Career planning and
job seeking workbook
Career planning and
job seeking workbook
Careers and Employability Services
Connect to us online:
https://www.facebook.com/OpenUniCareers
https://twitter.com/OpenUniCareers
https://www.linkedin.com/groups/3871260
Acknowledgements and thanks
Thanks to Jennifer Nisbet who wrote the publications, Career and life planning workbook and
Job search guide, on which this workbook is based.
Our thanks go also to Christine Adams, Anna Alston, Mary Guthrie, Anne Milne, Clare Riding,
Ian Tawse and Jo Ward for their additional material and work on the book, and to other colleagues
for comments, editorial suggestions and other production help.
Credits for images
Cover image: Matrix/The Open University. Page 7: Matrix/The Open University.
Page 8: Stocksy/The Open University. Page 10: Claudia Dewald/iStockphoto.com.
Page 13: Matrix/The Open University. Page 19: Chris Schmidt/iStockphoto.com.
Page 21: Matrix/The Open University; Pressmaster/www.bigstock.com.
Page 26: Peter Dazeley/The Open University; Matrix/The Open University. Kreci/iStockphoto.com.
Page 29: Matrix/The Open University.
Page 39: Richard Learoyd/The Open University. Nyul/iStockphoto.com.
Page 40: Imageshop/Alamy. Page 56: North/The Open University.
Page 66: Stocksy/The Open University. Page 80: North/The Open University.
Page 112: Kelly Cooper/The Open University. Page 134: Kelly Cooper/The Open University.
While every effort has been made to ensure that the information in this book is up to date
at the time of going to press, it may change during the life of this publication.
All rights reserved. No part of this work may be reproduced, stored in a retrieval system or
transmitted, in any form or by any means, without permission in writing from the publisher.
Produced by Student Services
Copyright © 2016 The Open University
Edited, designed and typeset by The Open University
Printed in the United Kingdom by Cambrian Printers, Aberystwyth
WEB 047607
The Open University Student Services
The Open University is incorporated by Royal Charter (number RC 000391), an exempt charity
in England & Wales and a charity registered in Scotland (number SC 038302).
Contents
This workbook consists of six sections that take you in a progressive series of
steps through the process of career review and choice, and applying for jobs.
Introduction	 6
How to use this workbook	 9
	01 	Knowing yourself	 11
	 1.1	 What am I like?	 12
	 1.2	 What work would suit me?	 17
Information and activities which help you build up
a file of your skills and experience, interests and
achievements, weaknesses and strengths. This will
help you to discover career opportunities that are
likely to match your strengths and circumstances.
	02 	Exploring possibilities	 41
	 2.1	 Planning your strategy	 41
	 2.2	 Graduate-level jobs	 42
	 2.3	 Creative job search	 45
	 2.4 	Finding vacancies	 46
	 2.5	 Building a network of contacts	 50
This section suggests how and where you might find
information to help in the process.
	03 	Making decisions and	 57
				 taking action
	 3.1	 Making decisions about your life	 57
	 3.2	 Goals, restrictions and resources	 58
	 3.3	 Plan of action	 62
How to move forward – this section gives you an
opportunity to look at your ‘framework of choice’,
consider the restrictions and resources in your life,
and create a ‘plan of action’ for managing change
and making things happen.
	04 	Getting the job	 67
	 4.1	 What do employers look for
			 in graduates?	 67
	 4.2	 Matching vacancies	 69
	 4.3	 Application forms	 73
	 4.4	 The curriculum vitae (CV)	 76
	 4.5	 The covering letter	 94
	 4.6	 The interview	 99
	 4.7	 Other selection techniques	 106
	 4.8 	What to do if you are not successful	 110
This will guide you through some important areas.
It discusses what employers look for and how to
tell exactly what skills vacancy adverts are seeking.
This section also shows you how to produce high-
quality application forms, CVs and covering letters,
and discusses how to perform to the best of your
ability in interviews and other selection procedures.
	05 	Equality and Diversity Issues	 113
	 5.1	Age	 115
	 5.2	 Criminal record	 116
	 5.3	 Disability or additional requirements	 122
	 5.4	Gender	 127
	 5.5	Race	 129
	 5.6	 Religion or belief	 131
	 5.7	 Sexuality and sexual orientation	 132
Explores a range of issues related to equality
of opportunity.
	06 	The next steps	 135
	 6.1	 Open University Careers and
			 Employability Services	 135
	 6.2	 Other sources of help	 137
Further sources of help – useful organisations,
websites and resources.
6 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Introduction
This workbook consists of six sections that take you in a progressive
series of steps through the process of a personal and career review,
career planning and job seeking.
Our advice if you’re job seeking in
uncertain times
Job seeking at the best of times can be challenging,
but in a time of economic uncertainty it can be that
bit harder. There are things that you can do to help
overcome any difficulties:
1. Stay positive
It can be very difficult to stay positive if you are
getting lots of rejections and/or finding very little for
which you can apply, but you do need to try. The first
thing to remember is not to blame yourself. Assuming
your applications are getting you interviews, and
the interview feedback is positive, then you are
performing well and it is the circumstances that are
against you. There is also an element of luck, and if
you persevere you will be successful. If you are not
getting interviews, or you are concerned about your
interview performance, see the sections on application
forms (Section 4.3), the interview (Section 4.6) and
what to do if you are not successful (Section 4.8).
You need to stay positive for your own mental
wellbeing, and also because it is likely that any
negativity will come through in your application or
at your interview. Even though employers probably
know rationally that any applicant is applying for a
range of jobs, they still like to believe that what they
are offering is special to any applicant, so you need
to be enthusiastic.
Most employers have a very positive attitude to Open
University students and graduates, recognising
the commitment and motivation that independent
study requires, the high standards set by The Open
University, and the time management and deadline
meeting required to achieve your qualification.
2. Network (see also Section 2.5)
This is the time to use any contacts you have. Make
sure family and friends (and families of friends) know
that you are looking for work, and have some idea of
what you want. Stay in touch with any ex-colleagues
who may hear of opportunities arising.
You will find advice on networking on our careers
website at www.open.ac.uk/careers.
Set up a profile on professional networking sites such
as LinkedIn (www.linkedin.com). You may also want
to try other social media websites. See the advice on
‘Job hunting and social media’ on Prospects website
at www.prospects.ac.uk/careers-advice/getting-a-
job/job-hunting-and-social-media. This includes top
tips for using Facebook, Twitter and LinkedIn.
Don’t forget your fellow students. Some that you may
be in contact with through forums or tutorials may be
able to help.
3. Be open to flexible working
You may not be able to get exactly what you want
immediately, but could you consider starting off part-
time? Maybe you could apply for more than one part-
time role and then hope for more hours? If you want
to work in a particular industry, it may be worth trying
to get in a different, possibly more junior role than the
one you ultimately want. This could help you build up
a network of contacts as well as prove your worth.
4. Do your research
Yes, you need to research careers and jobs,
especially if you are changing direction – but you
also need to investigate the local labour market
where you hope to work. Your local council may have
a business section or a register of developments. As
well as displaying local job adverts a local paper can
have articles about businesses that are expanding
or moving into the area. It helps both to know what
is available and have an idea of what organisations
may be developing.
5. Keep trying
It is all too easy to get disheartened, but you must
keep trying. As an Open University student you
have already proved that you can do this
– there must have been times
when you were tired or over
stretched, but you still
got the work done in
time, so you can do it.
Perseverance
works!
7Introduction
To find out more, visit our website at www.open.ac.uk/careers
Our advice if you’re changing careers or
are facing redundancy
If your reason for using this workbook is either due
to your intention to change careers or as the result
of redundancy see the additional advice below.
Once you have done some research and explored
the resources in this workbook you may also want to
contact a Careers Adviser.
1. Career change
Many people who study with The Open University
wish to use their qualification as a way of changing
career. This may be because they feel that they have
skills to offer in a different area or their interests have
developed in a new direction.
Some students may be looking for a new challenge
and see OU study as a way of achieving this. In
terms of your career planning it is important that
you choose the right qualifications to give you
the best chance of achieving your goal. You can
research qualifications required for specific careers
via the job profiles on Prospects website at
www.prospects.ac.uk/job-profiles.
Remember that if you are making a radical career
change, you may have to accept a lower position or
grade at first and then work your way up to where
you want to be. Accepting a part-time position
initially is also a useful strategy as you can gain
confidence in your new work area one step at a time.
2. Redundancy
The prospect of being made redundant can be
terrifying, but there are things you can do to help
prepare yourself to deal with it.
First of all, make sure you know your rights. Check
your contract of employment for any details there.
Are you a member of a trades union? If so, consult
them. You need to know the length of notice that you
are entitled to and – provided you have worked for
the employer for more than two years – what pay you
are entitled to.
Employers should try to find you alternative work
within the organisation, and should consult you
about the redundancy process, which should be
clear, objective and fair. This means that it should be
based on evidence, as opposed to your employer
just deciding who they want to make redundant.
Normally your job must have disappeared for you to
be made redundant.
For more information about your employment rights,
what pay you may be entitled to and sources of
help, visit the Gov.uk website (www.gov.uk/browse/
working) and see the section ‘Redundancies,
dismissals and disciplinaries.’
Once you know your rights, the next step is probably
to give some thought to the future. While redundancy
isn’t usually welcome, it is not necessarily a negative
situation to be in. Many people have used it as an
opportunity to change their lives and careers.
What is important, though, is how you react to the
situation. As an Open University student you may
already be in the process of career change, and
redundancy may be an opportunity to study faster
and achieve your goals more quickly.
If you have received a large lump sum, it may be
wise to get some financial advice about how best to
use it to tide you over until you get a new job.
This may take longer in the current economic climate,
so it’s probably wise to invest in some objective
financial planning. If there is a chance you may want
to start your own business you may need the money
as capital.
Although redundancy often comes as a shock, and
an unwelcome one, try to see it as an opportunity to
review your current position. Think about your skills
and abilities, and about any career goals that have
got lost along the way. This may be the time to revive
those goals.
Anecdotally, many people look back on redundancy
favourably, and as the prompt they needed to change
direction and/or improve their work/life balance.
To find out more, visit our website at www.open.ac.uk/careers
9How to use this workbook
To find out more, visit our website at www.open.ac.uk/careers
How to use this workbook
Use this workbook to help you to:
•	 Take stock
•	 Review your career and life
•	 Evaluate your aptitudes, skills, interests,
values and personal needs
•	 Decide what you want to achieve
•	 Begin to plan how you might achieve it.
The workbook outlines the practical steps needed
for looking for a job, planning a strategy, completing
application forms, designing a curriculum vitae (CV)
and presenting yourself at interviews.
This is a reference source that can stand on its own,
but it also complements information on our careers
website: www.open.ac.uk/careers
We recommend working through the workbook
sections in order, but you might want to dip into
different areas at different stages of your career
planning and job seeking.
This book focuses on you because although
organisations, agencies, people and materials are
all useful resources, they can’t make things happen
for you.
It is you who will be in the work situation, so the
clearer you are about your own characteristics,
the more precisely you can specify what you want
and communicate it to employers. This book invites
you to recognise your own qualities and abilities,
and to define what you’re really looking for.
Remember, the most important influence on your
career and life planning is you.
Activities
We encourage you to take time over the activities
suggested in this book, so that you can build a
sound foundation for later steps in reviewing your
career. You may find some of them particularly time
consuming, and you might well need to return to
them as your ideas develop.
Working through the activities should be challenging
but rewarding. The more open-minded, positive and
constructive you are, and the more time and effort
you put into them, the more productive they’ll be.
Keep your activities as you work through them.
They’re likely to be helpful when you reach the stage
of completing application forms, putting your CV
together or preparing for an interview.
Ways of working
Give some thought now to how you might work with
these materials before you begin. Working through
the activities at your own pace gives you scope for
quiet reflection, but you could become distracted
by the mechanics of the process. You might find it
useful to link up with another person or a small group.
Working with others can give you ideas, support and
encouragement; they can act as a sounding board
and suggest different ways of looking at things.
You could take a relatively informal approach,
working with a partner or friend, or set up a more
formal relationship, with a careers adviser or perhaps
through your appraiser at work or your line manager.
Whatever approach you decide on, make sure it’s
one you’re comfortable with. You’ll certainly find it
helpful to get comments and opinions from people
who know you well.
Time
It’s difficult to foresee exactly how much time you’ll
need. Career planning has to be a recurring process
– you can’t do it once and for all, then settle back
secure in the knowledge that you won’t have to do it
again. As we make changes and as circumstances
change around us, the basis of our original plans
inevitably shifts. To begin with, you might prefer to
tackle the process in stages, perhaps when you’re
not in the midst of your studies.
Challenges you may be facing
If you recognise concerns of your own – you may
find more than one – in this list, make a note of the
recommended sections:
•	 I don’t know where to begin.
Look particularly at Section 1.
•	 Will my age be a problem in changing career?
Look at Sections 2, 4 and 5.
•	 How should I update my CV?
Look at Section 4.
•	 I know what I want to do but don’t know how to
achieve it.
Look at Sections 2, 3, 4 and 6.
•	 How should I use the internet in looking for jobs?
Look at Section 2.
•	 I need to find a job in a particular
geographical area.
Look at Section 2.
10 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
11Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
01 Knowing yourself
1.1	 What am I like? 					 12
1.2	 What work would suit me? 			 17
Remember that you may have potential that has yet to be developed. Try to
keep an open mind when considering future possibilities, and reject them
only if, after exploring them, there’s good reason to.
You may find that some seemingly unchangeable things can be changed.
For example, re-evaluating your finances, geographical location or range of
commitments may enable you to free up resources to enable you to learn
new skills or take up more enjoyable, less well-paid work.
This section will help you to develop your self-
awareness, take a clear view of your career and life,
and consider the questions ‘What am I like?’ and
‘What can I do?’ It will help you to review your life and
work experience and the skills and qualities that have
grown out of them. This is the first step in the career-
review process.
The section starts by asking you to look back. Your
past has shaped you through your family background,
your education, training, work and leisure activities.
You’ve gained knowledge and skills from your
experiences, and learnt how you cope with and
respond to, different tasks and challenges. This kind
of self-knowledge is the soundest basis for making
decisions about your future.
The activities in this section ask you to think about
a series of questions as a beginning to your career
review. They offer different ways of considering what
you’re like and what you can do. At intervals you’ll
be asked to ‘pause for thought’ and note down your
responses. The questions are:
•	 Who am I? What were my early influences
and decisions?
•	 What are my main achievements?
•	 What roles do I play in life?
•	 What have I learnt in my spare time?
•	 How big a part of my life is work?
•	 What work experience have I had?
•	 What different roles do I take on at work?
•	 What sort of person am I to work with?
•	 What am I good at, as far as work is concerned?
•	 What do I really want from work?
•	 How well does my present (or last) job meet my
wants and needs?
•	 What kind of work would I like to do?
You may like to try out some of the activities from
this section on paper. You can also access career
planning activities online on our careers website at:
http://www2.open.ac.uk/students/help/career-self-
assessment
Here you will find links to lots of different activities
and resources to assist in career planning and job
seeking. Some of these resources and links are
provided by The Open University and some by
external organisations such as Graduate Prospects:
www.prospects.ac.uk
12 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.1
Secondary
school
Moved
house
Father died
Qualified
(production
engineer)
Marriage
Son
Daughter
Bought flat
(improvement
grant)
Bought house –
garden and
mortgage!
Promotion
problems due
to lack of
experience
Became management
trainee (part-time
study, diploma)
Changes in company
policy (new job,
project engineering)
NOW
Hospital
(appendix
removed)
Moved sideways (into
sales and marketing)
Left school
(apprenticeship)
HIGH POINT
LOW POINT
Company
hit hard time
(redundancy)
1.1	 What am I like?
1.1.1	 Who am I? What were my early influences and decisions?
The two activities in this section will help you to develop an overview of your career so far, and to consider how
your early history contributed to it.
In this activity you’re going
to draw a ‘lifeline’, to help
you reflect on the pattern
of your life. You’ll be asked
to refer back to your lifeline
later on.
This activity can help you to
gather insights that could
influence your future choices,
and to discover aspects
of yourself that you might
want to develop or change.
Note down key events, such
as education, marriage,
children, starting work and
so on. Put them in the form
of a diagram like the one
on the right showing high
and low points at different
times of your life.
The lifeline exercise can
result in a lot of emotions coming to the surface as
you review your experiences. You may find it useful
to talk through any difficult emotions with someone
you trust.
Example
When you’ve drawn a lifeline that records your
experiences, reflect on it as a whole. Think about
the feelings aroused by each experience and
answer these questions, noting any thoughts or
ideas that occur to you:
•	 What does the lifeline say about you and how
you’ve lived your life?
•	 Are there recognisable themes that have run
through your life?
•	 Is the pattern generally up or down? Is it
steady or changeable? What sort of incidents
were associated with the highs and lows?
Are the highs generally associated with your
own choices or actions and the lows with the
unexpected or things outside your control?
Are there some experiences you feel you cope
with easily and others that really throw you?
Would someone who knows you
well have drawn your lifeline
differently? What would that
person have said?
You may find it useful to reflect
on this with a trusted
friend or family member.
Pause for thought
•	 Are there any lessons to be learnt? For
instance, this activity revealed to one person
that all her high points were associated with
praise from others and her low points with
geographical moves. Another noted that all his
positive job changes followed disappointments
in his private life, and he saw that each
disappointment motivated him towards a
change and offered opportunities. For a third,
it helped them recognise the positive influence
and benefit of someone in their life acting as
a consistent and unobtrusive mentor.
13Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.2
This activity brings out some of the early
themes from your lifeline, concentrating on your
childhood and school life. Make notes under
the headings below. The activity may take some
time, and you might want to return to it later to
change or add points. Some of this information
will be useful when you put your CV together or
update your LinkedIn profile (see Section 4).
1	 Family influences
If applicable, write down any occupational
influences on you. For instance, was one of
your parents a mechanic or another a teacher?
2	 What do you remember about your 	
early childhood?
For example, the area and house you lived
in, family lifestyle, activities you participated
in, experiences you had, what your parents
expected of you, your role in the family.
3	Schooling
List the schools you went to, with dates, the
subjects you were good at and enjoyed, how
you got on with other children, how your
teachers saw you, how you saw your teachers,
school sports or other activities you took part in.
4	 Teenage years
What activities were you good at or did you
enjoy? How did your friends see you?
What were you like as a teenager? What
ambitions did you have (career or otherwise)?
5	 Any further education or training
What did you do? How did you choose it?
How did you get on? What prompted you to
begin studying with the OU?
Pause for thought
Now spend some time considering what your
notes say about you – what you’re like, why and
how you arrived at where you are today. You may
see themes appearing, such as strong aspects
of your personality or talents. Maybe you
had various abilities but developed
one rather than another – sporting
ability rather than artistic talent,
perhaps. Looking back, could you
have made different choices?
Make a note of any insights
you’ve gained through
remembering and reflecting.
14 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
1.1.2	 What are my main achievements?
The activity in this section can help you to recognise skills and qualities that you might not always be
conscious of. It can be a particularly useful approach if you haven’t had much formal experience like
paid work – it’s sometimes easy to assume that skills gained outside work somehow don’t count.
Looking back at your lifeline (Activity 1.1), note the achievements you are most proud of and what they
say about you. Set them out in the table below. They could be work-related or to do with relationships,
things you do in your spare time, recent or a long time ago. For example, passing all your exams first time
may say that you’re an excellent student; passing your driving test on the fifth attempt may say a lot about
your staying power and determination.
My achievements
1
2
3
4
5
What they say about me
1
2
3
4
5
Activity 1.3
Pause for thought
Which of the skills or qualities you’ve listed
could be used in a work situation?
What kind of work? The chances are
that you’ve highlighted ‘transferable
skills’ and qualities that would be
welcome in many kinds of
career role.
15Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
1.1.3 What roles do I play in life?
Another way of looking at your skills is to consider the roles you’ve played in your life.
Each role demands different skills. As a student, you need skills of learning, time management,
communication and keeping to schedules. If you enjoy DIY, you’ve developed not only practical skills
but planning and organising skills as well. If you are a parent, you have needed to develop skills of budgeting,
time management, delegating, cooking, and so on. By chairing meetings of a club, you develop skills of
briefing and dealing with people as well as organisational and management skills.
Activity 1.4
Now complete the table below. As a parent you may also be a cook, gardener, household manager.
You may take part in voluntary work (taking on roles such as counsellor, listener or organiser). You may be
an employee (team leader, working group member, project manager). You may find this is a particularly
useful exercise if you have little work experience to draw on, as many skills are learnt outside paid work.
My main roles
1
	
2
	
3
	
4
	
5
	
Pause for thought
Looking at all your roles, are you surprised at the
number of things you do and take for
granted every day? Look at the skills
you’ve listed. Circle the ones that
are particular strengths. How do
you feel about them? Which do
you most enjoy using? How could
you use them in work?
16 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.5
My main weaknesses
1
2
3
4
5
6
My main activities outside work are (or have been)
1
2
3
4
5
Review
Think about what you’ve done so far in this section. What have you learnt about yourself? Bringing some
of your answers together, what would you now say are your main strengths and weaknesses? They can be
skills, abilities, personal characteristics or interests. Remember that strengths can be built on for the future
and weaknesses can be reduced by your efforts to address these; they need not be barriers to the future.
My main strengths	
1
2
3
4
5
6
Pause for thought
What are the possibilities in your interests? Have you
held positions of responsibility in any of them? Can
you see any interests or hobbies that might be
helpful to future work plans? For example, although
you may not have financial responsibilities at work,
you might be treasurer to your local
darts team or do the audit for the
youth club funds.
1.1.4	 What have I learnt in my spare time?
What hobbies do you have or have you had in the past? You may not turn your hobby into a career, but your
spare-time activities could help you to demonstrate skills and qualities. lt’s easy to forget that leisure activities
can give us as many skills and abilities as those gained through work.
17Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.6
1.2	 What work would suit me?
Now that you’ve spent some time considering the skills and qualities you’ve developed
through experience, it’s time to think about work.
1.2.1	 How big a part of my life is work?
Before considering what you want to do, you need to be clear about how important work is to you. This is
something that varies from person to person. You might be highly ambitious, even a workaholic, or you might
avoid positions that regularly eat into your leisure time. You may have found yourself in a post that takes over
and leaves little time for family life, and may prefer something that can give you a better balance between work
and home life. The next activity can help you to think about this. If you don’t have much experience of paid
work, think about your approach to other activities or projects you take part in.
Rate each of the following statements
Use this scale – try to avoid choosing
option 3 unless you feel this is the only
appropriate response:
5 Always true
4 Usually true
3 Neither true nor untrue
2 Usually untrue
1 Always untrue
1	 I always aim high in my work
2	 My ambition isn’t necessarily
to get to the top	
3	 I set myself difficult goals
to achieve	
4	 I don’t like to let work disturb
my social life	
5	 I want to do well at whatever
I’m doing	
6	 Being a success in life isn’t
too important to me	
7	 I like being seen as
dedicated to my job	
8	 I don’t like to aim too high
9	 Work always comes before
pleasure	
10	People wouldn’t describe me
as very ambitious
Pause for thought
Think about the way you scored
in this activity. How does
this feel? Is it right for you
or would you like to change
this aspect of your life?
Add up your scores
From the odd-numbered questions
From the even-numbered questions
Take the ‘even’ score away
from the ‘odd’ score
(even if it produces a minus score)
What did you score?
If you have a plus (+) score, the higher your
score, the stronger your ambition. If you scored
+20, for example, you would always put work
first and aim high in your achievements.
You might even be seen as a ‘workaholic’!
If you have a minus (–) score, you don’t see
work as the most important aspect of your life.
At the lower end of the scale, for example if
you scored –20, you would put your social life
before work, have little concern about getting on
in your career, and might be seen as ‘laid back’.
If you have a more central score, you keep
a balance between work and leisure. You have
some concern about doing well and making
progress, but you don’t let work rule your life.
18 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.7
1.2.2	 What work experience have I had?
Most people would agree that work experience is very important when considering future directions, but it’s
easy to take yourself for granted and not recognise the wide range and high level of skills and abilities you
have. Many will be ‘transferable skills’ that you can use in other situations.
You will have learnt a huge amount through work (whether paid or voluntary) by noticing how you feel about
different tasks and respond to work situations, or how well you perform particular activities compared to other
people. You may also have learnt from others, either through formal appraisal or from informal comments and
reactions.
The next activity helps you to explore your experience, and will be useful when preparing for interviews
(see Section 4). The activity may take some time, and you might want to come back to it later.
1	 List the jobs you’ve had, with dates.
If you have limited or no experience of
paid employment, make a list of unpaid
or voluntary experience for example,
helping readers at school, delivering ‘Meals
on Wheels’, fundraising for a charity or
involvement in a conservation project.
2	 For each job, note how it came about.
Did you apply formally through an advert,
or did you make a speculative approach to
a company? Did you volunteer or were you
encouraged into it? If you had some choice,
what factors seemed important in deciding to
take it up?
3	 For each job, note the range of tasks or
activities you had to do.
Having an OU degree was useful for
getting my current post which is based
at home as it demonstrated that I could
work from home successfully.
BSc Hons Environmental Studies graduate
Pause for thought
Look back at what you’ve written.
Do you see any patterns?
Can you see particular strengths
or areas of difficulty? Do you enjoy
some things more than others?
Do others turn to you for help
with particular things?
4	 Did you have to deal with any difficulties?
5	 Which tasks or activities did you find most
appealing, enjoyable or rewarding, and why?
6	 What were your particular achievements?
7	 How did you get on with the other people?
8	 What was your style of working?
9	 Were you known for particular things?
10	What were you most proud of?
11	What were the things you disliked or
found frustrating?
19Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.8
1.2.3	 What different roles do I take on at work or elsewhere?
This activity should help you to become aware of the skills and experience you’ve developed through the
typical roles you play at work. If work hasn’t been a major part of your life, apply this to whatever activity
has taken up a lot of your time.
Some work roles and areas of competence are listed below. Work through each role in the list. Does it
sound like you? If it comes to you easily, put a tick beside it; if it isn’t a usual role for you, cross it out. If
you’re not sure or if it’s only partly true, leave it blank.
INITIATE SEEK COMMUNICATE
IMPLEMENT ORGANISE HARMONISE
MONITOR SOLVE CHECK
MAINTAIN DECIDE CAMPAIGN
IMPROVE LIAISE PERSUADE
CONTROL COORDINATE MEASURE
ALLOCATE EXPLORE SUPERVISE
SELECT INVESTIGATE CHOOSE
DEVELOP LINK GUIDE
CREATE SELL MAKE
ENHANCE PLAN TRAIN
DELEGATE TEACH EVALUATE
Pause for thought
Look at the roles you’ve ticked. Circle any that
describe you particularly. Can you think of any
specific activities or actions at work or in non-work
activities that show that they describe you?
What evidence can you give to prove them?
How do you feel about them? Which do you most
relish carrying out? You’ll find this list
useful when you come to preparing
a CV, completing an application
form or attending an interview
(which you will cover in more
detail in Section 4). All the words
describe positive qualities.
20 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
1.2.4 What sort of person am I to work with?
Your personality affects your style of operating in the workplace and the way you respond to situations.
Again, think more generally about your life if your workplace experiences are limited.
Activity 1.9
Work through the following descriptions, deciding how you compare with other people. Try to use the
full range of ratings from 5 (much more so than most other people) to 1 (much less so than most other
people), circling your position on the scale.
Average
Plan ahead and keep to it (t) 5 4 3 2 1
Stickler for detail or accuracy (t) 5 4 3 2 1
Easy mixer, socially confident (s) 5 4 3 2 1
Pessimistic (f) 5 4 3 2 1
Energetic (f) 5 4 3 2 1
Solitary (s) 5 4 3 2 1
Like lots of change and variety (t) 5 4 3 2 1
Very much affected by events or people (f) 5 4 3 2 1
Go my own way, act independently (s) 5 4 3 2 1
More practical than theoretical (t) 5 4 3 2 1
Determined (f) 5 4 3 2 1
Sympathetic, caring for others (s) 5 4 3 2 1
Always like to win, come in top (f) 5 4 3 2 1
Like persuading, negotiating (s) 5 4 3 2 1
Tend to worry, get anxious (f) 5 4 3 2 1
Like deadlines and timetables (t) 5 4 3 2 1
Usually take a leading role (s) 5 4 3 2 1
Good with complex ideas or data (t) 5 4 3 2 1
Demonstrative, show feelings (f) 5 4 3 2 1
Happy to be in charge of others (s) 5 4 3 2 1
Prefer traditional courses of action (t) 5 4 3 2 1
Equable, not easily upset (f) 5 4 3 2 1
Tend to influence people (s) 5 4 3 2 1
Ambitious to get on at all costs (f) 5 4 3 2 1
LessMore
21Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.9 continued
Now look over your ratings. You can group them
into those to do with relating to people and
social situations (s), to do with your approach
to work tasks (t), and to do with your drives and
emotions (f). Where did you score the most
highly? Or did you score evenly across the
three categories?
For instance, some people are at ease giving
a presentation while others find it very nerve-
racking. If you think about your colleagues
you’ll be aware how they differ from each other.
While one is reserved, another is very chatty
and communicative; one is a stickler for detail
while another is not too concerned about fine
accuracy.
There’s no right or wrong personality, but you
do need to take your own traits into account. A
work situation that suits a very sociable person
won’t suit someone who much prefers to work
alone. The better you know yourself, the more
opportunities you create for finding a situation
that will suit you.
What have you learnt about your
typical way of operating?
What kind of work situation
would be likely to suit you?
Pause for thought
22 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
1.2.5 What am I good at as far as
work is concerned?
This section should help you to think about your
aptitudes – what you can do and how well you can
do it. Some people have a creative imagination,
others a photographic memory, others are skilful with
statistics. Some people have been taught or have
learnt particular skills for themselves – competence
in a computer language, for example. Others have
specialist knowledge, such as accounting standards
or employment law.
This question is of particular interest to employers.
It’s also important for you to know what you’re good
at, as it affects the work or the parts of a particular
job that you can perform best. There’s generally
some connection between what we can do well
and what we enjoy doing, but it’s not a necessary
connection. You can be good at something without
particularly enjoying it. You should also remember
that you’ll go on developing as you cope with
different demands, as you learn through your own
study, by going on training courses, by trial and error,
by observing others, by reading and so on.
You can learn about your aptitudes from other
people’s comments, through taking psychometric
tests (which are discussed in more detail in Section 4)
or from your own perceptions of how well you cope
with different tasks. The next activities are based on
your own knowledge, but do use any other information
you can get.
Activity 1.10
Look back at your list of achievements and what they say about you. Now list some of your work/
voluntary/domestic achievements, projects you’ve tackled successfully, initiatives you’ve put into practice,
etc. Then think about the knowledge and abilities you needed to apply in order to achieve the result.
Perhaps you had to learn a new technique, or perhaps you used or developed a skill you already had.
What I achieved
1
2
3
4
5
Knowledge/abilities used
1
2
3
4
5
Pause for thought
Examine and reflect on what you’ve put under the
headings. You might discover that your strengths
are grouped in some areas rather
than others. It’s useful to know this,
as it enables you to recognise the
talents you have and also to see
whether there are gaps you want
to work on. It’s also useful as
evidence when you’re
completing a CV or
attending an interview.
Review
As you may be discovering, it’s helpful to reflect on
your past as you approach a decision that will
significantly affect your life. Consider your answers
so far. You may have begun to gain more insights or
realisations about your own nature. Your discoveries
might be to do with your skills and abilities or your
attitudes, ambitions, needs and values. You may have
learnt more about your personality, temperament or
way of dealing with the world. What have you learnt?
It can help, rather than simply thinking through these
questions, to have someone else with whom to talk
through your answers – perhaps a friend, relation or
a careers adviser.
23Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.11
The following activity is designed to help you do
a skills audit. You need to think about the skills
you have gained through your working, home
and social life, as well as those you are
developing and enhancing through your Open
University studies. The activity will help you to
assess your skills in more detail. The activity
is grouped into skills which are of particular
importance to employers, often referred to as
‘employability’ or ‘transferable skills’.
If you are unfamiliar with the language used in
recruitment, doing this exercise will help you
to start looking at your skills in the way that
employers expect and to use the language that
you will need to use in job applications.
Many people, especially those who may be
returning to work after a break, feel that they
are lacking in skills or that the skills they have
are rusty. It may be that you have gaps in your
skills and undertaking this exercise will help
you to identify those so that you can think about
how to plug the gap.
For example, think about your Open University
studies. It is likely that you have developed or
enhanced your written communication skills,
so you will have a good level of skill in points
8, 9, 10 and 12. You will certainly have evidence
that you can read efficiently, point 7, and
depending on any tutorial participation, you
may have enhanced your verbal skills.
A way of improving and demonstrating your
skill of dealing with people could involve
tutorials and forums.
You are certainly using the skills of thinking and
analysis, even if it is just points 5, 9 and 10.
In the technical/practical section you will be
using IT software and equipment. In creative/
innovative skills you may be writing with
imagination or creativity, and/or seeing new
possibilities or openings.
Your studies will also give you evidence of skills
in virtually every point made in the administrative/
organisational section. You will need to rate
how well you can do these. So, be as honest
as you can both in admitting lack of skill and
in acknowledging your competence, but don’t
underestimate what you are capable of.
Consider how well you can carry out each one
in comparison with other people. Try to use the
full range of ratings.
Rate each of the following statements
Use this scale – try to avoid choosing 3 if you can:
6 Very high, outstanding performance
5 High level, reliably perform better than average	
4 Good level generally able to do it quite well
Don’t devalue yourself. Recognise the
importance of what you’ve done, be it
through your study, be it through your life
experiences, because that’s what
enriches a firm, and that’s why
companies would be interested in
students from the OU.
Head of Recruitment, KPMG Europe
3 Reasonable level, just acceptable skills	
2 Very basic level, not usually adequate
1 No significant level of skills
24 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
1	 Listening, taking in what others say and checking your understanding
of the information
2	 Clear verbal expression, ability to convey information without confusion	
3	 Fluent speech, words flowing easily	
4	 Drawing people out, to encourage them to speak	
5	 Commanding an audience, giving a presentation	
6	 Using the telephone effectively: few misunderstandings	
7	 Reading efficiently: readily taking in written information	
8	 Writing effectively, matching style to purpose	
9	 Structuring reports and other written communications logically	
10	Using a wide vocabulary accurately and appropriately	
11	Speaking (accent and pronunciation) in a way that’s acceptable in a
wide range of social situations	
12	Spelling and grammar	
Communication
Total score
Rating
1	 Showing sensitivity to the feelings and needs of others;
taking account of this in dealing with them
2	 Getting on with a variety of people and building up working relationships	
3	 Instructing, teaching or coaching others	
4	 Delegating and managing others	
5	 Leading a work group, chairing a meeting	
6	 Encouraging, motivating, getting the best out of others	
7	 Counselling: helping with personal problems	
8	 Negotiating: mediating, dealing with conflict	
9	 Interviewing, assessing or appraising	
10	Persuading, encouraging, changing others’ views	
11	Consulting and building agreements	
12	Acting assertively (not aggressively)
Dealing with people Rating
Total score
25Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
1	 Understanding book-keeping
2	 Preparing a budget
3	 Using a spreadsheet	
4	 Understanding VAT and taxation	
5	 Producing a cash-flow forecast	
6	 Producing annual accounts	
7	 Carrying out a cost–benefit analysis	
8	 Interpreting management accounts	
9	 Working knowledge of volume and expenditure-related variances	
10	Operating PAYE	
11	Understanding types, uses and sources of loan finance	
12	Operating costing system
Financial activities Rating
Total score
1	 Using project management tools, e.g. critical path analysis
2	 Using statistics
3	 Logical thinking, working out implications	
4	 Applying critical ability in recognising potential weakness or problems 	
5	 Making logical use of facts or information	
6	 Using mental arithmetic, estimating orders or probability	
7	 Flow-charting	
8	 Rational decision-making	
9	 Carrying out analysis and evaluation	
10	Researching and gathering information	
11	Carrying out mathematical operations	
12	Carrying out stock or inventory control
Thinking and analysis Rating
Total score
26 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
1	 Competence in using tools and technical equipment
2	 Understanding data-processing equipment
3	 Applying craft or technical ability	
4	 Aptitude for diagnosing mechanical or electrical faults 	
5	 Constructing or assembling materials or equipment	
6	 Understanding current technical developments	
7	 Using laboratory equipment	
8	 Dealing with tangible, practical problems
9	 Using manual dexterity, hand-eye coordination	
10	Understanding physical sciences	
11	Understanding engineering	
12	Maintaining or repairing complex equipment
Technical/practical Rating
Total score
27Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
1	 Generating alternative solutions to problems
2	 Creating original ideas
3	 Improvising or adapting for other purposes	
4	 Designing new things, systems, layouts, events or courses 	
5	 Being insightful, intuitive or imaginative	
6	 Developing others’ products or ideas	
7	 Writing with imagination or creativity	
8	 Seeing new possibilities or openings
9	 Appreciating new or unconventional aspects	
10	Visualising: imagining how something will look	
11	Working creatively with shapes, colours, sounds and patterns	
12	Innovating and improving procedures in your own field
Creative/innovative Rating
Total score
1	 Managing your time
2	 Planning systematically
3	 Operating procedures precisely	
4	 Making things run like clockwork	
5	 Handling in-trays efficiently	
6	 Meeting deadlines	
7	 Producing clear operational structures	
8	 Developing resources to achieve objectives
9	 Organising working time	
10	Monitoring procedures and progress	
11	Making detailed plans of action	
12	Having a well-organised work space, filing system or recording procedures
Administrative/organisational Rating
Total score
28 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Now add up all your total scores. Look at the skills you scored most highly in
and those you most enjoy. Write them in this space:
Communication		
Dealing with people		 	
Financial activities
Thinking and analysis
Summary
Technical/practical		
Creative/innovative		
Administrative/organisational
Total score
Circle the skills that you’d most like to use in the future.
Now look through the original ratings to see whether there are skills you’re not yet very competent in,
but would like to develop. List those here:
	
	
	
	
	
Evidence of your skills
Now that you have identified your skill strengths, it
can be helpful to think about what evidence you can
give in support of those skills. On an application
form you are often asked to give an example of a
time when you effectively used a particular skill. In
a CV, if you claim to have a skill you are expected
to give evidence to that effect. Competency-based
questions are regularly used in graduate recruitment
processes. Employers identify the skills and abilities
(competences) that are vital for working in their
organisation and they use these as selection criteria
for choosing new recruits.
To measure your suitability, recruiters will ask questions
where you will need to draw on examples from your life
so far to demonstrate times when you have employed
particular competences. The logic is simple: your
past ability to use a skill is a good indicator of your
potential to be successful in the future.
When thinking about evidence it can help to think of
using a variety of sources, including your studies,
work, voluntary work or life in general.
In order to structure the information you give in
a clear and succinct way, you can use the STAR
method: Situation Task Actions Result.
•	 Situation - what was the situation and when did it
take place?
•	 Task - what task was it, and what was the
objective?
•	 Action - what action did you take to achieve this?
•	 Results - what happened as a result of your
action?
You may have more than one example to consider;
try to choose the one that
•	 is relevant and describes the skill being asked for
29Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
Pause for thought
What does this activity tell you? Are there any
surprises or does it confirm your expectations?
Either way, you can use the information when
you come to consider alternatives. Remember that
skills can always be developed simply by using
them more, and that the wider the range of skills
you have, the greater the variety of job
options open to you. Recognising the
skills you have to offer is key in being
able to market yourself successfully
to an employer (see also Section 4).
•	 demonstrates action and is something you actually
did, as opposed to what you learned, or what you
might do in a hypothetical situation
•	 is personalised by stating what you did, as
opposed to saying what other people did or what
happened
•	 has a positive outcome
•	 is appropriate and gives you something you can
talk comfortably about if asked for more detail
•	 is specific - if the question asks for an example,
then you should only describe one.
Keep your examples specific, recent
and relevant. We want to hear how you
have used skills and behaviours in a
positive way, so that we can see how you
would apply them in the work place.
Co-operative Group
Here are two examples:
Administrative/organisational: Whilst acting as
a marketing manager for my local hockey club, I
organised a successful recruitment drive: printing
flyers, arranging volunteers to distribute these
and putting in place free trial sessions to welcome
potential members. Membership increased by
20 per cent.
Communication: I lead seminars for junior members
of staff in my workplace. It is essential that I listen
carefully to establish their current knowledge and
only intervene when necessary to encourage them
to consider other areas. My performance in the first
seminar led to an increased workload to improve the
next set of seminars.
While competence-based questions focus on what
you can do, strengths-based questions focus on
what you like doing and are also being used now
by graduate employers (there is further exploration
of questions used in applications and interviews in
Section 4).
30 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Rate the values below for importance to you. Try to use the full range of scores.
4 Very important 3 Important 2 Less important 1 Not important
Description	 Value	Rating
Making decisions, independent action	 AUTONOMY
Change or variety in tasks, people, places	 VARIETY
Scope to learn, study, think, analyse	 INTELLECTUAL
Making friendly contacts with others	 SOCIAL
Large income, expensive possessions	 ECONOMIC
Expressing ethical code or religious beliefs	 SPIRITUAL
Using talents, developing skills	 USING ABILITIES
Being part of an important organisation	 COMMITMENT
Having lots of stimulus, excitement, thrills	 EXCITEMENT
Having influence or power over others	 AUTHORITY
Enjoying or making beautiful designs or things	 AESTHETIC
Getting promotion, career progression	 ADVANCEMENT
Helping or caring for others	 ALTRUISM
Concern for surroundings or location	 COMFORT
Being original, developing new ideas	 CREATIVITY
Activity, keeping moving, handling things	 PHYSICAL
Taking risks; business and trading	 COMMERCIAL
Does this make clear your reasons for wanting to work? Does it suggest the kind of work you like to do or
the type of organisation you feel most most suited to working for?
Clearly, some kinds of work have more to do with ALTRUISM and others with ECONOMIC or CREATIVE
values. In the same way, a manufacturing company, a charity, a newspaper office, a local authority,
a financial institution and so on will each have a different ‘feel’ as a place to work. Try to think through
which would suit you best.
Activity 1.12
1.2.6 What do I really want from work?
Now that you’ve thought about who and where you are and the skills you have, the next step is to recognise
what you’re satisfied with and what you’re dissatisfied with. This doesn’t mean that you can achieve everything
you wish, as restrictions of one kind or another will limit everyone’s range of choice. It is important though,
not to limit yourself by concentrating so much on restrictions that you achieve less than you might.
31Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
1.2.7	 How well does my present (or last) job meet my wants and needs?
Activity 1.13
To complete your examination of job satisfaction
or dissatisfaction, consider the following.
Circle the level that applies to your present or
most recent job.
Money Clearly, inadequate income causes
many problems and dissatisfactions.
Too little	 Adequate	 Well paid
Opportunity for control Simple, repetitive,
closely controlled work is generally far from
satisfying, but on the other hand having a
high level of responsibility (being a managing
director, for example) can be stressful.
Too little	 About right	 Too much
Opportunity to use skills Most of us
enjoy using and developing our skills and
competence. But having very high-level,
complicated demands repeatedly made on
us can be stressful.
Too little	 About right	 Too much
Goals People function best when there are
demands to be met, targets to be achieved,
challenges to rise to. We all have our own
preferred level of demand.
Too little	 About right	 Too much
Variety Individuals differ in the amount of variety
they prefer, but it’s stimulating to have some
change and variation in the work environment.
Too little	 About right	 Too much
Clear boundaries A work situation where
boundaries aren’t clear can cause uncertainty
and conflict. Equally, being in a tightly defined
job can feel restricting.
Too little	 About right	 Too much
Social contact Everyone’s need for contact
is different, but most of us get satisfaction from
being with others, chatting over coffee or
working in a team.
Too little	 About right	 Too much
Respect Most of us like to be thought well of
and respected by others. For work satisfaction
it’s important to feel that there’s some match
between your contribution and the position
you hold.
Too little	 About right	 Too much
Pause for thought
Which of these are the most important to you?
Answering that may clarify sources of satisfaction
and dissatisfaction in your current or most recent
job. It may begin to suggest either the kind of
work you’d like to do or the kind of organisation
you’d like to work for. This can be
helpful in supporting the question
of whether a change of employer/
organisation may be what
you’re looking for, or a change
of job role/new career
direction. Note any ideas
that occur to you.
32 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Review
You’ve now considered the reasons why you work (other than financial necessity) and which things you
most enjoy doing. If your occupation is to ‘feel right’, it’s important that it should be fulfilling, agree with
your beliefs in general and allow you to express your personality. Any significant mismatch is likely to
leave you feeling dissatisfied, stressed or becoming cynical about your job. Take time to reflect on the
results of the activities in this section, perhaps discuss them with a confidant and if necessary modify
them. Note your thoughts here.
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
Activity 1.14
33Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
1.2.8	 What kind of work would I like to do?
To help you decide on the kind of work you’d like to do, you also need to consider your interests.
Interests are to do with the things you find most appealing or enjoyable.			
Activity 1.15
Look through these kinds of work and consider whether you would like to carry each one out. You may
have had direct experience of some of them. Try to imagine whether you’d like doing the others or not.
It’s not a question of your ability or qualifications, but only of your own preferences. Assume that you
could do the activity if you wanted to.
Tick ‘Yes’, ‘Not sure’ or ‘No’ according to how you feel about each activity.
		 Yes	 Not sure	 No
1	 Supervise staff dealing with correspondence			
2	 Design a staff appraisal scheme			
3	 Monitor quality control activities			
4	 Keep up to date with computing developments			
5	 Put budgeting procedures into practice	 		
6	 Develop a marketing plan for a new service			
7	 Keep abreast of scientific developments			
8	 Write information booklets			
9	 Supervise process control staff			
10	Organise renewal of insurance cover			
11	Plan staff training schemes			
12	Forecast drawing office work schedules			
13	Find new areas for computer applications			
14	Keep abreast of money market changes			
15	Negotiate prices with suppliers			
16	Plan research and development (R and D)			
17	Handle public relations issues (PR)			
18	Revise road delivery schedules			
19	Plan introduction of new clerical procedures			
20	Interview job applicants			
21	Organise installation of an internal telephone system
34 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.15 continued
		 Yes	 Not sure	 No
22	Instruct computer users on procedures			
23	Coordinate work of audit staff			
24	Brief sales staff			
25	Design new technical equipment			
26	Collect and collate information			
27	Supervise warehouse staff			
28	Report on legal matters affecting the organisation			
29	Set up a staff-grievance procedure			
30	Plan equipment-maintenance schedules			
31	Review data-processing installations			
32	Monitor productivity of operations			
33	Analyse effectiveness of advertising			
34	Organise scientific research			
35	Design publicity leaflets			
36	Monitor productivity of operations			
37	Implement new administrative procedures			
38	Investigate staff turnover problems			
39	Monitor laboratory testing services			
40	Write computer documentation			
41	Brief colleagues on effects of taxation changes			
42	Report on sales performance			
43	Produce design specifications			
44	Manage external relations			
45	Supervise a building-maintenance programme			
46	Take minutes of meetings			
47	Prepare a staff handbook			
48	Carry out an energy usage audit			
49	Deal with computing problems
35Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.15 continued
			 Not sure	 No
50	Prepare financial reports			
51	Review a product range and pricing			
52	Develop and improve mechanical or electronic equipment			
53	Edit a newsletter or magazine			
54	Improve plant layout to increase productivity			
Scoring
Give 4 points for each ‘Yes’ response
Give 2 points for each ‘Not sure’ response
Give 0 points for each ‘No’ response
Now add up the scores for the groups of questions shown here:
		 Total
Group A	 Questions 1, 10, 19, 28, 37, 46	
Group B	 Questions 2, 11, 20, 29, 38, 47	
Group C	 Questions 3, 12, 21, 30, 39, 48	
Group D	 Questions 4, 13, 22, 31, 40, 49	
Group E	 Questions 5, 14, 23, 32, 41, 50	
Group F	 Questions 6, 15, 24, 33, 42, 51	
Group G	 Questions 7, 16, 25, 34, 43, 52	
Group H	 Questions 8, 17, 26, 35, 44, 53	
Group I	 Questions 9, 18, 27, 36, 45, 54	
Yes
36 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Activity 1.15 continued
What your scores mean
Your scores relate to different kinds of work activity:
		
A	 Administrative/legal/secretarial e.g. charity officer, health service manager	
B	 Personnel/training/education e.g. primary teacher, recruitment manager	
C	 Technical support e.g. quality assurance manager, laboratory technician	
D	 Data processing e.g. IT consultant, database administrator	
E	 Accounting/finance e.g. management accountant, tax inspector	
F	 Marketing/sales/purchasing e.g. retail buyer, sales manager	
G	 Scientific/engineering/research and design e.g. electronics engineer, architect	
H	 Information/communication e.g. librarian, interpreter	
I	 Operational/production/distribution e.g. transport planner, production manager	
Write in your total score for each group.
The result may be no surprise. It might be that you work or have worked in your highest-scoring area and
enjoyed it. If so, this is a reassuring confirmation and suggests that you should consider continuing in that
or related work, even if in a different kind of organisation. Alternatively, the pattern may suggest a move to
a different area of work.
The list of interests we’ve considered in this activity reflects common graduate and managerial areas of
work. It doesn’t include artistic, creative, craft and natural environment areas, nor those that depend on
performance skills such as acting, dancing, playing a musical instrument. If you have interests outside this
‘managerial scheme’, do take account of them in considering your future. Before carrying on, you might find
it helpful to look again at the section on the roles you play in your life and any possibilities you noted there.
Activity 1.16
You may also find it useful to work through Prospects Career Planner. This is an online career-planning
tool that will help you explore your skills, interests, and motivations. It will then match your profile with an
occupational database to produce a list of job suggestions for you to consider. Prospects Career Planner,
like similar programs, doesn’t tell you what you should do, but it will give you a starting point to explore
areas of work that may interest you.
https://www.prospects.ac.uk/planner
You’ll need to register (free) to access the Career Planner tool.
Score
37Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
Review
Read through the results of your work and reflect on
the notes you’ve made. You should by now have a
much clearer picture about:
•	 Your aptitudes
•	 Your skills and interests
•	 Your achievements and experience
•	 Your values
At this stage you might like to discuss things either
informally with a trusted friend or formally with a
careers adviser.
Now complete the summary chart below.
When you’ve done that, you may want to look at
Section 6 ‘The next steps’, or you might prefer to
move on to the possibilities that this knowledge could
open up for you in Section 2.
Summary chart
What am I good at?
Write down the aptitudes that you’d most like to use in work.
	
	
	
	
What are my main work values?
Write down the values you’d like to fulfil.
	
	
	
	
What would I like to do?
Write down the occupations or job areas you’d like to work in.
38 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Summary chart continued
How would I like to work with people?
What kind of environment?
Write down the kind of contact you’d like to have with people (working mainly independently or as part of
a team, having lots of customer contact, helping others in a caring or supporting role), and the kind of
work environment you’d like.
	
	
	
	
What other aspects are important to me?
Write down any other factors that are important to you, such as location, travel, organisational structure, etc.
	
	
	
	
	
