Datesand Durationof the Project:
November2012 – August2013
It took me exactly10 monthsto complete the Project atall three sitesIwasworkingon.
Location:
Lahore
Name of Organization:
Interactive Group
Title:
Regional Supervisor/TeamLead
B) BACKGROUND:
Nature of overall EngineeringProject:
Design,implementationandDeploymentof alarge scale distributedhealthinformation
managementsystemtobe deployedat44 locationsacrossthe country.
Objective of the Project:
Linkingall the 44 hospitals
Nature of your particularworkArea:
Installation ConfigurationandTroubleshootingof NetworkingEquipment, Deployment,
Monitoring,O& M, DocumentationandInventoryManagement.
Chart:
Solution Architect
Khurram Bhugwi
Project Manager
Irfan Ur Rehman
Regional Supervisor
Muhammad Iqbal (Head Engineer)
Resident Engineers (12 Engineers)
My Duties:
11 Engineerswere workingundermysupervision 3 at one site and4 at remainingtwo sites,
otherthan technical worksmydutyalsoincludedthere management, Otherthanmybase site I
had to visitthe 2 remainingsiteseveryweektocheckthere workand theirattendance andto
guide themaboutthe future assignmentsandtasks.Ienjoyedworkingwithall the teamaswe
all were youngandenergetic.
C) PERSONAL WORKSPACE ACTIVITY:
Deployment:
Visitsitesasa supervisor,Energizingthe cabinetsincludingconnectionof fiberopticwithODF(FC) and
the otherportionto the Switch(LC) ,while energizingImade sure thatits groundedandeverynode was
connectedbyhavingone personatnode pointsandme on the Cabinet.Deployednew
hardware/equipment/application,andfirewalls,cablingbetweenswitches,firewallsandservers,
configure switchesandfirewallsonremote sites,Configure hardwareandNetworks.
Monitoring:
Monitorinstalledequipment/application ,All the three alternativesthatthe clienthasestablished i.e..
Fiber,MetroEthernetandWimax.Resolve networklayer2and 3 issues.
Issue andIts Solution:
“In thisphase I wentthroughsome issuesandresolvedthemaccordingly the firstof themwasa
networkdisconnected betweendifferentdepartmentsfromthe mainDataCentre of the client’s
network.Itwasconnectedthrough JuniperRouterwithIP VPN.Istartedtroubleshootingbychecking
the network flow diagram. The Operational State wasdowneventhoughthe WAN portwasup.The
Sub-nettingwasrightbutthe pingwasunsuccessful.The service provideralsohadnoclue.
There wasno directconnection of the far-end(Remote router)butaconnectionwasneededinanycase
so wentforthe work around.
The area of jobwas verysensitive andurgentsolutionwasrequired.Butthere wasnodirectconnection.
I decidedtogo forthe work aroundas I neededtoestablishconnectionsomehowinordertominimize
the downtime. I askedfora remote connectionto a computerviainternet inNOC(SP) sothat I can have
the connectivity.Iusedthe TeamViewersoftware andestablishedthe connectionthe remote NOCto
telnetthe remote routerfromthere. There wasanerror in sub-nettingandawrongIP addresswasused
at the remote endWAN port.Throughsub-nettingtechniquesthe IPaddresswascorrectedbyme.And
at last the issue gotresolved “
Operation&Maintenance:
Solve problemsonWindowsplatforms,monitor&identifyproblemsinnetwork.Troubleshoot
switch/router/server,Troubleshootissues when,maintainlogsof switchesandrouters,manage
and monitorExchange server2003 onHP SAN clusterenvironment,Active Directoryserver2003
to keepthe operationsrunning.
Documentation:
Keeprecordof all equipment’sof site,Maintainlogof issues daily,Maintainlogof complaints
registeredonservice desk,Keeprecordinventoryissuedtousers,Collectdocumentsassite in
charge andkeeprecordof all activities.
Service DeskSupport:
Provide oncall support,Forwardissuestoconcerndepartments,Visitsitestomaintainand
upgrade layer2 and 3 network,Close ticketsafterverification,Install andconfigure hardwareon
requestsoto ensure maximumsupporttoclients.
ServerAdministration:
Monitor,Configure andtune performance of servers,Resolve issuesif found,Update Operating
Systemspatches,Upgrade software's,Analyze logsforperformance tuning,Generate andshare
systemhealthreportsassite in-charge inordertoensure properworkingof servers.
InventoryManagement:
Monitorcomplete inventoryof Networkhardware,cablingandpowerdiagrams,Trace and
record powersupplymechanismof site equipment's,Update above mentioninventorieswhen
requiredtokeepupto date inventorydetails.
Technology:
JUNIPER, Fiberhome, EMC2, SUN SOLARIS,WINDOWS,MPLS,VPLS,LAYER 2 and 3.
D) SUMMARY:
The Projectwas successfullycompletedin10monthsand one of my site wasthe firstto Produce
100% resultwithinweeksandwasacknowledgedbythe Companyaswell.
ClientwasExtremelySatisfiedwithmyworkandalsogave letterto myCompanymentioning
state of the art work done bythe Supervisorandhisteam.

