Summary of Experience
Over 30 Years’ Experience in Construction With 19 Years in Quality
Control/ Quality Assurance
QA/QC Inspector in Chemical plants, Refineries, Plastic plants, Paper Mill’s and
Pipeline that included Mechanical, Welding , Hydro-Testing NDE of the pipe per
ASME code and site specifications. Insured all coded work was performed per the
ASME , NBIC codes and the R-1 data reports completed and turned over to the
client. Verified that piping systems were complete to drawings and specifications,
including Pump Alignment, Stress, Coating and Insulation. Civil Inspection of
Concrete Pours. Structural Iron to drawings.
Project Types
Chemical Plants, Refineries, Plastic Plants, Power Plants, Food Process Plants,
Paper Mill Copper Mine, Copper Smelter, Pipe Line, NGL Distributions Facility
Education
1996High School - Truth or Consequences, N.M. Class of 1976 – 1977
College - San Jacinto, Pasadena, TX. 1995 – 1996. Level II VT, PT, MT
AWS Seminar Beaumont, TX. 2008
NCCER Abnormal Operating Conditions-Field Operations (Liquid and Gas) 2008
Certifications Held
SNT-TC-1A Level II Inspection VT, PT, MT San Jacinto College SNT-TC-1A
Level II Inspection VT Brown & Root Inc. SNT-TC-1A Level II Inspection VT, PT
Shaw Constructors Inc. SNT-TC-1A Level II Inspection VT Collins and Associates
Technical Services Incorporated CATSI SNT-TC-1A Level II Inspection VT Fugro
Consultants, Inc ( NCCER # 1340722 Abnormal Operating Conditions-Field
Operations (Liquid and Gas) 2012 ASNT-TC-1A Level II
Inspection VT For Austin Industrial Inc. API-11074 Welding
Inspection ONEOK NGL
NCCER Pipe Line OQ Training SouthLand Safety Henderson, Texas
Professional Experience
CB&I Ingleside Ethylene, LLC
Ingleside, Texas [2/8/16- Present]
Night Shift Lead Inspector, coordinate inspection personnel to preform duties as
required walking pre-hydro test packages ensure all NDE Requirements have been
satisfied per coed and project specifications. Witnessing Hydro-Test and
Pneumatic Testing, writing punch list, Coordinate with Construction and NDE
Contractors to obtain all required welds are X-Ray or PT Tested. Provide
Construction with Punch list in order to sell off restoration after Testing as well
as support team of 6 inspectors and provide a good turnover with Day time Quality
Manager
TIR / ONEOK NGL OMBS Storage & Pipeline Facility’s
Mont Belvieu , Texas [ 5/13/15- 12/30/15]
Welding / Craft Utility Inspector. Responsibilities Include Testing Contractors
Welders to API 1104 Requirements & ONEOK Standards and Specifications, 100%
Visual Inspection of Shop & Field Weld,s, Weld Mapping, Monitor contractors
preforming all tasks of fabrication, Bolt Up, Torqueing, Trenching, lowering in,
Foreign Utility Excavations and crossing, Blasting, Coating, Holliday Testing of
coated pipe, Vendor Surveillance of fabrication shops, Monitor Bending
Stronghold Inspection NCRA Refinery McPherson
Kansas [ 2/4/15 – 5/8/15]
3rd Party Welding Inspector. Representing NCRA Refinery Following Contractors
Ensure they are following the Refinery’s Specifications and following up with the
correct method of NDE, Witnessing Hydro Testing and final walk down per
Drawings and P&ID. In Preparations of start up of the ALKI Unit
TIR / ONEOK ROCKIES MIDSTREAM NGL
Watford City, North Dakota [ 8/7/14 – 2/7/15]
Welding Inspector . Responsibility’s Was Testing Contractors Welders to API
1104 Requirements & ONEOK Standards and Specifications Work with Tie-In
Crew’s Visual, Map and complete all documentation related to Tie-Ins coordinate
with X-Ray And Survey to Clear Weld Log on Repairs and Cut-Outs Monitor
Contractors Lowering in pipe, Coating, Trenching And Backfill
QIS / ONEOK NGL OMBS Storage & Pipeline Facility’s Mont
Belvieu , Texas [ 12/16/12- 7/27/14]
Welding / Craft Utility Inspector. Responsibilities Include Testing Contractors
Welders to API 1104 Requirements & ONEOK Standards and Specifications, 100%
Visual Inspection of Shop & Field Weld,s, Weld Mapping, Monitor contractors
preforming all tasks of fabrication, Bolt Up, Torqueing, Trenching, lowering in,
Foreign Utility Excavations and crossing, Blasting, Coating, Holliday Testing of
coated pipe, Vendor Surveillance of fabrication shops, Monitor Bending Shop work
in progress, Monitor Paint Yards, Monitor Civil Excavation and Drilling for Piers,
Slabs and Foundations. Review Contractors Documentation
ZACHRY DOW CHEMICAL
Deer Park, Texas [9/6 /12—12/14/12]
Fab Shop Welding Inspector. Responsibilities Include Visual Inspection of all shop
welds Control all .Welding Consumables Per company QA/QC Manual and site
requirements. Witness Hydro-Testing of shop spools and releasing them for Paint.
QIS / ONEOK ROCKIES MIDSTREAM NGL
Sidney Montana [ 4/20/2012- 8/27/12]
Welding / Craft Utility Inspector Spread 1. Responsibility’s Was Testing
Contractors Welders to API 1104 Requirements & ONEOK Standards and
Specifications. Monitor Disking of Right-of-way in preparation of removing Top
Soil in order to clear Right-of-Way for Construction. Witness Pre Hydro Testing
of All Road and Wetland Bore Sections above ground prior to pulling in to make
final Tie-In’s. Follow Up on Rejected Welds Visual The Repairs and coordinate
with X-Ray And Survey to Clear Weld Log on Repairs and Cut-Outs Monitor
Contractors Installation Of Silt Fence, Wattles, and Straw Bales, Welding
Inspection On Tie-In Crew.