What changes would I like to make?
Write down some changes you would like to make to help in your job searching.
39Knowing yourself
To find out more, visit our website at www.open.ac.uk/careers
You may wish to talk over some of your initial
thoughts with a careers adviser before you go on
to the next section. The content of Section 1 can
provide a really useful starting point to an individual
careers guidance consultation with a careers adviser.
You may find it useful to complete this section before
you book an consultation, which OU students can do
via the careers website.
You may prefer, however, to explore further by
continuing to read the remaining sections in this
book or by looking at information and activities on
the careers website at:
www.open.ac.uk/careers
Whichever route you choose good luck with the
next step!
Further resources
Try using the resources for developing self-
awareness and identifying which career might suit
you on our careers website at www.open.ac.uk/
careers. These include tools to match your skills and
interests to relevant types of job.
You also might like to look at the TargetJobs careers
report at https://targetjobs.co.uk/careers-report,
which uses questionnaires to explore your interests,
strengths, personality and abilities.
Be honest with yourself: what relevant
experience do you have? Where are
your gaps? How can you start to bridge
these gaps.
Head of Talent Management, Royal Mail
40 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
41Exploring possibilities
To find out more, visit our website at www.open.ac.uk/careers
02 Exploring possibilities
2.1	 Planning your strategy 				 41
2.2	 Graduate-level jobs 					 42
2.3	 Creative job search 					 45
2.4	 Finding vacancies 					 46
2.5	 Building a network of contacts 			 50
2.1	 Planning your strategy
Many job-seekers actually have very little knowledge
of how the job market works and how people are in
fact recruited. What information they do have can
often be based on personal experience or rumour.
As a result, people’s job-seeking methods can be
disorganised and inefficient rather than carefully
organised and systematic. So, a key fact you need
to grasp immediately is that it is vital that you plan
your strategy for job hunting in order to get the job
you want.
Another key fact you need to understand is that
different sectors and employers have their own
traditional methods for recruiting. The local sawmill
is likely to approach the task differently from a
multinational advertising agency. (In fact, the
only thing they might have in common is that they
probably use an interview during the selection
procedure.) Otherwise, the recruitment process
will be quite different. This means that you must
be flexible enough to adapt your approach to the
diversity of methods used by potential employers.
It’s also important that you don’t spend valuable
time applying for jobs where you have little chance
of success, or for jobs that don’t fit your needs or
meet your expectations. By planning your
job-search strategy, you will be able to focus much
more accurately on what you need to do to achieve
your goal.
We are assuming at this stage that you know what
you want to do. If you haven’t yet got a clear picture
of the kind of work or job you want to pursue, work
through Section 1 ‘Knowing yourself’ before going
any further.
2.1.1 A typical strategy
A strategic approach pays dividends, so be
organised and systematic. A typical strategy means
that you will:
•	 Consider all the opportunities open to you:
public, private and voluntary sectors.
•	 Look into and follow up all sources of information.
•	 Build up a file of background information about
companies, jobs and developments in sectors
you’re interested in.
•	 Get a general view before you start to draw up
a shortlist.
•	 Do some research: find out how, when, where
and how often vacancies are advertised.
Are graduates usually recruited? Are there formal
channels? What are the essential qualities sought
in candidates? How do you match up? What are
the application deadlines?
•	 Apply for jobs and attend interviews. Always keep
copies of your applications (including online
applications) and be prepared to ask for feedback
on how you’ve done.
•	 Don’t forget that you need to review and evaluate
your progress from time to time.
42 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
2.1.2 Information
Information is an essential tool in job hunting.
You need to find out as much as you can about the
job(s) and the companies you’re applying to, so that
you can present yourself effectively. The fuller your
awareness of the opportunities open to you, and the
more you know about each possibility, the better the
choices you will be able to make.
•	 Get to know the main sources of information about
careers and jobs.
•	 Use local careers libraries, relevant journals,
professional bodies, regional or national
representatives, websites, specialist and general
trade directories.
•	 Set up a file of job information, sample
advertisements, job descriptions and person
specifications, useful company and sector
contacts, details of salary bands, useful articles,
press releases, etc. You might want to do this
electronically.
•	 Follow up this information by talking to
professional careers advisers and people in the
job areas that interest you.
•	 Personal contacts can be invaluable: tutors,
fellow students, alumni, representatives from
professional bodies, and don’t forget to follow up
useful contacts from job advertisements.
•	 Keep notes of your conversations.
•	 Acknowledge those who have helped you –
quick telephone calls or thank-you notes may
pay dividends.
2.1.3 Review your progress
Keep records of all contacts and applications you
make. File copies of letters and applications and
record the progress on each one. To review your
progress:
•	 Consider what appears to work and what doesn’t,
and ask yourself why.
•	 Constantly reassess your assumptions about
questions such as your mobility and your
job preferences.
•	 Be realistic about the skills and experience you
have and those you need to acquire.
•	 Use a range of job-search methods.
•	 Be prepared to persist.
•	 Be prepared to change your strategy if necessary.
2.2	 Graduate-level jobs
Another important aspect of any job-search strategy
is to consider your options realistically in the context
of the current and future employment market. As you
research the main occupational areas that interest
you, look into trends in the area such as emerging
sectors, new jobs of the future, recession and
Government changes. They’ll all have a bearing
on employment, both on the number of people
employed and on the work that they do. You can do
this by exploring jobs in sectors on the Prospects
website at:
www.prospects.ac.uk/jobs-and-work-experience/
job-sectors
We welcome career changers who 	
completed their degree some years
ago and have some work experience.
The Fast Stream welcomes diversity,
as life and work experience will enrich
the Civil Service.
Head of Marketing & Diversity
Civil Service Fast Stream
2.2.1 What is a ‘graduate’ job?
One of the main reasons employers recruit graduates
is that they expect them to be more flexible, more
adaptable to change and capable of learning new
skills. However, it’s becoming increasingly difficult to
define exactly what’s meant by a ‘graduate job’.
The dramatic reductions in graduate recruitment
during the recession of the early 1990s and the
rise in the numbers of people studying for a degree
meant that, for all graduate job-seekers and job-
changers, employment seeking strategies have had
to be flexible and responsive to the employment
market. This is still so, and graduates are now
entering a much wider range of jobs.
As large numbers of graduates enter an increasingly
diverse range of jobs, the graduate labour market
boundaries are blurring. It’s becoming apparent
that it isn’t always the classification of the job
that’s important, but the nature of the graduate’s
experience and aspirations.
43Exploring possibilities
To find out more, visit our website at www.open.ac.uk/careers
Research conducted by Elias and Purcell (Seven
Years On: Graduate Careers in a Changing Labour
Market, www.hecsu.ac.uk/seven_years_on.htm)
grouped graduate jobs into five distinct categories:
1	 Traditional graduate occupations – Established
professions for which a degree has historically
been required, for example, solicitors or research
scientists. The graduate has to be an expert in a
very specific area.
2	 Modern graduate occupations – Since the
expansion of higher education in the 1960s,
there has been a development of new
professional areas requiring graduate-level
qualifications, for instance, journalism, nursing
or social work. A high level of interactive and
communication skills is usually required for these
areas in addition to having received training in
the specific area.
3	 New graduate occupations – These reflect
changes in technology and organisational
structures and priorities. Some are relatively new
occupations whereas the nature of others has
changed so that an increasingly common route
into them is via a graduate level qualification
(for instance, marketing, engineering,
environmental health). The ability to access and
use specialist information is an additional skill
for these areas.
4	 Niche graduate occupations – This is an
expanding area. Most jobs in this category don’t
usually ask for a degree but have some areas
that are deemed as ‘specialist’ and increasingly
ask for a degree at entry – for example, retail
management, graphic design.
5	 Non-graduate occupations – Increasing
numbers of graduates don’t immediately enter
the ‘graduate labour market’. Many are in
non-graduate jobs but using the skills that they
have developed as a result of their studies.
There are many instances of graduates in these
occupations demonstrating their potential and
developing their initial role to fit their skills.
I don’t think I would have stood a
chance of obtaining this job without a
degree. Many people taken on at the
same time as me (there were 15 positions
in various locations in south-east
England) have a masters degree – I do
not, which shows that the OU must be
thought of quite highly.
Environmental studies graduate
2.2.2 New and expanding opportunities
for graduates
Structured graduate programmes still exist with large
‘blue chip’ companies but competition is fierce and
fewer graduates now enter through these schemes.
According to research by the Institute of Employment
Studies only around 10 per cent of respondents
had a place on a graduate training scheme with a
blue chip employer. In fact, a growing proportion of
graduates find their first jobs in small and medium-
sized enterprises (SMEs) Something to bear in mind
is that SMEs account for 99.9% of all private sector
businesses in the UK.
For more information on SMEs go to:
www.fsb.org.uk/stats
OU students may have significant work experience
from different jobs or may have worked for a number
of years in a particular industry but now be looking
to develop or change their career. They may benefit
from a recruitment scheme known as “Experienced
Hire”. A number of big companies use this because
they recognise that students with significant work
experience may have developed key skills such as
the ability to manage, complete project work and hit
the ground running. Experienced Hire provides a
method for recruiters to hire these individuals rather
than recruiting them through the traditional ‘graduate
scheme’ route.
Experienced Hires usually undertake a similar
recruitment process to that for other graduate
positions. Examples of companies that recruit
for Experienced Hires include, Deloitte, PwC and
Goldman Sachs.
Destinations of Leavers from Higher
Education in the UK (DLHE)
Each year universities in the UK are required to ask
their graduates about what they are doing and how
studying has changed or developed their careers.
This data is published annually and can be seen at
www.hecsu.ac.uk/what_do_graduates_do_archive.htm
and on the Unistats site at http://unistats.direct.gov.uk
Unemployment among all UK graduates responding
to the DLHE survey in 2013/14 was 6.3 per cent
six months after graduation. Although we know
that OU students start from a different point as
many are working while they study, the data shows
the unemployment figure for OU students who
responded to the survey questionnaire in 2013/14
was 3 per cent. (The figure for part time first degree
students across the UK was 4.3%).
44 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
What sort of organisation are you suited to?
2.2.3 Internships
As a response to the recession, the UK Government
has been encouraging employers to offer internships
to unemployed graduates. An internship is a time-
limited work experience placement which gives
graduates a chance to enhance their employability
and career prospects. Graduate internships may be
full time or part time and many of them are paid.
You need to consider what type of opportunity might be right for you and think about the pros and
cons of working for an SME, a large company or working in the Third Sector. Here are some of the
differences between them.
SMEs
(Small and medium sized
enterprises)
Large companies
(With over 250 employees)
Third Sector
(Charitable/Not-for-profit)
•	 Fastest growing sector of
UK economy
•	 Easily identifiable
opportunities
•	 Focus on ethical work
•	 Local •	 National •	 Mainly local
•	 Early responsibility •	 Small cog in big wheel •	 No typical working day
•	 No formal induction •	 Structured training
programme
•	 Can be a very small
organisation
•	 Less red tape and
bureaucracy
•	 Formal structures embedded •	 Less bureaucracy
•	 Lower starting salary •	 Perks and higher starting
salary
•	 Typically a lower starting
salary
For more information, and to search for internships
online, go to the Graduate Talent Pool website:
http://graduatetalentpool.direct.gov.uk.
For further information on employment rights and
pay entitlement for interns, go to:
www.gov.uk/employment-rights-for-interns
2.2.4 Career change
Many people successfully change careers and may
do so more than once in their working life. There are
many reasons for doing so, including the fact that
you are unhappy with the work you are doing, have
always wanted to do something else, or feel that
you need to change your work/life balance and are
tired of bringing work home with you, literally or
figuratively. Others feel that they have never fulfilled
their potential, or regret the decisions they made/had
to make early in their careers.
It may be that you are studying as an Open
University student because you plan to change
career, or perhaps your studies have made you
aware of a wider range of interests than you had
before but without any definite career objectives
just yet. In either case, you will be developing skills
through your studies that will benefit you in your
future career.
It’s also possible that external forces suggest it’s time
for a change as the workplace changes, introducing
new roles and shedding older ones. People who are
made redundant may take this as an opportunity to
take some time out and rethink what they want to
do. Whatever the reason, it’s increasingly unlikely
that many people will stay with their first employer
throughout their working lives.
Approximately one in ten people in the UK have a
current intention to change their career. This suggests
that roughly 2.5 million people might consider
changing their career each year. This is likely to
double over the next 20 years.
45Exploring possibilities
To find out more, visit our website at www.open.ac.uk/careers
So a career change may be your choice or it may be
thrust upon you; either way it’s a time to take stock,
evaluate your skills and abilities, and think about
how you might apply these skills differently. If you
are studying because you have already decided to
change direction, you still need to do some research
so that you are clear about the planned route into this
career, and the demands that it will place upon you.
If you feel that you want a change but are unsure of
what might suit or interest you, it should help to work
through Section 1 if you haven’t already done so.
Becoming self-employed is another way to take
control of your career. Whether through learning a
trade or simply having a great business idea, more
people than ever are becoming self-employed – with
the national statistics showing 4.6 million people
registered as self-employed in 2014.
There may be a career that has always interested
you, or you may have come up with some new ideas
about specific jobs and/or ways to work. Either way,
you need to do the research so that you are clear
about the demands of this new direction. You could
start with the information about different types of
jobs at:
www.prospects.ac.uk/job-profiles
Once you have an idea of what you would like to do,
it would help to arrange to talk to someone already in
that role. If there is a relevant professional body, you
may be able to go through them, you could approach
people directly or work though an HR department.
As well as the resources mentioned above, there is a
useful section on changing careers on the National
Careers Service website that links to resources to
help you progress:
https://nationalcareersservice.direct.gov.uk/advice/
planning/Pages/chooseacareer.aspx
So changing careers takes research, planning and,
in some cases, a substantial investment of time.
It will help to have the support from your family and
friends, but it is possible – more and more people do
it every year.
2.3	 Creative job search
The career-review process isn’t something you
do once and for all and then never do again.
Most of us need to review our careers now and
again to take account of changes in ourselves and
the opportunities open to us. None of us can
predict what kind of jobs might be available in the
next few years.
Today’s labour market is increasingly diverse.
To succeed, you need to play by a set of new rules.
The best advice is to start as early as possible and
be creative in your job search.
So, how can you do a creative job search? Here are
a few essential steps to get you started:
•	 You need to ‘market’ yourself. Consider temporary
or part-time work to enhance your marketability,
skill development and knowledge of the industry
or job area, and to foster contacts.
•	 Think about doing voluntary work. Be clear about
what you’re offering to do, how long for, and what
benefits you hope to gain from the experience.
(See Section 2.5.6 for details.)
•	 Find out about getting appropriate training or
study with work experience. This may give you an
identifiable edge in the job market.
•	 Network with and develop contacts with well-
placed, knowledgeable people, including those in
organisations you’ve already worked for (if any).
•	 Find contacts in the sorts of organisation and
job you’d really like. Consider what you can do
for them.
•	 Don’t limit your marketing to letters of application.
You may want to ask to meet people, or talk to
them in person. Learn how to use the telephone
effectively – there’s some advice about this in
Section 2.5.2. Try to contact the person who
makes the decisions and might be interested in
your talents.
•	 Develop an excellent CV and application letter,
and adapt or customise them with a particular
opportunity or employer in mind (see Section 4
‘Getting the job’).
•	 Use LinkedIn to help you network with other
people in the career that you want to get into.
•	 Use the contacts you’ve made to get opportunities
to work-shadow or to carry out job study
interviews that will give you useful knowledge.
As the number of graduates has
increased – and competition for the
cream of the crop has grown
accordingly – investing in the traditional
‘milk round’ and a reliance on generic
marketing is no longer enough for
companies to attract the best talent.
Head of Graduate Recruitment, Accenture
46 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
•	 Use employment agencies, but don’t let them use
you. Make sure they keep you in mind for suitable
vacancies, and be sure to get constructive
comments on your applications and overall
approach (you will find out more about recruitment
and executive search agencies in Sections 2.4.9
and 2.4.10).
•	 Investigate the possibility of employment through
a ‘Knowledge Transfer Partnership’, a partnership
between employers and higher education
institutions – look at:
http://ktp.innovateuk.org
•	 Don’t forget the increasingly important non-
traditional graduate recruiters (small and medium-
sized enterprises – SMEs, which were discussed
above in Section 2.2.2).
•	 Use the internet to research companies and job
vacancies.
[Adapted from AGCAS information on
job-seeking strategies.]
It is easy to be overwhelmed by the amount of
research you need to do on possible opportunities.
The whole business of applying for jobs can also
be intimidating, especially if it is a while since you
have done it. There is a particular language that
employers tend to use and the jargon can, at first, be
very strange. Looking at job adverts will give you an
idea of the language used, as will the job profiles on
the Graduate Prospects website at:
www.prospects.ac.uk/job-profiles
Gaining work experience is a great
way to get a foot in the door, but it is
highly competitive and not often
advertised. Join the professional body
for your sector/profession. By attending
networking events or seminars you will
soon start to make valuable contacts
and make yourself more employable
through improved knowledge. Read the
trade or industry press to pick up on
trends, best practice and any changes
which may create opportunities.
Be proactive.
Talent Manager
Heinz
Pause for thought
Ask yourself what you can take
forward from these ideas.
What will your job search
strategy look like? Do you
need to think more creatively
to search for jobs?
2.4 	Finding vacancies
When it comes to job vacancies, they are classified
as either ‘open’ or ‘hidden’. In fact, it’s estimated that
seven out of ten jobs are ‘hidden’, in that they are
never even advertised! Often, in times of recession,
this hidden job market increases as some employers
shy away from the administrative burden of dealing
with the overwhelming number of responses their
recruitment advertisements produce. SMEs, in
particular, may not advertise due to the high costs
involved.
2.4.1 Applying for hidden jobs
Hidden jobs are produced:
•	 by organisational changes that make old jobs
obsolete and create new ones, or redefine
old ones.
•	 because an organisation doesn’t recruit enough
graduates to warrant much expenditure of effort
or money on advertising.
•	 because of the volume of unsolicited applications.
•	 when an organisation doesn’t particularly demand
a degree, but prefers specific skills, qualities
and experience.
•	 because an organisation may want to hire
internally as it is cheaper and the internal hire is
already familiar with company processes.
Do you know the answers to these questions?
•	 Can you identify the fastest growing sectors in the
region or nation that you want to work in?
•	 Can you identify some significant projects that
might provide employment opportunities for you?
•	 What skills are most in demand in your field?
Do you have them? If not, how can you
acquire them?
•	 How often do you monitor media sources or social
media to keep yourself in touch with what is going
on in your field?
47Exploring possibilities
To find out more, visit our website at www.open.ac.uk/careers
To find the kind of company that can use your skills
and satisfy your needs:
•	 Look at the resources suggested in this section.
•	 Look at company websites and find out more
about them.
•	 Consult the main directories in your local
reference library.
•	 Use social media sites, such as LinkedIn to
search for employers.
To get started try:
•	 General trade directories e.g. Yellow Pages
(www.yellow.com), Thomson Directory
(www.thomsonlocal.com) and KOMPASS
(www.kompass.com).
•	 Specialist trade directories for different
occupational areas e.g. The Writers’ and Artists’
Year Book (www.writersandartists.co.uk).
To see if there any specialist trade directories for
the profession you’re interested in go to:
www.prospects.ac.uk/job-profiles
Remember, even open jobs are hidden during the
early stages, while decisions are being made about
internal versus external recruitment campaigns,
selection dates, advertising space and so on.
2.4.2 Making speculative approaches
Please note: making speculative approaches to
companies is not permitted in Northern Ireland.
It isn’t enough just to wait for jobs to be advertised
in the media. The effective job-seeker must tap the
hidden market by making speculative approaches
to prospective employers. Turnover, promotion and
retirement continually create new job opportunities.
Economic, technological and organisational change
always affects employment patterns. Marketing
yourself means keeping ahead of the competition.
This approach gives you the initiative. You decide
which organisations, sectors, jobs and areas most
appeal to you. Speculative approaches can even
create new jobs. Convince employers that you have
exactly the skills they need to solve their business
problems. Prove that they need your abilities and
would benefit from your expertise. Demonstrate that
they can’t afford not to employ you.
This approach isn’t comfortable for some people for
example, a very nervous jobhunter, nor appropriate
in some areas of employment, for instance, teaching.
Consider what’s right for you and your ‘target’ area.
•	 Always follow up - Tell them in your initial contact
that you will follow up, and then make sure you
do so. If you hear nothing within two weeks, follow
up by telephone, perhaps to arrange a meeting
through a secretary. Offer dates and times.
•	 Take a long-term view - It takes time to build up a
mailing list, and responses may be slow and few.
If you’re going to make speculative approaches,
start planning early in your job search. You need
to be patient and not expect immediate results.
•	 Persevere - Occasionally persistence will pay off
and, after an initial refusal, you may be offered a
meeting. Make the most of it.
Making speculative contacts can pay off in several
ways. Even if you have no luck with a particular
employer, you may be referred or recommended to
another. Use these meetings to get more information
about the job market. Each employer you see is a
new contact. Each rejection may be one step nearer
to the job you want. Remember every ‘no’ brings you
closer to a ‘yes’!
Before submitting a speculative
application, please do check that the
employer concerned is happy to
receive these. Submitting a CV when
an employer clearly states in all
publicity that you should only apply to
an advertised vacancy shows a lack of
simple research and is not likely to
create a good impression.
UK Graduate Recruitment Manager
Logica
48 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
2.4.3 Using your networks
In the 2013/14 Destinations of Leavers from Higher
Education survey, 18 per cent of OU undergraduate
and 15 per cent of postgraduate students reported
that they had got their job as a result of personal
contacts. This represents an increase on previous
years. We will deal with networking in more detail in
Section 2.5 below. For now, just keep in mind that
research into how managers change to jobs with
other organisations has shown that over half get an
introduction through networking. ‘Networking’ is the
systematic use of personal contacts to:
•	 gather information about an industry or company
•	 discover hidden jobs, especially in
particular companies
•	 get an introduction to a key decision-maker in
a company, whom you can convince of your
qualities as a candidate
•	 develop further contacts to expand your network.
At first, it may seem a little strange to seek out
hidden jobs, or to concentrate on particular
companies just because they appeal to you.
But experience supports the practical wisdom of
doing so.
2.4.4 Applying for advertised jobs
Many jobs are of course advertised and listed below
are some of the places you can look for them.
If you reply to an advertisement, always follow the
instructions given. If it says write, telephone or email
for an application form, there’s no point in sending
a CV. Many employers send very poor information,
or none at all, about the job advertised or the
selection methods they use. Show initiative by
telephoning or emailing if you need to know more.
You may have to do some detective work if the
advertisement doesn’t give a telephone number.
Sources of vacancies
2.4.5 OU Careers and Employability
Services
If you are an OU student or graduate, you can
access vacancies with a wide variety of employers
on our online vacancy service, JobZone, on our
website www.open.ac.uk/careers. You can also see
profiles of OU-friendly employers and sources of
regional and national vacancies.
2.4.6 Newspapers and journals
You will find many job vacancies advertised in
newspapers and specialist or trade journals.
Because advertising in national newspapers is costly,
smaller employers often rely on advertisements in the
local press because it’s less expensive and brings in
a more manageable number of replies.
The best place to consult newspapers and journals
is your local library or online if you have access to
the internet. At the start, you may need to look at
them every day, as recruiters seldom place their
advertisements more than once. Make a note of the
advertising patterns: you will find that most of the
quality daily papers (The Times, The Irish Times,
Independent, Irish Independent, Guardian, Daily
Telegraph, Belfast Telegraph, Financial Times)
advertise certain kinds of work on particular days of
the week.
Local papers sometimes concentrate their job
advertisements on Thursdays, the day on which most
papers are sold. Make a note of advertising patterns
in your local press, and familiarise yourself with the
kinds of advertisement placed in each paper.
The big Sunday papers advertise a variety of jobs,
but their relatively high advertising rates tend to
restrict the salary range to the higher end. During
holiday periods, August to mid-September and
December, advertising is reduced.
You will find links to newspapers in the UK and
Ireland including national and regional papers from
www.thepaperboy.com/uk.
2.4.7 Professional associations
Many professional associations and institutions, for
example, the British Psychological Society have a
regional education or training officer and sometimes
a specialist careers adviser whom you can contact.
Some produce yearbooks and lists of members.
Addresses and other details are in the Directory of
British Associations, which can be found in most
major libraries. In Ireland the Institute of Public
Administration (IPA) publishes an Administration
Yearbook. This annual directory is available in most
public libraries and contains names and contact
details of key personnel in each of the organisations
listed. The ‘profession finder’ on the Total Professions
website www.totalprofessions.com will help you
to search for over 300 professional bodies and
associations in the UK.
49Exploring possibilities
To find out more, visit our website at www.open.ac.uk/careers
2.4.8 Recruitment agencies
Recruitment agencies tend to deal with lower-
level salaried positions. They often act for small to
medium-sized employers that have no personnel or
recruitment departments of their own. Many specialise
in particular kinds of work or industry, and in some
areas of employment (such as medical sales) they
are almost the standard source of recruits.
Services are free to you – the employing company
is charged a fee, usually a percentage of your
first year’s salary. Be clear, though, about what the
agency is offering you. Remember that it’s there to
fill its clients’ posts, not to help you sort out your
career plans.
The Recruitment and Employment Confederation
is the UK association for the recruitment and
staffing industry. You can search for agencies by
geographical location and by type of work from their
website at: www.rec.uk.com
In Ireland the National Recruitment Federation is a
voluntary organisation set up to establish and
maintain standards and codes of practice for the
recruitment industry in Ireland. You can search for
agencies that have signed up to the code of conduct
at: www.nrf.ie
firm work on a particular job. Sometimes
contingency firms will distribute your CV widely in
the hope of generating new business. They may
interview you and construct a pen picture to go
with your CV.
As noted above, search firms may deal with a limited
type of vacancy. As a result, they prefer to receive a
CV to judge whether you fit what they have on their
books at that moment, or are marketable enough to
fit something that might turn up in the future.
They receive enormous numbers of CVs and often
don’t bother to acknowledge them.
The average search firm has only three or four
consultants. Most consultants limit interviews and
initially are likely to carry out a telephone screening
with you. They seldom divulge information about their
clients. If they send you to an interview they’ll want to
know how things went; similarly, they can be a useful
source of information about how you were received
by the client.
Although some firms deal only with positions above
£50,000, they’re worth considering if you have skills
that are in short supply – accountancy is a particular
example. If you decide to use a search firm, send a
CV and covering letter, and always include details of
your former salary and the range you’re looking for.
Consultants often don’t share information with one
another, so if you apply to a large firm operating in
many locations you need to send your CV to all
of them.
To identify headhunters and executive search firms in
the UK visit Headhunters in the UK
www.allheadhunters.co.uk.
Study at the OU requires a level of
self-motivation and self-discipline. This
gives OU graduates a cachet which
conventional universities do not offer –
and that employers can’t fail to be
impressed by.
Employer
2.4.9 Executive search firms
There are more than 200 executive search firms in
the UK. While they are important in the market place,
their role is limited by the high fees they charge
to employers (typically 30–35 per cent of annual
salary). They tend to be used for jobs that are at
a high level or require scarce specialist skills for
example, specialist IT skills, or when commercial
confidentiality is essential. They are of two main kinds:
•	 Fee/assignment firms are given sole charge of
a particular search. They get most of their fee
whether the employer hires their candidates or not.
•	 Contingency firms are paid only when the
company hires someone they have presented.
Some employers let more than one contingency
We advertise our vacancies through a
wide range of media as well as on our
own website. We would recommend that
students visit the websites of major
graduate media suppliers such as
Hobsons, Prospects and Doctorjob.
It is also worth registering with websites
such as www.graduate-jobs.com and
www.milkround.com as many employers
use these organisations to publicise
vacancies and recruitment events.
UK Graduate Recruitment Manager
Logica
50 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
2.4.10 The internet
Most jobs are now advertised on the internet through
national websites directly associated with particular
careers. There are also opportunities to ‘post’ your
CV on the Web, entering it into the database of an
organisation (usually recruitment organisations) that
will either try to find a suitable match for you or allow
an employer to search the information and perhaps
select you for interview.
Bear in mind that not all sites offer confidentiality, and
your personal details may become public property.
You could find yourself treated like a trading
commodity if the website’s main interest is simply
to capture personal details and sell on a CV. Try to
make sure you use vetted or recommended websites
only to post your CV.
Think about what you are posting online and who you
are sharing it with. There are tips on how to protect
yourself by investigating potential employers on our
careers website www.open.ac.uk/careers.
Remember that:
•	 Websites may not always deliver what they promise.
Many sites change rapidly and there are no
guarantees about the accuracy of the information
displayed. Always try to cross-check information.
•	 Websites sometimes go online while still
under development.
•	 It’s sometimes difficult to see the wood for the
trees – not everyone has a brilliant web designer.
Most graduate recruiters now recruit online as well
as using other methods.
2.4.11 Social Media
You can directly search and apply for jobs on
professional networking sites such as LinkedIn.
Twitter and Facebook are useful for searching for job
vacancies either through hashtags or recent posts.
For helpful tips on job hunting and social media go to:
www.prospects.ac.uk/careers-advice/getting-a-job/
job-hunting-and-social-media
Further resources
You can search for jobs by keyword or career sector
on Prospects website
https://www.prospects.ac.uk/graduate-jobs and
TargetJobs www.targetjobs.co.uk.
2.5	 Building a network
of contacts
Personal contacts can be a fantastic source of help in
your job search. Your network of contacts can include
friends, relatives, fellow students, tutors or people
you’ve met through leisure interests, voluntary work
or casual part-time jobs. Even if these people can’t
help you themselves, they may be able to put you in
touch with someone who can. Through building up a
network of contacts, you may be able to discover:
•	 a company’s competitive position
•	 whether it’s in a state of growth, stability or decline
•	 its working climate and culture
•	 its business strategy
•	 the background of key managers, especially those
in the function that interests you
•	 possible job opportunities.
So, how do you build your network? Your primary
contacts are people who know you directly. They may
not have the job openings you want, but they can
become your publicity agents and your information
sources. Some will be able to give you names of their
own business contacts. These secondary contacts
can act as a bridge between you and the decision
makers in the companies you’re interested in, or they
may lead to other secondary sources.
2.5.1 To make an effective
speculative contact
•	 Pick out likely targets Be discriminating and
choose worthwhile prospects. You’re not sending
out a mail drop or a circular letter. Each approach
must be tailor made and will take time to prepare.
Which organisations have the sort of position
that attracts you? Who is recruiting, reorganising,
relocating? Use all your information sources and
network contacts (which we will discuss in more
detail below) to select a portfolio of companies,
and concentrate on those.
Pause for thought
Remember that if you can’t get
a paid job straight away, don’t
discount the value of work
experience. It can test out
your career plans, give you
something to put on your CV,
and it could give you a way in
to the job and employer you want.
51Exploring possibilities
To find out more, visit our website at www.open.ac.uk/careers
•	 Contact a named individual Approach only the
person who can take the decision to employ or
help you (you might be asking for information
rather than a job). Check with the organisation to
make sure that names, job titles and addresses
are correct. Your letter, telephone call or email
must reach the right person.
•	 Get a meeting No one ever got a job merely
by writing a letter, or sending an email. You
want a meeting: say so clearly when you make
contact. Be prepared to fit in with the employer’s
availability. Prepare for the meeting as you would
for a job interview.
•	 Give a specific reason for contact Have a peg to
hang your contact on. You’re not asking for a job
or hoping there might be a vacancy. You’re making
a business proposition, showing how your abilities
can contribute to the success of the enterprise.
You must prepare a thoroughly argued case to
prove that the cost of employing you is more
than outweighed by the benefits. Research the
organisation. Familiarise yourself with its problems
and needs, show where you can fit in, and how you
would improve, develop or help it become more
effective. And be sure you can deliver the goods!
I began my job search by following
the 10 to 15 companies I really wanted
to work for.
OU Student
Activity 2.1 Building up a network
Draw up a list of everyone who might be able
to help you – friends, family, former colleagues,
tutors, any business contacts you have, all
potential sources of information or advice.
Think what they can do for you:
•	 keep you informed
•	 comment on your strategy and approach, the
impression you make
•	 get you noticed.
Make a note in your career file of your list of
contacts. As you work towards developing and
extending your network, keep a record of each
letter, telephone call, conversation and so on, so
that you don’t get confused over important details.
Get under the surface of the glossy
marketing literature and talk to as many
people in the organisation as possible.
Graduate Programme Manager
The Co-operative group
Pause for thought
Perhaps you feel uncomfortable
about networking in this fashion.
Unease usually arises from the
misconception that using
contacts means asking people
for jobs. In fact, what you’re doing
is making the most of them as
sources of advice, information
and ideas. Put contacts at ease
about this to avoid embarrassment.
Most people will be only too glad to
help, or to refer you to someone
else who can. Getting the
approach right is important.
2.5.2 Approaching your contacts
You need to decide how you will approach your
contacts. A number of methods are possible but
you need to decide what is right for you, what is
appropriate for the area of work and what might
be effective.
By telephone
Your first approach could be by telephone.
Be very succinct.
Establish:
•	 What you’re seeking
•	 How your contact can help you
•	 How much time you’re asking for (15–20 minutes)
•	 Time and place for a meeting.
2.5.3 Using the telephone effectively
You may be making a speculative call, or telephoning
to follow up a contact you’ve been given or to make
an appointment for an interview. It’s often difficult
getting through to someone during the day.
Be persistent. Busy managers are usually in early
and late, so try outside normal office hours if you can.
52 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Some people are natural and relaxed on the
telephone. Others, even after years of practice, are
stilted and anxious. You don’t get the usual clues
from nods, smiles and so on, so it’s difficult to judge
what impression you’re making. To take some of
the stress out of the situation, plan the format and
content of your call:
•	 If they have a secretary, get their full name if
you can.
•	 Introduce yourself succinctly.
•	 Use the name of the referral source discreetly.
•	 State the objectives of your call.
•	 Get to the point quickly – treat it like a
mini-commercial for yourself.
•	 Get the contact interested straight away – make
notes beforehand of what you want to say.
•	 Try to avoid being interviewed over the phone
unless this is pre-arranged.
•	 Suggest times and dates for an appointment.
•	 Clarify the exact place of the appointment.
•	 Offer your telephone number or email in case of
a change in arrangements.
Understand what makes you different
and how you stand out from the crowd,
then market your ‘USPs’ – Unique
Selling Points.
Graduate Programme Manager
The Co-operative Group
2.5.4 Making an approach in person
Making an approach in person can be an
opportunity to test your interview skills and make
a good and lasting impression. For a productive
meeting, you need a carefully planned agenda. It
might cover:
•	 Why you’re thinking of leaving your present job
(or why you left your last one).
•	 Your job goals and some alternatives.
•	 Your strategy for getting there.
•	 A discussion about the industries you’re interested
in and the companies you’ve picked out.
•	 Questions about names and referrals to key people,
preferably decision-makers for your kind of job who
you can ask about opportunities in the industry.
•	 Advice and comment on your job-search strategy.
Here are some questions you might ask:
•	 Introduction: How did you join your employer?
What are you working on at the moment?
•	 Trends: What is happening in your business area
right now? What is going on in your company?
•	 Information: Where can I find out more about the
sector? Who else can help me? What projects
have been successful in your field?
•	 Advice: If you were me, what would you do now?
Why have you been so successful?
Be businesslike and professional in making your
proposals. Ask questions about the employer’s
needs. Treat the employer as a client,
explaining what you offer and what you can do.
Be flexible. Be prepared to negotiate. If a full-time
appointment isn’t practical, there may be a possibility
of employing you for a particular short-term project.
Get any agreements – proposals or contracts – in
writing as soon as you can.
Pause for thought
Meetings need to be well planned and purposeful.
Other people have their own agendas, and there’s
a lot to cover in twenty minutes.
Make sure that you’ve done your
research thoroughly, using published
sources, before you talk to your
contacts. They will respect you
more and be more prepared to help
if they have evidence of your
professional approach.
2.5.5 Drawing up your letter
When it comes to drawing up a letter, keep in mind
that there are three main reasons why someone
might want to employ you:
1	 To increase sales (or the employer’s equivalent –
service volume, membership, etc.).
2	 To decrease expenses.
3	 To obtain specialist expertise that leads to an
increase of sales or a decrease in expenses.
Your letter must list accomplishments that
correspond to these reasons. A speculative letter
will need many drafts in order to polish it.
•	 Your letter should be no longer than one side of
an A4 page and should:	
- include key achievements and relevant		
	experience	
- cover only the last five to ten years
53Exploring possibilities
To find out more, visit our website at www.open.ac.uk/careers
•	 Exclude:	
- Personal data (marital status, hobbies, etc.)	
- 	Dates	
- 	Salary	
- 	Copies of references.
•	 The first paragraph is crucial. Use it to mention an
achievement related to the job you’re seeking and
strike a chord of need in the reader. For example,
describe a relevant problem, outline how you
tackled it and state what results you got.
•	 Get someone else to check your spelling,
grammar and layout. Be critical over matters of
style, and prune ruthlessly.
Section 4 ‘Getting the job’ offers advice to help
you with the practical side of drawing up a letter to
accompany a CV.
2.5.6 Social and professional
networking sites
Social and professional networking websites such
as Facebook, and LinkedIn, can also be useful
tools for networking. Once you have joined business
networking sites you can invite other members to
join your network (your ‘contacts’). You will then have
access to their contacts’ profiles and can quickly
build links to other members‘ profiles – a great way
to make connections with potential employers.
For recruiters, LinkedIn has definite advantages over
some other methods of recruitment:
•	 It is cheaper
•	 It can be quicker
•	 It is often more effective.
Social media enables recruiters to be:
•	 Direct: they can target specific groups and
graduates
•	 Diverse: digital media enables them to reach a
different audience and pool of applicants
•	 Dynamic: they can be creative, and interactive in
the relationships they create with applicants.
Facebook
Facebook can bring together recruiters and job
seekers. Following companies can help you to
research the job market, accumulate evidence, and
acquire insider information that you might not find
elsewhere. Many graduate schemes use Facebook
as a way of showcasing frequently asked questions
about the selection process; cultivating queries from
interested students; and as place to offer insights,
advice and encouragement. For example the Civil
Service Fast Stream have used Facebook Live Chats
as a way to engage directly with students who are
interested in working in government.
LinkedIn
It will allow you to link with colleagues and
acquaintances from your own networks, and then
with their connections. It is possible to join groups
that interest you, which can give you access to
organisations and individuals who can help you in
your job search. LinkedIn is a platform that allows
you to connect with people, companies and groups
on a national and global scale.
Begin by adding your profile. Have a look at how
other people project their online presence to see
what works and what to avoid. A helpful tip to create
your profile is to lift content from your CV.
Some large companies use LinkedIn to search for
potential employees so this could be a good way
to access these hidden opportunities. In a recent
survey, four out of five recruiters who use LinkedIn
said that they liked to see membership or links
with professional organisations on a candidate’s
profile, and 66% said they reacted positively when
volunteering was mentioned.
Pause for thought
Building a network of contacts plays a key part in
creative job search. Before reading on, you might
find it helpful to look again at the
advice in Section 2.3 ‘Creative job
search’, considering what further
preparation you need at this point,
and to read the following example.
It was produced by one of the
students who tried out this pack before
publication and was preparing to
approach a particular company.
Pause for thought
More and more recruiters have
an online presence. Research
indicates 92% of recruiters
utilise social media networks.
(Jobvite)
54 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
•	 Add a headline. This is your way of telling people
what makes you unique, and helps you stand out
from the crowd.
•	 Add a professional looking photograph. If you
have a photograph, you are seven times more
likely to be found on LinkedIn.
•	 Your summary should not be too long. Three
or four paragraphs are enough. Your summary
should be factual, and most are written in the first
person, although it is acceptable to write it in the
third person.
•	 You can embed multimedia, eg videos,
documents, and links. This could be a good way
to show off your portfolio for some jobs. (Be aware
you may need to copyright ideas you share.)
•	 You can endorse and recommend others and
they can do the same for you. It could be helpful
to get some good recommendations from people
who know the quality of your work and your
professionalism.
•	 Engage in some of the groups you have joined by
asking questions or joining discussions.
•	 Keep your profile up to date.
•	 Separate your personal from your professional
profiles on social media. Adjust your privacy
settings, so that you are promoting the image you
want people to see.
Example
One of my network contacts led to an
introduction to the head of a department in a
company I was targeting.
I set up an appointment with her, and decided on
further preparation, as follows:
–– Carry out more research on the company
(e.g. journal and newspaper stories), to get
a ‘feel’ for the culture, trading problems/
opportunities (for me); exposure to risk,
political battles, etc.
–– Talk again to contacts. (A discussion with an
ex-employee could be particularly revealing.)
–– Put myself in the shoes of my prospective
boss. (Think about what sort of help the
company may need.)
–– How do my strengths match the needs?
–– Plan which of my strengths/accomplishments 	
I am going to mention, and how I am going to
present myself.
–– List which issues I want to investigate
(e.g. possible openings, prospects for
development/training/promotion).
–– Re-read the advice in Section 4 about job
applications and interviews.
Note in your career file what preparation you want to
make at this point.
2.5.7 Voluntary work
Voluntary work can be a fantastic way of getting
experience and building networks as well as showing
commitment to an area you are interested in. Local
centres seek to place people into suitable voluntary
work – meals on wheels, etc. Find out about potential
sources of voluntary work from The National Council
for Voluntary Organisations (England)
www.ncvo.org.uk/ncvo-volunteering and Volunteering
Wales at www.volunteering-wales.net
In addition, you may find the following websites
helpful for exploring opportunities to work with
charities and voluntary organisations:
Charity Job www.charityjob.co.uk
Charity People www.charitypeople.co.uk
Citizens Advice www.citizensadvice.org.uk
Volunteering Matters
http://volunteeringmatters.org.uk
Do-it Search this database for a wide range of
volunteering opportunities in the UK. From here you
can link to the various volunteer bureaus for your
area of the UK:
www.do-it.org.uk
The European Volunteer Centre
Lists member organisations in EU countries including
the UK and Ireland:
www.cev.be/member-organisations/
55Exploring possibilities
To find out more, visit our website at www.open.ac.uk/careers
Harris Hill
A UK charity recruitment agency, covering a wide
range of jobs and locations:
www.harrishill.co.uk
Beanstalk
Beanstalk has trained and supported volunteers to
work in primary schools with children who have fallen
behind with their reading since 1973:
www.beanstalkcharity.org.uk
Voluntary Service Overseas (VSO)
www.vsointernational.org
Volunteers Centre Ireland
The national organisation responsible for organising
volunteering in Ireland:
www.volunteer.ie
Volunteer Scotland www.volunteerscotland.net
Further resources
OU Careers and Employability Services
For further information and resources go to
www.open.ac.uk/careers
56 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
57Making decisions and taking action
To find out more, visit our website at www.open.ac.uk/careers
03 Making decisions
and taking action
3.1	 Making decisions about your life 		 57
3.2	 Goals, restrictions and resources 		 58
3.3	Plan of action 						62
If you’ve developed self-awareness, explored
opportunities and now need to make decisions and
put them into action, this section is for you. It will help
you to consider the advantages and disadvantages
of different decisions, find sources of help and plan
for action.
You’ve probably put a lot of time into analysing your
life and career. You should have considered your
strengths, skills and experience, and researched the
occupational areas that interest you. Before going
on to make decisions, it’s helpful to look at the
framework within which you may be making choices
about the future.
There are several models of decision-making and
while no one style is better than any other, certain
models will suit different people, for example:
•	 The evaluative decision-maker will go through a
process of self-reflection which may at first seem
like indecision but will eventually lead to improved
self-awareness and identification of long term
career goals.
•	 The strategic decision-maker tends to have a
more analytical style. They will weigh up the pros
and cons of a situation to reach a fixed solution.
The strategic thinker believes that they construct
their own career path and will set the plans to
achieving their goal.
•	 The aspirational decision-maker will look for and
grasp opportunities as they arise. While their
career path may seem less clear and structured,
they have the ability to cope with uncertainty and
make the most of situations.
Do any of these styles ring true with you?
To explore decision making factors and styles further,
there’s a range of resources available at: https://
www.mindtools.com/pages/main/newMN_TED.htm
3.1	 Making decisions
about your life
It’s not our claim that everyone can achieve everything
they want. Obviously you have to be realistic, as life
imposes restrictions on us all. But many people don’t
achieve all that they’re capable of, because they’re
not clear about what they want to do and how to
make decisions. It’s important to aim for what you
want while being aware of what’s achievable.
One way to consider the range of options is to look
at your goals alongside your personal restrictions
and resources.
3.1.1 Managing your situation
Whenever you’re in a situation you’re not happy with,
you have four basic options. You might think about
them both in the short term and in the long term.
For example, you may be clear that long term you
want to change jobs, but in the short term you might
be able to ‘change yourself’ to make things easier.
•	 Work for change Try to change the situation to
make it more as you want it to be. If you’ve tried
unsuccessfully to do this, you’re left with the other
three options.
•	 Change yourself Examine your own attitudes,
behaviour, ambitions, skills, lifestyle and so on,
and consider how, if you changed any of those,
your situation might improve.
58 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Activity 3.1
What are your goals?
Write them down here. You may not yet have fully identified your goals but put what you can here and add
to it later.									
•	 Live with it This means much more than ‘putting
up with it’. You need a strategy to minimise
the aspects of the situation you don’t like and
maximise those you do. For example, you might
put more energy into activities outside your job
if you’re dissatisfied at work, change the way
you work so that it reduces your contact with
troublesome elements, or spend more time
doing the things you enjoy and cutting down
those you don’t.
•	 Leave Find a constructive way to move on out of
the situation, job, relationship or problem.
Pause for thought
Consider the four options.
Which could apply to your
present situation?
How will you approach this?
3.2	 Goals, restrictions
and resources
Whatever your decision about the four options,
you need a goal and a plan to get there. In the next
section we are going to look at your goals and then
examine the restrictions and resources that may
affect how you reach them.
3.2.1 Goals
What is a goal?
•	 Goals are what you want to get out of life.
•	 You may use other words to describe your goals –
results, outcomes, aims and ambitions.
•	 Unlike dreams, hopes, fantasies and wishes,
goals are specific and expect the outcome
to arrive.
•	 Whether short or long term, goals should be
realistic but challenging.
•	 Remember: your goals may change over time.
59Making decisions and taking action
To find out more, visit our website at www.open.ac.uk/careers
3.2.2 Restrictions and resources
We’re all affected by our own restrictions and resources. Sometimes the same thing is both a restriction and
a resource. For example, if you’re buying a house on a mortgage, it’s both a liability and an asset; a friend or
relative might need support but might also be a source of support to you.
Activity 3.2
What are your restrictions and resources?
Think about your resources – the things, people and attitudes that could help you. Then think about your
restrictions – the things you need to take into account or that may be problems. Write them down on the chart.
	 Resources	Restrictions
	Money	
	 Financial resources	 Responsibilities
		
	
	 Equipment, tools, premises	
	 I have	 I haven’t got
		
	
	 People, family, contacts	
	 Who can help me?	 Who needs my help or support?
	
	
	 Health	
	 Good points	 Bad points
	
	 Beliefs, outlooks	
	 Positives	Negatives
	 	
Pause for thought
Consider your answers. How will they affect the
kind of opportunities open to you?
Are there other things you need to consider?
For example, do you need to work
near your home?
Could you move to a new area?
Will my commitments to others
change over time?
60 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
3.2.3 Balance helpful resources against restrictions
Now look back to the restrictions and resources you listed. You’ve probably noted some factors that will help
you in the direction you want to take and others that you need to find a way round. You now need to consider
each of your goals in terms of all the resources that could be helpful or cause restrictions. The next activity will
help with this.
Activity 3.3
Look first at the example below. It was produced by someone who wanted to apply for promotion.
Each restriction is set against a helping resource, giving a balanced picture of the situation.
Example: Goal – Promotion			
	
	 Resources:	 Restrictions:
	 Line manager’s support	 Colleagues’ reactions
	 Personal ambition/determined	 Limited mobility
	 Prepared to take responsibility 	 Little experience of managing people
	 Project management experience	 No experience of managing budgets
Now balance resources and restrictions for your own goal(s)
Which of the goals you’ve listed in Activity 3.1 are the most important? Underline them.
Make the most of resources
Look at the resources you listed. What actions would help you to make the most of them?
	
	
	
Minimise restrictions
Now look at the restrictions you listed. What actions would help you to reduce their effects?
	
	
	
You’ve now listed actions you can take towards your goals, but there’s more to do.
61Making decisions and taking action
To find out more, visit our website at www.open.ac.uk/careers
Activity 3.3 continued
Bring actions and resources together
List the resources that can help you to carry out each step. Look at the example. ‘No experience of
managing budgets’ was listed as a problem.
Actions:	 Resources:
	 Attend course on finance for non-managers	 Internal training courses
	 Attend outside course in the evenings	 Local college has course
	 Find out about the budget process	 Line manager’s support
			 Family support
Now do this for each of the actions you listed.
Actions	Resources
	
	
Actions	Resources
	
	
	
Actions	Resources
	
	
Pause for thought
You should now have a much clearer
picture of what you really want and
what ideas you want to develop.
You should also be clear about
the main helping forces and
problems you need to deal with.
62 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
3.3	 Plan of action
The next stage is to bring everything together into
a detailed plan of action. This means taking a few
different steps:
•	 Setting out your goals (long, medium and
short term)
•	 Deciding which actions you need to take
•	 Identifying your restrictions and resources
•	 Working out a realistic timescale to achieve
each step.
If you monitor your progress by checking your plan
from time to time you can identify what you have
achieved, and then revise your targets if necessary.
And of course if you change your mind about your
end goal then you can go back to your original plan
to make necessary adjustments.
You should consider five factors when drawing up
your action plan:
1	 What you need to do
2	 How you are going to take action
3	 Resources that could help you (e.g. finance,
information, friends)
4	 When you will achieve your targets
5	 How you will know when you have achieved
your goal.
One way to approach this is to break each activity
down into small steps and keep it manageable.
Action plans work best when they are SMART
(Specific, Measurable, Achievable, Realistic, Time
based).
Using a structure like this helps you to break down
bigger tasks into smaller, more manageable ones so
that you stay in control, and have the confidence that
you can manage them.
You might want to complete action
plans for several goals.
Once you’ve done this, you’re
ready to start taking action.
Pause for thought
3.3.1 Back-up plan
You should always try to have a back-up plan. So,
keep an eye on progress and adapt your plan if
necessary. At this stage it might be useful to read
through the work you’ve done in this section, and
perhaps discuss your plans either informally with
a trusted friend or formally with a careers adviser.
You could also look at Section 6 ‘The Next Steps’.
To generate ideas for your back-up plan you may
find it useful to use an online tool such as Prospects’
Career Planner:
https://www.prospects.ac.uk/planner
Review
If you don’t manage to meet your goals it may be that
your first plan needs to be improved. If, after doing
that, you still find that you’re unable to reach your
goal, you might have to reconsider it. Ask yourself, ‘Is
it realistic?’ If it isn’t, think about ways to revise it.
To achieve what you want, it might be necessary to
go through several stages. You might need to gain
experience or qualifications, gather information or
get access to a particular resource.
You may have to cope with setbacks and frustrations,
but you’re setting out on a potentially exciting journey,
taking the first steps towards a new or resumed
working life, with all its potential for improvement and
advancement. Set aside time to review your goals
and see how you are progressing. Put a note in your
diary or ask someone to remind you.
Further resources
The University of Kent Careers and Employability
Service website provides detailed advice on action
planning at:
https://www.kent.ac.uk/careers/sk/
skillsactionplanning.htm.
To help you with your action planning we have
provided a template Action Plan and worked
example to help you put into practice the advice
covered in this section.
63Making decisions and taking action
To find out more, visit our website at www.open.ac.uk/careers
Mylong-termgoal	Shortandmedium	Actionsrequired	Constraints	Resources–whoor	Targetdate			
	termgoalsto			whatcanhelpme?	foractions
	achievinglong-term
	goal	
				
Tobecomea	Postgraduatecourse	Findoutabout	Difficultyoffunding	Exploreeducational	Nextweek
journalist	injournalism	courses		orcareer
				developmentloans	
		Applyearly		Investigatelettingflat	Bytheendofthe		
				foryearofthecourse	month			
	Gainrelevant	Writetolocal	Afraidofrejection	Friendwillprovide	Withintwomonths	
	voluntary/paid	newspapers		supportand	
	experience			encouragement			
		Writefreelance
		articlesandsubmit
	Takeaneveningclass	Findoutwhere	Cost?Motivationto	Checkifspecial	Tomorrow
	inshorthandor	classesare	complete?	arrangementsare
	word-processing	offeredlocally		possibleforpayment
				e.g.weekly
				Findsomeoneelse
				keentodoit
Activity3.4Showingaworkedexampleofanactionplan
Lookattheworkedexamplebelow,thenfillinyourownplanonthefollowingpage.
64 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Mylong-termgoal	Shortandmedium	Actionsrequired	Constraints	Resources–whoor	Targetdate			
	termgoalsto			whatcanhelpme?	foractions
	achievinglong-term
	goal
Activity3.4Youractionplan
65Making decisions and taking action
To find out more, visit our website at www.open.ac.uk/careers
Notes
66 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
67Getting the job
To find out more, visit our website at www.open.ac.uk/careers
04 Getting the job
4.1	 What do employers look for in graduates?	 67
4.2	 Matching vacancies 	 69
4.3	 Application forms 	 72
4.4	 The curriculum vitae (CV) 	 75
4.5	 The covering letter 	 92
4.6	 The interview 	 97
4.7	 Other selection techniques	 104
4.8	 What to do if you are not successful	 108
4.1	 What do employers
look for in graduates?
My advice for graduates is to make
sure you reflect on what you have
learned – both at university and in an
extra-curricular capacity – and be able to
articulate it in your applications and at
interviews; think about what transferable
skills you might have gained and how you
would apply your knowledge and
experience to different situations. If you
are able to get into that mode of thinking,
you will be immediately more attractive
to employers.
Carl Gilleard,
Former Chief Executive of the AGR,
in the Association of Graduate Recruiters’
Graduate Recruiter magazine,
What I did find was (and many OU
graduates find this too) the fact that I
had done my degree with the OU
counted for a lot. Potential employers
could see that I’d had life experiences
alongside my degree studies. I found
that I could answer the interview
question: ‘Can you deal with a heavy
workload and meet deadlines?’ by saying
that I had got all my assignments in on
time while simultaneously bringing up a
family – it showed commitment.
OU graduate
A report by the Confederation of British Industry
(CBI) in 2012 identified seven key employability
skills sought by graduate employers: self-
management, team working, business and customer
awareness, problem solving, communication and
literacy, application of numeracy and application
of information technology. The Open University
is integrating these skills into its curricula.
Underpinning them all is a positive attitude and
enthusiasm.
Table 4.1 overleaf is adapted from the 2013 edition
of What do graduates do? It shows what types of
skills employers want and how these specific skills
can be developed.
68 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Table 4.1. Skills that employers want and how they can be developed
Type of skill ‘Buzz’ words Examples of how the skills can be
developed through interests, work
and education
Self-reliance
skills
Self-awareness – purposeful, focused, 
self-belief,
realistic, assessing your own performance
Proactivity – resourceful, drive, self-reliant
Willingness to learn – inquisitive, motivated,
enthusiastic
Self-promotion – positive, persistent, ambitious,
accepting responsibility
Networking – initiator, relationship-builder, resourceful
Problem solving – how you approach problems, finding
and implementing solutions
Planning action – decision-maker, planner, able to
prioritise, identifying areas for improvement
OU study – carrying out self-directed
projects
Roles within your working situation
Involvement in community groups or
charities
Roles within the home – 
planning,
coordinating others
People skills Team working – supportive, organised, 
coordinator,
deliverer, reliability, adaptability
Interpersonal skills – listener, adviser, 
cooperative,
assertive
Oral communication – communicator, presenter,
influencer
Leadership – motivator, energetic, visionary
Customer orientation – friendly, caring, diplomatic,
respect
Foreign language – specific language skills
Caring responsibilities
Work responsibilities in a team
Fundraising for charity
Voluntary work
Member of orchestra or drama group
Sport
Guide/scout leader
Travel
General
employment
skills
Problem-solving – practical, logical, 
results orientated
Flexibility – versatile, willing, multi-skilled
Business acumen – entrepreneurial, competitive, risk
taker, customer service
IT/computer literacy – office skills, keyboard skills,
software packages
Numeracy – accurate, quick thinker, methodical, dealing
with data
Commitment – dedicated, trustworthy, conscientious
Roles within the home – budgeting
Roles within work e.g. use of IT, 
work
experience
Project work through study
Membership of local clubs,
committees and societies
Self-employment
Specialist skills Specific occupational skills – specialist relevant
knowledge, e.g. languages, IT
Technical skills – e.g. journalism, engineering,
accounting, sales
OU study
European Computer Driving Licence
(ECDL)
Language skills
Web design skills – use of
programming or coding languages
Blogging and using other social media
tools
First aid at work qualification
NVQ qualification
Source: HECSU, AGCAS, UCAS and AGR
We have categorised them into four broad areas:
1	 Self-reliance skills
2	 People skills
3	 General employment skills and
4	 Specialist skills.
69Getting the job
To find out more, visit our website at www.open.ac.uk/careers
The requirements an employer sets out in a job
advertisement are likely to be much more specific,
but it’s worth bearing in mind that candidates who
apply for ‘graduate’ jobs are also expected to
demonstrate at least some if not all of these skills.
Many OU graduates have lots of evidence with which
they can demonstrate these skills:
•	 experience of the world of work and working
environments both paid and unpaid
•	 commitment to their own personal development
demonstrated by undertaking OU study
•	 time management and organisational skills
required to successfully combine OU study
and other responsibilities.
Remember to use this evidence when you apply for
jobs! If you don’t shout about it, nobody will do it for you!
Be proud of being an OU graduate.
The time management, self-drive and
prioritisation it takes to manage your
own learning is something to be
incredibly proud of.
Graduate Programme Manager
The Co-operative Group	
OU graduates are highly valued by employers and
profiles of employers who are particularly keen to
recruit OU students and alumni are on our careers
website at:
http://www2.open.ac.uk/students/help/employer-
showcase
You will find a brief description of the company
accompanied by a link to their website. There may
also be case studies and other information to help
you gain a better understanding of the company.
See our online vacancy service, JobZone, for details
of vacancies from companies interested in recruiting
from the OU.
http://www2.open.ac.uk/students/help/jobzone
4.2 Matching vacancies
You’ve seen a vacancy advertised that you’d like to
apply for. Now you want to make sure you have a
‘match’. So, before finding out more about the
position, analyse the information you already have.
Even a brief newspaper advertisement can reveal a
great deal of useful information if you read between
the lines. Look at the advertisement and analyse it
under these headings:
•	 Style and language What’s the general style of
the advertisement – formal, low key, flamboyant,
attention seeking? What does this tell you about the
organisation?
What is the vocabulary used to describe the
organisation – ‘dynamic’, ‘multinational’ …? How
does the organisation see itself and what image
does it want to project? Do you feel comfortable with
its choice of words? Will your personality fit the
organisation? Are your values similar?
•	 Brief job description Does the work genuinely
interest you? Does it match your needs? What are
the key tasks? What skills are needed? Can you
produce evidence of your ability to deal successfully
with each task? How will you demonstrate your
potential for coping with tasks you haven’t handled
before? Is there anything that seems unclear?
•	 Qualifications Are they preferred or essential?
For example, do you need a driving licence, or
other specified qualification?
•	 Experience Is it preferred or essential – will you
be ruled out? What experience can you offer from
any aspect of your life that demonstrates close or
transferable skills?
•	 Qualities Note the language used to describe the
ideal applicant. Analyse each noun and adjective
for its implications. For example, ‘committed self
starter’ could imply that there’ll be little supervision,
but may also mean that no training is provided. You
may have to motivate yourself with little support or
encouragement, or even in the face of resistance.
Find out what this will mean in practice, and be
honest about whether your personality and needs
match what the employer wants.
•	 Location and geographical mobility How far would
you travel each day? Would you consider moving
house? If you need to travel around, how much of
a problem would this be for you?
•	 Prospects What opportunities are there for
advancement in this job? The employer may be
looking for evidence of your willingness and ability
to progress. If the opportunities seem limited, it’s
important to see how you can use it to develop
your skills and experience.
•	 Salary Usually a good guide to the level of
qualifications and experience required, but you have
to be aware of the going rate for that occupation.
What are you looking for, especially if there isn’t a
specified salary?
•	 Named contact Is a name given to contact for further
information? It’s a good idea to follow up such offers,
but be prepared when you do, as the contact will
form an impression of you from the very beginning.
Rehearse your introduction and be prepared for the
question, ‘What would you like to know about us?’
Be ready to highlight your suitability for the post.
70 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
4.2.1 Matching the requirements
Once you’ve analysed your advertisement, decide if it
interests you, and then request further details, such as
the job description and person specification. You need
to try and match yourself to the requirements of the job
to judge whether or not you want to apply for it.
The job description and person specification are
usually set out under headings such as experience,
qualifications, skills and personal qualities. They
Vacancy: Fundraiser for Scottish Wildlife Preservation Society
Key experience
requirements			 My evidence
Numeracy				 e.g. Treasurer of Residents’ Association:
			 •	 Draw up budget bids or plans within agreed guidelines and procedures for 	
				 submission to internal and external bodies.
				 •	 Responsible for assessing potential expenditure in terms of value for 		
					 money and taking appropriate action to ensure this is achieved.
Keyboard skills			 •	 Self-taught packages in order to produce a dissertation for my degree.
				 •	 Worked in Windows-based environment for numerous holiday jobs 		
					 – secretarial role.
Marketing knowledge	 •	 Temporary job (with full induction and training) over two summer holidays 	
					 as a market research interviewer.
				 •	 Marketing module completed as part of my degree studies (12 months) 		
					 – identifying, anticipating and satisfying customer requirements profitably.
Ability to work on own		 e.g. From recent employment, current part-time study:
				 •	 As a part-time student I have worked within a thirty-two week study 		
					 calendar and managed a weekly workload of reading, assignments, 		
					 tutorials and revision alongside a part-time job and voluntary work.
				 •	 I have worked unsupervised as a treasurer for a local Residents 			
					 Association for two years and have always met deadlines for reports.
Interest in wildlife 				 e.g. Active member of RSPB:
				 •	 I have organised several meetings between the RSPB and the local branch 	
					 of the Campaign for the Protection of Rural England to look at the decline 	
					 of the blue tit in Cheshire and preventive measures.
				 •	 I am a regional fundraiser for BTCV and the PDSA.
				 •	 I work alternate Sundays at the local animal hospital as a volunteer.
				 •	 I am an avid reader and subscriber of The Warbler and make regular 		
					 contributions to this national magazine.
Presentation skills			 •	 I have used PowerPoint to present information on the decline of local bird 	
					 populations to a community group and to councillors.
				 •	 I have also organised and facilitated presentations to local schools and 		
					 governors using a variety of media.
should specify what the employer is looking for, so
you need to consider how you can show that you
meet the requirements. (It might help to refer to
Section 1.)
Look at the following example. Here the key
experience requirements are listed, and the second
column shows how a candidate would provide
evidence of having the necessary experience. This
is a useful way of approaching any job advert, as it
helps you to focus on the important aspects as you
complete your application form or prepare a CV.
71Getting the job
To find out more, visit our website at www.open.ac.uk/careers
Activity 4.1
Begin by looking at an advert or job description for a position that interests you. If you don’t have
a specific one in mind you might look in a careers publication or website such as www.jobs.ac.uk
Alternatively, look at the job profiles on Prospects website:
https://www.prospects.ac.uk/job-profiles
Whichever way you choose, ask yourself:
•	 Does the work genuinely interest me?
•	 Does it match my personality, values, interests, needs?
•	 What are the key job requirements?
•	 What skills are required to perform them?
•	 Can I produce evidence of these skills?
In the box below, note down in the left-hand column the key characteristics and requirements of your
selected vacancy. In the right-hand column, try to produce evidence of your suitability against each point.
Vacancy/job description: 	
	 Key requirements	 My evidence
	
	
	
	
	
	
	
