be two suits.
2. Order VIII rule 6 is a legal set off. CPC does not
have provisions for equitable se off. However, Order
VIII does not take away the right to an equitable set
off. Where it can be shown that a defendant will
have a right to set off independently of the Code the
Order VIII will not be used to prevent him from
exercising that equitable right.

Difference between Legal and Equitable Set Off:
1. A court is bound to entertain and adjudicate
upon a legal set off once it is pleaded. However,
where an equitable set off is pleaded the court has a
discretion to entertain it and adjudicate on it or order
that it be brought in separate suit.


                           55
NB: Whereas a legal set off is a matter of right an
equitable set off is not a right but discretional.
2. The amount recoverable. In a legal set off the
amount must be liquidated. One the other hand in an
equitable set off the amount is not ascertained.
3. In a legal set off it is important that the crossed
demand should have arisen in the same transaction
while in the equitable set off the cross-demand need
not have arisen in the same transaction.
Note:     1. Section 2(2) of the Judicature and
Application of Laws Act (JALA) provides for the
application of Equity in TZ.
     2. Section 95 of the CPC provides for the
inherent powers of the Court.

What Happens When There is a Set-Off?
According to Rule 6 of order VIII a decree may be
passed against the plaintiff in respect of a set-off.
Where there is a set-off the WSD is deemed to be a
plaint to the extent of set-ff. In the reply to the WSD
the defendant will be required to raise defences
against the set-off.

A COUNTER-CLAIM – Order VIII Rule 9
It is in its nature different from set-off.
Whereas rule 6 relates to a claim for a liquidated
amount of money, a Counter-Claim is general. It
relates to any suit.
Under rule 9(1) A defendant may raise a counter-
claim against the plaintiff when any cause of action
vests in the defendant at the time of presentation of
the WSD.

                           56
What should be established is: the fact that one of
the parties is the defendant and the other is the
plaintiff. Also one has got to establish that they
occupy the same position – personal or
representative capacity.

Distinction Between a Set-Off and a Counter-Claim
Set-off in its nature is a statutory defence. The statute
allows raising a defence by set-off.
A counter-claim in its nature a cross-suit – because it
embraces any cause of action which can be legally
sustained. In that cross-suit the defendant becomes
the plaintiff and the original plaintiff becomes the
defendant.
Is actively avoiding service of the summons or he has
failed after exercising all efforts to discover the
residence of the defendant or for any other sufficient
cause.
The sufficient cause should be ejusdem generis to
other things under rule 5.
Note:
Dismissal in all instances i.e. rules
  1, 2, 3, & 5 cannot be res judicata because – no
evidence & no hearing.
Where the defendant has been served and he is not
in                                                  court
If the suit is in the High Court and summons is proved
to have been properly served the plaintiff will be
allowed to prove his case ex parte.
Ex parte hearing does not mean that the plaintiff
must win. He must give sufficient evidence to
convince the court.

                            57
Where the defendant is in court and the plaintiff has
been allowed to proceed ex parte, the defendant will
not be allowed to produce any evidence or cross-
examine.
Ex-parte proof may be made in two ways:-
1. By way of affidavit by the plaintiff.
2. By way of oral evidence by the plaintiff.
You cannot proceed ex parte unless granted leave by
the court. On the day of hearing the plaintiff prays
the matter to be heard in chamber by the judge so
that he can get leave of the court.

The Procedure in the RM’s and DM’s Court
(Subordinate Courts)
- Where summons issued was for producing WSD the
court may proceed ex parte.
- Where summons issued was summons to appear
the court may enter judgment.
Ex parte procedure is penal; it should be exercised
where the defendant refuses intentionally to appear
or to submit to the jurisdiction of the court.
It must be proved that the summons was duly served.
Summons to appear is a summons for direction both
in the High Court and in the Subordinate Courts.
Summons for disposal of the suit constitute the first
day of hearing and it requires no proof like in the High
Court where there should be ex parte proof.
Where the court is not sure whether the summons
was duly served it will issue a fresh summons.
Since rule 6 to Order IX is intended to punish a
disobedient defendant, it can be shown although the
summons was duly served the defendant has not

                           58
failed to appear because of his abstinence the court
will not proceed further. Order IX rule 6(1) O where it
is proved that the summons was not served to give
defendant sufficient time to appear the court will fix
another time and adjourn the hearing. If it was the
plaintiff’s fault he will be ordered to pay the costs of
adjournment.

Where the Defendant appears after the order for
adjournment
Order IX rule 7 – where the court has ordered ex
parte proof under rule 6 but proof is not taken on
that day then the defendant may, on the day to which
the hearing has been ordered adjourned, make
application under rule 7 to make an order to set aside
the ex parte orders. The application must be by way
of a chamber summons supported by an affidavit.
In the application the defendant must show his
sufficient causes for his non-appearance. The court
has discretion to set a side the ex-parte judgment.
The court must be satisfied that the non-appearance
was due to sufficient reasons.

Where the Plaintiff and the Defendant do not
Appear
The Court shall dismiss the plaintiff’s claim and if the
defendant has a counter-claim the court will proceed
ex parte in respect of that counter-claim.
Where the defendant has not admitted part of the
plaintiff’s claim but admits part of it.
Order IX rule 8 – the dismissal under this rule is res
judicata.

                           59
Order IX rule 9 – the plaintiff may apply to the court
which dismissed the suit for an order setting aside the
ex parte decree passed against him. This is by way of
chamber summons supported by an affidavit with
sufficient grounds to persuade the court to set aside
the dismissal order.

NB: An order to set aside the dismissal under order
IX rule 8 cannot be made      unless the defendant
has been notified.
      An order to set aside the dismissal order cannot
be made ex parte.

Difference between ex parte judgment and ex parte
decree.
An ex parte decree is a decree which arises out of
judgment which was entered against the defendant
either after failing to file WSD or for his non-
appearance on the first day of hearing.
 Where the defendant appears on the first day of
hearing but does not appear on the day of judgment
he cannot be said to be given an ex parte judgment
but an ex parte decree.

Remedy for ex parte judgment
Refer Order IX rule 13.
Sufficient Cause depends on the material
circumstances of the case e.g. ignorance of
procedure,
Illness of the party or his advocate, Lack of transport
etc.


                           60
T.M. Sanga V. Sadrudin G. Alibhai & Ors [1977] LRT
51
It points out circumstances under which the rule (rule
13) can be applied.
1. Uncertainty of the service of the summons is
sufficient reason for allowing an application to set
aside an ex parte judgment and decree thereof.
2. It is important to consider whether there are any
triable issues in case the judgement is set aside.
When the court sets aside the ex parte judgment it
sets a date for proceeding with the suit and hearing
will continue as if no judgment had been entered.

FIRST HEARING OF THE CASE
The court is required to examine the parties to
ascertain whether the parties are really in
controversy (litis contestation) and if they are what
the real points of controversy between them.
This examination as also the purpose of framing the
issues. Order X rule 1 makes it mandatory for the
court to examine the parties. Under rule 3 of Order X
the examination must be reduced in writing and form
part of the record. Compare with the Pre-trial
Conferences in the US system.

INTERROGATORY – Order XI
Every party has a right to know the nature of its
opponent’s case.
There are several ways through which the party will
know the nature of his opponent’s case. E.g
.1. Pleadings. 2. Interrogatories. 3. Discovery of
Documents. 4. Inspection of Documents.

                          61
What are Interrogatories?
Interrogation is the act of questioning.
Interrogatories are, therefore, written questions put
by a party to civil proceedings to his opponent which
must be answered by his opponent by his filing an
affidavit in answer to the interrogatories. These
interrogatories are normally put to the opponent in
preparation for the hearing of the suit.

Functions of Interrogatories
1. They enable the party presenting them to know
the nature of the opponent’s case. They enable the
opponent to prepare his case – e.g. evidence etc.
2. They shorten the proceedings in that the
opponent may admit certain facts and once these
facts are admitted no need of evidence. The answers
to the interrogatories help to determine which
evidence is necessary and which is not.
3. They lessen expenses of litigation.
Marriot V. Chamberlain (1868) 17 QBD 154
“Every party to civil proceedings is entitled to know
the nature of his opponent’s case so that he may
know before hand what case he has to meet at the
hearing. However such a party is not entitled to know
facts which constitute exclusively the evidence of his
opponent’s case since an unscrupulous party may
tamper with his opponent’s evidence once he knows
of it or he may manufacture evidence to oppose it.”




                          62
Interrogatories which should not be admitted at all:
A party is not entitled to administer interrogatories
for obtaining a discovery of facts which constitute the
exclusive evidence of his adversary’s case or title.
A party is not entitled to interrogate his opponent on
confidential communication between his opponent
and his legal adviser.
Those interrogatories which are injurious to the
public interest or security e.g. the defendant as a
military officer to be inquired on military matters.

GENERAL FORM OF INTERROGATORY
TITLE
Interrogatories on behalf of the above named Plaintiff
(Defendant) for the examination of the above named
Defendants (Plaintiffs) pursuant to the order herein
dated……day of ……19….
Did you……………………
Were you………………….
Was it……………………..
If not weren’t you…………

(Set out the interrogatories in the form of concise
questions, each interrogatory to be set out in a
separate paragraph and numbered consecutively.)

The defendant (plaintiff) AB is requested to answer
the interrogatories numbered…….etc.

Served this ……day of ……19….
                                       ………………………
…………………

                           63
Advocate for
the Plaintiff (Defendant)

To:
The above named Defendant (Plaintiff)
NB:1. The affidavit should be within 10 days and it is
called affidavit for answer         of interrogatories.
       2. Failure to answer the interrogatories invite
penalty. If the party refuses to              answer
them he shall be penalized in costs or in some
instances he may          have his case struck out. This
is governed by Order XI rule 18.

Answer to interrogatory
It is a matter of law.
The party who is supposed to answer a question on
interrogatory is supposed to file an affidavit under
Order XI rule 7.
The affidavit should be made to make the questions
answered precisely and correctly.
No exception can be taken in the affidavit. The party
should not refuse to answer any question. However,
any just exception/objection may be raised in the
affidavit e.g. the grounds that it is fishing
interrogatory i.e. when its sole purpose is to discover
the evidence of the opponent.

Where the party interrogating considers the answers
inadequate he may demand full or further answers
under order XI rule 9 by application to the court.



                            64
DISCOVERY AND INSPECTION
Whereas interrogatories may be termed as a
discovery of facts there is a procedure of discovering
documents.
Discovery is governed by rule 10 Order XI.
Any party may without affidavit applies to court by
order to his opponent discover on oath all the
documents which are in his power or possession and
which he is going to rely upon his case. Therefore
discovery is a process under which a party to civil
proceedings discloses all the documents he is going to
rely upon in his case.
Discovery is a disclosure of documents made at the
instance of the opposite party.
Refer Section 64 of the Evidence Act
NB: Compare and Contrast orders XI rule 1, XI rule 10
and XLIII rule 2.

2 Ways of Discovery of Documents
Annexing them to the pleadings
Mentioning them in the pleadings – either in the main
body of the pleadings or in the list of documents to
be relied on. Order VII rule 14.

Categories of Discovery
Voluntary Discovery – the party discloses the
documents he has and he uses them without the
leave of the court.
Compelled discovery – is made at the instance of the
party and under the order of the court.


                          65
When the order for discovery is made, the party is
supposed to file an affidavit for documents.
Once the affidavit is filed two things may occur:-
The court at any stage of the suit may order the party
who made the discovery to produce certain
documents before the court.
The opposite party may alternatively at any time of
the proceedings give notice to the party who made
the discovery for the production of the documents for
purposes of inspection either by himself or by his
advocate. It is the duty of the party who holds such
documents to grant the party the right of inspect the
documents. The right should be granted within ten
days of the notice.
3 grounds upon which the party may resist discovery
Documents containing exclusive evidence of title.
Documents which contain privileged communication.
The discovery is irrelevant i.e. it does not go into
answering any material fact in the suit.

ADMISSIONS
ORDER XII
There are two types of admissions under the Civil
Procedure Code
Admissions made at the instance of the party
admitting himself.
Those admissions which are made at the instance of
the opposite party.




                          66
As a General Rule
A party is not prohibited from admitting certain facts.
Normally this is done where the party is sure that
contesting the facts will be of no benefit to him but
delay fair conclusion of the suit and imposes on him
more expenses.
When you admit you pay less costs because you don’t
put anybody into trouble.
Rule 1 Order XII enables the party to the proceedings
admit the truth of the part of the opponent’s case or
the whole of it. i.e. Voluntary Admission.
Rule 2 of the same Order provides that at any stage of
the proceedings a party may require his opponent to
admit certain facts or document by A DOCUMENT TO
ADMIT facts or document. Hence there is a admission
of facts and admission of documents.
Where a party refuses to admit any of the facts he
will bear the costs of proving them since evidence will
have to be lead by calling of witnesses etc.
Note:
1. Any admission made is for the purposes of the suit
only and not for any other purposes or persons.
2. There has to be filed a notice to admit in the
following format;
TITLE

NOTICE TO ADMIT FACTS
(Under Order XII Rule 2 of the Civil Procedure Code)
TAKE NOTICE that you are required to admit the
following facts for the purposes of the above-named
suit only.


                           67
1. That you lived with the petitioner as husband and
wife for 11 years.
2. That in that period you were blessed by 3 issues.
3. That you subsequently married Y under the
Christian rites.
4. That before marrying Y you had jointly with the
petitioner acquired the following assets…………..
TAKE NOTICE that you are required to admit the said
facts within six days after the service of this notice
and in default whereof you shall bear the costs of
proving them.

Dated at………this.....day of ……….1988

    ……………………………………
                                  ADVOCATE       FOR
PETITIONER
TO AB
C/O XY ADVOCATE
DSM
DRAWN BY
CD ADVOCATES
DSM
Section 64 of the EVIDENCE ACT requires primary
evidence to be given.
Under section 68 of the Evidence Act secondary
evidence may be given. If the document is in the
possession of the opponent, a notice must be served
on that party to produce the document within 10
days. Failure to produce the document will make the
party to produce secondary evidence.


                          68
i.e. “Admit or I’ll produce evidence to prove them
and if you don’t I’ll have notice to produce them”.

Note:
1. O.XI rule 13 is used when you want to inspect the
documents.
2. Section 68 is used when you want to use the
documents as evidence but they are in the possession
of your opponent. If he refuses to produce them then
you will use secondary evidence.
Production and Impounding of Documents
Order XIII of Civil Procedure Code
All parties have the duty to produce all documents
they are going to rely upon as evidence and which are
in their possession or power, at the first hearing of
the suit. This is a requirement of law under Rule 1
Order XIII.
I such documents are not produced at the first
hearing then the Court may grant leave for its
production.
Rule 2 prevents production of the documents at a
later stage – which were supposed to be produced at
the first hearing.
Note: The impoundment of documents does not
mean admissibility of the      documents
      The Court is merely concerned about the
preservation of those documents.
      They are not admitted at that stage as exhibit
but as a depository.
Order XIII empowers the court at any stage of the
proceedings to reject any evidence it considers
irrelevant or admissible.

                          69
Upon admitting the documents as part of the
evidence the court will have to endorse on the
documents.
Those documents which have been admitted as
evidence must be returned to the person who
produced them in court at the conclusion of the case
or if there is an appeal at the conclusion of the
appeal.
Settlement and Determination of Issues at the First
Hearing

Order XIV
The order relates to framing of issues.
Framing of the issues is done in the presence of the
parties and at the first hearing.
There are three Types of Issues.
1. Issues of fact.
2. Issues of law.
3. Issues of mixed fact and law.

WHAT ARE ISSUES?
There are several definitions but the best one is given
by Order XIV rule 1(2).
Under this rule issues are material propositions of
either fact or law or mixed fact and law which must
be alleged by the plaintiff in order for him to have a
right to sue and which has to be denied by the
defendant in order to constitute his defence.
Issues arise-from the allegation by the plaintiff and
denials by the defendant, they constitute the points
of dispute between the parties.
THEREFORE Issues arise from the pleadings.

                           70
Whatever alleged/denied constitute an issue.


SUPPLEMENTARY SOURCES
Issues also may arise from the documents submitted
by the parties to the court or by affidavit submitted
by the party to the court.
Also issues may arise from the oral examination at
the first hearing.
WHO HAS THE DUTY TO FRAME ISSUES?
Order XIV rule 1 provides that. It is the duty of the
court to frame the issues at the first hearing.
The duty is a mandatory duty. The court cannot shun
away from this duty.
There are instances where parties will help the court
in framing the issues. Where the parties are very
clear as to what the real matter is between them they
can help the court frame the issues. In most cases
where the parties are represented by advocates the
normal practice is for the parties to assist the court in
framing the issues. The court has discretion to accept
or reject them.

WHY FRAME ISSUES?
Framing the issues has a very important bearing.
Whether the outcome will be just or unjust it will
depend on the framed issues.
1. It is the issues that direct the parties as to how they
are going to adduce their evidence and not the
pleadings. The issues determine the relevance of the
evidence.


                            71
2. It is the issues which fix the case. A court cannot
refuse to make decision on an issue which has been
framed. The issues are framed to direct the court to
the nature of decision to be made even where the
issue though framed but not pleaded.

Odd Jobs V. Mubia [1970] EA 476.
You can have an issue framed and not pleaded but
the court must decide on the issue.
“On the point of that the court has no jurisdiction to
decree on an issue nor been pleaded. The attitude
adopted by this court is not as strict as appears to be
as it appears to be in India. In East Africa, the position
is that the Court may allow evidence to be called and
may base its decision on unpleaded issue if it appears
from the course followed at the trail that the
unpleaded issue has in fact been left for the court for
decision.”
The decision is supported by the case of NKALUBO V.
KIBIRIGE [1973] EA 103.
At page 105. The same issue arose and the Court of
Appeal reiterated the case of Odd Jobs.
As per the court
      “While the general rule is that relief not founded
on pleadings will not be given, a court may allow
evidence to be called and may base its decision on
an unpleaded issue if it appears from the course
followed at the trial that the unpleaded issue has in
fact been left for the court for decision.”
The case introduces the proviso that the freedom of
the court to allow evidence to be adduced on an issue
not pleaded and to base its decision on such issue is

                            72
not extensive to an extent of allowing the court to
make a decision on a completely new course of action
which was not pleaded.
See also
1. Mgonja V. Kihiyo
2. Gondij V. Caspar Air Charter Ltd. (1956) 23 EACA
139; 140.
3. Blay V. Pollard & Morris [1930] All ER (Rep)
610,612.
4. Joseph Marco V. Pascal Rweyemamu [1977] LRT 59
In the case of Blay V. Pollard it was said “Cases must
be decided on the issues on record and if it is desired
they must be placed on the record by amendment.
In the present case, the issue on which the judge
decided was raised by himself without amending the
pleadings in my opinion he was not entitled to take
such a cause.”
In another case which was decided in 1932 by the
House of Lords in Bell V. Lever Bros [1932] AC 161 at
216. In this case the court ruled that a trial court may,
with the consent of the parties, frame and decide on
an issue which does not appear in the pleadings.