Austin Industrial Inc. Baytown ,Texas
Bayer [ 09/16/2011- 04/02/2012]
QA/QC Inspector for Maintenance and Capital Projects Responsibilities are 100%
VT all welds, Flag and Request NDE As required per code and plant specifications,
Monitor Pipe / Civil / Structural work in process. Walking down Systems to ensure
all work was done to drawings and specifications. Witness Hydro Testing. Walking
down Packages with client Inspector for Final Acceptance and sign off. Assist Q/C
Manager with writing Repair Plans and Following all Code work and getting U1-A
form sighed by AI. Inspecting Paint and Insulation
Performance Contractors Industrial, Inc , Port Aurther,Texas.
Motiva [07/28/10 – 09/01/11]
Systems Turnover Foreman / Bit, Bic,QA/QC Inspector. Responsibilities are 100%
Flange Inspection prior to bolt up, 100% Inspection of bolt up connections and
installing tag seal per the Build It Tight Program walking down Packages.Pre and
Post Hydro. Verify all work has been completed to the latest Revised Drawings,
Details, Specifications, Code’s, Standards, and P & ID
BE&K/KBR, Tuscaloosa, Alabama.
Hunt Refinery [05/10/10---07/23/10] QA/QC
Inspector on grass roots project. VT all Welds Root and Finall Flag for appropriet
NDE procedures as Required by ASME B31.3 Code and plant Specifications. Walk
down Packages, Verify all work has been completed to the latest Revised
Drawings, Details, Specifications, Code’s, Standards, and P & ID Witness
Hydros.Walk down Systems with Engineering, 3rd Party Inspection and Operations
Starcon, Port Aurther, Texas.
Valero [01/25/10—02/28/10]
QA/QC Inspector on Turn-a-round Responsibilities were walking down Packages.
Verify all. Welding was complete, VT all welds ensure that all NDE was complete
per line spec, 100% Weld mapped and Documented. Build Hydro Packages, Walk
down packages for mechanical complete, Witness Hydro-Testing, Walk down
systems to ensure restoration was complete with correct bolts and gaskets
installed, Sell off to 3rd Party Inspection and Operations.
Performance Contractors Industrial, Inc. Garryville, LA
Marathon [8/2/09—10/18/09]
QC Inspector on new Crude Unit, Responsibilities were walking down Packages.
Verify all Welding was complete, VT all welds ensure that all NDE was complete
per line spec, 100% Weld mapped and Documented. Witness Hydro-Testing.
Welding Inspector on Code Job preformed on new Vacuum Column Verified all
welding / NDE done in accordance with ASME Sec IIV and NBIC Requirements
AI hold points met. Civil Inspection of Concrete & Grout before and after
placement. Structural Iron Inspections of platforms, Handrail and Gaiting. Sell
off completed packages to client with 3rd party inspector
Starcon, Canton, Ohio
Marathon [3/18/09—5/6/09]
QA/QC Inspector on Turn-a-round including piping and equipment
Responsibilities were to insure that all work is in compliance of the latest codes
and standards, & meets plant specifications, Weld Mapping & Tracking.
Monitoring construction, Visual inspection of all welds, Coordinate all required
NDE ,Wittiness hydro-testing
Starcon, Texas City. Texas
Valero [1/26/09—3/12/09]
QA/QC Inspector on Turn-a-round including piping and equipment
Responsibilities were to insure that all work is in compliance of the latest codes
and standards, & meets plant specifications, Weld Mapping & Tracking.
Monitoring construction, Visual inspection of all welds, Coordinate all required
NDE ,Wittiness hydro-testing
TIS,Rooney Engineer Rifle, Colorado
Exxon Pipeline [8/28/08—11/11/08]
Hydro Inspector on 50 mile pipeline. Responsibilities was to Verify all sections of
lines to be tested were complete to drawings and site specifications, Verify With
Welding Inspector that all NDE was complete and witness the cleaning run of 5
pigs using 2 brush and 3 poly pigs priory to installing the test headers with fill
pigs loaded ready to test. Verify that testing contractor set up and calibrated
their charts and equipment according to site specifications, witness testing, verify
chart readings & sign off on charts and test reports.
CATSI Contracted to JE Jacobs, Texas City, TX.
BP Refinery [8/24/06—8/25/08]
Lead Inspector for LDAR & Lamella Projects. Responsibilities were to insure that
all work is in compliance of the latest codes and standards, & meets plant
specifications, Weld Mapping & Tracking. Monitoring construction, Visual
inspection of all welds, Coordinate all required NDE, Paint, & Insulation activities.
Assemble all Hydro-Test Packages as well as Final Turnover Packages. Final walk
down and sign off with client job representative and operations
Performance Contractors Industrial, Inc. Port Author, Texas Valero [5/8/06 –
8/17/06]
QC Inspector on new ULSD Unit, Responsibilities were Walking down Pre-hydro
Pkgs. Hydro-Test’s, Final post-hydro punch out, Verify Paint & Insulation
complete and sell off to client
Shaw Constructors Inc. Pasadena, Texas. Valero
[2/13/06 – 4/29/06]
Welding inspector on grass roots ULSD Unit, Responsibilities were to VT all Root
and Finals, Weld map & Track, coordinate NDE, ensure that all NDE requirements
were done in accordance with project specifications and code requirements.