	
You can also try an activity on the OU careers
website to help you analyse potential jobs at:
http://www2.open.ac.uk/students/help/analyse-
potential-jobs
These kinds of activities are really helpful in
preparing for the completion of application forms or
for producing your CV. You should also take a look at
Section 4.4.6 on page 78.
72 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
4.2.2 What employers want
Many employers are moving towards a competency-
based style of assessment for evaluating candidates.
This requires the candidate to adopt a particular
approach if they are going to be successful. There
are definite techniques that can be employed to
greatly increase the chances of passing this stage.
The first hurdle may be a difficult one, because many
employers’ questionnaires are specifically designed
to fail a certain percentage of applicants.
For our application form we would
recommend spending three to four hours
on research and completion. Without a
good one, you will never progress to
the next stage.
UK Graduate Recruitment Manager
Logica
Competencies are the criteria that employers set
for each job. They show what you ‘can do’. Stating
this alone is not enough, as employers want you to
demonstrate your competencies through evidence.
Some job descriptions don’t mention competencies
at all – they talk about skills. Many employers use the
terms ‘skills’ and ‘competencies’ interchangeably, so
don’t worry too much about this.
The basic ethos of competency-based assessment
is that if you can demonstrate you did something in
the past, you can do it in the future.
A good technique to use when answering questions
on application forms or at interview is STAR:
•	 Situation – What was the situation and when did it
take place?
•	 Task – What task was it, and what was
the objective?
•	 Action – What action did you take to achieve this?
•	 Results – What happened as a result of your action?
When considering which example from your
experience to choose from when answering a
particular question, it might be helpful to use the
mnemonic RAPPAS as a guide:
•	 Relevant – Ensure your answer is describing the
skill being asked for.
•	 Action – Make sure you include something you
actually did, as opposed to what you learned, or
what you might do in a hypothetical situation.
•	 Personal – It is most important to state what you
did, as opposed to saying what other people did
or what happened.
•	 Positive – The answer will read better if the
situation has a positive outcome.
•	 Appropriate – The example needs to be
something you can talk comfortably about if
asked for more detail.
•	 Specific – If the question asks for an example,
then only one should be described, not a
composite of several.
Keep your examples specific, recent
and relevant. We want to hear how you
have used skills and behaviours in a
positive way so that we can see how you
would apply them in the workplace.
Graduate Programme Manager
The Co-operative Group
You may find some examples highlight numerous
skills or competencies. This can create overlap
where you find yourself repeatedly using the same
situation or example to demonstrate different
competencies.
In order to minimise the effects of this and to
ensure you utilise a range of evidence (e.g.
volunteering, OU study, employment, community
activities, hobbies etc.) try to take time to audit
your competencies and the answers that you will
provide. This way you can choose the strongest
and most relevant example to demonstrate each
competency in a targeted and thoughtful way.
73Getting the job
To find out more, visit our website at www.open.ac.uk/careers
The example below shows how full-time work as an IT technician and OU study can be used to provide
evidence of a range of different skills from the same example.
Team working	 IT technician: Full-time employment working in a team of 10.
Communication	 IT technician: Utilising communication methods effectively, with the ability to
	 explain problems and solutions to a range of different clients.
	 OU study: Academic writing style, report writing which can include 			
	 persuasion and critical reflection.
Organisation	 IT technician: Organising my workload. This can include working on several 	
	 projects and meeting tight deadlines.
	 OU study: Prioritising study commitments such as assignment deadlines and 	
	 self-directed learning alongside family life and working part-time.
Have a look at the OU careers website content on
how to plan your career for advice on analysing and
identifying your skills and qualities gained from study,
work and outside work www.open.ac.uk/careers.
Here are some examples of competency-based
questions for you to try out:
1.	 Self-management, problem-solving, analytical
ability – describe how your personal planning
and organisation resulted in the successful
achievement of a personal or group task.
2.	 Communication skills – can you summarise
key issues using logical arguments? Describe a
situation where you were successful in putting
your ideas across.
3.	 Self motivation, drive, energy, initiative – what is
your greatest achievement and why?
4.	 Analysis, problem-solving and creative thinking
– describe a difficult problem that you have
solved. State how you decided what the critical
issues were. Say what you did and what your
solution was. What other approaches could you
have taken?
The best way that mature students can
demonstrate the skills and life experience
that they have is within the competency-
based questions and within any questions
about work experience. And I have to
encourage mature students to be
extremely positive and to sell the benefits
of those skills and that life experience to
employers because it’s a significant
advantage over other candidates.
Rebecca Fielding, Gradconsult
Take a look at an example of a competency based
question that has been answered utilising the STAR
technique on our Careers website at:
http://www2.open.ac.uk/students/help/using-star-
technique
4.3	 Application forms
Application forms come in all shapes and sizes.
Some are designed for recruiting people for a
particular function or training scheme (e.g. graduate
engineer). Most are intended for a wide variety
of posts in the organisation (e.g. an NHS Trust).
Whatever format they come in though, the principles
for completing application forms are very similar.
Follow instructions carefully. If you’re asked to
submit an application form, don’t send a CV instead.
Often – but not always – you’re told that you may
also enclose a CV. If you do, it shouldn’t just repeat
what’s on your form. Use it effectively to include or to
emphasise information that you think is relevant and
isn’t allowed for on the form.
Keep the following points in mind when it comes to
completing an application form:
•	 The purpose of a completed application form, like
a CV or a speculative letter, is to get an interview.
•	 Your aim is to convince the employer that you’re
worth interviewing – you appear to be a suitable
candidate for the job and, also, the kind of person
the organisation wants to employ.
•	 The only information the selectors will have about
you is what you’ve given them in your written
application – emphasise the positive and leave it
to them to spot the negative. Convince them that
they need to see you.
74 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
•	 Remember that presentation can be as important
as content.
•	 Many larger employers ask you to complete
an online application. You can find some tips
on making applications online on the careers
website:
http://www2.open.ac.uk/students/help/applying-
online
•	 When completing online forms you may find that
some of your experiences do not fit neatly into the
categories provided. We suggest you contact the
employer for advice on how to approach this.
If you haven’t looked at employers’ application forms
for some time, you may be surprised at the probing
nature of some of the questions they ask, and not
only for senior jobs. You’ll come to some sample
questions below in Section 4.3.2.
Bear in mind that employers often receive a lot of
forms. This means that on an initial read through they
may spend as little as two minutes looking at your
form, so it is crucial that you sell yourself effectively.
4.3.1 Before you start your
application form
•	 Find out as much as you can about the vacancy
and the organisation. Ask the organisation for more
details (for example, a detailed job description
and person specification) and, if possible, visit a
careers service or large library to look for other
information. You can also research online, as most
organisations will have comprehensive information
on their websites. Have a look at the ‘about us’
page on the company website. This can provide
you with useful insights into the company history,
values and mission statements.
•	 Read through the whole form before you fill in any
of the sections.
•	 You may find it useful to make a photocopy of the
blank form (or print it from the screen) and use it
for your rough draft.
•	 Comply with instructions such as using black ink
or block capitals. You must keep to the prescribed
format, because many large employers now
optically scan applications to enter them into their
recruitment databases.
•	 Usually, the space allowed for each question
indicates its relative importance.
4.3.2 Filling in your form
•	 Complete all sections of the form. If a question
doesn’t apply to you, write ‘N/A’ or ‘Not applicable’
to show that you haven’t overlooked it.
•	 If there isn’t enough space for factual information
(e.g. ‘Give names, addresses and dates of all
previous employers’), attach a separate sheet,
unless you’re told that you must not attach any
other papers.
•	 If there isn’t enough space for general interest
information (e.g. ‘What have been the significant
factors in your life to date?’) prioritise and keep it
within the space allowed.
•	 Be sure to answer all the elements of each question
(e.g. ‘What are your spare time activities, what do
you contribute and what do you get out of them?’).
•	 Don’t cram sections too full, as that makes them
difficult to read. Layout can help – consider using
bullet points, underlined topic headings, etc. to
clarify your points. Being able to write succinctly is
evidence of your written communication skills.
•	 When answering extended (multi-part) or difficult
questions, think of:
–– What you’re going to say (understanding the
purpose of the question)
–– Who you’re saying it to (someone who doesn’t
know you but will make decisions about your
future)
–– How you’re going to say it (presenting an
accurate picture of yourself)
–– Why you’re saying it (showing that you have the
qualities, interests and skills the employer is
looking for)
•	 Make your points relevant, interesting and personal
(say ‘I’, not ‘we’). Give evidence and avoid bland
generalities (e.g. ‘I worked as a volunteer classroom
assistant for three years’ rather than ‘I love children’).
The skills you’ve developed in one context may well
be transferable to another and employers will look
for evidence that you recognise them: e.g. dealing
with members of the public, working under
pressure, handling money, working odd hours.
•	 Use positive language.
•	 Leave no unexplained gaps in your employment
record. If you’ve been unemployed, say so; but
mention any part-time or voluntary work you did
during that period. Look at Section 6 if you are or
have been an offender.
•	 Tailor your responses to the post you’re applying
for. If you’re applying for a job related to your
degree subject, give fuller details of your course
than you would if it’s not particularly relevant.
75Getting the job
To find out more, visit our website at www.open.ac.uk/careers
•	 Use the ‘any other information’ section to draw
attention to activities and qualities not covered
elsewhere on the form.
•	 Be convincing. Be positive and honest. Inaccuracy
in one section can raise doubts about other areas
of the form. Generalised waffle convinces no one.
•	 Get your referees’ agreement before giving their
names, and keep them well briefed so that they
can write supportive references. Usually, one
should be an academic referee; another someone
you’ve worked for who can write about you as an
employee. If appropriate, give their full titles and
status. For more information on how to get a
reference from the OU go to:
http://www2.open.ac.uk/students/help/references
4.3.3 Supporting or personal statements
In application forms employers are increasingly
asking candidates to indicate their suitability by
explaining how they match the requirements and
responsibilities of the job role. This is usually
addressed in the blank section of the form that is
referred to as the supporting or personal statement.
Useful tips:
•	 Write in continuous prose broken up by small
paragraphs. Do not copy sections of your CV.
•	 Use the person specification ‘essential’ and
‘desirable’ criteria to inform the content of your
statement.
•	 Demonstrate how your skills, experience and
qualifications match the employer’s requirements.
•	 Use evidence and examples to back up your
statements.
My best advice for people completing
a personal statement is to be honest
about who you are and your absolute
strengths and key talents. So think about
those things that you really can offer an
employer that are different, that are
exceptional, that are real strengths and
talents and combine those together as a
statement.
Rebecca Fielding, Gradconsult
Activity 4.2
Read the sample questions below. All are genuine
questions from graduate application forms used
by large companies. Look back at the answers
you gave to Activity 1.1 and consider answers
based on the evidence you’ve already gathered.
Question 1 On the first page of this application
you stated a preference for a particular job or
function. Explain why we should select you ahead
of other candidates.
There is 30mm space available on the form to
show that you understand what the job involves
and what you have to offer. Go for key points and
give evidence from your record.
Question 2 Outline any activities you have
planned and organised. Tell us what you did and
how you achieved results.
There is 80mm space available on the form.
Remember to cover ‘planned,’ ‘organised,’
‘what you did’ and ‘results’.
Question 3 Write a short autobiography.
Include such details as your achievements and
responsibilities; the people, events or experiences
that have influenced you; your ambitions and
aspirations.
There is 180mm space available on the form to
influence the selectors. This section will tell them
more about you as an individual than any other part
of the form. Every word should justify its inclusion.
You’ll need a lot of time, drafts and fine tuning.
Don’t forget that you can ask a careers adviser
for advice on what to include in your application.
4.3.4 Skills you have attained as an
OU student
As an Open University student, you can stress the
personal qualities and skills that OU study demands.
Every employer values determination, self-discipline,
flexibility and time management skills. Make the most
of these skills as well as your academic success.
You may be able to look back at the module
descriptions for the courses that you have studied
and pick out the kinds of skills that the course
aimed to develop. These may have been expressed
as learning outcomes. Learning outcomes will
give you some help in mapping out the skills and
achievements that you gained during OU study. They
can help you identify the subject-specific knowledge
and transferable skills you have acquired during
each module.
76 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Some jobs may require subject-specific knowledge
(e.g. to be a teacher) while some put emphasis on
transferable skills (which you dealt with in Section
1.2.5) and some look for a mixture of both. You will
find that by studying with the OU – whatever the
subject area – you will have developed a range of
both subject knowledge and transferable skills that
many employers will value. It is up to you to pick
these out from your own experience so that you can
present this on an application form. If you want to do
this in a more structured way, there are a number of
resources on the careers website at:
www.open.ac.uk/careers
under ‘Applying for jobs’ in the ‘CVs, applications and
interviews’ section
It’s also important to focus on what you can do rather
than anything you can’t. When writing an application
you are advised to focus on the positives, selling
your skills and abilities. You must be truthful, but are
expected to omit any deficiencies, e.g. you should
never state that you ‘don’t have relevant experience’.
It is up to the prospective employer to deduce that
from the information.
So try and stay positive about your skills and abilities,
especially as you are expanding and enhancing
them through your Open University studies.
4.3.5 When you’ve completed the form
•	 Check it thoroughly for spelling and grammatical
errors; ideally get someone else to check it rather
than relying on a spell checker. Make sure you’ve
been consistent in style (e.g. in your use of
personal pronouns).
•	 Look over the presentation. If possible, ask
someone else to look over your application before
you send it to make sure it makes sense and
comes across positively.
•	 Make a note of the job you’ve applied for, the name
and address of the person you sent the form to,
and the date you sent it.
•	 Use an envelope of suitable size so that the form
isn’t folded, or not more than once. Always send
it by first class post. If you are completing an
online application, you will usually receive an
email when it has been received.
•	 Make a copy of your completed form so that you
can re-read it before the interview. It’ll also take
some of the tedium out of tackling other forms.
You can often use the same material, with a little
editing, for several applications.
You’ll rarely find the perfect application form that
exactly suits your background and experience. You’ll
need to adapt your answers to the questions you find.
Practise answering the typical questions in activity 4.2.
4.4	 The curriculum
vitae (CV)
Creating an up-to-date CV is a really useful way to
assess and record your current skills, experience,
achievements and strengths. On reflection you may
identify gaps in your skillset; do not worry if this is
the case as it will allow you to plan how to address
and develop the skills you lack.
Like an application form, a CV is primarily intended
to make the recruiter think it worthwhile interviewing
you. Realistically employers do not have time to read
your CV at their leisure. Research has shown that
you do not have long to make an impact - Recruiters
spend approximately 6 seconds reviewing a CV! It is
important that you make your CV relevant, concise and
targeted. The advantage of a CV is that you get to
decide what information to include and highlight, and
what to leave out or minimise. In addition, your CV
doesn’t need to conform to a set format so you have
more control over the impression it will create. You can
tailor the style, content and design to show off your
strengths and present you in the most positive light.
4.4.1 The importance of tailoring your CV
It’s most important that you keep in mind that one
I found the Careers Adviser very helpful
with tweaking my CV so that it was clearer
about my personal skills rather than just
work history.
OU Student
‘all-purpose’ CV will not be much use to you. This is
only likely to work if you always apply for the same
function in several very similar organisations. Instead,
it is more often much more effective if you adapt your
CV to suit the particular organisation or job you’re
applying for (easy enough to do if it’s word-processed).
Employers expect you to show that you’re responding
to their own advertisements, not sending out a batch
of identical CVs to a list of companies you found in
the Yellow Pages. (So you may in fact be doing just
that, but it must look as though you’re targeting the
individual company.) And you can reinforce this
impression by tailoring the covering letter.
77Getting the job
To find out more, visit our website at www.open.ac.uk/careers
For me the company was always going
to be more important than the role. The
role is different from what I thought I
would be doing, but it builds on my
experience, uses my new found knowledge
from the OU courses and there are some
exiting challenges [ahead].
OU Student
4.4.2 What style of CV?
The general style of the CV should depend on the
sector or organisation it’s addressed to. For example,
applications to marketing organisations or to the
publishing industry can be successful if the style
and layout suggest a flair for lively prose or graphic
design. To use the same approach for, say, a financial
institution or a local authority might have an adverse
effect. Bear this in mind when you design your own CV.
For more information on CVs, go to our careers
website and look at the ‘CVs, applications and
interviews’ section:
www.open.ac.uk/careers
Alternatively, for tips and example CVs, look at:
www.prospects.ac.uk/careers-advice/cvs-and-cover-
letters
We also provide sample CVs in Section 4.4.7.
4.4.4 What to include (and not to include)
in your CV
Your CV is uniquely yours in style, content and
layout, but you may find the following ‘do’s’ and ‘don’ts’
helpful.
CVs usually contain:
•	 personal data
•	 employment experience
•	 education
•	 training
•	 interests, activities
•	 additional skills
•	 career aims, personal profile (optional)
•	 volunteering (optional)
•	 membership of professional associations
(optional)
•	 references.
Personal data
Name: Give the name you want to be known by if
you’re called for interview or appointed. However, you
don’t need to give initials or middle names; they’re
unnecessary at this stage and may confuse matters.
Put your name in the centre in larger bold font instead
of giving the document the title ‘Curriculum vitae’. It
should be quite obvious what it is.
Address: Be sure to give a full address with postcode,
since invitations to interview are often sent at short
notice and speedy delivery is in your interest. Include
an email address, but make sure this reflects the
image you want to project. pinkfluffybunny@hotmail.
com will not promote a professional impression to
recruiters. If you include a link to your social media
profile, again, make sure this is professional.
4.4.3 Preparing your CV
How you organise and present information about
yourself and your activities will convey significant
messages about your suitability as a potential
employee. Be prepared to spend a considerable
amount of time on creating and reworking an
effective document. You want to make sure that you
present yourself positively and accurately.
So, when it comes to preparing your CV, you need to
ask yourself a few key questions:
•	 What’s the area of work I’m after?
•	 Which employers or organisations
am I approaching?
•	 What messages do I want to send about myself,
my strengths and qualities?
•	 What experiences shall I emphasise?
•	 How can the style of my CV match the culture of
the organisation(s) I’m sending it to, as well as the
work I want?
78 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
•	 If you had a series of short-lived jobs and you want
to abbreviate the list, you could say something like
‘In the five years 1995–2000 I worked in various
temporary positions in the catering industry’.
Whichever system you use, make sure it’s clear and
that the way you present starting and leaving dates
is consistent. Don’t leave any unexplained gaps. For
example, if you’ve had time out of paid work to bring
up a family, state this. If you have served time in
prison, please refer to Section 5.2 for tips on dealing
with this.
Education
How far back should you go? School or young
college-leavers should be quite explicit about their
education since age 16, but it’s more appropriate
for senior managers to include a brief summary of
schools or just the universities attended and exams
passed. There’s no need to include the full address
of each school or college – condense the information
to dates, names and towns.
Present your qualifications in the way that makes the
most of them:
•	 If the job requires a degree or diploma it’s best
to start with that, enabling the employer to see at
once that you meet the requirement.
•	 If you have no higher-level educational
qualifications, you could list secondary school
educational history in chronological order –
that can be easier to digest than in reverse
chronological order – but use the same order
you used in ‘Employment Experience’. If you’ve
worked your way up from the bottom and lack
formal qualifications altogether, you could
expand your work achievements and contract the
education section.
•	 If you’re offering professional qualifications
it might be worth specifying not only the
qualification (with the S/NVQ level, if appropriate)
and the awarding institution, but also how you
obtained it, e.g. full-time course or day release.
Telephone: It’s important to give a telephone number
where you can be reached or where a message can
be left. Include your mobile number if you have one.
If you’re employed and prospective employers can
contact you during office hours, give your number
and say that it’s a work number so that the caller will
be discreet. Always give the full area code, number
and extension so that you can be reached as easily
as possible. At home, consider investing in an
answering service or machine.
Other personal details: There’s no need to include
such details as date of birth, nationality, gender, marital
status or number of children. These are irrelevant on
a CV, where your aim is to get yourself invited for
interview. You can discuss them at the interview if
appropriate, when you have more opportunity to
negotiate any difficulties.
Employment experience
Your aim here is to stress your achievements at work.
Include start and end dates as well as job titles.
Include the nature and place of your employer’s
business if it isn’t obvious from the name, but don’t
give the address or the name of your manager at this
stage. For more recent jobs, say during the last ten
years, give more detail about particular responsibilities,
projects, assignments and results achieved, preferably
in quantitative terms. A one-sentence description
of the scope of your job, with figures such as staff,
budget etc., should be followed by a statement of
achievements. Avoid specialised language unless
you’re sure the reader will understand it.
There are different opinions about whether you
set your experience out in forward or reverse
chronological order. So much depends on the nature
and relevance of your previous employment to the
job you’re applying for. But everyone agrees that the
most relevant job should appear at the top of the list,
so that the reader is encouraged to read on. Some
possible sequences are:
•	 Put your present or most recent job at the head
of the list, with appropriate detail; then the rest of
the employment history in backward or forward
chronological order.
•	 Start with the most relevant work experience,
even if it’s not the most recent, then work
backwards or forwards chronologically.
•	 Divide your experience under the headings
Related and Other. This allows you to highlight
the experience the employer is likely to be
most interested in and play down other,
less important jobs.
79Getting the job
To find out more, visit our website at www.open.ac.uk/careers
For a technical post or one that requires special
knowledge, consider giving additional information
to show that you have the relevant work
experience, knowledge or training.
•	 Be specific about what you studied in your Open
University modules, highlighting in a covering
letter or skill section the personal qualities and
skills that this kind of study requires. You might
find the module descriptions for the courses that
you have studied very useful: pick out the kinds
of skills that the course aimed to develop, which
are often listed as learning outcomes. Learning
outcomes can assist you in mapping out the skills
and achievements that you gained during OU
study. They can also help you identify the subject-
specific knowledge and transferable skills you
have acquired during each course. Of course,
some jobs do require subject-specific knowledge
(e.g. to be a teacher) while others place more
emphasis on transferable skills (see Section 1.2.5
of this workbook). Some look for a mixture of both.
By studying with the OU – whatever the subjects
are – you will find that you will have developed a
range of both subject knowledge and transferable
skills that many employers will value. It is up to you
to identify them from your own experience so that
you can present this on a CV.
•	 If your qualifications were awarded overseas,
mention the UK equivalent so that the employer
knows what level you’ve reached.
Training
Don’t give an exhaustive list of all the training
courses and seminars you’ve attended. Include
useful information about training and development
– courses of a week or more, or training in relevant
specialist skills.
Interests, activities
This section has various uses. It can show that you
have a well-rounded life and don’t live for work alone;
that you’re a sociable person who gets on with
others; or that you keep yourself fit. Your hobbies
may have given you opportunities to tackle roles
and develop skills that you haven’t had scope for
at work – perhaps you’ve been a school governor,
run a computer club or done voluntary work that
demonstrates organisational and management
skills. An unusual hobby such as sky-diving or
genealogical research can be worth mentioning,
even though it has no obvious relevance to the job.
It gives your CV an interesting feature and makes
it memorable.
Use this area to bring out skills you
have gained: your involvement in sports
activities can be used to highlight your
team-working skills. Voluntary work can
demonstrate your planning and
organisation skills. We are looking for
enthusiastic people, so show that you
are enthusiastic about what you have
achieved already.
UK Graduate Recruitment Manager
Logica
Additional skills
The diversity of individual careers sometimes
makes extra sections desirable: you can make up
your own subheadings. Include details you think a
prospective employer really ought to know – driving
licence; additional skills such as foreign languages
(if possible, give an indication of your level of
competence), first aid training and so on. It is also
important to outline your level of IT and keyboard
skills, including software you are familiar with, e.g.
Word and Excel.
Career aims, personal profile
Including career aims and a skill profile can be
particularly effective if you’re seeking a career
change, you’re a mature graduate, you have an
unconventional record or you’re applying for a job
for which the competition is particularly keen.
Volunteering
Including details of volunteering activities can
demonstrate valuable skills and experiences to an
employer. Highlight your key achievements. This is a
great way to add a USP* to help you ‘stand out from
the crowd’. (*unique selling point)
Professional membership
Evidence of professional membership indicates
dedication to your career and for some professions
this is a requirement. Adding your level of
membership such as ‘student’ or ‘associate’ member
shows commitment to your profession.
References
You’ll usually need two referees, one your present
or last employer. Give their names, addresses and
telephone numbers, email address and their status
or relationship to you (e.g. line manager, course
tutor). If you don’t want your employer approached
80 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
at this stage, say so in your CV or covering letter.
You might prefer to omit referees on the CV and put
‘Available on request’.
4.4.5 Presentation of your CV
To produce an effective CV, pay attention to its
appearance as well as its content.
•	 Make it easy to read and follow. Yours will be one
of many that the employer has to read. Use an
‘easy-to-read’ font and size, such as Arial 11 point.
•	 Be consistent in how you present the information
(e.g. chronological order) and in your layout.
Have headings in the same style (capital letters,
bold, underlining). Use bullet points to make
reading quicker.
•	 Two sides of A4 is usually the right length (unless
it is a CV for an academic position, which is
usually longer because it includes listings of
published work and/or research). Consider using
an appendix for very detailed information such as
a list of publications.
•	 Don’t cram the page, or clutter it up with
unnecessary punctuation. Space makes text
easier to read and more attractive.
•	 Put the most important information on the first page
and as near the top as possible. The employer
may not bother to read on if there’s nothing of
interest to begin with.
•	 The space you give to each section should reflect
its importance. Concentrate on the aspects that
are most important for the employer to know.
•	 Avoid long, complicated sentences. Don’t use
clichés, jargon and abbreviations that the reader
may be unfamiliar with. Write the words out
in full the first time you use them and put the
abbreviation in brackets; after that you can use it
on its own.
•	 Seek other people’s views on your draft and
proofread the final version carefully.
•	 Your CV should be produced to a high standard,
word processed and printed or copied on
good-quality white or cream paper. Make sure
the copies are sharp and clear. If you need to
demonstrate an interest in design (e.g. for some
media jobs) more elaborate graphics and perhaps
coloured paper might be appropriate.
•	 Make sure that your CV arrives looking like
a quality document. Don’t fold it. Use an A4
envelope with cardboard reinforcement.
•	 If you send your CV by email, follow it up by
sending a hard copy straight away.
Keep a copy of your CV in a safe place. You’ll need it
again to adapt for other employers.
4.4.6 Analysing a job description
In order to construct a CV that’s effectively related
to the job you’re seeking, particularly if you want to
offer a targeted CV, you’ll need to analyse the job
itself. One way to do this is from the job description.
To illustrate this, we’ve chosen a description for
human resource management. It might be helpful to
read it alongside CV example 3, which is designed
for this area of work. Some of the key words in the
description have been emphasised, and the notes
that follow it suggest some inferences that can be
drawn from them about the nature of the work of
personnel management, and in particular the skills
it calls for.
Get the basics right. Check that there
are no spelling mistakes, text jargon or
missing information. At Enterprise
we are also interested to hear about
your extra-curricular activities, awards
and interests. It gives us an insight into
what you like to do outside work and
education, and helps us form
interview questions.
HR Director, Europe
Enterprise Rent a Car
81Getting the job
To find out more, visit our website at www.open.ac.uk/careers
Example
Human Resource Management
Advising on, developing and administering policies in relation to staff recruitment and training, career
development, industrial relations, general conditions of employment and other personnel matters.
Some typical tasks may include.
•	 Analysing staffing requirements in consultation with department and other managers, 			
		 (undertaking job analysis and evaluations as appropriate).
•	 Arranging for dissemination of vacancy details by internal and external means, 				
	 interviewing applicants and advising on the selection of those most suitable.
•	 Helping to undertake staff appraisals and, as appropriate, discussing career development, 		
	 personal welfare and other matters with individual members of staff.
•	 Advising management on standards of remuneration, working conditions, management/			
	 staff communications, staff promotion schemes and other matters.
•	 Assisting in negotiations in the field of industrial relations and ensuring observance of 			
	 regulations and agreements relative to personnel matters.
•	 Maintaining staff records, records of labour turnover and other necessary information and 		
	 assisting with human resource planning procedures and programmes.
•	 Words such as ‘analysing’, ‘evaluations’, ‘appraisals’, ‘human resource planning’ and ‘forecasting’
	 imply the need for skills in evaluating information and reaching appropriate conclusions.
•	 Words such as ‘arranging’ and ‘records’ imply the need for administrative skills.
•	 Words such as ‘consultations’, ‘interviewing’, ‘discussing’, ‘advising’ and ‘negotiations’
	 imply the need for skills in dealing with people, especially the ability to communicate effectively
	 with them.
The following examples of CVs illustrate some of
the points you should consider when designing your
own CV. The examples (all fictitious, by the way)
illustrate each of the four main CV formats in turn:
chronological, functional, targeted and academic.
None is perfect. (Indeed the academic CV shows
that the applicant studied medicine, which you
can’t do with the OU, but the style is standard for
academic CVs in general.) You may well decide
that a quite different layout and format are more
appropriate for your individual circumstances.
And bear in mind that covering letters, the subject
of the next section, would accompany these CVs.
Activity 4.3
Take some time to reflect again on the CV
guidelines and examples.
•	 If you already have a CV, ask yourself
whether it presents the information you want
to give in the way you want it to be seen.
•	 If you think that your CV looks feeble,
uninteresting, wordy or messy, it probably is.
It’s time to redesign it.
•	 Look again at the example CVs to see whether
any of the formats would be particularly
appropriate to convey what you want.
•	 Think about the general style of your CV in
relation to the person who’s going to read it.
•	 Make sure that you’ve:
		 - analysed the requirements of the job
		 - listed your skills
		 - composed your examples of
key achievements.
Then go ahead and construct or redesign
your own CV.
82 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
4.4.7 Examples of different types of CV
There’s no right or wrong way to write a CV. The right
one is the one that works for you in your situation and
succeeds in getting you interviews. Here we will just
provide some guidelines on good practice and offer
some examples of possible formats:
•	 chronological
•	 functional
•	 targeted.
We will also show some examples of targeted CVs
for specific purposes. Most people tend to prefer
one style over the others (though as you will see,
an academic CV is used mainly for applying for
academic posts). Whichever format you choose,
it should be flexible enough to allow modification to
match the job you’re seeking.
For most jobs, you need to make a decision about
the kind of CV to use as most employers will not
specify. However, some job areas have expectations
that a particular kind of CV is submitted. When
researching jobs, look at what the expectations
might be. It is important that you find out if there is
a preferred format for the type of job that you are
applying for by doing further research into the job
and if necessary seeking advice from a careers
adviser (or the professional body if there is one).
For instance, some professions, such as the legal
profession, prefer CVs in a chronological format.
When you have work experience that is directly
relevant, it is useful to highlight this in a separate
section as it draws attention to it.
The chronological CV
You are probably most familiar with a chronological
CV. This lists jobs by date, beginning with the most
recent, showing the name of each employer, where
you worked, the period you were employed, your job
title(s), responsibilities and key achievements.
The advantages of a chronological CV are:
•	 It can be very easy to produce.
•	 It has for many years been recognised as a
standard approach to CVs.
•	 It allows prospective employers to see very
quickly how an individual has progressed and
increased responsibility.
However, the disadvantages to a chronological CV
are that any gaps in your employment stand out.
As a result, if you’ve changed jobs frequently, it can
suggest instability and will require explanation –
particularly if you’ve changed profession or career
direction. In addition, with a chronological CV, it isn’t
always easy to spot key achievements or skills which
might get ‘buried’ under different job titles.
Daniel Rossi
16 Any Street, Portsmouth, XY11 3ZZ
Tel./fax 01234 123456	
email D-Rossi@nomail.co.uk
LinkedIn: www.linkedin.com/in/danielrossi
Career Summary
I am a highly motivated CIMA professional with in-depth knowledge of financial and management information systems.
My key strengths include: commercial and business awareness, strategic analysis, analytical thinking and a logical
approach to work.
Having successfully completed my Masters in Business Administration, and having developed my current role,
I am now seeking an opportunity to take on greater management responsibilities and challenges within a company
finance function.
Professional Qualifications	
2012 – 2016	 Masters in Business Administration (MBA)	 The Open University
		 Courses studied include Managing performance and change, Financial strategy,
		 and Business operations: delivering value.
2012 – 2013	 Professional Diploma in Management	 The Open University
		 Projects included analysis of change strategy within current company and a review of
		 accounting systems, including proposals for future developments.
2008 – 2010	 Chartered Institute of Management Accountancy exams 	 CIMA
		 All passed on first attempt
Continued
83Getting the job
To find out more, visit our website at www.open.ac.uk/careers
Career History	
2012 – Present	 Deputy Finance Manager	 Ace Holdings Plc Portsmouth
Achievements:	 • 	Planned and coordinated computerisation of the management accounts system: 		
	 			 required me to use high-level organisational skills and my ability to think strategically and
				 to deal with complex problems as the project progressed.
		 • Trained staff in the use of the new system: provided concise and effective guidelines and 	
				 designed a training plan. Ensured full staff engagement through involvement at all levels.
		 • 	Reduced the cost of supplies by 11% in 2009–2010: was able to make savings by thinking 	
				 creatively and identifying alternative methods of purchasing goods, as well as encouraging
				 the purchasing department to source new suppliers.
		 • 	Strengthened and simplified the reporting of financial information: each team was given 		
				 greater responsibility for reporting on their own accounts which led to greater transparency. 	
				 This required more of my time initially in coaching them through this process, but resulted
				 in more effective financial records.
		 • 	Researched a detailed marketing study leading to a refocused annual marketing plan.
				 This required me to consult and liaise with colleagues in marketing, and I developed a
				 greater understanding of their function as a result.
		 • 	Negotiated £2m loan for a major construction project: required me to research and present
				 our case. Represented the company in negotiations throughout the bidding process.
		 • 	Handled credit analyses and made credit recommendations.
2010 – 2012	 Management Accountant	 Southern Finance Plc Portsmouth
		 • 	Preparing regular financial statements and accounts, such as profit and loss accounts
		 • 	Analysing company performance
		 • 	Monitoring spending, costs and budgets
		 • 	Interviewing clients
		 • 	Supervising an office of nine staff.
2004 – 2010	 Accounts Technician	 Southern Finance Plc Southampton
		 • 	Assisting with ledger accounts and budget preparation
		 • 	Preparing statements showing income and expenditure
		 • 	Processing expenses claims.
Qualifications	
I started work as a trainee accounts clerk with Southern Finance, learning the job and assisting with ledger accounts.
From there I was quickly promoted to accounts clerk and began working towards professional qualifications.
Additional Information
• 	IT skills: use Microsoft Office and SAGE financial management software on a daily basis to write documents,
	 prepare presentations, store and manipulate data and produce financial reports.
• 	Part-time study of the courses described above required self discipline, time-management skills and determination. 	
	 I developed a much broader awareness and understanding of company systems and functions as a result of study.
• 	Keen member of a local amateur dramatics society, and have been stage manager for the last four years.
	 This provides an additional arena to further develop my organisational and people-management skills.
• 	Currently treasurer of my children’s primary school PTA. This requires careful thought on how to present financial 	
	 information to members of PTA who are without financial knowledge.
• 	My language skills include conversational Spanish and French. I have taken several evening classes to develop my 	
	 confidence when communicating on holiday.
• 	Full clean driving licence.
84 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
The functional CV
A functional CV focuses attention on your skills
and achievements, presented according to the
function or responsibilities you’ve undertaken rather
than according to individual jobs. This kind of CV
shows that you’re conscious of the demands of the
prospective employer and of what you have to offer.
Its advantages are:
•	 It can highlight your skills rather than job changes.
•	 If your current or most recent experience isn’t
related to the position you’re applying for, a
functional CV allows you to place more emphasis
on relevant strengths and experience from
earlier periods.
•	 You can group different achievements together
to match the job that you are applying for.
The disadvantages are that it takes more thought
to prepare a functional CV and you have to ensure
that it is clear and relevant to the chosen job without
looking as though you might be hiding something!
Sandra Edwards
5 Any Street
Cambridge XY11 3ZZ
Tel. 01234 123456
Mobile 01234 123456
email: Sandra@nomail.com
LinkedIn: www.linkedin.com/in/sandraedwards
PERSONAL PROFILE
A graduate biologist with strong industry experience in quality assurance, research and development and creation
of new products. Have up-to-date knowledge of quality management systems including ISO 9000. Capable of
achieving personal objectives, as demonstrated by the successful completion of my Open University degree
alongside full-time work. Goal orientated, with a clear and concise vision of future objectives. I am now keen to
find a challenging position that offers long-term potential in quality assurance and/or new product development.
SKILLS AND ACHIEVEMENTS
Analysis and problem solving
• 	Analysed the quality assurance system at Continental Kitchens Ltd, making recommendations for new 		
	 procedures, which led to an entirely new quality control system. This facilitated a faster, more accurate 		
	 means of inspection, saving £200K annually.
• 	Developed and instituted a statistical quality control programme to cover all critical control points in the 		
	 manufacturing process. The system alerts operators when to change the process parameters without 			
	 disturbing production flow.
Technical skills
• 	Created computer applications for environmental microbiological trends for control of plant cleanliness, 		
	 resulting in significant improvement in overall sanitation.
• 	Formulated new and improved food products, and contributed to the development of a new line of
	 Polish foods for wholesale distribution.
Communication skills
• 	Able to enthuse others and inspire a positive attitude to setting up new procedures, as demonstrated 		
	 by effective implementation.
• 	Excellent report writing and presentation skills, evident in work and successful university study.
Continued
85Getting the job
To find out more, visit our website at www.open.ac.uk/careers
CAREER HISTORY	
Quality Assurance Coordinator		 Continental Kitchens Ltd Cambridge		 2012 to date
• 	Responsible for managing and maintaining all quality control systems.
• 	Ensuring procedures conform to legislation.
• 	Creation of statistical programmes to help with the transition of quality assurance responsibility to
	 individual operators.
• 	Setting up a new product-recall procedure to facilitate any possible product retrieval due to failures
	 reported in post-manufacturing integrity testing.
• 	Supervision of the sanitation crew during microbiological clean-ups.
• 	Reviewing existing policies and setting up plans to improve quality systems.
Quality Assurance Auditor		 Continental Kitchens Ltd Cambridge		 2009–2012
• 	Analysing business statistics to measure performance against in-house and external standards.
•	 Auditing, sampling and testing production process to check product quality.
Career break		 Raising a family				 2005–2009
Research Technician		 Bow Wow Pet Foods Ltd Leicester		 2001–2005
• 	Formulating and improving product lines.
• 	Performing shelf-life studies on a range of products.
• 	Supervising in-plant testing of laboratory formulations.
• 	Analysing waste water to ensure it met government standards.
EDUCATION AND TRAINING
Member Chartered Quality Institute							2013
BSc (Hons) 2:1 in Biology		 The Open University				 2006–2012
Courses included: Health and disease, Environment, Living processes, Ecology, and Evolution.
Developed confidence in ability to analyse data, produce reports and in the methodology of conducting experiments.
Benefited from working with others at residential schools and tutorials.
2 ‘A’ levels: Biology (C) Mathematics (D) Huntingdon College			 1998–2000
GCSEs including English and Maths (Grades A-C) Parkside School		 1996–1998
Attained formal recognition for CQI training courses successfully completed, including:
Developing the skills of new quality managers Implementing ISO 9001.
IMS internal auditing and self assessment.
ADDITIONAL INFORMATION
•	 Spent a year after ‘A’ levels travelling the world: developed an appreciation of other cultures, an ability to
	 be very flexible in planning next steps and an interest in scuba diving.
•	 Served as a regional representative on the OU Students’ Association for three years and contributed to
	 student feedback on two courses in their first year of presentation.
•	 Excellent computer skills, including Microsoft Word, Excel and PowerPoint.
•	 Full driving licence.
86 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
The targeted CV
A targeted CV is even more closely matched to the
needs of a particular employer, with the skills required
and the evidence of them clearly laid out at the
beginning, followed by the details, dates and so on.
It combines elements from both the chronological
and the functional CV. Most candidates for
managerial posts use this format. The advantages are:
•	 It focuses straight away on your strengths.
•	 It is more likely to catch the reader’s interest.
•	 You can adapt it to suit the job you’re after without
sacrificing quality.
•	 You can lead the reader in the direction you want
to go – your skills and achievements.
The disadvantages are that, like the functional CV,
this one isn’t easy to prepare. It has to change to
match each job, with all the time, effort and skill
that implies.
Vigla Kozlowski
ADDRESS: 45 Longhurst Avenue, London, N10 8EP
TELEPHONE: 020 8887 5131	 EMAIL: Vkozlowski@wizard.net
LINKEDIN: www.linkedin.com/in/viglakozlowski
Career aim
Building on my previous experience of working in a large organisation at a time of change to train and work as a
professional personnel manager.
Skill profile
Project Management: 	As a project manager currently working simultaneously on a range of demanding
projects, I have been responsible for cultivating a spirit of teamwork and cooperation.
I have to be able to prioritise work within both strict financial and time constraints and
ensure that others do too. Sound judgement, combined with organisational sensitivity
and a high level of accuracy and attention to detail, have been essential to the success
of my section.
Teamwork:			 I am a member of a small steering group set up within the bank as a result of the recent
major changes in working practices. The work involves planning, implementation and
evaluation of new systems and their effect on staff at all levels. Both my work as a nurse
and in banking has demanded a high level of personal responsibility, autonomy and
judgement, whilst working in a team.
Communication:			 My experience has shown me the importance of good interpersonal and communication
skills. I have become used to seeking and learning from criticism, and to resolving
potentially disruptive differences of opinion. As important is my ability to express myself
clearly and effectively both face-to-face and on paper, in projects and reports.
Drive:			 I am hardworking and have always put considerable energy and enthusiasm into all of
my activities, believing that this is the key to achieving worthwhile results. I thrive on the
challenge of change, making sure that I always fulfil my function and deliver to deadlines.
Education
2001–2008			 The Open University. BSc. Hons, 2.1 in Psychology
					 Courses chosen to obtain recognition by the British Psychological Society.
					 Distinctions obtained in Social and cognitive psychology, in Biology: brain and behaviour,
and in Principles of social and educational research. My main research topic involved
interviewing a wide cross-section of both adults and children in small groups and on an
individual basis, devising questionnaires and analysing data.
Continued
87Getting the job
To find out more, visit our website at www.open.ac.uk/careers
1992–1997	 Parsifal Comprehensive, Finchley Road, London
	 Three ‘A’ levels: English (C), Biology (D), Chemistry (D)
Training
2006	 IPM Certificate in Personnel Practice
2001	 Lloyds Bank short in-house course in Personnel Management.
Work experience
2009 to date	 Lloyds Bank, Business Loans Section
	 Responsible for assessing loan applications and making loan decisions. This involves
initial discussions with individuals and, frequently for larger loans, working with the
personnel of companies and other institutions with a financial interest in the company’s
future. Section leader with responsibility for the work of six staff who report directly to me.
	 Banking attracted me because it offered a structured training and a wide range of
opportunities within each department. I would now like to broaden my experience into
personnel in a large retail organisation.
1999–2009	 Lloyds Bank, Recruitment Officer – Recruitment interviewing, in charge of four staff.
1997–1999	 Lloyds Bank, Personnel Assistant – Personnel administration, pay and pensions,
record keeping, three staff.
1996–1997	 Lloyds Bank, Counter Clerk – Responsible for serving customers, handling cash.
1993–1996	 North London Hospital, Student Nurse
	 Although I could have gone to university when I left school I had always wanted to be a
nurse, so I decided to train at the local hospital. However, during my training I realised
that this career was not for me. As I had enjoyed the studying and wanted to further my
academic studies in a related subject, I decided to apply for a job and combine this with
part-time study with The Open University.
Additional skills
•	 Sound working knowledge of Excel and Lotus 1-2-3 spreadsheets, Dbase IV and Q&A databases and 		
	 word-processing using Word and other Microsoft Office packages
•	Interviewing
•	 Psychological test administration and interpretation
•	 Car owner. Full, clean driving licence.
Activities and interests
•	 I am teaching myself to play the saxophone and enjoy getting together with my friends for
	 musical improvisation.
•	 I spend one evening a week as a volunteer tutor with a literacy project, working with adults on a
	 one-to-one basis and in small groups.
•	 I keep fit by swimming and running regularly each week.
Referees
Names available on request.
88 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Targeted CV for a career changer
Adding a section on any relevant work experience
(paid or unpaid) to your CV can be a shrewd move
when you are sending it to potential employers
in your desired career area. This will give your
application credibility as well as showing that you
are motivated and possess initiative.
You should create a targeted CV and an associated
covering letter (an example can be seen in Section
4.5) that gives you the best chance of achieving
your goal.
For advice regarding changing careers see
section 2.2.4.
Peter Evans
11 Wood Lane,
York,
North Yorkshire
QQ1 3ZZ
Tel: 01999 223344
email: p.evans@nomail.co.uk
Career aim
For the past 9 years I have been working as a Computer Technician for a local Health Authority. I have always had
an interest in environmental issues and six years ago I decided to take a degree course with The Open University.
I now consider this to be one of the best decisions that I have ever taken as it has made me see the potential of a
completely new career for me.
I have accumulated significant experience in the area of preservation of wildlife habitats and the associated
environment. Having completed my degree I am now committed to securing a challenging and exciting
opportunity in this area of work.
Education
2016				 BSc (Honours) in Environmental Science
					 Stage 1: Environment: journeys through a changing world; Exploring science
					 Stage 2: Environmental science; Geology; Practical environmental science
					 Stage 3: Ecosystems; Practical environmental project; Renewable energy;
					 Geological record of environmental change
					 The Open University
2007				 BTEC National Diploma in Computing (Distinction)
					 York College of Further Education
2005				 6 GCSE passes at grades A–C including A* in Maths and IT.	
					 Eskdale School
Relevant experience
Summer 2010: 			 Conservation Volunteer, Sea Turtle Protection Society, Greece
			 • 	Spent 4 weeks carrying out field work tasks and interacting with visitors to the island 	
				 promoting the work of the society
			 • Used initiative and determination to raise finances to fund trip
			 • 	Developed communication skills and patience to interact with other volunteers from 9 	
	 different countries, local people and tourists.
2008 to present date: 	 Conservation Volunteer, York
			 • 	I have participated in regular one-day conservation tasks including tree planting,
				 footpath construction and creating wildlife habitats.
			 • I have also organised and led fellow students in these activities.
Continued
89Getting the job
To find out more, visit our website at www.open.ac.uk/careers
Other work experience
Summer 2007 – 			 Computer Technician, York Health Authority
Present			 • 	Maintaining the computer network of the organisation on a daily basis
					 • 	Diagnosing and fixing faults on site
					 •	 Use of computer systems in searching for records and data input
					 •	 Upgrading existing hardware and software
					 •	 Servicing printers, scanners and other peripherals
					 •	 Carrying out scheduled maintenance checks
Summer 2006 – 			 Lifeguard/Assistant Swimming Teacher, York Leisure Centre
Present			 • 	Responsible for the safety of swimmers during public sessions
					 • 	Assisting Swimming teacher with coaching both adults and children
					 •	 Co-ordinating and supervising activities at the childrens’ swimming club
Positions of responsibility
• 	Treasurer of the York Conservation Society 2005–2012. Undertaking and organising practical conservation 		
	 trips at least once a week.
Professional membership
•	 I am a student member of the Institute of Ecology and Environmental Management (IEEM)
Activities and interests
•	 I still swim regularly
•	 I am a keen natural history photographer
Skills
•	 I am familiar with Windows, Microsoft Office and web design
•	 Basic First Aid (Module I)
•	 National Pool Lifeguard Qualification
•	 Full clean driving licence
References
Available on request
90 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
CV targeted at applying for work experience
A career in the law is one example of where you will
need to obtain some relevant work experience while
studying for your law degree, in order to become a
solicitor. You may try to arrange this for yourself or
you could apply for ‘vacation schemes’ run by the
larger law firms. Here is a CV that targets gaining
such experience and an example of a suitable
covering letter to accompany this CV can be found in
Section 4.5.4.
Amerjit Kaur
78, Aston Street, Coventry, ZX42 6XY
Tel: 06321 496284
email: a.kaur@nomail.co.uk
Personal profile
I am a highly motivated and organised team worker and am also used to working on my own initiative. I have extensive
experience of working with the public both in a Social Services Department and a Housing Association. I feel that this
experience has helped me to develop highly effective interpersonal skills and a tactful and discreet approach to
clients’ needs.
I am currently completing a Law degree with The Open University with a view to securing a legal training contract in
the next 12 months.
Qualifications
2016				 LLB (Hons) Law
					 Stage 1: Rules, rights and justice; Introduction to business studies
					 Stage 2: Understanding law; Law: the individual and the state
					 Stage 3: Law: agreements, rights and responsibilities; Law: ownership and trusteeship
					 The Open University
2014 			 3 A-level passes in English (B), History (B), Government and Politics (A)
					 2 AS passes in French (C) and General Studies (C)
					 Coventry Sixth Form College
2002				 9 GCSE passes at grades A-C including English, Mathematics, History, French
					 and Information Technology
					 Oakwood School
Law experience
2013				 Placement 	 Parkin and Munro Solicitors
					 I completed a short vacation placement for one week. I worked on a client project
					 which developed my team working and communication skills.
Work experience
February 2012 – 			 Housing Officer	 Alpha Homes Ltd., Coventry
Present				• 	Allocating vacant accommodation
					 •	 Overseeing property exchanges
					 •	 Assessing the needs of people applying for housing
Continued
91Getting the job
To find out more, visit our website at www.open.ac.uk/careers
					 •	 Dealing with issues such as anti-social behaviour, squatters and
								 broken tenancy agreements
					 •	 Setting rents and dealing with payments and arrears
					 •	 Arranging for legal action to be taken when other forms of legal action have failed.
September 2004 – 			Social Services Assistant	 Coventry City Council
February 2012			 I worked mainly with families, older people and children at risk. My duties included:
					 • 	Contacting clients and following up enquiries
					 •	 Advising clients and their families about the help that was available
					 •	 Visiting people at home to check on their welfare
					 •	 Working out client’s needs and devising care plans
					 •	 Keeping up to date with changes in the law
					 •	 Attending meetings with clients and other health and care professionals
Additional information
• 	I have a full, clean driving licence
• I have a current certificate in First Aid
Activities and interests
• 	Scuba diving
• Yoga
• Salsa dancing
• Indian cooking
References
Available on request.
92 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
CV for an academic role
For academic jobs in universities (such as lecturer
and postdoctoral research posts), it is expected that
candidates will produce an academic CV. These
CVs place more emphasis on the subject matter of
the degree and/or research, and on the knowledge
and achievements gained. They are likely to include
information on some or all of the following:
•	 the title of your PhD and the names of
your supervisors
•	 teaching/administrative experience
•	 professional memberships (if relevant)
•	 fellowships and awards
•	 conferences attended/presentations given
•	 a detailed abstract of research should be
appended to the end of the CV
•	 full details of publications.
Because of this, academic CVs are often longer
than other types of CV. You should also include three
referees rather than two.
•	 Remember to include examples of the skills that
you have developed through your research.
•	 If you are a postgraduate or research student who
is applying for a job outside academia, you should
consider a chronological, skills or targeted CV,
depending on what you are applying for.
In presenting your research, you should do this
without using any subject-specific jargon so that
it is understandable to the employer. Ask someone
who knows nothing about your research subject
to read through what you’ve written and check
it makes sense to the lay reader. Remember to
emphasise the transferable skills that you have
developed in undertaking higher level study,
such as communication, analysis and working
to deadlines.
There is more advice on CVs for PhD researchers in
the ‘CVs, applications and interviews’ section of the
careers website:
www.open.ac.uk/careers
Hilary Michelle McArthur
18 Poole Avenue, Milton Keynes, MK6 3DY
Tel. 07900 543 21
Email: h.mcarthur@yahoo.co.uk
EDUCATION
The Open University – PhD in Medicine 2012–2015
Thesis Title: The regulation of leukocyte migration away from the subendothelial compartment.
Supervisors: Professor R. Jordan and Dr. D. James
Project synopsis: Adapted, validated and implemented a ‘novel’ assay to investigate leukocyte migration
and survival.
Systematically investigated the role of soluble mediators and adhesive interactions in the survival of neutrophils
following transendothelial migration.
Identified phenotypic alterations in T-cell subpopulations following migration through an endothelial-fibroblast bilayer.
University of Manchester – MSc in Immunology (distinction) 2011–2013
Dissertation project: ‘Neutrophil spontaneous apoptosis is mediated through the acid sphingomyelinase dependent
generation of ceramide.’
Modules studied included: tolerance and autoimmunity; transplantation biology and cell adhesion; haemopoietic cell
differentiation and malignancies.
University of Salford – BSc (Hons) in Biochemistry (first class) 2008–2011
Dissertation project: ‘Autoimmunity: A genetic perspective.’
Modules studied included: cell biology; genetics; immunology; microbiology; oncology; and physiology. This was a
broad-based degree in biochemistry with the second year spent studying at Oregon State University, USA.
93Getting the job
To find out more, visit our website at www.open.ac.uk/careers
RESEARCH EXPERIENCE AND TECHNICAL SKILLS
•	 Development of static adhesion and migration assay.
•	 Adaptation of a novel co-culture system: culture stromal cells on the apical and basal surface of Transwell inserts.
•	 Image-based analysis of leukocyte behaviour in static and flow adhesion and migration assays.
•	 Microscopy: phase contrast and fluorescence.
•	 Isolation of leukocytes subsets and endothelial cells.
•	 Flow cytometry.
•	 Subcellular fractionation.
COMPUTER SKILLS
Extensive experience of Microsoft Word, Excel, PowerPoint and Prism, and a working knowledge of
WinMDI and Image Pro.
RESEARCH AND TEACHING EXPERIENCE
Tutor on an Open University Residential School, July 2015
•	 Trained undergraduates in basic laboratory skills
•	 Allocated tasks and ensured their completion.
•	 Marked undergraduate work and provided individual guidance to undergraduate students.
Student Mentor for The Open University’s Outreach Programme 2012 - 2014
•	 Responsible for communicating and demonstrating technical skills to A level science students at a
	 local college, as well as showing visiting work experience students laboratory protocols.
Laboratory Assistant, Scientific Laboratories, Salford, Summer 2004
•	 Worked independently on an assigned project.