More Related Content

Viewers also liked

Graduation Project Report
Graduation Project Report Graduation Project Report
Graduation Project Report Ranvijay Singh
 
INTRODUCCIÓN A LA TRIBUTACIÓN
INTRODUCCIÓN A LA TRIBUTACIÓNINTRODUCCIÓN A LA TRIBUTACIÓN
INTRODUCCIÓN A LA TRIBUTACIÓN
Erika Ricaurte Pacheco
 
Mini Cruiser Concept Design - TET 120
Mini Cruiser Concept Design - TET 120Mini Cruiser Concept Design - TET 120
Mini Cruiser Concept Design - TET 120Gian Paolo Nari
 
Nari yacht design
Nari yacht designNari yacht design
Nari yacht design
Gian Paolo Nari
 
Буклет "НЕГОРИН" (NEGORIN`S Booklet) Rev.2014
Буклет "НЕГОРИН" (NEGORIN`S Booklet) Rev.2014Буклет "НЕГОРИН" (NEGORIN`S Booklet) Rev.2014
Буклет "НЕГОРИН" (NEGORIN`S Booklet) Rev.2014
negorin_tm
 
53mt Yacht "Proteus" refit proposal (Project NR403)
53mt Yacht "Proteus" refit proposal (Project NR403)53mt Yacht "Proteus" refit proposal (Project NR403)
53mt Yacht "Proteus" refit proposal (Project NR403)
Gian Paolo Nari
 
Open House Powerpoint 2013
Open House Powerpoint 2013Open House Powerpoint 2013
Open House Powerpoint 2013krollings
 
Буклет "АнКар" (AnKar`s Booklet)
Буклет "АнКар" (AnKar`s Booklet)Буклет "АнКар" (AnKar`s Booklet)
Буклет "АнКар" (AnKar`s Booklet)
negorin_tm
 
Disney II First Grade Open House Slideshow 2014
Disney II First Grade Open House Slideshow 2014Disney II First Grade Open House Slideshow 2014
Disney II First Grade Open House Slideshow 2014
krollings
 
Nari activities
Nari activitiesNari activities
Nari activities
Gian Paolo Nari
 
18m Trawler Yacht (Project NP601)
18m Trawler Yacht (Project NP601)18m Trawler Yacht (Project NP601)
18m Trawler Yacht (Project NP601)
Gian Paolo Nari
 
First Grade Open House 2015
First Grade Open House 2015First Grade Open House 2015
First Grade Open House 2015
krollings
 
Brochure nm512 open73
Brochure nm512 open73Brochure nm512 open73
Brochure nm512 open73
Gian Paolo Nari
 
Cv mona klüver roed nielsen
Cv   mona klüver roed nielsenCv   mona klüver roed nielsen
Cv mona klüver roed nielsenMona Klüver Roed
 
WC_Complete_Guide_To_Email_Marketing_2014
WC_Complete_Guide_To_Email_Marketing_2014WC_Complete_Guide_To_Email_Marketing_2014
WC_Complete_Guide_To_Email_Marketing_2014Tim Muenchen
 

Viewers also liked (19)

Graduation Project Report
Graduation Project Report Graduation Project Report
Graduation Project Report
 
INTRODUCCIÓN A LA TRIBUTACIÓN
INTRODUCCIÓN A LA TRIBUTACIÓNINTRODUCCIÓN A LA TRIBUTACIÓN
INTRODUCCIÓN A LA TRIBUTACIÓN
 
Mini Cruiser Concept Design - TET 120
Mini Cruiser Concept Design - TET 120Mini Cruiser Concept Design - TET 120
Mini Cruiser Concept Design - TET 120
 