FAILURE TO FRAME ISSUES
Failure to frame issues is a procedural irregularity
which may not be fatal to the proceedings. It will be
fatal to the proceedings when an appellate court
forms an expression that the failure has occasioned
injustices to one of the parties.

CONSEQUENCE OF FAILURE TO FRAME ISSUES


                            73
Norman V. Overseas Motor Transport [1959] EA 131.
In this case the trial court failed to frame issues. On
appeal the issue was whether the failure could be
fatal to the proceedings. The Court stated as follows:
      “The failure to frame issues is an irregularity, the
question      would      appear    to     be     whether
notwithstanding the failure to frame issues the
parties at the trail knew what the real question
between them was, that the evidence on the
question had been taken and the court duly
considered it.”
According to the case – where the court has
failed/omitted to frame issues, it is apparent that the
parties knew what the dispute between them was
and had an opportunity to give evidence, which has
been taken into account by the court to make its
decision. Such failure or omission will not be fatal to
the proceedings. It is fatal only to the proceedings
only when it is apparent on the face of the record
that the parties did not know what the real issue was
between them.
Justification
The framing of issues like practice of pleading is
intended to avoid taking of the parties by surprise,
and also, intended to assist the court in
understanding the case.

THE ART OF FRAMING THE ISSUES
1. The first rule of the thumb – where there are
both issues of fact and law in the same suit and the
determination of the issues of law may dispose of the
suit then the court must frame those issues first.

                            74
There is no use calling evidence where the law is
clear. The issues of law will be preliminary issues
because their determination will dispose of the suit.
This quickens the process of litigation.
Issues of law are a matter of Judicial Notice. Eg
Limitation, wrong parties, jurisdiction, res judicata,
capacity etc.
2. Framing of the issues of fact comes next.
Note that:- All issues whether of law or fact have got
to be framed in the affirmative. E.g. in issues of law –
whether the suit is time barred, whether the suit is
not time barred. In issues of fact – whether X is Y’s
legitimate son / whether X is Y’s illegitimate son.
3. Issues are not framed in argumentative way.
Issues must be concise, precise and clear questions of
mostly not more than 8 words.

AFTER FRAMING THE ISSUES
Order XIV rule 6 – where the issues are between the
parties and the parties submit them to the Court with
an agreement in writing that they will be bound by
the decision of the court on them the court will have
3 things to do:
1. To ascertain whether the agreement was duly
executed by the parties.
2. To inquire as to whether the parties who have
executed the agreement have substantial interest in
the outcome of the case.
3. To see if the issues framed are fit for trial.
          If the court is satisfied that the three things
have been complied with                       then it will
proceed with the trail of the issues only.

                            75
The court has got power to amend the issues at any
time of the trail but it has to be before judgment.

Certain issues can be added by the court in the course
of hearing.

ORDER XV
The suit is now ready for hearing.
After framing of the issues the court may however
find no case to hear and the case will come to an end.
Order XV rule 1: The court is empowered to
pronounce judgment at the first hearing when it is of
the impression that the parties are in no dispute on
the points of fact or points of law. That impression is
formed by the court looking at the pleadings.

ABSENCE OF DISPUTE
Exists in two ways:
1. Where the court establishes that there is no litis
contestatio (contested dispute).
2. Where there are admissions either in the
pleadings or as a result of a notice to admit issued
under the provisions of Order XII.
In both situations the court is empowered to
pronounce judgment and this judgment is a judgment
on merit since it has gone in the substance of the suit.
In a situation where there are more than two parties
Order XV rule 2 will come into play. In this case the
court may pronounce judgement in respect of the
parties not in dispute and will allow the proceedings


                           76
to go into full hearing in respect of those parties who
are in dispute.
This rule applies mostly in cases where there are
more than one defendant.
Where summons to appear has been issued but at
the first hearing the party has without sufficient
cause failed to produce the witnesses under Order XV
rule 4 the Court has power to pronounce judgment
against the party who has failed to bring the
witnesses.
This is called A DISMISSAL FOR LACK OF
PROSECUTION.

ZAID V. HUMEIDAN [1960] EA 92
In this case a distinction was made between a
dismissal for lack of prosecution and a judgment
under Order XV rule 4.
Technically a dismissal for lack prosecution is not the
same as judgment entered upon.
In one situation what a court does is merely to
dismiss the suit. This happens only against the
defendant. You cannot technically dismiss the
defendant. A dismissal for lack of prosecution is only
to the plaintiff.

WHERE THE DEFENDANT DOES NOT APPEAR
Where the defendant does not appear and the case is
coming for hearing he suffers an ex parte decree.
Where the defendant turns up but does not comply
with the requirement of the summons to appear eg
he does not bring the witnesses (evidence) judgment


                           77
will be pronounced against him in terms of order XV
rule 4.


SUMMONING AND ATTENDANCE OF WITNESSES
There are two types:-
Witnesses to give oral testimony before the court,
and
Witnesses who are summoned merely for the
purposes of giving/producing documents.

Generally
It is the duty of a party to civil proceedings to prove
his case. In the course of hearing we are applying 2
principles of civil litigation namely:
1. The principle of party prosecution.
2. The principle of Dispositive Election.

THE PRINCIPLE OF PARTY PROSECUTION
The conduct of the case is left to the party to the
proceedings. They are the ones to prosecute their
own cases and to decide which step to take next. The
court participates in the proceedings as a passive
arbiters.
The principle operates very closely with the principle
of PARTY INVESTIGATION as opposed to the
PRINCIPLE OF JUDICIAL INVESTIGATION.
Under party investigation it is the parties who are
supposed to investigate and collect evidence of their
own case. The Court is ignorant of the case. Refer THE
NATURE OF ADVERSARIAL SYSTEM.


                           78
Therefore it the party himself who will know the
nature of the evidence he will use and the sources
thereof.

THE PRINCIPLE OF DISPOSITIVE ELECTION
It relates to what the party can and cannot tell the
court.
The party has a choice of whether he should tell the
court anything or not thus he has the election of what
to say and what not to.

WHERE THE WITNESS REFUSES TO APPEAR
The court will assist the parties to compel the
witnesses to appear. Order XVI has the procedure of
securing the court assistance.
Rule 1 Order XVI provides that at any time after the
suit has been instituted the court may issue witness
summons, at any stage of the case the court may
issue summonses against persons who are necessary
to appear before it to produce documents etc. These
summonses are issued on application by the parties
who intend to use the witnesses.

Where the witness does not appear even after due
service of the summons the court will issue a
proclamation will be affixed at the door of the
witness or at any other conspicuous place.
Order XVI rule 10 (2).
The court may order attachment of his property and
when the witness appears the attachment will be
raised provided he pays the court broker.


                          79
Another alternative is that the Court has got
discretion to issue arrest warrant with or without bail.
The court may order the witness to be placed under
custody but will the witness give evidence in favour of
the party who has summoned him?

WITNESSES OF THE COURT
Order XVI allows the court to play an active role in the
proceedings and therefore it is not totally true that
courts in TZ are operating typically under adversarial
system.
A witness may not be desired by the party but the
court may summon him. Order XVI rule 14. Under this
rule the court may on its own motion and at any
stage of the proceedings summon a witness who was
not summoned by the parties.            This happens
especially when the court requires eg expert opinion.
Eg Accountant in fraud cases, medical doctor,
engineer etc.
Refer Joseph Marco V. Pascal Rweyemamu [1977] LRT
59
     Thobias Zenda V. Herman Zenda [1977] LRT 23
In the case of Joseph the court stated that where an
additional witness is summoned by the court under
O.XVI Rule14 such witness becomes a court witness
and not a witness for any party to the dispute.
The case of Thobias acknowledges that the court has
power to summon an additional witness if it thinks it
necessary so to do.

ADJOURNMENT OF HEARING
Order XVII

                           80
Under Rule 1 (1) the court has power to adjourn the
hearing to a future date. It is a discretionary power
which has to be exercised judiciously. There must be
sufficient reasons for adjournment.
Once evidence is taken the hearing is supposed to
continue from day to day until all the witnesses in
attendance have been examined unless the court
sees it necessary to adjourn the hearing till the next
hearing.

Agreeing on Adjournment
See:
1. Shabani Mbaga & Another V. Karadha Co. Ltd.
[1975] LRT 13 (HC)
2. A.S. Masikini V. George Mbugus [1976] LRT 62 (CA)
In the two cases advocates for both parties filed
letters of consent for an adjournment.
Per Mustafa J., “A consent letter filed by the parties
wanting to remove a case from the hearing list cannot
automatically remove the case from the hearing list
no more than an application for an adjournment or
notice of an intention to apply for an adjournment of
a case. An adjournment cannot be granted as of right
but can only be granted for sufficient course. It
therefore involves the exercise of discretion by the
court and this must be exercised judiciously. Once the
pleadings are closed in a case it is the duty of the
court to dispose of the case with reasonable
dispatch.”
The business of this court is subject to the vagaries of
the business activities of advocates engaged by the
litigants concerned, although a consent letter might

                           81
be a factor which may be taken into consideration in
an application for an adjournment. Such consent
cannot almost certainly result in adjournment.

From the 2 cases above we have 3 propositions:-
1. No adjournment can be opted at the instance of
the party to the proceedings except where the
circumstances are beyond his control.
2. The engagement of an advocate in another court is
not a ground for adjournment.
3. Illness of a lawyer cannot be a ground for an
adjournment when it is found as a matter of fact that
a party who represented by the advocate had enough
time to engage another lawyer.

The period within which the adjournment should be
granted depends on the decision of the Court.

Where the parties do not appear on the date of
hearing after adjournment it is the discretion of the
Court to further adjourn or terminate the case.

TYPES OF ADJOURMENT.
1. Those which are granted for specific date.
    In this the court appoints a specified day on which
to proceed with the
    case.
See Order XVII rule 2.

2. Adjournment sine die.
     Adjournments sine die are those which do not
provide for a specific

                           82
date. The matter is simply adjourned unless certain
actions are taken.
    The party seeking hearing has got to apply to the
court for fixing of the
   date of hearing.

Here there are two positions:-

1. Where adjournment lasts for one year
If the plaintiff does not apply for hearing date after
one year it is the duty of the court to issue a notice to
the plaintiff to show cause why should not the suit be
struck out.
A general adjournment should not last for more than
a year. If the plaintiff is serious about his case he will
not stay for more than one.
2. In any other case where there has been an
adjournment and the case
has stayed pending for a period of three years the
court has the duty to strike it off without giving the
plaintiff any notice.
Refer Rule 5 0.XVII. (Striking out for lack of
prosecution).

When a suit is struck out under this rule the plaintiff
may bring a fresh
suit subject to the Law of Limitation.

PROCEDURE OF HEARING A SUIT
Order XVIII
The Order enacts the principle of Orality of
Proceedings as distinguished from Pleadings.

                            83
It also enacts the principle of MEDIACY as opposed to
IMMEDIACY. The court must see the parties and hear
the witnesses. See the provision of Order XXVI
(Commission to examine witnesses).

What is the Order of Hearing?
As a general rule it is the plaintiff who has the right to
begin unless the defendant admits the plaintiff’s
allegations but gives counter-allegations in which he
will have to begin.
The person on whom the burden of proof lies is the
one who has the right to begin.
He begins by giving an opening address which
comprise of the general overview of his case and will
tell the court the way he will proceed discharging his
burden of proof.
He will in the opening speech tell the court in
summary the nature of evidence and witness he has.
In practice it is not always the case.
Opening speeches are rarely given.
As a practitioner you should see whether there is an
ideal situation for making a speech in the court.

After the opening address
The Plaintiff gives his address. It is at this stage he can
give evidence on oath and call his witnesses one by
one.
After the Plaintiff has stated his evidence then the
defendants gets a chance to state his case in open
audience and gives his evidence.



                             84
Immediately after this the defendant has the right to
address the court on all the evidence. This is normally
called the Final Submission.

Then the Plaintiff has the right to reply.
It is the plaintiff who begins and it is him who
concludes.


Technical Hearing
Under the Criminal Procedure Act section 230 the
court has to rule as to whether there is a prima facie
case or no case to answer
Criminal case can be concluded even before the
accused talks BUT under the Civil Procedure Code
there is no provision which talks about prima facie
case. In East Africa there is no law which talks of no
case to answer in civil litigations as in criminal
litigations. Therefore there is a lacuna in our law. We
have to go to the provisions of section 2 of the
Judicature and Application of Laws Ordinance (JALO)
cap 534. (22nd July 1920). Under this provision the
procedure used in England should apply. The
provisions bring the procedure under Common law of
no case to answer.
The procedure to be followed for no case to answer
in civil litigations in Tanzania according to case law is
different from that of criminal litigations.
In criminal proceedings once the court has
established that there is no case to answer the court
cannot compel the accused to say that there is a case
to answer.

                            85
What is the Submission of No Case to Answer in Civil
Proceedings?
See Ramsden V Ramsden [1954] All ER 623.
     Vye V. Vye [1969] All ER 29
In the case of Ramsden it was stated
“There are two sets of circumstances under which
defendant may       submit that he has not case to
answer. In the one case there may be a submission
that accepting plaintiff’s evidence at its value no case
     has been established in law and in the other that
the evidence led for         the    plaintiff    is    so
unsatisfactory or unreliable that the court should find
that the burden of proof had not been discharged.

Submission of No Case to Answer in Civil Cases
Can a defendant, at the close of a plaintiff’s case
submit in law that there is no case to answer?
Refer Hon. JK’s decision in MWALIMU PAUL JOHN
MHOZYA V. THE AG HC Civil Case No. 206 of 1993
DSM Registry; citing the case of Daikin Air-
conditioning (EC) V. Harvard University (DSM) Civil
Appeal No. 21 of 1976. He held: “A submission of no
case to answer in a civil case stands on the same
footing as a submission of no case to answer in a
criminal case, save that there is a difference in the
standard of proof. What then is the test to be applied
when such a submission is made? As I understand the
law, when the dismissal of the plaintiff’s case on the
basis that no case has been made out is prayed for,
the court should not ask itself whether the evidence
given and/or adduced by the plaintiff establishes
what would finally be required to be established, but

                            86
whether there is evidence upon which a court,
applying its mind reasonably to such evidence, could
or might (not should or ought to) find for the plaintiff.
The submission of no case to answer cannot be
upheld if there is sufficient evidence on record on
which a court might make a reasonable mistake and
enter a judgment for the plaintiff. Whereas the test
to be applied at the close of the defendant’s case is
what ought a reasonable to court to do? The one to
be applied on determining the validity or otherwise of
a submission of no case to answer is what might a
reasonable court do? :
See: Supreme Service Station (1969) (Pvt) Ltd v. Fox
and Goodridge (Pvt) Ltd 1971 (1) RLR 1. The latter test
I have described is the one I must apply in
determining Mr. Mwidunda’s submission in the
matter now before me.”
EFFECT OF A SUBMISSION OF NO CASE TO ANSWER
A submission of No-Case-To-Answer does not have an
automatic effect of suspending the proceedings until
the decision is made on whether a prima facie case
has been established or not. It is the duty of the
court to put the defendant to an election. The
defendant will have two options:
1. He may rely totally on the submission of no case
to answer in which case he court will have to make a
ruling; or
2. He may submit that he does not have a case to
answer and yet produce evidence against the
plaintiff’s allegations.
Once the Court addresses its mind to submission of
no case to answer and then overrules that submission

                            87
then it proceeds immediately giving a judgment
basing on the evidence given instead of adjourning
the hearing.
The procedure has been discussed in the following
cases:
1. Alexander V. Rayson [1936] 1KB 169
2. Parry V. The Aluminum Corporation Ltd. [1940]
….162 LJ 236
3. Laurie V. Raglan Building Company [1942] 1KB
152
The three have one thing in common. They are
authority for the proposition that where a submission
of no case to answer is given by the defendant, it
does not mean that by the defendant submitting a no
case to answer ipso facto loses his right to call
evidence when his submission is overruled. He loses
his right to call evidence only when he definitely
elects not to call evidence. Such an election can be
made either expressly or impliedly.
See the case of DAIKIN AIR CONDITIONING (EA) LTD
V. HAVARD UNIVERSITY (HC) Per Samatta J, Civil Case
No. 21/76 Unreported. This case adopted the three
cases cited above.

HEARING CONTINUES
All witnesses have to be examined in open court
under the personal direction of the magistrate or the
judge. The evidence has to be recorded in the
language of the court in the narrative form except
where the party considers that a particular question
or answer is important and also the court considers it
so.

                          88
When certain questions are objected to by one party
but allowed by the court the reasons for allowing
them must be recorded.
The court also has the duty to record the impressions
on the demeanour of the witnesses before it i.e.
Judge’s Notes.
When a witness has been released the court has
power under order XVIII rule 12 to record the
examination. When the magistrate fails to conclude
the hearing the evidence he has recorded may be
used by the subsequent magistrate.
But in the case of Thobias Zenda V. Herman Zenda
[1977] LRT n.23 it was stated that – where the
decision depends on the previous magistrate’s
observation of the demeanour of the witnesses – the
correct position should be concluded by the same
magistrate or the trial starts afresh before a new
magistrate.

AFFIDAVITS
Affidavits are written statements of evidence which
are sworn before a Commissioner for Oaths.
Mainly they are not used for the main suit because of
the fact that in the main suit the principle of orality
applies.
Refer Order XLIII Rule 2 of the Civil Procedure Code.
Although affidavits may be accepted instead of oral
statements, the opponent has a right to demand
personal appearance of the witness for cross-
examination but this is within the discretion of the
court.