•	 Developed technical writing skills for industry purposes, along with presentation and
	 communication skills.
PUBLICATIONS
Bennett, A., Jones, J. and McArthur, H.M., Transmigration prolongs neutrophil survival through a beta-2-
integrin-dependent adhesion signal. (Paper submitted to the UK Medical Biology Journal)
Bennett, A., Layerton, S. and McArthur, H.M., Identification of a phenotypically and functionally distinct population of
neutrophils in a model of reverse endothelial migration. American Journal of Medicine, January 2015
ABSTRACTS, POSTERS AND PRESENTATIONS
Bennett, A., Jones. J. and McArthur, H.M., Transmigration prolongs neutrophil survival through a beta-2-integrin-
dependent adhesion signal. British Society of Immunology, July 2013.
Bennett A., Layerton S. and McArthur, H.M., Rapidly recruited TNF-stimulated endothelial cells – is this a novel route
for neutrophil clearance from inflamed tissue? International Society for Thrombosis and Haemostasis, March 2015.
Bennett, A., Jones, J. and McArthur, H.M., Ceramide rich lipid rafts and acid sphingomyelinase activity
are required for spontaneous neutrophil apoptosis. International Conference, Manchester, 2014.
ACHIEVEMENTS
Received awards for best overall academic achievement and best dissertation project at the end of my MSc (2012).
Received award for best overall academic achievement at the end of my BSc (2011).
REFEREES
Professor Rebecca Jordan
r.g.jordan2@open.ac.uk
Dr David James
d.d.james1@open.ac.uk
Dr Steven Mayes
s.r.f.mayes@open.ac.uk
All referees can be contacted via
The Open University, Davis Medical Building, Milton Keynes, MK7 6AA or by phone on 01908 456 789
The above example of an academic CV has been published with the permission of the Association of Graduate Careers Advisory Services (AGCAS).
94 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
4.5	 The covering letter
Your covering letter is your opportunity to market
yourself. It introduces your application and draws
attention to the main factors that make you suitable
for the job. It will usually be read first, so make sure
that the reader will want to find out more about you.
It should enhance your application, not repeat what’s
on the application form or CV. Always include a
covering letter unless the employer specifically tells
you not to.
Application forms often allow you reasonable scope
to sell yourself and may need only a brief covering
letter. A CV will usually require more of an introduction.
4.5.1 Applying for a job in a vacancy list
or answering an advertisement
Mention the job title (including any reference number),
and say where and when you saw the vacancy.
Highlight your strongest selling points, such as a
relevant degree, appropriate qualification, related
experience. Stress how you think the organisation
can benefit from employing you. Add some other
detail to reinforce your suitability, without duplicating
what’s on the application form or CV.
4.5.2 Applying speculatively
Remember, a speculative approach is not allowed in
Northern Ireland.
If you’ve worked through Section 2 in this book,
you’ll know that to make a speculative approach
you have to present your case in a letter, usually
accompanied by your CV. Convey clearly what kind
of work you’re seeking, your qualifications and what
you have to offer. You’re trying to find out whether
there are any vacancies, or whether vacancies will
arise in the near future. At the same time you must
leave the impression that you’re someone useful for
the employer to know about. If there’s a vacancy
this will, if done well, translate into being someone
the employer ought to see. So make clear who
you are, where you are, what you’re studying, then
highlight the relevant points in the CV such as work
experience, interests and activities. Say why you
want to work for that particular organisation, and
when you would be able to start.
4.5.3 Drafting your letter
•	 Type or word-process your letter (though very
occasionally an employer will ask for a handwritten
letter).
•	 Use plain A4 paper of good quality.
•	 Keep it brief – usually not more than one side
of A4.
•	 Put your name, address, telephone number and
date at the top right-hand corner and, on the left-
hand side, the name, job title and organisation of
the person you’re writing to.
•	 Address your letter to an individual person by
name and job title. Switchboard staff can be
very helpful in supplying this information if it isn’t
otherwise available.
•	 When writing to a named individual, end ‘Yours
sincerely’. If you do have to resort to ‘Dear Sir or
Madam’, end ‘Yours faithfully’.
•	 Although you should be business-like, steer clear
of stilted expressions like ‘I beg to remain’.
•	 Make sure your spelling and grammar are correct,
and that you’ve expressed yourself clearly.
Ask someone else to read it – don’t rely on your
computer’s spelling check, especially as it may
be based on US spelling.
•	 Print your name clearly below your signature.
•	 You can use your covering letter to give additional
information such as reasons for an unusual change
in career, or highlight aspects of your CV which
you feel are particularly important.
•	 If there are any special circumstances not
covered in the application form or CV, such as
a disability and how you overcome potential
difficulties, mention them in the letter.
Keep a copy of your letter. If you haven’t received an
acknowledgement within two or three weeks, send a
brief follow-up letter or telephone to make sure that
it’s been received.
Four examples of covering letters are set out
overleaf. The first is a speculative approach asking
for an advice interview from a director the writer
doesn’t know. The second letter accompanies a CV
in response to a newspaper advertisement. The third
letter is applying for a graduate position, and the
fourth is from a student applying speculatively for
work experience in a law firm.
95Getting the job
To find out more, visit our website at www.open.ac.uk/careers
Example 1
Speculative letter
Joginder Singh
123 Warwick Road
Kenilworth
Warwickshire
CV8 1EJ
01926 850973
Mr George Black
Export Sales Director
Blank Distribution Company
5 Blank Street
Royal Leamington Spa
Warwickshire
CV35 8EE
10 February 2016
Dear Mr Black,
I noted in yesterday’s Financial Times that your company received an export award from the
Department of Trade and Industry, and I wish to congratulate you. Your success in selling
computer components to Asian countries has been something few companies have achieved
in the last few years. With your knowledge of exporting, I should appreciate your advice
concerning the development of my career.
Having had over ten years’ experience in export sales, including experience of exporting
electronic, and computer based control equipment, I am now seeking a career change that will
build on this experience.
Some of my key achievements have been:
•	 Locating new lines of products and developing international sales for them.
•	 Selecting and working with local distributors throughout the world.
•	 Increasing sales by 26 per cent in one year when the pound was at its highest exchange rate.
Although I would like to work for your company, your advice and suggestions would also
be helpful and influential in helping me research my options to develop my career. I should
appreciate a personal meeting with you and will contact you in the next week to discuss this.
Yours sincerely
Joginder Singh
96 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Example 2
Response to an advertisement
Margaret Minty
8 Milton Avenue
Edinburgh
EH10 3PQ
0131 668 1394
Mrs Shirley Barrett
Personnel Manager
Fairplay Industries Ltd
123 Evergreen Way
Milton Keynes
Buckinghamshire
MK10 8VS
6 March 2016
Dear Mrs Barrett,
Assistant Finance Director, Fairplay Industries Ltd.
I am enclosing my CV in response to your advertisement for the above post which appeared in
The Daily Telegraph on 1 March.
I am a qualified accountant with substantial professional experience. I have particular interest
in computer-based accounting procedures and posess extensive staff management experience.
Working in a team alongside other senior management colleagues, I have brought about a
sustained improvement in my office’s financial performance over the past five years.
I have recently taken voluntary redundancy as a consequence of a nationwide organisational
restructuring programme. My decision was based on a desire to change employers in order
to broaden my professional experience as I am keen to develop my career in a managerially
demanding environment. Having read the detailed description of the post, and discussed
specific aspects with the Finance Director over the telephone yesterday, I am confident that I
could make a significant contribution to Fairplay Industries Ltd.
Although I currently live in Edinburgh, I am free to relocate to another area and see this as a
positive addition to my professional and personal development.
I look forward to hearing from you.
Yours sincerely
Margaret Minty
97Getting the job
To find out more, visit our website at www.open.ac.uk/careers
Example 3
For a career change
										Peter Evans
										11 Wood Lane
										York
										North Yorkshire
										QQ1 3ZZ
To: Mr K. Jackson
Recruiting Manager
The Environment Agency
Midtown
MDT 8XX
9 April 2014
Dear Mr Jackson,
Vacancy for Graduate Trainee Consultant – Countryside and Environment
I would like to apply for the graduate trainee position within the Countryside and
Environment Sector. I enclose my CV for your consideration.
The opportunity to work for the Environment Agency appeals to me because of the innovative
nature of the organisation and the explicit commitment to protecting and improving the
environment. This training programme offers the opportunity to experience a range of
functions which correlate directly with my specific interest in countryside management and
my broader interest in the diverse project work undertaken by the Environment Agency.
I am specifically interested in the sustainability of habitats and the environment because it is
an area that I am familiar with and relates very closely to my academic studies. I have been
involved for 8 years in a local project which protects natural habitats through the planting of
trees and creating new areas for wildlife. I also spent 4 weeks as a conservation volunteer on
a Sea Turtle preservation project in Greece.
In terms of my suitability to the post, I have developed a strong technical skill set through
academic fieldwork and a range of practical project work.
However, I am conscious that this role requires more than a strong technical background.
My wider experience in the IT sector allied to my extra-curricular interests and activities
have enabled me to develop strong interpersonal skills, to communicate effectively, to solve
problems and to make sound decisions. These skills have become particularly evident
in my voluntary work for the York Conservation Society, where I have organised practical
conservation trips on a weekly basis.
Thank you for your time and consideration and I look forward to hearing from you in
the near future.
Yours sincerely,
Peter Evans
98 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Example 4
For work experience
Amerjit Kaur
78 Aston Street
Coventry
ZX42 6XY
06321 496284
To: Mr A. Sherman
Partner
Sherman & Wilkes
3 Royal Street
Coventry
ZX38 5PS
3 February 2016
Dear Mr Sherman,
I am writing to you to inquire about the availability of work experience at your legal practice in
the near future.
I am due to complete my Bachelor of Laws (Honours) with The Open University this year and I
am looking to enhance my experience by gaining a short work placement of one or two weeks
during June or July.
I completed a short placement with a local solicitor last year which I found very useful.
However, I feel I would be more interested in training with a commercial firm, and would like to
gain some experience in this sector before applying for training contracts next year.
I am interested in the aspects of legal work which Sherman & Wilkes can offer, including
probate, conveyancing and litigation, and the range of clients with whom you deal. I feel that a
short placement with your firm would provide me with an excellent insight into this work.
I feel that experience gained from my previous employment has equipped me with some
relevant skills which will be useful to me in a legal career. This included working in the social
services department of a local authority, where I was often responsible for interviewing clients
about their circumstances and personal situations. This called for good interpersonal and
communication skills, as well as a need for empathy and discretion.
I have enclosed my CV which I hope will be of interest to you. I look forward to hearing from
you in the near future if you feel you are able to offer me a short placement this summer.
Yours sincerely,
Amerjit Kaur
99Getting the job
To find out more, visit our website at www.open.ac.uk/careers
do most of the talking – in effect determining the
content, while the interviewer sets the format.
•	 A few seconds silence in an interview can seem
an eternity. Don’t be panicked into responding too
quickly, perhaps in an illogical way. Fill a thinking
gap with comments such as ‘That’s an interesting
question, I need a moment or two to think about it.’
•	 Always try to be positive in what you say and
never be critical of a previous employer.
•	 Guard against being too open.
•	 When asked whether you have any questions,
it can be useful to ask about future business
plans. If the interview has already covered that,
use the opportunity to add relevant information
about yourself that you haven’t had an adequate
opportunity to express.
From a careers advice perspective,
employers have always said to me that
they will always interview an OU
graduate because anyone who can
achieve an OU qualification is a certain
kind of person.
BA Open Graduate
From the vast amount of research into interviews as
a selection method, some important insights for
candidates emerge:
•	 Some interviewers make up their minds about
candidates within the first four minutes of an
interview, and aren’t easily swayed by factual
information thereafter. First impressions count;
initial answers are critical.
•	 Interviewers are more likely to be swayed by
negative information or behaviour on the part of
the candidate than positive. Interviews tend to
exclude rather than to include.
•	 Interviewers may be poor at assessing the
personality characteristics of individual candidates
with any validity, but they make very consistent
judgements and assessments between candidates.
This suggests that a good interview performance
is likely to impress.
•	 A candidate’s body language (for example, not
maintaining eye contact) in an interview can be
more important in determining its outcome than
experience or qualifications.
•	 Interviewers’ judgements about a candidate are
always made in relation to judgements about
earlier candidates, so the sequence of interviews
assumes an importance of its own. If you’re given
a choice, go first. You can set a standard against
which the others will be judged.
4.6	 The interview
Interviews remain the most common method of
filling vacancies.
There are different formats of interview you may face:
•	 Face-to-face: This is the most common, and can
be in the form of a one-to-one meeting or there
may be a sequence of interviews, each with a
different member of staff.
•	 Telephone: These are as formal as face-to-face
interviews, so you need to be well prepared.
•	 Panel: You will meet several interviewers in one
interview. Try not to be put off by panel members
making notes as you speak.
•	 Video interviews: Graduate interviews by video,
can also be used during the screening process.
This can be a live connection with an interviewer
or a pre-recorded video questionnaire.
Different types of interviews you may encounter are:
•	 Competency-based: Interviewers ask you
questions relating to the skills and competencies
needed for the job. You therefore need to know
what they are, and have prepared some examples
from your experiences to demonstrate them.
•	 Strength-based: A relatively new approach
to assess candidates. Questions are based
around what you enjoy doing, to identify where
your natural aptitudes lie. This method prevents
candidates from giving pre-rehearsed answers.
Here are some initial tips for interviews:
•	 Interviewers want you to do yourself justice. They’re
hoping that you’ll be an excellent candidate and that
the interviewing time and effort will be well spent.
•	 Interviewers too may be inexperienced or nervous.
It’s up to you to help them out and make them
feel comfortable.
•	 When faced with a panel of interviewers you
should address the majority of your response to
the interviewer who has asked you a question
whilst ensuring that you still have some eye
contact with the rest of the panel.
•	 Show acceptance of the interviewer as a person.
Remember that interviewers want to be liked and
hope to be supported in their day-to-day work
and career by your appointment. They’ll be asking
themselves ‘Could we get on?’ ‘Would this person
be supportive?’
•	 Balance the initiative-taking. The ideal interview
should flow like a conversation, reaching greater
depths as the rapport develops between the two
parties. Neither should psychologically dominate
the discussion, although as the candidate you should
100 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
4.6.1 Interviewers
Below we list the four main types of interviewers you
may come across. Don’t let your own stereotyping
of the interviewer affect your interview technique.
Remember that when managers interview they’re
playing a role to a set of social rules, and may not
be entirely their usual selves. Their perspectives may
differ according to their job function:
Human resource/recruitment managers
Well-trained and experienced, often astute and
very sensitive
Acting as internal screener, judgement valued
by others 	 	
Likely to concentrate on personality and
organisational ‘fit’
May have a fund of knowledge about
company culture	
Head of a group or department
A technical expert with wider
managerial experience
Will talk shop, problems, solutions, within a
broader organisational framework
May have standard questions, pick bits from CV
Concerned about your professional
competence and the rapport between you
Line manager or decision-maker
Trying to assess your style of working
Concerned about your motivation,
achievements and personal ambition
Considering how you’ll fit with the rest of
the team
May have to ‘sell’ you to more senior colleagues
Serious but relaxed, may try to ‘sell’ the job
Managing director or company founder
May digress into lengthy company history
Concerned about cultural fit; may look for
shared vision
May be looking for someone who’ll question or
act as an agent of change
Will seek views from all those who’ve come into
contact with you
You could read all the books ever written on how to
do well at interview and still not be good at it.
Practice is essential. Even experience as an
interviewer doesn’t make for a flawless performance,
for insight often leads to heightened anxiety. How you
project yourself through your social and communication
skills will determine your success whenever you
speak with potential employers. Find out all you can
about interviewing techniques and be ready to cope
with them:
•	 Read about the process. Consult some of the
resources listed at the end of this booklet.
•	 Think about the interview and plan for it. Try to
foresee questions or situations and work out
possible answers.
•	 Practise by role-play with a partner, careers
adviser or colleague, or use audio or video
recordings. How you sound will be crucial.
Practise speaking on the phone to a friend and
ask what impression you’re making. Practise some
answers into a voice recorder and listen critically
to yourself.
•	 Ask for comments from a partner, network
contacts or interviewers who have rejected you.
•	 Learn from observing others – take the role of
interviewer with a partner.
•	 Reflect on your experience. Evaluate your
performance and incorporate the learning into
your next interview.
4.6.2 Before your interview
•	 Research the job and employer again thoroughly
beforehand. If you can, find out something about
the people interviewing you.
•	 Review your CV or re-read your application form.
Why have you been invited for interview? What are
your unique selling points? Questions are likely to
focus on:
	 - your achievements
	 - your motives for applying
	 - your likely contribution.
•	 Prepare by marshalling your material in advance.
Collect as many concrete examples of things
you’ve done that clearly demonstrate your skills
as you can. Read the section on ‘Tough questions’
in Section 4.6.9 and practise some answers
out loud.
101Getting the job
To find out more, visit our website at www.open.ac.uk/careers
•	 Think about what kinds of skills may be important
to perform well in the job.
•	 Think about times in the past when you have
demonstrated your abilities, e.g. successful
projects; successful interactions with other
people; convincing a difficult audience; analysing
a large amount of information, etc. Don’t just
think about job-related examples – you may have
excellent evidence from your study, hobbies or
other activities.
•	 What are your weak spots and what do you feel
uncomfortable talking about?
•	 Why would you not employ yourself? Produce
convincing counter-arguments.
•	 Practise your answers in the weak areas. Ask a
careers adviser or a friend or colleague to help
you. Do it out loud, record it and listen to it again.
•	 Prepare some questions that you would like to ask.
Having questions prepared shows your interest in
and keenness to develop within the organisation,
e.g. ‘How is performance and development
assessed?’; ‘How is the job likely to develop over
the next two years?’
•	 Plan travel and arrival times, and if possible do a
dummy run.
•	 Decide what to wear. Show that you know the
interview ‘rules’ by wearing smart clothes,
polishing your shoes and so on. Conservative
dress is more likely to pay off than flamboyance.
Try the whole outfit some days before, so that if it
doesn’t feel right you’ve got time to change your
plans. Dress appropriately for the culture. If you’re
very unsure about this, look at company literature
or their website to get an idea of how people
dress. If there’s no suitable literature you could
telephone and ask the person on the switchboard
or the secretary of the person interviewing you.
4.6.3 On the day …
•	 Don’t smoke before you go into the interview.
•	 Don’t be overburdened with bags,
papers, umbrellas.
•	 Arrive in good time, allow yourself time to relax.
•	 If you are delayed, telephone.
•	 Remember the need for a poised,
confident first impression.
•	 Listen carefully and attentively to the questions;
ask for repetition or clarification if you don’t
understand a question.
•	 Remember to take a copy of your application
with you.
•	 Don’t forget to turn off your mobile phone.
4.6.4 How you sound
•	 Sound as if you have confidence in yourself.
•	 Speak clearly. Don’t drop your voice towards the
end of sentences, and don’t mumble or speak
too fast.
•	 Use plain language that doesn’t confuse the
interviewer, or divert off at a tangent. Avoid jargon
or clichés.
•	 Speak concisely, be specific, and judge when
you’ve said enough. Watch the interviewer’s
behaviour, which will give you clues to whether
you are answering the questions and timing your
replies appropriately. If in doubt ask ‘Would you
like me to go on?’
•	 Show through your answers that you’ve done
your research into the company and tailored your
answers specifically to them.
•	 Don’t just tell them what you think they want
to hear.
•	 Make sure you answer the question that is
being asked.
•	 Convey the right amount of enthusiasm, warmth,
friendliness and sincerity. Smile!
•	 Avoid negative statements.
4.6.5 Body language
•	 Walk and sit with good posture.
•	 Shake hands firmly and briefly. Some people need
to practise this.
•	 Use your natural gestures – there’s no need to
look frozen!
•	 Avoid fidgeting, and keep your hands away from
your mouth.
•	 Don’t fold your arms.
•	 Maintain good eye contact with the person you’re
speaking to.
Take evidence of your achievements
to the interview in a personal portfolio.
This will really help you to stand out from
the crowd and will aid your preparation
for the interview by reflecting on your
greatest achievements to date.
Graduate Programme Manager
The Co-operative Group
102 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
4.6.6 Answering questions
Whatever the nature of the job, the interviewer will be
working to a mental model consisting of three related
profiles, or groups of characteristics – your personal,
professional, and achievement profile. It’s your task
to provide evidence in your answers that demonstrates
these characteristics.
Personal profile	 Professional profile	 Achievement profile
Intellectual ability	 Knowledge	 Effectiveness
Communication skills	 Reliability	Efficiency
Listening skills	 Integrity	Economy
Confidence	 Commitment	
Job motivation	 	
Energy and drive	 	
Endurance	 	
Development	 	
Financial motivation
You also need to be prepared to adapt your
responses to the different kinds of question:
Specific questions invite factual replies, often with a
technical content, e.g. ‘What problems did you
encounter in the early planning stage of the building
extension?’
Open questions used by skilled interviewers
encourage expansive replies incorporating both facts
and attitudes or feelings, e.g. ‘Tell me about the three
years you spent studying with The Open University.’
Hypothetical questions test speed and quality of
thought, e.g. ‘What if the policy changed to carrying
more freight by rail?’ In reply be methodical, state
assumptions you’re making, and say where you’d
need more information, e.g. ‘Would this just be in
the UK or the whole of Europe?’ There is usually no
right or wrong answer – the interviewer is looking for
logical, clear thinking.
Competency-based questions look for you to talk
about your skills, qualities and competencies relating
to the job. The basic ethos of a competency-based
question is that if you can demonstrate you did
something in the past, you can do it in the future.
These questions would normally ask for an example
of a situation in which you have shown that skill, and
how you would deal effectively with it. Questions
often begin ‘Can you tell us a time when…’
Technical questions ask you to demonstrate your
knowledge of specialist concepts and terminology.
These often feature in engineering, scientific and IT
interviews.
If you would like further help on types of interview
questions you may encounter, have a look at the
interview preparation activity on the careers website:
http://www2.open.ac.uk/students/help/interview-
preparation-activity
4.6.7 After the interview
•	 Think about the questions and your answers.
Did you do yourself justice? Did you allow
negative information or negative expressions of
feelings to creep in? Did you find a particular
question difficult? If so, write it down to help you
prepare answers for the future.
•	 Send the employer an informal thank-you note
soon afterwards. This reinforces recollections of
you. Even if you’re unsuccessful this time, there
may be other positions coming up.
If you fail to plan, you plan to fail.
Pause for thought
They also threw in test questions. They
take one of your stated positives and then
ask whether you are weak in the opposite.
So my talk about liking new challenges
sparked the question if I was easily bored.
And I answered doing the same every day
would bore me rigid. Turns out they really
like the frank answers and the fact that you
don’t wiggle out of these.
OU Student
103Getting the job
To find out more, visit our website at www.open.ac.uk/careers
•	 Do you sound confident and interested, or
monotonous or tentative?
•	 Don’t forget to smile when you’re talking on the
telephone, as you would when talking to someone
face to face. The smile won’t be seen but it can
be heard.
•	 Standing up while talking can make you sound
more confident.
•	 Some candidates dress in the clothes they would
wear to an interview to put themselves in the right
frame of mind.
There’s some general advice about using the
telephone effectively in Section 2.5.2.
4.6.9 Tough questions …
Bear in mind that these are asked to
check how articulate and poised you are,
and how well you handle stress.
Graduate Recruitment Manager
Credit Suisse
Everyone has a different perception of what
constitutes a tough question. Here are some tips to
help you through them followed by some examples
and how to approach them.
In general:
•	 If you feel yourself under pressure, you’ll tend
not to listen so acutely. Ask for the question to be
repeated, take time and keep to the point. When
you’ve answered, stop and leave it at that.
•	 Try to show that you understand why the
interviewers have asked you the question. If you
can show that you know what they’re getting at,
you’re halfway to giving an appropriate answer.
•	 In response to embarrassing – rather than
simply tough – questions, keep your answer
simple and short.
•	 Always put a positive spin on your answers to
difficult questions. If you lack a particular skill,
try to emphasise how quickly you learn and can
develop this.
A wide range of questions is covered in Great
Answers to Tough Interview Questions by Martin Yate
(see the end of this section for further details). Look
through the next examples – you’re bound to come
up against some of them in one form or another.
•	 If you’re rejected, write a letter asking for some
constructive feedback by telephone, at the
employer’s convenience.
Seek feedback from the people who
are screening you out. They can give
tips for future applications and point you
in the right direction. You will have to
swallow some pride in making the call
but, if it helps you gain the job you have
always wanted, it’s worth a go. Each
failed application should be a learning
experience.
HR Director, Europe
Enterprise Rent a Car
4.6.8 Interviews by telephone
Increasing numbers of companies are using the
telephone in the first stage of the interviewing
process. They do this in several ways:
•	 Fully automated: you receive a letter giving a
freephone telephone number to ring. You hear
a list of statements and press a number on the
telephone keypad to indicate your response.
•	 Structured: a mutually convenient time is fixed in
advance for the interview. You’re taken through
a series of questions that are recorded and
analysed by trained interviewers. The questions
are designed to establish whether or not you have
the required skills for the job.
•	 Screening: you’re questioned on various aspects
of your CV or application form to decide whether
you’ll be invited to a personal interview.
•	 A sales exercise: you’re given an opportunity to sell
a product over the phone. This technique is used
for recruiting sales, marketing or telesales staff.
The advice that follows about face-to-face interviews
below applies just as much to telephone interviews,
but some things are especially important:
•	 Try to arrange the interview for a time and place
where you won’t be interrupted.
•	 Keep your application and any other pre-prepared
notes with you.
There are no visual cues so greater importance will
be placed on your telephone manner, tone and pitch:
•	 Do you speak loudly enough?
•	 Is your voice clear or do you have a tendency
to mumble?
104 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Examples of tough questions
and how to answer them
Q	 What are your strengths?
A	 You’ll have become aware of these
through your self-analysis. Draw on
examples from the three profiles –
personal, professional and achievement
– we discussed in ‘Answering questions’
above to produce a rounded picture.
Include any particular characteristics that
you feel relate to the job.
Q	 Tell me about yourself.
A	 Cover relevant aspects of your life, e.g:
	 Early years (if appropriate)
	 Education
	 Work experience
	 Significant events
	 Keep your answer short (three to four
minutes). This question needs practice.
Remember that this question isn’t simply
about your factual history so don’t give
too much detail. It is your chance to
provide an overview and at the same
time to throw in leads that you hope the
interviewer will take up.
Q	 What are your weaknesses?
A	 Don’t claim to be faultless! Most
strengths taken to the extreme become
weaknesses. Either choose one that
isn’t particularly significant, or pair
one with something that can be turned
from a weakness into a strength (e.g.
conscientiousness) to end on a positive
note. Or explain how you had a weakness
(e.g. time management) but have taken
action to overcome it. Use phrases like
‘learning a valuable lesson’ rather than
admitting to making a mistake.
Q	 Why should you be appointed rather
than an internal candidate?
A	 This is an invitation to list your main
strengths. Try to restrict yourself to four
or five as too long a list will confuse
the interviewer. Draw attention to the
possibilities of bringing in skills or
experience that the company would
benefit from, the fresh perspective of
an outsider, and the ‘political’ gains of
instigating change through appointing an
outsider. You could also provide evidence
of being a quick learner.
Q	 How much are you worth?
A	 Try to delay answering this until you know
the responsibilities and scope of the job,
and the typical salary ranges. Mention
your previous salary and any financial
commitments that lead you to raise or
lower your expectations. Negotiations like
this might seem strange to you if your
only experience is of fixed salary scales.
Q	 Having worked for one company for so
long, what difficulties do you expect in
adapting to our culture?
A	 Make it clear that you understand the
importance of the concept of culture
by mentioning the internal diversity of
companies and organisations you’ve
had contact with. Describe how you’ve
adapted to different subcultures you’ve
encountered by doing different jobs in
your career.
Q	 Isn’t it a bit late in your working life to
change career?
A	 It is perhaps unlikely that you would be
asked this, particularly in view of age
legislation introduced in 2006 but you
never know…! The interviewer could be
suggesting either that you’re too old to
adapt or that you haven’t got a realistic
appreciation of the demands of the new job.
	 Concentrate on the many positive
features of your greater maturity:
experience of life and work, credibility
with clients, emotional stability, coaching
and mentoring skills, domestic stability,
freedom from childcare. Then express
your motivation and drive, to counter
any thoughts that you might simply be
looking for a refuge. Add a balanced,
well-reasoned argument for your choice
of this new kind of work.
Q	 How have you tried to stay up to date?
	 (Age is commonly associated with
obsolescence of skills or knowledge
and ineffectiveness. There’s no research
evidence to support this assumption.)
A	 Quote samples of your own recent
learning, either at work or at leisure.
If possible, relate this to the job you
are applying for. It is also important to
emphasise IT skills and keeping up with
professional journals/research in the area.
105Getting the job
To find out more, visit our website at www.open.ac.uk/careers
Q	 How would you describe your
management style?
A	 Have a well thought-out answer ready.
You might start by briefly describing how
your style has developed as you’ve grown
in experience and social expectations
have changed. Concentrate on flexibility,
your variations in style according to
different people and different tasks.
Relate your answer in the final stages to
the job you’re applying for.
Q	 Why do you want to work for us?
A	 Your research will pay off here. Be honest.
A trite or bland answer will seriously
undermine your application. Include a
reference to how important work is to you,
and your hope that some of these needs
will be met.
Q	 What are your ambitions?
A	 Concentrate on your desire to do the
job well and to develop your skills
and confidence. Statements about
far-reaching ambitions should sound
realistic. Make clear statements about
your willingness to shoulder responsibility
and say that you would consider career
progression within the company at an
appropriate time.
Q	 Do you not feel that you might be over-
qualified (or too experienced) for the
position we are filling?
A	 A strong company needs highly
competent people with appropriate
experience to deal with current problems.
Uncertainties in the business environment
will probably lead to growth opportunities
for the company and you. Emphasise
that you are adaptable and respond
positively to circumstances and would not
necessarily expect to use all of your skills
in the first instance.
Q	 What were the circumstances of your
leaving your last employer?
A	 Keep your reply short and don’t touch
on any conflict or bitterness. Create a
favourable impression based on the
things you’ve done to help yourself.
Emphasise your desire to develop your
skills by moving to a more demanding job.
Q	 Why has it taken you so long to find a
new job?
A	 Finding any sort of job is easy; finding an
appropriate job takes time. Mention steps
you’ve taken to keep up to date, mentally
sharp and so on.
Q	 If you had complete freedom of choice
of jobs and employers, what would you
choose?
A	 Talk about the kind of work you’re being
interviewed for and why this company
interests you.
Q	 What interests you least about this job?
A	 Choose a routine activity (filing, filling in
expense claim forms), but be careful
that it isn’t a core function of the job.
Plead ignorance about other potentially
boring duties.
Q	 What sort of relationship did you have
with your last manager?
A	 Concentrate on understanding your
manager’s expectations and objectives.
Include examples of support and how
you kept your manager informed.
Q	 What things might make an application
from an OU graduate stand out to an
employer?
A	 The fact that someone has been able to
balance both a full-time job and study
at the same time. The level of motivation
required is impressive, and demonstrates
ambition and a desire to improve one’s
skills.
Time management, hard work and
commitment are probably the three main
attributes that I have developed through
studying with the OU.
Open degree graduate
106 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Activity 4.4
Here are some more examples of interviewers’
questions to think through yourself.
•	 Why did you decide to study with
The Open University?
•	 The classic three-part question:
		 What kind of people do you like to work with?
		 What kind of people do you find it difficult to
work with?
		 How have you worked successfully with this 	
difficult type of person?
•	 What are your short-, medium- and
long-term goals?
•	 Why have you decided to change careers?
•	 What are the main challenges facing
(e.g. the Health Service, education,
this company…) today?
		 Do you feel well equipped to meet those 		
challenges?
•	 None of your experience is at managerial level.
How would you cope with the transition?
•	 How long would you expect to stay here?
•	 How would you describe yourself?
•	 In your present/last job, what do/did you like
most/least? Why?
		 What was your greatest success?
		 What has been your biggest failure?
•	 What do you see as the most difficult aspect
of (e.g. this job, being a manager…)?
•	 How do you react to criticism?
•	 How do you feel about the progress you
made in your present/last position?
•	 In your present/last job, what do/did you
spend most time on, and why?
•	 Do/did you have any frustrations in your
present/last job?
•	 What did you learn from (e.g. your last job)?
•	 What is the most difficult decision you
have faced?
•	 What kinds of decisions are most difficult
for you?
•	 What area of your skills or professional
development would you like to improve?
•	 Describe your ideal job.
•	 Why should we appoint you?
•	 Have you any questions?
For academic jobs:
•	 What publication are you most proud of
and why?
•	 What do you see as the main benefits of
your research?
•	 Tell me about your PhD research assuming
that I have no background knowledge.
•	 What would you find easy about teaching
undergraduates and what would be
challenging?
Don’t forget that you can ask a careers adviser
for help in preparing for interviews.
4.7	 Other selection
techniques
Larger employers, aware that interviews have many
shortcomings, are increasing their use of additional
tools. One such tool is the use of assessment centres
– these are not places, but a technique (a mixture
of tests, exercises and interviews) for recruiting new
employees, particularly at graduate level. You would
normally find out about the way an organisation
uses these by researching their recruitment literature
or website.
4.7.1 Assessment centres
This approach has been defined as ‘the use of any
selection device, in any combination, beyond the
interview’. It can include situational activities, group
discussions, in-tray exercises and the like, as well as
interviews and psychometric tests.
If you are asked to attend an assessment centre,
here are some general guidelines:
•	 Don’t be intimidated. All the other candidates will
be nervous too. Because assessment centres are
more thorough, they are fairer to you.
107Getting the job
To find out more, visit our website at www.open.ac.uk/careers
•	 The company is looking to assess a range of
competencies. Each competency will be assessed
at least twice, so you will not be limited to just one
opportunity to demonstrate a particular skill.
•	 Decisions are made by drawing on all the
evidence; failure in one or two elements won’t
automatically mean rejection.
•	 Different assessors are involved so that there is a
more objective view of your skills.
•	 Try to focus on your own performance rather than
that of others and don’t assume that she or he
who shouts loudest will win. The ability to listen
and support others is also highly valued.
•	 Assessment centres sometimes have the advantage
that they give you longer to judge the organisation
and the people within it.
Treat the assessment centre as a two-
way process: use it as a chance to find
out more about the company. Have some
questions prepared before you go – the
interviewer will usually give you the
chance to ask them, and it looks quite
poor if you don’t seem to want to know
anything more about the company.
UK Graduate Recruitment Manager
Logica
Get yourself ready, both mentally and physically:
•	 Your invitation may include a programme of events.
Study it carefully, paying attention to any special
instructions. You might be asked to prepare
something in advance, or bring your own calculator,
for example.
•	 If you have a disability and need special
arrangements (e.g. induction loop, special seating)
discuss it with the selector in advance. If you wear
glasses for reading, make sure you take them
with you.
•	 Take the pens and pencils you like to write with.
A highlighter pen could be useful.
•	 In summer, choose something that’s cool as well
as smart to wear. You may face hours of hot sticky
work in examination conditions.
•	 Try to get a good night’s sleep beforehand.
When the time comes:
•	 Arrive in good time.
•	 Make sure that you know exactly what you’re
required to do. Don’t be afraid to ask questions.
•	 Go to the toilet before major exercises; they can
last several hours.
•	 Take care at social events: rich food and drink
dull the brain!
•	 Try to ensure that you talk to as many of the
company representatives and other candidates
as possible – don’t just limit yourself to one or two
who seem the friendliest.
•	 Assume that you’ll be closely observed the
whole time.
Further resources
For further information and resources on assessment
centres go to:
www.prospects.ac.uk/careers-advice/interview-tips/
assessment-centres
http://www2.open.ac.uk/students/help/assessment-
centres
To practice some of the things you might be asked to
do at an assessment centre, go to:
www.assessmentday.co.uk/in-tray-exercise.htm
www.assessmentday.co.uk/situational-judgement-
test.htm
4.7.2 Psychometric tests
Psychometric tests are structured pencil-and-paper
or computer exercises, often in the form of multiple-
choice questions. They’re designed to assess your
reasoning abilities, or how you respond to different
situations. The tests should have been carefully
researched and tried out to ensure that they’re fair
to everyone who takes them. Your results are usually
compared with how others have done on the tests
in the past. The tests are used in a variety of ways,
depending on the organisation and more usually by
large blue chip companies:
•	 as a selection exercise before an interview
•	 to accompany an interview selection
•	 as part of a number of selection exercises at an
assessment centre.
There are two main kinds of psychometric test:
•	 Aptitude, cognitive, ability or intelligence tests
These aim to assess your capabilities in tests of
reasoning: that is, the level and nature of your
thinking skills (typically, verbal, numerical and
perceptual skills).
•	 Personality questionnaires These gather
information about how and why you do things
in your own particular way. They look at how
you react or behave in different situations, and
108 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
your preferences and attitudes. Unlike aptitude
tests, they have no ‘right’ or ‘wrong’ answers.
The selectors aren’t looking for a rigidly ‘typical’
personality, although certain characteristics will be
more or less appropriate for the job (e.g. for sales
personnel, independence, social confidence and
persuasiveness would be considered important
characteristics).
Decisions about senior appointments are never
based on test results alone. In fact, a good test
can offset weaknesses in interview performance –
it never seems to work the other way round.
Tests are designed so that you have a few items to
practise on first, but if you’re anxious about them,
getting in some practice will probably make you feel
better. You will find practice tests at:
www.shldirect.com and
www.jobtestprep.co.uk/freepsychometrics.aspx
When it comes to completing the tests:
•	 Read the instructions carefully and follow
them precisely.
•	 Some ability tests have tight time limits and too
many questions to do in the time allowed.
•	 Others, such as personality and interest
questionnaires, have no time limits.
•	 Ask during the practice session if you
don’t understand.
Personality tests are easy to fake, but there are
dangers in trying to do this. For one thing, most tests
contain ‘lie scales’, for another, you’ll have to guess
what sort of personality the company is looking for.
Some selection procedures include a discussion
about the test results with a psychologist, and faking
then becomes very difficult to sustain. Honesty is the
best policy.
If you have a disability that you believe may affect
your ability to do these tests, it is advisable to talk
to the employer about this beforehand to discuss
whether there are any alternative arrangements that
would be appropriate for your situation.
4.7.3 Written exercises
Typically, you’ll be given a lot of written data and
asked to write a report, outline a proposal or draft
a letter. A suitable structure for your answer is likely
to be:
•	 A redefinition of the problem (by drawing out the
key issues).
•	 Setting out the main options, with their pros and
cons. Don’t ignore the possibility of recombining
parts of different options.
•	 Recommendation of an option, with your reasons
(is it practicable, and how?).
If you’re faced with a written exercise:
•	 Follow the instructions. Like examination
candidates, applicants who fail selection tests often
do so because they don’t answer the questions.
•	 What’s usually wanted is a business report, not an
essay. Make liberal use of subheadings and bullet
points to make your answer easy to read.
•	 Don’t spend so much time thinking and planning
that you haven’t got time to write the report.
•	 Don’t rework chunks of the brief. The marker will
be looking for original thought.
•	 Make assumptions explicit, and if more information
might be needed say what it is. If asked to do so,
come to a conclusion or recommendation, with
reasoning to support your choice.
•	 You won’t get any marks if the marker can’t read
your writing. If you have trouble with it, don’t use
a ballpoint pen – it tends to make things worse.
Concentrate your thinking and be succinct in your
expression so that you have less to write.
•	 Remember to put your name on all the sheets of
paper you use.
4.7.4 Presentations
These are often used as part of an assessment
exercise. They’re easy to set up and provide a useful
sample of logical thinking, communication skills and
persuasiveness. Sometimes you’re told the topic
before the day, sometimes during the assessment
centre, but you’re always given time to prepare, and
you may have access to audio-visual materials. You may
need to make your presentation just to the selectors,
or sometimes to the other candidates as well. There
could be questions afterwards.
Keep the presentation simple. Remember the rubric:
Tell ’em what you’re going to tell ’em
Tell ’em
Tell ’em what you’ve told ’em
Keep in mind some general advice about presentations:
•	 Whatever the instructions, see it as a task in which
you have to convince or persuade the selectors.
Talk directly to them. Make it a lively delivery.
Never read from a prepared script. How you say it
is as important as what you say.
•	 Don’t be tempted to produce complex visuals.
You’ll probably have only five minutes of
presentation time, not enough to do them justice.
•	 Keep a careful eye on the time; don’t over-run, but
make good use of your allowance. If you’ve been
asked to prepare in advance, practise so that you’ve
got the timing right. Candidates often fail through
producing two to three times too much material.
109Getting the job
To find out more, visit our website at www.open.ac.uk/careers
4.7.5 Group discussions
Three to eight candidates sit in a group and discuss
one or more topics, with the selectors acting as
observers. Very often you’ll be set a task as a group
or given a case study to look at. The observers
will be making notes about the quality of your
contribution (logic, verbal expression, relationship
with other participants).
•	 Be clear about the aims of the exercise: keep the
group focused on the task.
•	 Make an early contribution, but not necessarily
the first.
•	 Be supportive and pleasant to the other candidates.
Be cooperative; remember that getting the best
out of others is a skill in itself. You’re not going to
be judged on your ability to dominate.
•	 Mentally ‘stand back’ occasionally and evaluate
what’s happening. Intervene if there’s loss of
direction, or conflict between the other participants.
•	 Keep a careful eye on the time. If you have to
reach a decision within thirty minutes, remind the
group if necessary.
Make a point of discussing your strategy and
interpretation of the group discussion with the
interviewer later, even if you’re not asked to do so.
4.7.6 In-tray exercises
These simulations of the administrative aspects of a
job can be very taxing. You may be asked to respond
quickly (in timed conditions) to a number of typical
questions or issues that may crop up in a job and
say what you would do and how you would prioritise
tasks. They’re usually set in an unrealistic scenario
that prevents you from talking to other people in
the organisation (e.g. colleagues are ill, abroad,
it’s Saturday afternoon). The qualities most likely to
be assessed are analysis, organisation, decision-
making, judgement, and ability to communicate in
clear English. How to go about it:
•	 It may be possible to take the in-tray apart and
sort it into heaps. If you like to work like that, make
sure that it’s permitted. You may be allowed to use
the floor if the desk isn’t big enough.
•	 Read the instructions carefully and plan your
time accordingly.
•	 If the first part of the exercise asks you to set
priorities, follow this up by tackling the items
according to those you set. Don’t just put your
head down and plough through the lot. A well
constructed test in-tray will contain distracting
trivia, just like a real one.
•	 Look for links within an in-tray, and between in-
trays if there’s more than one. Signal in your
comments that you’ve spotted these links.
•	 Remain balanced in your judgement. A cleverly
constructed in-tray will generate emotional
responses that can cloud decision-making.
Staffing issues are most likely to spring this trap.
•	 Give reasons for your decisions; make reporting
and follow-up clear; set timescales; use your diary
and your secretary well. Treat the whole exercise
like real life, with appropriate levels of formality
and informality in your responses.
•	 You can be judged only on what you’ve written
down, not on what went through your head. Best
marks are obtained by candidates who produce
the largest volume of appropriate written output.
•	 Don’t be discouraged. Most candidates find these
tests tough.
It can be difficult, but try to relax and
enjoy the day. Employers want to see
what sort of person you are, what skills
you can offer now, and what you have the
potential to do in the future. Don’t try to
put on an act for the day – you will never
be able to keep it up for a whole career.
Surround yourself with positive people
before you go – if they are reminding you
about what a great asset you will be to
the company, you will feel more positive
about your chances and this will come
across on the day.
UK Graduate Recruitment Manager
Logica
4.7.7 Biodata analysis
‘Biodata’, a contraction of ‘biographical data’, means
that details of an individual’s history are correlated
with the biographical details of others who have
succeeded in the same occupation. The biographical
data need not have any recognised link with
performance, other than statistical correlation.
Information may be collected from the standard
application form, but often a special form is needed.
110 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
4.7.8 Proficiency tests
These tests are used to find out whether candidates
have the skills they claim – 120 words per minute
shorthand, for example, or 90 words per minute
word-processing. Related tests of ‘potential for
proficiency’ (trainability) assess characteristics such
as hand–eye coordination.
4.7.9 Medical tests
The job advertisement or person specification should
state clearly whether a certain level of physical fitness
is required. As well as general fitness, medical tests
cover sight, colour perception and hearing.
Pause for thought
Getting the job you want is always
a challenge, and may take time.
By taking the trouble to reflect and
to prepare, you’ll be maximising
your chance of success.
4.8 	What to do if you are
not successful
If you are not getting selected for interviews you can
take various steps to improve your chances:
•	 Review your CV or application form. Were they
tailored to the specific job? Do they promote you
in the best way?
•	 Ask others to give you feedback on your
applications. Talk to a careers adviser or
friends/colleagues.
•	 Think about whether you are applying for
appropriate vacancies. Do you have the skills
and experience they are asking for?
•	 Look at your job hunting strategy. Are you only
applying speculatively? Are you using a variety of
different methods to search for jobs? Do you need
to think about which sectors/employers you are
applying to?
If you are getting interviews but are not getting
any further:
•	 Ask for feedback from the employer. Finding
out where you fell short on this occasion should
provide invaluable advice to help you succeed
the next time.
•	 Review your interview technique: did you do
enough research beforehand? Were you prepared
for the questions? Ask yourself what you could
have done better.
•	 Talk to a Careers Adviser who can help you with
your preparation.
4.8.1 Handling rejection
If you have done all of the above, having asked for
feedback to make sure that you have interviewed
well, the next thing to bear in mind if you are rejected
is to try not to take it personally. It is not a criticism of
you; it is simply that in this instance you have been
unsuccessful. It doesn’t mean that they thought you
couldn’t do the job.
It may mean that someone with more relevant
experience has got the job, or that there was a
strongly favoured internal candidate. If you were
invited to interview it means that, on paper, the
recruiters believed you could do the job. Interviewing
is expensive and employers won’t waste time
interviewing someone they feel is not qualified for
the role in question. During times of recession
competition for jobs can increase significantly
and so it’s worth bearing this in mind if you are
unsuccessful.
It can help to reflect and make notes as soon as
you come out of an interview. This could be listing
what went well, what didn’t, and suggestions of
how you might improve. Once you relax after an
interview you may not remember as much detail. You
can also compare your notes to any feedback you
get by asking, ’How could I strengthen any future
application?’ Try and treat the whole experience as
something you can learn from.
Remember, it took J.K. Rowling a year to find a
publisher for her first Harry Potter book and some
of the publishing houses made what was, with
hindsight, an enormous mistake. It is important to try
and stay positive and focused and persevere with
your job search.
Pause for thought
Be prepared to invest time in your
job search; remember it can
take up to 3 months or longer
depending on the industry, and
this can be greater for more
high-level roles.
111Getting the job
To find out more, visit our website at www.open.ac.uk/careers
Further resources
M. Parkinson (4th edition 2010) How to Master
Psychometric Tests, Kogan Page.
M. Byron (2010) How to Pass the Civil Service
Qualifying Tests, Kogan Page.
M.J. Yate (7th edition 2011) Great Answers to Tough
Interview Questions, Kogan Page.
For more information on CVs, go to our careers
website and look at ‘Applying for Jobs’ section via the
‘Features’ tab:
www.open.ac.uk/careers
The Prospects website has useful information on
CVs, applications and interviews under ‘Careers
advice at:
www.prospects.ac.uk
The Jobs.ac.uk website has useful tips and advice
particularly for academic careers:
www.jobs.ac.uk/careers-advice
You’ll find help and advice about giving presentations
on our ‘Skills for study’ website:
www.open.ac.uk/skillsforstudy/giving-presentations.php
Think about your whole approach:
are you tailoring your applications for the
specific requirements of each company,
or do you have a tendency to ‘copy and
paste’ your information? If you are being
asked for examples of when you have
shown certain behaviours, focus on
what action you personally took and
what the result was – organisations are
less interested in the background and
situation (so keep this brief); they want to
know what ‘you’ did, not what ‘we’ did.
Head of Talent Management
Royal Mail
Notes
112 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
113Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
05 Equality and Diversity Issues
5.1	 Age	 113
5.2	 Criminal record 	 114
5.3	 Disability or additional requirements 	 118
5.4	 Gender 	 123
5.5	 Race 	 125
5.6	 Religion or belief 	 127
5.7	 Sexual orientation	 128
Equality Act 2010
In April 2010 a new single Equality Bill for Great Britain brought disability, sex,
race and other grounds of discrimination within one piece of legislation. This
discrimination law protects individuals from unfair treatment and promotes a
fair and more equal society. For up-to-date information on equality legislation,
please look at the Equality and Human Rights Commission (EHRC) website
at: www.equalityhumanrights.com. Note, however, that this Bill does not
apply to Northern Ireland, which has separate legislation providing similar
protections to individuals.
What the law
protects against
Discrimination
This includes:
•	 direct discrimination – treating a person worse
than someone else because of a protected
characteristic; for example, their age or race
•	 indirect discrimination – putting in place a rule
or way of doing things that has a worse impact
on someone with a protected characteristic
than someone without one, when this cannot be
objectively justified
•	 failing to make reasonable adjustments for people
with disabilities.
Harassment
•	 Unwanted conduct that has the purpose or effect
of violating someone’s dignity or that is hostile,
degrading, humiliating or offensive to someone
with a protected characteristic, or in a way that is
sexual in nature.
Victimisation
•	 Treating someone unfavourably because they
have taken (or might be taking) action under the
Equality Act or supporting somebody who is
doing so.
As well as these characteristics, the law also protects
people from being discriminated against:
•	 by someone who wrongly perceives them to have
one of the protected characteristics; for example,
a disability,
•	 because they are associated with someone who
has a protected characteristic – this includes the
parent of a disabled child or adult, or someone
else who is caring for a disabled person.
114 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
The same principles of career planning and job
seeking apply to everyone regardless of their
background. In this section we highlight some of the
additional challenges that may be faced by students
and graduates.
Many employers have well-developed equal
opportunity and diversity policies to help them
to recruit a diverse workforce. In fact, some
organisations aim specifically to recruit a workforce
that reflects the community they serve, and you will
often see this highlighted in job advertisements.
However, there is evidence that certain groups of
people are at a disadvantage and may experience
difficulty in achieving their career aims and
aspirations. This section will explore a range of
issues related to equality of opportunity in relation to:
•	 age
•	 criminal record
•	 disability or additional requirements
•	 gender
•	 race
•	 religion or belief
•	 sexual orientation.
Each section includes a discussion of some of
the issues you may encounter, the legal position,
strategies to help you in your job search and further
resources that you may find helpful.
For more information and links on job-seeking
strategies when facing discrimination, go to:
http://www2.open.ac.uk/students/help/equality-and-
diversity
Pause for thought
Keep in mind that disclosure of personal information
during the recruitment process can be a concern
for some people. The issues of whether,
when or how you should do so;
on your application form; on a
covering letter; before or during
an interview will be considered
later in this section.
We are also trying to promote diversity
and, while our diversity statistics are
relatively good for a law firm, we want to
do much more. I was thinking about how
to achieve a more diverse workforce
when an obvious thought struck me –
where better to find a group of diverse
students than the OU?
HR Director
Beechcroft
Activity 5.1
Note here any issues that could affect you at work, which you might like to discuss with a careers adviser.
115Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
5.1	Age
Are you concerned that, having completed your
degree, your age will count against you in the
job market?
5.1.1 Your rights
Equality law provides protection against
discrimination, harassment and victimisation on the
grounds of age.
The regulations cover:
•	 recruitment and selection
•	 pay and benefits
•	 training and promotion
•	 termination of employment, redundancy
and retirement.
Employers can only treat people differently on the
grounds of age if there is a genuine occupational
requirement (GOR); however, this defence is likely
to apply in very limited circumstances. Since April
2011, the default retirement age (DRA) has been
phased out. This means employers cannot force an
employee to retire at 65.
Employment law gives some employees the right
to request flexible working. These include parents
with a child under 17 (or a disabled child under 18)
and people helping to look after an adult relative
who needs care. An employee who has worked for
at least 26 weeks qualifies for the right to request
flexible working, and your employer can only refuse if
there is a clear business reason for doing so. It may
not be logistically possible to offer flexible working to
all members of staff in a services role.
The Employers Network for Equality and Inclusion
(www.enei.org.uk) states that ‘being an employer of
choice in an environment with an ageing population
means ensuring that employment policies and
practices are attractive to all age groups’.
Employers vary a great deal in their attitudes
towards age and recruitment and with the increasing
numbers of older applicants offering a wide range of
qualifications and experience, selection procedures
in large organisations are being reviewed.
Having a degree is not enough to secure a job.
Employers are looking for more than a qualification.
They are saying, ‘Yes, you have a degree and...’.
This is where you are able, as a more experienced
graduate, to offer a range of transferable skills and
experience to an employer. So, you need to present
your experience and skills positively and highlight
your ‘added value’.
5.1.2 How to help yourself
in the job market
Take a look at Section 4 on applying for jobs. Then
contact Careers and Employability Services to get
help with your marketing plan. Remember, hone your
CV to highlight that ‘extra’ you can offer to enhance
your application. This should also help you to feel
confident about what you can offer to the workplace.
If you haven’t had any recent work experience (paid
or voluntary), then you could consider exploring
your local options. For instance, look at the careers
website for contacts for volunteering opportunities,
or get in touch with Careers and Employability
Services. It’s not enough to think that because you
have completed a part-time degree, juggling study
and home responsibilities, and paid work, that you
are automatically going to be offered a job. This may
feel unfair, especially when you have used all your
spare time to get the degree in the first place. So,
plan ahead and make use of the study breaks and
any contacts you have to find out all you can about
the area of work you are interested in.
Many OU graduates have changed careers in mid-
life; some have started new careers in their 50s. You
do need to be clear about what you want and what
you can offer. And you must be determined and
active in your approach. Don’t be put off by negative
reactions if at first you don’t succeed!
Tell employers about your skills and what you
have had to do to get an OU qualification. Most
employers will be impressed by your commitment
and motivation.
Perhaps the most important thing to remember is
that if you see your age as a problem, so will an
employer. You need to think of all the skills and
abilities that you can bring to the role to which you
are applying, and be able to explain them positively
to a prospective employer.
Some areas of work look for maturity, and view
life experience as an advantage e.g. counselling,
psychotherapy, social work, occupational therapy,
teaching and archive work. Nonetheless, it’s vital –
whatever your aims – to research your chosen area
thoroughly and market yourself effectively.
As an older student, you are likely to have evidence
of successfully balancing and prioritising your
work, life and studies, and are demonstrating that
you can continue to learn and adjust to new settings.
Studying with The Open University also emphasises
your commitment and motivation to yourself and
career development, as well as your ability to
work independently.