Nari yacht design
Nari yacht designNari yacht design
Nari yacht design
 
Буклет "НЕГОРИН" (NEGORIN`S Booklet) Rev.2014
Буклет "НЕГОРИН" (NEGORIN`S Booklet) Rev.2014Буклет "НЕГОРИН" (NEGORIN`S Booklet) Rev.2014
Буклет "НЕГОРИН" (NEGORIN`S Booklet) Rev.2014
 
53mt Yacht "Proteus" refit proposal (Project NR403)
53mt Yacht "Proteus" refit proposal (Project NR403)53mt Yacht "Proteus" refit proposal (Project NR403)
53mt Yacht "Proteus" refit proposal (Project NR403)
 
Open House Powerpoint 2013
Open House Powerpoint 2013Open House Powerpoint 2013
Open House Powerpoint 2013
 
Буклет "АнКар" (AnKar`s Booklet)
Буклет "АнКар" (AnKar`s Booklet)Буклет "АнКар" (AnKar`s Booklet)
Буклет "АнКар" (AnKar`s Booklet)
 
Disney II First Grade Open House Slideshow 2014
Disney II First Grade Open House Slideshow 2014Disney II First Grade Open House Slideshow 2014
Disney II First Grade Open House Slideshow 2014
 
มะขาม
มะขามมะขาม
มะขาม
 
Nari activities
Nari activitiesNari activities
Nari activities
 
18m Trawler Yacht (Project NP601)
18m Trawler Yacht (Project NP601)18m Trawler Yacht (Project NP601)
18m Trawler Yacht (Project NP601)
 
First Grade Open House 2015
First Grade Open House 2015First Grade Open House 2015
First Grade Open House 2015
 
Brochure nm512 open73
Brochure nm512 open73Brochure nm512 open73
Brochure nm512 open73
 
Cv mona klüver roed nielsen
Cv   mona klüver roed nielsenCv   mona klüver roed nielsen
Cv mona klüver roed nielsen
 
Highorderfunctions
HighorderfunctionsHighorderfunctions
Highorderfunctions
 
Pattern matching and case classes
Pattern matching and case classesPattern matching and case classes
Pattern matching and case classes
 
Apresentação play framework
Apresentação play frameworkApresentação play framework
Apresentação play framework
 
WC_Complete_Guide_To_Email_Marketing_2014
WC_Complete_Guide_To_Email_Marketing_2014WC_Complete_Guide_To_Email_Marketing_2014
WC_Complete_Guide_To_Email_Marketing_2014
 

Similar to CDR-COMMENTS IAC

Mounir_Sardouk_Final_Report_touch
Mounir_Sardouk_Final_Report_touchMounir_Sardouk_Final_Report_touch
Mounir_Sardouk_Final_Report_touchMounir Sardouk
 
NETWORKING SYSTEMS .docx
NETWORKING SYSTEMS                                                .docxNETWORKING SYSTEMS                                                .docx
NETWORKING SYSTEMS .docx
dohertyjoetta
 
interoperatbility between IPv4 and IPv6
interoperatbility between IPv4 and IPv6interoperatbility between IPv4 and IPv6
interoperatbility between IPv4 and IPv6Nitin Gehlot
 
Automated Site Verification | Solution Brief | Infovista
Automated Site Verification | Solution Brief | InfovistaAutomated Site Verification | Solution Brief | Infovista
Automated Site Verification | Solution Brief | Infovista
Infovista
 
OpenFlow Aware Network Processor
OpenFlow Aware Network ProcessorOpenFlow Aware Network Processor
OpenFlow Aware Network Processor
Mahesh Dananjaya
 
What I learned at Energizer
What I learned at EnergizerWhat I learned at Energizer
What I learned at EnergizerDavid Epperson
 
24 Months - A DevOps Retrospective
24 Months - A DevOps Retrospective24 Months - A DevOps Retrospective
24 Months - A DevOps Retrospective
Sam McLeod
 
Report for-smart-trash-project
Report for-smart-trash-project Report for-smart-trash-project
Report for-smart-trash-project
Aimen Hajri
 
Networking ppt hcl
Networking ppt hclNetworking ppt hcl
Networking ppt hcl
Vishal Kumar
 
Jonas_Lesy_Ruben_Vervaeke_Thesis_Applying_Internet_Of_Things
Jonas_Lesy_Ruben_Vervaeke_Thesis_Applying_Internet_Of_ThingsJonas_Lesy_Ruben_Vervaeke_Thesis_Applying_Internet_Of_Things
Jonas_Lesy_Ruben_Vervaeke_Thesis_Applying_Internet_Of_ThingsJonas Lesy
 
gaurav_shitole_profile
gaurav_shitole_profilegaurav_shitole_profile
gaurav_shitole_profileGaurav Shitole
 