                           89
The Person who swears the affidavit is called a
deponent.


General Rule:
All civil proceedings must be commenced by a plaint
and evidence must be viva voce i.e oral.
However the court has discretion to allow evidence in
writing. When the court allows that evidence to be in
writing it has to be by way of an affidavit.
Note:
1. That affidavits save time.
2. There is a disadvantage of the court not
observing the demeanour of the witness.
3. Affidavits are evidence and they should
therefore follow the rules of evidence. Nothing is
inadmissible in oral evidence that can be made
admissible in affidavits.

GENERAL RULES OF DRAFTING OF AFFIDAVITS
1. Affidavits are Court Documents. Like any other
court document an affidavit has to have a TITLE i.e
Name of the Court, Parties, Nature of the Proceedings
and their Number.
2. If the deponent is a Christian there may be a
clause to make an oath. In any other religion the
deponent solemnly affirms.
3. All affidavits have got to be sworn in the first
person. Nobody can swear an affidavit on behalf of
another. This will be hearsay evidence. It should be
either “I” or “WE”.


                          90
4. All statements of fact in an affidavit must appear
in separate paragraphs which must be consecutively
numbered.
5. An affidavit should not contain hearsay evidence
EXCEPT IN INTERLOCUTORY APPLICATIONS where by
virtue of Order XIX rule 3 a deponent may swear on
certain facts on the information in belief of that –
these can be disclosed.
6. Affidavits as statements of evidence are not
submissions and therefore they should not contain
argumentative material but statements of fact.
7. All affidavits have to be signed by the deponent
in the presence of a Commissioner for Oaths. The
signatures must be accompanied by the date. The left
hand corner of the affidavit is known s the Jurat. ie
“SWORN or AFFIRMED AT DSM by..”
8. An advocate who draws an affidavit for his client
cannot attest it by himself. He must find another
advocate to attest it.

CONSEQUENCES OF FILING A DEFECTIVE AFFIDAVIT
A defective affidavit is the one which breaches the
rules relating to the drafting of affidavit.
A defective affidavit is generally rejected by the court.
However, superficial defects can be allowed to be
rectified eg by removing the offensive paragraphs
and leave the clear ones.
See:
1. Project Planning Consultants V. Tanzania Audit
Corporation [1974] LRT n. 10
- It deals with defective affidavits and what the court
will do with defective affidavits.

                            91
- It was also held that an advocate who draws an
affidavit for his client should not attest it himself.
2. Mtaki V. January Kapembwa [1976] LRT n. 7
Where an affidavit is made on information it should
not be acted upon unless the sources of the
information have been disclosed.
3. Margovind Savani V. Juthalal Velji Ltd. [1969]
HCD 278
The case gives good definitions of an Affidavit and a
Statutory Declaration
“Both affidavit and Statutory Declarations are written
statements solely made on oath as true facts on the
knowledge, information and belief of the declarant. In
affidavits one must distinguish between the facts that
are true to his own knowledge from those which he
thinks or believes are true to his information and
belief and in the latter group he must also disclose
the sources of his information as well as his grounds
for belief.”
The same position was held in the case of Thseen-
sthlunion Export & GMBH V. Kibo Wire Industries Ltd.
[1973] LRT n.54.

RECENT JUDICIAL DECISIONS

PLEADINGS:
STATEMENT OF DEFENCE:
NOTCO (TANZANIA) LIMITED V. FREIGHTWINGS
INTERNATIONAL LTD.
High Court Civil Case No.293 of 1988 DSM Registry
(Unreported)
Mkude J,

                          92
Cited KASHIBAI V. SEMPAGANA (1962) EA 16 per
Bennet J, in which the defendant was ordered to
furnish particulars of his defence that “the plaint was
bad in law and did not disclose any cause of action.”
The learned Judge quoted from the A.I.R.
Commentaries (7th Edition) Vol. II pg. 2182 the
following passage relating to what should be pleaded
in written statement of defence which raises a point
of law:
“Where the defendant contends that the suit or
application is misconceived he must specify or
particularize why he contends that the suit or
application is misconceived. If he relies on any facts
for those purposes he must state those facts in his
pleading, if it is merely the position in law which he
relies on, he must set out with sufficient particulars
the position in law upon which he ultimately bases his
submission.
PLEADINGS & RELIEFS
MICHAEL LOSINA V. MARCEL LOSINA
High Court Civil Appeal No. 7 of 1986 Dodoma
Registry
Masanche J,
The first legal principle in civil cases is that parties to
litigation are bound by their pleadings and that a
court of law may not depart from the agreed issues
unless there is good cause and unless evidence is led
to prove the necessity for such departure. Spry V.P
said in the case of Nkalube V. Kibirige [1973] EA at
page 105 that:
“It is true that this Court has said, more often than
once, that while the general rule is that “relief not

                             93
founded on the pleadings will not be given (Per
SINCLAIR V.P in Gaudy V. Gaspair (1956) 23 E.A.C.A
139 at 140), a court may allow evidence to be called
(emphasis supplied) and may base its decision, on
unpleaded issue, if it appears from the course
followed at the trail that the unpleaded issue has in
fact been left to the court for decision”. (Per LAW J.A
in Odd v. Mubia [1970] EA 476 at p.478).
See: Order VI Rule 17 CPC – Amendment of pleadings.
But it was cautioned by the Court of Appeal, in the
case of Eastern Bakery V. Castelins [1958] EA 461 and
quoted with approval by Onyiuke J, in the case of
Shivji V. Pallegrini (1972) HCD n.76 where Onyiuke J,
said:-
“As a rule amendments to pleadings should be freely
allowed if they can be made without injustice to the
other side. The powers of amendment should not be
used to substitute one cause of action for another or
change an action into another of a substantially
different character.”
See also the case of BISHOP H. N. SARYA & 2 OTHERS
V. SAIMON BUTENG’E & 16 ORS
HC Civil Case No.68 of 1989 Mwanza Registry per
Masanche, J;
Citing Chitaley in the Code of Civil Procedure, at page
1304
“The main consideration to be borne in mind in
exercising the discretion (to amend or not to amend)
are that the rules of procedure have no other aim
than to facilitate the task of justice, that multiplicity
of suits should be avoided and that the interests of
substantial justice should be advanced. Thus a court

                            94
should order for the amendment of a pleading where
there has been a clerical error, or a bona fide wrong
description of property or where there has been
mistake of law or fact, provided there is no injustice
to the other side which cannot be compensated by
the award of costs.”
Masanche J adds;
“It is gratifying to note that in the recent case of
General Tito Okello v. Sospeter Awiti Civil Appeal
No.13 of 1990, of the Court of Appeal, Dar es Salaam
Registry, Makame J.A has advised that where there
are errors of oversight, such as the one here, of
defendants not signing the written statement of
defence, or, of forgetting to attach an annexture to
the pleadings, proviso to Order 7 Rule 110 of the Civil
Procedure Code 1966, as introduced by GN, No.228 of
22/10/71 should be used. The proviso reads:-
“Provided that where a plaint does not disclose a
cause of action or where the suit appears from the
statement in plaint to be barred by any law and the
Court is satisfied that if the plaintiff is permitted to
amend the plaint, the plaint will disclose a cause of
action, or as the case may be, the suit will cease to
appear from the plaint to be barred by any law, the
Court may allow the plaintiff to amend the plaint
subject to such conditions as the costs or otherwise
as the Court may deem fit to impose.”

JUDGMENT & DECREE
Judgments and decrees are covered by O.XX rule 1
CPC.


                           95
At the conclusion of the hearing the court will
pronounce judgment. Decree follows the judgment.
Definition of judgment is found under Section 3 of the
CPC.
A judgment is a statement of the decision of the court
at the conclusion of the hearing of the case plus the
reasons for such a decision of the court.
In the judgment the court is supposed to address its
mind on the issues, evidence and the provisions of
the law which govern that dispute.
There are however certain circumstances under
which the judgment can be dictated to a
Stenographer.

TYPES OF JUDGMENT
There are two types of judgment i.e. Judgment in
Rem and Judgment in Persona
1. Judgment In Rem
 It is a judgment which attaches to the thing. It is a
judgment against the whole world. It relates to one’s
absolute right.
2. Judgment In Persona
It is a judgment which attaches to a person. It relates
to the right of that person only but it does not include
other better rights invested                    in other
persons.
           For     example     –     Land     lord     &
Tenant/Trespasser.
They are rights inter se and the judgment should be in
person.



                           96
At the conclusion of the hearing the court will
pronounce judgment. Decree follows the judgment.
Definition of judgment is found under Section 3 of the
CPC.
A judgment is a statement of the decision of the court
at the conclusion of the hearing of the case plus the
reasons for such a decision of the court.
In the judgment the court is supposed to address its
mind on the issues, evidence and the provisions of
the law which govern that dispute.
There are however certain circumstances under
which the judgment can be dictated to a
Stenographer.

TYPES OF JUDGMENT
There are two types of judgment i.e. Judgment in
Rem and Judgment in Persona
1. Judgment In Rem
 It is a judgment which attaches to the thing. It is a
judgment against the whole world. It relates to one’s
absolute right.
2. Judgment In Persona
It is a judgment which attaches to a person. It relates
to the right of that person only but it does not include
other better rights invested                    in other
persons.
           For     example     –     Land     lord     &
Tenant/Trespasser.
They are rights inter se and the judgment should be in
person.



                           96
At the conclusion of the hearing the court will
pronounce judgment. Decree follows the judgment.
Definition of judgment is found under Section 3 of the
CPC.
A judgment is a statement of the decision of the court
at the conclusion of the hearing of the case plus the
reasons for such a decision of the court.
In the judgment the court is supposed to address its
mind on the issues, evidence and the provisions of
the law which govern that dispute.
There are however certain circumstances under
which the judgment can be dictated to a
Stenographer.

TYPES OF JUDGMENT
There are two types of judgment i.e. Judgment in
Rem and Judgment in Persona
1. Judgment In Rem
 It is a judgment which attaches to the thing. It is a
judgment against the whole world. It relates to one’s
absolute right.
2. Judgment In Persona
It is a judgment which attaches to a person. It relates
to the right of that person only but it does not include
other better rights invested                    in other
persons.
           For     example     –     Land     lord     &
Tenant/Trespasser.
They are rights inter se and the judgment should be in
person.