116 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Here are some tips from the Association of Graduate
Recruiters (AGR) and the Association of Graduate
Careers Advisory Services (AGCAS) to help you
maximise your potential for job seeking:
•	 Produce a concise CV and match your experience
to the job requirements. Be prepared to produce
more than one CV.
•	 Fully research each employer, starting by using
the company website (if there is one available).
•	 Be confident if you are offered an interview as this
means your CV/application form has obviously
been successful.
•	 Use positive language in applications and
interviews and never apologise for your age.
•	 Create your own network using contacts from
previous jobs/friends/family.
•	 Identify the skills you developed in previous
work, studies and general life experience, e.g.
teamwork, communication, adaptability.
•	 Stress your ability to hit the ground running – you
know all about working for a living.
•	 Demonstrate your experience when making
effective business decisions and give examples.
•	 Highlight your time management, organisational
and self-motivational skills; you have just spent a
number of years improving these through part-
time study.
•	 Demonstrate your flexibility and experience of
studying and working in mixed-age environments.
•	 Convey your reliability, loyalty and confidence to
manage change.
Further resources
For the latest information on age legislation, go to
The Employers Network for Equality & Inclusion,
which now incorporates the Employers Forum on
Age and works with organisations to promote best
practice in equality and inclusion in the workplace:
www.enei.org.uk
Age UK has a good website with a section on work
and learning that includes a very good sub-section
on discrimination and rights.
www.ageuk.org.uk/work-and-learning
The Third Age Employment Network (TAEN) works
for better opportunities for mature people to continue
to learn, work and earn for as long as they want, or
need, to do so. You can access the network at:
www.taen.org.uk
Equality and Human Rights Commission From the
homepage, go to ‘Equality Act’, ‘Know Your Rights’
then ‘Age discrimination’.
www.equalityhumanrights.com
Equality and Diversity – Information for jobseekers
on how to challenge unfair discrimination in the
workplace is available on the Targetjobs website at:
https://Targetjobs.co.uk/careers-advice/equality-
and-diversity.
5.2	 Criminal record
If you have a criminal record, you may be confused
about its implications for working in the future.
Having a criminal record does not prevent you
from getting a job, especially if it is spent and
you no longer have to declare it. However, some
organisations are exempt from the Rehabilitation of
Offenders Act in the UK (similar legislation exists in
the Republic of Ireland) and you will need to disclose
all convictions whether they are spent or not.
Some of your concerns may include:
•	 Whether you must declare any convictions.
•	 What impact a criminal record will have on your
gaining and keeping employment.
•	 How, when and if to disclose a conviction to a
prospective employer.
Your strategy will depend on whether the conviction
is ‘spent’ and the type of work you want to apply for.
5.2.1 Your rights
Under the Rehabilitation of Offenders Act (ROA)
1974, most convictions become ‘spent’, or forgotten,
after a certain amount of time.
Unlock (a charity for people with convictions)
provides a table on their website which sets out
the time it takes for the main sentences to become
spent, following changes to the Rehabilitation of
Offenders Act that were introduced in 2014. This is
known as the ‘rehabilitation period’ for the conviction.
A conviction may have a number of rehabilitation
periods depending on the sentence – in this
situation, the longest one applies. You can read
about this on:
http://hub.unlock.org.uk/information/rehabilitation-
of-offenders-act-1974/
There are, however, certain exceptions to this
depending on the sentence you were given and the
type of work you want to do. For some areas of work,
such as ‘regularly caring for, training, supervising
or being in sole charge of persons aged under 18’,
employers are required by law to seek disclosure of
117Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
criminal records from the relevant criminal records
office. This would include careers in social work,
teaching, nursing, law and medicine. If you are
applying for any of these jobs you are required to
declare a conviction even if it is spent. You are also
required to declare convictions when applying for
vocational training relating to these jobs, such as
courses in nursing, teaching or social work.
If you are applying for a job or a type of work where
Criminal Records Bureau (CRB) checks are required,
it will be in your interests to disclose information
about your convictions that may come to light. The
Safeguarding Vulnerable Groups Act 2006 resulted
in the Independent Safeguarding Authority and
the Criminal Records Bureau checking individuals’
suitability to work with vulnerable people.
It is illegal for an employer to refuse to employ you or to
dismiss you on the grounds of a spent conviction. It is
also illegal for anybody to reveal information about your
conviction after the end of the rehabilitation period.
5.2.2 How to help yourself in the
job market
If you have unspent convictions (or spent convictions
that have to be disclosed by law), it can seem a
challenging task to seek employment. Here is a
range of strategies to help you:
•	 When making applications, focus the employers
mind on your abilities, and don’t allow your
criminal record to dominate your application.
•	 You might choose to send a separate covering
letter, if possible, that outlines and explains the
circumstances of your conviction. However, make
sure that it doesn’t sound as if you are making
excuses or are not willing to accept responsibility
for the offence.
•	 If you have been in prison, you may feel you need
to discuss your situation with a careers adviser
about the process of applying for jobs early on in
your studies.
•	 Enhance your application by undertaking work
experience or voluntary work.
•	 Market yourself as positively as possible
(see Section 4).
•	 Be realistic about the employment area you wish to
enter. Keep in mind that there are certain jobs for
which convictions never become spent. Before
you start studying for a specific career area, or
applying for jobs, check the legal situation carefully.
•	 Make use of other agencies that can help and
advise you. They may be able to point you in
the direction of opportunities from sympathetic
employers, or support you with your applications.
5.2.3 Disclosing a criminal record
The right way to disclose
You will improve your chances by disclosing in the
right way. You need to reassure employers that you
are not a risk and that your crimes are in the past.
Therefore, if your record is old, you can point this out.
Unlock has excellent advice on disclosure:
http://hub.unlock.org.uk/information/disclosing-to-
employers/
They also have examples of disclosure statements in
letters of application at:
http://hub.unlock.org.uk/wp-content/uploads/Self-
disclosure-statement-examples.pdf
If you were found guilty when young and have grown
up and taken on a family, home, job and other duties
since then – meaning that you have much to lose by
getting into trouble – you can point this out also.
If the record is not relevant to the job, you should say
so. If you owned up to the crime or pleaded guilty,
then you could say so. If the crime sounds more
serious than it is, you could explain this too. If the
reasons behind the crime would help to minimise its
seriousness, you could highlight this.
You must not allow your record to take over an
application, covering letter or interview. However,
you must be careful to ensure that your explanation
does not sound like an excuse. An employer will not
want to know. You should try to put yourself in the
employer’s position.
When to disclose
If an employer is going to ask about records, it
is likely to be at the application stage. Where an
application form asks about a criminal record or
you are sending in a CV it might be best to put ‘See
covering letter’, where you give a short account of
the offence and your attitude to it. Alternatively, you
can say that you will discuss this at the interview.
If you have served a prison sentence that has left a
gap in your work history, you can write on the form or
your CV ‘Not in employment’ or ‘Unavailable for work
due to personal circumstances’, and give details in
the covering letter or at the interview.
The advantage of disclosing at the interview is that
the employer has the opportunity to see the person
behind the conviction; but bear in mind that it takes a
lot of confidence to disclose at this stage.
However, the employer might unexpectedly ask
about criminal records or require you to disclose
at the job offer stage. If you have not already been
asked, you should be prepared to deal with this to
reduce the chances of a job offer being withdrawn.
118 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
5.2.4 Example CV if you have a criminal record ‘Before’ including feedback
from a careers adviser
Name: Andrew Bailey
Address:
100 No Road,
Chatham,
XY18 6AA
Tel: 07123 456789
Email: a.bailey@nowhere.com
You don’t need to put the words ‘name’ and ‘address’ on your CV.
The address can go on one line rather than across 3 or 4 lines. If your CV is light on content elsewhere,
then you need to develop a skills section, rather than filling space with your personal details.
Put this section in the centre rather than having it on the left.
Personal Profile
I am a hard-working, motivated and responsible person who is seaking* to build on the experience I have
gained working in a gym for the last 18 months. I am interested in undertaking further training to help me to start
a career as a Personal Trainer.
* Make sure you check for basic spelling errors – especially in your Personal Profile. It is the first item an
employer will read after your name and personal details and mistakes do not make a good impression.
If you have achieved something significant in the last year of which you are especially proud, record it here
under a section called ‘Recent Achievement’. It will focus the attention of the employer.
A ‘Skills Profile’ could be added here to enable a potential employer to see if your skills and competencies
match with available opportunities.
If you are an OU student then make sure it features on the first page of your CV.
Qualifications
Various courses from the						 2009 - 2012
Open University:
	 - E112 Introduction to Sport, Fitness and Management – 60 credits
	 - E113 Working and Learning in Sport and Fitness – 60 credits
	 - E217 Sport and Conditioning Science into Practice – 60 points
	 - EXF224 Making your Exercise Instruction Count – 60 credits
NVQ Level 2 Gym Instructor 						 2012
NVQ Level 1 & 2 Warehouse and Storage (Day Release)			 2001 – 2003
In–Train Ltd, Leicester
2 GCSE passes (grades A-C) in Design Technology 			 2001	
and ICT
St. Gregory’s Comprehensive School, Sittingbourne
Notice that in this section the dates have been placed on the right-hand side whereas in the next section
they are on the left. Be consistent in your layout, and make it easy to read in order to make more impact.
Listing OU modules is useful here, but you don’t need to put the codes in or the credits.
119Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
Work Experience
May 2014 – Present			
	 Assisted in Blogg’s Gym. I helped take classes and maintained 				
	 equipment, as well as keeping records.
Put Employment and Work Experience together in one section.
The layout of this could be better. Need to bullet point duties, so they are clearer.You completed this while
in a Cat D prison and you are right not to put that, it is the experience which is important.
Did you gain any other experience in prison? If so, it is worth adding this.
Employment
Aug. 2011 – May 2014	 Serving my sentence at HMP Coldingley
A CV is your chance to highlight your strengths. NACRO (charity offering resettlement advice), says:
You should not include any information about your criminal record on your CV. If you have gaps in your
employment history which are due to time in prison and you are not asked directly to write about your
criminal record in your application, you could explain these gaps by stating that you were ‘unavailable for
work’ at a certain period in time.
Remember: if you are not asked for a criminal record declaration directly, then there is no need for you
to disclose this information at this stage. But you must be prepared to answer fully and honestly if you
are asked, at interview, to explain what you mean by ‘unavailable for work’.
Highlight what you did during this time e.g. OU student, orderly work or other courses you have taken.
2001 – June 2009	 Warehouse Assistant 	 Wilson’s Wholesale, Maidstone
Main duties involved taking delivery of goods and supplies and storing the goods. I moved stock ready for dispatch
using a forklift truck. My duties also involved picking and packing orders and keeping records of stock. I also drove
the delivery vans.
Again the layout is not used in the best way. Use of bullet points here allows the reader to quickly scan
this section rather than have to read it all.
Additional Information:
	 - I am a qualified Fork Lift Truck Operator (NTPC Level2)
	 - I have a current First Aid Certificate
	 - I have a full, clean driving licence
Use proper bullet points here.
Activities and Interests:
I enjoy cycling and motocross. I am a local community volunteer for 10 hours per week.
References:
Available on request.
Not necessary on a CV. Most employers only take references after interview.
120 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
5.2.5 Example CV if you have a criminal record ‘After’ the feedback has
been implemented
Andrew Bailey
100 No Road, Chatham, XY18 6AA
07123 456789
a.bailey@nowhere.com
Personal profile
I am a hard-working, motivated and responsible person who is seeking to build on the experience I have gained
as part of the personal training team at Blogg’s Gym for the last 18 months. I am interested in undertaking further
training to help me to start a career as a Personal Trainer.
I am studying towards a degree in Sports, Fitness and Coaching with The Open University. I also have a relevant
NVQ Level 2 qualification.
Recent Achievement
In September I took part in The Great South Run in Portsmouth. I trained for the event for 8 months and raised
over £1,100 in sponsorship for Crisis – the national charity for homeless young people.
Skills Profile
• Experience in setting realistic short and long term goals with clients
• Delivered education programme about healthy lifestyles
• Motivated clients with disabilities/ health issues in following programmes safely and effectively
• Measured clients’ progress: measuring heart rate and body fat levels
• Knowledge of Microsoft Office applications, including Word, Excel, and PowerPoint
• Ability to manage my own time and workload – I have worked and studied at the same time
• Self-motivation and commitment to own learning and development
Qualifications
2013 – present 			 The Open University
					 Working towards a degree in Sports & Fitness
Modules completed:
• Introduction to sport, fitness and management
• Working and learning in sport and fitness
• Sport and conditioning science into practice
• Making your exercise instruction certificate count
2012				 Register of Exercise Professionals
					 Level 2 Instructor (Gym)
2001 – 2003			 In–Train Ltd, Maidstone
					 NVQ Level 1 & 2 Warehouse and Storage (Day Release)
2001				 St. Gregory’s Comprehensive School, Sittingbourne
					 2 GCSE passes (grades A-C) in Design Technology and ICT
121Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
Employment & Work Experience
May 2014 – Present 	 Assistant Personal Trainer Blogg’s Gym, Chatham
• Assisting in delivery of range of exercise classes
• One to one support for clients
• Assisting in induction programme for new clients
• Ensuring equipment functional and clean
• Administrative duties
Aug 2011 – May 2014 	 Experience gained:
• Open University student
• Gym assistant
• Initiated and ran 5 a side football competition
• Listener (Samaritans)
• Assistant in delivering adult literacy classes
2007 – 2011 			 Warehouse Assistant Wilson’s Wholesale, Maidstone
					 Main Duties:
• Taking delivery of goods and supplies
• Storing goods
• Moving stock using a forklift truck
• Picking and packing orders
• Loading goods for dispatch
• Keeping records of stock
• Driving delivery vehicles
Additional information
•	 I am a qualified Fork Lift Truck Operator (NTPC Level 2)
•	 I have a current First Aid Certificate
• 	I have a full, clean driving licence
Activities and interests
I enjoy cycling, running and play for my local football team. I am a local community volunteer for
5 hours per week.
122 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Further resources
Disclosure and Barring Service (England and
Wales) at:
https://www.gov.uk/government/organisations/
disclosure-and-barring-service
Scottish Criminal Record Office (Scotland) at:
www.disclosurescotland.co.uk
Access Northern Ireland (Northern Ireland criminal
records checking service)
www.dojni.gov.uk/accessni
The Apex Trust – support, information and advice
for ex-offenders seeking work. It also works with
employers to break down barriers. More information
can be found at:
www.apextrust.com
The National Association for the Care and
Resettlement of Offenders (NACRO) publishes a
number of advice leaflets. You can access them at:
www.nacro.org.uk
Unlock – for people with convictions, is a charity that
supports reformed offenders and helps them to
achieve their potential by overcoming the barriers
caused by a criminal record. The website contains an
Information and Advice Service
www.unlock.org.uk
5.3	 Disability or
additional requirements
Many students and graduates with disabilities have
the same skills and abilities to offer as anyone else,
without the need for specific adjustments or support.
For some students, additional support can help to
enable access to work. The key starting point is to
explore career areas that are relevant to your interests
and skills, and then to consider the next steps as
outlined below.
5.3.1 Your rights
Equality law protects against discrimination,
harassment and victimisation on the grounds of
disability. It defines the rights for disabled people,
particularly in relation to employment and access
to goods, services and facilities. You are protected
under the Act if you have ‘a physical or mental
impairment which has a substantial and long-term
adverse effect on your ability to carry out normal
day-to-day activities’. This definition includes sensory
impairments, learning disabilities and mental
illness, as well as physical disabilities and medical
conditions. This covers people who have had a
disability, as defined by the Act, in the past; those who
have recurring or progressive conditions; and people
with severe disfigurements. You don’t have to register
as a disabled person or even consider yourself to be
disabled to be protected.
Equality law prevents discrimination against disabled
people at work and in recruitment and selection. All
employers are covered except for the armed forces.
Discrimination is unlawful in all aspects of employment,
including recruitment, promotion, training and selection,
redundancy or dismissal.
Employers are also required to make reasonable
adjustments to the workplace, working practices and
the job description (provided they know, or could
reasonably be expected to know that you have a
disability). These may include adjusting premises,
altering hours or buying equipment. The effectiveness
of the adjustment in reducing the disadvantage must
be taken into account, and so must the finances of the
employer. Large companies will probably be expected
to adapt the workplace, but smaller companies with
lesser funds may not have to do so. Employers must
show that they have looked into the costs of adaptations,
and what funding is available from other sources.
You can find out more from the Equality and Human
Rights Commission:
www.equalityhumanrights.com – go to Equality Act,
Know your rights, Disability Discrimination
In Northern Ireland you can find out more from the
Equality Commission for Northern Ireland:
www.equalityni.org
5.3.2 How to help yourself in the
job market
You may need to decide whether or not to tell an
employer that you have a disability. If you do decide
to declare your disability, you will need to consider
the method and timing. Do you tell them on your
application form? In a covering letter? Before or after
an interview? There are no clear-cut answers to these
questions. You must make your own judgement,
though you may find it helpful to talk it over with a
careers adviser.
When you apply for jobs and you are considering
whether to disclose your disability:
•	 Always focus on what you can do, not what
you can’t.
•	 Don’t assume that an employer will view your
disability in a negative way. There are now over 400
member companies in the Business Disability
Forum http://www.businessdisabilityforum.org.
uk/. Each is committed to creating and developing
opportunities for people with disabilities.
123Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
•	 Don’t restrict your applications only to employers
who are keen to recruit disabled people.
Here are some reasons why it might be a good idea
to declare your disability:
•	 Some employers are keen to employ people with
disabilities and use the disability symbol – this
shows they are positive about employing disabled
staff. However, many employers do not use the
symbol but there may be practical evidence that
they are positive about disability – such as offering
information in alternative formats and alternative
ways of contacting them. So, look for employers
who make these kinds of positive statements even
if they don’t use the disability symbol.
•	 You can control the way your disability is explained.
You will be able to describe things in a positive
light – your strengths, your coping strategies,
determination to succeed, etc.
•	 Many employers have equal opportunities policies
and are open to recruitment and employment
without prejudice.
•	 Access to Work – a Jobcentre Plus programme
(see 5.3.4) can provide support for you in a job.
For instance, it may fund specialist equipment
or transport costs. It’s worth pointing this out to
employers as they may not be aware of
the programme.
•	 According to a Remploy survey, only one in five
disabled people need any kind of adaptations to
their workplace – and the vast majority of these
can be carried out for as little as £50.
•	 If you think you will need a reasonable adjustment
to attend an interview or assessment centre, you
will need to tell the employer in advance so that
they can provide this for you.
•	 If you declare your disability and believe that
you have been discriminated against during the
application process, equality law entitles you to
take your case to an employment tribunal.
Here are some reasons why it might be a good idea
not to declare your disability:
•	 You may believe that your disability has no effect
on your ability to do the job.
•	 You might feel that you will be discriminated
against and rejected straight away.
•	 You may think that an employer will automatically
see you as a potential expense.
•	 Perhaps you prefer not to discuss your disability
with a stranger.
5.3.3 Declaring a disability
This section deals with whether or not to declare
a disability to a potential employer. Many people
choose not to declare their disability because of fear
or bad experiences in the past. It is often difficult to
know whether to tell an employer and also to know
when and how this information should be given.
The decision is a personal one but the following
points may help you to make your decision.
Should you declare or not?
•	 You may not want to declare having a disability
as you may be concerned about being rejected
automatically or facing discrimination.
•	 You may feel that having a disability does not
actually affect your ability to do the job that you
have applied for.
Reasons for declaring
If you declare your disability during the application
process, for example, when you send in your CV,
and then you feel that you have been treated unfairly,
you can make a complaint under equality law.
However, if you have not told the employer about
your disability, it may be possible for them to say that
they did not know about it and could not have been
expected to make any adjustments. By not declaring
your disability it takes the emphasis away from the
employer to make a reasonable adjustment.
If you have disclosed a disability, the employer cannot
lawfully refuse to employ you because of that disability
without a genuine occupational reason.
Forming a disclosure strategy
If you decide to tell a potential employer about your
disability, the next stage is to establish at what point
in the application process you should tell them.
Curriculum vitae
It is not necessary to mention your disability on
your CV. You may feel that an employer will see your
disability as the most important thing about you or
make assumptions about you on the basis of your
disability. Also, there may not be room on your CV
to qualify your disability or to highlight the range of
positive adjustments that could be made.
If the CV is speculative, or not followed by an
application form, you need to decide if you would
prefer for an employer to know about your disability
before you are called for an interview. This may
depend on whether you will need a reasonable
adjustment to be made for you at the interview and
in order for you to do the job satisfactorily.
124 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Covering letter
A covering letter should be sent with your CV to
potential employers. You do not need to disclose
your disability on the CV or covering letter. However,
if your CV highlights that you have a disability (for
example, you attended The Royal Blind School),
the covering letter allows you the opportunity to
explain your disability in more detail than on a CV.
You can also highlight the range of adjustments that
are available and that funding for these is available
for these through the Access to Work scheme.
Bear in mind that the focus of a covering letter
should always be on your skills to do the job.
Likewise you should focus at an interview on the
way in which you fit the requirements for the job,
rather than your disability.
You may have done voluntary work, which may cause
the employer to wonder if you have a disability.
For example, you may be the secretary of your local
voluntary society for the deaf and have gained skills
that are relevant to the job you are applying for.
In summary, you do not have to tell an employer
about your disability. By not saying anything it may
mean that you face less discrimination, but it also
takes away some of the obligations of an employer.
It may be an idea to form a disclosure strategy,
where you plan how you tell an employer about your
disability. This means that you can positively discuss
your disability on your own terms and retain a focus
on your own skills and abilities.
Example of a covering letter
declaring a disability
Dear Mrs Bailey,
I am responding to your advert in the Birmingham Evening Mail for a Trainee Advertising
Executive. As you will see from my CV, I am about to complete a BA in Business with
The Open University and I have extensive customer service and sales experience from
working with some national employers.
I also have strong administrative and IT skills, having worked as a secretary to the manager
of a clothing manufacturing company.
As a result of contracting meningitis when I was a child, I have limited use of my right leg,
which affects my mobility. I am able to walk unaided and have significant experience of
shop work, spending all day on my feet, but I am not able to climb stairs quickly or easily.
This is the only limitation arising from my mobility impairment. I spent my teenage years
coming to terms with my disability and developing my own ways of coping and solving
problems. I believe that this attitude has developed a positive approach to life which I have
been able to bring to my various job roles.
I am an active and outgoing person who enjoys travel as well as keep fit activities such as
swimming and Pilates. I also have a full driving licence. I would be happy to answer any
questions you may have on my general fitness.
I look forward to hearing from you in the near future.
Yours sincerely,
Samantha Williams
125Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
Example CV
Samantha Williams
51, Park Street, Edgbaston, XY31 5XX
Tel: 04231 987234
Email: s.williams@nomail.co.uk
Personal profile
I am a hard-working and dependable business undergraduate with the ability to work both independently and in
a team. I have extensive experience of working with the public in a sales and customer service capacity. This has
made me develop excellent interpersonal skills and an ability to think on my feet.
	 My experience to date has now given me the confidence and experience to embark on a career in advertising.
	 Qualifications
2011–2014 			 BA (Hons) in Business Administration: Introduction to business studies;
Introduction to bookkeeping and accounting; Understanding management;
Professional communication skills for business
					 The Open University
2006				 NVQ level 3 in Business Administration
					 Springfield Training, Birmingham
2005				 6 GCSEs at grade A–C including English, Maths and I.T.
					 All Saints High School, Birmingham
Employment experience
August 2011 – 			 Secretary/PA to Sales Manager	 New Look Fashion
Present			 • 	Providing secretarial and administrative support to the Sales Manager
					 • Arranging meetings, diary management, dealing with appointment requests
					 • Updating records using computer database and spreadsheet software
					 • Liaising with other managers, suppliers and clients etc.
					 • Writing reports and briefing papers and making presentations.
May 2008 – 			 Senior Sales Assistant	 New Look Fashion
August 2011			 • 	Responsible for driving sales
					 • Supervising a small sales team
					 • Ensuring good customer service
					 • Building relationships with suppliers
					 • Implementing agreed promotional activities
July 2005 – 			 Modern Apprentice (Retail Work)	 Dixons
May 2008			 • 	Dealing with customer enquiries and sales
					 • Stock control including checking deliveries
					 • Customer services including handling complaints
					 • Promoting certain products under the guidance of management
					 • Maintaining displays and visual standards within the store
Additional information
• 	I have a full, clean driving licence
• I am actively involved with three children’s charities for which I have arranged fund-raising activities.
Activities and interests
I enjoy travel, swimming, Pilates and reading.
References
Available on request
126 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
5.3.4 Resources for employment
and training
The majority of disabled jobseekers who find work
through the Jobcentre are assisted by a disability
employment adviser (DEA). Specialist DEAs can
discuss your current employment situation with you
to plan the best way into work. If you’re concerned
about losing the job you’re already in for a reason
associated with disability, the DEA can provide advice
to you and your employer and explore practical ways
to help you keep your job.
Services the DEAs can offer include:
•	 An employment assessment to identify what work
or training suits you best.
•	 Referral where appropriate to a
work preparation programme.
•	 Referral if needed to an
occupational psychologist.
•	 A job matching and referral service.
•	 Information on employers in your area who are
Disability Symbol users.
•	 Referral where appropriate to specialist Jobcentre
Plus programmes for disabled people, including:
Access to Work – Can help you make the most of
your opportunities in work by helping you to tackle
some of the practical obstacles you may meet at
work if you have a disability. The scheme can pay for
the costs of adjustments for new members of staff,
or contribute to the costs for existing staff.
Work Choice – Helps people with disabilities who
need more specialised support to find employment
or keep a job once they have started work. The
programme is in three different sections:
–	 Work entry support – This will last for up to six 	
	 months. You will receive help with personal 	
	 skills and work-related advice.
–	 In-work support – This will last for up to two 	
	 years. You will receive help to start work and 	
	 stay in your job.
–	 Longer-term in-work support – You will
	 receive help to progress in your job and
	 where appropriate, help you move into
	 unsupported work.
•	 Details about work-based learning for adults.
•	 Information on local and national disability
organisations of and for disabled people.
For more information, go to:
www.gov.uk/looking-for-work-if-disabled
Disabled students’ allowances (DSAs)
Disabled students’ allowances (DSAs) are grants
available to disabled students in higher education
to help with the extra costs of services and facilities
they need for their studies because of a disability
or specific learning difficulty. The OU provides
information about DSAs on the website at:
www.open.ac.uk/disability
Further resources
Great with Disability, advice on employment issues
and live vacancies
www.greatwithdisability.com/recruitment-disability
Association of Disabled Professionals provides
advice, information and peer support to disabled
people, focusing on employment related issues.
For more details go to:
www.adp.org.uk
Disability Rights UK formed through the unification
of Disability Alliance, Skill, Radar and the National
Centre for Independent Living in 2012. It is the
largest pan-disability organisation in the UK. It has
a downloadable booklet called Doing Careers
Differently, which is about how to make a success
of your career while living with a disability or health
condition. You can download it from:
http://www.disabilityrightsuk.org/how-we-can-help/
publications/doing-life-differently-series/doing-
careers-differently
AHEAD (The Association for Higher Education
Access and Disability) is an independent
organisation working in the Republic of Ireland to
promote full access to, and participation in,
further and higher education for students with
disabilities and to enhance their employment
prospects on graduation:
www.ahead.ie.
Disabled Entrepreneurs Network:
www.disabled-entrepreneurs.net
The Business Disability Forum is an employers’
organisation focused on disability as it affects the
workplace. You can check the site for support, but
also to find any member companies who are likely to
have a very positive attitude to those with disabilities.
http://www.businessdisabilityforum.org.uk/
EmployAbility – A not-for-profit organisation that
helps disabled people into employment:
www.employ-ability.org.uk
127Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
Remploy provides a comprehensive range of
employment services to support disabled people
and those experiencing complex barriers to work
into gaining and retaining sustainable employment.
They work with many UK employers to help them
understand disability, and to recruit people into
all types of jobs. Their Employability Programme
is a free course for finalists and recent graduates
who have a disability, learning difference or
health condition.
www.remploy.co.uk
The Shaw Trust is a national charity that supports
disabled and disadvantaged people to prepare for
work, find jobs and live more independently. It offers
a service for students and graduates with disabilities,
dyslexia or a specific learning difficulty. They work in
partnership with top employers to offer a variety of
opportunities within a range of sectors.
www.shaw-trust.org.uk
Blind in Business is a charity that helps visually
impaired students and graduates of all ages into
work, through CV coaching, help with filling out
application forms, interview practice and other
advice and support.
www.blindinbusiness.co.uk
The OU Careers website contains useful information
on equality and diversity issues at:
http://www2.open.ac.uk/students/help/equality-and-
diversity
Equality and Diversity: Information for jobseekers
on how to challenge unfair discrimination in the
workplace is available on the Targetjobs website at:
https://Targetjobs.co.uk/careers-advice/equality-
and-diversity.
5.4	Gender
Does it make a difference if you are a man or a
woman when applying for a job? Unfortunately, yes:
despite the legislation we still find gender discrimination
in the workplace. There is a lot of discussion about
the ‘glass ceiling’ that prevents women from achieving
‘top jobs’, and in fact, there is still evidence of a
pay gap between male and female employees
(particularly over the age of 40) – even when they
have the same qualifications in the same subject.
To see if an organisation is the right fit for you as
a place to work you could consider looking for
examples of support provided by employers such
as childcare facilities and flexible working policies
and practices. You could also try to find out what
arrangements they have in place to develop women
to work at senior and board level.
It’s important that you are aware of the issues
concerning gender discrimination – at both
recruitment stage, and in employment. If you check
on the legal situation, this can help you in presenting
yourself in your application for work, and in ongoing
communication with your employer. (You might also
want to check whether a prospective employer has
an equal opportunities policy.)
Other equality issues that you might encounter
include harassment at work, needing time off work
for parenting or caring duties, and looking for flexible
working arrangements. Times are changing: for
instance, in the UK mothers and fathers of children
under 17, or of disabled children under 18, have the
right to request flexible working. If you live outside
the UK you will need to check the legal position for
your country of residence.
5.4.1 Your rights
Equality law provides protection against
discrimination, harassment and victimisation on the
grounds of sex, and gives an individual a right to the
same contractual pay and benefits as a person of
the opposite sex in the same employment, where the
man and the woman are doing:
•	 like work; or
•	 work rated as equivalent under an analytical job
evaluation study; or
•	 work that is proved to be of equal value.
Employers are not required to provide the same pay
and benefits if they can prove that the difference
in pay or benefits is genuinely due to a reason
other than one related to gender. The Act applies to
England, Wales and Scotland. It covers indirect sex
discrimination as well as direct discrimination.
128 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
Equality law prohibits sex discrimination against
individuals in the areas of employment, education,
and the provision of goods, facilities and services
and in the disposal or management of premises.
It also prohibits discrimination in employment
against married people. Victimisation because
someone has tried to exercise their rights under
the Act is also prohibited.
There are a few exceptions to the Act surrounding
recruitment, if the gender of the worker is
considered a genuine occupational requirement
(GOR). This defence is likely to apply in very limited
circumstances.
The Act applies to women and men of any age,
including children and prohibits direct and indirect
sex discrimination. There are special provisions
about discrimination on the grounds of gender
reassignment (see page 5.4.4 below). The Act applies
to all public services, requiring them to promote
gender equality and eliminate sex discrimination.
All organisations serving the public must show their
policies and procedures comply with gender
discrimination legislation.
5.4.2 Direct sex discrimination
This is where someone is treated less favourably
than a person of the opposite sex in comparable
circumstances because of their sex. For instance,
one type of direct sex discrimination is sexual
harassment; another is treating a woman adversely
because she is pregnant.
5.4.3 Indirect sex discrimination
This is where a condition or practice is applied to
both sexes but it adversely affects a considerably
larger proportion of one sex than the other. For
instance, an unnecessary requirement to be under
5’ 10” could discriminate against men; a requirement
to work full-time might be unlawful discrimination
against women.
5.4.4 Transgender and
gender reassignment
‘Transgender’ is an umbrella term used by people
whose gender identity and/or gender expression
differs from their birth sex. The term includes, but
is not limited to, transsexual people and others who
define as gender-variant. ‘Trans’ as an umbrella term
includes transsexual people, transgender people,
people who cross-dress and a range of other distinct
forms of identity and expression.
People perceive and express their gender identity
in different ways, so trans people are therefore quite
clearly diverse. The experience of discrimination,
harassment, victimisation or adverse outcomes is
common to all trans people, though.
Equality law provides protection against discrimination
on the grounds of gender reassignment in
recruitment, employment or training, the provision
of goods, facilities and services, and education.
This is a protected characteristic under the Act, and
it protects people at any stage of having their sex
reassigned and without the need to be under any
medical supervision. Employment-related claims
are brought in an employment tribunal. Strict time
limits can apply from the act of the discrimination for
employment tribunal cases, so get advice as soon
as possible.
5.4.5 How to help yourself in the
job market
Here are a few suggestions to help prevent
discrimination against yourself in the job market:
•	 Plan your application effectively to minimise the
possibility of unfair discrimination. This is especially
important if you are looking to enter a field of
employment that is traditionally dominated by one
sex or the other.
•	 Provide clear evidence of your ability to do the
job, and this will help to counter any negative
stereotypes that may exist.
•	 Concentrate on your strengths.
•	 Discuss your application with a careers adviser.
Returning to the labour market after a career break
can be difficult, especially if you have spent a long
time away. If this reflects your situation, there are a
number of issues and strategies you can consider:
•	 Think about your future goals.
•	 Research the careers that appeal to you in
some depth.
•	 Consider the skills and experience you have.
•	 Do some work experience or
voluntary work if you need to
enhance this.
•	 Find support networks to
boost your confidence.
•	 Market yourself effectively
in your applications.
For more help and advice visit:
www.open.ac.uk/careers
129Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
5.4.6 Resources for employment
and training
The Equality and Human Rights Commission (EHRC)
is the leading agency working to eliminate
discrimination in the UK. The EHRC campaigns to:
•	 Close the pay gap between women and men.
•	 Make it easier for parents to balance work with
family responsibilities.
•	 Increase the number of women in public life.
•	 Break free of male and female stereotypes.
•	 End sexual harassment at work.
•	 Make public services relevant to the differing
needs of men and women.
•	 Secure comprehensive equality legislation in
Europe, England, Scotland and Wales.
Go to their website and click on ‘Advice and
Guidance’:
www.equalityhumanrights.com
In Northern Ireland you can find out more from the
Equality Commission for Northern Ireland:
www.equalityni.org
Press for Change is a political lobbying and
educational organisation that campaigns to achieve
equal civil rights and liberties for all transgender
people in the UK, through legislation and social change.
www.pfc.org.uk
Gender Identity Research and Education Society
(GIRES) provides helpful information for trans
people, their families and the professionals who care
for them.
www.gires.org.uk
The Gender Trust offers support and information
for trans people and all those affected by gender
identity issues.
www.gendertrust.org.uk
Further resources
Work Life Balance Centre – available at:
www.worklifebalancecentre.org
Business in the Community offer schemes such as
‘Opportunity Now’, which empowers employers to
accelerate change for women in the workplace.
http://workplace.bitc.org.uk/
Equality and Diversity – Information for jobseekers
on how to challenge unfair discrimination in the
workplace is available on the Targetjobs website at:
https://Targetjobs.co.uk/careers-advice/equality-
and-diversity.
5.5	Race
A Parliamentary Briefing Paper ‘Unemployment and
Ethnic Background’, using data provided by the
Office for National Statistics, states that:
The UK unemployment rate (the
proportion of the economically active
population who are unemployed) was 5.1%
in December 2015-February 2016. The
unemployment rate was 4.3% for white
people compared to 9.6% for people from
other ethnic backgrounds, although the rate
varied between different ethnic minority
groups.
Theresa May is including employment in
official audit of racial inequality in public
services, which she launched in August
2016.
5.5.1 Your rights
Equality law protects against discrimination,
harassment and victimisation on the grounds of
race. This covers race, colour, nationality (including
citizenship), and national or ethnic origin. In practice,
most racial discrimination in Britain is against ethnic
minorities, but people of every background, race,
colour and nationality are protected by the law.
If you think you have been discriminated against on
racial grounds, equality law gives you the right to
take your complaint before an employment tribunal.
Keep in mind that there are strict time limits for filing
your case at an employment tribunal or court, so
don’t delay. In general, you have three months to file
an employment case.
The Equality Act identifies three main types of
racial discrimination:
•	 direct racial discrimination
•	 indirect racial discrimination
•	 victimisation.
5.5.2 Direct racial discrimination
Direct racial discrimination occurs when a person is
treated less favourably on racial grounds than others in
similar circumstances. If you think this has happened to
you, and you want to prove it, it will help if you can
give an example of someone from a different racial
group who, in similar circumstances, has been
treated more favourably than you. Racist abuse and
harassment are also forms of direct discrimination.
130 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
5.5.3 Indirect racial discrimination
Indirect racial discrimination occurs when a person
from a particular racial group is less likely to be able
to comply with a requirement or condition that applies
to everyone but which cannot be justified.
5.5.4 Victimisation
Victimisation has a special legal meaning in the
Equality Act. This happens when a person is treated
less favourably because they have complained
about racial discrimination or supported someone
else who has.
If you think you have been discriminated against at
work, or when applying for work, you have the right
under the Act to take your complaint before an
employment tribunal. If you are thinking of bringing
a case of racial discrimination, you can apply to the
Equality and Human Rights Commission (EHRC), or to
one of a number of other organisations such as trade
unions, racial equality councils, law centres, citizens
advice bureaux and other advice agencies, for help.
5.5.5 How to help yourself in the
job market
So what can and should you do to market yourself,
to target employers, and to challenge unfair
discrimination? Here are some suggestions:
•	 Think about your future goals and research the
careers that appeal to you in some depth.
•	 Make use of Section 4 ‘Getting the job’ to prepare
your marketing tools, your CV, application forms
and covering letters.
•	 Consider your unique selling points and market
yourself in a positive way that shows employers
your skills. This can challenge any stereotypical
ideas employers might have.
•	 Discuss your plans and approach with a careers
adviser.
•	 Many employers have staff networks for minority
ethnic groups. Target employers with a reputation
for good equality and diversity policy and practice
•	 Understand the relevant legal situation.
•	 Develop contacts and make the most of your
networking skills.
•	 Check if the organisation is a member of Business
in the Community (BITC) at www.bitc.org.uk.
Race for Opportunity is a programme, run by BITC,
that is dedicated to advancing racial equality.
•	 Be proud of who you are and what you have
achieved. Many employers are keen to recruit
from a wide pool of talent as they recognise that
different opinions, experiences and backgrounds
allow for better quality decision making.
5.5.6 Resources for employment
and training
Equality and Human Rights Commission (EHRC)
The EHRC is the national organisation for monitoring
racial equality (as well as other equality issues).
Contact them for information on legal issues,
campaigns and services as well as vacancies in
the commission:
www.equalityhumanrights.com
Equality Commission for Northern Ireland
The Equality Commission for Northern Ireland is
responsible for promoting awareness of, and enforcing,
anti-discrimination law. For more information see:
www.equalityni.org
Equality and Diversity – information for jobseekers on
how to challenge unfair discrimination in the workplace
is available on the Targetjobs website at:
https://Targetjobs.co.uk/careers-advice/equality-
and-diversity
National Mentoring Consortium
The National Mentoring Consortium aims to promote
equality and diversity in graduate recruitment, and
works with employers and universities to enhance the
employability of students from minority ethnic groups.
The Ethnic Minority Undergraduate Scheme lasts six
months and links undergraduates with mentors in
order to help them prepare for entry into the world of
work. Find out more about the scheme at:
http://www.nmc-online.com/schemes/ethnic.htm
TeacherWorld UK
TeacherWorld UK provides information and support
for teachers (and those intending to teach) particularly
those from minority ethnic backgrounds. You can log
onto its website at:
www.teacherworld.org.uk
Windsor Fellowship
The Windsor Fellowship is a charitable organisation
that offers skills development programmes to
undergraduates and graduates from minority ethnic
groups. Their website is:
www.windsor-fellowship.org
Business in the Community
Business in the Community has a campaign ‘Race
for Opportunity’ which is committed to improving
employment opportunities for ethnic minorities
across the UK. It is the only race diversity campaign
that has access to and influence over the leaders of
the UK’s best known organisations.
http://workplace.bitc.org.uk/
131Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
Further resources
Recruitment websites – sites such as Ethnic Jobsite
(www.ethnicjobsite.co.uk), Asian Jobsite (www.asian
jobsite.co.uk) all offer vacancies, advice on job hunting
and applications for ethnic minority students and
graduates looking for employment.
5.6	 Religion or belief
Equality law provides protection against
discrimination, harassment and victimisation on
the grounds of religion or belief, which includes
discrimination because of a lack of religion or belief.
It is unlawful to discriminate against anyone on the
grounds of religion or belief. There are exemptions
for religious institutions, but they need to be able
to show that a particular religion or belief is a
requirement, and this is likely to be justifiable only for
particular roles (for example, for ministers or priests,
but not for administrators, managers or technicians).
There are also some occupational requirements that
may require particular dress codes, but most good
employers will have alternatives to allow for particular
religious observance.
The most likely ways in which employers may
discriminate might be around the way in which they
recruit new staff, where they advertise, days when
they choose to interview, staff development and
promotion, dress codes, or training days clashing
with days of worship or important festivals.
You should be aware that many organisations now
do take proactive measures to promote flexible
and integrated working through surveys and staff
development and training to promote inclusion and
raise awareness.
The Equality Act (2010) also makes it illegal to
discriminate because of a lack of religion or belief.
5.6.1 How to help yourself in the
job market
If this is an area that is of concern to you, it is
important (as is the case with all job applications and
career decisions) to research jobs and organisations
to ensure that they are right for you.
Here are some suggestions to look for in an employer:
•	 facilities for prayer or contemplation
•	 catering for different dietary requirements
•	 leave policies that allow for people to take leave at
times of festivals/pilgrimages related to different
religions – not just that they can request leave
but that there is an expectation for managers to
grant permission
•	 awareness and promotion of dates and times to
avoid scheduling meetings and work activities
which coincide with practices related to
different religions
•	 dress codes that accommodate different
requirements and preferences
•	 dignity at work or bullying and harassment policies
that make explicit that inappropriate behaviour
related to religion or belief is unacceptable.
You may find it helpful to discuss some of these
issues with the equality and diversity officer if the
organisation has one. Alternatively, someone from
human resources may be able to help.
5.6.2 Disclosure
There is no requirement for individuals to tell an
employer or prospective employer about their religion
or belief. Disclosure is a personal decision that will
be influenced by a number of factors (you may want
some reassurance before you apply or before you
accept a job) and you may want to discuss in more
detail with a careers adviser before you decide what
to do. It is unlikely that you will find questions relating
to religion or belief on an application form (other than
for equal opportunity monitoring) or that you would
come across it in an interview, unless it is a genuine
occupational requirement (GOR). This defence is
likely to apply in very limited circumstances.
In the meantime, if this is a concern for you, keep up
to date on the law and your rights.
Further resources
Equality and Human Rights Commission. Great
Britain’s national equality body:
www.equalityhumanrights.com
Equality Commission for Northern Ireland works
towards equality of opportunity and the elimination
of discrimination in Northern Ireland:
www.equalityni.org
Equality and Diversity – information for jobseekers
on how to challenge unfair discrimination in the
workplace is available on the Targetjobs website at:
https://Targetjobs.co.uk/careers-advice/equality-
and-diversity
Business in the Community is a group of more than
800 companies that are committed to improving their
positive impact on society.
www.bitc.org.uk
132 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
5.7	 Sexuality and
sexual orientation
Are you worried about possible discrimination in
the workplace because of your sexuality? Whether
to, when to, and how much to declare to a potential
employer and to work colleagues is of course a
matter of personal choice. You will need to consider
how comfortable you will be in an area of work
where you are not open about your sexuality, and this
will depend on your own experience and lifestyle.
5.7.1 Your rights
Equality law provides protection against
discrimination, harassment and victimisation on the
grounds of sexual orientation.
Unlawful sexual orientation discrimination happens
when someone is treated less favourably due to their
sexual orientation, their perceived sexual orientation
or the sexual orientation of those they associate with.
5.7.2 How to help yourself in the
job market
There are a number of measures that you can take to
help yourself in the job market:
•	 Many employers now have Equality and Diversity
Policies that include lesbian, gay and bisexual
people, especially the public sector and large
private employers. You can ask for a copy of
the policy before applying for a job. If there is
a statement about equality and diversity in your
contract you might be able to directly rely upon it.
•	 Consider joining a trade union where you will
receive support and legal advice. If you encounter
discrimination, the support of a trade union can
protect you. A number of motions passed at TUC
conferences have made it clear that all affiliated
unions should adhere to equal opportunities for
lesbians and gay men.
•	 If your employer recognises more than one union,
contact their headquarters to check which is the
most progressive on lesbian and gay issues:
some produce specific material and some have
lesbian, gay and bisexual groups.
•	 Find out about employers who belong to the
Diversity Champions Programme managed by
Stonewall. They have also produced a Corporate
Equality Index, which identifies the top 100 gay-
friendly employers.
5.7.3 Resources for employment
and training
Stonewall
Stonewall works to achieve legal equality and social
justice for lesbians, gay men and bisexual people
and launched Diversity Champions in 2001. This is a
forum in which more than 600 employers work with
Stonewall to encourage diversity in the workplace.
Usually, these employers are at the cutting edge
of innovation in business and public service, and
Diversity Champions allows employers to focus on
the new challenges and opportunities for addressing
issues of diversity in the workplace.
www.stonewall.org.uk
‘Starting Out’ is Stonewall’s directory of gay-friendly
employers. It also contains tips for job search and
how to develop your career. You can find the current
edition at:
http://www.stonewall.org.uk/sites/default/files/
starting_out.pdf 	
Being a Stonewall Diversity Champion
means that The Open University is
committed to providing an inclusive
workplace for lesbian, gay and bisexual
staff, and an inclusive learning environment
for our students. In practice, this means
we are working to enable our staff and
students to be as open as they want to be,
and to bring their whole selves to work
and study, without fear of any negative
consequences. Honest and open
relationships at work and in learning lead
to greater trust and engagement, which in
turn leads to a high performing work
culture and students that are more likely to
achieve their study goals. As Stonewall
rightly says, ‘people perform better when
they can be themselves’.
Tony O’Shea-Poon, former Head of Equality and
Diversity, The Open University.
133Equality and diversity issues
To find out more, visit our website at www.open.ac.uk/careers
Notes
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
Further resources
Equality and Human Rights Commission
www.equalityhumanrights.com
Equality Commission for Northern Ireland
www.equalityni.org
Equality and Diversity – information for jobseekers
on how to challenge unfair discrimination in the
workplace is available on the Targetjobs website at:
https://Targetjobs.co.uk/careers-advice/equality-
and-diversity
Gay Business Association provides networking
opportunities to make business contacts and offers
training for professionals in legal, marketing and
business development, and employment issues.
www.gba.org.uk
134 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
135The next steps
To find out more, visit our website at www.open.ac.uk/careers
your needs. You may need to allow some time for the
appropriate arrangements to be made.
6.1.1 Open University Careers website
Visit our website at:
www.open.ac.uk/careers
The site takes you through the various stages of
planning your career, from analysing your potential
to applying for jobs. You will also find information on
career opportunities linked to relevant OU subjects
and qualifications. In addition the site includes:
•	 careers and employability news items
•	 an online vacancy service
•	 information about employers interested in
recruiting from the OU
•	 clips of employers talking about the recruitment
process and the skills they value
•	 an interview simulation.
[The careers adviser] was amazingly
professional, helpful and resourceful. I am
very impressed by how she dealt with my
issues, I was very concerned that I wouldn’t
get much help as I was very confused
about what to do next but [the CA] asked
the right questions to map my academic
and personal situation and was
tremendously helpful
OU Student
6.1.2 Open University Careers forums
and webinars
All OU students have access to our online Careers
forums and webinars.
For details, follow the link from our website:
www.open.ac.uk/careers
06 The next steps
6.1	 Open University Careers and Employability
	Services	 135
6.3	 Other sources of help 	 137
When you’ve worked through this book there’s a lot to
gain not only by reflecting and reconsidering things,
but also by discussing them either informally with a
trusted friend or formally with a careers adviser.
You can contact a careers adviser via the careers
website at:
http://www2.open.ac.uk/students/help/contact-a-
careers-adviser
As you clarify your objectives, you’ll be able to develop
a plan of action. In order to achieve what you want,
you may need to go through several smaller steps
such as gaining particular experience or qualifications,
gathering information or getting access to a particular
resource.
Look through the information and resources that we
recommend. Remember that many of the resources
listed are concerned primarily with the UK job market.
Readers outside the UK should look at:
https://targetjobs.co.uk/careers-advice/working-
abroad
6.1	 Open University
Careers and Employability
Services
We provide access to appropriate careers and
employability information, advice and guidance
for prospective and current students and recent
graduates. You can view our statement of service
outlining the range of services available to you at:
http://www.open.ac.uk/students/charter/essential-
documents/our-statements-of-service
You may want to request an individual consultation
with one of our careers advisers. This can be
conducted by telephone, Skype or email. You can
contact a careers adviser via the Careers website at:
www.open.ac.uk/careers
If you have additional requirements that may lead
to difficulties accessing any of our services, we will
be happy to take reasonable steps to accommodate
136 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
I would say that the careers forums are
brilliant. My questions were answered by
the Careers Adviser, and the information
I was given answered my points
specifically rather than being vague. As
a student still deciding what I want to do
it is really helpful as I am looking into
various career paths, and other people
bring up questions that I would never
have thought of.
Social Sciences student
Excellent advice, not pointing to one
role but encouraging [me] to look at
different options. Motivating and
encouraging – just what was needed!
OU student
6.1.3 Publications and information
There are a number of useful publications and
sources of careers information available to all
students of The Open University:
Becoming a teacher – This publication contains
information on routes into teaching; entry requirements;
and the implications for planning your OU study.
It is available in hard copy or online at:
to http://www2.open.ac.uk/students/help/starting-
points-teaching
Association of Graduate Careers Advisory Services
(AGCAS) Information
You can look at and/or download careers information,
written by members of AGCAS who are careers
guidance staff from UK universities, on the Prospects
website at:
www.prospects.ac.uk
This includes information such as:
•	 What can I do with my degree?:
www.prospects.ac.uk/careers-advice/what-can-i-do-
with-my-degree
•	 Information about specific jobs:
www.prospects.ac.uk/job-profiles
•	 An overview of job sectors (for example education,
information technology, law and social care):
https://www.prospects.ac.uk/jobs-and-work-
experience/job-sectors
You can also find information on special interest
topics such as:
Prospects website also includes a free online career
planning tool ”What job would suit me”. This asks
users questions on a range of factors related to their
career choice and a list of potential occupations
is generated according to their responses. OU
students may find it helpful to discuss their results
with a careers adviser. You can access this at:
www.prospects.ac.uk/planner
Graduate Careers Ireland (GCI) information
GCI careers information is researched and written by
members of Graduate Careers Ireland specifically
for graduates wanting to work in Ireland. It includes
the following:
Sector guides – Information on opportunities in a
range of careers, e.g. computing and IT, social work,
teaching and education, and law.
You can view or download this information at:
www.gradireland.com/publications
Students and graduates in Ireland will also find
careers information and help with career planning at:
www.careersportal.ie
Your Student Support Team may also be able to
provide or suggest other sources of information.
6.1.4 Social Media
You can connect with OU Careers and Employability
Services on Facebook, Twitter and LinkedIn to find
out more about:
•	 Where your OU study can take you
•	 Starting out in a new career or developing in your
current one
•	 Your career options
•	 How to sell your OU study to employers
•	 What you can do with what you’ve already achieved
•	 News from Careers & Employability Services
•	 Upcoming forums, webinars and live Facebook
chats
•	 Careers resources, advice, motivation and
inspiration
•	 The latest jobs from JobZone, our online vacancy
service.
Facebook:	www.facebook.com/OpenUniCareers
Twitter:	 https://twitter.com/OpenUniCareers
LinkedIn:	 www.linkedin.com/groups/3871260
137The next steps
To find out more, visit our website at www.open.ac.uk/careers
6.2	 Other sources of help
6.3.1 External guidance providers
Other university careers services may allow OU
students to use their information rooms. You are
advised to ring first.
For details of adult advice and guidance services in
the following countries, look at these websites:
England
https://nationalcareersservice.direct.gov.uk
Northern Ireland and Republic of Ireland
www.nidirect.gov.uk/careers
www.gradireland.com
Scotland
www.myworldofwork.co.uk/
Wales
www.careerswales.com
Keep in mind that the extent of advice and guidance
provided for adults varies and there may be charges
for some services.
Further resources
A list of further resources is given at the end of each
section of this book.
To find out about services offered by
The Open University library at Walton Hall, go to:
www.open.ac.uk/library
Finally
You may have to cope with setbacks and
frustrations, but remember that you’re setting
out on an exciting journey, taking the first steps
towards a new or resumed working life, with all
its potential for improvement and advancement.
Good luck and best wishes
for your future!
138 Career planning and job-seeking workbook
To find out more, visit our website at www.open.ac.uk/careers
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
Notes
139The next steps
To find out more, visit our website at www.open.ac.uk/careers
To find out more, visit our website at:
www.open.ac.uk/careers
WEB 047607
Careersplanningand
jobseekingworkbook

