Session 2 C Water, Disasters, Energy




CEOP – AEGIS contribution to GEOSS Data CORE


                 Massimo Menenti
           Delft University of Technology
                    Jerome Colin
             Université de Strasbourg


           GEO European Project Workshop ‐ London February 8 ‐ 9   1
Practical contributon to the GEOSS Data-CORE


 Hydrometeorological data on large transnational river
basins:
    the case of the Qinghai – Tibet Plateau, the major rivers of SE
   Asia

  need to bring together data generated by on-going
international initiatives:
    CEOP – AEGIS
    Third Pole Environment
    JICA – Tibet
    PAPRIKA (IT, F)


                GEO European Project Workshop ‐ London February 8 ‐ 9   2
GEOSS Data-CORE:
                global vs. regional data


• Terrestrial water cycle

• Data need to be integrated by watershed

• Information is actionable

• real‐time/near real‐time monitoring capabilities via GEOSS 
  for key variables of interest to the IPCC – and IPCC 
  stakeholders



                GEO European Project Workshop ‐ London February 8 ‐ 9   3
CEOP‐AEGIS contribution to GEOSSS 
          Water theme
• ceop‐aegis.org portal:
  – General information
  – IT platform for the consortium
  – Information system on the hydrology of the 
    Tibetan Plateau for the community
• Schedule:
     • Until May 2012: no public access to foreground
     • After May 2012: all project foreground freely 
                                                                      Registered 
       available to the community                                      in GEOSS

              GEO European Project Workshop ‐ London February 8 ‐ 9        4
Qinghai‐Tibet hot‐spot
• Hot spot:
  – Higher spatial and/or temporal frequency than global 
    products
  – Larger panel of dedicated products
• CEOP‐AEGIS:
  – Area covered 4,292,130 km2
  – 1x1 km grids for EO products
  – 5x5 km grids for Hydrological Model outputs
  – 30x30 km grids for Atmospheric Model outputs
  – In‐Situ data network
  – Daily to weekly, since 2008
                GEO European Project Workshop ‐ London February 8 ‐ 9   5
Water Balance Model domain




  GEO European Project Workshop ‐ London February 8 ‐ 9   6
CEOP-AEGIS Database


• Principles
                                           Project partners
   – all project products in 
     one single entry point
   – web‐based user‐friendly               GIS Service
     interface
   – registered as a                       Data Server (openDAP)

     contribution to GEOSS                 CEOP‐AEGIS Web Portal
   – open access to the 
     scientific community
                                           GEOSS 
                                           Portal



                                           Scientific community
               GEO European Project Workshop ‐ London February 8 ‐ 9   7
CEOP‐AEGIS contribution to GEOSSS 
    Water theme: product types
• Documents:
  – Periodic reports, Algorithm Theoretical Basis 
    Documents,
• Datasets:
  – Ground measurements, final EO products, 
    Hydrological Model outputs
• Services & software:
  – Drought and flood early warning tools
  – Water & Energy Budget Models
  – Training material for stakeholders