                           96

Civil procedure udsm manual 2002

  • 1.
  • 2.
    CIVIL PROCEDURE Readings I. Text Books 1. D.F. Mulla, Code of Civil Procedure 1908: in 2 volumes. A practitioner’s book to be used carefully because some of the principles do not apply in Tanzania. 2. Rao and Chitaley Code of Civil Procedure: in 3 volumes 3. Bullen and Leaks Precedents on Pleadings edited by I.H. Jacob Suitable for practice – drafting. 4. I.H. Jacob Chitty’s Queens Bench Forms. It gives method of drafting and interrogating. It covers many things except Plaints. 5. Lord EVERSHED Atkins Court Forms 33Volumes very relevant to students. 6. Odgers On Pleadings Shaukut Mahmood the Code of Civil Procedure 1908 7. Flemming Civil Procedure – America book. 8. Spry Civil Procedure in East Africa II. Statutes 2
  • 3.
    CIVIL PROCEDURE Civil ProcedureIs a procedure of litigation before the Courts in civil matters. It does not give any litigant a right but it enacts a procedure through which a right can be obtained. It is a Procedural law unlike Substantive law which gives a right to a litigant. Functions of Civil Procedure It helps resolve the arguments presented from the parties. Civil Procedure helps in making availability of right clear through procedural rules. Procedural law assures you that the rights given by the substantial law are obtainable. The Civil Procedure Code of Tanzania is divided into two parts: 1. The Main Act 2. The Schedules In Tanzania the Schedules are regarded as part of the Act – which is a departure from the general rule of interpretation that, neither schedules nor preambles are part of the Act. Construction of the Civil Procedure Code Since Civil Procedure is adjectival law and a way of facilitating administration of justice or rather the way through which a right is obtained, the provisions of Civil Procedure Code should be given the literal meaning. 3
  • 4.
    All rules ofprocedure must be geared at speedy ending of litigations and at a lower cost. Procedure is a servant – which should facilitate and not hinder the administration of justice. IRON AND STEEL WARES V C.W.MARTY & CO. (1956) 23 3ACA 175, 177. Procedural statutes must be interpreted liberally. This position is illustrated in KENDAL V HAMILTON (1878)4 AC 504 at page 525: “Procedure is but a machinery of the law after all, the channel and means whereby is administered and justice reached. It strangely departs from its proper office when in place of facilitating it is permitted to obstruct and even extinguish legal rights and thus made to govern where it ought to subserve.” Procedural Statutes should not be construed in such a technical way that will make the court fall to do substantial justice between the parties. Preliminaries to Litigation In any litigation of a civil nature there must be two things co-existing: 1. Parties 2. A dispute NB: Not all disputes go to court but only those which are contested. The claimant must present a demand note upon the prospective defendant – in East Africa it is called a Letter of Demand. A LETTER OF DEMAND: Is a letter presented to the prospective defendant by the prospective plaintiff laying down the claims by the prospective plaintiff 4
  • 5.
    against the prospectivedefendant and demanding a remedy at the threat of being sued. There is no a prescribed form of a letter of demand provided it provides the necessary information. Three things in a Letter of Demand: 1. Concise statement of claim - which should contain particulars sufficient for the prospective defendant to know what is required by him. 2. That letter should contain a clear and unambiguous demand that the claim should remain good. 3. The letter should prescribe a limitation period normally 14 days within which the claim should be met or else legal proceedings may be instituted without any further notice. This is what has made the letter be referred to as a notice with an intention to sue. NB. The Civil Procedure Code does not provide for a letter of demand. It is provided for in the Advocates’ Remunerations and Taxation of Costs Rules GN 193 of 1924 under Rule 61 it is provided as follows: “If the Plaintiff in any action has not given the defendant notice of his intention to sue, and the defendant pays the amount claimed or found to be due, at or before the first hearing no advocate’s fee will be allowed except on the special orders of the judge." 5
  • 6.
    JURISDICTION Section 13 ofthe Civil Procedure Code provides that – every suit should be instituted in the Court of the lowest grade competent to try it. What is Jurisdiction? Is the power to hear and determine matters which are litigated before a tribunal. Jurisdiction is a question of law – a creature of statute e.g. in Tanzania the High Court is established by the Constitution and the subordinate courts are established by the Magistrates Court Act, No. 2 of 1984. Jurisdiction is determined before the beginning of the proceedings. Refer the case of Anisminic Case – which is just persuasive for Tanzania. TYPES OF JURISDICTION 1. Territorial Jurisdiction Every court has a limited area is i.e. geographical area – in which it operates. This is provided by statute establishing that court and in some cases by the subsidiary legislation. In Tanzania there is only one court having jurisdiction over the whole country, this is the High Court of Tanzania. There are two High Courts in the United Republic of Tanzania. These are – the High Court of the United Republic of Tanzania and the High Court of Zanzibar. The two High Courts have concurrent jurisdiction. 6
  • 7.
    Note: The HighCourt of the United Republic has no jurisdiction over matters of Zanzibar but over matters arising from the mainland, except over matters relating to election. The High Court of Zanzibar has no jurisdiction over election petitions arising from the Mainland but for matters of petition arising from the House of Representatives. The High Court of the United Republic of Tanzania has several registries. However the High Court has no territorial limit. The High Court Registries Rules give guidance on the procedure of filing a case in registry in which the case arises, or the area where the parties reside. There is an exception to this rule depending on the circumstances of the case therefore, a case can be filed in any registry but it will be transferred to its proper registry. District Court Territorial jurisdiction of a District Court is the boundaries for which the district is established. Refer the Magistrates’ Courts Act, 1984. Note: That there are two types of District Magistrates. Those designated as Civil Magistrates - who are entitled to hear civil cases. And those not designated to hear civil cases. Resident Magistrate’s Courts Magistrates of the RM’s Courts have a wider jurisdiction. Their territorial jurisdiction is the region in which that court is established. Refer the Magistrates’ Court Act, 1984. 7
  • 8.
    Primary Courts Territorial jurisdictionof Primary Court is limited to the district where it is established. Eg. the Primary Court Manzese is the Primary Court of Kinondoni at Manzese. Jurisdiction in respect of Immovable Property The court in which area the property is situated has jurisdiction over the property. In claims relating to immovable property the party can chose between where the claim arose and the area where the other party voluntarily resides and/or works for gain. Primary Court has unlimited jurisdiction over property held under customary law and in matters of Islamic Law. 2. Exclusive Jurisdiction This is jurisdiction vested in a particular court in exclusion of any other court. This jurisdiction is normally vested in that court by a statute e.g. Workmen’s Compensation Ordinance which vests exclusive original jurisdiction over matters relating to the Ordinance to the District Court; and the Rent Restriction Act(REPEALED & LAND ACT CAP 113 IS IN EXISTANCE) which grants exclusive original jurisdiction over matters relating to landlord and tenant to the Housing Tribunal. 3. Concurrent Jurisdiction Courts are said to exercise concurrent jurisdiction when they can exercise original jurisdiction over the same matter. 8
  • 9.
    4. Pecuniary Jurisdiction Refer to Magistrates Courts Act, 1984. All courts except the High Court are courts of limited jurisdiction. Note: -1- The Magistrates Courts Act provides for unlimited jurisdiction over Islamic & Customary Law to Primary Courts but the Act does not provide specifically for exclusive jurisdiction over civil matters related to Islamic and Customary Law. -2- Under the MCA all civil proceedings in respect of Islamic and Customary law must be commenced in primary court unless the Republic or the President is a party or the High Court has granted leave to the parties to otherwise commence the civil proceedings. -3- A primary court has no jurisdiction to civil case unless customary law is a applicable or the proceedings are for the recovery of civil debts of interest due to the United Republic of Tanzania or Local Authorities. THINGS TO CONSIDER BEFORE INSTITUTION A SUIT. 1. Subject matter for the suit – Whether movable or immovable. Movable Property –the suit most be field in the court within which the subject matter is situated. Immovable property – where the property is suited. Refer section 13 of the CPC Pecuniary jurisdiction. The place where the defendant resides or works for gain. 9
  • 10.
    NB: Suit mayeither follow the defendant or the cause of action. A company may be sued or sue where there is head office or branch or sub-office of the company. Authorities 1. Francis Mwijage v Boniface Kabalemeza (1968) HCD n. 341 2. Sheikh Kassim Suleman v Ayubu Kamgila (1968) HCD n. 79 3. Walumu Jilala v John Mongo (1968) HCD n. 81 4. Edward Kalemela v Muyebe Rwenjege (1968) HCD n. 80 2. RES JUDICATA Is a Common Law doctrine included in the Civil Procedure Code. It has two elements Res meaning matter and judicata meaning already adjudicated. Res judicata – bars subsequent litigations involving matters substantially and directly the same between the same parties or parties claiming on the same thing. -Res Judicata applies only to civil litigations. The doctrine of Res judicata is based on two well known maxims of Common law. 1. interest reipubicae est ut sit finis litium i.e. it is in the public interest that there be an end to litigation. 2. nemo debet bis vexari pro aedem causa i.e. no one should be in jeopardy twice on the same ground. 10
  • 11.
    Elements of ResJudicata Refer Section 9 of the CPC 1. There must exist two suits – one finally and conclusively determined and another pending. 2. These suits must be before courts of competent jurisdiction. 3. These suits must have been between same parties – or parties claiming under the same title. 4. The matters that are directly and substantially in issue between the parties in the pending suit must have also been directly and substantially in issue in the previously decided suit. Effect of the doctrine A person cannot raise an allegation which has previously been decided against him by a court of competent jurisdiction. A Judgement may be assailed by an appeal where a right of appeal exists, or by applying to have the judgment set aside where it was obtained fraudulently or collusively. See: R.V. Hatchings (1881), 6 QB 300. 3. PARTIES TO SUIT In every civil litigation there has to be a minimum of two parties opposing each other in respect of a dispute. In other words there has to be a lis inter parte with litis contestatio The two parties to a suit are PLAINTIFF and DEFENDANT. Plaintiff is the party who has a right to relief against the other party (defendant). The right of relief should not be a moral right but a legal right. 11
  • 12.
    In simple civilsuit there is a single plaintiff and a single defendant while in a complex suit there are various parties. Parties to a Civil Suit 1. Proper Party Is that party without whom no effective decree can be issued? His presence is necessary because the court must either give a relief or a decree against him. Proper parties are parties who must be before the court. 2. Necessary Party Is the one whose presence in court is desirable but whose absence does not render the decree ineffective Eg. In nuisance suit over a flow of sewage – a decree against the tenant can be affected through the landlord. The tenant is therefore a proper party because he will bring the landlord - he is therefore not a necessary party but a proper party and the landlord the necessary party. The person who will be compelled to do what is sought is the necessary party. JOINDER OF PARTIES General Principle: The CPC does not compel a party to combine the parties in pursuance of their rights nor does it prohibit joinder of the parties. Joinder of Plaintiffs Order 1 rule 1 CPC provides – More than one plaintiff can sue against one or more defendants if the right to 12
  • 13.
    relief claimed bythem arises out of the same act or transaction or a series of acts or transactions and if separate suits were brought, common questions of law or fact may arise. Refer: Yowana Kahere V. Lunjo Estates Ltd [1959] EA 319 Kanani V. Desai Uganda High Court Civil Case No. 469/1953 Points to Consider In Joinder of Plaintiffs These are just practical and not legal considerations 1. Parties (co-plaintiffs) must have common interests. Where it is likely to differ in interests it is advisable that each plaintiff should sue separately. 2. Co-plaintiffs should be represented by the same advocate to avoid prejudice to parties. 3. Joinder of plaintiffs shortens the conclusion of the case. 4. It is less expensive to sue jointly than separately in terms of mobilizing the parties and witnesses. 5. Suing jointly does not require presentation of third party notice against some of the plaintiffs. 6. Where the defendant is successful against some of the plaintiffs, there is a real likelihood that the successful plaintiff will be found to be jointly liable to the defendant. Cause of action Means all the facts which have to be proved by plaintiff in order to be entitled to a relief or the facts which are going to be proved in the court in order to obtain relief. 13
  • 14.
    Joinder of Plaintiffs Thetest is whether the plaintiffs are jointly interested in the same subject matter. See: BOLTON V SALIM KAMBI [1958] EA 360 The Plaintiff sued under Cap. 360 for damages on his own behalf as the dependant of his deceased son and at the same time he sued as the administrator of the estate of his deceased son. The issue was whether there was a proper joinder of plaintiffs. It was held that there was nothing wrong for a person to sue in a dual capacity. Joinder of Defendants Rule 3 of Order 1 It is not necessary that every defendant should be interested as to all the reliefs claimed in any suit against him. The rule does not require that all questions of law or fact must be common to all the parties. It is sufficient that there is a common question either of law or of fact. ILLUSTRATIONS 1. A brought a suit against B, C, D and E for recovery of certain documents of title and the goods in suit were his property; that defendant B obtained from him the documents of title relating thereto by fraud and made them over to defendant C; that defendant C wrongfully dealt with them and sold the goods to defendants D and E; that D and E claimed to retain the goods and documents of title. 14
  • 15.
    Held: The rightto relief against each of the defendants is based upon the same act, namely, the alleged fraud of B, and this is so notwithstanding the fact that there may have been subsequent acts or transactions in which the different defendants are individually concerned and which may enable them to raise distinct defences. If different suits were instituted, at least one common question of fact would arise, namely the exact nature of the act imputed to B, which would have to be investigated, presumably on the same evidence separately adduced in several suits. 2. A holder of 100 shares in a company, brought an action against the company, its several directors and promoters and executors of a deceased director and promoter, as against the company’s cancellation of the allotment to him of his shares and return of his money by paid him with interest, damages as against the defendants other than the company and rectification of the company’s register of members by the removal of his name therefrom. He alleged that he had applied for the shares upon the faith of, and induced by the misrepresentations contained in the prospectus issued by and with the authority of the defendants (other than the company and executors) and of the deceased. Held: In substance, the shareholder has one grievance, call it a cause of action or what you like, and in substance he has one complaint, and all the persons he sues, have according to him, been guilty of conduct which gives him a right to relief in respect 15
  • 16.
    of one thingwhich they have done, namely issuing of the prospectus. See also the case of Thomas V. Moore (1918) IKB 555 per Lawrence, J. ‘that the court has discretion as to allowing the joinder of the defendants and that as there was a common question of fact to be tried………….the court would in exercise of that discretion allow the two defendants to be joined in one action. As a General Rule: where claims by or against different parties involve or may involve a common question of fact being against different parties of sufficient importance in proportion to the rest of action to render it desirable that the whole of the matters should be disposed of at the same time, then it will allow the joinder of plaintiffs or defendants subject to its discretion as to how the action should be brought. It should be noted that joinder of the parties and causes of action is discretionary in the sense that if they are joined there is no absolute right to have them struck out but it is discretionary in the court to do so.’ The plaintiff can at his option join as parties all or any of the persons jointly or severally liable on any contract including parties to bills of exchange, hundies and promissory notes. See: Order I Rule 6 CPC. If the Plaintiff is in doubt as to the person from whom he is to obtain redress, he may join two or more defendants in order that the question as to which of 16
  • 17.
    the defendants isliable, and to what extent may be determined as between all parties. See: Order I Rule 7 CPC. Under Which Circumstances Can You Join the Defendants? 1. In joining defendants one has to look at the connection between the defendant and the cause of action. See: Order I Rule 3 CPC 2. Rights to relief must arise out of the same act or transaction 3. If separate suits are brought against the defendants there would be common question(s) of law. Authorities i) PETER COMPANY LIMITED V. MANGALJI & OTHERS [1964] EA80.81 ii) THE BANK OF INDIA V. AMBAL SHAH & OTHERS [1965] EA 18 “Although the word ‘same’ must govern the words ‘series of acts or transactions’ it is not necessary that all defendants should be interested in the relief claimed in the suit but it is necessary that there must be a ‘cause of action’ in which all the defendants are more or less interested although the relief asked against them may vary:” Reference should be made to Section 111 of the Evidence Act, 1967. That, the plaintiff must prove the case against the defendant or all the defendants on balance of probability. 17
  • 18.
    REPRESENTATIVE SUITS (GROUPACTIONS) - Order I Rule 8 CPC Where several plaintiffs claim a right to relief against one defendant or several defendants jointly and such persons have the same interest in the subject matter of the suit then a member of them may sue on behalf of all. They are actions normally filed against a public or a particular social group, trade union, local authority or in declaratory actions against the Government. The persons suing are known as Representatives. Before they file the suit they must first obtain a representation order by filing an Application (chamber summons) and Notice must be given in Mass Newspaper to invite objections. If there is no objection the court will grant the Representation Order. Judgment given out of a representative suit shall bind all the parties. EFFECT OF JOINDER OF DEFENDANTS Addition of defendant necessitates amendment of the pleadings in order to incorporate the new defendant into the action and he must be served with a copy of the pleadings. NB: Addition of defendant is subject to the Law of Limitation. Order I Rule 12: Where there is a joinder of parties whether plaintiffs or defendants, some of them will be allowed to appear, plead and conduct the case on behalf of the others. 18
  • 19.
    Where there ismore than one plaintiff or defendant, the parties may appoint one of them to proceed on behalf of the others provided the authorization must be in writing and signed by the parties. The parties not appearing in court will be bound by the decision of the court. THIRD PARTY PROCEDURE – Order I Rule 14 CPC A procedure under which a party who is not an original party to the proceedings is brought to the suit and thereby made a party to the suit. The third party is neither a plaintiff nor a defendant. It is a procedure which enables the court to make orders in favour of the defendant against the third party when the defendant is found liable to the plaintiff. In effect it is a procedure which enables the court to entertain two suits simultaneously thereby saving time and reduce costs of litigation. This procedure is available to the defendant only. The relevant provisions for Third party Procedure are Paras (a), (b) and (c) of rule 15 of Order I of the CPC. In the Case of Bhamji Laxman limited V. National Sisal Authority & the NBC. High Court Civil Case No.60 of 1993 (DSM). Mwaikasu J., stated in the said case that: “At this juncture let it be pointed out that a Third Party Notice is for all practical purposes, a form of a claim by the defendant instituted against the third party, for the relief’s sought. As the defendant’s claim against the third party hinge on the nature of the 19
  • 20.
    claim of theplaintiff against the defendant, it is for a fair and just adjudication of the dispute imperative that the third party should be supplied with sufficient facts as to make him know adequately the nature of the claim as to be in a position to prepare a proper and adequate defense. The need for such sufficient facts to enable the third party identify the nature of the claim comes to the fore when one reads Rule 17 of Order 1 of the CPC.” Conditions For Third Party Proceedings The applicant must establish that he is entitled to contribution or indemnity. Refer: Parry V. Carson “In order to bring himself within the ambit of Order 1 Rule 14 the applicant must show upon the face of the pleadings and upon his supporting affidavit that he would be entitled to indemnity from the third party in respect of the amount which the plaintiff claims from him in the event of that claim be successful.” Refer also: WALUSIMBI V. A.G (U) [1959] EA 223 RMINGHAM & DISTRICT LAND CO. V. LONDON NORTH WESTERN RAILWAY CO. (1887) 34 Ch. D.261 WYNE V. TEMPEST [1897] 1Ch.110 at 113 per Chitty, J; “A right to indemnity may arise under express or implied contract or by reason of an obligation from the relation of the parties, such an obligation arises in equity from the relation of the parties when two trustees are liable for a breach of trust and one has applied the trust fund to his own use; in that case the 20
  • 21.
    trustee who hasso dis-applied the fund is liable to indemnify his co-trustee; so where a man has requested another to hold as a trustee for him shares upon which there is liability for calls or the like the trustee is entitled to an indemnity not merely out of the trust property but by the cestui que trust i.e. the beneficiary.” Note: - The right to indemnity is a contractual right while the right to contribution is an equitable right. - Joint tortfeasor has a duty to contribution against his co-tortfeasor. LIMIT OF THIRD PARTY PROCEDURE Edward Kirondoke Kaggwa V. Castapereira [1963] EA 213 “Third Party Procedure is limited to claims to contribution or indemnity only and it cannot be extended to a right for damages.” Refer – Insurance Claims. Overseas Touring Road Services V. Africa Produce Agency [1962] EA 190, 191. HOW TO INSTITUTE THIRD PARTY PROCEEDINGS Order I Rule 14(2) CPC The defendant desiring to issue a third party notice must file an application to Court for leave to issue the third party notice. The application has to be made ex parte supported by an affidavit. The affidavit will disclose the grounds upon which the application is made. It must disclose a cause of action. - Once there has been service to the Third Party , he becomes a party to the proceedings 21