Witness hydro testing of completed systems.
Performance Contractors Industrial, Inc. Pasadena, Texas.
Kaneka [10/6/05 – 1/26/06]
QA/QC Inspector over Pipe, Civil, Structural and Mechanical for a Grass Roots
Pharmaceutical Plant designed to manufacture vitamins Responsible for Final
Alignment on rotating equipment, VT of all pipe and structural welding, Weld
Mapping & Tracking of NDE. Walk down hydro packages with 3rd party
inspector.
Teton Industrial Construction, Inc. Sweeney, Texas. Conoco
Phillips [7/11/05 – 7/22/05]
QC Inspector over all mechanical and rotating equipment. Including setting,
alignment and elevation before and after grout. To ISO 9000 Specifications and
company procedures.
Base Line Data. Ardmore, Oklahoma. Valero
Refinery Turnaround. [3/21/05 – 4/30/04]
QA Inspector Representing Valero following the Maintenance Contractors
throughout the refinery. To ensure that they are performing their work in
accordance with ASME code and plant standards and specifications. That all NDE
has been done and has Acceptable Results and reports in their Hydro Test
package. Walking lines and systems down to ensure that they are complete and
match the Drawings and P&ID that all bolts and gaskets comply with the BOM,
Spec. And standards of the plant.
Austin Industrial, Inc. Deer Park, Texas.
Auto Fina Turn-A Round [9/21/04 – 9/30/04]
QA/QC Inspector for Auto Fena, Monitoring ongoing construction works being
performed by other contractors. Witnessing all hydro and pneumatic testing of all
piping systems work was performed on. Witness torque of bolts on exchanger
heads. Walk down all Final turn over packages with AutoFina operations and
Inspection group with contractor QC inspector.
Kellogg Brown & Root,Deer Park, Texas, Shell
Oil OP-2 Debottleneck Project [11/05/02 – 10/17/03]
QA/QC Inspector – Walking mechanicals,
pre-hydro test packages, hydro-tests,
posting test packages to ensure that all
components are properly installed per
Drawings, Plant Specifications and
P&ID, s PT old to new pipe Tie-In, s.
Monitor in process pipe fitting and
welding.
Kellogg Brown & Root. Texas City, Texas.
BP Chemical Co [06/12/02 – 11/07/02]
QA/QC Manager/Inspector for a grass roots compressor building. Job deities
were to insure that all welders were tested to the requirements of ASME section
IX and were in compliance with the latest welding procedures and job
specifications. Ensure that all welder continuity papers were up to date. Weld
map to 100% tractability. Coordinate all NDE to ensure all Required PMI, Brunel,
RT, and PT. And Post weld heat treat was done to meet the requirements of
applicable codes and standards for the project. Record all Data on electronic weld
log for tractability. Build hydro test packages for testing.
Kellogg Brown & Root. Texas City, Texas.
Sterling Chemical Co [01/16/02 - 02/26/02]
QA/QC Inspector for Shutdown on Styrene unit. Insured that all welders were tested to
the requirements of ASME section IX, and all coded work is performed per the latest
edition of ASME code and the NBIC code requirements. Insured all welding was done
to the requirements of the applicable welding procedure per job note work order. Insured
that all NDE was performed, and correct bolts and gaskets were used prior to leak
testing or Hydro-Testing.
Foster Wheeler Constructors Jacksonville, Florida.
JEA-NSRPCO [07/16/01 - 01/04/02]
QA Assistant Mgr/Inspector I worked with the Management Group on a 300 MW
circulating fluidized bed (CFB) Boiler. The project scope Included 2 new grass root
boilers, Polishing Scrubbers, Particulate collectors (Bag House) and Limestone
Preparation system. My role was to audit the sub-contractors QA/QC and insure that
they were following the latest codes and standards for the project. Interface with the
Client Inspection Group to insure that all Hold points were met and to accompany them
to all Hydro-Tests, Equipment Alignments, Grout or Concrete Pours, Structural, Pipe,
Civil, Mechanical, Paint, and Insulation Inspections.
S & B Constructors Lakeland, Florida. City
of Lakeland Power Plant - [06/04/01 - 07/09/01]
QA/QC Inspector on HERSG boiler. Visual inspection of all Fit-ups, Root visual
inspections, Final weld profile inspection, weld mapping, coordinate NDE per
specifications and code Requirements. Witness Hydro-Testing of completed lines or
systems. Walk down final installation of all supports and specialty items to ensure they
match the latest revision of drawings and P & Ids.
Kellogg Brown & Root Tampa, Florida. Tampa
Elect. Gannon Station [05/01/01 - 05/19/01]
QA/QC Inspector on power Boiler Shutdown. I worked as a 3rd party to the client
coordinating and inspecting the work of Brown & Root as well as the sub-contractors
and all NDE for the project. Report the progress and Quality to The Client on a daily
report.
Kellogg Brown & Root, Deer Park, Texas.
Shell Oil OP-2 Debottleneck -[03/02/01 – 04/27/01]
QA/QC Inspector on Turn-a-Round Preparing unit to be re-constructed for
future Tie-in After construction is complete. Job duties were piping and civil
inspections that were but not limited to Hot-Taps, Hydro testing, Repairs of
existing equipment, and Paint & Insulation of new tie-in points.
Kellogg Brown & Root, Deer Park, Texas.
Shell Oil [01/15/01 - 02/28/01]
QA/QC Inspector for Coker Turnaround NDE coordinator for BRIS and all sub
contractors, piping and mechanical inspector, verify that all work has been done
to code; specifications and procedures verify that all bolts and gaskets are
correct and tight. Witness hydro tests insure that all isolation blinds has been
removed and system restored to working condition.
