The document outlines the tasks for checking signals and testing functionality between the control system and steam turbine, boiler, cooling water and steam cycle systems at a thermal power plant. Key responsibilities include developing logic and HMI screens using MAX tools, downloading I/O, forcing I/O and checking statuses, preparing documentation, reviewing commissioning plans and procedures, organizing commissioning testing teams, and advising operations during start-up and normal operation.