  • 22.
    - The Third Party is liable when the defendant is liable when the defendant is liable to plaintiff. - The Third Party can not challenge the plaintiff’s case but he may defend himself against the defendant. i.e. pointing out that the defendant is not entitled to any contribution or indemnity. APPEARANCE Three Modes of Appearance 1. Personal Appearance A party in law is entitled to enter appearance personally except where it is a corporation. Corporations can only appear by an advocate. Iboos Petrol Station V. Blackstone Utility 1955 KLR 20 A Corporation aggregate has got two types of agents. Agent for ministerial/administrative purposes i.e. manager to cleaner. Agent for Legal purposes who must be an advocate. NB: A Company’s Secretary though a lawyer is not an agent. Section 3 of the Advocates Ordinance Cap. 341 define an advocate as a person whose name appears in the Roll of Advocates. TLCs Act, 1971 - TLC advocates cannot act where their employers are not involved. Zuberi Gigi V. The Returning Officer 1974 LRT n.52 – A State Attorney is an advocate only when he is acting on behalf of the State. 2. By As Advocate Duly Instructed W. V. Commissioner of Income Tax [1973] EA 187 defines who an advocate is. To be duly instructed an 22
  • 23.
    advocate must beable to answer all the material questions relating to the suit. Clients verify this by signing the pleadings. See: KIWANUKA & CO V. WALUGEMBE [1969] EA 660 BUGERERE COFFEE GROWERS V. SSEBBADUKA [197O] EA 147 KAFUMA V. KIMBOWA HUILDERS & CONTACTORS [1974] EA 91 3. By Recognized Agent A recognized agent is a person who holds power of attorney. A power of attorney is a document/instrument by which a person empowers another person to represent him or act in his stead for certain purposes. The person so appointed becomes an Agent of the Principal. Order III rule I CPC provides: “Any appearance, application or act in or to any court, required or authorized by law to be made or done by a party in such court, may, except where otherwise expressly provided by any law for the time being in force, be made or done by the party in person or by his recognized agent or by an advocate duly appointed to act on behalf or, where the Attorney-General is a party, by a public officer duly authorized by him in that behalf. Provided that any such appearance shall, if the court so directs, be made by the party in person.” In the case of Hans Nagorsen V.BP Tanzania Ltd. High Court Civil Case No. 239 of 1987 (DSM Registry) 23
  • 24.
    Hans was authorizedonly to settle the claim against the Defendant and not to act as authorized agent in terms of the provisions of Order III rule I of the CPC. Instead Hans Nagorsen filed a suit as the Attorney of the Plaintiff. Kyando J, held: “I would readily agree that authorization to settle a claim is not the same thing as authorization to appear, apply or do any act in or to any court within the meaning of those words as used in Order III rule l of CPC. As I see it, Mr. Nargosen was authorized to negotiate settlements out of court, of the claim. He certainly was not, by the above letter, authorized to institute a suit or suits. The institution of the present suit by him was done without authority or power therefore.” It was also stated in the above case that. “Where a party is unable to sign the pleading it may be signed by any person duly authorized by him to sign or to sue or defend on his behalf.” In another case, Amirah Ahmed Jaffer V. Abdulrasul Ahmed JAFFER & 2 Others. High Court Misc. Civil Case No.48 of 1992 (DSM). Mapigano J, stated as follows: “As every lawyer perfectly understands, a power of attorney is a formal instrument by which one person empowers another to represent him or act in his stead for certain purposes. Under Order III rule 2 (a) of CPC a grantee of such powers is competent to go to law and make application on behalf of the grantor, 24
  • 25.
    providing that theinstrument gives him such authority, and I am acutely aware that the terms of such instrument should receive a strict construction as giving only such authority as it confers expressly or by necessary implication.” The trial Judge went on to say: “By the same token where the principal himself makes or does an application, appearance or act, his attorney has no locus.” INSTITUTION OF SUITS Section 22 and Order IV of CPC SUIT – Is a proceeding of a civil nature which has been commenced by the presentation of a plaint or in any other manner which has been prescribed by the rules made under the Civil Procedure Code. Refer – Mansion House Ltd V. Wilkinson (1945) EACA 98. The word ‘plaint’ has no statutory interpretation. It can however be defined to be “a memorandum presented to court by a claimant setting forth his reasons of complaint and the relief he is seeking from the court. So as to be a plaint it has to comply with the rules of pleadings as provided under Orders VI and VIII of the Code.” WHO MAY COMMENCE CIVIL PROCEEDINGS Any person whose legal right has been infringed upon has a right to bring a suit against the infringer/intruder. Order III Rule 1 25
  • 26.
    Any act whichmay be done by a party to the proceedings may be done by his agent or advocate duly instructed. As a general rule a plaint must be presented by the plaintiff himself or by the person duly authorized. Presentation of the plaint must be physical. The same must be physically presented to the Officer of the court authorized, a plaint cannot be presented by post, telegram etc. See Order IV Rule 1 CPC. TIME AND PLACE OF PRESENTATION OF THE PLAINT There is no specific provision for time and place of presentation of the plaint. Presentation can be made at any time and place provided it has been presented to the authorized person. This saves time as once the party delays to file his plaint he has got to apply to the Minister for Justice for extension of time. WHEN IS A SUIT TAKEN TO BE FILED A suit is taken to have been filed when the necessary court fees have been paid. Presentation of the plaint has to be coupled with the payment of fees i.e. the plaint must be accompanied by an official receipt evidencing payment of the necessary fees. As for payment of the fees by cheque, date of filing is not the date when the cheque is signed but when it has been honoured by the bank and therefore although it is presented any time and place the plaintiff must pay and get the receipt. See: RATAN JAYAKISAN SHUKLA V. BAPU HIRAJI KWILO AIR (V.24) Bomb.25 The judge stated: 26
  • 27.
    “The Judge canaccept a plaint at any hour he chooses though outside office hours and at any place he chooses and I see no reason to doubt that the Clerk of the court who is a duly constituted officer of the court with power to accept a plaint can accept that plaint outside office hours and outside the court building although I don’t, for a moment, the clerk is bound to accept out of the court hours.” See also PILLAI V. AMIR SALUB & ORS AIR Vol.1 [1914- Mad.488] Note: under the Court Fees Rules, Rule 8 allows the court to grant leave to sue in forma pauperis. In SINGH V. SINGH AIR 1937 Oush.452 it was stated that ‘….merely filing an application for leave to sue in forma pauperis, though it is accompanied by the plaint, does not amount to the institution of the suit there cannot be any suit or plaint before the court until the application to sue in forma pauperis is granted. A PLAINT must contain precise and concise statement of the claim against the defendant, it has to disclose a cause of action against the defendant, and it has also to be verified by the plaintiff. The same applies to all other pleadings. SUMMONS - ORDER V CPC Order V Rule 1 – Once a suit has been filed it is the duty of the court to summon the defendant. What is a Summons? It is a process (document) of the court addressed to the defendant informing him that a suit has been instituted against him and requiring him to submit to the jurisdiction of the court either by filing a written statement of defence 27
  • 28.
    (WSD) within thespecified period in the summons or to enter appearance before the court for the purposes of receiving the directions of the court on a date specified in the summons. PURPOSE OF SUMMONS The procedure conforms with the rules of natural justice that no party should be condemned unheard. It gives the defendant an opportunity to be heard. TYPES OF SUMMONS There are two types of summons. 1. Summons to appear 2. Summons to file a Written Statement of Defence (WSD) NB: Summons to appear are normally issued by the High Court. Summons to file WSD is invariably issued by Subordinate Courts. Mandatory (Basic) Requirements of a Summons 1. Under Order V Rule 2 a summons must be signed by a Judge or a Magistrate or any other Officer appointed by the Chief Justice for such purposes. 2. It must bear the seal of the court. What is a seal? It is a metal endorsement on a document. The High Court is the only court in Tanzania with such a seal. However, rubber stamp may be a valid seal as the endorsement seal. See: SATCHU V. A.G [1960] EA 508 and BAWMAN V NADIOPE [1968] EA 306. There is a rebuttable presumption that the person signing the summons has the authority to do so. One cannot inquire as to the authenticity of the signature at the time of service. 28
  • 29.
    3. A summonsmust be accompanied by another document. Order V Rule 3 of CPC - to enable the defendant know the nature of the suit relating to the summons. The Plaintiff must produce enough copies for all the defendants. APPEARANCE Appearance by the defendant means the defendant’s submission to the court and his intention to defend his case. EAP & T V. M/S TERRAZO PAVIORS [1973] LTR 58 “Appearance under the Code means attendance in person or by an advocate in court on the date stated in the summons which is also the date of hearing. Once the defendant is present, either in person or by an advocate when the case is called up that is sufficient appearance.” Methods of Serving Summons The general principle is that service of summons should be made upon the defendant himself personally. The person who does the delivery of the summons is the Court Process Server or the Court Bailiff (Officer of the court specifically appointed for purposes of serving processes of the court). Refer: Order V Rules 9 to 15 CPC. Exceptions to the general principle: 1. Where the defendant has an agent authorized to receive summons the summons will be served on the agent. 2. Where the suit relates to any business or work and the defendant does not reside within the 29
  • 30.
    jurisdiction of thecourt then service may be made on the Manager of the business. 3. Where the suit relates to immovable property service of the summons must be made to the agent with authority to deal with that property. 4. Where the defendant cannot be found, nor has an agent or authority to receive summons then the summons may be served on any adult member of the household except the servant. Proof of Service of Summons Order V Rule 16 CPC The person who receives the summons must acknowledge receipt by signing on the original summons which is then returned to the court and he retains the copy. Where the party refuses to receive the summons the Process - Server leaves the copy aside and swears on the affidavit that the bearer has refused to receive the summons and that a copy thereof has been left on him. Witnesses’ addresses may also be mentioned. Where the defendant or his agent cannot be found and no adult member of the family leave of the court is sought to have a copy of the summons affixed at the place which is known to be the defendant’s last place of aboard. Substituted Service (in substitution of personal service) Order V Rule 20 CPC The rules relating the substituted service are exception to Rule 12 of Order V in that they allow service of the summons by a method which directly does not involve the defendant. A plaintiff desiring to serve the defendant with substituted service must get leave of the court. 30
  • 31.
    He must applyby showing grounds and reasons for this. Substituted service is done by publication in the newspapers or by affixing the copy of the summons at the court - house or at a public place where pubic notices are given. Note: Substitution of summons does not include copy of the plaint. The copy of the plaint will remain in the registry and the defendant will be free to go there to collect it. Other Forms of Service of Summons Service by Post Order V Rule 21 CPC It is secured on application by the plaintiff. The application is made orally on the mention date. Such order is granted only upon the court being satisfied that personal service will entail unreasonable delay. Such a summons must be by registered mail. See Order V Rule 30. The defendant will be required to sign on the original summons as acknowledgement and return the same to the court. The defendant may write a letter to the court to acknowledge receipt of the summons. Service outside the jurisdiction of the Court but within Tanzania Order V Rule 22 CPC The court which issues a summons to the defendant who resides outside its jurisdiction sends the original summons and a copy to the court having jurisdiction in the area the defendant is known to reside. e.g. The RM in DSM sends summons and a copy to the RM in Mbeya. 31
  • 32.
    Note: This appliesonly to subordinate courts. A subordinate court cannot send a summons to the High Court. When a summons is received by that court it is served in the normal way. This court then returns to the court which issued the summons the original summons signed by the defendant with a covering letter stating how the same was served. Where the defendant resides within the jurisdiction of Zanzibar the court may either send it by post or physically by Officer of the court. Alternatively the court may send it directly to the subordinate court in Zanzibar. If the defendant is in Prison the summons will be sent through the Officer – In -Charge of the Prison together with the copy of the plaint. If the defendant is a member of the Armed Forces then the summons is sent to his Commanding Officer who has the duty to send the copy to the defendant and return the original signed by the defendant. Where the defendant is an employee in the Civil Service then he may be served through his superior. Service of Summons to Defendant outside Tanzania There are two categories of countries. 1. Kenya, Uganda, Malawi and Zambia. These have specific agreement with Tanzania as to service of civil processes. Summons to these countries is served by: i) Post – registered mail where the address of the defendant is known. 32
  • 33.
    ii) Directly to the court of that country with jurisdiction over the place where the defendant resides. On receipt the court will receive it as if it was its own summons. iii) By the plaintiff or his agent sending the summons personally with permission of the court. 2. Other Countries than those mentioned above. These falls into two categories: – 1. Countries which Tanzania has agreement (conventions) as to service of civil processes. 2. Those countries which Tanzania has no agreement. Where we have conventions the service is in accordance with the agreement. Regardless of this summons may be served by post or through the court of that country. In Tanzania the Magistrate prepares the summons, sends it with the plaint to the High Court, for translation where the country is not an English speaking country. The Registrar of the High Court then sends it to the Principal Secretary of the Ministry of Foreign Affairs which will prepare a document to be sent to that foreign country. Service through the foreign court will be as effectual as our own Local Courts. PLEADINGS What is Pleading? It is a legal term which connotes the presentation of ones claim (case) before the court. Generally, pleadings comprise of two things; 33
  • 34.
    1. The documentswhich are presented before the court in preparation of the suit. These documents lay bare the material facts of the case. 2. The process of preparing the documents. Order VI Rule 1 defines pleadings as the plaint, the written statement of defence and the reply to the written statement of defence and any other document produced to court for the purpose of preparing the suit. The definition is not exhaustive. Pleadings also include the process of preparing the documents which lays bare the facts of the case and it includes the documents themselves. In other words pleading is an art of preparing the documents and on the other hand it is the product of this art. Functions of Pleadings Pleadings serve three purposes: i) Pleadings inform the court about the nature of the parties’ case by identifying the area of controversy between the parties. ii) Pleadings serve the purposes of bringing the parties to the issue. i.e. they establish litis contestation iii) Pleadings put the dispute on record. They define the area upon which the decision of the court is sought and they put those areas in court. Once there is decision the matter becomes res judicata. 34
  • 35.
    NB: Every partyin civil litigation is entitled to know the nature of the case against him. Thorp V. Holdworth (1876) 3 Ch. D. 637,639 (Leading Case) “The whole object of pleading is to bring the parties to an issue and the whole meaning of the rules was to prevent the issue being enlarged which would prevent either party from knowing when the cause came on for trial, what the real point to be discussed and decided was. In fact, the whole meaning of the system is to narrow the parties to definite issues and thereby to diminish expense as delayed especially as regards the amount of testimony required at the hearing.” See also Palmer V. Gudagni [1906] 2Ch. 494,497 Esso Petroleum Co. Ltd V. Southport Corpn. [1939/59] AC 218,238 “The function of pleading is to give fair notice of the case which has to be met so that the opposing party may direct evidence to the issues disclosed by them.” Joseph Marco V. Pascal Rweyemamu (1977) LRT 59 Zalkha Binti Moh’d Juma Mazige [1970] HCD 132 N.J. Amin Ltd. V.B. Patel Co. Ltd. [1969] HCD 17 Note: 1. Only matters which are in dispute between the parties should be the subject of decision by the court. 2. The purpose of pleadings is not to set out the whole case. Pleadings are not evidence. They comprise only of the allegations to be supported by evidence. 35
  • 36.
    3. Pleadings relateto material facts only and not the law. Material facts are those which constitute the cause of action. They constitute a right and the infringement of that right and the consequence of the infringement of that right. 4. As a general rule you do not plead particulars. There are certain exceptions to this rule e.g. in Negligence [which is a very wide tort], in fraudulent cases – you must specify the nature of the fraudulent behaviour, Misrepresentation, Undue influence, Breach of Trust, Willful default. In all these actions the party pleading them must give the particulars. Refer Order VI CPC and the case of Northwestern Salt Co. Ltd. Certainty & Particularity in Pleading The question of certainty was brought up in the case of William V. Wilcox 112 ER 857,863. The case gives tactics to be used in pleading. The CJ said: “The certainty or particularity of pleading is directed not to the disclosure of the case of a party but to informing the court, the jury and the opponent of the specific proposition for which it contains and a scarcely important objects that bringing the parties to issue on a single and certain point avoiding prolixity and uncertainty which would very probably arise from stating all the steps which lead up to that point.” According to the case there are two categories of facts 1. The material facts 2. The subordinate facts 36
  • 37.
    Material facts: These arethose facts which lay out the cause of action. Subordinate facts: These are those facts which may properly be called evidence. In the process of pleading you are required to plead the material facts and not the subordinate facts. See: Gautret V. Egerton 1867 LR 2CP 371, 374 Lumb V. Bealimont 49 LR 772 Millington V. Lorring 43 LT 657 The Nature of Pleading Certain Facts Under Rule 6 - where a condition precedent is alleged, the facts disclosing such condition have got to be specifically pleaded. Under Rule 8 - where a contract is illegal, a bare denial will relate to existence of the illegality. Under Rule 10 - where a state of mind is pleaded it is enough to allege that state of mind, e.g. malice or knowledge. Rule 13 - you do not plead law because law is a matter of judicial notice. Subsequent pleading cannot raise new grounds. A pleading which is not signed is a defective pleading as it is required by the Rule 14 to be signed by the party himself or his advocate or where the party is absent from the jurisdiction of the court or where he is unable to sign, by a duly authorized person. The requirement of signatures is a requirement of law; however the absence of signature is not fatal to 37
  • 38.
    the proceedings. Therefore,where a pleading is not signed, the defect may be curable by allowing the party to sign. Where a party applies to have a signature on his pleading, the court will freely grant that application. Rule 15 - demands that all pleadings have to be verified. What is verification? It is a statement by a pleader showing that he has full knowledge of what is pleaded and indicates his bona fide of what he has pleaded. Verification is a mandatory requirement. Under Rule 15(2) - the party verifying must verify to the different paragraphs separately and show which are verified according to his knowledge, belief and information. E.g. VERIFICATION I. XY, being the plaintiff in the above named suit do hereby state that all that is stated in paras 1 to 5 above is there to in the best of my own knowledge, what is stated in paras 6 and 7 is there to the best of my belief and what is stated in para 8 is there to the information supplied to me by the Dean of Students. DATED at Dar es Salaam this……….day of November, 1988. ………………………………………. PLAINTIFF 38
  • 39.
    A plaint whichis not signed/ verified is ineffective and therefore the Officer of the court may reject it. The object of verification is to fix responsibility on the party pleading and to prevent false pleadings being recklessly filed or false allegations recklessly made. STRICKING OUT OF PLEADINGS Order VI Rule 16 empowers a court at any of the proceeding to strike out or amend any matter in the pleadings which according to it are offensive. Situations in which striking out of pleadings may be ordered:- I. Where the pleadings or certain parts of the pleadings are unnecessary i.e. for being prolix. II. When the court is of the opinion that such pleadings do embarrass the opponent eg. where the pleadings are so ambiguous that your opponent will be unable to understand them. III. Where the court is of the impression that the pleadings tend to prejudice that opposite party. IV. Where the court is of the opinion that the pleadings will tend to delay a fair trial. NB. The provision of Order VI Rule 3 must be read together with the provisions of Order VI Rule 16 and the case of N.J. Amin V. B. Patel & Co. Ltd [1969] HCD 17. In the case of Knowles V. Roberts 1883 38 Ch. D 263 it was observed that courts should not dictate to the 39
  • 40.