Kellogg Brown& Root ,Morenci, Arizona.
Phelps Dodge [10/27/00 - 12/29/00]
QA/QC Inspector on Mine for Leach project. Job Duties was to verify that all
mechanical equipment was properly Installed and lubricated prier to run in. Testing
welder’s per-ASME Section IX Insured that Structural steals was complete, per
drawings. Walk down Pipe packages to insure they were complete per drawings and
specifications. Coordinate all NDE Insure that all x-ray was done required by code.
Witnessed Hydro testing of Pipe and verified lines were restored for start up.
Bay Ltd. Sweeny, Texas.
Phillips 66 [5/01/00 - 8/24/00]
QA/QC Inspector for pre-turnaround piping & mechanical modifications necessary for
integration of new Coker unit. Insured that all welding was done to the requirements of
ASME-B31.3 and the applicable welding procedures Coordinate all NDE including x-
rays, Stress Relief, MT, PT, & PMI. Walk test packages witness Hydro-Testing and
Restoration of systems including checking bolts & gaskets.
Kellogg Brown & Root, Texas City, Texas. Amoco
Oil [2/07/00 - 3/10/00]
QA/QC Inspector for three turnarounds. Insured that all welders were tested to the
requirements of ASME section IX, and all coded work is performed per the latest
edition of ASME code and the NBIC code requirements. Insured all welding was done
to the requirements of the applicable welding procedure per job note work order. Insured
that all NDE was performed, and correct bolts and gaskets were used prior to leak
testing or Hydro-Testing.
Kellogg Brown & Root, Texas City, Texas.
Sterling Chemical [12/28/99 - 2/06/00]
QA/QC Inspector worked with site QA/QC personnel to insure all welders were
tested per ASME section IX and all coded work is performed per the latest
edition of the ASME and NBIC codes. Monitored in process welding, Fabrication
of piping spools, Coordinate all NDE and Heat-Treating on site. Also weld data
cards signed as work progresses, weld mapping and documentation of all work.
Insured that the R-1’s were properly filled out and a copy on file with one to the
client, also a copy sent to NBIC.
Brown & Root Industrial Service Inc. Orange Texas.
Inland Container and Paper Board Inc [11/18/99 -12/11/99]
QA/QC Inspector for December Shutdown, Monitor all pre shutdown piping fabrication.
Tested welders per ASME section IX for shutdown. Would interface with Inland
Engineers to obtain drawings and original U-1A data reports for the coded work Brown
and Root was to perform. Primary Coordinate or for NDE company and Authorized
Inspector. Insured all work was performed per the latest edition of ASME and NBIC
codes and site specifications, R-1s completed
Kellogg Brown & Root, Belle Chase, Louisiana.
BP Alliance Refinery - [9/27/99 - 11/14/99]
QA/QC Inspector for October turn around. Current responsibility included flange
inspection and Insured that all flange inspections was preformed per BP site
procedures and specifications Coordinating NDE to insure the client that all work
was performed per ASME code, site specifications and procedures. Weld map all
piping that was fabricated and flag for x-ray and/or hydro-test as required.
Insured all gaskets were installed per specifications, and all Bolts were properly
installed and tight.
Kellogg Brown & Root, Geismar , Louisiana
Shell Chemical - [2/22/99 - 4/08/99]
QA/QC Inspector responsibilities included pre-hydro package walk down with
client inspection group. To verify that pipelines was complete to drawings, bill of
materials and P&ID. Verified that welding department completed all NDE.
Witnessed and documented hydro testing. Post-hydro walk down to insure that all
blinds were removed, correct gaskets installed, and all bolts tight. Systems walk
down to insure that the total system was complete, including Coatings and
Insulation.
Kellogg Brown & Root, Deer Park,Texas.
Shell Chemical [12/22/98 - 2/15/99]
QA/QC Inspector for turn-around. Insured that all work was performed to ASME
code and site specifications, insured that all NDE was performed in accordance
with ASME and Shell Engineering standards and specifications. PT all old to new
pipe tie-in’s and root beads. All tie-ins were x-rayed 100% and weld mapped.
Halliburton / Brown & Root Inc. Houston,Texas.
Green’s Bayou Fabrication Yard [6/9/97 - 12/20/98]
QA/QC Inspector over fabrication and construction of ASME section VIII division
1 coded pressure vessels. Had to insure that all material was marked and stored
per code requirements. Welders were qualified to ASME section IX code, that all
welding procedures were followed; inspect all fit-ups prior to welding. Monitor
pre-heat during in-process welding, and coordinate NDE and hydro testing. Was
primary coordinator between NDE Company and American Bureau of Shipping
Surveyor and Authorized Inspector? Inspection of Sandblasting, Painting. And
compiled all documentation complete U-1 data reports. Stamp nameplates.
Brown & Root Inc,Crosby,Texas. Elf
Ato Chem [4/07/97 - 5/23/97]
QA/QC Piping and mechanical Inspector. Job duties included walk-down of pre
hydro-test packages to verify lines were installed per drawings and specifications,
Witness hydro test’s, coordinate NDE, verify pump alignment, weld mapping.
Brown & Root Inc.Hamilton, Mississippi.
Kerr McGee [8/20/96 3/20/97]
QA/QC Inspector for job site. Involving, Pipe, Mechanical, Civil, Coatings, Structural
Iron, Insulation and Welding. Was primary coordinator between contractors on welding
related items?
Brown & Root Inc. Pasadena, Texas.
Philips / Sumika Project.[11/22/95 - 8/13/96]
Pipe Welder for 3 months. QA/QC Inspector for remainder of job. Duties were P.T. all
alloy socket welds. Punch out lines. Walk down Hydro Tests.