Career planning-and-job-seeking-workbook

  • 1.
    Career planning and jobseeking workbook
  • 3.
    Career planning and jobseeking workbook Careers and Employability Services Connect to us online: https://www.facebook.com/OpenUniCareers https://twitter.com/OpenUniCareers https://www.linkedin.com/groups/3871260
  • 4.
    Acknowledgements and thanks Thanksto Jennifer Nisbet who wrote the publications, Career and life planning workbook and Job search guide, on which this workbook is based. Our thanks go also to Christine Adams, Anna Alston, Mary Guthrie, Anne Milne, Clare Riding, Ian Tawse and Jo Ward for their additional material and work on the book, and to other colleagues for comments, editorial suggestions and other production help. Credits for images Cover image: Matrix/The Open University. Page 7: Matrix/The Open University. Page 8: Stocksy/The Open University. Page 10: Claudia Dewald/iStockphoto.com. Page 13: Matrix/The Open University. Page 19: Chris Schmidt/iStockphoto.com. Page 21: Matrix/The Open University; Pressmaster/www.bigstock.com. Page 26: Peter Dazeley/The Open University; Matrix/The Open University. Kreci/iStockphoto.com. Page 29: Matrix/The Open University. Page 39: Richard Learoyd/The Open University. Nyul/iStockphoto.com. Page 40: Imageshop/Alamy. Page 56: North/The Open University. Page 66: Stocksy/The Open University. Page 80: North/The Open University. Page 112: Kelly Cooper/The Open University. Page 134: Kelly Cooper/The Open University. While every effort has been made to ensure that the information in this book is up to date at the time of going to press, it may change during the life of this publication. All rights reserved. No part of this work may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, without permission in writing from the publisher. Produced by Student Services Copyright © 2016 The Open University Edited, designed and typeset by The Open University Printed in the United Kingdom by Cambrian Printers, Aberystwyth WEB 047607 The Open University Student Services The Open University is incorporated by Royal Charter (number RC 000391), an exempt charity in England & Wales and a charity registered in Scotland (number SC 038302).
  • 5.
    Contents This workbook consistsof six sections that take you in a progressive series of steps through the process of career review and choice, and applying for jobs. Introduction 6 How to use this workbook 9 01 Knowing yourself 11 1.1 What am I like? 12 1.2 What work would suit me? 17 Information and activities which help you build up a file of your skills and experience, interests and achievements, weaknesses and strengths. This will help you to discover career opportunities that are likely to match your strengths and circumstances. 02 Exploring possibilities 41 2.1 Planning your strategy 41 2.2 Graduate-level jobs 42 2.3 Creative job search 45 2.4 Finding vacancies 46 2.5 Building a network of contacts 50 This section suggests how and where you might find information to help in the process. 03 Making decisions and 57 taking action 3.1 Making decisions about your life 57 3.2 Goals, restrictions and resources 58 3.3 Plan of action 62 How to move forward – this section gives you an opportunity to look at your ‘framework of choice’, consider the restrictions and resources in your life, and create a ‘plan of action’ for managing change and making things happen. 04 Getting the job 67 4.1 What do employers look for in graduates? 67 4.2 Matching vacancies 69 4.3 Application forms 73 4.4 The curriculum vitae (CV) 76 4.5 The covering letter 94 4.6 The interview 99 4.7 Other selection techniques 106 4.8 What to do if you are not successful 110 This will guide you through some important areas. It discusses what employers look for and how to tell exactly what skills vacancy adverts are seeking. This section also shows you how to produce high- quality application forms, CVs and covering letters, and discusses how to perform to the best of your ability in interviews and other selection procedures. 05 Equality and Diversity Issues 113 5.1 Age 115 5.2 Criminal record 116 5.3 Disability or additional requirements 122 5.4 Gender 127 5.5 Race 129 5.6 Religion or belief 131 5.7 Sexuality and sexual orientation 132 Explores a range of issues related to equality of opportunity. 06 The next steps 135 6.1 Open University Careers and Employability Services 135 6.2 Other sources of help 137 Further sources of help – useful organisations, websites and resources.
  • 6.
    6 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Introduction This workbook consists of six sections that take you in a progressive series of steps through the process of a personal and career review, career planning and job seeking. Our advice if you’re job seeking in uncertain times Job seeking at the best of times can be challenging, but in a time of economic uncertainty it can be that bit harder. There are things that you can do to help overcome any difficulties: 1. Stay positive It can be very difficult to stay positive if you are getting lots of rejections and/or finding very little for which you can apply, but you do need to try. The first thing to remember is not to blame yourself. Assuming your applications are getting you interviews, and the interview feedback is positive, then you are performing well and it is the circumstances that are against you. There is also an element of luck, and if you persevere you will be successful. If you are not getting interviews, or you are concerned about your interview performance, see the sections on application forms (Section 4.3), the interview (Section 4.6) and what to do if you are not successful (Section 4.8). You need to stay positive for your own mental wellbeing, and also because it is likely that any negativity will come through in your application or at your interview. Even though employers probably know rationally that any applicant is applying for a range of jobs, they still like to believe that what they are offering is special to any applicant, so you need to be enthusiastic. Most employers have a very positive attitude to Open University students and graduates, recognising the commitment and motivation that independent study requires, the high standards set by The Open University, and the time management and deadline meeting required to achieve your qualification. 2. Network (see also Section 2.5) This is the time to use any contacts you have. Make sure family and friends (and families of friends) know that you are looking for work, and have some idea of what you want. Stay in touch with any ex-colleagues who may hear of opportunities arising. You will find advice on networking on our careers website at www.open.ac.uk/careers. Set up a profile on professional networking sites such as LinkedIn (www.linkedin.com). You may also want to try other social media websites. See the advice on ‘Job hunting and social media’ on Prospects website at www.prospects.ac.uk/careers-advice/getting-a- job/job-hunting-and-social-media. This includes top tips for using Facebook, Twitter and LinkedIn. Don’t forget your fellow students. Some that you may be in contact with through forums or tutorials may be able to help. 3. Be open to flexible working You may not be able to get exactly what you want immediately, but could you consider starting off part- time? Maybe you could apply for more than one part- time role and then hope for more hours? If you want to work in a particular industry, it may be worth trying to get in a different, possibly more junior role than the one you ultimately want. This could help you build up a network of contacts as well as prove your worth. 4. Do your research Yes, you need to research careers and jobs, especially if you are changing direction – but you also need to investigate the local labour market where you hope to work. Your local council may have a business section or a register of developments. As well as displaying local job adverts a local paper can have articles about businesses that are expanding or moving into the area. It helps both to know what is available and have an idea of what organisations may be developing. 5. Keep trying It is all too easy to get disheartened, but you must keep trying. As an Open University student you have already proved that you can do this – there must have been times when you were tired or over stretched, but you still got the work done in time, so you can do it. Perseverance works!
  • 7.
    7Introduction To find outmore, visit our website at www.open.ac.uk/careers Our advice if you’re changing careers or are facing redundancy If your reason for using this workbook is either due to your intention to change careers or as the result of redundancy see the additional advice below. Once you have done some research and explored the resources in this workbook you may also want to contact a Careers Adviser. 1. Career change Many people who study with The Open University wish to use their qualification as a way of changing career. This may be because they feel that they have skills to offer in a different area or their interests have developed in a new direction. Some students may be looking for a new challenge and see OU study as a way of achieving this. In terms of your career planning it is important that you choose the right qualifications to give you the best chance of achieving your goal. You can research qualifications required for specific careers via the job profiles on Prospects website at www.prospects.ac.uk/job-profiles. Remember that if you are making a radical career change, you may have to accept a lower position or grade at first and then work your way up to where you want to be. Accepting a part-time position initially is also a useful strategy as you can gain confidence in your new work area one step at a time. 2. Redundancy The prospect of being made redundant can be terrifying, but there are things you can do to help prepare yourself to deal with it. First of all, make sure you know your rights. Check your contract of employment for any details there. Are you a member of a trades union? If so, consult them. You need to know the length of notice that you are entitled to and – provided you have worked for the employer for more than two years – what pay you are entitled to. Employers should try to find you alternative work within the organisation, and should consult you about the redundancy process, which should be clear, objective and fair. This means that it should be based on evidence, as opposed to your employer just deciding who they want to make redundant. Normally your job must have disappeared for you to be made redundant. For more information about your employment rights, what pay you may be entitled to and sources of help, visit the Gov.uk website (www.gov.uk/browse/ working) and see the section ‘Redundancies, dismissals and disciplinaries.’ Once you know your rights, the next step is probably to give some thought to the future. While redundancy isn’t usually welcome, it is not necessarily a negative situation to be in. Many people have used it as an opportunity to change their lives and careers. What is important, though, is how you react to the situation. As an Open University student you may already be in the process of career change, and redundancy may be an opportunity to study faster and achieve your goals more quickly. If you have received a large lump sum, it may be wise to get some financial advice about how best to use it to tide you over until you get a new job. This may take longer in the current economic climate, so it’s probably wise to invest in some objective financial planning. If there is a chance you may want to start your own business you may need the money as capital. Although redundancy often comes as a shock, and an unwelcome one, try to see it as an opportunity to review your current position. Think about your skills and abilities, and about any career goals that have got lost along the way. This may be the time to revive those goals. Anecdotally, many people look back on redundancy favourably, and as the prompt they needed to change direction and/or improve their work/life balance.
  • 8.
    To find outmore, visit our website at www.open.ac.uk/careers
  • 9.
    9How to usethis workbook To find out more, visit our website at www.open.ac.uk/careers How to use this workbook Use this workbook to help you to: • Take stock • Review your career and life • Evaluate your aptitudes, skills, interests, values and personal needs • Decide what you want to achieve • Begin to plan how you might achieve it. The workbook outlines the practical steps needed for looking for a job, planning a strategy, completing application forms, designing a curriculum vitae (CV) and presenting yourself at interviews. This is a reference source that can stand on its own, but it also complements information on our careers website: www.open.ac.uk/careers We recommend working through the workbook sections in order, but you might want to dip into different areas at different stages of your career planning and job seeking. This book focuses on you because although organisations, agencies, people and materials are all useful resources, they can’t make things happen for you. It is you who will be in the work situation, so the clearer you are about your own characteristics, the more precisely you can specify what you want and communicate it to employers. This book invites you to recognise your own qualities and abilities, and to define what you’re really looking for. Remember, the most important influence on your career and life planning is you. Activities We encourage you to take time over the activities suggested in this book, so that you can build a sound foundation for later steps in reviewing your career. You may find some of them particularly time consuming, and you might well need to return to them as your ideas develop. Working through the activities should be challenging but rewarding. The more open-minded, positive and constructive you are, and the more time and effort you put into them, the more productive they’ll be. Keep your activities as you work through them. They’re likely to be helpful when you reach the stage of completing application forms, putting your CV together or preparing for an interview. Ways of working Give some thought now to how you might work with these materials before you begin. Working through the activities at your own pace gives you scope for quiet reflection, but you could become distracted by the mechanics of the process. You might find it useful to link up with another person or a small group. Working with others can give you ideas, support and encouragement; they can act as a sounding board and suggest different ways of looking at things. You could take a relatively informal approach, working with a partner or friend, or set up a more formal relationship, with a careers adviser or perhaps through your appraiser at work or your line manager. Whatever approach you decide on, make sure it’s one you’re comfortable with. You’ll certainly find it helpful to get comments and opinions from people who know you well. Time It’s difficult to foresee exactly how much time you’ll need. Career planning has to be a recurring process – you can’t do it once and for all, then settle back secure in the knowledge that you won’t have to do it again. As we make changes and as circumstances change around us, the basis of our original plans inevitably shifts. To begin with, you might prefer to tackle the process in stages, perhaps when you’re not in the midst of your studies. Challenges you may be facing If you recognise concerns of your own – you may find more than one – in this list, make a note of the recommended sections: • I don’t know where to begin. Look particularly at Section 1. • Will my age be a problem in changing career? Look at Sections 2, 4 and 5. • How should I update my CV? Look at Section 4. • I know what I want to do but don’t know how to achieve it. Look at Sections 2, 3, 4 and 6. • How should I use the internet in looking for jobs? Look at Section 2. • I need to find a job in a particular geographical area. Look at Section 2.
  • 10.
    10 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers
  • 11.
    11Knowing yourself To findout more, visit our website at www.open.ac.uk/careers 01 Knowing yourself 1.1 What am I like? 12 1.2 What work would suit me? 17 Remember that you may have potential that has yet to be developed. Try to keep an open mind when considering future possibilities, and reject them only if, after exploring them, there’s good reason to. You may find that some seemingly unchangeable things can be changed. For example, re-evaluating your finances, geographical location or range of commitments may enable you to free up resources to enable you to learn new skills or take up more enjoyable, less well-paid work. This section will help you to develop your self- awareness, take a clear view of your career and life, and consider the questions ‘What am I like?’ and ‘What can I do?’ It will help you to review your life and work experience and the skills and qualities that have grown out of them. This is the first step in the career- review process. The section starts by asking you to look back. Your past has shaped you through your family background, your education, training, work and leisure activities. You’ve gained knowledge and skills from your experiences, and learnt how you cope with and respond to, different tasks and challenges. This kind of self-knowledge is the soundest basis for making decisions about your future. The activities in this section ask you to think about a series of questions as a beginning to your career review. They offer different ways of considering what you’re like and what you can do. At intervals you’ll be asked to ‘pause for thought’ and note down your responses. The questions are: • Who am I? What were my early influences and decisions? • What are my main achievements? • What roles do I play in life? • What have I learnt in my spare time? • How big a part of my life is work? • What work experience have I had? • What different roles do I take on at work? • What sort of person am I to work with? • What am I good at, as far as work is concerned? • What do I really want from work? • How well does my present (or last) job meet my wants and needs? • What kind of work would I like to do? You may like to try out some of the activities from this section on paper. You can also access career planning activities online on our careers website at: http://www2.open.ac.uk/students/help/career-self- assessment Here you will find links to lots of different activities and resources to assist in career planning and job seeking. Some of these resources and links are provided by The Open University and some by external organisations such as Graduate Prospects: www.prospects.ac.uk
  • 12.
    12 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Activity 1.1 Secondary school Moved house Father died Qualified (production engineer) Marriage Son Daughter Bought flat (improvement grant) Bought house – garden and mortgage! Promotion problems due to lack of experience Became management trainee (part-time study, diploma) Changes in company policy (new job, project engineering) NOW Hospital (appendix removed) Moved sideways (into sales and marketing) Left school (apprenticeship) HIGH POINT LOW POINT Company hit hard time (redundancy) 1.1 What am I like? 1.1.1 Who am I? What were my early influences and decisions? The two activities in this section will help you to develop an overview of your career so far, and to consider how your early history contributed to it. In this activity you’re going to draw a ‘lifeline’, to help you reflect on the pattern of your life. You’ll be asked to refer back to your lifeline later on. This activity can help you to gather insights that could influence your future choices, and to discover aspects of yourself that you might want to develop or change. Note down key events, such as education, marriage, children, starting work and so on. Put them in the form of a diagram like the one on the right showing high and low points at different times of your life. The lifeline exercise can result in a lot of emotions coming to the surface as you review your experiences. You may find it useful to talk through any difficult emotions with someone you trust. Example When you’ve drawn a lifeline that records your experiences, reflect on it as a whole. Think about the feelings aroused by each experience and answer these questions, noting any thoughts or ideas that occur to you: • What does the lifeline say about you and how you’ve lived your life? • Are there recognisable themes that have run through your life? • Is the pattern generally up or down? Is it steady or changeable? What sort of incidents were associated with the highs and lows? Are the highs generally associated with your own choices or actions and the lows with the unexpected or things outside your control? Are there some experiences you feel you cope with easily and others that really throw you? Would someone who knows you well have drawn your lifeline differently? What would that person have said? You may find it useful to reflect on this with a trusted friend or family member. Pause for thought • Are there any lessons to be learnt? For instance, this activity revealed to one person that all her high points were associated with praise from others and her low points with geographical moves. Another noted that all his positive job changes followed disappointments in his private life, and he saw that each disappointment motivated him towards a change and offered opportunities. For a third, it helped them recognise the positive influence and benefit of someone in their life acting as a consistent and unobtrusive mentor.
  • 13.
    13Knowing yourself To findout more, visit our website at www.open.ac.uk/careers Activity 1.2 This activity brings out some of the early themes from your lifeline, concentrating on your childhood and school life. Make notes under the headings below. The activity may take some time, and you might want to return to it later to change or add points. Some of this information will be useful when you put your CV together or update your LinkedIn profile (see Section 4). 1 Family influences If applicable, write down any occupational influences on you. For instance, was one of your parents a mechanic or another a teacher? 2 What do you remember about your early childhood? For example, the area and house you lived in, family lifestyle, activities you participated in, experiences you had, what your parents expected of you, your role in the family. 3 Schooling List the schools you went to, with dates, the subjects you were good at and enjoyed, how you got on with other children, how your teachers saw you, how you saw your teachers, school sports or other activities you took part in. 4 Teenage years What activities were you good at or did you enjoy? How did your friends see you? What were you like as a teenager? What ambitions did you have (career or otherwise)? 5 Any further education or training What did you do? How did you choose it? How did you get on? What prompted you to begin studying with the OU? Pause for thought Now spend some time considering what your notes say about you – what you’re like, why and how you arrived at where you are today. You may see themes appearing, such as strong aspects of your personality or talents. Maybe you had various abilities but developed one rather than another – sporting ability rather than artistic talent, perhaps. Looking back, could you have made different choices? Make a note of any insights you’ve gained through remembering and reflecting.
  • 14.
    14 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 1.1.2 What are my main achievements? The activity in this section can help you to recognise skills and qualities that you might not always be conscious of. It can be a particularly useful approach if you haven’t had much formal experience like paid work – it’s sometimes easy to assume that skills gained outside work somehow don’t count. Looking back at your lifeline (Activity 1.1), note the achievements you are most proud of and what they say about you. Set them out in the table below. They could be work-related or to do with relationships, things you do in your spare time, recent or a long time ago. For example, passing all your exams first time may say that you’re an excellent student; passing your driving test on the fifth attempt may say a lot about your staying power and determination. My achievements 1 2 3 4 5 What they say about me 1 2 3 4 5 Activity 1.3 Pause for thought Which of the skills or qualities you’ve listed could be used in a work situation? What kind of work? The chances are that you’ve highlighted ‘transferable skills’ and qualities that would be welcome in many kinds of career role.
  • 15.
    15Knowing yourself To findout more, visit our website at www.open.ac.uk/careers 1.1.3 What roles do I play in life? Another way of looking at your skills is to consider the roles you’ve played in your life. Each role demands different skills. As a student, you need skills of learning, time management, communication and keeping to schedules. If you enjoy DIY, you’ve developed not only practical skills but planning and organising skills as well. If you are a parent, you have needed to develop skills of budgeting, time management, delegating, cooking, and so on. By chairing meetings of a club, you develop skills of briefing and dealing with people as well as organisational and management skills. Activity 1.4 Now complete the table below. As a parent you may also be a cook, gardener, household manager. You may take part in voluntary work (taking on roles such as counsellor, listener or organiser). You may be an employee (team leader, working group member, project manager). You may find this is a particularly useful exercise if you have little work experience to draw on, as many skills are learnt outside paid work. My main roles 1 2 3 4 5 Pause for thought Looking at all your roles, are you surprised at the number of things you do and take for granted every day? Look at the skills you’ve listed. Circle the ones that are particular strengths. How do you feel about them? Which do you most enjoy using? How could you use them in work?
  • 16.
    16 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Activity 1.5 My main weaknesses 1 2 3 4 5 6 My main activities outside work are (or have been) 1 2 3 4 5 Review Think about what you’ve done so far in this section. What have you learnt about yourself? Bringing some of your answers together, what would you now say are your main strengths and weaknesses? They can be skills, abilities, personal characteristics or interests. Remember that strengths can be built on for the future and weaknesses can be reduced by your efforts to address these; they need not be barriers to the future. My main strengths 1 2 3 4 5 6 Pause for thought What are the possibilities in your interests? Have you held positions of responsibility in any of them? Can you see any interests or hobbies that might be helpful to future work plans? For example, although you may not have financial responsibilities at work, you might be treasurer to your local darts team or do the audit for the youth club funds. 1.1.4 What have I learnt in my spare time? What hobbies do you have or have you had in the past? You may not turn your hobby into a career, but your spare-time activities could help you to demonstrate skills and qualities. lt’s easy to forget that leisure activities can give us as many skills and abilities as those gained through work.
  • 17.
    17Knowing yourself To findout more, visit our website at www.open.ac.uk/careers Activity 1.6 1.2 What work would suit me? Now that you’ve spent some time considering the skills and qualities you’ve developed through experience, it’s time to think about work. 1.2.1 How big a part of my life is work? Before considering what you want to do, you need to be clear about how important work is to you. This is something that varies from person to person. You might be highly ambitious, even a workaholic, or you might avoid positions that regularly eat into your leisure time. You may have found yourself in a post that takes over and leaves little time for family life, and may prefer something that can give you a better balance between work and home life. The next activity can help you to think about this. If you don’t have much experience of paid work, think about your approach to other activities or projects you take part in. Rate each of the following statements Use this scale – try to avoid choosing option 3 unless you feel this is the only appropriate response: 5 Always true 4 Usually true 3 Neither true nor untrue 2 Usually untrue 1 Always untrue 1 I always aim high in my work 2 My ambition isn’t necessarily to get to the top 3 I set myself difficult goals to achieve 4 I don’t like to let work disturb my social life 5 I want to do well at whatever I’m doing 6 Being a success in life isn’t too important to me 7 I like being seen as dedicated to my job 8 I don’t like to aim too high 9 Work always comes before pleasure 10 People wouldn’t describe me as very ambitious Pause for thought Think about the way you scored in this activity. How does this feel? Is it right for you or would you like to change this aspect of your life? Add up your scores From the odd-numbered questions From the even-numbered questions Take the ‘even’ score away from the ‘odd’ score (even if it produces a minus score) What did you score? If you have a plus (+) score, the higher your score, the stronger your ambition. If you scored +20, for example, you would always put work first and aim high in your achievements. You might even be seen as a ‘workaholic’! If you have a minus (–) score, you don’t see work as the most important aspect of your life. At the lower end of the scale, for example if you scored –20, you would put your social life before work, have little concern about getting on in your career, and might be seen as ‘laid back’. If you have a more central score, you keep a balance between work and leisure. You have some concern about doing well and making progress, but you don’t let work rule your life.
  • 18.
    18 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Activity 1.7 1.2.2 What work experience have I had? Most people would agree that work experience is very important when considering future directions, but it’s easy to take yourself for granted and not recognise the wide range and high level of skills and abilities you have. Many will be ‘transferable skills’ that you can use in other situations. You will have learnt a huge amount through work (whether paid or voluntary) by noticing how you feel about different tasks and respond to work situations, or how well you perform particular activities compared to other people. You may also have learnt from others, either through formal appraisal or from informal comments and reactions. The next activity helps you to explore your experience, and will be useful when preparing for interviews (see Section 4). The activity may take some time, and you might want to come back to it later. 1 List the jobs you’ve had, with dates. If you have limited or no experience of paid employment, make a list of unpaid or voluntary experience for example, helping readers at school, delivering ‘Meals on Wheels’, fundraising for a charity or involvement in a conservation project. 2 For each job, note how it came about. Did you apply formally through an advert, or did you make a speculative approach to a company? Did you volunteer or were you encouraged into it? If you had some choice, what factors seemed important in deciding to take it up? 3 For each job, note the range of tasks or activities you had to do. Having an OU degree was useful for getting my current post which is based at home as it demonstrated that I could work from home successfully. BSc Hons Environmental Studies graduate Pause for thought Look back at what you’ve written. Do you see any patterns? Can you see particular strengths or areas of difficulty? Do you enjoy some things more than others? Do others turn to you for help with particular things? 4 Did you have to deal with any difficulties? 5 Which tasks or activities did you find most appealing, enjoyable or rewarding, and why? 6 What were your particular achievements? 7 How did you get on with the other people? 8 What was your style of working? 9 Were you known for particular things? 10 What were you most proud of? 11 What were the things you disliked or found frustrating?
  • 19.
    19Knowing yourself To findout more, visit our website at www.open.ac.uk/careers Activity 1.8 1.2.3 What different roles do I take on at work or elsewhere? This activity should help you to become aware of the skills and experience you’ve developed through the typical roles you play at work. If work hasn’t been a major part of your life, apply this to whatever activity has taken up a lot of your time. Some work roles and areas of competence are listed below. Work through each role in the list. Does it sound like you? If it comes to you easily, put a tick beside it; if it isn’t a usual role for you, cross it out. If you’re not sure or if it’s only partly true, leave it blank. INITIATE SEEK COMMUNICATE IMPLEMENT ORGANISE HARMONISE MONITOR SOLVE CHECK MAINTAIN DECIDE CAMPAIGN IMPROVE LIAISE PERSUADE CONTROL COORDINATE MEASURE ALLOCATE EXPLORE SUPERVISE SELECT INVESTIGATE CHOOSE DEVELOP LINK GUIDE CREATE SELL MAKE ENHANCE PLAN TRAIN DELEGATE TEACH EVALUATE Pause for thought Look at the roles you’ve ticked. Circle any that describe you particularly. Can you think of any specific activities or actions at work or in non-work activities that show that they describe you? What evidence can you give to prove them? How do you feel about them? Which do you most relish carrying out? You’ll find this list useful when you come to preparing a CV, completing an application form or attending an interview (which you will cover in more detail in Section 4). All the words describe positive qualities.
  • 20.
    20 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 1.2.4 What sort of person am I to work with? Your personality affects your style of operating in the workplace and the way you respond to situations. Again, think more generally about your life if your workplace experiences are limited. Activity 1.9 Work through the following descriptions, deciding how you compare with other people. Try to use the full range of ratings from 5 (much more so than most other people) to 1 (much less so than most other people), circling your position on the scale. Average Plan ahead and keep to it (t) 5 4 3 2 1 Stickler for detail or accuracy (t) 5 4 3 2 1 Easy mixer, socially confident (s) 5 4 3 2 1 Pessimistic (f) 5 4 3 2 1 Energetic (f) 5 4 3 2 1 Solitary (s) 5 4 3 2 1 Like lots of change and variety (t) 5 4 3 2 1 Very much affected by events or people (f) 5 4 3 2 1 Go my own way, act independently (s) 5 4 3 2 1 More practical than theoretical (t) 5 4 3 2 1 Determined (f) 5 4 3 2 1 Sympathetic, caring for others (s) 5 4 3 2 1 Always like to win, come in top (f) 5 4 3 2 1 Like persuading, negotiating (s) 5 4 3 2 1 Tend to worry, get anxious (f) 5 4 3 2 1 Like deadlines and timetables (t) 5 4 3 2 1 Usually take a leading role (s) 5 4 3 2 1 Good with complex ideas or data (t) 5 4 3 2 1 Demonstrative, show feelings (f) 5 4 3 2 1 Happy to be in charge of others (s) 5 4 3 2 1 Prefer traditional courses of action (t) 5 4 3 2 1 Equable, not easily upset (f) 5 4 3 2 1 Tend to influence people (s) 5 4 3 2 1 Ambitious to get on at all costs (f) 5 4 3 2 1 LessMore
  • 21.
    21Knowing yourself To findout more, visit our website at www.open.ac.uk/careers Activity 1.9 continued Now look over your ratings. You can group them into those to do with relating to people and social situations (s), to do with your approach to work tasks (t), and to do with your drives and emotions (f). Where did you score the most highly? Or did you score evenly across the three categories? For instance, some people are at ease giving a presentation while others find it very nerve- racking. If you think about your colleagues you’ll be aware how they differ from each other. While one is reserved, another is very chatty and communicative; one is a stickler for detail while another is not too concerned about fine accuracy. There’s no right or wrong personality, but you do need to take your own traits into account. A work situation that suits a very sociable person won’t suit someone who much prefers to work alone. The better you know yourself, the more opportunities you create for finding a situation that will suit you. What have you learnt about your typical way of operating? What kind of work situation would be likely to suit you? Pause for thought
  • 22.
    22 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 1.2.5 What am I good at as far as work is concerned? This section should help you to think about your aptitudes – what you can do and how well you can do it. Some people have a creative imagination, others a photographic memory, others are skilful with statistics. Some people have been taught or have learnt particular skills for themselves – competence in a computer language, for example. Others have specialist knowledge, such as accounting standards or employment law. This question is of particular interest to employers. It’s also important for you to know what you’re good at, as it affects the work or the parts of a particular job that you can perform best. There’s generally some connection between what we can do well and what we enjoy doing, but it’s not a necessary connection. You can be good at something without particularly enjoying it. You should also remember that you’ll go on developing as you cope with different demands, as you learn through your own study, by going on training courses, by trial and error, by observing others, by reading and so on. You can learn about your aptitudes from other people’s comments, through taking psychometric tests (which are discussed in more detail in Section 4) or from your own perceptions of how well you cope with different tasks. The next activities are based on your own knowledge, but do use any other information you can get. Activity 1.10 Look back at your list of achievements and what they say about you. Now list some of your work/ voluntary/domestic achievements, projects you’ve tackled successfully, initiatives you’ve put into practice, etc. Then think about the knowledge and abilities you needed to apply in order to achieve the result. Perhaps you had to learn a new technique, or perhaps you used or developed a skill you already had. What I achieved 1 2 3 4 5 Knowledge/abilities used 1 2 3 4 5 Pause for thought Examine and reflect on what you’ve put under the headings. You might discover that your strengths are grouped in some areas rather than others. It’s useful to know this, as it enables you to recognise the talents you have and also to see whether there are gaps you want to work on. It’s also useful as evidence when you’re completing a CV or attending an interview. Review As you may be discovering, it’s helpful to reflect on your past as you approach a decision that will significantly affect your life. Consider your answers so far. You may have begun to gain more insights or realisations about your own nature. Your discoveries might be to do with your skills and abilities or your attitudes, ambitions, needs and values. You may have learnt more about your personality, temperament or way of dealing with the world. What have you learnt? It can help, rather than simply thinking through these questions, to have someone else with whom to talk through your answers – perhaps a friend, relation or a careers adviser.
  • 23.
    23Knowing yourself To findout more, visit our website at www.open.ac.uk/careers Activity 1.11 The following activity is designed to help you do a skills audit. You need to think about the skills you have gained through your working, home and social life, as well as those you are developing and enhancing through your Open University studies. The activity will help you to assess your skills in more detail. The activity is grouped into skills which are of particular importance to employers, often referred to as ‘employability’ or ‘transferable skills’. If you are unfamiliar with the language used in recruitment, doing this exercise will help you to start looking at your skills in the way that employers expect and to use the language that you will need to use in job applications. Many people, especially those who may be returning to work after a break, feel that they are lacking in skills or that the skills they have are rusty. It may be that you have gaps in your skills and undertaking this exercise will help you to identify those so that you can think about how to plug the gap. For example, think about your Open University studies. It is likely that you have developed or enhanced your written communication skills, so you will have a good level of skill in points 8, 9, 10 and 12. You will certainly have evidence that you can read efficiently, point 7, and depending on any tutorial participation, you may have enhanced your verbal skills. A way of improving and demonstrating your skill of dealing with people could involve tutorials and forums. You are certainly using the skills of thinking and analysis, even if it is just points 5, 9 and 10. In the technical/practical section you will be using IT software and equipment. In creative/ innovative skills you may be writing with imagination or creativity, and/or seeing new possibilities or openings. Your studies will also give you evidence of skills in virtually every point made in the administrative/ organisational section. You will need to rate how well you can do these. So, be as honest as you can both in admitting lack of skill and in acknowledging your competence, but don’t underestimate what you are capable of. Consider how well you can carry out each one in comparison with other people. Try to use the full range of ratings. Rate each of the following statements Use this scale – try to avoid choosing 3 if you can: 6 Very high, outstanding performance 5 High level, reliably perform better than average 4 Good level generally able to do it quite well Don’t devalue yourself. Recognise the importance of what you’ve done, be it through your study, be it through your life experiences, because that’s what enriches a firm, and that’s why companies would be interested in students from the OU. Head of Recruitment, KPMG Europe 3 Reasonable level, just acceptable skills 2 Very basic level, not usually adequate 1 No significant level of skills
  • 24.
    24 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 1 Listening, taking in what others say and checking your understanding of the information 2 Clear verbal expression, ability to convey information without confusion 3 Fluent speech, words flowing easily 4 Drawing people out, to encourage them to speak 5 Commanding an audience, giving a presentation 6 Using the telephone effectively: few misunderstandings 7 Reading efficiently: readily taking in written information 8 Writing effectively, matching style to purpose 9 Structuring reports and other written communications logically 10 Using a wide vocabulary accurately and appropriately 11 Speaking (accent and pronunciation) in a way that’s acceptable in a wide range of social situations 12 Spelling and grammar Communication Total score Rating 1 Showing sensitivity to the feelings and needs of others; taking account of this in dealing with them 2 Getting on with a variety of people and building up working relationships 3 Instructing, teaching or coaching others 4 Delegating and managing others 5 Leading a work group, chairing a meeting 6 Encouraging, motivating, getting the best out of others 7 Counselling: helping with personal problems 8 Negotiating: mediating, dealing with conflict 9 Interviewing, assessing or appraising 10 Persuading, encouraging, changing others’ views 11 Consulting and building agreements 12 Acting assertively (not aggressively) Dealing with people Rating Total score
  • 25.
    25Knowing yourself To findout more, visit our website at www.open.ac.uk/careers 1 Understanding book-keeping 2 Preparing a budget 3 Using a spreadsheet 4 Understanding VAT and taxation 5 Producing a cash-flow forecast 6 Producing annual accounts 7 Carrying out a cost–benefit analysis 8 Interpreting management accounts 9 Working knowledge of volume and expenditure-related variances 10 Operating PAYE 11 Understanding types, uses and sources of loan finance 12 Operating costing system Financial activities Rating Total score 1 Using project management tools, e.g. critical path analysis 2 Using statistics 3 Logical thinking, working out implications 4 Applying critical ability in recognising potential weakness or problems 5 Making logical use of facts or information 6 Using mental arithmetic, estimating orders or probability 7 Flow-charting 8 Rational decision-making 9 Carrying out analysis and evaluation 10 Researching and gathering information 11 Carrying out mathematical operations 12 Carrying out stock or inventory control Thinking and analysis Rating Total score
  • 26.
    26 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 1 Competence in using tools and technical equipment 2 Understanding data-processing equipment 3 Applying craft or technical ability 4 Aptitude for diagnosing mechanical or electrical faults 5 Constructing or assembling materials or equipment 6 Understanding current technical developments 7 Using laboratory equipment 8 Dealing with tangible, practical problems 9 Using manual dexterity, hand-eye coordination 10 Understanding physical sciences 11 Understanding engineering 12 Maintaining or repairing complex equipment Technical/practical Rating Total score
  • 27.
    27Knowing yourself To findout more, visit our website at www.open.ac.uk/careers 1 Generating alternative solutions to problems 2 Creating original ideas 3 Improvising or adapting for other purposes 4 Designing new things, systems, layouts, events or courses 5 Being insightful, intuitive or imaginative 6 Developing others’ products or ideas 7 Writing with imagination or creativity 8 Seeing new possibilities or openings 9 Appreciating new or unconventional aspects 10 Visualising: imagining how something will look 11 Working creatively with shapes, colours, sounds and patterns 12 Innovating and improving procedures in your own field Creative/innovative Rating Total score 1 Managing your time 2 Planning systematically 3 Operating procedures precisely 4 Making things run like clockwork 5 Handling in-trays efficiently 6 Meeting deadlines 7 Producing clear operational structures 8 Developing resources to achieve objectives 9 Organising working time 10 Monitoring procedures and progress 11 Making detailed plans of action 12 Having a well-organised work space, filing system or recording procedures Administrative/organisational Rating Total score
  • 28.
    28 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Now add up all your total scores. Look at the skills you scored most highly in and those you most enjoy. Write them in this space: Communication Dealing with people Financial activities Thinking and analysis Summary Technical/practical Creative/innovative Administrative/organisational Total score Circle the skills that you’d most like to use in the future. Now look through the original ratings to see whether there are skills you’re not yet very competent in, but would like to develop. List those here: Evidence of your skills Now that you have identified your skill strengths, it can be helpful to think about what evidence you can give in support of those skills. On an application form you are often asked to give an example of a time when you effectively used a particular skill. In a CV, if you claim to have a skill you are expected to give evidence to that effect. Competency-based questions are regularly used in graduate recruitment processes. Employers identify the skills and abilities (competences) that are vital for working in their organisation and they use these as selection criteria for choosing new recruits. To measure your suitability, recruiters will ask questions where you will need to draw on examples from your life so far to demonstrate times when you have employed particular competences. The logic is simple: your past ability to use a skill is a good indicator of your potential to be successful in the future. When thinking about evidence it can help to think of using a variety of sources, including your studies, work, voluntary work or life in general. In order to structure the information you give in a clear and succinct way, you can use the STAR method: Situation Task Actions Result. • Situation - what was the situation and when did it take place? • Task - what task was it, and what was the objective? • Action - what action did you take to achieve this? • Results - what happened as a result of your action? You may have more than one example to consider; try to choose the one that • is relevant and describes the skill being asked for
  • 29.
    29Knowing yourself To findout more, visit our website at www.open.ac.uk/careers Pause for thought What does this activity tell you? Are there any surprises or does it confirm your expectations? Either way, you can use the information when you come to consider alternatives. Remember that skills can always be developed simply by using them more, and that the wider the range of skills you have, the greater the variety of job options open to you. Recognising the skills you have to offer is key in being able to market yourself successfully to an employer (see also Section 4). • demonstrates action and is something you actually did, as opposed to what you learned, or what you might do in a hypothetical situation • is personalised by stating what you did, as opposed to saying what other people did or what happened • has a positive outcome • is appropriate and gives you something you can talk comfortably about if asked for more detail • is specific - if the question asks for an example, then you should only describe one. Keep your examples specific, recent and relevant. We want to hear how you have used skills and behaviours in a positive way, so that we can see how you would apply them in the work place. Co-operative Group Here are two examples: Administrative/organisational: Whilst acting as a marketing manager for my local hockey club, I organised a successful recruitment drive: printing flyers, arranging volunteers to distribute these and putting in place free trial sessions to welcome potential members. Membership increased by 20 per cent. Communication: I lead seminars for junior members of staff in my workplace. It is essential that I listen carefully to establish their current knowledge and only intervene when necessary to encourage them to consider other areas. My performance in the first seminar led to an increased workload to improve the next set of seminars. While competence-based questions focus on what you can do, strengths-based questions focus on what you like doing and are also being used now by graduate employers (there is further exploration of questions used in applications and interviews in Section 4).
  • 30.
    30 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Rate the values below for importance to you. Try to use the full range of scores. 4 Very important 3 Important 2 Less important 1 Not important Description Value Rating Making decisions, independent action AUTONOMY Change or variety in tasks, people, places VARIETY Scope to learn, study, think, analyse INTELLECTUAL Making friendly contacts with others SOCIAL Large income, expensive possessions ECONOMIC Expressing ethical code or religious beliefs SPIRITUAL Using talents, developing skills USING ABILITIES Being part of an important organisation COMMITMENT Having lots of stimulus, excitement, thrills EXCITEMENT Having influence or power over others AUTHORITY Enjoying or making beautiful designs or things AESTHETIC Getting promotion, career progression ADVANCEMENT Helping or caring for others ALTRUISM Concern for surroundings or location COMFORT Being original, developing new ideas CREATIVITY Activity, keeping moving, handling things PHYSICAL Taking risks; business and trading COMMERCIAL Does this make clear your reasons for wanting to work? Does it suggest the kind of work you like to do or the type of organisation you feel most most suited to working for? Clearly, some kinds of work have more to do with ALTRUISM and others with ECONOMIC or CREATIVE values. In the same way, a manufacturing company, a charity, a newspaper office, a local authority, a financial institution and so on will each have a different ‘feel’ as a place to work. Try to think through which would suit you best. Activity 1.12 1.2.6 What do I really want from work? Now that you’ve thought about who and where you are and the skills you have, the next step is to recognise what you’re satisfied with and what you’re dissatisfied with. This doesn’t mean that you can achieve everything you wish, as restrictions of one kind or another will limit everyone’s range of choice. It is important though, not to limit yourself by concentrating so much on restrictions that you achieve less than you might.
  • 31.
    31Knowing yourself To findout more, visit our website at www.open.ac.uk/careers 1.2.7 How well does my present (or last) job meet my wants and needs? Activity 1.13 To complete your examination of job satisfaction or dissatisfaction, consider the following. Circle the level that applies to your present or most recent job. Money Clearly, inadequate income causes many problems and dissatisfactions. Too little Adequate Well paid Opportunity for control Simple, repetitive, closely controlled work is generally far from satisfying, but on the other hand having a high level of responsibility (being a managing director, for example) can be stressful. Too little About right Too much Opportunity to use skills Most of us enjoy using and developing our skills and competence. But having very high-level, complicated demands repeatedly made on us can be stressful. Too little About right Too much Goals People function best when there are demands to be met, targets to be achieved, challenges to rise to. We all have our own preferred level of demand. Too little About right Too much Variety Individuals differ in the amount of variety they prefer, but it’s stimulating to have some change and variation in the work environment. Too little About right Too much Clear boundaries A work situation where boundaries aren’t clear can cause uncertainty and conflict. Equally, being in a tightly defined job can feel restricting. Too little About right Too much Social contact Everyone’s need for contact is different, but most of us get satisfaction from being with others, chatting over coffee or working in a team. Too little About right Too much Respect Most of us like to be thought well of and respected by others. For work satisfaction it’s important to feel that there’s some match between your contribution and the position you hold. Too little About right Too much Pause for thought Which of these are the most important to you? Answering that may clarify sources of satisfaction and dissatisfaction in your current or most recent job. It may begin to suggest either the kind of work you’d like to do or the kind of organisation you’d like to work for. This can be helpful in supporting the question of whether a change of employer/ organisation may be what you’re looking for, or a change of job role/new career direction. Note any ideas that occur to you.
  • 32.
    32 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Review You’ve now considered the reasons why you work (other than financial necessity) and which things you most enjoy doing. If your occupation is to ‘feel right’, it’s important that it should be fulfilling, agree with your beliefs in general and allow you to express your personality. Any significant mismatch is likely to leave you feeling dissatisfied, stressed or becoming cynical about your job. Take time to reflect on the results of the activities in this section, perhaps discuss them with a confidant and if necessary modify them. Note your thoughts here. Activity 1.14
  • 33.
    33Knowing yourself To findout more, visit our website at www.open.ac.uk/careers 1.2.8 What kind of work would I like to do? To help you decide on the kind of work you’d like to do, you also need to consider your interests. Interests are to do with the things you find most appealing or enjoyable. Activity 1.15 Look through these kinds of work and consider whether you would like to carry each one out. You may have had direct experience of some of them. Try to imagine whether you’d like doing the others or not. It’s not a question of your ability or qualifications, but only of your own preferences. Assume that you could do the activity if you wanted to. Tick ‘Yes’, ‘Not sure’ or ‘No’ according to how you feel about each activity. Yes Not sure No 1 Supervise staff dealing with correspondence 2 Design a staff appraisal scheme 3 Monitor quality control activities 4 Keep up to date with computing developments 5 Put budgeting procedures into practice 6 Develop a marketing plan for a new service 7 Keep abreast of scientific developments 8 Write information booklets 9 Supervise process control staff 10 Organise renewal of insurance cover 11 Plan staff training schemes 12 Forecast drawing office work schedules 13 Find new areas for computer applications 14 Keep abreast of money market changes 15 Negotiate prices with suppliers 16 Plan research and development (R and D) 17 Handle public relations issues (PR) 18 Revise road delivery schedules 19 Plan introduction of new clerical procedures 20 Interview job applicants 21 Organise installation of an internal telephone system
  • 34.
    34 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Activity 1.15 continued Yes Not sure No 22 Instruct computer users on procedures 23 Coordinate work of audit staff 24 Brief sales staff 25 Design new technical equipment 26 Collect and collate information 27 Supervise warehouse staff 28 Report on legal matters affecting the organisation 29 Set up a staff-grievance procedure 30 Plan equipment-maintenance schedules 31 Review data-processing installations 32 Monitor productivity of operations 33 Analyse effectiveness of advertising 34 Organise scientific research 35 Design publicity leaflets 36 Monitor productivity of operations 37 Implement new administrative procedures 38 Investigate staff turnover problems 39 Monitor laboratory testing services 40 Write computer documentation 41 Brief colleagues on effects of taxation changes 42 Report on sales performance 43 Produce design specifications 44 Manage external relations 45 Supervise a building-maintenance programme 46 Take minutes of meetings 47 Prepare a staff handbook 48 Carry out an energy usage audit 49 Deal with computing problems
  • 35.
    35Knowing yourself To findout more, visit our website at www.open.ac.uk/careers Activity 1.15 continued Not sure No 50 Prepare financial reports 51 Review a product range and pricing 52 Develop and improve mechanical or electronic equipment 53 Edit a newsletter or magazine 54 Improve plant layout to increase productivity Scoring Give 4 points for each ‘Yes’ response Give 2 points for each ‘Not sure’ response Give 0 points for each ‘No’ response Now add up the scores for the groups of questions shown here: Total Group A Questions 1, 10, 19, 28, 37, 46 Group B Questions 2, 11, 20, 29, 38, 47 Group C Questions 3, 12, 21, 30, 39, 48 Group D Questions 4, 13, 22, 31, 40, 49 Group E Questions 5, 14, 23, 32, 41, 50 Group F Questions 6, 15, 24, 33, 42, 51 Group G Questions 7, 16, 25, 34, 43, 52 Group H Questions 8, 17, 26, 35, 44, 53 Group I Questions 9, 18, 27, 36, 45, 54 Yes
  • 36.
    36 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Activity 1.15 continued What your scores mean Your scores relate to different kinds of work activity: A Administrative/legal/secretarial e.g. charity officer, health service manager B Personnel/training/education e.g. primary teacher, recruitment manager C Technical support e.g. quality assurance manager, laboratory technician D Data processing e.g. IT consultant, database administrator E Accounting/finance e.g. management accountant, tax inspector F Marketing/sales/purchasing e.g. retail buyer, sales manager G Scientific/engineering/research and design e.g. electronics engineer, architect H Information/communication e.g. librarian, interpreter I Operational/production/distribution e.g. transport planner, production manager Write in your total score for each group. The result may be no surprise. It might be that you work or have worked in your highest-scoring area and enjoyed it. If so, this is a reassuring confirmation and suggests that you should consider continuing in that or related work, even if in a different kind of organisation. Alternatively, the pattern may suggest a move to a different area of work. The list of interests we’ve considered in this activity reflects common graduate and managerial areas of work. It doesn’t include artistic, creative, craft and natural environment areas, nor those that depend on performance skills such as acting, dancing, playing a musical instrument. If you have interests outside this ‘managerial scheme’, do take account of them in considering your future. Before carrying on, you might find it helpful to look again at the section on the roles you play in your life and any possibilities you noted there. Activity 1.16 You may also find it useful to work through Prospects Career Planner. This is an online career-planning tool that will help you explore your skills, interests, and motivations. It will then match your profile with an occupational database to produce a list of job suggestions for you to consider. Prospects Career Planner, like similar programs, doesn’t tell you what you should do, but it will give you a starting point to explore areas of work that may interest you. https://www.prospects.ac.uk/planner You’ll need to register (free) to access the Career Planner tool. Score
  • 37.
    37Knowing yourself To findout more, visit our website at www.open.ac.uk/careers Review Read through the results of your work and reflect on the notes you’ve made. You should by now have a much clearer picture about: • Your aptitudes • Your skills and interests • Your achievements and experience • Your values At this stage you might like to discuss things either informally with a trusted friend or formally with a careers adviser. Now complete the summary chart below. When you’ve done that, you may want to look at Section 6 ‘The next steps’, or you might prefer to move on to the possibilities that this knowledge could open up for you in Section 2. Summary chart What am I good at? Write down the aptitudes that you’d most like to use in work. What are my main work values? Write down the values you’d like to fulfil. What would I like to do? Write down the occupations or job areas you’d like to work in.
  • 38.
    38 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Summary chart continued How would I like to work with people? What kind of environment? Write down the kind of contact you’d like to have with people (working mainly independently or as part of a team, having lots of customer contact, helping others in a caring or supporting role), and the kind of work environment you’d like. What other aspects are important to me? Write down any other factors that are important to you, such as location, travel, organisational structure, etc. What changes would I like to make? Write down some changes you would like to make to help in your job searching.
  • 39.
    39Knowing yourself To findout more, visit our website at www.open.ac.uk/careers You may wish to talk over some of your initial thoughts with a careers adviser before you go on to the next section. The content of Section 1 can provide a really useful starting point to an individual careers guidance consultation with a careers adviser. You may find it useful to complete this section before you book an consultation, which OU students can do via the careers website. You may prefer, however, to explore further by continuing to read the remaining sections in this book or by looking at information and activities on the careers website at: www.open.ac.uk/careers Whichever route you choose good luck with the next step! Further resources Try using the resources for developing self- awareness and identifying which career might suit you on our careers website at www.open.ac.uk/ careers. These include tools to match your skills and interests to relevant types of job. You also might like to look at the TargetJobs careers report at https://targetjobs.co.uk/careers-report, which uses questionnaires to explore your interests, strengths, personality and abilities. Be honest with yourself: what relevant experience do you have? Where are your gaps? How can you start to bridge these gaps. Head of Talent Management, Royal Mail
  • 40.
    40 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers
  • 41.
    41Exploring possibilities To findout more, visit our website at www.open.ac.uk/careers 02 Exploring possibilities 2.1 Planning your strategy 41 2.2 Graduate-level jobs 42 2.3 Creative job search 45 2.4 Finding vacancies 46 2.5 Building a network of contacts 50 2.1 Planning your strategy Many job-seekers actually have very little knowledge of how the job market works and how people are in fact recruited. What information they do have can often be based on personal experience or rumour. As a result, people’s job-seeking methods can be disorganised and inefficient rather than carefully organised and systematic. So, a key fact you need to grasp immediately is that it is vital that you plan your strategy for job hunting in order to get the job you want. Another key fact you need to understand is that different sectors and employers have their own traditional methods for recruiting. The local sawmill is likely to approach the task differently from a multinational advertising agency. (In fact, the only thing they might have in common is that they probably use an interview during the selection procedure.) Otherwise, the recruitment process will be quite different. This means that you must be flexible enough to adapt your approach to the diversity of methods used by potential employers. It’s also important that you don’t spend valuable time applying for jobs where you have little chance of success, or for jobs that don’t fit your needs or meet your expectations. By planning your job-search strategy, you will be able to focus much more accurately on what you need to do to achieve your goal. We are assuming at this stage that you know what you want to do. If you haven’t yet got a clear picture of the kind of work or job you want to pursue, work through Section 1 ‘Knowing yourself’ before going any further. 2.1.1 A typical strategy A strategic approach pays dividends, so be organised and systematic. A typical strategy means that you will: • Consider all the opportunities open to you: public, private and voluntary sectors. • Look into and follow up all sources of information. • Build up a file of background information about companies, jobs and developments in sectors you’re interested in. • Get a general view before you start to draw up a shortlist. • Do some research: find out how, when, where and how often vacancies are advertised. Are graduates usually recruited? Are there formal channels? What are the essential qualities sought in candidates? How do you match up? What are the application deadlines? • Apply for jobs and attend interviews. Always keep copies of your applications (including online applications) and be prepared to ask for feedback on how you’ve done. • Don’t forget that you need to review and evaluate your progress from time to time.
  • 42.
    42 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 2.1.2 Information Information is an essential tool in job hunting. You need to find out as much as you can about the job(s) and the companies you’re applying to, so that you can present yourself effectively. The fuller your awareness of the opportunities open to you, and the more you know about each possibility, the better the choices you will be able to make. • Get to know the main sources of information about careers and jobs. • Use local careers libraries, relevant journals, professional bodies, regional or national representatives, websites, specialist and general trade directories. • Set up a file of job information, sample advertisements, job descriptions and person specifications, useful company and sector contacts, details of salary bands, useful articles, press releases, etc. You might want to do this electronically. • Follow up this information by talking to professional careers advisers and people in the job areas that interest you. • Personal contacts can be invaluable: tutors, fellow students, alumni, representatives from professional bodies, and don’t forget to follow up useful contacts from job advertisements. • Keep notes of your conversations. • Acknowledge those who have helped you – quick telephone calls or thank-you notes may pay dividends. 2.1.3 Review your progress Keep records of all contacts and applications you make. File copies of letters and applications and record the progress on each one. To review your progress: • Consider what appears to work and what doesn’t, and ask yourself why. • Constantly reassess your assumptions about questions such as your mobility and your job preferences. • Be realistic about the skills and experience you have and those you need to acquire. • Use a range of job-search methods. • Be prepared to persist. • Be prepared to change your strategy if necessary. 2.2 Graduate-level jobs Another important aspect of any job-search strategy is to consider your options realistically in the context of the current and future employment market. As you research the main occupational areas that interest you, look into trends in the area such as emerging sectors, new jobs of the future, recession and Government changes. They’ll all have a bearing on employment, both on the number of people employed and on the work that they do. You can do this by exploring jobs in sectors on the Prospects website at: www.prospects.ac.uk/jobs-and-work-experience/ job-sectors We welcome career changers who completed their degree some years ago and have some work experience. The Fast Stream welcomes diversity, as life and work experience will enrich the Civil Service. Head of Marketing & Diversity Civil Service Fast Stream 2.2.1 What is a ‘graduate’ job? One of the main reasons employers recruit graduates is that they expect them to be more flexible, more adaptable to change and capable of learning new skills. However, it’s becoming increasingly difficult to define exactly what’s meant by a ‘graduate job’. The dramatic reductions in graduate recruitment during the recession of the early 1990s and the rise in the numbers of people studying for a degree meant that, for all graduate job-seekers and job- changers, employment seeking strategies have had to be flexible and responsive to the employment market. This is still so, and graduates are now entering a much wider range of jobs. As large numbers of graduates enter an increasingly diverse range of jobs, the graduate labour market boundaries are blurring. It’s becoming apparent that it isn’t always the classification of the job that’s important, but the nature of the graduate’s experience and aspirations.
  • 43.
    43Exploring possibilities To findout more, visit our website at www.open.ac.uk/careers Research conducted by Elias and Purcell (Seven Years On: Graduate Careers in a Changing Labour Market, www.hecsu.ac.uk/seven_years_on.htm) grouped graduate jobs into five distinct categories: 1 Traditional graduate occupations – Established professions for which a degree has historically been required, for example, solicitors or research scientists. The graduate has to be an expert in a very specific area. 2 Modern graduate occupations – Since the expansion of higher education in the 1960s, there has been a development of new professional areas requiring graduate-level qualifications, for instance, journalism, nursing or social work. A high level of interactive and communication skills is usually required for these areas in addition to having received training in the specific area. 3 New graduate occupations – These reflect changes in technology and organisational structures and priorities. Some are relatively new occupations whereas the nature of others has changed so that an increasingly common route into them is via a graduate level qualification (for instance, marketing, engineering, environmental health). The ability to access and use specialist information is an additional skill for these areas. 4 Niche graduate occupations – This is an expanding area. Most jobs in this category don’t usually ask for a degree but have some areas that are deemed as ‘specialist’ and increasingly ask for a degree at entry – for example, retail management, graphic design. 5 Non-graduate occupations – Increasing numbers of graduates don’t immediately enter the ‘graduate labour market’. Many are in non-graduate jobs but using the skills that they have developed as a result of their studies. There are many instances of graduates in these occupations demonstrating their potential and developing their initial role to fit their skills. I don’t think I would have stood a chance of obtaining this job without a degree. Many people taken on at the same time as me (there were 15 positions in various locations in south-east England) have a masters degree – I do not, which shows that the OU must be thought of quite highly. Environmental studies graduate 2.2.2 New and expanding opportunities for graduates Structured graduate programmes still exist with large ‘blue chip’ companies but competition is fierce and fewer graduates now enter through these schemes. According to research by the Institute of Employment Studies only around 10 per cent of respondents had a place on a graduate training scheme with a blue chip employer. In fact, a growing proportion of graduates find their first jobs in small and medium- sized enterprises (SMEs) Something to bear in mind is that SMEs account for 99.9% of all private sector businesses in the UK. For more information on SMEs go to: www.fsb.org.uk/stats OU students may have significant work experience from different jobs or may have worked for a number of years in a particular industry but now be looking to develop or change their career. They may benefit from a recruitment scheme known as “Experienced Hire”. A number of big companies use this because they recognise that students with significant work experience may have developed key skills such as the ability to manage, complete project work and hit the ground running. Experienced Hire provides a method for recruiters to hire these individuals rather than recruiting them through the traditional ‘graduate scheme’ route. Experienced Hires usually undertake a similar recruitment process to that for other graduate positions. Examples of companies that recruit for Experienced Hires include, Deloitte, PwC and Goldman Sachs. Destinations of Leavers from Higher Education in the UK (DLHE) Each year universities in the UK are required to ask their graduates about what they are doing and how studying has changed or developed their careers. This data is published annually and can be seen at www.hecsu.ac.uk/what_do_graduates_do_archive.htm and on the Unistats site at http://unistats.direct.gov.uk Unemployment among all UK graduates responding to the DLHE survey in 2013/14 was 6.3 per cent six months after graduation. Although we know that OU students start from a different point as many are working while they study, the data shows the unemployment figure for OU students who responded to the survey questionnaire in 2013/14 was 3 per cent. (The figure for part time first degree students across the UK was 4.3%).
  • 44.
    44 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers What sort of organisation are you suited to? 2.2.3 Internships As a response to the recession, the UK Government has been encouraging employers to offer internships to unemployed graduates. An internship is a time- limited work experience placement which gives graduates a chance to enhance their employability and career prospects. Graduate internships may be full time or part time and many of them are paid. You need to consider what type of opportunity might be right for you and think about the pros and cons of working for an SME, a large company or working in the Third Sector. Here are some of the differences between them. SMEs (Small and medium sized enterprises) Large companies (With over 250 employees) Third Sector (Charitable/Not-for-profit) • Fastest growing sector of UK economy • Easily identifiable opportunities • Focus on ethical work • Local • National • Mainly local • Early responsibility • Small cog in big wheel • No typical working day • No formal induction • Structured training programme • Can be a very small organisation • Less red tape and bureaucracy • Formal structures embedded • Less bureaucracy • Lower starting salary • Perks and higher starting salary • Typically a lower starting salary For more information, and to search for internships online, go to the Graduate Talent Pool website: http://graduatetalentpool.direct.gov.uk. For further information on employment rights and pay entitlement for interns, go to: www.gov.uk/employment-rights-for-interns 2.2.4 Career change Many people successfully change careers and may do so more than once in their working life. There are many reasons for doing so, including the fact that you are unhappy with the work you are doing, have always wanted to do something else, or feel that you need to change your work/life balance and are tired of bringing work home with you, literally or figuratively. Others feel that they have never fulfilled their potential, or regret the decisions they made/had to make early in their careers. It may be that you are studying as an Open University student because you plan to change career, or perhaps your studies have made you aware of a wider range of interests than you had before but without any definite career objectives just yet. In either case, you will be developing skills through your studies that will benefit you in your future career. It’s also possible that external forces suggest it’s time for a change as the workplace changes, introducing new roles and shedding older ones. People who are made redundant may take this as an opportunity to take some time out and rethink what they want to do. Whatever the reason, it’s increasingly unlikely that many people will stay with their first employer throughout their working lives. Approximately one in ten people in the UK have a current intention to change their career. This suggests that roughly 2.5 million people might consider changing their career each year. This is likely to double over the next 20 years.
  • 45.
    45Exploring possibilities To findout more, visit our website at www.open.ac.uk/careers So a career change may be your choice or it may be thrust upon you; either way it’s a time to take stock, evaluate your skills and abilities, and think about how you might apply these skills differently. If you are studying because you have already decided to change direction, you still need to do some research so that you are clear about the planned route into this career, and the demands that it will place upon you. If you feel that you want a change but are unsure of what might suit or interest you, it should help to work through Section 1 if you haven’t already done so. Becoming self-employed is another way to take control of your career. Whether through learning a trade or simply having a great business idea, more people than ever are becoming self-employed – with the national statistics showing 4.6 million people registered as self-employed in 2014. There may be a career that has always interested you, or you may have come up with some new ideas about specific jobs and/or ways to work. Either way, you need to do the research so that you are clear about the demands of this new direction. You could start with the information about different types of jobs at: www.prospects.ac.uk/job-profiles Once you have an idea of what you would like to do, it would help to arrange to talk to someone already in that role. If there is a relevant professional body, you may be able to go through them, you could approach people directly or work though an HR department. As well as the resources mentioned above, there is a useful section on changing careers on the National Careers Service website that links to resources to help you progress: https://nationalcareersservice.direct.gov.uk/advice/ planning/Pages/chooseacareer.aspx So changing careers takes research, planning and, in some cases, a substantial investment of time. It will help to have the support from your family and friends, but it is possible – more and more people do it every year. 2.3 Creative job search The career-review process isn’t something you do once and for all and then never do again. Most of us need to review our careers now and again to take account of changes in ourselves and the opportunities open to us. None of us can predict what kind of jobs might be available in the next few years. Today’s labour market is increasingly diverse. To succeed, you need to play by a set of new rules. The best advice is to start as early as possible and be creative in your job search. So, how can you do a creative job search? Here are a few essential steps to get you started: • You need to ‘market’ yourself. Consider temporary or part-time work to enhance your marketability, skill development and knowledge of the industry or job area, and to foster contacts. • Think about doing voluntary work. Be clear about what you’re offering to do, how long for, and what benefits you hope to gain from the experience. (See Section 2.5.6 for details.) • Find out about getting appropriate training or study with work experience. This may give you an identifiable edge in the job market. • Network with and develop contacts with well- placed, knowledgeable people, including those in organisations you’ve already worked for (if any). • Find contacts in the sorts of organisation and job you’d really like. Consider what you can do for them. • Don’t limit your marketing to letters of application. You may want to ask to meet people, or talk to them in person. Learn how to use the telephone effectively – there’s some advice about this in Section 2.5.2. Try to contact the person who makes the decisions and might be interested in your talents. • Develop an excellent CV and application letter, and adapt or customise them with a particular opportunity or employer in mind (see Section 4 ‘Getting the job’). • Use LinkedIn to help you network with other people in the career that you want to get into. • Use the contacts you’ve made to get opportunities to work-shadow or to carry out job study interviews that will give you useful knowledge. As the number of graduates has increased – and competition for the cream of the crop has grown accordingly – investing in the traditional ‘milk round’ and a reliance on generic marketing is no longer enough for companies to attract the best talent. Head of Graduate Recruitment, Accenture
  • 46.
    46 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers • Use employment agencies, but don’t let them use you. Make sure they keep you in mind for suitable vacancies, and be sure to get constructive comments on your applications and overall approach (you will find out more about recruitment and executive search agencies in Sections 2.4.9 and 2.4.10). • Investigate the possibility of employment through a ‘Knowledge Transfer Partnership’, a partnership between employers and higher education institutions – look at: http://ktp.innovateuk.org • Don’t forget the increasingly important non- traditional graduate recruiters (small and medium- sized enterprises – SMEs, which were discussed above in Section 2.2.2). • Use the internet to research companies and job vacancies. [Adapted from AGCAS information on job-seeking strategies.] It is easy to be overwhelmed by the amount of research you need to do on possible opportunities. The whole business of applying for jobs can also be intimidating, especially if it is a while since you have done it. There is a particular language that employers tend to use and the jargon can, at first, be very strange. Looking at job adverts will give you an idea of the language used, as will the job profiles on the Graduate Prospects website at: www.prospects.ac.uk/job-profiles Gaining work experience is a great way to get a foot in the door, but it is highly competitive and not often advertised. Join the professional body for your sector/profession. By attending networking events or seminars you will soon start to make valuable contacts and make yourself more employable through improved knowledge. Read the trade or industry press to pick up on trends, best practice and any changes which may create opportunities. Be proactive. Talent Manager Heinz Pause for thought Ask yourself what you can take forward from these ideas. What will your job search strategy look like? Do you need to think more creatively to search for jobs? 2.4 Finding vacancies When it comes to job vacancies, they are classified as either ‘open’ or ‘hidden’. In fact, it’s estimated that seven out of ten jobs are ‘hidden’, in that they are never even advertised! Often, in times of recession, this hidden job market increases as some employers shy away from the administrative burden of dealing with the overwhelming number of responses their recruitment advertisements produce. SMEs, in particular, may not advertise due to the high costs involved. 2.4.1 Applying for hidden jobs Hidden jobs are produced: • by organisational changes that make old jobs obsolete and create new ones, or redefine old ones. • because an organisation doesn’t recruit enough graduates to warrant much expenditure of effort or money on advertising. • because of the volume of unsolicited applications. • when an organisation doesn’t particularly demand a degree, but prefers specific skills, qualities and experience. • because an organisation may want to hire internally as it is cheaper and the internal hire is already familiar with company processes. Do you know the answers to these questions? • Can you identify the fastest growing sectors in the region or nation that you want to work in? • Can you identify some significant projects that might provide employment opportunities for you? • What skills are most in demand in your field? Do you have them? If not, how can you acquire them? • How often do you monitor media sources or social media to keep yourself in touch with what is going on in your field?
  • 47.
    47Exploring possibilities To findout more, visit our website at www.open.ac.uk/careers To find the kind of company that can use your skills and satisfy your needs: • Look at the resources suggested in this section. • Look at company websites and find out more about them. • Consult the main directories in your local reference library. • Use social media sites, such as LinkedIn to search for employers. To get started try: • General trade directories e.g. Yellow Pages (www.yellow.com), Thomson Directory (www.thomsonlocal.com) and KOMPASS (www.kompass.com). • Specialist trade directories for different occupational areas e.g. The Writers’ and Artists’ Year Book (www.writersandartists.co.uk). To see if there any specialist trade directories for the profession you’re interested in go to: www.prospects.ac.uk/job-profiles Remember, even open jobs are hidden during the early stages, while decisions are being made about internal versus external recruitment campaigns, selection dates, advertising space and so on. 2.4.2 Making speculative approaches Please note: making speculative approaches to companies is not permitted in Northern Ireland. It isn’t enough just to wait for jobs to be advertised in the media. The effective job-seeker must tap the hidden market by making speculative approaches to prospective employers. Turnover, promotion and retirement continually create new job opportunities. Economic, technological and organisational change always affects employment patterns. Marketing yourself means keeping ahead of the competition. This approach gives you the initiative. You decide which organisations, sectors, jobs and areas most appeal to you. Speculative approaches can even create new jobs. Convince employers that you have exactly the skills they need to solve their business problems. Prove that they need your abilities and would benefit from your expertise. Demonstrate that they can’t afford not to employ you. This approach isn’t comfortable for some people for example, a very nervous jobhunter, nor appropriate in some areas of employment, for instance, teaching. Consider what’s right for you and your ‘target’ area. • Always follow up - Tell them in your initial contact that you will follow up, and then make sure you do so. If you hear nothing within two weeks, follow up by telephone, perhaps to arrange a meeting through a secretary. Offer dates and times. • Take a long-term view - It takes time to build up a mailing list, and responses may be slow and few. If you’re going to make speculative approaches, start planning early in your job search. You need to be patient and not expect immediate results. • Persevere - Occasionally persistence will pay off and, after an initial refusal, you may be offered a meeting. Make the most of it. Making speculative contacts can pay off in several ways. Even if you have no luck with a particular employer, you may be referred or recommended to another. Use these meetings to get more information about the job market. Each employer you see is a new contact. Each rejection may be one step nearer to the job you want. Remember every ‘no’ brings you closer to a ‘yes’! Before submitting a speculative application, please do check that the employer concerned is happy to receive these. Submitting a CV when an employer clearly states in all publicity that you should only apply to an advertised vacancy shows a lack of simple research and is not likely to create a good impression. UK Graduate Recruitment Manager Logica
  • 48.
    48 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 2.4.3 Using your networks In the 2013/14 Destinations of Leavers from Higher Education survey, 18 per cent of OU undergraduate and 15 per cent of postgraduate students reported that they had got their job as a result of personal contacts. This represents an increase on previous years. We will deal with networking in more detail in Section 2.5 below. For now, just keep in mind that research into how managers change to jobs with other organisations has shown that over half get an introduction through networking. ‘Networking’ is the systematic use of personal contacts to: • gather information about an industry or company • discover hidden jobs, especially in particular companies • get an introduction to a key decision-maker in a company, whom you can convince of your qualities as a candidate • develop further contacts to expand your network. At first, it may seem a little strange to seek out hidden jobs, or to concentrate on particular companies just because they appeal to you. But experience supports the practical wisdom of doing so. 2.4.4 Applying for advertised jobs Many jobs are of course advertised and listed below are some of the places you can look for them. If you reply to an advertisement, always follow the instructions given. If it says write, telephone or email for an application form, there’s no point in sending a CV. Many employers send very poor information, or none at all, about the job advertised or the selection methods they use. Show initiative by telephoning or emailing if you need to know more. You may have to do some detective work if the advertisement doesn’t give a telephone number. Sources of vacancies 2.4.5 OU Careers and Employability Services If you are an OU student or graduate, you can access vacancies with a wide variety of employers on our online vacancy service, JobZone, on our website www.open.ac.uk/careers. You can also see profiles of OU-friendly employers and sources of regional and national vacancies. 2.4.6 Newspapers and journals You will find many job vacancies advertised in newspapers and specialist or trade journals. Because advertising in national newspapers is costly, smaller employers often rely on advertisements in the local press because it’s less expensive and brings in a more manageable number of replies. The best place to consult newspapers and journals is your local library or online if you have access to the internet. At the start, you may need to look at them every day, as recruiters seldom place their advertisements more than once. Make a note of the advertising patterns: you will find that most of the quality daily papers (The Times, The Irish Times, Independent, Irish Independent, Guardian, Daily Telegraph, Belfast Telegraph, Financial Times) advertise certain kinds of work on particular days of the week. Local papers sometimes concentrate their job advertisements on Thursdays, the day on which most papers are sold. Make a note of advertising patterns in your local press, and familiarise yourself with the kinds of advertisement placed in each paper. The big Sunday papers advertise a variety of jobs, but their relatively high advertising rates tend to restrict the salary range to the higher end. During holiday periods, August to mid-September and December, advertising is reduced. You will find links to newspapers in the UK and Ireland including national and regional papers from www.thepaperboy.com/uk. 2.4.7 Professional associations Many professional associations and institutions, for example, the British Psychological Society have a regional education or training officer and sometimes a specialist careers adviser whom you can contact. Some produce yearbooks and lists of members. Addresses and other details are in the Directory of British Associations, which can be found in most major libraries. In Ireland the Institute of Public Administration (IPA) publishes an Administration Yearbook. This annual directory is available in most public libraries and contains names and contact details of key personnel in each of the organisations listed. The ‘profession finder’ on the Total Professions website www.totalprofessions.com will help you to search for over 300 professional bodies and associations in the UK.