              GEO European Project Workshop ‐ London February 8 ‐ 9   8
Product types: documents, datasets, 
                   services & softwares
D0.1.1   Science Progress Report 2009                                                D4.3    Estimation of soil moisture from Geostationary Satellite (GS) data
D0.1.2   Science Progress Report 2010                                                D4.4    A data product of the plateau using different sensors simultaneously
                                                                                     D4.5    Validation results and documentation of uncertainties
D0.1.3   Science Progress Report 2011
                                                                                     D5.1    Provide algorithm for QPE, 3D mosaic and hydrometeors classification
D0.1.4   Science Progress Report 2012                                                D5.2    Provide rainfall estimation algorithms from satellites (MW, VIS-IR) data
D0.2.1   Technical Reports by Working Groups 2009                                    D5.3    Provide 3-years 3-D gridded radar data for case studies
D0.2.2   Technical Reports by Working Groups 2010                                            Provide high space and temporal resolution precipitation data retrieved from radar,
D0.2.3   Technical Reports by Working Groups 2011                                    D5.4    satellite (both VIS-IR and MW) and ground rain gauge data for case studies
                                                                                     D6.1    Sample data set and Report on retrieval performance based on MODIS and AMSR-E data
D0.2.4   Technical Reports by Working Groups 2012
                                                                                     D6.2    Preliminary Algorithm Theoretical Basis Documents for snow/ice properties
D0.5.1   Final report                                                                        Final Algorithm Theoretical Basis Document;+Snow data assimilation system and
D1.1     Detailed approach and preliminary data analysis protocol                    D6.3    documentation
         Analysis protocol report and sample data sets on seasonal and inter-                Validated data set (include snow cover area, SWE, glacier area and storage from satellite
         annual time scale of the exchange of surface heat flux, momentum flux,      D6.4    data, and assimilation data sets) from 2008 to 2010
         water vapour flux, surface and soil moisture over the different land                Final report for water resources contributed by the snow and glacier melt on Qinghai-
D1.2                                                                                 D6.5    Tibet Plateau
         surfaces of the Tibetan Plateau
                                                                                             Report and data set on results of numerical experiments to document the response to
         Report on footprint analysis and structure characteristics of the Surface   D7.1    observed evolution of snow and vegetation cover and surface heat fluxes over the Plateau
D1.3     Layer (SL) and Atmospheric Boundary Layer                                   D7.2    Report on rainfall forecast performance
         Final 3 years dataset on aerodynamic and thermodynamic variables            D8.1    Design of data processing protocol for E.O. based water balance products
D1.4     over the different land surfaces of the Tibetan Plateau                     D8.2    Time series analysis of water balance data
D2.1     Generic algorithms LSV-s                                                            Prototype of data collection, integration and processing system to monitor the Plateau
                                                                                     D8.3    water balance
D2.2     Algorithms land surface temperature PS                                      D8.4    Database management system
         Algorithms surface albedo, emissivity and temperature geostationary         D9.1    Vegetation dynamic maps over a long-term period
D2.3     satellite                                                                   D9.2    Maps of drought vulnerability zones in the study area
D2.4     Algorithm Theoretical Basis Documents multi-source remote sensing           D9.3    Tools for time series analysis of vegetation response to drought
         Data set vegetation cover, surface albedo, LAI, aerosol optical depth,      D9.4    Tools for drought prediction by analyzing vegetation response
         precipitable water vapour, soil/foliage component and land surface          D9.5    Anomalies maps of rainfall, vegetation response
D2.5     emissivity/temperatures for a 3 years period.                               D9.6    Tool for evaluating drought impact on agriculture and forestry
                                                                                             System applicable for drought monitoring and early warning in the pilot areas in China
         Review of selected existing algorithms and models on local, regional
                                                                                     D9.7    and India
D3.1     and Plateau scales data sets
                                                                                             Algorithm Theoretical Basis Document for surface wetness indicator retrieved from
         Generalize SEB calculation at a high spatial resolution and on a regional   D10.1   passive and active microwave satellite data
D3.2     extent                                                                              Real time flood forecast models based on stochastic time series, ANN and Fuzzy logic for
D3.3     Time-series Maps Processing and Validation Procedure Document               D10.2   the study area
         Validated complete time-series maps of fluxes over 3 years, with a                  Flood inundation, flood hazard and flood risk zone maps based on the hydraulic modelling
D3.4     target frequency of one week                                                D10.3   and analysis of satellite data
                                                                                             Real time forecasting of flood inundation, depth, areal extent and return period of
         Collection of consistent continuous in-situ soil moisture measurements      D10.4   flooding
D4.1     at regional scale                                                           D10.5   Case studies on flood events in the period 1999-2010
         Development of a satellite sensor independent system for the soil
D4.2     moisture combined retrieval algorithms
                                                 GEO European Project Workshop ‐ London February 8 ‐ 9                                                                   9
Open and Standard Design
• Advanced data and meta‐data models
  – netCDF3, netCDF4/HDF5
• Meta‐data follow international standards
  – CF 1.4 meta‐data semantics
  – XML and NCML online documentation
• Open Source technologies for data exchanges
  – OPeNDAP protocol
  – Open source, java based, friendly user interface

             GEO European Project Workshop ‐ London February 8 ‐ 9   10
GEO European Project Workshop ‐ London February 8 ‐ 9   11
GEO European Project Workshop ‐ London February 8 ‐ 9   12
GEO European Project Workshop ‐ London February 8 ‐ 9   13
Large fluctuations of regional and local
                       water cycles




                                                      30000
                                                                         Indus
                                                                         Brahmaputra
                                                      25000
                                                                         Salween
                                                                         Mekong
                                                      20000              Yangtze
                                                                         Yellow




