1. Ron Coleman / 870-759-2360
1808 Fox Meadow Ln.
Jonesboro, AR. 72404
EDUCATION
Highland High School, Highland IL.
ASU Tech / Searcy, AR. Welding 1 & 2 ( 8/74 – 8/76 )
U of Texas ext. / Nat. Gas Compressor and operations ( 1988 )
Black River Tech / Pocahontas, AR. Machine Lathe & Blueprint ( 9/89 – 4/90 )
ASU Tech / Jonesboro, AR. Welding Qualifications ( 4/05)
Lexicon QA QC Training / Little Rock, AR. ( 6/07 & 5/10 )
CWI Training and Certification ( 9/09)
CWI certificate # 09102871 / ph. verification # 305 443 9353
API 510 Certification ( 6/14) / certification # 52997
API 570 Certification (12/14) / certification # 55740
EMPLOYMENT
Panda Power Funds (11/14 – present)
Weld Lead – QA @ Panda Liberty Power Project, Bradford Co. PA.
Natural gas fueled, 829 megawatt combined cycle generating stations ( 2 units)
Ohmstede Industrial (9/14 - 10/14)
CWI - API 510 @ Marathon Refinery, Catlettsburg KY.
Replace tubes on convection side of 3 heaters and replace steam lines. 4 week shut
down.
Bilfinger/ Westcon ( 6/14 - 8 / 14 )
Lead Inspector,new construction of Dakota Prairie Refinery, Dickinson N.D. of light crude
refinery. ( 20,000 barrel per day )
Inspection and documentation of installation of piping, vessels and mechanical
equipment.
Critical Path Resources ( CPR ) - ( 2/14 – 5/14 )
Lead CWI / QA Inspector @ Marathon Refinery, Texas City, TX. , Oversee NDE, PWHT,
hydro and visual inspection per completion packages of boiler tube repair, in mud and
steam drum and F – stack.
Performance Contractors ( 2/13 – 1/14 )
QA/QC Mgr., Kemper Co. IGCC / Meridian Ms.
Daily duties / 6 inspectors performing VT, fit up and welding of pipe and vessels. Weld
tracking, flange and bolt make up. Scheduled 3rd party NDE, PWHT and documented.
Walked system turn over packages
Lexicon, Inc. / Little Rock, Ar. ( 4/12 – 1/13 )
Lead QA / QC, Process Gas Heater / Convent, LA.
Oversee and document anchor bolt placement & alignment, concrete maturity,
structural steel acceptance, pre installation verification of fastener assemblies per AISC
specs. Inspect and map welds.
Lexicon, Inc. / Little Rock, AR. ( 5/10 – 4/12 )
Site Mgr., Nucor St. / Memphis, TN. Managed budget, job analysis, installation of
mechanical and structural projects on new construction for shutdowns involving 50 –
2. 300 man crews. Maintenance was 24 hour 7 days all emergency down time and
repairs. Project Completion with safety, quality and costs.
DTZ, Inc. / Memphis, TN. ( 4/09 – 5/10 )
QA / QC Inspector @ Cargill Mill, Implemented QC program to qualify welders and
procedures, inspected repairs to vessels and piping. AWS D1.1, ASME B31.1 and 31.3
codes.
Lexicon, Inc. / Memphis, TN. ( 6/07 – 3/09 )
QC Inspector new construction of Nucor St. mill, involving civil, structural, mechanical
and piping inspections. Bolt up and welding & documentation including, tracking and
testing, also RFI and NCR's
CONTACTS
Sam Arrendondo ( CPR ) 713 291 4462
Roger Parker ( Lexicon, Inc. ) 615 618 0072
William Waddle ( Pro Energy ) 432 507 3830
Marc Pryun ( Westcon ) 225 247 6109