  • 49.
    49Exploring possibilities To findout more, visit our website at www.open.ac.uk/careers 2.4.8 Recruitment agencies Recruitment agencies tend to deal with lower- level salaried positions. They often act for small to medium-sized employers that have no personnel or recruitment departments of their own. Many specialise in particular kinds of work or industry, and in some areas of employment (such as medical sales) they are almost the standard source of recruits. Services are free to you – the employing company is charged a fee, usually a percentage of your first year’s salary. Be clear, though, about what the agency is offering you. Remember that it’s there to fill its clients’ posts, not to help you sort out your career plans. The Recruitment and Employment Confederation is the UK association for the recruitment and staffing industry. You can search for agencies by geographical location and by type of work from their website at: www.rec.uk.com In Ireland the National Recruitment Federation is a voluntary organisation set up to establish and maintain standards and codes of practice for the recruitment industry in Ireland. You can search for agencies that have signed up to the code of conduct at: www.nrf.ie firm work on a particular job. Sometimes contingency firms will distribute your CV widely in the hope of generating new business. They may interview you and construct a pen picture to go with your CV. As noted above, search firms may deal with a limited type of vacancy. As a result, they prefer to receive a CV to judge whether you fit what they have on their books at that moment, or are marketable enough to fit something that might turn up in the future. They receive enormous numbers of CVs and often don’t bother to acknowledge them. The average search firm has only three or four consultants. Most consultants limit interviews and initially are likely to carry out a telephone screening with you. They seldom divulge information about their clients. If they send you to an interview they’ll want to know how things went; similarly, they can be a useful source of information about how you were received by the client. Although some firms deal only with positions above £50,000, they’re worth considering if you have skills that are in short supply – accountancy is a particular example. If you decide to use a search firm, send a CV and covering letter, and always include details of your former salary and the range you’re looking for. Consultants often don’t share information with one another, so if you apply to a large firm operating in many locations you need to send your CV to all of them. To identify headhunters and executive search firms in the UK visit Headhunters in the UK www.allheadhunters.co.uk. Study at the OU requires a level of self-motivation and self-discipline. This gives OU graduates a cachet which conventional universities do not offer – and that employers can’t fail to be impressed by. Employer 2.4.9 Executive search firms There are more than 200 executive search firms in the UK. While they are important in the market place, their role is limited by the high fees they charge to employers (typically 30–35 per cent of annual salary). They tend to be used for jobs that are at a high level or require scarce specialist skills for example, specialist IT skills, or when commercial confidentiality is essential. They are of two main kinds: • Fee/assignment firms are given sole charge of a particular search. They get most of their fee whether the employer hires their candidates or not. • Contingency firms are paid only when the company hires someone they have presented. Some employers let more than one contingency We advertise our vacancies through a wide range of media as well as on our own website. We would recommend that students visit the websites of major graduate media suppliers such as Hobsons, Prospects and Doctorjob. It is also worth registering with websites such as www.graduate-jobs.com and www.milkround.com as many employers use these organisations to publicise vacancies and recruitment events. UK Graduate Recruitment Manager Logica
  • 50.
    50 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 2.4.10 The internet Most jobs are now advertised on the internet through national websites directly associated with particular careers. There are also opportunities to ‘post’ your CV on the Web, entering it into the database of an organisation (usually recruitment organisations) that will either try to find a suitable match for you or allow an employer to search the information and perhaps select you for interview. Bear in mind that not all sites offer confidentiality, and your personal details may become public property. You could find yourself treated like a trading commodity if the website’s main interest is simply to capture personal details and sell on a CV. Try to make sure you use vetted or recommended websites only to post your CV. Think about what you are posting online and who you are sharing it with. There are tips on how to protect yourself by investigating potential employers on our careers website www.open.ac.uk/careers. Remember that: • Websites may not always deliver what they promise. Many sites change rapidly and there are no guarantees about the accuracy of the information displayed. Always try to cross-check information. • Websites sometimes go online while still under development. • It’s sometimes difficult to see the wood for the trees – not everyone has a brilliant web designer. Most graduate recruiters now recruit online as well as using other methods. 2.4.11 Social Media You can directly search and apply for jobs on professional networking sites such as LinkedIn. Twitter and Facebook are useful for searching for job vacancies either through hashtags or recent posts. For helpful tips on job hunting and social media go to: www.prospects.ac.uk/careers-advice/getting-a-job/ job-hunting-and-social-media Further resources You can search for jobs by keyword or career sector on Prospects website https://www.prospects.ac.uk/graduate-jobs and TargetJobs www.targetjobs.co.uk. 2.5 Building a network of contacts Personal contacts can be a fantastic source of help in your job search. Your network of contacts can include friends, relatives, fellow students, tutors or people you’ve met through leisure interests, voluntary work or casual part-time jobs. Even if these people can’t help you themselves, they may be able to put you in touch with someone who can. Through building up a network of contacts, you may be able to discover: • a company’s competitive position • whether it’s in a state of growth, stability or decline • its working climate and culture • its business strategy • the background of key managers, especially those in the function that interests you • possible job opportunities. So, how do you build your network? Your primary contacts are people who know you directly. They may not have the job openings you want, but they can become your publicity agents and your information sources. Some will be able to give you names of their own business contacts. These secondary contacts can act as a bridge between you and the decision makers in the companies you’re interested in, or they may lead to other secondary sources. 2.5.1 To make an effective speculative contact • Pick out likely targets Be discriminating and choose worthwhile prospects. You’re not sending out a mail drop or a circular letter. Each approach must be tailor made and will take time to prepare. Which organisations have the sort of position that attracts you? Who is recruiting, reorganising, relocating? Use all your information sources and network contacts (which we will discuss in more detail below) to select a portfolio of companies, and concentrate on those. Pause for thought Remember that if you can’t get a paid job straight away, don’t discount the value of work experience. It can test out your career plans, give you something to put on your CV, and it could give you a way in to the job and employer you want.
  • 51.
    51Exploring possibilities To findout more, visit our website at www.open.ac.uk/careers • Contact a named individual Approach only the person who can take the decision to employ or help you (you might be asking for information rather than a job). Check with the organisation to make sure that names, job titles and addresses are correct. Your letter, telephone call or email must reach the right person. • Get a meeting No one ever got a job merely by writing a letter, or sending an email. You want a meeting: say so clearly when you make contact. Be prepared to fit in with the employer’s availability. Prepare for the meeting as you would for a job interview. • Give a specific reason for contact Have a peg to hang your contact on. You’re not asking for a job or hoping there might be a vacancy. You’re making a business proposition, showing how your abilities can contribute to the success of the enterprise. You must prepare a thoroughly argued case to prove that the cost of employing you is more than outweighed by the benefits. Research the organisation. Familiarise yourself with its problems and needs, show where you can fit in, and how you would improve, develop or help it become more effective. And be sure you can deliver the goods! I began my job search by following the 10 to 15 companies I really wanted to work for. OU Student Activity 2.1 Building up a network Draw up a list of everyone who might be able to help you – friends, family, former colleagues, tutors, any business contacts you have, all potential sources of information or advice. Think what they can do for you: • keep you informed • comment on your strategy and approach, the impression you make • get you noticed. Make a note in your career file of your list of contacts. As you work towards developing and extending your network, keep a record of each letter, telephone call, conversation and so on, so that you don’t get confused over important details. Get under the surface of the glossy marketing literature and talk to as many people in the organisation as possible. Graduate Programme Manager The Co-operative group Pause for thought Perhaps you feel uncomfortable about networking in this fashion. Unease usually arises from the misconception that using contacts means asking people for jobs. In fact, what you’re doing is making the most of them as sources of advice, information and ideas. Put contacts at ease about this to avoid embarrassment. Most people will be only too glad to help, or to refer you to someone else who can. Getting the approach right is important. 2.5.2 Approaching your contacts You need to decide how you will approach your contacts. A number of methods are possible but you need to decide what is right for you, what is appropriate for the area of work and what might be effective. By telephone Your first approach could be by telephone. Be very succinct. Establish: • What you’re seeking • How your contact can help you • How much time you’re asking for (15–20 minutes) • Time and place for a meeting. 2.5.3 Using the telephone effectively You may be making a speculative call, or telephoning to follow up a contact you’ve been given or to make an appointment for an interview. It’s often difficult getting through to someone during the day. Be persistent. Busy managers are usually in early and late, so try outside normal office hours if you can.
  • 52.
    52 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Some people are natural and relaxed on the telephone. Others, even after years of practice, are stilted and anxious. You don’t get the usual clues from nods, smiles and so on, so it’s difficult to judge what impression you’re making. To take some of the stress out of the situation, plan the format and content of your call: • If they have a secretary, get their full name if you can. • Introduce yourself succinctly. • Use the name of the referral source discreetly. • State the objectives of your call. • Get to the point quickly – treat it like a mini-commercial for yourself. • Get the contact interested straight away – make notes beforehand of what you want to say. • Try to avoid being interviewed over the phone unless this is pre-arranged. • Suggest times and dates for an appointment. • Clarify the exact place of the appointment. • Offer your telephone number or email in case of a change in arrangements. Understand what makes you different and how you stand out from the crowd, then market your ‘USPs’ – Unique Selling Points. Graduate Programme Manager The Co-operative Group 2.5.4 Making an approach in person Making an approach in person can be an opportunity to test your interview skills and make a good and lasting impression. For a productive meeting, you need a carefully planned agenda. It might cover: • Why you’re thinking of leaving your present job (or why you left your last one). • Your job goals and some alternatives. • Your strategy for getting there. • A discussion about the industries you’re interested in and the companies you’ve picked out. • Questions about names and referrals to key people, preferably decision-makers for your kind of job who you can ask about opportunities in the industry. • Advice and comment on your job-search strategy. Here are some questions you might ask: • Introduction: How did you join your employer? What are you working on at the moment? • Trends: What is happening in your business area right now? What is going on in your company? • Information: Where can I find out more about the sector? Who else can help me? What projects have been successful in your field? • Advice: If you were me, what would you do now? Why have you been so successful? Be businesslike and professional in making your proposals. Ask questions about the employer’s needs. Treat the employer as a client, explaining what you offer and what you can do. Be flexible. Be prepared to negotiate. If a full-time appointment isn’t practical, there may be a possibility of employing you for a particular short-term project. Get any agreements – proposals or contracts – in writing as soon as you can. Pause for thought Meetings need to be well planned and purposeful. Other people have their own agendas, and there’s a lot to cover in twenty minutes. Make sure that you’ve done your research thoroughly, using published sources, before you talk to your contacts. They will respect you more and be more prepared to help if they have evidence of your professional approach. 2.5.5 Drawing up your letter When it comes to drawing up a letter, keep in mind that there are three main reasons why someone might want to employ you: 1 To increase sales (or the employer’s equivalent – service volume, membership, etc.). 2 To decrease expenses. 3 To obtain specialist expertise that leads to an increase of sales or a decrease in expenses. Your letter must list accomplishments that correspond to these reasons. A speculative letter will need many drafts in order to polish it. • Your letter should be no longer than one side of an A4 page and should: - include key achievements and relevant experience - cover only the last five to ten years
  • 53.
    53Exploring possibilities To findout more, visit our website at www.open.ac.uk/careers • Exclude: - Personal data (marital status, hobbies, etc.) - Dates - Salary - Copies of references. • The first paragraph is crucial. Use it to mention an achievement related to the job you’re seeking and strike a chord of need in the reader. For example, describe a relevant problem, outline how you tackled it and state what results you got. • Get someone else to check your spelling, grammar and layout. Be critical over matters of style, and prune ruthlessly. Section 4 ‘Getting the job’ offers advice to help you with the practical side of drawing up a letter to accompany a CV. 2.5.6 Social and professional networking sites Social and professional networking websites such as Facebook, and LinkedIn, can also be useful tools for networking. Once you have joined business networking sites you can invite other members to join your network (your ‘contacts’). You will then have access to their contacts’ profiles and can quickly build links to other members‘ profiles – a great way to make connections with potential employers. For recruiters, LinkedIn has definite advantages over some other methods of recruitment: • It is cheaper • It can be quicker • It is often more effective. Social media enables recruiters to be: • Direct: they can target specific groups and graduates • Diverse: digital media enables them to reach a different audience and pool of applicants • Dynamic: they can be creative, and interactive in the relationships they create with applicants. Facebook Facebook can bring together recruiters and job seekers. Following companies can help you to research the job market, accumulate evidence, and acquire insider information that you might not find elsewhere. Many graduate schemes use Facebook as a way of showcasing frequently asked questions about the selection process; cultivating queries from interested students; and as place to offer insights, advice and encouragement. For example the Civil Service Fast Stream have used Facebook Live Chats as a way to engage directly with students who are interested in working in government. LinkedIn It will allow you to link with colleagues and acquaintances from your own networks, and then with their connections. It is possible to join groups that interest you, which can give you access to organisations and individuals who can help you in your job search. LinkedIn is a platform that allows you to connect with people, companies and groups on a national and global scale. Begin by adding your profile. Have a look at how other people project their online presence to see what works and what to avoid. A helpful tip to create your profile is to lift content from your CV. Some large companies use LinkedIn to search for potential employees so this could be a good way to access these hidden opportunities. In a recent survey, four out of five recruiters who use LinkedIn said that they liked to see membership or links with professional organisations on a candidate’s profile, and 66% said they reacted positively when volunteering was mentioned. Pause for thought Building a network of contacts plays a key part in creative job search. Before reading on, you might find it helpful to look again at the advice in Section 2.3 ‘Creative job search’, considering what further preparation you need at this point, and to read the following example. It was produced by one of the students who tried out this pack before publication and was preparing to approach a particular company. Pause for thought More and more recruiters have an online presence. Research indicates 92% of recruiters utilise social media networks. (Jobvite)
  • 54.
    54 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers • Add a headline. This is your way of telling people what makes you unique, and helps you stand out from the crowd. • Add a professional looking photograph. If you have a photograph, you are seven times more likely to be found on LinkedIn. • Your summary should not be too long. Three or four paragraphs are enough. Your summary should be factual, and most are written in the first person, although it is acceptable to write it in the third person. • You can embed multimedia, eg videos, documents, and links. This could be a good way to show off your portfolio for some jobs. (Be aware you may need to copyright ideas you share.) • You can endorse and recommend others and they can do the same for you. It could be helpful to get some good recommendations from people who know the quality of your work and your professionalism. • Engage in some of the groups you have joined by asking questions or joining discussions. • Keep your profile up to date. • Separate your personal from your professional profiles on social media. Adjust your privacy settings, so that you are promoting the image you want people to see. Example One of my network contacts led to an introduction to the head of a department in a company I was targeting. I set up an appointment with her, and decided on further preparation, as follows: –– Carry out more research on the company (e.g. journal and newspaper stories), to get a ‘feel’ for the culture, trading problems/ opportunities (for me); exposure to risk, political battles, etc. –– Talk again to contacts. (A discussion with an ex-employee could be particularly revealing.) –– Put myself in the shoes of my prospective boss. (Think about what sort of help the company may need.) –– How do my strengths match the needs? –– Plan which of my strengths/accomplishments I am going to mention, and how I am going to present myself. –– List which issues I want to investigate (e.g. possible openings, prospects for development/training/promotion). –– Re-read the advice in Section 4 about job applications and interviews. Note in your career file what preparation you want to make at this point. 2.5.7 Voluntary work Voluntary work can be a fantastic way of getting experience and building networks as well as showing commitment to an area you are interested in. Local centres seek to place people into suitable voluntary work – meals on wheels, etc. Find out about potential sources of voluntary work from The National Council for Voluntary Organisations (England) www.ncvo.org.uk/ncvo-volunteering and Volunteering Wales at www.volunteering-wales.net In addition, you may find the following websites helpful for exploring opportunities to work with charities and voluntary organisations: Charity Job www.charityjob.co.uk Charity People www.charitypeople.co.uk Citizens Advice www.citizensadvice.org.uk Volunteering Matters http://volunteeringmatters.org.uk Do-it Search this database for a wide range of volunteering opportunities in the UK. From here you can link to the various volunteer bureaus for your area of the UK: www.do-it.org.uk The European Volunteer Centre Lists member organisations in EU countries including the UK and Ireland: www.cev.be/member-organisations/
  • 55.
    55Exploring possibilities To findout more, visit our website at www.open.ac.uk/careers Harris Hill A UK charity recruitment agency, covering a wide range of jobs and locations: www.harrishill.co.uk Beanstalk Beanstalk has trained and supported volunteers to work in primary schools with children who have fallen behind with their reading since 1973: www.beanstalkcharity.org.uk Voluntary Service Overseas (VSO) www.vsointernational.org Volunteers Centre Ireland The national organisation responsible for organising volunteering in Ireland: www.volunteer.ie Volunteer Scotland www.volunteerscotland.net Further resources OU Careers and Employability Services For further information and resources go to www.open.ac.uk/careers
  • 56.
    56 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers
  • 57.
    57Making decisions andtaking action To find out more, visit our website at www.open.ac.uk/careers 03 Making decisions and taking action 3.1 Making decisions about your life 57 3.2 Goals, restrictions and resources 58 3.3 Plan of action 62 If you’ve developed self-awareness, explored opportunities and now need to make decisions and put them into action, this section is for you. It will help you to consider the advantages and disadvantages of different decisions, find sources of help and plan for action. You’ve probably put a lot of time into analysing your life and career. You should have considered your strengths, skills and experience, and researched the occupational areas that interest you. Before going on to make decisions, it’s helpful to look at the framework within which you may be making choices about the future. There are several models of decision-making and while no one style is better than any other, certain models will suit different people, for example: • The evaluative decision-maker will go through a process of self-reflection which may at first seem like indecision but will eventually lead to improved self-awareness and identification of long term career goals. • The strategic decision-maker tends to have a more analytical style. They will weigh up the pros and cons of a situation to reach a fixed solution. The strategic thinker believes that they construct their own career path and will set the plans to achieving their goal. • The aspirational decision-maker will look for and grasp opportunities as they arise. While their career path may seem less clear and structured, they have the ability to cope with uncertainty and make the most of situations. Do any of these styles ring true with you? To explore decision making factors and styles further, there’s a range of resources available at: https:// www.mindtools.com/pages/main/newMN_TED.htm 3.1 Making decisions about your life It’s not our claim that everyone can achieve everything they want. Obviously you have to be realistic, as life imposes restrictions on us all. But many people don’t achieve all that they’re capable of, because they’re not clear about what they want to do and how to make decisions. It’s important to aim for what you want while being aware of what’s achievable. One way to consider the range of options is to look at your goals alongside your personal restrictions and resources. 3.1.1 Managing your situation Whenever you’re in a situation you’re not happy with, you have four basic options. You might think about them both in the short term and in the long term. For example, you may be clear that long term you want to change jobs, but in the short term you might be able to ‘change yourself’ to make things easier. • Work for change Try to change the situation to make it more as you want it to be. If you’ve tried unsuccessfully to do this, you’re left with the other three options. • Change yourself Examine your own attitudes, behaviour, ambitions, skills, lifestyle and so on, and consider how, if you changed any of those, your situation might improve.
  • 58.
    58 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Activity 3.1 What are your goals? Write them down here. You may not yet have fully identified your goals but put what you can here and add to it later. • Live with it This means much more than ‘putting up with it’. You need a strategy to minimise the aspects of the situation you don’t like and maximise those you do. For example, you might put more energy into activities outside your job if you’re dissatisfied at work, change the way you work so that it reduces your contact with troublesome elements, or spend more time doing the things you enjoy and cutting down those you don’t. • Leave Find a constructive way to move on out of the situation, job, relationship or problem. Pause for thought Consider the four options. Which could apply to your present situation? How will you approach this? 3.2 Goals, restrictions and resources Whatever your decision about the four options, you need a goal and a plan to get there. In the next section we are going to look at your goals and then examine the restrictions and resources that may affect how you reach them. 3.2.1 Goals What is a goal? • Goals are what you want to get out of life. • You may use other words to describe your goals – results, outcomes, aims and ambitions. • Unlike dreams, hopes, fantasies and wishes, goals are specific and expect the outcome to arrive. • Whether short or long term, goals should be realistic but challenging. • Remember: your goals may change over time.
  • 59.
    59Making decisions andtaking action To find out more, visit our website at www.open.ac.uk/careers 3.2.2 Restrictions and resources We’re all affected by our own restrictions and resources. Sometimes the same thing is both a restriction and a resource. For example, if you’re buying a house on a mortgage, it’s both a liability and an asset; a friend or relative might need support but might also be a source of support to you. Activity 3.2 What are your restrictions and resources? Think about your resources – the things, people and attitudes that could help you. Then think about your restrictions – the things you need to take into account or that may be problems. Write them down on the chart. Resources Restrictions Money Financial resources Responsibilities Equipment, tools, premises I have I haven’t got People, family, contacts Who can help me? Who needs my help or support? Health Good points Bad points Beliefs, outlooks Positives Negatives Pause for thought Consider your answers. How will they affect the kind of opportunities open to you? Are there other things you need to consider? For example, do you need to work near your home? Could you move to a new area? Will my commitments to others change over time?
  • 60.
    60 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 3.2.3 Balance helpful resources against restrictions Now look back to the restrictions and resources you listed. You’ve probably noted some factors that will help you in the direction you want to take and others that you need to find a way round. You now need to consider each of your goals in terms of all the resources that could be helpful or cause restrictions. The next activity will help with this. Activity 3.3 Look first at the example below. It was produced by someone who wanted to apply for promotion. Each restriction is set against a helping resource, giving a balanced picture of the situation. Example: Goal – Promotion Resources: Restrictions: Line manager’s support Colleagues’ reactions Personal ambition/determined Limited mobility Prepared to take responsibility Little experience of managing people Project management experience No experience of managing budgets Now balance resources and restrictions for your own goal(s) Which of the goals you’ve listed in Activity 3.1 are the most important? Underline them. Make the most of resources Look at the resources you listed. What actions would help you to make the most of them? Minimise restrictions Now look at the restrictions you listed. What actions would help you to reduce their effects? You’ve now listed actions you can take towards your goals, but there’s more to do.
  • 61.
    61Making decisions andtaking action To find out more, visit our website at www.open.ac.uk/careers Activity 3.3 continued Bring actions and resources together List the resources that can help you to carry out each step. Look at the example. ‘No experience of managing budgets’ was listed as a problem. Actions: Resources: Attend course on finance for non-managers Internal training courses Attend outside course in the evenings Local college has course Find out about the budget process Line manager’s support Family support Now do this for each of the actions you listed. Actions Resources Actions Resources Actions Resources Pause for thought You should now have a much clearer picture of what you really want and what ideas you want to develop. You should also be clear about the main helping forces and problems you need to deal with.
  • 62.
    62 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 3.3 Plan of action The next stage is to bring everything together into a detailed plan of action. This means taking a few different steps: • Setting out your goals (long, medium and short term) • Deciding which actions you need to take • Identifying your restrictions and resources • Working out a realistic timescale to achieve each step. If you monitor your progress by checking your plan from time to time you can identify what you have achieved, and then revise your targets if necessary. And of course if you change your mind about your end goal then you can go back to your original plan to make necessary adjustments. You should consider five factors when drawing up your action plan: 1 What you need to do 2 How you are going to take action 3 Resources that could help you (e.g. finance, information, friends) 4 When you will achieve your targets 5 How you will know when you have achieved your goal. One way to approach this is to break each activity down into small steps and keep it manageable. Action plans work best when they are SMART (Specific, Measurable, Achievable, Realistic, Time based). Using a structure like this helps you to break down bigger tasks into smaller, more manageable ones so that you stay in control, and have the confidence that you can manage them. You might want to complete action plans for several goals. Once you’ve done this, you’re ready to start taking action. Pause for thought 3.3.1 Back-up plan You should always try to have a back-up plan. So, keep an eye on progress and adapt your plan if necessary. At this stage it might be useful to read through the work you’ve done in this section, and perhaps discuss your plans either informally with a trusted friend or formally with a careers adviser. You could also look at Section 6 ‘The Next Steps’. To generate ideas for your back-up plan you may find it useful to use an online tool such as Prospects’ Career Planner: https://www.prospects.ac.uk/planner Review If you don’t manage to meet your goals it may be that your first plan needs to be improved. If, after doing that, you still find that you’re unable to reach your goal, you might have to reconsider it. Ask yourself, ‘Is it realistic?’ If it isn’t, think about ways to revise it. To achieve what you want, it might be necessary to go through several stages. You might need to gain experience or qualifications, gather information or get access to a particular resource. You may have to cope with setbacks and frustrations, but you’re setting out on a potentially exciting journey, taking the first steps towards a new or resumed working life, with all its potential for improvement and advancement. Set aside time to review your goals and see how you are progressing. Put a note in your diary or ask someone to remind you. Further resources The University of Kent Careers and Employability Service website provides detailed advice on action planning at: https://www.kent.ac.uk/careers/sk/ skillsactionplanning.htm. To help you with your action planning we have provided a template Action Plan and worked example to help you put into practice the advice covered in this section.
  • 63.
    63Making decisions andtaking action To find out more, visit our website at www.open.ac.uk/careers Mylong-termgoal Shortandmedium Actionsrequired Constraints Resources–whoor Targetdate termgoalsto whatcanhelpme? foractions achievinglong-term goal Tobecomea Postgraduatecourse Findoutabout Difficultyoffunding Exploreeducational Nextweek journalist injournalism courses orcareer developmentloans Applyearly Investigatelettingflat Bytheendofthe foryearofthecourse month Gainrelevant Writetolocal Afraidofrejection Friendwillprovide Withintwomonths voluntary/paid newspapers supportand experience encouragement Writefreelance articlesandsubmit Takeaneveningclass Findoutwhere Cost?Motivationto Checkifspecial Tomorrow inshorthandor classesare complete? arrangementsare word-processing offeredlocally possibleforpayment e.g.weekly Findsomeoneelse keentodoit Activity3.4Showingaworkedexampleofanactionplan Lookattheworkedexamplebelow,thenfillinyourownplanonthefollowingpage.
  • 64.
    64 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Mylong-termgoal Shortandmedium Actionsrequired Constraints Resources–whoor Targetdate termgoalsto whatcanhelpme? foractions achievinglong-term goal Activity3.4Youractionplan
  • 65.
    65Making decisions andtaking action To find out more, visit our website at www.open.ac.uk/careers Notes
  • 66.
    66 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers
  • 67.
    67Getting the job Tofind out more, visit our website at www.open.ac.uk/careers 04 Getting the job 4.1 What do employers look for in graduates? 67 4.2 Matching vacancies 69 4.3 Application forms 72 4.4 The curriculum vitae (CV) 75 4.5 The covering letter 92 4.6 The interview 97 4.7 Other selection techniques 104 4.8 What to do if you are not successful 108 4.1 What do employers look for in graduates? My advice for graduates is to make sure you reflect on what you have learned – both at university and in an extra-curricular capacity – and be able to articulate it in your applications and at interviews; think about what transferable skills you might have gained and how you would apply your knowledge and experience to different situations. If you are able to get into that mode of thinking, you will be immediately more attractive to employers. Carl Gilleard, Former Chief Executive of the AGR, in the Association of Graduate Recruiters’ Graduate Recruiter magazine, What I did find was (and many OU graduates find this too) the fact that I had done my degree with the OU counted for a lot. Potential employers could see that I’d had life experiences alongside my degree studies. I found that I could answer the interview question: ‘Can you deal with a heavy workload and meet deadlines?’ by saying that I had got all my assignments in on time while simultaneously bringing up a family – it showed commitment. OU graduate A report by the Confederation of British Industry (CBI) in 2012 identified seven key employability skills sought by graduate employers: self- management, team working, business and customer awareness, problem solving, communication and literacy, application of numeracy and application of information technology. The Open University is integrating these skills into its curricula. Underpinning them all is a positive attitude and enthusiasm. Table 4.1 overleaf is adapted from the 2013 edition of What do graduates do? It shows what types of skills employers want and how these specific skills can be developed.
  • 68.
    68 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Table 4.1. Skills that employers want and how they can be developed Type of skill ‘Buzz’ words Examples of how the skills can be developed through interests, work and education Self-reliance skills Self-awareness – purposeful, focused, 
self-belief, realistic, assessing your own performance Proactivity – resourceful, drive, self-reliant Willingness to learn – inquisitive, motivated, enthusiastic Self-promotion – positive, persistent, ambitious, accepting responsibility Networking – initiator, relationship-builder, resourceful Problem solving – how you approach problems, finding and implementing solutions Planning action – decision-maker, planner, able to prioritise, identifying areas for improvement OU study – carrying out self-directed projects Roles within your working situation Involvement in community groups or charities Roles within the home – 
planning, coordinating others People skills Team working – supportive, organised, 
coordinator, deliverer, reliability, adaptability Interpersonal skills – listener, adviser, 
cooperative, assertive Oral communication – communicator, presenter, influencer Leadership – motivator, energetic, visionary Customer orientation – friendly, caring, diplomatic, respect Foreign language – specific language skills Caring responsibilities Work responsibilities in a team Fundraising for charity Voluntary work Member of orchestra or drama group Sport Guide/scout leader Travel General employment skills Problem-solving – practical, logical, 
results orientated Flexibility – versatile, willing, multi-skilled Business acumen – entrepreneurial, competitive, risk taker, customer service IT/computer literacy – office skills, keyboard skills, software packages Numeracy – accurate, quick thinker, methodical, dealing with data Commitment – dedicated, trustworthy, conscientious Roles within the home – budgeting Roles within work e.g. use of IT, 
work experience Project work through study Membership of local clubs, committees and societies Self-employment Specialist skills Specific occupational skills – specialist relevant knowledge, e.g. languages, IT Technical skills – e.g. journalism, engineering, accounting, sales OU study European Computer Driving Licence (ECDL) Language skills Web design skills – use of programming or coding languages Blogging and using other social media tools First aid at work qualification NVQ qualification Source: HECSU, AGCAS, UCAS and AGR We have categorised them into four broad areas: 1 Self-reliance skills 2 People skills 3 General employment skills and 4 Specialist skills.
  • 69.
    69Getting the job Tofind out more, visit our website at www.open.ac.uk/careers The requirements an employer sets out in a job advertisement are likely to be much more specific, but it’s worth bearing in mind that candidates who apply for ‘graduate’ jobs are also expected to demonstrate at least some if not all of these skills. Many OU graduates have lots of evidence with which they can demonstrate these skills: • experience of the world of work and working environments both paid and unpaid • commitment to their own personal development demonstrated by undertaking OU study • time management and organisational skills required to successfully combine OU study and other responsibilities. Remember to use this evidence when you apply for jobs! If you don’t shout about it, nobody will do it for you! Be proud of being an OU graduate. The time management, self-drive and prioritisation it takes to manage your own learning is something to be incredibly proud of. Graduate Programme Manager The Co-operative Group OU graduates are highly valued by employers and profiles of employers who are particularly keen to recruit OU students and alumni are on our careers website at: http://www2.open.ac.uk/students/help/employer- showcase You will find a brief description of the company accompanied by a link to their website. There may also be case studies and other information to help you gain a better understanding of the company. See our online vacancy service, JobZone, for details of vacancies from companies interested in recruiting from the OU. http://www2.open.ac.uk/students/help/jobzone 4.2 Matching vacancies You’ve seen a vacancy advertised that you’d like to apply for. Now you want to make sure you have a ‘match’. So, before finding out more about the position, analyse the information you already have. Even a brief newspaper advertisement can reveal a great deal of useful information if you read between the lines. Look at the advertisement and analyse it under these headings: • Style and language What’s the general style of the advertisement – formal, low key, flamboyant, attention seeking? What does this tell you about the organisation? What is the vocabulary used to describe the organisation – ‘dynamic’, ‘multinational’ …? How does the organisation see itself and what image does it want to project? Do you feel comfortable with its choice of words? Will your personality fit the organisation? Are your values similar? • Brief job description Does the work genuinely interest you? Does it match your needs? What are the key tasks? What skills are needed? Can you produce evidence of your ability to deal successfully with each task? How will you demonstrate your potential for coping with tasks you haven’t handled before? Is there anything that seems unclear? • Qualifications Are they preferred or essential? For example, do you need a driving licence, or other specified qualification? • Experience Is it preferred or essential – will you be ruled out? What experience can you offer from any aspect of your life that demonstrates close or transferable skills? • Qualities Note the language used to describe the ideal applicant. Analyse each noun and adjective for its implications. For example, ‘committed self starter’ could imply that there’ll be little supervision, but may also mean that no training is provided. You may have to motivate yourself with little support or encouragement, or even in the face of resistance. Find out what this will mean in practice, and be honest about whether your personality and needs match what the employer wants. • Location and geographical mobility How far would you travel each day? Would you consider moving house? If you need to travel around, how much of a problem would this be for you? • Prospects What opportunities are there for advancement in this job? The employer may be looking for evidence of your willingness and ability to progress. If the opportunities seem limited, it’s important to see how you can use it to develop your skills and experience. • Salary Usually a good guide to the level of qualifications and experience required, but you have to be aware of the going rate for that occupation. What are you looking for, especially if there isn’t a specified salary? • Named contact Is a name given to contact for further information? It’s a good idea to follow up such offers, but be prepared when you do, as the contact will form an impression of you from the very beginning. Rehearse your introduction and be prepared for the question, ‘What would you like to know about us?’ Be ready to highlight your suitability for the post.
  • 70.
    70 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 4.2.1 Matching the requirements Once you’ve analysed your advertisement, decide if it interests you, and then request further details, such as the job description and person specification. You need to try and match yourself to the requirements of the job to judge whether or not you want to apply for it. The job description and person specification are usually set out under headings such as experience, qualifications, skills and personal qualities. They Vacancy: Fundraiser for Scottish Wildlife Preservation Society Key experience requirements My evidence Numeracy e.g. Treasurer of Residents’ Association: • Draw up budget bids or plans within agreed guidelines and procedures for submission to internal and external bodies. • Responsible for assessing potential expenditure in terms of value for money and taking appropriate action to ensure this is achieved. Keyboard skills • Self-taught packages in order to produce a dissertation for my degree. • Worked in Windows-based environment for numerous holiday jobs – secretarial role. Marketing knowledge • Temporary job (with full induction and training) over two summer holidays as a market research interviewer. • Marketing module completed as part of my degree studies (12 months) – identifying, anticipating and satisfying customer requirements profitably. Ability to work on own e.g. From recent employment, current part-time study: • As a part-time student I have worked within a thirty-two week study calendar and managed a weekly workload of reading, assignments, tutorials and revision alongside a part-time job and voluntary work. • I have worked unsupervised as a treasurer for a local Residents Association for two years and have always met deadlines for reports. Interest in wildlife e.g. Active member of RSPB: • I have organised several meetings between the RSPB and the local branch of the Campaign for the Protection of Rural England to look at the decline of the blue tit in Cheshire and preventive measures. • I am a regional fundraiser for BTCV and the PDSA. • I work alternate Sundays at the local animal hospital as a volunteer. • I am an avid reader and subscriber of The Warbler and make regular contributions to this national magazine. Presentation skills • I have used PowerPoint to present information on the decline of local bird populations to a community group and to councillors. • I have also organised and facilitated presentations to local schools and governors using a variety of media. should specify what the employer is looking for, so you need to consider how you can show that you meet the requirements. (It might help to refer to Section 1.) Look at the following example. Here the key experience requirements are listed, and the second column shows how a candidate would provide evidence of having the necessary experience. This is a useful way of approaching any job advert, as it helps you to focus on the important aspects as you complete your application form or prepare a CV.
  • 71.
    71Getting the job Tofind out more, visit our website at www.open.ac.uk/careers Activity 4.1 Begin by looking at an advert or job description for a position that interests you. If you don’t have a specific one in mind you might look in a careers publication or website such as www.jobs.ac.uk Alternatively, look at the job profiles on Prospects website: https://www.prospects.ac.uk/job-profiles Whichever way you choose, ask yourself: • Does the work genuinely interest me? • Does it match my personality, values, interests, needs? • What are the key job requirements? • What skills are required to perform them? • Can I produce evidence of these skills? In the box below, note down in the left-hand column the key characteristics and requirements of your selected vacancy. In the right-hand column, try to produce evidence of your suitability against each point. Vacancy/job description: Key requirements My evidence You can also try an activity on the OU careers website to help you analyse potential jobs at: http://www2.open.ac.uk/students/help/analyse- potential-jobs These kinds of activities are really helpful in preparing for the completion of application forms or for producing your CV. You should also take a look at Section 4.4.6 on page 78.
  • 72.
    72 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 4.2.2 What employers want Many employers are moving towards a competency- based style of assessment for evaluating candidates. This requires the candidate to adopt a particular approach if they are going to be successful. There are definite techniques that can be employed to greatly increase the chances of passing this stage. The first hurdle may be a difficult one, because many employers’ questionnaires are specifically designed to fail a certain percentage of applicants. For our application form we would recommend spending three to four hours on research and completion. Without a good one, you will never progress to the next stage. UK Graduate Recruitment Manager Logica Competencies are the criteria that employers set for each job. They show what you ‘can do’. Stating this alone is not enough, as employers want you to demonstrate your competencies through evidence. Some job descriptions don’t mention competencies at all – they talk about skills. Many employers use the terms ‘skills’ and ‘competencies’ interchangeably, so don’t worry too much about this. The basic ethos of competency-based assessment is that if you can demonstrate you did something in the past, you can do it in the future. A good technique to use when answering questions on application forms or at interview is STAR: • Situation – What was the situation and when did it take place? • Task – What task was it, and what was the objective? • Action – What action did you take to achieve this? • Results – What happened as a result of your action? When considering which example from your experience to choose from when answering a particular question, it might be helpful to use the mnemonic RAPPAS as a guide: • Relevant – Ensure your answer is describing the skill being asked for. • Action – Make sure you include something you actually did, as opposed to what you learned, or what you might do in a hypothetical situation. • Personal – It is most important to state what you did, as opposed to saying what other people did or what happened. • Positive – The answer will read better if the situation has a positive outcome. • Appropriate – The example needs to be something you can talk comfortably about if asked for more detail. • Specific – If the question asks for an example, then only one should be described, not a composite of several. Keep your examples specific, recent and relevant. We want to hear how you have used skills and behaviours in a positive way so that we can see how you would apply them in the workplace. Graduate Programme Manager The Co-operative Group You may find some examples highlight numerous skills or competencies. This can create overlap where you find yourself repeatedly using the same situation or example to demonstrate different competencies. In order to minimise the effects of this and to ensure you utilise a range of evidence (e.g. volunteering, OU study, employment, community activities, hobbies etc.) try to take time to audit your competencies and the answers that you will provide. This way you can choose the strongest and most relevant example to demonstrate each competency in a targeted and thoughtful way.
  • 73.
    73Getting the job Tofind out more, visit our website at www.open.ac.uk/careers The example below shows how full-time work as an IT technician and OU study can be used to provide evidence of a range of different skills from the same example. Team working IT technician: Full-time employment working in a team of 10. Communication IT technician: Utilising communication methods effectively, with the ability to explain problems and solutions to a range of different clients. OU study: Academic writing style, report writing which can include persuasion and critical reflection. Organisation IT technician: Organising my workload. This can include working on several projects and meeting tight deadlines. OU study: Prioritising study commitments such as assignment deadlines and self-directed learning alongside family life and working part-time. Have a look at the OU careers website content on how to plan your career for advice on analysing and identifying your skills and qualities gained from study, work and outside work www.open.ac.uk/careers. Here are some examples of competency-based questions for you to try out: 1. Self-management, problem-solving, analytical ability – describe how your personal planning and organisation resulted in the successful achievement of a personal or group task. 2. Communication skills – can you summarise key issues using logical arguments? Describe a situation where you were successful in putting your ideas across. 3. Self motivation, drive, energy, initiative – what is your greatest achievement and why? 4. Analysis, problem-solving and creative thinking – describe a difficult problem that you have solved. State how you decided what the critical issues were. Say what you did and what your solution was. What other approaches could you have taken? The best way that mature students can demonstrate the skills and life experience that they have is within the competency- based questions and within any questions about work experience. And I have to encourage mature students to be extremely positive and to sell the benefits of those skills and that life experience to employers because it’s a significant advantage over other candidates. Rebecca Fielding, Gradconsult Take a look at an example of a competency based question that has been answered utilising the STAR technique on our Careers website at: http://www2.open.ac.uk/students/help/using-star- technique 4.3 Application forms Application forms come in all shapes and sizes. Some are designed for recruiting people for a particular function or training scheme (e.g. graduate engineer). Most are intended for a wide variety of posts in the organisation (e.g. an NHS Trust). Whatever format they come in though, the principles for completing application forms are very similar. Follow instructions carefully. If you’re asked to submit an application form, don’t send a CV instead. Often – but not always – you’re told that you may also enclose a CV. If you do, it shouldn’t just repeat what’s on your form. Use it effectively to include or to emphasise information that you think is relevant and isn’t allowed for on the form. Keep the following points in mind when it comes to completing an application form: • The purpose of a completed application form, like a CV or a speculative letter, is to get an interview. • Your aim is to convince the employer that you’re worth interviewing – you appear to be a suitable candidate for the job and, also, the kind of person the organisation wants to employ. • The only information the selectors will have about you is what you’ve given them in your written application – emphasise the positive and leave it to them to spot the negative. Convince them that they need to see you.
  • 74.
    74 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers • Remember that presentation can be as important as content. • Many larger employers ask you to complete an online application. You can find some tips on making applications online on the careers website: http://www2.open.ac.uk/students/help/applying- online • When completing online forms you may find that some of your experiences do not fit neatly into the categories provided. We suggest you contact the employer for advice on how to approach this. If you haven’t looked at employers’ application forms for some time, you may be surprised at the probing nature of some of the questions they ask, and not only for senior jobs. You’ll come to some sample questions below in Section 4.3.2. Bear in mind that employers often receive a lot of forms. This means that on an initial read through they may spend as little as two minutes looking at your form, so it is crucial that you sell yourself effectively. 4.3.1 Before you start your application form • Find out as much as you can about the vacancy and the organisation. Ask the organisation for more details (for example, a detailed job description and person specification) and, if possible, visit a careers service or large library to look for other information. You can also research online, as most organisations will have comprehensive information on their websites. Have a look at the ‘about us’ page on the company website. This can provide you with useful insights into the company history, values and mission statements. • Read through the whole form before you fill in any of the sections. • You may find it useful to make a photocopy of the blank form (or print it from the screen) and use it for your rough draft. • Comply with instructions such as using black ink or block capitals. You must keep to the prescribed format, because many large employers now optically scan applications to enter them into their recruitment databases. • Usually, the space allowed for each question indicates its relative importance. 4.3.2 Filling in your form • Complete all sections of the form. If a question doesn’t apply to you, write ‘N/A’ or ‘Not applicable’ to show that you haven’t overlooked it. • If there isn’t enough space for factual information (e.g. ‘Give names, addresses and dates of all previous employers’), attach a separate sheet, unless you’re told that you must not attach any other papers. • If there isn’t enough space for general interest information (e.g. ‘What have been the significant factors in your life to date?’) prioritise and keep it within the space allowed. • Be sure to answer all the elements of each question (e.g. ‘What are your spare time activities, what do you contribute and what do you get out of them?’). • Don’t cram sections too full, as that makes them difficult to read. Layout can help – consider using bullet points, underlined topic headings, etc. to clarify your points. Being able to write succinctly is evidence of your written communication skills. • When answering extended (multi-part) or difficult questions, think of: –– What you’re going to say (understanding the purpose of the question) –– Who you’re saying it to (someone who doesn’t know you but will make decisions about your future) –– How you’re going to say it (presenting an accurate picture of yourself) –– Why you’re saying it (showing that you have the qualities, interests and skills the employer is looking for) • Make your points relevant, interesting and personal (say ‘I’, not ‘we’). Give evidence and avoid bland generalities (e.g. ‘I worked as a volunteer classroom assistant for three years’ rather than ‘I love children’). The skills you’ve developed in one context may well be transferable to another and employers will look for evidence that you recognise them: e.g. dealing with members of the public, working under pressure, handling money, working odd hours. • Use positive language. • Leave no unexplained gaps in your employment record. If you’ve been unemployed, say so; but mention any part-time or voluntary work you did during that period. Look at Section 6 if you are or have been an offender. • Tailor your responses to the post you’re applying for. If you’re applying for a job related to your degree subject, give fuller details of your course than you would if it’s not particularly relevant.
  • 75.
    75Getting the job Tofind out more, visit our website at www.open.ac.uk/careers • Use the ‘any other information’ section to draw attention to activities and qualities not covered elsewhere on the form. • Be convincing. Be positive and honest. Inaccuracy in one section can raise doubts about other areas of the form. Generalised waffle convinces no one. • Get your referees’ agreement before giving their names, and keep them well briefed so that they can write supportive references. Usually, one should be an academic referee; another someone you’ve worked for who can write about you as an employee. If appropriate, give their full titles and status. For more information on how to get a reference from the OU go to: http://www2.open.ac.uk/students/help/references 4.3.3 Supporting or personal statements In application forms employers are increasingly asking candidates to indicate their suitability by explaining how they match the requirements and responsibilities of the job role. This is usually addressed in the blank section of the form that is referred to as the supporting or personal statement. Useful tips: • Write in continuous prose broken up by small paragraphs. Do not copy sections of your CV. • Use the person specification ‘essential’ and ‘desirable’ criteria to inform the content of your statement. • Demonstrate how your skills, experience and qualifications match the employer’s requirements. • Use evidence and examples to back up your statements. My best advice for people completing a personal statement is to be honest about who you are and your absolute strengths and key talents. So think about those things that you really can offer an employer that are different, that are exceptional, that are real strengths and talents and combine those together as a statement. Rebecca Fielding, Gradconsult Activity 4.2 Read the sample questions below. All are genuine questions from graduate application forms used by large companies. Look back at the answers you gave to Activity 1.1 and consider answers based on the evidence you’ve already gathered. Question 1 On the first page of this application you stated a preference for a particular job or function. Explain why we should select you ahead of other candidates. There is 30mm space available on the form to show that you understand what the job involves and what you have to offer. Go for key points and give evidence from your record. Question 2 Outline any activities you have planned and organised. Tell us what you did and how you achieved results. There is 80mm space available on the form. Remember to cover ‘planned,’ ‘organised,’ ‘what you did’ and ‘results’. Question 3 Write a short autobiography. Include such details as your achievements and responsibilities; the people, events or experiences that have influenced you; your ambitions and aspirations. There is 180mm space available on the form to influence the selectors. This section will tell them more about you as an individual than any other part of the form. Every word should justify its inclusion. You’ll need a lot of time, drafts and fine tuning. Don’t forget that you can ask a careers adviser for advice on what to include in your application. 4.3.4 Skills you have attained as an OU student As an Open University student, you can stress the personal qualities and skills that OU study demands. Every employer values determination, self-discipline, flexibility and time management skills. Make the most of these skills as well as your academic success. You may be able to look back at the module descriptions for the courses that you have studied and pick out the kinds of skills that the course aimed to develop. These may have been expressed as learning outcomes. Learning outcomes will give you some help in mapping out the skills and achievements that you gained during OU study. They can help you identify the subject-specific knowledge and transferable skills you have acquired during each module.
  • 76.
    76 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Some jobs may require subject-specific knowledge (e.g. to be a teacher) while some put emphasis on transferable skills (which you dealt with in Section 1.2.5) and some look for a mixture of both. You will find that by studying with the OU – whatever the subject area – you will have developed a range of both subject knowledge and transferable skills that many employers will value. It is up to you to pick these out from your own experience so that you can present this on an application form. If you want to do this in a more structured way, there are a number of resources on the careers website at: www.open.ac.uk/careers under ‘Applying for jobs’ in the ‘CVs, applications and interviews’ section It’s also important to focus on what you can do rather than anything you can’t. When writing an application you are advised to focus on the positives, selling your skills and abilities. You must be truthful, but are expected to omit any deficiencies, e.g. you should never state that you ‘don’t have relevant experience’. It is up to the prospective employer to deduce that from the information. So try and stay positive about your skills and abilities, especially as you are expanding and enhancing them through your Open University studies. 4.3.5 When you’ve completed the form • Check it thoroughly for spelling and grammatical errors; ideally get someone else to check it rather than relying on a spell checker. Make sure you’ve been consistent in style (e.g. in your use of personal pronouns). • Look over the presentation. If possible, ask someone else to look over your application before you send it to make sure it makes sense and comes across positively. • Make a note of the job you’ve applied for, the name and address of the person you sent the form to, and the date you sent it. • Use an envelope of suitable size so that the form isn’t folded, or not more than once. Always send it by first class post. If you are completing an online application, you will usually receive an email when it has been received. • Make a copy of your completed form so that you can re-read it before the interview. It’ll also take some of the tedium out of tackling other forms. You can often use the same material, with a little editing, for several applications. You’ll rarely find the perfect application form that exactly suits your background and experience. You’ll need to adapt your answers to the questions you find. Practise answering the typical questions in activity 4.2. 4.4 The curriculum vitae (CV) Creating an up-to-date CV is a really useful way to assess and record your current skills, experience, achievements and strengths. On reflection you may identify gaps in your skillset; do not worry if this is the case as it will allow you to plan how to address and develop the skills you lack. Like an application form, a CV is primarily intended to make the recruiter think it worthwhile interviewing you. Realistically employers do not have time to read your CV at their leisure. Research has shown that you do not have long to make an impact - Recruiters spend approximately 6 seconds reviewing a CV! It is important that you make your CV relevant, concise and targeted. The advantage of a CV is that you get to decide what information to include and highlight, and what to leave out or minimise. In addition, your CV doesn’t need to conform to a set format so you have more control over the impression it will create. You can tailor the style, content and design to show off your strengths and present you in the most positive light. 4.4.1 The importance of tailoring your CV It’s most important that you keep in mind that one I found the Careers Adviser very helpful with tweaking my CV so that it was clearer about my personal skills rather than just work history. OU Student ‘all-purpose’ CV will not be much use to you. This is only likely to work if you always apply for the same function in several very similar organisations. Instead, it is more often much more effective if you adapt your CV to suit the particular organisation or job you’re applying for (easy enough to do if it’s word-processed). Employers expect you to show that you’re responding to their own advertisements, not sending out a batch of identical CVs to a list of companies you found in the Yellow Pages. (So you may in fact be doing just that, but it must look as though you’re targeting the individual company.) And you can reinforce this impression by tailoring the covering letter.
  • 77.
    77Getting the job Tofind out more, visit our website at www.open.ac.uk/careers For me the company was always going to be more important than the role. The role is different from what I thought I would be doing, but it builds on my experience, uses my new found knowledge from the OU courses and there are some exiting challenges [ahead]. OU Student 4.4.2 What style of CV? The general style of the CV should depend on the sector or organisation it’s addressed to. For example, applications to marketing organisations or to the publishing industry can be successful if the style and layout suggest a flair for lively prose or graphic design. To use the same approach for, say, a financial institution or a local authority might have an adverse effect. Bear this in mind when you design your own CV. For more information on CVs, go to our careers website and look at the ‘CVs, applications and interviews’ section: www.open.ac.uk/careers Alternatively, for tips and example CVs, look at: www.prospects.ac.uk/careers-advice/cvs-and-cover- letters We also provide sample CVs in Section 4.4.7. 4.4.4 What to include (and not to include) in your CV Your CV is uniquely yours in style, content and layout, but you may find the following ‘do’s’ and ‘don’ts’ helpful. CVs usually contain: • personal data • employment experience • education • training • interests, activities • additional skills • career aims, personal profile (optional) • volunteering (optional) • membership of professional associations (optional) • references. Personal data Name: Give the name you want to be known by if you’re called for interview or appointed. However, you don’t need to give initials or middle names; they’re unnecessary at this stage and may confuse matters. Put your name in the centre in larger bold font instead of giving the document the title ‘Curriculum vitae’. It should be quite obvious what it is. Address: Be sure to give a full address with postcode, since invitations to interview are often sent at short notice and speedy delivery is in your interest. Include an email address, but make sure this reflects the image you want to project. pinkfluffybunny@hotmail. com will not promote a professional impression to recruiters. If you include a link to your social media profile, again, make sure this is professional. 4.4.3 Preparing your CV How you organise and present information about yourself and your activities will convey significant messages about your suitability as a potential employee. Be prepared to spend a considerable amount of time on creating and reworking an effective document. You want to make sure that you present yourself positively and accurately. So, when it comes to preparing your CV, you need to ask yourself a few key questions: • What’s the area of work I’m after? • Which employers or organisations am I approaching? • What messages do I want to send about myself, my strengths and qualities? • What experiences shall I emphasise? • How can the style of my CV match the culture of the organisation(s) I’m sending it to, as well as the work I want?
  • 78.
    78 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers • If you had a series of short-lived jobs and you want to abbreviate the list, you could say something like ‘In the five years 1995–2000 I worked in various temporary positions in the catering industry’. Whichever system you use, make sure it’s clear and that the way you present starting and leaving dates is consistent. Don’t leave any unexplained gaps. For example, if you’ve had time out of paid work to bring up a family, state this. If you have served time in prison, please refer to Section 5.2 for tips on dealing with this. Education How far back should you go? School or young college-leavers should be quite explicit about their education since age 16, but it’s more appropriate for senior managers to include a brief summary of schools or just the universities attended and exams passed. There’s no need to include the full address of each school or college – condense the information to dates, names and towns. Present your qualifications in the way that makes the most of them: • If the job requires a degree or diploma it’s best to start with that, enabling the employer to see at once that you meet the requirement. • If you have no higher-level educational qualifications, you could list secondary school educational history in chronological order – that can be easier to digest than in reverse chronological order – but use the same order you used in ‘Employment Experience’. If you’ve worked your way up from the bottom and lack formal qualifications altogether, you could expand your work achievements and contract the education section. • If you’re offering professional qualifications it might be worth specifying not only the qualification (with the S/NVQ level, if appropriate) and the awarding institution, but also how you obtained it, e.g. full-time course or day release. Telephone: It’s important to give a telephone number where you can be reached or where a message can be left. Include your mobile number if you have one. If you’re employed and prospective employers can contact you during office hours, give your number and say that it’s a work number so that the caller will be discreet. Always give the full area code, number and extension so that you can be reached as easily as possible. At home, consider investing in an answering service or machine. Other personal details: There’s no need to include such details as date of birth, nationality, gender, marital status or number of children. These are irrelevant on a CV, where your aim is to get yourself invited for interview. You can discuss them at the interview if appropriate, when you have more opportunity to negotiate any difficulties. Employment experience Your aim here is to stress your achievements at work. Include start and end dates as well as job titles. Include the nature and place of your employer’s business if it isn’t obvious from the name, but don’t give the address or the name of your manager at this stage. For more recent jobs, say during the last ten years, give more detail about particular responsibilities, projects, assignments and results achieved, preferably in quantitative terms. A one-sentence description of the scope of your job, with figures such as staff, budget etc., should be followed by a statement of achievements. Avoid specialised language unless you’re sure the reader will understand it. There are different opinions about whether you set your experience out in forward or reverse chronological order. So much depends on the nature and relevance of your previous employment to the job you’re applying for. But everyone agrees that the most relevant job should appear at the top of the list, so that the reader is encouraged to read on. Some possible sequences are: • Put your present or most recent job at the head of the list, with appropriate detail; then the rest of the employment history in backward or forward chronological order. • Start with the most relevant work experience, even if it’s not the most recent, then work backwards or forwards chronologically. • Divide your experience under the headings Related and Other. This allows you to highlight the experience the employer is likely to be most interested in and play down other, less important jobs.
  • 79.
    79Getting the job Tofind out more, visit our website at www.open.ac.uk/careers For a technical post or one that requires special knowledge, consider giving additional information to show that you have the relevant work experience, knowledge or training. • Be specific about what you studied in your Open University modules, highlighting in a covering letter or skill section the personal qualities and skills that this kind of study requires. You might find the module descriptions for the courses that you have studied very useful: pick out the kinds of skills that the course aimed to develop, which are often listed as learning outcomes. Learning outcomes can assist you in mapping out the skills and achievements that you gained during OU study. They can also help you identify the subject- specific knowledge and transferable skills you have acquired during each course. Of course, some jobs do require subject-specific knowledge (e.g. to be a teacher) while others place more emphasis on transferable skills (see Section 1.2.5 of this workbook). Some look for a mixture of both. By studying with the OU – whatever the subjects are – you will find that you will have developed a range of both subject knowledge and transferable skills that many employers will value. It is up to you to identify them from your own experience so that you can present this on a CV. • If your qualifications were awarded overseas, mention the UK equivalent so that the employer knows what level you’ve reached. Training Don’t give an exhaustive list of all the training courses and seminars you’ve attended. Include useful information about training and development – courses of a week or more, or training in relevant specialist skills. Interests, activities This section has various uses. It can show that you have a well-rounded life and don’t live for work alone; that you’re a sociable person who gets on with others; or that you keep yourself fit. Your hobbies may have given you opportunities to tackle roles and develop skills that you haven’t had scope for at work – perhaps you’ve been a school governor, run a computer club or done voluntary work that demonstrates organisational and management skills. An unusual hobby such as sky-diving or genealogical research can be worth mentioning, even though it has no obvious relevance to the job. It gives your CV an interesting feature and makes it memorable. Use this area to bring out skills you have gained: your involvement in sports activities can be used to highlight your team-working skills. Voluntary work can demonstrate your planning and organisation skills. We are looking for enthusiastic people, so show that you are enthusiastic about what you have achieved already. UK Graduate Recruitment Manager Logica Additional skills The diversity of individual careers sometimes makes extra sections desirable: you can make up your own subheadings. Include details you think a prospective employer really ought to know – driving licence; additional skills such as foreign languages (if possible, give an indication of your level of competence), first aid training and so on. It is also important to outline your level of IT and keyboard skills, including software you are familiar with, e.g. Word and Excel. Career aims, personal profile Including career aims and a skill profile can be particularly effective if you’re seeking a career change, you’re a mature graduate, you have an unconventional record or you’re applying for a job for which the competition is particularly keen. Volunteering Including details of volunteering activities can demonstrate valuable skills and experiences to an employer. Highlight your key achievements. This is a great way to add a USP* to help you ‘stand out from the crowd’. (*unique selling point) Professional membership Evidence of professional membership indicates dedication to your career and for some professions this is a requirement. Adding your level of membership such as ‘student’ or ‘associate’ member shows commitment to your profession. References You’ll usually need two referees, one your present or last employer. Give their names, addresses and telephone numbers, email address and their status or relationship to you (e.g. line manager, course tutor). If you don’t want your employer approached
  • 80.
    80 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers at this stage, say so in your CV or covering letter. You might prefer to omit referees on the CV and put ‘Available on request’. 4.4.5 Presentation of your CV To produce an effective CV, pay attention to its appearance as well as its content. • Make it easy to read and follow. Yours will be one of many that the employer has to read. Use an ‘easy-to-read’ font and size, such as Arial 11 point. • Be consistent in how you present the information (e.g. chronological order) and in your layout. Have headings in the same style (capital letters, bold, underlining). Use bullet points to make reading quicker. • Two sides of A4 is usually the right length (unless it is a CV for an academic position, which is usually longer because it includes listings of published work and/or research). Consider using an appendix for very detailed information such as a list of publications. • Don’t cram the page, or clutter it up with unnecessary punctuation. Space makes text easier to read and more attractive. • Put the most important information on the first page and as near the top as possible. The employer may not bother to read on if there’s nothing of interest to begin with. • The space you give to each section should reflect its importance. Concentrate on the aspects that are most important for the employer to know. • Avoid long, complicated sentences. Don’t use clichés, jargon and abbreviations that the reader may be unfamiliar with. Write the words out in full the first time you use them and put the abbreviation in brackets; after that you can use it on its own. • Seek other people’s views on your draft and proofread the final version carefully. • Your CV should be produced to a high standard, word processed and printed or copied on good-quality white or cream paper. Make sure the copies are sharp and clear. If you need to demonstrate an interest in design (e.g. for some media jobs) more elaborate graphics and perhaps coloured paper might be appropriate. • Make sure that your CV arrives looking like a quality document. Don’t fold it. Use an A4 envelope with cardboard reinforcement. • If you send your CV by email, follow it up by sending a hard copy straight away. Keep a copy of your CV in a safe place. You’ll need it again to adapt for other employers. 4.4.6 Analysing a job description In order to construct a CV that’s effectively related to the job you’re seeking, particularly if you want to offer a targeted CV, you’ll need to analyse the job itself. One way to do this is from the job description. To illustrate this, we’ve chosen a description for human resource management. It might be helpful to read it alongside CV example 3, which is designed for this area of work. Some of the key words in the description have been emphasised, and the notes that follow it suggest some inferences that can be drawn from them about the nature of the work of personnel management, and in particular the skills it calls for. Get the basics right. Check that there are no spelling mistakes, text jargon or missing information. At Enterprise we are also interested to hear about your extra-curricular activities, awards and interests. It gives us an insight into what you like to do outside work and education, and helps us form interview questions. HR Director, Europe Enterprise Rent a Car
  • 81.
    81Getting the job Tofind out more, visit our website at www.open.ac.uk/careers Example Human Resource Management Advising on, developing and administering policies in relation to staff recruitment and training, career development, industrial relations, general conditions of employment and other personnel matters. Some typical tasks may include. • Analysing staffing requirements in consultation with department and other managers, (undertaking job analysis and evaluations as appropriate). • Arranging for dissemination of vacancy details by internal and external means, interviewing applicants and advising on the selection of those most suitable. • Helping to undertake staff appraisals and, as appropriate, discussing career development, personal welfare and other matters with individual members of staff. • Advising management on standards of remuneration, working conditions, management/ staff communications, staff promotion schemes and other matters. • Assisting in negotiations in the field of industrial relations and ensuring observance of regulations and agreements relative to personnel matters. • Maintaining staff records, records of labour turnover and other necessary information and assisting with human resource planning procedures and programmes. • Words such as ‘analysing’, ‘evaluations’, ‘appraisals’, ‘human resource planning’ and ‘forecasting’ imply the need for skills in evaluating information and reaching appropriate conclusions. • Words such as ‘arranging’ and ‘records’ imply the need for administrative skills. • Words such as ‘consultations’, ‘interviewing’, ‘discussing’, ‘advising’ and ‘negotiations’ imply the need for skills in dealing with people, especially the ability to communicate effectively with them. The following examples of CVs illustrate some of the points you should consider when designing your own CV. The examples (all fictitious, by the way) illustrate each of the four main CV formats in turn: chronological, functional, targeted and academic. None is perfect. (Indeed the academic CV shows that the applicant studied medicine, which you can’t do with the OU, but the style is standard for academic CVs in general.) You may well decide that a quite different layout and format are more appropriate for your individual circumstances. And bear in mind that covering letters, the subject of the next section, would accompany these CVs. Activity 4.3 Take some time to reflect again on the CV guidelines and examples. • If you already have a CV, ask yourself whether it presents the information you want to give in the way you want it to be seen. • If you think that your CV looks feeble, uninteresting, wordy or messy, it probably is. It’s time to redesign it. • Look again at the example CVs to see whether any of the formats would be particularly appropriate to convey what you want. • Think about the general style of your CV in relation to the person who’s going to read it. • Make sure that you’ve: - analysed the requirements of the job - listed your skills - composed your examples of key achievements. Then go ahead and construct or redesign your own CV.
  • 82.
    82 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 4.4.7 Examples of different types of CV There’s no right or wrong way to write a CV. The right one is the one that works for you in your situation and succeeds in getting you interviews. Here we will just provide some guidelines on good practice and offer some examples of possible formats: • chronological • functional • targeted. We will also show some examples of targeted CVs for specific purposes. Most people tend to prefer one style over the others (though as you will see, an academic CV is used mainly for applying for academic posts). Whichever format you choose, it should be flexible enough to allow modification to match the job you’re seeking. For most jobs, you need to make a decision about the kind of CV to use as most employers will not specify. However, some job areas have expectations that a particular kind of CV is submitted. When researching jobs, look at what the expectations might be. It is important that you find out if there is a preferred format for the type of job that you are applying for by doing further research into the job and if necessary seeking advice from a careers adviser (or the professional body if there is one). For instance, some professions, such as the legal profession, prefer CVs in a chronological format. When you have work experience that is directly relevant, it is useful to highlight this in a separate section as it draws attention to it. The chronological CV You are probably most familiar with a chronological CV. This lists jobs by date, beginning with the most recent, showing the name of each employer, where you worked, the period you were employed, your job title(s), responsibilities and key achievements. The advantages of a chronological CV are: • It can be very easy to produce. • It has for many years been recognised as a standard approach to CVs. • It allows prospective employers to see very quickly how an individual has progressed and increased responsibility. However, the disadvantages to a chronological CV are that any gaps in your employment stand out. As a result, if you’ve changed jobs frequently, it can suggest instability and will require explanation – particularly if you’ve changed profession or career direction. In addition, with a chronological CV, it isn’t always easy to spot key achievements or skills which might get ‘buried’ under different job titles. Daniel Rossi 16 Any Street, Portsmouth, XY11 3ZZ Tel./fax 01234 123456 email D-Rossi@nomail.co.uk LinkedIn: www.linkedin.com/in/danielrossi Career Summary I am a highly motivated CIMA professional with in-depth knowledge of financial and management information systems. My key strengths include: commercial and business awareness, strategic analysis, analytical thinking and a logical approach to work. Having successfully completed my Masters in Business Administration, and having developed my current role, I am now seeking an opportunity to take on greater management responsibilities and challenges within a company finance function. Professional Qualifications 2012 – 2016 Masters in Business Administration (MBA) The Open University Courses studied include Managing performance and change, Financial strategy, and Business operations: delivering value. 2012 – 2013 Professional Diploma in Management The Open University Projects included analysis of change strategy within current company and a review of accounting systems, including proposals for future developments. 2008 – 2010 Chartered Institute of Management Accountancy exams CIMA All passed on first attempt Continued
  • 83.
    83Getting the job Tofind out more, visit our website at www.open.ac.uk/careers Career History 2012 – Present Deputy Finance Manager Ace Holdings Plc Portsmouth Achievements: • Planned and coordinated computerisation of the management accounts system: required me to use high-level organisational skills and my ability to think strategically and to deal with complex problems as the project progressed. • Trained staff in the use of the new system: provided concise and effective guidelines and designed a training plan. Ensured full staff engagement through involvement at all levels. • Reduced the cost of supplies by 11% in 2009–2010: was able to make savings by thinking creatively and identifying alternative methods of purchasing goods, as well as encouraging the purchasing department to source new suppliers. • Strengthened and simplified the reporting of financial information: each team was given greater responsibility for reporting on their own accounts which led to greater transparency. This required more of my time initially in coaching them through this process, but resulted in more effective financial records. • Researched a detailed marketing study leading to a refocused annual marketing plan. This required me to consult and liaise with colleagues in marketing, and I developed a greater understanding of their function as a result. • Negotiated £2m loan for a major construction project: required me to research and present our case. Represented the company in negotiations throughout the bidding process. • Handled credit analyses and made credit recommendations. 2010 – 2012 Management Accountant Southern Finance Plc Portsmouth • Preparing regular financial statements and accounts, such as profit and loss accounts • Analysing company performance • Monitoring spending, costs and budgets • Interviewing clients • Supervising an office of nine staff. 2004 – 2010 Accounts Technician Southern Finance Plc Southampton • Assisting with ledger accounts and budget preparation • Preparing statements showing income and expenditure • Processing expenses claims. Qualifications I started work as a trainee accounts clerk with Southern Finance, learning the job and assisting with ledger accounts. From there I was quickly promoted to accounts clerk and began working towards professional qualifications. Additional Information • IT skills: use Microsoft Office and SAGE financial management software on a daily basis to write documents, prepare presentations, store and manipulate data and produce financial reports. • Part-time study of the courses described above required self discipline, time-management skills and determination. I developed a much broader awareness and understanding of company systems and functions as a result of study. • Keen member of a local amateur dramatics society, and have been stage manager for the last four years. This provides an additional arena to further develop my organisational and people-management skills. • Currently treasurer of my children’s primary school PTA. This requires careful thought on how to present financial information to members of PTA who are without financial knowledge. • My language skills include conversational Spanish and French. I have taken several evening classes to develop my confidence when communicating on holiday. • Full clean driving licence.
  • 84.