    parties how theyshould frame their case. However, this is subject to the limitation that the parties must not offend against the rules which have been laid down by the law. “ Where a party to civil proceedings alleges a scandalous matter it will be struck out only when it is irrelevant, however , not every indecent or offensive is not material is to be considered as scandalous….” If the scandalous matter is relevant it will not be struck out. AMENDMENT OF PLEADINGS As a general principle courts have discretion to order amendment of the pleadings at any stage. Order VI Rule 17 can be employed at any stage before judgment but it is advisable to effect them earlier because it may be detrimental to parties. See the case of Motohov V. Auto Garage Ltd [1971] HCD 81 per Biron J, “The making of amendments is not merely a matter of the power of court but it is a duty so that substantive justice will be made.” Although Order VI Rule 17 is a permissive provision the High Court has interpreted the conditions as mandatory. In Tanzania amendments are the duty of the court. The party seeking amendment is the one to pay the costs of amendment. Endevain V. Cohen (1889)43 Ch. D. 187 Clarapede V. Commercial Union Association (1883) 32 WR 262. 40
  • 41.
    When an inconvenienceis suffered by a party can be assessed in monetary terms and therefore attorned by the court for the interest of determining it the court will allow amendment. Although amendment will freely be granted an advocate will suffer the costs. A professional lawyer should not make an application to amend pleadings. Principle: The court will allow amendment when the inconvenience caused can be assessed in monetary terms to compensate the opposite party. Shivji V. Pallegrino The amendments are ordered only for the purposes of making the existing pleadings clear. They are made to elaborate the cause of action pleaded. Amendment will not be awarded where the effect of granting it will be to introduce a new course of action. Also an effect of amendment is not to substitute the cause of action for a new cause of action Therefore, Order VI rule 16 cannot be used where through negligence a party has failed to join causes of action where he could have done so in the beginning. When an order for amendment is granted the party who has been allowed to amend must do so within 14 days. If he cannot do so he cannot amend his pleadings unless he is allowed an extension of time by the court. 41
  • 42.
    PLAINT Order VII CPC. Aplaint is a court document, it should contain a title. What comprises of the title of a plaint? Refer: Rule 1 (a) (b) & (c).The name of the court, the number of the case and the names of the parties. In the body of the plaint the first paragraph should contain the description of the plaintiff. Where there is more than one plaintiff, each plaintiff will be described in his own paragraph. The second paragraph will contain the description of the defendant. Where there is more than one defendant, each will be described in separate paragraph. The main body of the plaint will constitute the facts which show the cause of action. Towards the end of the plaint there should be a statement to the effect that a claim has been made and the defendant has refused to accede to it. There has to be a paragraph towards the end to show that the court has jurisdiction. This is followed by prayer for reliefs. See: Rule 2. Note: that a relief not prayed cannot be granted. At the end of the prayer of relief there must be a signature of the plaintiff or any person entitled by the law. Then comes verification which should be signed at the left hand corner by an Advocate or Magistrate. 42
  • 43.
    Normally there isno specific type of paper to use but the practice is – pleadings are written in light green paper which is less than 800 grams. In England, there is a rule – it must be an A4 paper. In Tanzania it must be in a foolscap. General notes on Plaint. - The names together with the description and the place of residence or place of business must be set out in the title part of the plaint. - If the plaintiff is unable to give the full name of the defendant it is better to state in the body of plaint that, in spite of his best endeavor, the plaintiff could not ascertain the full name of the defendant. - A corporation must sue or be sued in its full corporate name. - Partners may be sued in the firm’s name. - The capacity in which the plaintiff sues or the defendant is being sued ordinarily be set out in the body of the plaint. - Dual capacity, as where the plaintiff sues in a representative capacity as also in his own right should be clearly stated. - Rule 1 (b) and (c) of Order VII requires that the place of the plaintiff or the defendant is to be stated in the plaint. It does not say anything about the place where the plaintiff or the defendant carries on business or personally works for gain. - Place of residence however, can only apply to person actions. It cannot apply to a firm, corporation or government. 43
  • 44.
    Even in personalactions the place where a party carries on a business or personally works for gain may be, and often is stated instead of his place of residence. In case of registered company, the place where the registered office of the company is situated or where any of the branch offices of the company is situated. The body of the plaint should be divided into paragraphs and consecutively numbered. Dates, sums and numbers should be expressed in figure. See: Order VI Rule 2. RETURN AND REJECTION OF PLAINT. RETURN OF PLAINT A plaint is return to the person who filed it in a wrong court i.e court with no jurisdiction. The return is made, either at the presentation of the plaint or at the time of hearing. Only a judge or magistrate has power to return a plaint. It is a judicial act in the sense that the judge or the magistrate must give reasons for the return and these must be recorded. Order VII Rule 10(2) the wrong court has no power to dismiss the suit. You do not have jurisdiction to entertain the suit therefore you do not have power to dismiss the suit. The proper approach is not to dismiss it but to return it to the proper court. This exercise may be at any stage of the suit. It depends upon the time the court discovers. 44
  • 45.
    REJECT OF THEPLAINT Order VII Rule 11 There are three circumstances under which a court may reject a plaint: I. Where the plaint does not disclose a cause of action. II. Where it appears to the court that the claim is under-valued. After the court has given power to the plaintiff to value it properly and the plaintiff has declined to do so. III. Where on the face of the plaint the suit appears to be barred under any law. Eg. The Law of Limitation Act, Security of Employment, res judicata, res sub judice, etc. The flexible approach of courts of Tanzania has resulted into the amendment of rule 11 by GN 228/1971. Under the amendments the Chief Justice used his power of making rules under section 81CPC to add a proviso to rule 11 which states: “Provided that where the court is of the opinion that, by allowing an amendment the plaint will disclose a cause of action, the court may order an amendment instead of rejecting the plaint.” The implication is that When the court rejects the plaint it must state that the reasons for so doing as this order are appellable. Rejection of a plaint is not a decision of the case on merits and therefore the doctrine of res judicata will not apply Rule 13 Order VIII. A rejection of the plaint under this rule does not operate by itself as a bar to the plaintiff against filing 45
  • 46.
    a fresh suiton the same subject matter and of the same parties. DOCUMENTS TO BE RELIED UPON BY THE PLAINTIFF IN A PLAINT There are two documents: 1. Those which form the basis of the claim. 2. Those which form the evidence to support the plaintiff’s claim. Those documents which form the basis of the claim will be annexed to the plaint but those which form the evidence need not be annexed to the plaint. Those in category 1 must be in the parties’ power of possession. A list of those documents which are not in the power of possession of the party and which will be used in evidence may be annexed to the plaint or listed at the foot of the plaint. Consequences of not disclosing the documents The party proposing to rely on the documents cannot produce them in court unless granted leave of the court. Although those documents will be inadmissible they may assist in cross-examination. Order Vii Rule 18(2). The principle of contingent cumulation – requires a party to plead every remedy/cause of action which is available however contradictory. Eg. I never ran him over. Even if I ran him over, which is denied, I was not negligent. Even if the court finds me liable for running him over I was not negligent. 46
  • 47.
    Even if Iran him over, and even if I was negligent, which is denied, the defendant was contributory negligent. NB. The contradictions are allowed because they help frame the issue. The Principle of Preclusion says that the party cannot lead evidence on anything which was not pleaded. If one does not plead it he is precluded from leading evidence on it. WRITTEN STATEMENT OF DEFENCE Written Statement of Defense is a pleading presented by the defendant intended to traverse the allegations written on the plaint. Two occasions under which the defendant may present the WSD Once the defendant has been given a summons to appear he does not have the need to do anything and he cannot be penalized for not filing WSD. Under order VIII rule 1 a defendant summoned to appear may file a WSD to shorten the time of litigation. When a summons to file WSD has been issued the defendant is required to file the WSD on or before the date indicated. The day of filing WSD is the day of hearing and not the day of mention. However the court has power to extend the period of filing WSD. Contents of WSD Order VIII rule 2. WSD should contain all facts which will show that the plaintiff’s suit is not maintainable. 47
  • 48.
    These may bequestions of fact eg failure of consideration or questions of law. Eg res judicata, limitation, illegality etc. General rule Each and every allegation in the plaint has got to be traversed/opposed. Allegations denied or admitted must be specifically stated in the WSD. Each paragraph of the plaint should be denied separately. Several words are used in traversing e.g. para (i) and (ii) are admitted. They are normally the addresses. You cannot deny the defendant’s address but yours. Eg incases where you are not using the address of the advocate. Para (iii) is denied. Even if there was a contract, which is denied, there was a failure of consideration. Para (iv) is denied. Even if there was a contract and consideration, which is denied, the defendant asserts that the contractual amounts were paid. NB The technique of confession and avoidance is used in writing the WSD in which the defendant Admits the existence of some facts but at the same time avoids the legal consequences of the existence of those facts. Eg X admits the existence of a contract but there were no vegetables, which is denied, the defendant asserts that the vegetables were rotten and therefore unfit for human consumption. Under Order VII rule 3 general denials are bad in law. 48
  • 49.
    (x) Save ashereunder expressly admitted the defendant denies each and every facts contained in the plaint as if the same were set fort seriatim and specifically traversed D paragraph help against the presumption that whatever is not specifically and denied is admitted. Note: Although as a general rule a general denial is not admissible, it is acceptable where there has been already specific denial. Where there is not specific denial, a general denial is inadmissible, and the defendant will be taken to have admitted the rest. Refer Warner V. Sampson [1959] All ER 120 at 123 per Denning; LJ “It is used [general denial] in nearly every defence that goes out from the temple [inns of court where barristers operate from, in England] it comes at the end the pleader has – early gone through……in the statement of claim and dealt with them. Some he has admitted, others he has denied. Whenever knows there is a serious contest he takes no instructions on a particular allegation he covers it by a general denial of this kind so that he can, if need be, put the plaintiff In this cross-suit the defendant will be required to present a WSD into sections: The Defence. 2. A statement of claim against the plaintiff. Although the plaintiff may not exercise his right to reply he is duty bound to present a WSD to the counter-claim. Rule 12 provides – where a defendant has set up a counter-claim the court may order separate trials when it is in the opinion of the court that the 49
  • 50.
    plaintiff’s claim andthe defendant’s counter-claim cannot be heard simultaneously. Note: In counter-claim it is mandatory that the plaintiff should file his reply. In Set-Off the plaintiff has an option of replying or not. When is a Suit Ready for Hearing? This will depend on the case. When there is no counter-claim or set-off the pleadings are closed and the suit is deemed ready for hearing once the plaintiff files a reply to the WSD. When there is a set-off or counter-claim and the plaintiff has in his reply raised a defence to such a set- off or counter-claim pleadings will be deemed to be closed and the suit ready for hearing after the defendant has filed his reply to the reply. Where he has already replied, rule 13 provides that, no further pleading can be presented to the court subsequent to the reply of the WSD other than a defence to set-off or counter-claim without the leave of the court. Consequences of Failure to present a WSD or a Defence to Counter-claim There are different consequences depending on different things: The court may pronounce judgment against the person who was supposed to present the defence. In a case where the Summons was for appearing and he has been given an order for appearing. 50
  • 51.
    Where the summonswas to file a WSD there are 2 consequences: Where the claim is for a liquidated amount of money which does not exceed T.Sh.1,000/= the plaintiff may make an application to the court in writing for leave to prove his case ex-parte by affidavit or by oral evidence. Where the amount exceeds 1,000/= and in any other case the court may pronounce judgment after ex- parte proof. General Defences available in drafting a WSD 1. Accord & Satisfaction – in law of contract. 2. Acquiescence. 3. Conditions Precedent. 4. Custom and Usage. 5. Capacity. 6. Estoppel 7. Fraud 8. Illegality 9. Jurisdiction 10. Limitation 11. Laches [lashes] i.e. equitable limitation. 12. Misjoinder – of parties & of causes of action. 13. Non-joinder of parties & causes of action 14. Mistake 15. Notice –insuffiency of Notice 16. Payment 17. Penalty as opposed to damages Defence under protest 18. Release 19. Rescission 51
  • 52.
    20. Remoteness of Damages 21. Res Judicata 22. Res Sub judice 23. Set-Off 24. Tender 25. Undue Influence 26. Duress 27. Lack of Special Damages 28. Waiver 29. Want of Cause of Action. NON-APPEARANCE Read the provisions of Order IX, the case of EAP &BTV. Terrazo, and Orders III and V. The consequences of non-appearance of a party differ depending on who does not appear. Non-Appearance of the Defendant When summons was not served and failure to serve the summons was due to mistake of the plaintiff either as a result of failing to pay court fees or his failure to pay postal charges the suit is to be dismissed. This is because there cannot be a suit without parties. Order IX Rule 2 – The court has power to dismiss the suit on the first day of hearing. If by coincidence the defendant is in court the court will not dismiss the suit. Where neither the plaintiff nor the defendant is in court the court will dismiss the case. Order IX Rule 3. 52
  • 53.
    The summons isreturned unserved and the defendant does not appear, it is the duty of the plaintiff to apply for re-service. This application has to be made within 3 months. If not within this period, the court will dismiss the suit per Order IX Rule 5. Exceptions A suit may not be dismissed under rule 5 where the plaintiff shows the court that the defendant in proof of it at the trial, sometimes the pleader denies, sometimes he does not admit each and every allegation but whatever phrase is used it all comes back to the same thing. The allegation has to be regarded as if were specifically set out and traversed seriatim. In other words it is traversed no more no less. The effect of the traverse has been known to generations of pleaders. It casts upon the plaintiff the burden of proving the allegations denied. So this general denial does no more than put the plaintiff into proof.” SET OFFS In law of banking – one account can be used to set off a debt in another account. Generally: Is a mutual extinction of mutual debts in which two people (defendant & plaintiff) stand reciprocally as creditors and debtors. Under the doctrine of Set Off: A defendant who stands in a position of creditor to the plaintiff, has a right to raise a defence of set off against the plaintiff. “In case he is found liable to the plaintiff then the sums that will be found owing to him from the 53
  • 54.
    plaintiff should beset off against his liability to the plaintiff.” “What is owed by the plaintiff is cancelled by what the plaintiff owes him.” In the final analysis he will be required to pay the balance. 2 Types of Set Off Legal Set Off & Equitable Set Off A Legal Set Off exists when there is a liquidated sum of money and the plaintiff must owe the defendant the liquidated sum of money. An Equitable Set Off – The amount owing is not liquidated. It will be settled by adjudication. The Whole Doctrine In Essence It is found under Order VIII rule 6. It is a doctrine under which here is an extinction of debts of which 2 persons are reciprocally debtors to one another. The two debts are extinguished by creditor of which these two people are creditors reciprocally to one another. Under the doctrine – a defendant in a suit for recovery of money, who holds a position of creditor against a plaintiff, may claim a set off against the plaintiff. 5 Conditions to be met before Order VIII rule 6 comes into operation: The suit must be for recovery of money. The defendant has to have the monetary claim against the plaintiff and this must be recoverable claim. It it is a debt it must be due. 54
  • 55.
    The defendant’s claimmust be for a liquidated sum of money. Both parties must be in the same capacity – i.e. Where the plaintiff is suing in a representative capacity and owes the defendant a certain amount of money in his personal capacity, that money cannot be set off because the liability of the plaintiff to the defendant is not in a representative capacity. The defendant did not lend the money to the plaintiff’s child. The sums sought to be set off should not exceed the pecuniary limit of the court’s jurisdiction. Note the following: 1. A set off in its nature is an independent action. But for avoidance of multiplicity of suits there should not be two suits. 2. Order VIII rule 6 is a legal set off. CPC does not have provisions for equitable se off. However, Order VIII does not take away the right to an equitable set off. Where it can be shown that a defendant will have a right to set off independently of the Code the Order VIII will not be used to prevent him from exercising that equitable right. Difference between Legal and Equitable Set Off: 1. A court is bound to entertain and adjudicate upon a legal set off once it is pleaded. However, where an equitable set off is pleaded the court has a discretion to entertain it and adjudicate on it or order that it be brought in separate suit. 55
  • 56.
    NB: Whereas alegal set off is a matter of right an equitable set off is not a right but discretional. 2. The amount recoverable. In a legal set off the amount must be liquidated. One the other hand in an equitable set off the amount is not ascertained. 3. In a legal set off it is important that the crossed demand should have arisen in the same transaction while in the equitable set off the cross-demand need not have arisen in the same transaction. Note: 1. Section 2(2) of the Judicature and Application of Laws Act (JALA) provides for the application of Equity in TZ. 2. Section 95 of the CPC provides for the inherent powers of the Court. What Happens When There is a Set-Off? According to Rule 6 of order VIII a decree may be passed against the plaintiff in respect of a set-off. Where there is a set-off the WSD is deemed to be a plaint to the extent of set-ff. In the reply to the WSD the defendant will be required to raise defences against the set-off. A COUNTER-CLAIM – Order VIII Rule 9 It is in its nature different from set-off. Whereas rule 6 relates to a claim for a liquidated amount of money, a Counter-Claim is general. It relates to any suit. Under rule 9(1) A defendant may raise a counter- claim against the plaintiff when any cause of action vests in the defendant at the time of presentation of the WSD. 56
  • 57.
    What should beestablished is: the fact that one of the parties is the defendant and the other is the plaintiff. Also one has got to establish that they occupy the same position – personal or representative capacity. Distinction Between a Set-Off and a Counter-Claim Set-off in its nature is a statutory defence. The statute allows raising a defence by set-off. A counter-claim in its nature a cross-suit – because it embraces any cause of action which can be legally sustained. In that cross-suit the defendant becomes the plaintiff and the original plaintiff becomes the defendant. Is actively avoiding service of the summons or he has failed after exercising all efforts to discover the residence of the defendant or for any other sufficient cause. The sufficient cause should be ejusdem generis to other things under rule 5. Note: Dismissal in all instances i.e. rules 1, 2, 3, & 5 cannot be res judicata because – no evidence & no hearing. Where the defendant has been served and he is not in court If the suit is in the High Court and summons is proved to have been properly served the plaintiff will be allowed to prove his case ex parte. Ex parte hearing does not mean that the plaintiff must win. He must give sufficient evidence to convince the court. 57
  • 58.
    Where the defendantis in court and the plaintiff has been allowed to proceed ex parte, the defendant will not be allowed to produce any evidence or cross- examine. Ex-parte proof may be made in two ways:- 1. By way of affidavit by the plaintiff. 2. By way of oral evidence by the plaintiff. You cannot proceed ex parte unless granted leave by the court. On the day of hearing the plaintiff prays the matter to be heard in chamber by the judge so that he can get leave of the court. The Procedure in the RM’s and DM’s Court (Subordinate Courts) - Where summons issued was for producing WSD the court may proceed ex parte. - Where summons issued was summons to appear the court may enter judgment. Ex parte procedure is penal; it should be exercised where the defendant refuses intentionally to appear or to submit to the jurisdiction of the court. It must be proved that the summons was duly served. Summons to appear is a summons for direction both in the High Court and in the Subordinate Courts. Summons for disposal of the suit constitute the first day of hearing and it requires no proof like in the High Court where there should be ex parte proof. Where the court is not sure whether the summons was duly served it will issue a fresh summons. Since rule 6 to Order IX is intended to punish a disobedient defendant, it can be shown although the summons was duly served the defendant has not 58
  • 59.
    failed to appearbecause of his abstinence the court will not proceed further. Order IX rule 6(1) O where it is proved that the summons was not served to give defendant sufficient time to appear the court will fix another time and adjourn the hearing. If it was the plaintiff’s fault he will be ordered to pay the costs of adjournment. Where the Defendant appears after the order for adjournment Order IX rule 7 – where the court has ordered ex parte proof under rule 6 but proof is not taken on that day then the defendant may, on the day to which the hearing has been ordered adjourned, make application under rule 7 to make an order to set aside the ex parte orders. The application must be by way of a chamber summons supported by an affidavit. In the application the defendant must show his sufficient causes for his non-appearance. The court has discretion to set a side the ex-parte judgment. The court must be satisfied that the non-appearance was due to sufficient reasons. Where the Plaintiff and the Defendant do not Appear The Court shall dismiss the plaintiff’s claim and if the defendant has a counter-claim the court will proceed ex parte in respect of that counter-claim. Where the defendant has not admitted part of the plaintiff’s claim but admits part of it. Order IX rule 8 – the dismissal under this rule is res judicata. 59