Lan network with Redundancy
Lan network with RedundancyLan network with Redundancy
Lan network with Redundancy
Santanu Mukhopadhyay
 
Haven Teen Center Project
Haven Teen Center ProjectHaven Teen Center Project
Haven Teen Center ProjectElizabeth Evans
 

Similar to CDR-COMMENTS IAC (20)

Mounir_Sardouk_Final_Report_touch
Mounir_Sardouk_Final_Report_touchMounir_Sardouk_Final_Report_touch
Mounir_Sardouk_Final_Report_touch
 
PROJECT SEMESTER REVIEW
PROJECT SEMESTER REVIEWPROJECT SEMESTER REVIEW
PROJECT SEMESTER REVIEW
 
NETWORKING SYSTEMS .docx
NETWORKING SYSTEMS                                                .docxNETWORKING SYSTEMS                                                .docx
NETWORKING SYSTEMS .docx
 
interoperatbility between IPv4 and IPv6
interoperatbility between IPv4 and IPv6interoperatbility between IPv4 and IPv6
interoperatbility between IPv4 and IPv6
 
Automated Site Verification | Solution Brief | Infovista
Automated Site Verification | Solution Brief | InfovistaAutomated Site Verification | Solution Brief | Infovista
Automated Site Verification | Solution Brief | Infovista
 
kunal vedpathak
kunal vedpathakkunal vedpathak
kunal vedpathak
 
nitesh_rajpurkar_2016
nitesh_rajpurkar_2016nitesh_rajpurkar_2016
nitesh_rajpurkar_2016
 
OpenFlow Aware Network Processor
OpenFlow Aware Network ProcessorOpenFlow Aware Network Processor
OpenFlow Aware Network Processor
 
What I learned at Energizer
What I learned at EnergizerWhat I learned at Energizer
What I learned at Energizer
 
24 Months - A DevOps Retrospective
24 Months - A DevOps Retrospective24 Months - A DevOps Retrospective
24 Months - A DevOps Retrospective
 
Report for-smart-trash-project
Report for-smart-trash-project Report for-smart-trash-project
Report for-smart-trash-project
 
Networking ppt hcl
Networking ppt hclNetworking ppt hcl
Networking ppt hcl
 
Jonas_Lesy_Ruben_Vervaeke_Thesis_Applying_Internet_Of_Things
Jonas_Lesy_Ruben_Vervaeke_Thesis_Applying_Internet_Of_ThingsJonas_Lesy_Ruben_Vervaeke_Thesis_Applying_Internet_Of_Things
Jonas_Lesy_Ruben_Vervaeke_Thesis_Applying_Internet_Of_Things
 
Nareshkumar_CV
Nareshkumar_CVNareshkumar_CV
Nareshkumar_CV
 
gaurav_shitole_profile
gaurav_shitole_profilegaurav_shitole_profile
gaurav_shitole_profile
 
Robbie Greig CV
Robbie Greig CVRobbie Greig CV
Robbie Greig CV
 
Prashant CV 2.5+ yr Exp
Prashant CV 2.5+ yr ExpPrashant CV 2.5+ yr Exp
Prashant CV 2.5+ yr Exp
 
ravi_resume
ravi_resumeravi_resume
ravi_resume
 
Lan network with Redundancy
Lan network with RedundancyLan network with Redundancy
Lan network with Redundancy
 
Haven Teen Center Project
Haven Teen Center ProjectHaven Teen Center Project
Haven Teen Center Project
 