Brown & Root Inc.
Various Projects - USA. [6/26/78 - 10/17/03]
I have worked in all divisions and all crafts as a Welder / Fitter.

Charles_D_Green

  • 1.
    Charles D Green 158Orion Lane Conroe Texas 77306 Home Phone :(936) 258-5491 Cell Phone: (281) 229-0751 Email: shortygreen77535@Yahoo.com Summary of Experience Over 30 Years’ Experience in Construction With 19 Years in Quality Control/ Quality Assurance QA/QC Inspector in Chemical plants, Refineries, Plastic plants, Paper Mill’s and Pipeline that included Mechanical, Welding , Hydro-Testing NDE of the pipe per ASME code and site specifications. Insured all coded work was performed per the ASME , NBIC codes and the R-1 data reports completed and turned over to the client. Verified that piping systems were complete to drawings and specifications, including Pump Alignment, Stress, Coating and Insulation. Civil Inspection of Concrete Pours. Structural Iron to drawings. Project Types Chemical Plants, Refineries, Plastic Plants, Power Plants, Food Process Plants, Paper Mill Copper Mine, Copper Smelter, Pipe Line, NGL Distributions Facility Education 1996High School - Truth or Consequences, N.M. Class of 1976 – 1977 College - San Jacinto, Pasadena, TX. 1995 – 1996. Level II VT, PT, MT AWS Seminar Beaumont, TX. 2008 NCCER Abnormal Operating Conditions-Field Operations (Liquid and Gas) 2008 Certifications Held SNT-TC-1A Level II Inspection VT, PT, MT San Jacinto College SNT-TC-1A Level II Inspection VT Brown & Root Inc. SNT-TC-1A Level II Inspection VT, PT Shaw Constructors Inc. SNT-TC-1A Level II Inspection VT Collins and Associates Technical Services Incorporated CATSI SNT-TC-1A Level II Inspection VT Fugro Consultants, Inc ( NCCER # 1340722 Abnormal Operating Conditions-Field Operations (Liquid and Gas) 2012 ASNT-TC-1A Level II
  • 2.
    Inspection VT ForAustin Industrial Inc. API-11074 Welding Inspection ONEOK NGL NCCER Pipe Line OQ Training SouthLand Safety Henderson, Texas Professional Experience CB&I Ingleside Ethylene, LLC Ingleside, Texas [2/8/16- Present] Night Shift Lead Inspector, coordinate inspection personnel to preform duties as required walking pre-hydro test packages ensure all NDE Requirements have been satisfied per coed and project specifications. Witnessing Hydro-Test and Pneumatic Testing, writing punch list, Coordinate with Construction and NDE Contractors to obtain all required welds are X-Ray or PT Tested. Provide Construction with Punch list in order to sell off restoration after Testing as well as support team of 6 inspectors and provide a good turnover with Day time Quality Manager TIR / ONEOK NGL OMBS Storage & Pipeline Facility’s Mont Belvieu , Texas [ 5/13/15- 12/30/15] Welding / Craft Utility Inspector. Responsibilities Include Testing Contractors Welders to API 1104 Requirements & ONEOK Standards and Specifications, 100% Visual Inspection of Shop & Field Weld,s, Weld Mapping, Monitor contractors preforming all tasks of fabrication, Bolt Up, Torqueing, Trenching, lowering in, Foreign Utility Excavations and crossing, Blasting, Coating, Holliday Testing of coated pipe, Vendor Surveillance of fabrication shops, Monitor Bending Stronghold Inspection NCRA Refinery McPherson Kansas [ 2/4/15 – 5/8/15] 3rd Party Welding Inspector. Representing NCRA Refinery Following Contractors Ensure they are following the Refinery’s Specifications and following up with the
  • 3.
    correct method ofNDE, Witnessing Hydro Testing and final walk down per Drawings and P&ID. In Preparations of start up of the ALKI Unit TIR / ONEOK ROCKIES MIDSTREAM NGL Watford City, North Dakota [ 8/7/14 – 2/7/15] Welding Inspector . Responsibility’s Was Testing Contractors Welders to API 1104 Requirements & ONEOK Standards and Specifications Work with Tie-In Crew’s Visual, Map and complete all documentation related to Tie-Ins coordinate with X-Ray And Survey to Clear Weld Log on Repairs and Cut-Outs Monitor Contractors Lowering in pipe, Coating, Trenching And Backfill QIS / ONEOK NGL OMBS Storage & Pipeline Facility’s Mont Belvieu , Texas [ 12/16/12- 7/27/14] Welding / Craft Utility Inspector. Responsibilities Include Testing Contractors Welders to API 1104 Requirements & ONEOK Standards and Specifications, 100% Visual Inspection of Shop & Field Weld,s, Weld Mapping, Monitor contractors preforming all tasks of fabrication, Bolt Up, Torqueing, Trenching, lowering in, Foreign Utility Excavations and crossing, Blasting, Coating, Holliday Testing of coated pipe, Vendor Surveillance of fabrication shops, Monitor Bending Shop work in progress, Monitor Paint Yards, Monitor Civil Excavation and Drilling for Piers, Slabs and Foundations. Review Contractors Documentation ZACHRY DOW CHEMICAL Deer Park, Texas [9/6 /12—12/14/12] Fab Shop Welding Inspector. Responsibilities Include Visual Inspection of all shop welds Control all .Welding Consumables Per company QA/QC Manual and site requirements. Witness Hydro-Testing of shop spools and releasing them for Paint. QIS / ONEOK ROCKIES MIDSTREAM NGL Sidney Montana [ 4/20/2012- 8/27/12] Welding / Craft Utility Inspector Spread 1. Responsibility’s Was Testing Contractors Welders to API 1104 Requirements & ONEOK Standards and
  • 4.