  • 60.
    Order IX rule9 – the plaintiff may apply to the court which dismissed the suit for an order setting aside the ex parte decree passed against him. This is by way of chamber summons supported by an affidavit with sufficient grounds to persuade the court to set aside the dismissal order. NB: An order to set aside the dismissal under order IX rule 8 cannot be made unless the defendant has been notified. An order to set aside the dismissal order cannot be made ex parte. Difference between ex parte judgment and ex parte decree. An ex parte decree is a decree which arises out of judgment which was entered against the defendant either after failing to file WSD or for his non- appearance on the first day of hearing. Where the defendant appears on the first day of hearing but does not appear on the day of judgment he cannot be said to be given an ex parte judgment but an ex parte decree. Remedy for ex parte judgment Refer Order IX rule 13. Sufficient Cause depends on the material circumstances of the case e.g. ignorance of procedure, Illness of the party or his advocate, Lack of transport etc. 60
  • 61.
    T.M. Sanga V.Sadrudin G. Alibhai & Ors [1977] LRT 51 It points out circumstances under which the rule (rule 13) can be applied. 1. Uncertainty of the service of the summons is sufficient reason for allowing an application to set aside an ex parte judgment and decree thereof. 2. It is important to consider whether there are any triable issues in case the judgement is set aside. When the court sets aside the ex parte judgment it sets a date for proceeding with the suit and hearing will continue as if no judgment had been entered. FIRST HEARING OF THE CASE The court is required to examine the parties to ascertain whether the parties are really in controversy (litis contestation) and if they are what the real points of controversy between them. This examination as also the purpose of framing the issues. Order X rule 1 makes it mandatory for the court to examine the parties. Under rule 3 of Order X the examination must be reduced in writing and form part of the record. Compare with the Pre-trial Conferences in the US system. INTERROGATORY – Order XI Every party has a right to know the nature of its opponent’s case. There are several ways through which the party will know the nature of his opponent’s case. E.g .1. Pleadings. 2. Interrogatories. 3. Discovery of Documents. 4. Inspection of Documents. 61
  • 62.
    What are Interrogatories? Interrogationis the act of questioning. Interrogatories are, therefore, written questions put by a party to civil proceedings to his opponent which must be answered by his opponent by his filing an affidavit in answer to the interrogatories. These interrogatories are normally put to the opponent in preparation for the hearing of the suit. Functions of Interrogatories 1. They enable the party presenting them to know the nature of the opponent’s case. They enable the opponent to prepare his case – e.g. evidence etc. 2. They shorten the proceedings in that the opponent may admit certain facts and once these facts are admitted no need of evidence. The answers to the interrogatories help to determine which evidence is necessary and which is not. 3. They lessen expenses of litigation. Marriot V. Chamberlain (1868) 17 QBD 154 “Every party to civil proceedings is entitled to know the nature of his opponent’s case so that he may know before hand what case he has to meet at the hearing. However such a party is not entitled to know facts which constitute exclusively the evidence of his opponent’s case since an unscrupulous party may tamper with his opponent’s evidence once he knows of it or he may manufacture evidence to oppose it.” 62
  • 63.
    Interrogatories which shouldnot be admitted at all: A party is not entitled to administer interrogatories for obtaining a discovery of facts which constitute the exclusive evidence of his adversary’s case or title. A party is not entitled to interrogate his opponent on confidential communication between his opponent and his legal adviser. Those interrogatories which are injurious to the public interest or security e.g. the defendant as a military officer to be inquired on military matters. GENERAL FORM OF INTERROGATORY TITLE Interrogatories on behalf of the above named Plaintiff (Defendant) for the examination of the above named Defendants (Plaintiffs) pursuant to the order herein dated……day of ……19…. Did you…………………… Were you…………………. Was it…………………….. If not weren’t you………… (Set out the interrogatories in the form of concise questions, each interrogatory to be set out in a separate paragraph and numbered consecutively.) The defendant (plaintiff) AB is requested to answer the interrogatories numbered…….etc. Served this ……day of ……19…. ……………………… ………………… 63
  • 64.
    Advocate for the Plaintiff(Defendant) To: The above named Defendant (Plaintiff) NB:1. The affidavit should be within 10 days and it is called affidavit for answer of interrogatories. 2. Failure to answer the interrogatories invite penalty. If the party refuses to answer them he shall be penalized in costs or in some instances he may have his case struck out. This is governed by Order XI rule 18. Answer to interrogatory It is a matter of law. The party who is supposed to answer a question on interrogatory is supposed to file an affidavit under Order XI rule 7. The affidavit should be made to make the questions answered precisely and correctly. No exception can be taken in the affidavit. The party should not refuse to answer any question. However, any just exception/objection may be raised in the affidavit e.g. the grounds that it is fishing interrogatory i.e. when its sole purpose is to discover the evidence of the opponent. Where the party interrogating considers the answers inadequate he may demand full or further answers under order XI rule 9 by application to the court. 64
  • 65.
    DISCOVERY AND INSPECTION Whereasinterrogatories may be termed as a discovery of facts there is a procedure of discovering documents. Discovery is governed by rule 10 Order XI. Any party may without affidavit applies to court by order to his opponent discover on oath all the documents which are in his power or possession and which he is going to rely upon his case. Therefore discovery is a process under which a party to civil proceedings discloses all the documents he is going to rely upon in his case. Discovery is a disclosure of documents made at the instance of the opposite party. Refer Section 64 of the Evidence Act NB: Compare and Contrast orders XI rule 1, XI rule 10 and XLIII rule 2. 2 Ways of Discovery of Documents Annexing them to the pleadings Mentioning them in the pleadings – either in the main body of the pleadings or in the list of documents to be relied on. Order VII rule 14. Categories of Discovery Voluntary Discovery – the party discloses the documents he has and he uses them without the leave of the court. Compelled discovery – is made at the instance of the party and under the order of the court. 65
  • 66.
    When the orderfor discovery is made, the party is supposed to file an affidavit for documents. Once the affidavit is filed two things may occur:- The court at any stage of the suit may order the party who made the discovery to produce certain documents before the court. The opposite party may alternatively at any time of the proceedings give notice to the party who made the discovery for the production of the documents for purposes of inspection either by himself or by his advocate. It is the duty of the party who holds such documents to grant the party the right of inspect the documents. The right should be granted within ten days of the notice. 3 grounds upon which the party may resist discovery Documents containing exclusive evidence of title. Documents which contain privileged communication. The discovery is irrelevant i.e. it does not go into answering any material fact in the suit. ADMISSIONS ORDER XII There are two types of admissions under the Civil Procedure Code Admissions made at the instance of the party admitting himself. Those admissions which are made at the instance of the opposite party. 66
  • 67.
    As a GeneralRule A party is not prohibited from admitting certain facts. Normally this is done where the party is sure that contesting the facts will be of no benefit to him but delay fair conclusion of the suit and imposes on him more expenses. When you admit you pay less costs because you don’t put anybody into trouble. Rule 1 Order XII enables the party to the proceedings admit the truth of the part of the opponent’s case or the whole of it. i.e. Voluntary Admission. Rule 2 of the same Order provides that at any stage of the proceedings a party may require his opponent to admit certain facts or document by A DOCUMENT TO ADMIT facts or document. Hence there is a admission of facts and admission of documents. Where a party refuses to admit any of the facts he will bear the costs of proving them since evidence will have to be lead by calling of witnesses etc. Note: 1. Any admission made is for the purposes of the suit only and not for any other purposes or persons. 2. There has to be filed a notice to admit in the following format; TITLE NOTICE TO ADMIT FACTS (Under Order XII Rule 2 of the Civil Procedure Code) TAKE NOTICE that you are required to admit the following facts for the purposes of the above-named suit only. 67
  • 68.
    1. That youlived with the petitioner as husband and wife for 11 years. 2. That in that period you were blessed by 3 issues. 3. That you subsequently married Y under the Christian rites. 4. That before marrying Y you had jointly with the petitioner acquired the following assets………….. TAKE NOTICE that you are required to admit the said facts within six days after the service of this notice and in default whereof you shall bear the costs of proving them. Dated at………this.....day of ……….1988 …………………………………… ADVOCATE FOR PETITIONER TO AB C/O XY ADVOCATE DSM DRAWN BY CD ADVOCATES DSM Section 64 of the EVIDENCE ACT requires primary evidence to be given. Under section 68 of the Evidence Act secondary evidence may be given. If the document is in the possession of the opponent, a notice must be served on that party to produce the document within 10 days. Failure to produce the document will make the party to produce secondary evidence. 68
  • 69.
    i.e. “Admit orI’ll produce evidence to prove them and if you don’t I’ll have notice to produce them”. Note: 1. O.XI rule 13 is used when you want to inspect the documents. 2. Section 68 is used when you want to use the documents as evidence but they are in the possession of your opponent. If he refuses to produce them then you will use secondary evidence. Production and Impounding of Documents Order XIII of Civil Procedure Code All parties have the duty to produce all documents they are going to rely upon as evidence and which are in their possession or power, at the first hearing of the suit. This is a requirement of law under Rule 1 Order XIII. I such documents are not produced at the first hearing then the Court may grant leave for its production. Rule 2 prevents production of the documents at a later stage – which were supposed to be produced at the first hearing. Note: The impoundment of documents does not mean admissibility of the documents The Court is merely concerned about the preservation of those documents. They are not admitted at that stage as exhibit but as a depository. Order XIII empowers the court at any stage of the proceedings to reject any evidence it considers irrelevant or admissible. 69
  • 70.
    Upon admitting thedocuments as part of the evidence the court will have to endorse on the documents. Those documents which have been admitted as evidence must be returned to the person who produced them in court at the conclusion of the case or if there is an appeal at the conclusion of the appeal. Settlement and Determination of Issues at the First Hearing Order XIV The order relates to framing of issues. Framing of the issues is done in the presence of the parties and at the first hearing. There are three Types of Issues. 1. Issues of fact. 2. Issues of law. 3. Issues of mixed fact and law. WHAT ARE ISSUES? There are several definitions but the best one is given by Order XIV rule 1(2). Under this rule issues are material propositions of either fact or law or mixed fact and law which must be alleged by the plaintiff in order for him to have a right to sue and which has to be denied by the defendant in order to constitute his defence. Issues arise-from the allegation by the plaintiff and denials by the defendant, they constitute the points of dispute between the parties. THEREFORE Issues arise from the pleadings. 70
  • 71.
    Whatever alleged/denied constitutean issue. SUPPLEMENTARY SOURCES Issues also may arise from the documents submitted by the parties to the court or by affidavit submitted by the party to the court. Also issues may arise from the oral examination at the first hearing. WHO HAS THE DUTY TO FRAME ISSUES? Order XIV rule 1 provides that. It is the duty of the court to frame the issues at the first hearing. The duty is a mandatory duty. The court cannot shun away from this duty. There are instances where parties will help the court in framing the issues. Where the parties are very clear as to what the real matter is between them they can help the court frame the issues. In most cases where the parties are represented by advocates the normal practice is for the parties to assist the court in framing the issues. The court has discretion to accept or reject them. WHY FRAME ISSUES? Framing the issues has a very important bearing. Whether the outcome will be just or unjust it will depend on the framed issues. 1. It is the issues that direct the parties as to how they are going to adduce their evidence and not the pleadings. The issues determine the relevance of the evidence. 71
  • 72.
    2. It isthe issues which fix the case. A court cannot refuse to make decision on an issue which has been framed. The issues are framed to direct the court to the nature of decision to be made even where the issue though framed but not pleaded. Odd Jobs V. Mubia [1970] EA 476. You can have an issue framed and not pleaded but the court must decide on the issue. “On the point of that the court has no jurisdiction to decree on an issue nor been pleaded. The attitude adopted by this court is not as strict as appears to be as it appears to be in India. In East Africa, the position is that the Court may allow evidence to be called and may base its decision on unpleaded issue if it appears from the course followed at the trail that the unpleaded issue has in fact been left for the court for decision.” The decision is supported by the case of NKALUBO V. KIBIRIGE [1973] EA 103. At page 105. The same issue arose and the Court of Appeal reiterated the case of Odd Jobs. As per the court “While the general rule is that relief not founded on pleadings will not be given, a court may allow evidence to be called and may base its decision on an unpleaded issue if it appears from the course followed at the trial that the unpleaded issue has in fact been left for the court for decision.” The case introduces the proviso that the freedom of the court to allow evidence to be adduced on an issue not pleaded and to base its decision on such issue is 72
  • 73.
    not extensive toan extent of allowing the court to make a decision on a completely new course of action which was not pleaded. See also 1. Mgonja V. Kihiyo 2. Gondij V. Caspar Air Charter Ltd. (1956) 23 EACA 139; 140. 3. Blay V. Pollard & Morris [1930] All ER (Rep) 610,612. 4. Joseph Marco V. Pascal Rweyemamu [1977] LRT 59 In the case of Blay V. Pollard it was said “Cases must be decided on the issues on record and if it is desired they must be placed on the record by amendment. In the present case, the issue on which the judge decided was raised by himself without amending the pleadings in my opinion he was not entitled to take such a cause.” In another case which was decided in 1932 by the House of Lords in Bell V. Lever Bros [1932] AC 161 at 216. In this case the court ruled that a trial court may, with the consent of the parties, frame and decide on an issue which does not appear in the pleadings. FAILURE TO FRAME ISSUES Failure to frame issues is a procedural irregularity which may not be fatal to the proceedings. It will be fatal to the proceedings when an appellate court forms an expression that the failure has occasioned injustices to one of the parties. CONSEQUENCE OF FAILURE TO FRAME ISSUES 73
  • 74.
    Norman V. OverseasMotor Transport [1959] EA 131. In this case the trial court failed to frame issues. On appeal the issue was whether the failure could be fatal to the proceedings. The Court stated as follows: “The failure to frame issues is an irregularity, the question would appear to be whether notwithstanding the failure to frame issues the parties at the trail knew what the real question between them was, that the evidence on the question had been taken and the court duly considered it.” According to the case – where the court has failed/omitted to frame issues, it is apparent that the parties knew what the dispute between them was and had an opportunity to give evidence, which has been taken into account by the court to make its decision. Such failure or omission will not be fatal to the proceedings. It is fatal only to the proceedings only when it is apparent on the face of the record that the parties did not know what the real issue was between them. Justification The framing of issues like practice of pleading is intended to avoid taking of the parties by surprise, and also, intended to assist the court in understanding the case. THE ART OF FRAMING THE ISSUES 1. The first rule of the thumb – where there are both issues of fact and law in the same suit and the determination of the issues of law may dispose of the suit then the court must frame those issues first. 74
  • 75.
    There is nouse calling evidence where the law is clear. The issues of law will be preliminary issues because their determination will dispose of the suit. This quickens the process of litigation. Issues of law are a matter of Judicial Notice. Eg Limitation, wrong parties, jurisdiction, res judicata, capacity etc. 2. Framing of the issues of fact comes next. Note that:- All issues whether of law or fact have got to be framed in the affirmative. E.g. in issues of law – whether the suit is time barred, whether the suit is not time barred. In issues of fact – whether X is Y’s legitimate son / whether X is Y’s illegitimate son. 3. Issues are not framed in argumentative way. Issues must be concise, precise and clear questions of mostly not more than 8 words. AFTER FRAMING THE ISSUES Order XIV rule 6 – where the issues are between the parties and the parties submit them to the Court with an agreement in writing that they will be bound by the decision of the court on them the court will have 3 things to do: 1. To ascertain whether the agreement was duly executed by the parties. 2. To inquire as to whether the parties who have executed the agreement have substantial interest in the outcome of the case. 3. To see if the issues framed are fit for trial. If the court is satisfied that the three things have been complied with then it will proceed with the trail of the issues only. 75
  • 76.
    The court hasgot power to amend the issues at any time of the trail but it has to be before judgment. Certain issues can be added by the court in the course of hearing. ORDER XV The suit is now ready for hearing. After framing of the issues the court may however find no case to hear and the case will come to an end. Order XV rule 1: The court is empowered to pronounce judgment at the first hearing when it is of the impression that the parties are in no dispute on the points of fact or points of law. That impression is formed by the court looking at the pleadings. ABSENCE OF DISPUTE Exists in two ways: 1. Where the court establishes that there is no litis contestatio (contested dispute). 2. Where there are admissions either in the pleadings or as a result of a notice to admit issued under the provisions of Order XII. In both situations the court is empowered to pronounce judgment and this judgment is a judgment on merit since it has gone in the substance of the suit. In a situation where there are more than two parties Order XV rule 2 will come into play. In this case the court may pronounce judgement in respect of the parties not in dispute and will allow the proceedings 76
  • 77.
    to go intofull hearing in respect of those parties who are in dispute. This rule applies mostly in cases where there are more than one defendant. Where summons to appear has been issued but at the first hearing the party has without sufficient cause failed to produce the witnesses under Order XV rule 4 the Court has power to pronounce judgment against the party who has failed to bring the witnesses. This is called A DISMISSAL FOR LACK OF PROSECUTION. ZAID V. HUMEIDAN [1960] EA 92 In this case a distinction was made between a dismissal for lack of prosecution and a judgment under Order XV rule 4. Technically a dismissal for lack prosecution is not the same as judgment entered upon. In one situation what a court does is merely to dismiss the suit. This happens only against the defendant. You cannot technically dismiss the defendant. A dismissal for lack of prosecution is only to the plaintiff. WHERE THE DEFENDANT DOES NOT APPEAR Where the defendant does not appear and the case is coming for hearing he suffers an ex parte decree. Where the defendant turns up but does not comply with the requirement of the summons to appear eg he does not bring the witnesses (evidence) judgment 77
  • 78.
    will be pronouncedagainst him in terms of order XV rule 4. SUMMONING AND ATTENDANCE OF WITNESSES There are two types:- Witnesses to give oral testimony before the court, and Witnesses who are summoned merely for the purposes of giving/producing documents. Generally It is the duty of a party to civil proceedings to prove his case. In the course of hearing we are applying 2 principles of civil litigation namely: 1. The principle of party prosecution. 2. The principle of Dispositive Election. THE PRINCIPLE OF PARTY PROSECUTION The conduct of the case is left to the party to the proceedings. They are the ones to prosecute their own cases and to decide which step to take next. The court participates in the proceedings as a passive arbiters. The principle operates very closely with the principle of PARTY INVESTIGATION as opposed to the PRINCIPLE OF JUDICIAL INVESTIGATION. Under party investigation it is the parties who are supposed to investigate and collect evidence of their own case. The Court is ignorant of the case. Refer THE NATURE OF ADVERSARIAL SYSTEM. 78
  • 79.
    Therefore it theparty himself who will know the nature of the evidence he will use and the sources thereof. THE PRINCIPLE OF DISPOSITIVE ELECTION It relates to what the party can and cannot tell the court. The party has a choice of whether he should tell the court anything or not thus he has the election of what to say and what not to. WHERE THE WITNESS REFUSES TO APPEAR The court will assist the parties to compel the witnesses to appear. Order XVI has the procedure of securing the court assistance. Rule 1 Order XVI provides that at any time after the suit has been instituted the court may issue witness summons, at any stage of the case the court may issue summonses against persons who are necessary to appear before it to produce documents etc. These summonses are issued on application by the parties who intend to use the witnesses. Where the witness does not appear even after due service of the summons the court will issue a proclamation will be affixed at the door of the witness or at any other conspicuous place. Order XVI rule 10 (2). The court may order attachment of his property and when the witness appears the attachment will be raised provided he pays the court broker. 79