CDR-COMMENTS IAC

  • 1. “LARGESCALEDISTRIBUTED HEALTH INFORMATIONMANAGEMENTSYSTEM” A) INTRODUCTION: Datesand Durationof the Project: November2012 – August2013 It took me exactly10 monthsto complete the Project atall three sitesIwasworkingon. Location: Lahore Name of Organization: Interactive Group Title: Regional Supervisor/TeamLead B) BACKGROUND: Nature of overall EngineeringProject: Design,implementationandDeploymentof alarge scale distributedhealthinformation managementsystemtobe deployedat44 locationsacrossthe country. Objective of the Project: Linkingall the 44 hospitals Nature of your particularworkArea: Installation ConfigurationandTroubleshootingof NetworkingEquipment, Deployment, Monitoring,O& M, DocumentationandInventoryManagement. Chart: Solution Architect Khurram Bhugwi Project Manager Irfan Ur Rehman Regional Supervisor Muhammad Iqbal (Head Engineer) Resident Engineers (12 Engineers)
  • 2. My Duties: 11 Engineerswere workingundermysupervision 3 at one site and4 at remainingtwo sites, otherthan technical worksmydutyalsoincludedthere management, Otherthanmybase site I had to visitthe 2 remainingsiteseveryweektocheckthere workand theirattendance andto guide themaboutthe future assignmentsandtasks.Ienjoyedworkingwithall the teamaswe all were youngandenergetic. C) PERSONAL WORKSPACE ACTIVITY: Deployment: Visitsitesasa supervisor,Energizingthe cabinetsincludingconnectionof fiberopticwithODF(FC) and the otherportionto the Switch(LC) ,while energizingImade sure thatits groundedandeverynode was connectedbyhavingone personatnode pointsandme on the Cabinet.Deployednew hardware/equipment/application,andfirewalls,cablingbetweenswitches,firewallsandservers, configure switchesandfirewallsonremote sites,Configure hardwareandNetworks. Monitoring: Monitorinstalledequipment/application ,All the three alternativesthatthe clienthasestablished i.e.. Fiber,MetroEthernetandWimax.Resolve networklayer2and 3 issues. Issue andIts Solution: “In thisphase I wentthroughsome issuesandresolvedthemaccordingly the firstof themwasa networkdisconnected betweendifferentdepartmentsfromthe mainDataCentre of the client’s network.Itwasconnectedthrough JuniperRouterwithIP VPN.Istartedtroubleshootingbychecking the network flow diagram. The Operational State wasdowneventhoughthe WAN portwasup.The Sub-nettingwasrightbutthe pingwasunsuccessful.The service provideralsohadnoclue. There wasno directconnection of the far-end(Remote router)butaconnectionwasneededinanycase so wentforthe work around. The area of jobwas verysensitive andurgentsolutionwasrequired.Butthere wasnodirectconnection. I decidedtogo forthe work aroundas I neededtoestablishconnectionsomehowinordertominimize the downtime. I askedfora remote connectionto a computerviainternet inNOC(SP) sothat I can have the connectivity.Iusedthe TeamViewersoftware andestablishedthe connectionthe remote NOCto telnetthe remote routerfromthere. There wasanerror in sub-nettingandawrongIP addresswasused at the remote endWAN port.Throughsub-nettingtechniquesthe IPaddresswascorrectedbyme.And at last the issue gotresolved “ Operation&Maintenance: Solve problemsonWindowsplatforms,monitor&identifyproblemsinnetwork.Troubleshoot
  • 3. switch/router/server,Troubleshootissues when,maintainlogsof switchesandrouters,manage and monitorExchange server2003 onHP SAN clusterenvironment,Active Directoryserver2003 to keepthe operationsrunning. Documentation: Keeprecordof all equipment’sof site,Maintainlogof issues daily,Maintainlogof complaints registeredonservice desk,Keeprecordinventoryissuedtousers,Collectdocumentsassite in charge andkeeprecordof all activities. Service DeskSupport: Provide oncall support,Forwardissuestoconcerndepartments,Visitsitestomaintainand upgrade layer2 and 3 network,Close ticketsafterverification,Install andconfigure hardwareon requestsoto ensure maximumsupporttoclients. ServerAdministration: Monitor,Configure andtune performance of servers,Resolve issuesif found,Update Operating Systemspatches,Upgrade software's,Analyze logsforperformance tuning,Generate andshare systemhealthreportsassite in-charge inordertoensure properworkingof servers. InventoryManagement: Monitorcomplete inventoryof Networkhardware,cablingandpowerdiagrams,Trace and record powersupplymechanismof site equipment's,Update above mentioninventorieswhen requiredtokeepupto date inventorydetails. Technology: JUNIPER, Fiberhome, EMC2, SUN SOLARIS,WINDOWS,MPLS,VPLS,LAYER 2 and 3. D) SUMMARY: The Projectwas successfullycompletedin10monthsand one of my site wasthe firstto Produce 100% resultwithinweeksandwasacknowledgedbythe Companyaswell. ClientwasExtremelySatisfiedwithmyworkandalsogave letterto myCompanymentioning state of the art work done bythe Supervisorandhisteam.