    Specifications. Monitor Diskingof Right-of-way in preparation of removing Top Soil in order to clear Right-of-Way for Construction. Witness Pre Hydro Testing of All Road and Wetland Bore Sections above ground prior to pulling in to make final Tie-In’s. Follow Up on Rejected Welds Visual The Repairs and coordinate with X-Ray And Survey to Clear Weld Log on Repairs and Cut-Outs Monitor Contractors Installation Of Silt Fence, Wattles, and Straw Bales, Welding Inspection On Tie-In Crew. Austin Industrial Inc. Baytown ,Texas Bayer [ 09/16/2011- 04/02/2012] QA/QC Inspector for Maintenance and Capital Projects Responsibilities are 100% VT all welds, Flag and Request NDE As required per code and plant specifications, Monitor Pipe / Civil / Structural work in process. Walking down Systems to ensure all work was done to drawings and specifications. Witness Hydro Testing. Walking down Packages with client Inspector for Final Acceptance and sign off. Assist Q/C Manager with writing Repair Plans and Following all Code work and getting U1-A form sighed by AI. Inspecting Paint and Insulation Performance Contractors Industrial, Inc , Port Aurther,Texas. Motiva [07/28/10 – 09/01/11] Systems Turnover Foreman / Bit, Bic,QA/QC Inspector. Responsibilities are 100% Flange Inspection prior to bolt up, 100% Inspection of bolt up connections and installing tag seal per the Build It Tight Program walking down Packages.Pre and Post Hydro. Verify all work has been completed to the latest Revised Drawings, Details, Specifications, Code’s, Standards, and P & ID BE&K/KBR, Tuscaloosa, Alabama. Hunt Refinery [05/10/10---07/23/10] QA/QC Inspector on grass roots project. VT all Welds Root and Finall Flag for appropriet NDE procedures as Required by ASME B31.3 Code and plant Specifications. Walk down Packages, Verify all work has been completed to the latest Revised Drawings, Details, Specifications, Code’s, Standards, and P & ID Witness Hydros.Walk down Systems with Engineering, 3rd Party Inspection and Operations
  • 5.
    Starcon, Port Aurther,Texas. Valero [01/25/10—02/28/10] QA/QC Inspector on Turn-a-round Responsibilities were walking down Packages. Verify all. Welding was complete, VT all welds ensure that all NDE was complete per line spec, 100% Weld mapped and Documented. Build Hydro Packages, Walk down packages for mechanical complete, Witness Hydro-Testing, Walk down systems to ensure restoration was complete with correct bolts and gaskets installed, Sell off to 3rd Party Inspection and Operations. Performance Contractors Industrial, Inc. Garryville, LA Marathon [8/2/09—10/18/09] QC Inspector on new Crude Unit, Responsibilities were walking down Packages. Verify all Welding was complete, VT all welds ensure that all NDE was complete per line spec, 100% Weld mapped and Documented. Witness Hydro-Testing. Welding Inspector on Code Job preformed on new Vacuum Column Verified all welding / NDE done in accordance with ASME Sec IIV and NBIC Requirements AI hold points met. Civil Inspection of Concrete & Grout before and after placement. Structural Iron Inspections of platforms, Handrail and Gaiting. Sell off completed packages to client with 3rd party inspector Starcon, Canton, Ohio Marathon [3/18/09—5/6/09] QA/QC Inspector on Turn-a-round including piping and equipment Responsibilities were to insure that all work is in compliance of the latest codes and standards, & meets plant specifications, Weld Mapping & Tracking. Monitoring construction, Visual inspection of all welds, Coordinate all required NDE ,Wittiness hydro-testing Starcon, Texas City. Texas Valero [1/26/09—3/12/09] QA/QC Inspector on Turn-a-round including piping and equipment Responsibilities were to insure that all work is in compliance of the latest codes and standards, & meets plant specifications, Weld Mapping & Tracking. Monitoring construction, Visual inspection of all welds, Coordinate all required NDE ,Wittiness hydro-testing TIS,Rooney Engineer Rifle, Colorado Exxon Pipeline [8/28/08—11/11/08]
  • 6.
    Hydro Inspector on50 mile pipeline. Responsibilities was to Verify all sections of lines to be tested were complete to drawings and site specifications, Verify With Welding Inspector that all NDE was complete and witness the cleaning run of 5 pigs using 2 brush and 3 poly pigs priory to installing the test headers with fill pigs loaded ready to test. Verify that testing contractor set up and calibrated their charts and equipment according to site specifications, witness testing, verify chart readings & sign off on charts and test reports. CATSI Contracted to JE Jacobs, Texas City, TX. BP Refinery [8/24/06—8/25/08] Lead Inspector for LDAR & Lamella Projects. Responsibilities were to insure that all work is in compliance of the latest codes and standards, & meets plant specifications, Weld Mapping & Tracking. Monitoring construction, Visual inspection of all welds, Coordinate all required NDE, Paint, & Insulation activities. Assemble all Hydro-Test Packages as well as Final Turnover Packages. Final walk down and sign off with client job representative and operations Performance Contractors Industrial, Inc. Port Author, Texas Valero [5/8/06 – 8/17/06] QC Inspector on new ULSD Unit, Responsibilities were Walking down Pre-hydro Pkgs. Hydro-Test’s, Final post-hydro punch out, Verify Paint & Insulation complete and sell off to client Shaw Constructors Inc. Pasadena, Texas. Valero [2/13/06 – 4/29/06] Welding inspector on grass roots ULSD Unit, Responsibilities were to VT all Root and Finals, Weld map & Track, coordinate NDE, ensure that all NDE requirements were done in accordance with project specifications and code requirements. Witness hydro testing of completed systems. Performance Contractors Industrial, Inc. Pasadena, Texas. Kaneka [10/6/05 – 1/26/06]
  • 7.