  • 80.
    Another alternative isthat the Court has got discretion to issue arrest warrant with or without bail. The court may order the witness to be placed under custody but will the witness give evidence in favour of the party who has summoned him? WITNESSES OF THE COURT Order XVI allows the court to play an active role in the proceedings and therefore it is not totally true that courts in TZ are operating typically under adversarial system. A witness may not be desired by the party but the court may summon him. Order XVI rule 14. Under this rule the court may on its own motion and at any stage of the proceedings summon a witness who was not summoned by the parties. This happens especially when the court requires eg expert opinion. Eg Accountant in fraud cases, medical doctor, engineer etc. Refer Joseph Marco V. Pascal Rweyemamu [1977] LRT 59 Thobias Zenda V. Herman Zenda [1977] LRT 23 In the case of Joseph the court stated that where an additional witness is summoned by the court under O.XVI Rule14 such witness becomes a court witness and not a witness for any party to the dispute. The case of Thobias acknowledges that the court has power to summon an additional witness if it thinks it necessary so to do. ADJOURNMENT OF HEARING Order XVII 80
  • 81.
    Under Rule 1(1) the court has power to adjourn the hearing to a future date. It is a discretionary power which has to be exercised judiciously. There must be sufficient reasons for adjournment. Once evidence is taken the hearing is supposed to continue from day to day until all the witnesses in attendance have been examined unless the court sees it necessary to adjourn the hearing till the next hearing. Agreeing on Adjournment See: 1. Shabani Mbaga & Another V. Karadha Co. Ltd. [1975] LRT 13 (HC) 2. A.S. Masikini V. George Mbugus [1976] LRT 62 (CA) In the two cases advocates for both parties filed letters of consent for an adjournment. Per Mustafa J., “A consent letter filed by the parties wanting to remove a case from the hearing list cannot automatically remove the case from the hearing list no more than an application for an adjournment or notice of an intention to apply for an adjournment of a case. An adjournment cannot be granted as of right but can only be granted for sufficient course. It therefore involves the exercise of discretion by the court and this must be exercised judiciously. Once the pleadings are closed in a case it is the duty of the court to dispose of the case with reasonable dispatch.” The business of this court is subject to the vagaries of the business activities of advocates engaged by the litigants concerned, although a consent letter might 81
  • 82.
    be a factorwhich may be taken into consideration in an application for an adjournment. Such consent cannot almost certainly result in adjournment. From the 2 cases above we have 3 propositions:- 1. No adjournment can be opted at the instance of the party to the proceedings except where the circumstances are beyond his control. 2. The engagement of an advocate in another court is not a ground for adjournment. 3. Illness of a lawyer cannot be a ground for an adjournment when it is found as a matter of fact that a party who represented by the advocate had enough time to engage another lawyer. The period within which the adjournment should be granted depends on the decision of the Court. Where the parties do not appear on the date of hearing after adjournment it is the discretion of the Court to further adjourn or terminate the case. TYPES OF ADJOURMENT. 1. Those which are granted for specific date. In this the court appoints a specified day on which to proceed with the case. See Order XVII rule 2. 2. Adjournment sine die. Adjournments sine die are those which do not provide for a specific 82
  • 83.
    date. The matteris simply adjourned unless certain actions are taken. The party seeking hearing has got to apply to the court for fixing of the date of hearing. Here there are two positions:- 1. Where adjournment lasts for one year If the plaintiff does not apply for hearing date after one year it is the duty of the court to issue a notice to the plaintiff to show cause why should not the suit be struck out. A general adjournment should not last for more than a year. If the plaintiff is serious about his case he will not stay for more than one. 2. In any other case where there has been an adjournment and the case has stayed pending for a period of three years the court has the duty to strike it off without giving the plaintiff any notice. Refer Rule 5 0.XVII. (Striking out for lack of prosecution). When a suit is struck out under this rule the plaintiff may bring a fresh suit subject to the Law of Limitation. PROCEDURE OF HEARING A SUIT Order XVIII The Order enacts the principle of Orality of Proceedings as distinguished from Pleadings. 83
  • 84.
    It also enactsthe principle of MEDIACY as opposed to IMMEDIACY. The court must see the parties and hear the witnesses. See the provision of Order XXVI (Commission to examine witnesses). What is the Order of Hearing? As a general rule it is the plaintiff who has the right to begin unless the defendant admits the plaintiff’s allegations but gives counter-allegations in which he will have to begin. The person on whom the burden of proof lies is the one who has the right to begin. He begins by giving an opening address which comprise of the general overview of his case and will tell the court the way he will proceed discharging his burden of proof. He will in the opening speech tell the court in summary the nature of evidence and witness he has. In practice it is not always the case. Opening speeches are rarely given. As a practitioner you should see whether there is an ideal situation for making a speech in the court. After the opening address The Plaintiff gives his address. It is at this stage he can give evidence on oath and call his witnesses one by one. After the Plaintiff has stated his evidence then the defendants gets a chance to state his case in open audience and gives his evidence. 84
  • 85.
    Immediately after thisthe defendant has the right to address the court on all the evidence. This is normally called the Final Submission. Then the Plaintiff has the right to reply. It is the plaintiff who begins and it is him who concludes. Technical Hearing Under the Criminal Procedure Act section 230 the court has to rule as to whether there is a prima facie case or no case to answer Criminal case can be concluded even before the accused talks BUT under the Civil Procedure Code there is no provision which talks about prima facie case. In East Africa there is no law which talks of no case to answer in civil litigations as in criminal litigations. Therefore there is a lacuna in our law. We have to go to the provisions of section 2 of the Judicature and Application of Laws Ordinance (JALO) cap 534. (22nd July 1920). Under this provision the procedure used in England should apply. The provisions bring the procedure under Common law of no case to answer. The procedure to be followed for no case to answer in civil litigations in Tanzania according to case law is different from that of criminal litigations. In criminal proceedings once the court has established that there is no case to answer the court cannot compel the accused to say that there is a case to answer. 85
  • 86.
    What is theSubmission of No Case to Answer in Civil Proceedings? See Ramsden V Ramsden [1954] All ER 623. Vye V. Vye [1969] All ER 29 In the case of Ramsden it was stated “There are two sets of circumstances under which defendant may submit that he has not case to answer. In the one case there may be a submission that accepting plaintiff’s evidence at its value no case has been established in law and in the other that the evidence led for the plaintiff is so unsatisfactory or unreliable that the court should find that the burden of proof had not been discharged. Submission of No Case to Answer in Civil Cases Can a defendant, at the close of a plaintiff’s case submit in law that there is no case to answer? Refer Hon. JK’s decision in MWALIMU PAUL JOHN MHOZYA V. THE AG HC Civil Case No. 206 of 1993 DSM Registry; citing the case of Daikin Air- conditioning (EC) V. Harvard University (DSM) Civil Appeal No. 21 of 1976. He held: “A submission of no case to answer in a civil case stands on the same footing as a submission of no case to answer in a criminal case, save that there is a difference in the standard of proof. What then is the test to be applied when such a submission is made? As I understand the law, when the dismissal of the plaintiff’s case on the basis that no case has been made out is prayed for, the court should not ask itself whether the evidence given and/or adduced by the plaintiff establishes what would finally be required to be established, but 86
  • 87.
    whether there isevidence upon which a court, applying its mind reasonably to such evidence, could or might (not should or ought to) find for the plaintiff. The submission of no case to answer cannot be upheld if there is sufficient evidence on record on which a court might make a reasonable mistake and enter a judgment for the plaintiff. Whereas the test to be applied at the close of the defendant’s case is what ought a reasonable to court to do? The one to be applied on determining the validity or otherwise of a submission of no case to answer is what might a reasonable court do? : See: Supreme Service Station (1969) (Pvt) Ltd v. Fox and Goodridge (Pvt) Ltd 1971 (1) RLR 1. The latter test I have described is the one I must apply in determining Mr. Mwidunda’s submission in the matter now before me.” EFFECT OF A SUBMISSION OF NO CASE TO ANSWER A submission of No-Case-To-Answer does not have an automatic effect of suspending the proceedings until the decision is made on whether a prima facie case has been established or not. It is the duty of the court to put the defendant to an election. The defendant will have two options: 1. He may rely totally on the submission of no case to answer in which case he court will have to make a ruling; or 2. He may submit that he does not have a case to answer and yet produce evidence against the plaintiff’s allegations. Once the Court addresses its mind to submission of no case to answer and then overrules that submission 87
  • 88.
    then it proceedsimmediately giving a judgment basing on the evidence given instead of adjourning the hearing. The procedure has been discussed in the following cases: 1. Alexander V. Rayson [1936] 1KB 169 2. Parry V. The Aluminum Corporation Ltd. [1940] ….162 LJ 236 3. Laurie V. Raglan Building Company [1942] 1KB 152 The three have one thing in common. They are authority for the proposition that where a submission of no case to answer is given by the defendant, it does not mean that by the defendant submitting a no case to answer ipso facto loses his right to call evidence when his submission is overruled. He loses his right to call evidence only when he definitely elects not to call evidence. Such an election can be made either expressly or impliedly. See the case of DAIKIN AIR CONDITIONING (EA) LTD V. HAVARD UNIVERSITY (HC) Per Samatta J, Civil Case No. 21/76 Unreported. This case adopted the three cases cited above. HEARING CONTINUES All witnesses have to be examined in open court under the personal direction of the magistrate or the judge. The evidence has to be recorded in the language of the court in the narrative form except where the party considers that a particular question or answer is important and also the court considers it so. 88
  • 89.
    When certain questionsare objected to by one party but allowed by the court the reasons for allowing them must be recorded. The court also has the duty to record the impressions on the demeanour of the witnesses before it i.e. Judge’s Notes. When a witness has been released the court has power under order XVIII rule 12 to record the examination. When the magistrate fails to conclude the hearing the evidence he has recorded may be used by the subsequent magistrate. But in the case of Thobias Zenda V. Herman Zenda [1977] LRT n.23 it was stated that – where the decision depends on the previous magistrate’s observation of the demeanour of the witnesses – the correct position should be concluded by the same magistrate or the trial starts afresh before a new magistrate. AFFIDAVITS Affidavits are written statements of evidence which are sworn before a Commissioner for Oaths. Mainly they are not used for the main suit because of the fact that in the main suit the principle of orality applies. Refer Order XLIII Rule 2 of the Civil Procedure Code. Although affidavits may be accepted instead of oral statements, the opponent has a right to demand personal appearance of the witness for cross- examination but this is within the discretion of the court. 89
  • 90.
    The Person whoswears the affidavit is called a deponent. General Rule: All civil proceedings must be commenced by a plaint and evidence must be viva voce i.e oral. However the court has discretion to allow evidence in writing. When the court allows that evidence to be in writing it has to be by way of an affidavit. Note: 1. That affidavits save time. 2. There is a disadvantage of the court not observing the demeanour of the witness. 3. Affidavits are evidence and they should therefore follow the rules of evidence. Nothing is inadmissible in oral evidence that can be made admissible in affidavits. GENERAL RULES OF DRAFTING OF AFFIDAVITS 1. Affidavits are Court Documents. Like any other court document an affidavit has to have a TITLE i.e Name of the Court, Parties, Nature of the Proceedings and their Number. 2. If the deponent is a Christian there may be a clause to make an oath. In any other religion the deponent solemnly affirms. 3. All affidavits have got to be sworn in the first person. Nobody can swear an affidavit on behalf of another. This will be hearsay evidence. It should be either “I” or “WE”. 90
  • 91.
    4. All statementsof fact in an affidavit must appear in separate paragraphs which must be consecutively numbered. 5. An affidavit should not contain hearsay evidence EXCEPT IN INTERLOCUTORY APPLICATIONS where by virtue of Order XIX rule 3 a deponent may swear on certain facts on the information in belief of that – these can be disclosed. 6. Affidavits as statements of evidence are not submissions and therefore they should not contain argumentative material but statements of fact. 7. All affidavits have to be signed by the deponent in the presence of a Commissioner for Oaths. The signatures must be accompanied by the date. The left hand corner of the affidavit is known s the Jurat. ie “SWORN or AFFIRMED AT DSM by..” 8. An advocate who draws an affidavit for his client cannot attest it by himself. He must find another advocate to attest it. CONSEQUENCES OF FILING A DEFECTIVE AFFIDAVIT A defective affidavit is the one which breaches the rules relating to the drafting of affidavit. A defective affidavit is generally rejected by the court. However, superficial defects can be allowed to be rectified eg by removing the offensive paragraphs and leave the clear ones. See: 1. Project Planning Consultants V. Tanzania Audit Corporation [1974] LRT n. 10 - It deals with defective affidavits and what the court will do with defective affidavits. 91
  • 92.
    - It wasalso held that an advocate who draws an affidavit for his client should not attest it himself. 2. Mtaki V. January Kapembwa [1976] LRT n. 7 Where an affidavit is made on information it should not be acted upon unless the sources of the information have been disclosed. 3. Margovind Savani V. Juthalal Velji Ltd. [1969] HCD 278 The case gives good definitions of an Affidavit and a Statutory Declaration “Both affidavit and Statutory Declarations are written statements solely made on oath as true facts on the knowledge, information and belief of the declarant. In affidavits one must distinguish between the facts that are true to his own knowledge from those which he thinks or believes are true to his information and belief and in the latter group he must also disclose the sources of his information as well as his grounds for belief.” The same position was held in the case of Thseen- sthlunion Export & GMBH V. Kibo Wire Industries Ltd. [1973] LRT n.54. RECENT JUDICIAL DECISIONS PLEADINGS: STATEMENT OF DEFENCE: NOTCO (TANZANIA) LIMITED V. FREIGHTWINGS INTERNATIONAL LTD. High Court Civil Case No.293 of 1988 DSM Registry (Unreported) Mkude J, 92
  • 93.
    Cited KASHIBAI V.SEMPAGANA (1962) EA 16 per Bennet J, in which the defendant was ordered to furnish particulars of his defence that “the plaint was bad in law and did not disclose any cause of action.” The learned Judge quoted from the A.I.R. Commentaries (7th Edition) Vol. II pg. 2182 the following passage relating to what should be pleaded in written statement of defence which raises a point of law: “Where the defendant contends that the suit or application is misconceived he must specify or particularize why he contends that the suit or application is misconceived. If he relies on any facts for those purposes he must state those facts in his pleading, if it is merely the position in law which he relies on, he must set out with sufficient particulars the position in law upon which he ultimately bases his submission. PLEADINGS & RELIEFS MICHAEL LOSINA V. MARCEL LOSINA High Court Civil Appeal No. 7 of 1986 Dodoma Registry Masanche J, The first legal principle in civil cases is that parties to litigation are bound by their pleadings and that a court of law may not depart from the agreed issues unless there is good cause and unless evidence is led to prove the necessity for such departure. Spry V.P said in the case of Nkalube V. Kibirige [1973] EA at page 105 that: “It is true that this Court has said, more often than once, that while the general rule is that “relief not 93
  • 94.
    founded on thepleadings will not be given (Per SINCLAIR V.P in Gaudy V. Gaspair (1956) 23 E.A.C.A 139 at 140), a court may allow evidence to be called (emphasis supplied) and may base its decision, on unpleaded issue, if it appears from the course followed at the trail that the unpleaded issue has in fact been left to the court for decision”. (Per LAW J.A in Odd v. Mubia [1970] EA 476 at p.478). See: Order VI Rule 17 CPC – Amendment of pleadings. But it was cautioned by the Court of Appeal, in the case of Eastern Bakery V. Castelins [1958] EA 461 and quoted with approval by Onyiuke J, in the case of Shivji V. Pallegrini (1972) HCD n.76 where Onyiuke J, said:- “As a rule amendments to pleadings should be freely allowed if they can be made without injustice to the other side. The powers of amendment should not be used to substitute one cause of action for another or change an action into another of a substantially different character.” See also the case of BISHOP H. N. SARYA & 2 OTHERS V. SAIMON BUTENG’E & 16 ORS HC Civil Case No.68 of 1989 Mwanza Registry per Masanche, J; Citing Chitaley in the Code of Civil Procedure, at page 1304 “The main consideration to be borne in mind in exercising the discretion (to amend or not to amend) are that the rules of procedure have no other aim than to facilitate the task of justice, that multiplicity of suits should be avoided and that the interests of substantial justice should be advanced. Thus a court 94
  • 95.
    should order forthe amendment of a pleading where there has been a clerical error, or a bona fide wrong description of property or where there has been mistake of law or fact, provided there is no injustice to the other side which cannot be compensated by the award of costs.” Masanche J adds; “It is gratifying to note that in the recent case of General Tito Okello v. Sospeter Awiti Civil Appeal No.13 of 1990, of the Court of Appeal, Dar es Salaam Registry, Makame J.A has advised that where there are errors of oversight, such as the one here, of defendants not signing the written statement of defence, or, of forgetting to attach an annexture to the pleadings, proviso to Order 7 Rule 110 of the Civil Procedure Code 1966, as introduced by GN, No.228 of 22/10/71 should be used. The proviso reads:- “Provided that where a plaint does not disclose a cause of action or where the suit appears from the statement in plaint to be barred by any law and the Court is satisfied that if the plaintiff is permitted to amend the plaint, the plaint will disclose a cause of action, or as the case may be, the suit will cease to appear from the plaint to be barred by any law, the Court may allow the plaintiff to amend the plaint subject to such conditions as the costs or otherwise as the Court may deem fit to impose.” JUDGMENT & DECREE Judgments and decrees are covered by O.XX rule 1 CPC. 95
  • 96.
    At the conclusionof the hearing the court will pronounce judgment. Decree follows the judgment. Definition of judgment is found under Section 3 of the CPC. A judgment is a statement of the decision of the court at the conclusion of the hearing of the case plus the reasons for such a decision of the court. In the judgment the court is supposed to address its mind on the issues, evidence and the provisions of the law which govern that dispute. There are however certain circumstances under which the judgment can be dictated to a Stenographer. TYPES OF JUDGMENT There are two types of judgment i.e. Judgment in Rem and Judgment in Persona 1. Judgment In Rem It is a judgment which attaches to the thing. It is a judgment against the whole world. It relates to one’s absolute right. 2. Judgment In Persona It is a judgment which attaches to a person. It relates to the right of that person only but it does not include other better rights invested in other persons. For example – Land lord & Tenant/Trespasser. They are rights inter se and the judgment should be in person. 96
  • 97.
    At the conclusionof the hearing the court will pronounce judgment. Decree follows the judgment. Definition of judgment is found under Section 3 of the CPC. A judgment is a statement of the decision of the court at the conclusion of the hearing of the case plus the reasons for such a decision of the court. In the judgment the court is supposed to address its mind on the issues, evidence and the provisions of the law which govern that dispute. There are however certain circumstances under which the judgment can be dictated to a Stenographer. TYPES OF JUDGMENT There are two types of judgment i.e. Judgment in Rem and Judgment in Persona 1. Judgment In Rem It is a judgment which attaches to the thing. It is a judgment against the whole world. It relates to one’s absolute right. 2. Judgment In Persona It is a judgment which attaches to a person. It relates to the right of that person only but it does not include other better rights invested in other persons. For example – Land lord & Tenant/Trespasser. They are rights inter se and the judgment should be in person. 96
  • 98.
    At the conclusionof the hearing the court will pronounce judgment. Decree follows the judgment. Definition of judgment is found under Section 3 of the CPC. A judgment is a statement of the decision of the court at the conclusion of the hearing of the case plus the reasons for such a decision of the court. In the judgment the court is supposed to address its mind on the issues, evidence and the provisions of the law which govern that dispute. There are however certain circumstances under which the judgment can be dictated to a Stenographer. TYPES OF JUDGMENT There are two types of judgment i.e. Judgment in Rem and Judgment in Persona 1. Judgment In Rem It is a judgment which attaches to the thing. It is a judgment against the whole world. It relates to one’s absolute right. 2. Judgment In Persona It is a judgment which attaches to a person. It relates to the right of that person only but it does not include other better rights invested in other persons. For example – Land lord & Tenant/Trespasser. They are rights inter se and the judgment should be in person. 96