                                            m3 / s
                                                      15000


                                                      10000


                                                        5000


                                                              0
                                                              0


                                                                       0


                                                                                 0


                                                                                           0


                                                                                                    0


                                                                                                             0


                                                                                                                      0


                                                                                                                               0


                                                                                                                                        0


                                                                                                                                                 0


                                                                                                                                                          0


                                                                                                                                                                   0
                                                            0


                                                                     0


                                                                               0


                                                                                         0


                                                                                                  0


                                                                                                           0


                                                                                                                    0


                                                                                                                             0


                                                                                                                                      0


                                                                                                                                               0


                                                                                                                                                        0


                                                                                                                                                                 0
                                                         20


                                                                  20


                                                                            20


                                                                                      20


                                                                                               20


                                                                                                        20


                                                                                                                 20


                                                                                                                          20


                                                                                                                                   20


                                                                                                                                            20


                                                                                                                                                     20


                                                                                                                                                              20
                                                         1/


                                                                  2/


                                                                           3/


                                                                                      4/


                                                                                               5/


                                                                                                        6/


                                                                                                                 7/


                                                                                                                          8/


                                                                                                                                   9/


                                                                                                                                            0/


                                                                                                                                                     1/


                                                                                                                                                              2/
                                                       /0


                                                                /0


                                                                         /0


                                                                                    /0


                                                                                             /0


                                                                                                      /0


                                                                                                               /0


                                                                                                                        /0


                                                                                                                                 /0


                                                                                                                                          /1


                                                                                                                                                   /1


                                                                                                                                                            /1
                                                     01


                                                              01


                                                                       01


                                                                                  01


                                                                                           01


                                                                                                    01


                                                                                                             01


                                                                                                                      01


                                                                                                                               01


                                                                                                                                        01


                                                                                                                                                 01


                                                                                                                                                          01
        GEO European Project Workshop ‐ London February 8 ‐ 9                                                                                                          14