    QA/QC Inspector overPipe, Civil, Structural and Mechanical for a Grass Roots Pharmaceutical Plant designed to manufacture vitamins Responsible for Final Alignment on rotating equipment, VT of all pipe and structural welding, Weld Mapping & Tracking of NDE. Walk down hydro packages with 3rd party inspector. Teton Industrial Construction, Inc. Sweeney, Texas. Conoco Phillips [7/11/05 – 7/22/05] QC Inspector over all mechanical and rotating equipment. Including setting, alignment and elevation before and after grout. To ISO 9000 Specifications and company procedures. Base Line Data. Ardmore, Oklahoma. Valero Refinery Turnaround. [3/21/05 – 4/30/04] QA Inspector Representing Valero following the Maintenance Contractors throughout the refinery. To ensure that they are performing their work in accordance with ASME code and plant standards and specifications. That all NDE has been done and has Acceptable Results and reports in their Hydro Test package. Walking lines and systems down to ensure that they are complete and match the Drawings and P&ID that all bolts and gaskets comply with the BOM, Spec. And standards of the plant. Austin Industrial, Inc. Deer Park, Texas. Auto Fina Turn-A Round [9/21/04 – 9/30/04] QA/QC Inspector for Auto Fena, Monitoring ongoing construction works being performed by other contractors. Witnessing all hydro and pneumatic testing of all piping systems work was performed on. Witness torque of bolts on exchanger heads. Walk down all Final turn over packages with AutoFina operations and Inspection group with contractor QC inspector.
  • 8.
    Kellogg Brown &Root,Deer Park, Texas, Shell Oil OP-2 Debottleneck Project [11/05/02 – 10/17/03] QA/QC Inspector – Walking mechanicals, pre-hydro test packages, hydro-tests, posting test packages to ensure that all components are properly installed per Drawings, Plant Specifications and P&ID, s PT old to new pipe Tie-In, s. Monitor in process pipe fitting and welding. Kellogg Brown & Root. Texas City, Texas. BP Chemical Co [06/12/02 – 11/07/02] QA/QC Manager/Inspector for a grass roots compressor building. Job deities were to insure that all welders were tested to the requirements of ASME section IX and were in compliance with the latest welding procedures and job specifications. Ensure that all welder continuity papers were up to date. Weld map to 100% tractability. Coordinate all NDE to ensure all Required PMI, Brunel, RT, and PT. And Post weld heat treat was done to meet the requirements of applicable codes and standards for the project. Record all Data on electronic weld log for tractability. Build hydro test packages for testing. Kellogg Brown & Root. Texas City, Texas. Sterling Chemical Co [01/16/02 - 02/26/02] QA/QC Inspector for Shutdown on Styrene unit. Insured that all welders were tested to the requirements of ASME section IX, and all coded work is performed per the latest edition of ASME code and the NBIC code requirements. Insured all welding was done to the requirements of the applicable welding procedure per job note work order. Insured
  • 9.
    that all NDEwas performed, and correct bolts and gaskets were used prior to leak testing or Hydro-Testing. Foster Wheeler Constructors Jacksonville, Florida. JEA-NSRPCO [07/16/01 - 01/04/02] QA Assistant Mgr/Inspector I worked with the Management Group on a 300 MW circulating fluidized bed (CFB) Boiler. The project scope Included 2 new grass root boilers, Polishing Scrubbers, Particulate collectors (Bag House) and Limestone Preparation system. My role was to audit the sub-contractors QA/QC and insure that they were following the latest codes and standards for the project. Interface with the Client Inspection Group to insure that all Hold points were met and to accompany them to all Hydro-Tests, Equipment Alignments, Grout or Concrete Pours, Structural, Pipe, Civil, Mechanical, Paint, and Insulation Inspections. S & B Constructors Lakeland, Florida. City of Lakeland Power Plant - [06/04/01 - 07/09/01] QA/QC Inspector on HERSG boiler. Visual inspection of all Fit-ups, Root visual inspections, Final weld profile inspection, weld mapping, coordinate NDE per specifications and code Requirements. Witness Hydro-Testing of completed lines or systems. Walk down final installation of all supports and specialty items to ensure they match the latest revision of drawings and P & Ids. Kellogg Brown & Root Tampa, Florida. Tampa Elect. Gannon Station [05/01/01 - 05/19/01] QA/QC Inspector on power Boiler Shutdown. I worked as a 3rd party to the client coordinating and inspecting the work of Brown & Root as well as the sub-contractors and all NDE for the project. Report the progress and Quality to The Client on a daily report. Kellogg Brown & Root, Deer Park, Texas. Shell Oil OP-2 Debottleneck -[03/02/01 – 04/27/01] QA/QC Inspector on Turn-a-Round Preparing unit to be re-constructed for future Tie-in After construction is complete. Job duties were piping and civil inspections that were but not limited to Hot-Taps, Hydro testing, Repairs of existing equipment, and Paint & Insulation of new tie-in points.
  • 10.