CEOP-AEGIS at GEPW5 Session 2

  • 1.
    Session 2 CWater, Disasters, Energy CEOP – AEGIS contribution to GEOSS Data CORE Massimo Menenti Delft University of Technology Jerome Colin Université de Strasbourg GEO European Project Workshop ‐ London February 8 ‐ 9 1
  • 2.
    Practical contributon tothe GEOSS Data-CORE Hydrometeorological data on large transnational river basins: the case of the Qinghai – Tibet Plateau, the major rivers of SE Asia need to bring together data generated by on-going international initiatives: CEOP – AEGIS Third Pole Environment JICA – Tibet PAPRIKA (IT, F) GEO European Project Workshop ‐ London February 8 ‐ 9 2
  • 3.
    GEOSS Data-CORE: global vs. regional data • Terrestrial water cycle • Data need to be integrated by watershed • Information is actionable • real‐time/near real‐time monitoring capabilities via GEOSS  for key variables of interest to the IPCC – and IPCC  stakeholders GEO European Project Workshop ‐ London February 8 ‐ 9 3
  • 4.
    CEOP‐AEGIS contribution to GEOSSS  Water theme • ceop‐aegis.org portal: – General information – IT platform for the consortium – Information system on the hydrology of the  Tibetan Plateau for the community • Schedule: • Until May 2012: no public access to foreground • After May 2012: all project foreground freely  Registered  available to the community in GEOSS GEO European Project Workshop ‐ London February 8 ‐ 9 4
  • 5.
    Qinghai‐Tibet hot‐spot • Hot spot: – Higher spatial and/or temporal frequency than global  products – Larger panel of dedicated products • CEOP‐AEGIS: – Area covered 4,292,130 km2 – 1x1 km grids for EO products – 5x5 km grids for Hydrological Model outputs – 30x30 km grids for Atmospheric Model outputs – In‐Situ data network – Daily to weekly, since 2008 GEO European Project Workshop ‐ London February 8 ‐ 9 5
  • 6.
    Water Balance Modeldomain GEO European Project Workshop ‐ London February 8 ‐ 9 6
  • 7.
    CEOP-AEGIS Database • Principles Project partners – all project products in  one single entry point – web‐based user‐friendly  GIS Service interface – registered as a  Data Server (openDAP) contribution to GEOSS CEOP‐AEGIS Web Portal – open access to the  scientific community GEOSS  Portal Scientific community GEO European Project Workshop ‐ London February 8 ‐ 9 7
  • 8.
    CEOP‐AEGIS contribution to GEOSSS  Water theme: product types • Documents: – Periodic reports, Algorithm Theoretical Basis  Documents, • Datasets: – Ground measurements, final EO products,  Hydrological Model outputs • Services & software: – Drought and flood early warning tools – Water & Energy Budget Models – Training material for stakeholders GEO European Project Workshop ‐ London February 8 ‐ 9 8
  • 9.
    Product types: documents, datasets,  services & softwares D0.1.1 Science Progress Report 2009 D4.3 Estimation of soil moisture from Geostationary Satellite (GS) data D0.1.2 Science Progress Report 2010 D4.4 A data product of the plateau using different sensors simultaneously D4.5 Validation results and documentation of uncertainties D0.1.3 Science Progress Report 2011 D5.1 Provide algorithm for QPE, 3D mosaic and hydrometeors classification D0.1.4 Science Progress Report 2012 D5.2 Provide rainfall estimation algorithms from satellites (MW, VIS-IR) data D0.2.1 Technical Reports by Working Groups 2009 D5.3 Provide 3-years 3-D gridded radar data for case studies D0.2.2 Technical Reports by Working Groups 2010 Provide high space and temporal resolution precipitation data retrieved from radar, D0.2.3 Technical Reports by Working Groups 2011 D5.4 satellite (both VIS-IR and MW) and ground rain gauge data for case studies D6.1 Sample data set and Report on retrieval performance based on MODIS and AMSR-E data D0.2.4 Technical Reports by Working Groups 2012 D6.2 Preliminary Algorithm Theoretical Basis Documents for snow/ice properties D0.5.1 Final report Final Algorithm Theoretical Basis Document;+Snow data assimilation system and D1.1 Detailed approach and preliminary data analysis protocol D6.3 documentation Analysis protocol report and sample data sets on seasonal and inter- Validated data set (include snow cover area, SWE, glacier area and storage from satellite annual time scale of the exchange of surface heat flux, momentum flux, D6.4 data, and assimilation data sets) from 2008 to 2010 water vapour flux, surface and soil moisture over the different land Final report for water resources contributed by the snow and glacier melt on Qinghai- D1.2 D6.5 Tibet Plateau surfaces of the Tibetan Plateau Report and data set on results of numerical experiments to document the response to Report on footprint analysis and structure characteristics of the Surface D7.1 observed evolution of snow and vegetation cover and surface heat fluxes over the Plateau D1.3 Layer (SL) and Atmospheric Boundary Layer D7.2 Report on rainfall forecast performance Final 3 years dataset on aerodynamic and thermodynamic variables D8.1 Design of data processing protocol for E.O. based water balance products D1.4 over the different land surfaces of the Tibetan Plateau D8.2 Time series analysis of water balance data D2.1 Generic algorithms LSV-s Prototype of data collection, integration and processing system to monitor the Plateau D8.3 water balance D2.2 Algorithms land surface temperature PS D8.4 Database management system Algorithms surface albedo, emissivity and temperature geostationary D9.1 Vegetation dynamic maps over a long-term period D2.3 satellite D9.2 Maps of drought vulnerability zones in the study area D2.4 Algorithm Theoretical Basis Documents multi-source remote sensing D9.3 Tools for time series analysis of vegetation response to drought Data set vegetation cover, surface albedo, LAI, aerosol optical depth, D9.4 Tools for drought prediction by analyzing vegetation response precipitable water vapour, soil/foliage component and land surface D9.5 Anomalies maps of rainfall, vegetation response D2.5 emissivity/temperatures for a 3 years period. D9.6 Tool for evaluating drought impact on agriculture and forestry System applicable for drought monitoring and early warning in the pilot areas in China Review of selected existing algorithms and models on local, regional D9.7 and India D3.1 and Plateau scales data sets Algorithm Theoretical Basis Document for surface wetness indicator retrieved from Generalize SEB calculation at a high spatial resolution and on a regional D10.1 passive and active microwave satellite data D3.2 extent Real time flood forecast models based on stochastic time series, ANN and Fuzzy logic for D3.3 Time-series Maps Processing and Validation Procedure Document D10.2 the study area Validated complete time-series maps of fluxes over 3 years, with a Flood inundation, flood hazard and flood risk zone maps based on the hydraulic modelling D3.4 target frequency of one week D10.3 and analysis of satellite data Real time forecasting of flood inundation, depth, areal extent and return period of Collection of consistent continuous in-situ soil moisture measurements D10.4 flooding D4.1 at regional scale D10.5 Case studies on flood events in the period 1999-2010 Development of a satellite sensor independent system for the soil D4.2 moisture combined retrieval algorithms GEO European Project Workshop ‐ London February 8 ‐ 9 9
  • 10.
    Open and Standard Design • Advanced data and meta‐data models – netCDF3, netCDF4/HDF5 • Meta‐data follow international standards – CF 1.4 meta‐data semantics – XML and NCML online documentation • Open Source technologies for data exchanges – OPeNDAP protocol – Open source, java based, friendly user interface GEO European Project Workshop ‐ London February 8 ‐ 9 10
  • 11.
  • 12.
  • 13.
  • 14.
    Large fluctuations ofregional and local water cycles 30000 Indus Brahmaputra 25000 Salween Mekong 20000 Yangtze Yellow m3 / s 15000 10000 5000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 20 20 20 20 20 20 20 20 20 20 20 1/ 2/ 3/ 4/ 5/ 6/ 7/ 8/ 9/ 0/ 1/ 2/ /0 /0 /0 /0 /0 /0 /0 /0 /0 /1 /1 /1 01 01 01 01 01 01 01 01 01 01 01 01 GEO European Project Workshop ‐ London February 8 ‐ 9 14