    Kellogg Brown &Root, Deer Park, Texas. Shell Oil [01/15/01 - 02/28/01] QA/QC Inspector for Coker Turnaround NDE coordinator for BRIS and all sub contractors, piping and mechanical inspector, verify that all work has been done to code; specifications and procedures verify that all bolts and gaskets are correct and tight. Witness hydro tests insure that all isolation blinds has been removed and system restored to working condition. Kellogg Brown& Root ,Morenci, Arizona. Phelps Dodge [10/27/00 - 12/29/00] QA/QC Inspector on Mine for Leach project. Job Duties was to verify that all mechanical equipment was properly Installed and lubricated prier to run in. Testing welder’s per-ASME Section IX Insured that Structural steals was complete, per drawings. Walk down Pipe packages to insure they were complete per drawings and specifications. Coordinate all NDE Insure that all x-ray was done required by code. Witnessed Hydro testing of Pipe and verified lines were restored for start up. Bay Ltd. Sweeny, Texas. Phillips 66 [5/01/00 - 8/24/00] QA/QC Inspector for pre-turnaround piping & mechanical modifications necessary for integration of new Coker unit. Insured that all welding was done to the requirements of ASME-B31.3 and the applicable welding procedures Coordinate all NDE including x- rays, Stress Relief, MT, PT, & PMI. Walk test packages witness Hydro-Testing and Restoration of systems including checking bolts & gaskets. Kellogg Brown & Root, Texas City, Texas. Amoco Oil [2/07/00 - 3/10/00] QA/QC Inspector for three turnarounds. Insured that all welders were tested to the requirements of ASME section IX, and all coded work is performed per the latest edition of ASME code and the NBIC code requirements. Insured all welding was done to the requirements of the applicable welding procedure per job note work order. Insured that all NDE was performed, and correct bolts and gaskets were used prior to leak testing or Hydro-Testing. Kellogg Brown & Root, Texas City, Texas. Sterling Chemical [12/28/99 - 2/06/00]
  • 11.
    QA/QC Inspector workedwith site QA/QC personnel to insure all welders were tested per ASME section IX and all coded work is performed per the latest edition of the ASME and NBIC codes. Monitored in process welding, Fabrication of piping spools, Coordinate all NDE and Heat-Treating on site. Also weld data cards signed as work progresses, weld mapping and documentation of all work. Insured that the R-1’s were properly filled out and a copy on file with one to the client, also a copy sent to NBIC. Brown & Root Industrial Service Inc. Orange Texas. Inland Container and Paper Board Inc [11/18/99 -12/11/99] QA/QC Inspector for December Shutdown, Monitor all pre shutdown piping fabrication. Tested welders per ASME section IX for shutdown. Would interface with Inland Engineers to obtain drawings and original U-1A data reports for the coded work Brown and Root was to perform. Primary Coordinate or for NDE company and Authorized Inspector. Insured all work was performed per the latest edition of ASME and NBIC codes and site specifications, R-1s completed Kellogg Brown & Root, Belle Chase, Louisiana. BP Alliance Refinery - [9/27/99 - 11/14/99] QA/QC Inspector for October turn around. Current responsibility included flange inspection and Insured that all flange inspections was preformed per BP site procedures and specifications Coordinating NDE to insure the client that all work was performed per ASME code, site specifications and procedures. Weld map all piping that was fabricated and flag for x-ray and/or hydro-test as required. Insured all gaskets were installed per specifications, and all Bolts were properly installed and tight. Kellogg Brown & Root, Geismar , Louisiana Shell Chemical - [2/22/99 - 4/08/99] QA/QC Inspector responsibilities included pre-hydro package walk down with client inspection group. To verify that pipelines was complete to drawings, bill of materials and P&ID. Verified that welding department completed all NDE. Witnessed and documented hydro testing. Post-hydro walk down to insure that all blinds were removed, correct gaskets installed, and all bolts tight. Systems walk down to insure that the total system was complete, including Coatings and Insulation.
  • 12.
    Kellogg Brown &Root, Deer Park,Texas. Shell Chemical [12/22/98 - 2/15/99] QA/QC Inspector for turn-around. Insured that all work was performed to ASME code and site specifications, insured that all NDE was performed in accordance with ASME and Shell Engineering standards and specifications. PT all old to new pipe tie-in’s and root beads. All tie-ins were x-rayed 100% and weld mapped. Halliburton / Brown & Root Inc. Houston,Texas. Green’s Bayou Fabrication Yard [6/9/97 - 12/20/98] QA/QC Inspector over fabrication and construction of ASME section VIII division 1 coded pressure vessels. Had to insure that all material was marked and stored per code requirements. Welders were qualified to ASME section IX code, that all welding procedures were followed; inspect all fit-ups prior to welding. Monitor pre-heat during in-process welding, and coordinate NDE and hydro testing. Was primary coordinator between NDE Company and American Bureau of Shipping Surveyor and Authorized Inspector? Inspection of Sandblasting, Painting. And compiled all documentation complete U-1 data reports. Stamp nameplates. Brown & Root Inc,Crosby,Texas. Elf Ato Chem [4/07/97 - 5/23/97] QA/QC Piping and mechanical Inspector. Job duties included walk-down of pre hydro-test packages to verify lines were installed per drawings and specifications, Witness hydro test’s, coordinate NDE, verify pump alignment, weld mapping. Brown & Root Inc.Hamilton, Mississippi. Kerr McGee [8/20/96 3/20/97] QA/QC Inspector for job site. Involving, Pipe, Mechanical, Civil, Coatings, Structural Iron, Insulation and Welding. Was primary coordinator between contractors on welding related items? Brown & Root Inc. Pasadena, Texas. Philips / Sumika Project.[11/22/95 - 8/13/96] Pipe Welder for 3 months. QA/QC Inspector for remainder of job. Duties were P.T. all alloy socket welds. Punch out lines. Walk down Hydro Tests. Brown & Root Inc.
  • 13.
    Various Projects -USA. [6/26/78 - 10/17/03] I have worked in all divisions and all crafts as a Welder / Fitter.