    84 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers The functional CV A functional CV focuses attention on your skills and achievements, presented according to the function or responsibilities you’ve undertaken rather than according to individual jobs. This kind of CV shows that you’re conscious of the demands of the prospective employer and of what you have to offer. Its advantages are: • It can highlight your skills rather than job changes. • If your current or most recent experience isn’t related to the position you’re applying for, a functional CV allows you to place more emphasis on relevant strengths and experience from earlier periods. • You can group different achievements together to match the job that you are applying for. The disadvantages are that it takes more thought to prepare a functional CV and you have to ensure that it is clear and relevant to the chosen job without looking as though you might be hiding something! Sandra Edwards 5 Any Street Cambridge XY11 3ZZ Tel. 01234 123456 Mobile 01234 123456 email: Sandra@nomail.com LinkedIn: www.linkedin.com/in/sandraedwards PERSONAL PROFILE A graduate biologist with strong industry experience in quality assurance, research and development and creation of new products. Have up-to-date knowledge of quality management systems including ISO 9000. Capable of achieving personal objectives, as demonstrated by the successful completion of my Open University degree alongside full-time work. Goal orientated, with a clear and concise vision of future objectives. I am now keen to find a challenging position that offers long-term potential in quality assurance and/or new product development. SKILLS AND ACHIEVEMENTS Analysis and problem solving • Analysed the quality assurance system at Continental Kitchens Ltd, making recommendations for new procedures, which led to an entirely new quality control system. This facilitated a faster, more accurate means of inspection, saving £200K annually. • Developed and instituted a statistical quality control programme to cover all critical control points in the manufacturing process. The system alerts operators when to change the process parameters without disturbing production flow. Technical skills • Created computer applications for environmental microbiological trends for control of plant cleanliness, resulting in significant improvement in overall sanitation. • Formulated new and improved food products, and contributed to the development of a new line of Polish foods for wholesale distribution. Communication skills • Able to enthuse others and inspire a positive attitude to setting up new procedures, as demonstrated by effective implementation. • Excellent report writing and presentation skills, evident in work and successful university study. Continued
  • 85.
    85Getting the job Tofind out more, visit our website at www.open.ac.uk/careers CAREER HISTORY Quality Assurance Coordinator Continental Kitchens Ltd Cambridge 2012 to date • Responsible for managing and maintaining all quality control systems. • Ensuring procedures conform to legislation. • Creation of statistical programmes to help with the transition of quality assurance responsibility to individual operators. • Setting up a new product-recall procedure to facilitate any possible product retrieval due to failures reported in post-manufacturing integrity testing. • Supervision of the sanitation crew during microbiological clean-ups. • Reviewing existing policies and setting up plans to improve quality systems. Quality Assurance Auditor Continental Kitchens Ltd Cambridge 2009–2012 • Analysing business statistics to measure performance against in-house and external standards. • Auditing, sampling and testing production process to check product quality. Career break Raising a family 2005–2009 Research Technician Bow Wow Pet Foods Ltd Leicester 2001–2005 • Formulating and improving product lines. • Performing shelf-life studies on a range of products. • Supervising in-plant testing of laboratory formulations. • Analysing waste water to ensure it met government standards. EDUCATION AND TRAINING Member Chartered Quality Institute 2013 BSc (Hons) 2:1 in Biology The Open University 2006–2012 Courses included: Health and disease, Environment, Living processes, Ecology, and Evolution. Developed confidence in ability to analyse data, produce reports and in the methodology of conducting experiments. Benefited from working with others at residential schools and tutorials. 2 ‘A’ levels: Biology (C) Mathematics (D) Huntingdon College 1998–2000 GCSEs including English and Maths (Grades A-C) Parkside School 1996–1998 Attained formal recognition for CQI training courses successfully completed, including: Developing the skills of new quality managers Implementing ISO 9001. IMS internal auditing and self assessment. ADDITIONAL INFORMATION • Spent a year after ‘A’ levels travelling the world: developed an appreciation of other cultures, an ability to be very flexible in planning next steps and an interest in scuba diving. • Served as a regional representative on the OU Students’ Association for three years and contributed to student feedback on two courses in their first year of presentation. • Excellent computer skills, including Microsoft Word, Excel and PowerPoint. • Full driving licence.
  • 86.
    86 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers The targeted CV A targeted CV is even more closely matched to the needs of a particular employer, with the skills required and the evidence of them clearly laid out at the beginning, followed by the details, dates and so on. It combines elements from both the chronological and the functional CV. Most candidates for managerial posts use this format. The advantages are: • It focuses straight away on your strengths. • It is more likely to catch the reader’s interest. • You can adapt it to suit the job you’re after without sacrificing quality. • You can lead the reader in the direction you want to go – your skills and achievements. The disadvantages are that, like the functional CV, this one isn’t easy to prepare. It has to change to match each job, with all the time, effort and skill that implies. Vigla Kozlowski ADDRESS: 45 Longhurst Avenue, London, N10 8EP TELEPHONE: 020 8887 5131 EMAIL: Vkozlowski@wizard.net LINKEDIN: www.linkedin.com/in/viglakozlowski Career aim Building on my previous experience of working in a large organisation at a time of change to train and work as a professional personnel manager. Skill profile Project Management: As a project manager currently working simultaneously on a range of demanding projects, I have been responsible for cultivating a spirit of teamwork and cooperation. I have to be able to prioritise work within both strict financial and time constraints and ensure that others do too. Sound judgement, combined with organisational sensitivity and a high level of accuracy and attention to detail, have been essential to the success of my section. Teamwork: I am a member of a small steering group set up within the bank as a result of the recent major changes in working practices. The work involves planning, implementation and evaluation of new systems and their effect on staff at all levels. Both my work as a nurse and in banking has demanded a high level of personal responsibility, autonomy and judgement, whilst working in a team. Communication: My experience has shown me the importance of good interpersonal and communication skills. I have become used to seeking and learning from criticism, and to resolving potentially disruptive differences of opinion. As important is my ability to express myself clearly and effectively both face-to-face and on paper, in projects and reports. Drive: I am hardworking and have always put considerable energy and enthusiasm into all of my activities, believing that this is the key to achieving worthwhile results. I thrive on the challenge of change, making sure that I always fulfil my function and deliver to deadlines. Education 2001–2008 The Open University. BSc. Hons, 2.1 in Psychology Courses chosen to obtain recognition by the British Psychological Society. Distinctions obtained in Social and cognitive psychology, in Biology: brain and behaviour, and in Principles of social and educational research. My main research topic involved interviewing a wide cross-section of both adults and children in small groups and on an individual basis, devising questionnaires and analysing data. Continued
  • 87.
    87Getting the job Tofind out more, visit our website at www.open.ac.uk/careers 1992–1997 Parsifal Comprehensive, Finchley Road, London Three ‘A’ levels: English (C), Biology (D), Chemistry (D) Training 2006 IPM Certificate in Personnel Practice 2001 Lloyds Bank short in-house course in Personnel Management. Work experience 2009 to date Lloyds Bank, Business Loans Section Responsible for assessing loan applications and making loan decisions. This involves initial discussions with individuals and, frequently for larger loans, working with the personnel of companies and other institutions with a financial interest in the company’s future. Section leader with responsibility for the work of six staff who report directly to me. Banking attracted me because it offered a structured training and a wide range of opportunities within each department. I would now like to broaden my experience into personnel in a large retail organisation. 1999–2009 Lloyds Bank, Recruitment Officer – Recruitment interviewing, in charge of four staff. 1997–1999 Lloyds Bank, Personnel Assistant – Personnel administration, pay and pensions, record keeping, three staff. 1996–1997 Lloyds Bank, Counter Clerk – Responsible for serving customers, handling cash. 1993–1996 North London Hospital, Student Nurse Although I could have gone to university when I left school I had always wanted to be a nurse, so I decided to train at the local hospital. However, during my training I realised that this career was not for me. As I had enjoyed the studying and wanted to further my academic studies in a related subject, I decided to apply for a job and combine this with part-time study with The Open University. Additional skills • Sound working knowledge of Excel and Lotus 1-2-3 spreadsheets, Dbase IV and Q&A databases and word-processing using Word and other Microsoft Office packages • Interviewing • Psychological test administration and interpretation • Car owner. Full, clean driving licence. Activities and interests • I am teaching myself to play the saxophone and enjoy getting together with my friends for musical improvisation. • I spend one evening a week as a volunteer tutor with a literacy project, working with adults on a one-to-one basis and in small groups. • I keep fit by swimming and running regularly each week. Referees Names available on request.
  • 88.
    88 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Targeted CV for a career changer Adding a section on any relevant work experience (paid or unpaid) to your CV can be a shrewd move when you are sending it to potential employers in your desired career area. This will give your application credibility as well as showing that you are motivated and possess initiative. You should create a targeted CV and an associated covering letter (an example can be seen in Section 4.5) that gives you the best chance of achieving your goal. For advice regarding changing careers see section 2.2.4. Peter Evans 11 Wood Lane, York, North Yorkshire QQ1 3ZZ Tel: 01999 223344 email: p.evans@nomail.co.uk Career aim For the past 9 years I have been working as a Computer Technician for a local Health Authority. I have always had an interest in environmental issues and six years ago I decided to take a degree course with The Open University. I now consider this to be one of the best decisions that I have ever taken as it has made me see the potential of a completely new career for me. I have accumulated significant experience in the area of preservation of wildlife habitats and the associated environment. Having completed my degree I am now committed to securing a challenging and exciting opportunity in this area of work. Education 2016 BSc (Honours) in Environmental Science Stage 1: Environment: journeys through a changing world; Exploring science Stage 2: Environmental science; Geology; Practical environmental science Stage 3: Ecosystems; Practical environmental project; Renewable energy; Geological record of environmental change The Open University 2007 BTEC National Diploma in Computing (Distinction) York College of Further Education 2005 6 GCSE passes at grades A–C including A* in Maths and IT. Eskdale School Relevant experience Summer 2010: Conservation Volunteer, Sea Turtle Protection Society, Greece • Spent 4 weeks carrying out field work tasks and interacting with visitors to the island promoting the work of the society • Used initiative and determination to raise finances to fund trip • Developed communication skills and patience to interact with other volunteers from 9 different countries, local people and tourists. 2008 to present date: Conservation Volunteer, York • I have participated in regular one-day conservation tasks including tree planting, footpath construction and creating wildlife habitats. • I have also organised and led fellow students in these activities. Continued
  • 89.
    89Getting the job Tofind out more, visit our website at www.open.ac.uk/careers Other work experience Summer 2007 – Computer Technician, York Health Authority Present • Maintaining the computer network of the organisation on a daily basis • Diagnosing and fixing faults on site • Use of computer systems in searching for records and data input • Upgrading existing hardware and software • Servicing printers, scanners and other peripherals • Carrying out scheduled maintenance checks Summer 2006 – Lifeguard/Assistant Swimming Teacher, York Leisure Centre Present • Responsible for the safety of swimmers during public sessions • Assisting Swimming teacher with coaching both adults and children • Co-ordinating and supervising activities at the childrens’ swimming club Positions of responsibility • Treasurer of the York Conservation Society 2005–2012. Undertaking and organising practical conservation trips at least once a week. Professional membership • I am a student member of the Institute of Ecology and Environmental Management (IEEM) Activities and interests • I still swim regularly • I am a keen natural history photographer Skills • I am familiar with Windows, Microsoft Office and web design • Basic First Aid (Module I) • National Pool Lifeguard Qualification • Full clean driving licence References Available on request
  • 90.
    90 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers CV targeted at applying for work experience A career in the law is one example of where you will need to obtain some relevant work experience while studying for your law degree, in order to become a solicitor. You may try to arrange this for yourself or you could apply for ‘vacation schemes’ run by the larger law firms. Here is a CV that targets gaining such experience and an example of a suitable covering letter to accompany this CV can be found in Section 4.5.4. Amerjit Kaur 78, Aston Street, Coventry, ZX42 6XY Tel: 06321 496284 email: a.kaur@nomail.co.uk Personal profile I am a highly motivated and organised team worker and am also used to working on my own initiative. I have extensive experience of working with the public both in a Social Services Department and a Housing Association. I feel that this experience has helped me to develop highly effective interpersonal skills and a tactful and discreet approach to clients’ needs. I am currently completing a Law degree with The Open University with a view to securing a legal training contract in the next 12 months. Qualifications 2016 LLB (Hons) Law Stage 1: Rules, rights and justice; Introduction to business studies Stage 2: Understanding law; Law: the individual and the state Stage 3: Law: agreements, rights and responsibilities; Law: ownership and trusteeship The Open University 2014 3 A-level passes in English (B), History (B), Government and Politics (A) 2 AS passes in French (C) and General Studies (C) Coventry Sixth Form College 2002 9 GCSE passes at grades A-C including English, Mathematics, History, French and Information Technology Oakwood School Law experience 2013 Placement Parkin and Munro Solicitors I completed a short vacation placement for one week. I worked on a client project which developed my team working and communication skills. Work experience February 2012 – Housing Officer Alpha Homes Ltd., Coventry Present • Allocating vacant accommodation • Overseeing property exchanges • Assessing the needs of people applying for housing Continued
  • 91.
    91Getting the job Tofind out more, visit our website at www.open.ac.uk/careers • Dealing with issues such as anti-social behaviour, squatters and broken tenancy agreements • Setting rents and dealing with payments and arrears • Arranging for legal action to be taken when other forms of legal action have failed. September 2004 – Social Services Assistant Coventry City Council February 2012 I worked mainly with families, older people and children at risk. My duties included: • Contacting clients and following up enquiries • Advising clients and their families about the help that was available • Visiting people at home to check on their welfare • Working out client’s needs and devising care plans • Keeping up to date with changes in the law • Attending meetings with clients and other health and care professionals Additional information • I have a full, clean driving licence • I have a current certificate in First Aid Activities and interests • Scuba diving • Yoga • Salsa dancing • Indian cooking References Available on request.
  • 92.
    92 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers CV for an academic role For academic jobs in universities (such as lecturer and postdoctoral research posts), it is expected that candidates will produce an academic CV. These CVs place more emphasis on the subject matter of the degree and/or research, and on the knowledge and achievements gained. They are likely to include information on some or all of the following: • the title of your PhD and the names of your supervisors • teaching/administrative experience • professional memberships (if relevant) • fellowships and awards • conferences attended/presentations given • a detailed abstract of research should be appended to the end of the CV • full details of publications. Because of this, academic CVs are often longer than other types of CV. You should also include three referees rather than two. • Remember to include examples of the skills that you have developed through your research. • If you are a postgraduate or research student who is applying for a job outside academia, you should consider a chronological, skills or targeted CV, depending on what you are applying for. In presenting your research, you should do this without using any subject-specific jargon so that it is understandable to the employer. Ask someone who knows nothing about your research subject to read through what you’ve written and check it makes sense to the lay reader. Remember to emphasise the transferable skills that you have developed in undertaking higher level study, such as communication, analysis and working to deadlines. There is more advice on CVs for PhD researchers in the ‘CVs, applications and interviews’ section of the careers website: www.open.ac.uk/careers Hilary Michelle McArthur 18 Poole Avenue, Milton Keynes, MK6 3DY Tel. 07900 543 21 Email: h.mcarthur@yahoo.co.uk EDUCATION The Open University – PhD in Medicine 2012–2015 Thesis Title: The regulation of leukocyte migration away from the subendothelial compartment. Supervisors: Professor R. Jordan and Dr. D. James Project synopsis: Adapted, validated and implemented a ‘novel’ assay to investigate leukocyte migration and survival. Systematically investigated the role of soluble mediators and adhesive interactions in the survival of neutrophils following transendothelial migration. Identified phenotypic alterations in T-cell subpopulations following migration through an endothelial-fibroblast bilayer. University of Manchester – MSc in Immunology (distinction) 2011–2013 Dissertation project: ‘Neutrophil spontaneous apoptosis is mediated through the acid sphingomyelinase dependent generation of ceramide.’ Modules studied included: tolerance and autoimmunity; transplantation biology and cell adhesion; haemopoietic cell differentiation and malignancies. University of Salford – BSc (Hons) in Biochemistry (first class) 2008–2011 Dissertation project: ‘Autoimmunity: A genetic perspective.’ Modules studied included: cell biology; genetics; immunology; microbiology; oncology; and physiology. This was a broad-based degree in biochemistry with the second year spent studying at Oregon State University, USA.
  • 93.
    93Getting the job Tofind out more, visit our website at www.open.ac.uk/careers RESEARCH EXPERIENCE AND TECHNICAL SKILLS • Development of static adhesion and migration assay. • Adaptation of a novel co-culture system: culture stromal cells on the apical and basal surface of Transwell inserts. • Image-based analysis of leukocyte behaviour in static and flow adhesion and migration assays. • Microscopy: phase contrast and fluorescence. • Isolation of leukocytes subsets and endothelial cells. • Flow cytometry. • Subcellular fractionation. COMPUTER SKILLS Extensive experience of Microsoft Word, Excel, PowerPoint and Prism, and a working knowledge of WinMDI and Image Pro. RESEARCH AND TEACHING EXPERIENCE Tutor on an Open University Residential School, July 2015 • Trained undergraduates in basic laboratory skills • Allocated tasks and ensured their completion. • Marked undergraduate work and provided individual guidance to undergraduate students. Student Mentor for The Open University’s Outreach Programme 2012 - 2014 • Responsible for communicating and demonstrating technical skills to A level science students at a local college, as well as showing visiting work experience students laboratory protocols. Laboratory Assistant, Scientific Laboratories, Salford, Summer 2004 • Worked independently on an assigned project. • Developed technical writing skills for industry purposes, along with presentation and communication skills. PUBLICATIONS Bennett, A., Jones, J. and McArthur, H.M., Transmigration prolongs neutrophil survival through a beta-2- integrin-dependent adhesion signal. (Paper submitted to the UK Medical Biology Journal) Bennett, A., Layerton, S. and McArthur, H.M., Identification of a phenotypically and functionally distinct population of neutrophils in a model of reverse endothelial migration. American Journal of Medicine, January 2015 ABSTRACTS, POSTERS AND PRESENTATIONS Bennett, A., Jones. J. and McArthur, H.M., Transmigration prolongs neutrophil survival through a beta-2-integrin- dependent adhesion signal. British Society of Immunology, July 2013. Bennett A., Layerton S. and McArthur, H.M., Rapidly recruited TNF-stimulated endothelial cells – is this a novel route for neutrophil clearance from inflamed tissue? International Society for Thrombosis and Haemostasis, March 2015. Bennett, A., Jones, J. and McArthur, H.M., Ceramide rich lipid rafts and acid sphingomyelinase activity are required for spontaneous neutrophil apoptosis. International Conference, Manchester, 2014. ACHIEVEMENTS Received awards for best overall academic achievement and best dissertation project at the end of my MSc (2012). Received award for best overall academic achievement at the end of my BSc (2011). REFEREES Professor Rebecca Jordan r.g.jordan2@open.ac.uk Dr David James d.d.james1@open.ac.uk Dr Steven Mayes s.r.f.mayes@open.ac.uk All referees can be contacted via The Open University, Davis Medical Building, Milton Keynes, MK7 6AA or by phone on 01908 456 789 The above example of an academic CV has been published with the permission of the Association of Graduate Careers Advisory Services (AGCAS).
  • 94.
    94 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 4.5 The covering letter Your covering letter is your opportunity to market yourself. It introduces your application and draws attention to the main factors that make you suitable for the job. It will usually be read first, so make sure that the reader will want to find out more about you. It should enhance your application, not repeat what’s on the application form or CV. Always include a covering letter unless the employer specifically tells you not to. Application forms often allow you reasonable scope to sell yourself and may need only a brief covering letter. A CV will usually require more of an introduction. 4.5.1 Applying for a job in a vacancy list or answering an advertisement Mention the job title (including any reference number), and say where and when you saw the vacancy. Highlight your strongest selling points, such as a relevant degree, appropriate qualification, related experience. Stress how you think the organisation can benefit from employing you. Add some other detail to reinforce your suitability, without duplicating what’s on the application form or CV. 4.5.2 Applying speculatively Remember, a speculative approach is not allowed in Northern Ireland. If you’ve worked through Section 2 in this book, you’ll know that to make a speculative approach you have to present your case in a letter, usually accompanied by your CV. Convey clearly what kind of work you’re seeking, your qualifications and what you have to offer. You’re trying to find out whether there are any vacancies, or whether vacancies will arise in the near future. At the same time you must leave the impression that you’re someone useful for the employer to know about. If there’s a vacancy this will, if done well, translate into being someone the employer ought to see. So make clear who you are, where you are, what you’re studying, then highlight the relevant points in the CV such as work experience, interests and activities. Say why you want to work for that particular organisation, and when you would be able to start. 4.5.3 Drafting your letter • Type or word-process your letter (though very occasionally an employer will ask for a handwritten letter). • Use plain A4 paper of good quality. • Keep it brief – usually not more than one side of A4. • Put your name, address, telephone number and date at the top right-hand corner and, on the left- hand side, the name, job title and organisation of the person you’re writing to. • Address your letter to an individual person by name and job title. Switchboard staff can be very helpful in supplying this information if it isn’t otherwise available. • When writing to a named individual, end ‘Yours sincerely’. If you do have to resort to ‘Dear Sir or Madam’, end ‘Yours faithfully’. • Although you should be business-like, steer clear of stilted expressions like ‘I beg to remain’. • Make sure your spelling and grammar are correct, and that you’ve expressed yourself clearly. Ask someone else to read it – don’t rely on your computer’s spelling check, especially as it may be based on US spelling. • Print your name clearly below your signature. • You can use your covering letter to give additional information such as reasons for an unusual change in career, or highlight aspects of your CV which you feel are particularly important. • If there are any special circumstances not covered in the application form or CV, such as a disability and how you overcome potential difficulties, mention them in the letter. Keep a copy of your letter. If you haven’t received an acknowledgement within two or three weeks, send a brief follow-up letter or telephone to make sure that it’s been received. Four examples of covering letters are set out overleaf. The first is a speculative approach asking for an advice interview from a director the writer doesn’t know. The second letter accompanies a CV in response to a newspaper advertisement. The third letter is applying for a graduate position, and the fourth is from a student applying speculatively for work experience in a law firm.
  • 95.
    95Getting the job Tofind out more, visit our website at www.open.ac.uk/careers Example 1 Speculative letter Joginder Singh 123 Warwick Road Kenilworth Warwickshire CV8 1EJ 01926 850973 Mr George Black Export Sales Director Blank Distribution Company 5 Blank Street Royal Leamington Spa Warwickshire CV35 8EE 10 February 2016 Dear Mr Black, I noted in yesterday’s Financial Times that your company received an export award from the Department of Trade and Industry, and I wish to congratulate you. Your success in selling computer components to Asian countries has been something few companies have achieved in the last few years. With your knowledge of exporting, I should appreciate your advice concerning the development of my career. Having had over ten years’ experience in export sales, including experience of exporting electronic, and computer based control equipment, I am now seeking a career change that will build on this experience. Some of my key achievements have been: • Locating new lines of products and developing international sales for them. • Selecting and working with local distributors throughout the world. • Increasing sales by 26 per cent in one year when the pound was at its highest exchange rate. Although I would like to work for your company, your advice and suggestions would also be helpful and influential in helping me research my options to develop my career. I should appreciate a personal meeting with you and will contact you in the next week to discuss this. Yours sincerely Joginder Singh
  • 96.
    96 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Example 2 Response to an advertisement Margaret Minty 8 Milton Avenue Edinburgh EH10 3PQ 0131 668 1394 Mrs Shirley Barrett Personnel Manager Fairplay Industries Ltd 123 Evergreen Way Milton Keynes Buckinghamshire MK10 8VS 6 March 2016 Dear Mrs Barrett, Assistant Finance Director, Fairplay Industries Ltd. I am enclosing my CV in response to your advertisement for the above post which appeared in The Daily Telegraph on 1 March. I am a qualified accountant with substantial professional experience. I have particular interest in computer-based accounting procedures and posess extensive staff management experience. Working in a team alongside other senior management colleagues, I have brought about a sustained improvement in my office’s financial performance over the past five years. I have recently taken voluntary redundancy as a consequence of a nationwide organisational restructuring programme. My decision was based on a desire to change employers in order to broaden my professional experience as I am keen to develop my career in a managerially demanding environment. Having read the detailed description of the post, and discussed specific aspects with the Finance Director over the telephone yesterday, I am confident that I could make a significant contribution to Fairplay Industries Ltd. Although I currently live in Edinburgh, I am free to relocate to another area and see this as a positive addition to my professional and personal development. I look forward to hearing from you. Yours sincerely Margaret Minty
  • 97.
    97Getting the job Tofind out more, visit our website at www.open.ac.uk/careers Example 3 For a career change Peter Evans 11 Wood Lane York North Yorkshire QQ1 3ZZ To: Mr K. Jackson Recruiting Manager The Environment Agency Midtown MDT 8XX 9 April 2014 Dear Mr Jackson, Vacancy for Graduate Trainee Consultant – Countryside and Environment I would like to apply for the graduate trainee position within the Countryside and Environment Sector. I enclose my CV for your consideration. The opportunity to work for the Environment Agency appeals to me because of the innovative nature of the organisation and the explicit commitment to protecting and improving the environment. This training programme offers the opportunity to experience a range of functions which correlate directly with my specific interest in countryside management and my broader interest in the diverse project work undertaken by the Environment Agency. I am specifically interested in the sustainability of habitats and the environment because it is an area that I am familiar with and relates very closely to my academic studies. I have been involved for 8 years in a local project which protects natural habitats through the planting of trees and creating new areas for wildlife. I also spent 4 weeks as a conservation volunteer on a Sea Turtle preservation project in Greece. In terms of my suitability to the post, I have developed a strong technical skill set through academic fieldwork and a range of practical project work. However, I am conscious that this role requires more than a strong technical background. My wider experience in the IT sector allied to my extra-curricular interests and activities have enabled me to develop strong interpersonal skills, to communicate effectively, to solve problems and to make sound decisions. These skills have become particularly evident in my voluntary work for the York Conservation Society, where I have organised practical conservation trips on a weekly basis. Thank you for your time and consideration and I look forward to hearing from you in the near future. Yours sincerely, Peter Evans
  • 98.
    98 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Example 4 For work experience Amerjit Kaur 78 Aston Street Coventry ZX42 6XY 06321 496284 To: Mr A. Sherman Partner Sherman & Wilkes 3 Royal Street Coventry ZX38 5PS 3 February 2016 Dear Mr Sherman, I am writing to you to inquire about the availability of work experience at your legal practice in the near future. I am due to complete my Bachelor of Laws (Honours) with The Open University this year and I am looking to enhance my experience by gaining a short work placement of one or two weeks during June or July. I completed a short placement with a local solicitor last year which I found very useful. However, I feel I would be more interested in training with a commercial firm, and would like to gain some experience in this sector before applying for training contracts next year. I am interested in the aspects of legal work which Sherman & Wilkes can offer, including probate, conveyancing and litigation, and the range of clients with whom you deal. I feel that a short placement with your firm would provide me with an excellent insight into this work. I feel that experience gained from my previous employment has equipped me with some relevant skills which will be useful to me in a legal career. This included working in the social services department of a local authority, where I was often responsible for interviewing clients about their circumstances and personal situations. This called for good interpersonal and communication skills, as well as a need for empathy and discretion. I have enclosed my CV which I hope will be of interest to you. I look forward to hearing from you in the near future if you feel you are able to offer me a short placement this summer. Yours sincerely, Amerjit Kaur
  • 99.
    99Getting the job Tofind out more, visit our website at www.open.ac.uk/careers do most of the talking – in effect determining the content, while the interviewer sets the format. • A few seconds silence in an interview can seem an eternity. Don’t be panicked into responding too quickly, perhaps in an illogical way. Fill a thinking gap with comments such as ‘That’s an interesting question, I need a moment or two to think about it.’ • Always try to be positive in what you say and never be critical of a previous employer. • Guard against being too open. • When asked whether you have any questions, it can be useful to ask about future business plans. If the interview has already covered that, use the opportunity to add relevant information about yourself that you haven’t had an adequate opportunity to express. From a careers advice perspective, employers have always said to me that they will always interview an OU graduate because anyone who can achieve an OU qualification is a certain kind of person. BA Open Graduate From the vast amount of research into interviews as a selection method, some important insights for candidates emerge: • Some interviewers make up their minds about candidates within the first four minutes of an interview, and aren’t easily swayed by factual information thereafter. First impressions count; initial answers are critical. • Interviewers are more likely to be swayed by negative information or behaviour on the part of the candidate than positive. Interviews tend to exclude rather than to include. • Interviewers may be poor at assessing the personality characteristics of individual candidates with any validity, but they make very consistent judgements and assessments between candidates. This suggests that a good interview performance is likely to impress. • A candidate’s body language (for example, not maintaining eye contact) in an interview can be more important in determining its outcome than experience or qualifications. • Interviewers’ judgements about a candidate are always made in relation to judgements about earlier candidates, so the sequence of interviews assumes an importance of its own. If you’re given a choice, go first. You can set a standard against which the others will be judged. 4.6 The interview Interviews remain the most common method of filling vacancies. There are different formats of interview you may face: • Face-to-face: This is the most common, and can be in the form of a one-to-one meeting or there may be a sequence of interviews, each with a different member of staff. • Telephone: These are as formal as face-to-face interviews, so you need to be well prepared. • Panel: You will meet several interviewers in one interview. Try not to be put off by panel members making notes as you speak. • Video interviews: Graduate interviews by video, can also be used during the screening process. This can be a live connection with an interviewer or a pre-recorded video questionnaire. Different types of interviews you may encounter are: • Competency-based: Interviewers ask you questions relating to the skills and competencies needed for the job. You therefore need to know what they are, and have prepared some examples from your experiences to demonstrate them. • Strength-based: A relatively new approach to assess candidates. Questions are based around what you enjoy doing, to identify where your natural aptitudes lie. This method prevents candidates from giving pre-rehearsed answers. Here are some initial tips for interviews: • Interviewers want you to do yourself justice. They’re hoping that you’ll be an excellent candidate and that the interviewing time and effort will be well spent. • Interviewers too may be inexperienced or nervous. It’s up to you to help them out and make them feel comfortable. • When faced with a panel of interviewers you should address the majority of your response to the interviewer who has asked you a question whilst ensuring that you still have some eye contact with the rest of the panel. • Show acceptance of the interviewer as a person. Remember that interviewers want to be liked and hope to be supported in their day-to-day work and career by your appointment. They’ll be asking themselves ‘Could we get on?’ ‘Would this person be supportive?’ • Balance the initiative-taking. The ideal interview should flow like a conversation, reaching greater depths as the rapport develops between the two parties. Neither should psychologically dominate the discussion, although as the candidate you should
  • 100.
    100 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 4.6.1 Interviewers Below we list the four main types of interviewers you may come across. Don’t let your own stereotyping of the interviewer affect your interview technique. Remember that when managers interview they’re playing a role to a set of social rules, and may not be entirely their usual selves. Their perspectives may differ according to their job function: Human resource/recruitment managers Well-trained and experienced, often astute and very sensitive Acting as internal screener, judgement valued by others Likely to concentrate on personality and organisational ‘fit’ May have a fund of knowledge about company culture Head of a group or department A technical expert with wider managerial experience Will talk shop, problems, solutions, within a broader organisational framework May have standard questions, pick bits from CV Concerned about your professional competence and the rapport between you Line manager or decision-maker Trying to assess your style of working Concerned about your motivation, achievements and personal ambition Considering how you’ll fit with the rest of the team May have to ‘sell’ you to more senior colleagues Serious but relaxed, may try to ‘sell’ the job Managing director or company founder May digress into lengthy company history Concerned about cultural fit; may look for shared vision May be looking for someone who’ll question or act as an agent of change Will seek views from all those who’ve come into contact with you You could read all the books ever written on how to do well at interview and still not be good at it. Practice is essential. Even experience as an interviewer doesn’t make for a flawless performance, for insight often leads to heightened anxiety. How you project yourself through your social and communication skills will determine your success whenever you speak with potential employers. Find out all you can about interviewing techniques and be ready to cope with them: • Read about the process. Consult some of the resources listed at the end of this booklet. • Think about the interview and plan for it. Try to foresee questions or situations and work out possible answers. • Practise by role-play with a partner, careers adviser or colleague, or use audio or video recordings. How you sound will be crucial. Practise speaking on the phone to a friend and ask what impression you’re making. Practise some answers into a voice recorder and listen critically to yourself. • Ask for comments from a partner, network contacts or interviewers who have rejected you. • Learn from observing others – take the role of interviewer with a partner. • Reflect on your experience. Evaluate your performance and incorporate the learning into your next interview. 4.6.2 Before your interview • Research the job and employer again thoroughly beforehand. If you can, find out something about the people interviewing you. • Review your CV or re-read your application form. Why have you been invited for interview? What are your unique selling points? Questions are likely to focus on: - your achievements - your motives for applying - your likely contribution. • Prepare by marshalling your material in advance. Collect as many concrete examples of things you’ve done that clearly demonstrate your skills as you can. Read the section on ‘Tough questions’ in Section 4.6.9 and practise some answers out loud.
  • 101.
    101Getting the job Tofind out more, visit our website at www.open.ac.uk/careers • Think about what kinds of skills may be important to perform well in the job. • Think about times in the past when you have demonstrated your abilities, e.g. successful projects; successful interactions with other people; convincing a difficult audience; analysing a large amount of information, etc. Don’t just think about job-related examples – you may have excellent evidence from your study, hobbies or other activities. • What are your weak spots and what do you feel uncomfortable talking about? • Why would you not employ yourself? Produce convincing counter-arguments. • Practise your answers in the weak areas. Ask a careers adviser or a friend or colleague to help you. Do it out loud, record it and listen to it again. • Prepare some questions that you would like to ask. Having questions prepared shows your interest in and keenness to develop within the organisation, e.g. ‘How is performance and development assessed?’; ‘How is the job likely to develop over the next two years?’ • Plan travel and arrival times, and if possible do a dummy run. • Decide what to wear. Show that you know the interview ‘rules’ by wearing smart clothes, polishing your shoes and so on. Conservative dress is more likely to pay off than flamboyance. Try the whole outfit some days before, so that if it doesn’t feel right you’ve got time to change your plans. Dress appropriately for the culture. If you’re very unsure about this, look at company literature or their website to get an idea of how people dress. If there’s no suitable literature you could telephone and ask the person on the switchboard or the secretary of the person interviewing you. 4.6.3 On the day … • Don’t smoke before you go into the interview. • Don’t be overburdened with bags, papers, umbrellas. • Arrive in good time, allow yourself time to relax. • If you are delayed, telephone. • Remember the need for a poised, confident first impression. • Listen carefully and attentively to the questions; ask for repetition or clarification if you don’t understand a question. • Remember to take a copy of your application with you. • Don’t forget to turn off your mobile phone. 4.6.4 How you sound • Sound as if you have confidence in yourself. • Speak clearly. Don’t drop your voice towards the end of sentences, and don’t mumble or speak too fast. • Use plain language that doesn’t confuse the interviewer, or divert off at a tangent. Avoid jargon or clichés. • Speak concisely, be specific, and judge when you’ve said enough. Watch the interviewer’s behaviour, which will give you clues to whether you are answering the questions and timing your replies appropriately. If in doubt ask ‘Would you like me to go on?’ • Show through your answers that you’ve done your research into the company and tailored your answers specifically to them. • Don’t just tell them what you think they want to hear. • Make sure you answer the question that is being asked. • Convey the right amount of enthusiasm, warmth, friendliness and sincerity. Smile! • Avoid negative statements. 4.6.5 Body language • Walk and sit with good posture. • Shake hands firmly and briefly. Some people need to practise this. • Use your natural gestures – there’s no need to look frozen! • Avoid fidgeting, and keep your hands away from your mouth. • Don’t fold your arms. • Maintain good eye contact with the person you’re speaking to. Take evidence of your achievements to the interview in a personal portfolio. This will really help you to stand out from the crowd and will aid your preparation for the interview by reflecting on your greatest achievements to date. Graduate Programme Manager The Co-operative Group
  • 102.
    102 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 4.6.6 Answering questions Whatever the nature of the job, the interviewer will be working to a mental model consisting of three related profiles, or groups of characteristics – your personal, professional, and achievement profile. It’s your task to provide evidence in your answers that demonstrates these characteristics. Personal profile Professional profile Achievement profile Intellectual ability Knowledge Effectiveness Communication skills Reliability Efficiency Listening skills Integrity Economy Confidence Commitment Job motivation Energy and drive Endurance Development Financial motivation You also need to be prepared to adapt your responses to the different kinds of question: Specific questions invite factual replies, often with a technical content, e.g. ‘What problems did you encounter in the early planning stage of the building extension?’ Open questions used by skilled interviewers encourage expansive replies incorporating both facts and attitudes or feelings, e.g. ‘Tell me about the three years you spent studying with The Open University.’ Hypothetical questions test speed and quality of thought, e.g. ‘What if the policy changed to carrying more freight by rail?’ In reply be methodical, state assumptions you’re making, and say where you’d need more information, e.g. ‘Would this just be in the UK or the whole of Europe?’ There is usually no right or wrong answer – the interviewer is looking for logical, clear thinking. Competency-based questions look for you to talk about your skills, qualities and competencies relating to the job. The basic ethos of a competency-based question is that if you can demonstrate you did something in the past, you can do it in the future. These questions would normally ask for an example of a situation in which you have shown that skill, and how you would deal effectively with it. Questions often begin ‘Can you tell us a time when…’ Technical questions ask you to demonstrate your knowledge of specialist concepts and terminology. These often feature in engineering, scientific and IT interviews. If you would like further help on types of interview questions you may encounter, have a look at the interview preparation activity on the careers website: http://www2.open.ac.uk/students/help/interview- preparation-activity 4.6.7 After the interview • Think about the questions and your answers. Did you do yourself justice? Did you allow negative information or negative expressions of feelings to creep in? Did you find a particular question difficult? If so, write it down to help you prepare answers for the future. • Send the employer an informal thank-you note soon afterwards. This reinforces recollections of you. Even if you’re unsuccessful this time, there may be other positions coming up. If you fail to plan, you plan to fail. Pause for thought They also threw in test questions. They take one of your stated positives and then ask whether you are weak in the opposite. So my talk about liking new challenges sparked the question if I was easily bored. And I answered doing the same every day would bore me rigid. Turns out they really like the frank answers and the fact that you don’t wiggle out of these. OU Student
  • 103.
    103Getting the job Tofind out more, visit our website at www.open.ac.uk/careers • Do you sound confident and interested, or monotonous or tentative? • Don’t forget to smile when you’re talking on the telephone, as you would when talking to someone face to face. The smile won’t be seen but it can be heard. • Standing up while talking can make you sound more confident. • Some candidates dress in the clothes they would wear to an interview to put themselves in the right frame of mind. There’s some general advice about using the telephone effectively in Section 2.5.2. 4.6.9 Tough questions … Bear in mind that these are asked to check how articulate and poised you are, and how well you handle stress. Graduate Recruitment Manager Credit Suisse Everyone has a different perception of what constitutes a tough question. Here are some tips to help you through them followed by some examples and how to approach them. In general: • If you feel yourself under pressure, you’ll tend not to listen so acutely. Ask for the question to be repeated, take time and keep to the point. When you’ve answered, stop and leave it at that. • Try to show that you understand why the interviewers have asked you the question. If you can show that you know what they’re getting at, you’re halfway to giving an appropriate answer. • In response to embarrassing – rather than simply tough – questions, keep your answer simple and short. • Always put a positive spin on your answers to difficult questions. If you lack a particular skill, try to emphasise how quickly you learn and can develop this. A wide range of questions is covered in Great Answers to Tough Interview Questions by Martin Yate (see the end of this section for further details). Look through the next examples – you’re bound to come up against some of them in one form or another. • If you’re rejected, write a letter asking for some constructive feedback by telephone, at the employer’s convenience. Seek feedback from the people who are screening you out. They can give tips for future applications and point you in the right direction. You will have to swallow some pride in making the call but, if it helps you gain the job you have always wanted, it’s worth a go. Each failed application should be a learning experience. HR Director, Europe Enterprise Rent a Car 4.6.8 Interviews by telephone Increasing numbers of companies are using the telephone in the first stage of the interviewing process. They do this in several ways: • Fully automated: you receive a letter giving a freephone telephone number to ring. You hear a list of statements and press a number on the telephone keypad to indicate your response. • Structured: a mutually convenient time is fixed in advance for the interview. You’re taken through a series of questions that are recorded and analysed by trained interviewers. The questions are designed to establish whether or not you have the required skills for the job. • Screening: you’re questioned on various aspects of your CV or application form to decide whether you’ll be invited to a personal interview. • A sales exercise: you’re given an opportunity to sell a product over the phone. This technique is used for recruiting sales, marketing or telesales staff. The advice that follows about face-to-face interviews below applies just as much to telephone interviews, but some things are especially important: • Try to arrange the interview for a time and place where you won’t be interrupted. • Keep your application and any other pre-prepared notes with you. There are no visual cues so greater importance will be placed on your telephone manner, tone and pitch: • Do you speak loudly enough? • Is your voice clear or do you have a tendency to mumble?
  • 104.
    104 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Examples of tough questions and how to answer them Q What are your strengths? A You’ll have become aware of these through your self-analysis. Draw on examples from the three profiles – personal, professional and achievement – we discussed in ‘Answering questions’ above to produce a rounded picture. Include any particular characteristics that you feel relate to the job. Q Tell me about yourself. A Cover relevant aspects of your life, e.g: Early years (if appropriate) Education Work experience Significant events Keep your answer short (three to four minutes). This question needs practice. Remember that this question isn’t simply about your factual history so don’t give too much detail. It is your chance to provide an overview and at the same time to throw in leads that you hope the interviewer will take up. Q What are your weaknesses? A Don’t claim to be faultless! Most strengths taken to the extreme become weaknesses. Either choose one that isn’t particularly significant, or pair one with something that can be turned from a weakness into a strength (e.g. conscientiousness) to end on a positive note. Or explain how you had a weakness (e.g. time management) but have taken action to overcome it. Use phrases like ‘learning a valuable lesson’ rather than admitting to making a mistake. Q Why should you be appointed rather than an internal candidate? A This is an invitation to list your main strengths. Try to restrict yourself to four or five as too long a list will confuse the interviewer. Draw attention to the possibilities of bringing in skills or experience that the company would benefit from, the fresh perspective of an outsider, and the ‘political’ gains of instigating change through appointing an outsider. You could also provide evidence of being a quick learner. Q How much are you worth? A Try to delay answering this until you know the responsibilities and scope of the job, and the typical salary ranges. Mention your previous salary and any financial commitments that lead you to raise or lower your expectations. Negotiations like this might seem strange to you if your only experience is of fixed salary scales. Q Having worked for one company for so long, what difficulties do you expect in adapting to our culture? A Make it clear that you understand the importance of the concept of culture by mentioning the internal diversity of companies and organisations you’ve had contact with. Describe how you’ve adapted to different subcultures you’ve encountered by doing different jobs in your career. Q Isn’t it a bit late in your working life to change career? A It is perhaps unlikely that you would be asked this, particularly in view of age legislation introduced in 2006 but you never know…! The interviewer could be suggesting either that you’re too old to adapt or that you haven’t got a realistic appreciation of the demands of the new job. Concentrate on the many positive features of your greater maturity: experience of life and work, credibility with clients, emotional stability, coaching and mentoring skills, domestic stability, freedom from childcare. Then express your motivation and drive, to counter any thoughts that you might simply be looking for a refuge. Add a balanced, well-reasoned argument for your choice of this new kind of work. Q How have you tried to stay up to date? (Age is commonly associated with obsolescence of skills or knowledge and ineffectiveness. There’s no research evidence to support this assumption.) A Quote samples of your own recent learning, either at work or at leisure. If possible, relate this to the job you are applying for. It is also important to emphasise IT skills and keeping up with professional journals/research in the area.
  • 105.
    105Getting the job Tofind out more, visit our website at www.open.ac.uk/careers Q How would you describe your management style? A Have a well thought-out answer ready. You might start by briefly describing how your style has developed as you’ve grown in experience and social expectations have changed. Concentrate on flexibility, your variations in style according to different people and different tasks. Relate your answer in the final stages to the job you’re applying for. Q Why do you want to work for us? A Your research will pay off here. Be honest. A trite or bland answer will seriously undermine your application. Include a reference to how important work is to you, and your hope that some of these needs will be met. Q What are your ambitions? A Concentrate on your desire to do the job well and to develop your skills and confidence. Statements about far-reaching ambitions should sound realistic. Make clear statements about your willingness to shoulder responsibility and say that you would consider career progression within the company at an appropriate time. Q Do you not feel that you might be over- qualified (or too experienced) for the position we are filling? A A strong company needs highly competent people with appropriate experience to deal with current problems. Uncertainties in the business environment will probably lead to growth opportunities for the company and you. Emphasise that you are adaptable and respond positively to circumstances and would not necessarily expect to use all of your skills in the first instance. Q What were the circumstances of your leaving your last employer? A Keep your reply short and don’t touch on any conflict or bitterness. Create a favourable impression based on the things you’ve done to help yourself. Emphasise your desire to develop your skills by moving to a more demanding job. Q Why has it taken you so long to find a new job? A Finding any sort of job is easy; finding an appropriate job takes time. Mention steps you’ve taken to keep up to date, mentally sharp and so on. Q If you had complete freedom of choice of jobs and employers, what would you choose? A Talk about the kind of work you’re being interviewed for and why this company interests you. Q What interests you least about this job? A Choose a routine activity (filing, filling in expense claim forms), but be careful that it isn’t a core function of the job. Plead ignorance about other potentially boring duties. Q What sort of relationship did you have with your last manager? A Concentrate on understanding your manager’s expectations and objectives. Include examples of support and how you kept your manager informed. Q What things might make an application from an OU graduate stand out to an employer? A The fact that someone has been able to balance both a full-time job and study at the same time. The level of motivation required is impressive, and demonstrates ambition and a desire to improve one’s skills. Time management, hard work and commitment are probably the three main attributes that I have developed through studying with the OU. Open degree graduate
  • 106.
    106 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Activity 4.4 Here are some more examples of interviewers’ questions to think through yourself. • Why did you decide to study with The Open University? • The classic three-part question: What kind of people do you like to work with? What kind of people do you find it difficult to work with? How have you worked successfully with this difficult type of person? • What are your short-, medium- and long-term goals? • Why have you decided to change careers? • What are the main challenges facing (e.g. the Health Service, education, this company…) today? Do you feel well equipped to meet those challenges? • None of your experience is at managerial level. How would you cope with the transition? • How long would you expect to stay here? • How would you describe yourself? • In your present/last job, what do/did you like most/least? Why? What was your greatest success? What has been your biggest failure? • What do you see as the most difficult aspect of (e.g. this job, being a manager…)? • How do you react to criticism? • How do you feel about the progress you made in your present/last position? • In your present/last job, what do/did you spend most time on, and why? • Do/did you have any frustrations in your present/last job? • What did you learn from (e.g. your last job)? • What is the most difficult decision you have faced? • What kinds of decisions are most difficult for you? • What area of your skills or professional development would you like to improve? • Describe your ideal job. • Why should we appoint you? • Have you any questions? For academic jobs: • What publication are you most proud of and why? • What do you see as the main benefits of your research? • Tell me about your PhD research assuming that I have no background knowledge. • What would you find easy about teaching undergraduates and what would be challenging? Don’t forget that you can ask a careers adviser for help in preparing for interviews. 4.7 Other selection techniques Larger employers, aware that interviews have many shortcomings, are increasing their use of additional tools. One such tool is the use of assessment centres – these are not places, but a technique (a mixture of tests, exercises and interviews) for recruiting new employees, particularly at graduate level. You would normally find out about the way an organisation uses these by researching their recruitment literature or website. 4.7.1 Assessment centres This approach has been defined as ‘the use of any selection device, in any combination, beyond the interview’. It can include situational activities, group discussions, in-tray exercises and the like, as well as interviews and psychometric tests. If you are asked to attend an assessment centre, here are some general guidelines: • Don’t be intimidated. All the other candidates will be nervous too. Because assessment centres are more thorough, they are fairer to you.
  • 107.
    107Getting the job Tofind out more, visit our website at www.open.ac.uk/careers • The company is looking to assess a range of competencies. Each competency will be assessed at least twice, so you will not be limited to just one opportunity to demonstrate a particular skill. • Decisions are made by drawing on all the evidence; failure in one or two elements won’t automatically mean rejection. • Different assessors are involved so that there is a more objective view of your skills. • Try to focus on your own performance rather than that of others and don’t assume that she or he who shouts loudest will win. The ability to listen and support others is also highly valued. • Assessment centres sometimes have the advantage that they give you longer to judge the organisation and the people within it. Treat the assessment centre as a two- way process: use it as a chance to find out more about the company. Have some questions prepared before you go – the interviewer will usually give you the chance to ask them, and it looks quite poor if you don’t seem to want to know anything more about the company. UK Graduate Recruitment Manager Logica Get yourself ready, both mentally and physically: • Your invitation may include a programme of events. Study it carefully, paying attention to any special instructions. You might be asked to prepare something in advance, or bring your own calculator, for example. • If you have a disability and need special arrangements (e.g. induction loop, special seating) discuss it with the selector in advance. If you wear glasses for reading, make sure you take them with you. • Take the pens and pencils you like to write with. A highlighter pen could be useful. • In summer, choose something that’s cool as well as smart to wear. You may face hours of hot sticky work in examination conditions. • Try to get a good night’s sleep beforehand. When the time comes: • Arrive in good time. • Make sure that you know exactly what you’re required to do. Don’t be afraid to ask questions. • Go to the toilet before major exercises; they can last several hours. • Take care at social events: rich food and drink dull the brain! • Try to ensure that you talk to as many of the company representatives and other candidates as possible – don’t just limit yourself to one or two who seem the friendliest. • Assume that you’ll be closely observed the whole time. Further resources For further information and resources on assessment centres go to: www.prospects.ac.uk/careers-advice/interview-tips/ assessment-centres http://www2.open.ac.uk/students/help/assessment- centres To practice some of the things you might be asked to do at an assessment centre, go to: www.assessmentday.co.uk/in-tray-exercise.htm www.assessmentday.co.uk/situational-judgement- test.htm 4.7.2 Psychometric tests Psychometric tests are structured pencil-and-paper or computer exercises, often in the form of multiple- choice questions. They’re designed to assess your reasoning abilities, or how you respond to different situations. The tests should have been carefully researched and tried out to ensure that they’re fair to everyone who takes them. Your results are usually compared with how others have done on the tests in the past. The tests are used in a variety of ways, depending on the organisation and more usually by large blue chip companies: • as a selection exercise before an interview • to accompany an interview selection • as part of a number of selection exercises at an assessment centre. There are two main kinds of psychometric test: • Aptitude, cognitive, ability or intelligence tests These aim to assess your capabilities in tests of reasoning: that is, the level and nature of your thinking skills (typically, verbal, numerical and perceptual skills). • Personality questionnaires These gather information about how and why you do things in your own particular way. They look at how you react or behave in different situations, and
  • 108.
    108 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers your preferences and attitudes. Unlike aptitude tests, they have no ‘right’ or ‘wrong’ answers. The selectors aren’t looking for a rigidly ‘typical’ personality, although certain characteristics will be more or less appropriate for the job (e.g. for sales personnel, independence, social confidence and persuasiveness would be considered important characteristics). Decisions about senior appointments are never based on test results alone. In fact, a good test can offset weaknesses in interview performance – it never seems to work the other way round. Tests are designed so that you have a few items to practise on first, but if you’re anxious about them, getting in some practice will probably make you feel better. You will find practice tests at: www.shldirect.com and www.jobtestprep.co.uk/freepsychometrics.aspx When it comes to completing the tests: • Read the instructions carefully and follow them precisely. • Some ability tests have tight time limits and too many questions to do in the time allowed. • Others, such as personality and interest questionnaires, have no time limits. • Ask during the practice session if you don’t understand. Personality tests are easy to fake, but there are dangers in trying to do this. For one thing, most tests contain ‘lie scales’, for another, you’ll have to guess what sort of personality the company is looking for. Some selection procedures include a discussion about the test results with a psychologist, and faking then becomes very difficult to sustain. Honesty is the best policy. If you have a disability that you believe may affect your ability to do these tests, it is advisable to talk to the employer about this beforehand to discuss whether there are any alternative arrangements that would be appropriate for your situation. 4.7.3 Written exercises Typically, you’ll be given a lot of written data and asked to write a report, outline a proposal or draft a letter. A suitable structure for your answer is likely to be: • A redefinition of the problem (by drawing out the key issues). • Setting out the main options, with their pros and cons. Don’t ignore the possibility of recombining parts of different options. • Recommendation of an option, with your reasons (is it practicable, and how?). If you’re faced with a written exercise: • Follow the instructions. Like examination candidates, applicants who fail selection tests often do so because they don’t answer the questions. • What’s usually wanted is a business report, not an essay. Make liberal use of subheadings and bullet points to make your answer easy to read. • Don’t spend so much time thinking and planning that you haven’t got time to write the report. • Don’t rework chunks of the brief. The marker will be looking for original thought. • Make assumptions explicit, and if more information might be needed say what it is. If asked to do so, come to a conclusion or recommendation, with reasoning to support your choice. • You won’t get any marks if the marker can’t read your writing. If you have trouble with it, don’t use a ballpoint pen – it tends to make things worse. Concentrate your thinking and be succinct in your expression so that you have less to write. • Remember to put your name on all the sheets of paper you use. 4.7.4 Presentations These are often used as part of an assessment exercise. They’re easy to set up and provide a useful sample of logical thinking, communication skills and persuasiveness. Sometimes you’re told the topic before the day, sometimes during the assessment centre, but you’re always given time to prepare, and you may have access to audio-visual materials. You may need to make your presentation just to the selectors, or sometimes to the other candidates as well. There could be questions afterwards. Keep the presentation simple. Remember the rubric: Tell ’em what you’re going to tell ’em Tell ’em Tell ’em what you’ve told ’em Keep in mind some general advice about presentations: • Whatever the instructions, see it as a task in which you have to convince or persuade the selectors. Talk directly to them. Make it a lively delivery. Never read from a prepared script. How you say it is as important as what you say. • Don’t be tempted to produce complex visuals. You’ll probably have only five minutes of presentation time, not enough to do them justice. • Keep a careful eye on the time; don’t over-run, but make good use of your allowance. If you’ve been asked to prepare in advance, practise so that you’ve got the timing right. Candidates often fail through producing two to three times too much material.
  • 109.
    109Getting the job Tofind out more, visit our website at www.open.ac.uk/careers 4.7.5 Group discussions Three to eight candidates sit in a group and discuss one or more topics, with the selectors acting as observers. Very often you’ll be set a task as a group or given a case study to look at. The observers will be making notes about the quality of your contribution (logic, verbal expression, relationship with other participants). • Be clear about the aims of the exercise: keep the group focused on the task. • Make an early contribution, but not necessarily the first. • Be supportive and pleasant to the other candidates. Be cooperative; remember that getting the best out of others is a skill in itself. You’re not going to be judged on your ability to dominate. • Mentally ‘stand back’ occasionally and evaluate what’s happening. Intervene if there’s loss of direction, or conflict between the other participants. • Keep a careful eye on the time. If you have to reach a decision within thirty minutes, remind the group if necessary. Make a point of discussing your strategy and interpretation of the group discussion with the interviewer later, even if you’re not asked to do so. 4.7.6 In-tray exercises These simulations of the administrative aspects of a job can be very taxing. You may be asked to respond quickly (in timed conditions) to a number of typical questions or issues that may crop up in a job and say what you would do and how you would prioritise tasks. They’re usually set in an unrealistic scenario that prevents you from talking to other people in the organisation (e.g. colleagues are ill, abroad, it’s Saturday afternoon). The qualities most likely to be assessed are analysis, organisation, decision- making, judgement, and ability to communicate in clear English. How to go about it: • It may be possible to take the in-tray apart and sort it into heaps. If you like to work like that, make sure that it’s permitted. You may be allowed to use the floor if the desk isn’t big enough. • Read the instructions carefully and plan your time accordingly. • If the first part of the exercise asks you to set priorities, follow this up by tackling the items according to those you set. Don’t just put your head down and plough through the lot. A well constructed test in-tray will contain distracting trivia, just like a real one. • Look for links within an in-tray, and between in- trays if there’s more than one. Signal in your comments that you’ve spotted these links. • Remain balanced in your judgement. A cleverly constructed in-tray will generate emotional responses that can cloud decision-making. Staffing issues are most likely to spring this trap. • Give reasons for your decisions; make reporting and follow-up clear; set timescales; use your diary and your secretary well. Treat the whole exercise like real life, with appropriate levels of formality and informality in your responses. • You can be judged only on what you’ve written down, not on what went through your head. Best marks are obtained by candidates who produce the largest volume of appropriate written output. • Don’t be discouraged. Most candidates find these tests tough. It can be difficult, but try to relax and enjoy the day. Employers want to see what sort of person you are, what skills you can offer now, and what you have the potential to do in the future. Don’t try to put on an act for the day – you will never be able to keep it up for a whole career. Surround yourself with positive people before you go – if they are reminding you about what a great asset you will be to the company, you will feel more positive about your chances and this will come across on the day. UK Graduate Recruitment Manager Logica 4.7.7 Biodata analysis ‘Biodata’, a contraction of ‘biographical data’, means that details of an individual’s history are correlated with the biographical details of others who have succeeded in the same occupation. The biographical data need not have any recognised link with performance, other than statistical correlation. Information may be collected from the standard application form, but often a special form is needed.
  • 110.
    110 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 4.7.8 Proficiency tests These tests are used to find out whether candidates have the skills they claim – 120 words per minute shorthand, for example, or 90 words per minute word-processing. Related tests of ‘potential for proficiency’ (trainability) assess characteristics such as hand–eye coordination. 4.7.9 Medical tests The job advertisement or person specification should state clearly whether a certain level of physical fitness is required. As well as general fitness, medical tests cover sight, colour perception and hearing. Pause for thought Getting the job you want is always a challenge, and may take time. By taking the trouble to reflect and to prepare, you’ll be maximising your chance of success. 4.8 What to do if you are not successful If you are not getting selected for interviews you can take various steps to improve your chances: • Review your CV or application form. Were they tailored to the specific job? Do they promote you in the best way? • Ask others to give you feedback on your applications. Talk to a careers adviser or friends/colleagues. • Think about whether you are applying for appropriate vacancies. Do you have the skills and experience they are asking for? • Look at your job hunting strategy. Are you only applying speculatively? Are you using a variety of different methods to search for jobs? Do you need to think about which sectors/employers you are applying to? If you are getting interviews but are not getting any further: • Ask for feedback from the employer. Finding out where you fell short on this occasion should provide invaluable advice to help you succeed the next time. • Review your interview technique: did you do enough research beforehand? Were you prepared for the questions? Ask yourself what you could have done better. • Talk to a Careers Adviser who can help you with your preparation. 4.8.1 Handling rejection If you have done all of the above, having asked for feedback to make sure that you have interviewed well, the next thing to bear in mind if you are rejected is to try not to take it personally. It is not a criticism of you; it is simply that in this instance you have been unsuccessful. It doesn’t mean that they thought you couldn’t do the job. It may mean that someone with more relevant experience has got the job, or that there was a strongly favoured internal candidate. If you were invited to interview it means that, on paper, the recruiters believed you could do the job. Interviewing is expensive and employers won’t waste time interviewing someone they feel is not qualified for the role in question. During times of recession competition for jobs can increase significantly and so it’s worth bearing this in mind if you are unsuccessful. It can help to reflect and make notes as soon as you come out of an interview. This could be listing what went well, what didn’t, and suggestions of how you might improve. Once you relax after an interview you may not remember as much detail. You can also compare your notes to any feedback you get by asking, ’How could I strengthen any future application?’ Try and treat the whole experience as something you can learn from. Remember, it took J.K. Rowling a year to find a publisher for her first Harry Potter book and some of the publishing houses made what was, with hindsight, an enormous mistake. It is important to try and stay positive and focused and persevere with your job search. Pause for thought Be prepared to invest time in your job search; remember it can take up to 3 months or longer depending on the industry, and this can be greater for more high-level roles.
  • 111.
    111Getting the job Tofind out more, visit our website at www.open.ac.uk/careers Further resources M. Parkinson (4th edition 2010) How to Master Psychometric Tests, Kogan Page. M. Byron (2010) How to Pass the Civil Service Qualifying Tests, Kogan Page. M.J. Yate (7th edition 2011) Great Answers to Tough Interview Questions, Kogan Page. For more information on CVs, go to our careers website and look at ‘Applying for Jobs’ section via the ‘Features’ tab: www.open.ac.uk/careers The Prospects website has useful information on CVs, applications and interviews under ‘Careers advice at: www.prospects.ac.uk The Jobs.ac.uk website has useful tips and advice particularly for academic careers: www.jobs.ac.uk/careers-advice You’ll find help and advice about giving presentations on our ‘Skills for study’ website: www.open.ac.uk/skillsforstudy/giving-presentations.php Think about your whole approach: are you tailoring your applications for the specific requirements of each company, or do you have a tendency to ‘copy and paste’ your information? If you are being asked for examples of when you have shown certain behaviours, focus on what action you personally took and what the result was – organisations are less interested in the background and situation (so keep this brief); they want to know what ‘you’ did, not what ‘we’ did. Head of Talent Management Royal Mail Notes
  • 112.
    112 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers
  • 113.
    113Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers 05 Equality and Diversity Issues 5.1 Age 113 5.2 Criminal record 114 5.3 Disability or additional requirements 118 5.4 Gender 123 5.5 Race 125 5.6 Religion or belief 127 5.7 Sexual orientation 128 Equality Act 2010 In April 2010 a new single Equality Bill for Great Britain brought disability, sex, race and other grounds of discrimination within one piece of legislation. This discrimination law protects individuals from unfair treatment and promotes a fair and more equal society. For up-to-date information on equality legislation, please look at the Equality and Human Rights Commission (EHRC) website at: www.equalityhumanrights.com. Note, however, that this Bill does not apply to Northern Ireland, which has separate legislation providing similar protections to individuals. What the law protects against Discrimination This includes: • direct discrimination – treating a person worse than someone else because of a protected characteristic; for example, their age or race • indirect discrimination – putting in place a rule or way of doing things that has a worse impact on someone with a protected characteristic than someone without one, when this cannot be objectively justified • failing to make reasonable adjustments for people with disabilities. Harassment • Unwanted conduct that has the purpose or effect of violating someone’s dignity or that is hostile, degrading, humiliating or offensive to someone with a protected characteristic, or in a way that is sexual in nature. Victimisation • Treating someone unfavourably because they have taken (or might be taking) action under the Equality Act or supporting somebody who is doing so. As well as these characteristics, the law also protects people from being discriminated against: • by someone who wrongly perceives them to have one of the protected characteristics; for example, a disability, • because they are associated with someone who has a protected characteristic – this includes the parent of a disabled child or adult, or someone else who is caring for a disabled person.
  • 114.
    114 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers The same principles of career planning and job seeking apply to everyone regardless of their background. In this section we highlight some of the additional challenges that may be faced by students and graduates. Many employers have well-developed equal opportunity and diversity policies to help them to recruit a diverse workforce. In fact, some organisations aim specifically to recruit a workforce that reflects the community they serve, and you will often see this highlighted in job advertisements. However, there is evidence that certain groups of people are at a disadvantage and may experience difficulty in achieving their career aims and aspirations. This section will explore a range of issues related to equality of opportunity in relation to: • age • criminal record • disability or additional requirements • gender • race • religion or belief • sexual orientation. Each section includes a discussion of some of the issues you may encounter, the legal position, strategies to help you in your job search and further resources that you may find helpful. For more information and links on job-seeking strategies when facing discrimination, go to: http://www2.open.ac.uk/students/help/equality-and- diversity Pause for thought Keep in mind that disclosure of personal information during the recruitment process can be a concern for some people. The issues of whether, when or how you should do so; on your application form; on a covering letter; before or during an interview will be considered later in this section. We are also trying to promote diversity and, while our diversity statistics are relatively good for a law firm, we want to do much more. I was thinking about how to achieve a more diverse workforce when an obvious thought struck me – where better to find a group of diverse students than the OU? HR Director Beechcroft Activity 5.1 Note here any issues that could affect you at work, which you might like to discuss with a careers adviser.
  • 115.
    115Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers 5.1 Age Are you concerned that, having completed your degree, your age will count against you in the job market? 5.1.1 Your rights Equality law provides protection against discrimination, harassment and victimisation on the grounds of age. The regulations cover: • recruitment and selection • pay and benefits • training and promotion • termination of employment, redundancy and retirement. Employers can only treat people differently on the grounds of age if there is a genuine occupational requirement (GOR); however, this defence is likely to apply in very limited circumstances. Since April 2011, the default retirement age (DRA) has been phased out. This means employers cannot force an employee to retire at 65. Employment law gives some employees the right to request flexible working. These include parents with a child under 17 (or a disabled child under 18) and people helping to look after an adult relative who needs care. An employee who has worked for at least 26 weeks qualifies for the right to request flexible working, and your employer can only refuse if there is a clear business reason for doing so. It may not be logistically possible to offer flexible working to all members of staff in a services role. The Employers Network for Equality and Inclusion (www.enei.org.uk) states that ‘being an employer of choice in an environment with an ageing population means ensuring that employment policies and practices are attractive to all age groups’. Employers vary a great deal in their attitudes towards age and recruitment and with the increasing numbers of older applicants offering a wide range of qualifications and experience, selection procedures in large organisations are being reviewed. Having a degree is not enough to secure a job. Employers are looking for more than a qualification. They are saying, ‘Yes, you have a degree and...’. This is where you are able, as a more experienced graduate, to offer a range of transferable skills and experience to an employer. So, you need to present your experience and skills positively and highlight your ‘added value’. 5.1.2 How to help yourself in the job market Take a look at Section 4 on applying for jobs. Then contact Careers and Employability Services to get help with your marketing plan. Remember, hone your CV to highlight that ‘extra’ you can offer to enhance your application. This should also help you to feel confident about what you can offer to the workplace. If you haven’t had any recent work experience (paid or voluntary), then you could consider exploring your local options. For instance, look at the careers website for contacts for volunteering opportunities, or get in touch with Careers and Employability Services. It’s not enough to think that because you have completed a part-time degree, juggling study and home responsibilities, and paid work, that you are automatically going to be offered a job. This may feel unfair, especially when you have used all your spare time to get the degree in the first place. So, plan ahead and make use of the study breaks and any contacts you have to find out all you can about the area of work you are interested in. Many OU graduates have changed careers in mid- life; some have started new careers in their 50s. You do need to be clear about what you want and what you can offer. And you must be determined and active in your approach. Don’t be put off by negative reactions if at first you don’t succeed! Tell employers about your skills and what you have had to do to get an OU qualification. Most employers will be impressed by your commitment and motivation. Perhaps the most important thing to remember is that if you see your age as a problem, so will an employer. You need to think of all the skills and abilities that you can bring to the role to which you are applying, and be able to explain them positively to a prospective employer. Some areas of work look for maturity, and view life experience as an advantage e.g. counselling, psychotherapy, social work, occupational therapy, teaching and archive work. Nonetheless, it’s vital – whatever your aims – to research your chosen area thoroughly and market yourself effectively. As an older student, you are likely to have evidence of successfully balancing and prioritising your work, life and studies, and are demonstrating that you can continue to learn and adjust to new settings. Studying with The Open University also emphasises your commitment and motivation to yourself and career development, as well as your ability to work independently.
  • 116.
    116 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Here are some tips from the Association of Graduate Recruiters (AGR) and the Association of Graduate Careers Advisory Services (AGCAS) to help you maximise your potential for job seeking: • Produce a concise CV and match your experience to the job requirements. Be prepared to produce more than one CV. • Fully research each employer, starting by using the company website (if there is one available). • Be confident if you are offered an interview as this means your CV/application form has obviously been successful. • Use positive language in applications and interviews and never apologise for your age. • Create your own network using contacts from previous jobs/friends/family. • Identify the skills you developed in previous work, studies and general life experience, e.g. teamwork, communication, adaptability. • Stress your ability to hit the ground running – you know all about working for a living. • Demonstrate your experience when making effective business decisions and give examples. • Highlight your time management, organisational and self-motivational skills; you have just spent a number of years improving these through part- time study. • Demonstrate your flexibility and experience of studying and working in mixed-age environments. • Convey your reliability, loyalty and confidence to manage change. Further resources For the latest information on age legislation, go to The Employers Network for Equality & Inclusion, which now incorporates the Employers Forum on Age and works with organisations to promote best practice in equality and inclusion in the workplace: www.enei.org.uk Age UK has a good website with a section on work and learning that includes a very good sub-section on discrimination and rights. www.ageuk.org.uk/work-and-learning The Third Age Employment Network (TAEN) works for better opportunities for mature people to continue to learn, work and earn for as long as they want, or need, to do so. You can access the network at: www.taen.org.uk Equality and Human Rights Commission From the homepage, go to ‘Equality Act’, ‘Know Your Rights’ then ‘Age discrimination’. www.equalityhumanrights.com Equality and Diversity – Information for jobseekers on how to challenge unfair discrimination in the workplace is available on the Targetjobs website at: https://Targetjobs.co.uk/careers-advice/equality- and-diversity. 5.2 Criminal record If you have a criminal record, you may be confused about its implications for working in the future. Having a criminal record does not prevent you from getting a job, especially if it is spent and you no longer have to declare it. However, some organisations are exempt from the Rehabilitation of Offenders Act in the UK (similar legislation exists in the Republic of Ireland) and you will need to disclose all convictions whether they are spent or not. Some of your concerns may include: • Whether you must declare any convictions. • What impact a criminal record will have on your gaining and keeping employment. • How, when and if to disclose a conviction to a prospective employer. Your strategy will depend on whether the conviction is ‘spent’ and the type of work you want to apply for. 5.2.1 Your rights Under the Rehabilitation of Offenders Act (ROA) 1974, most convictions become ‘spent’, or forgotten, after a certain amount of time. Unlock (a charity for people with convictions) provides a table on their website which sets out the time it takes for the main sentences to become spent, following changes to the Rehabilitation of Offenders Act that were introduced in 2014. This is known as the ‘rehabilitation period’ for the conviction. A conviction may have a number of rehabilitation periods depending on the sentence – in this situation, the longest one applies. You can read about this on: http://hub.unlock.org.uk/information/rehabilitation- of-offenders-act-1974/ There are, however, certain exceptions to this depending on the sentence you were given and the type of work you want to do. For some areas of work, such as ‘regularly caring for, training, supervising or being in sole charge of persons aged under 18’, employers are required by law to seek disclosure of
  • 117.
    117Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers criminal records from the relevant criminal records office. This would include careers in social work, teaching, nursing, law and medicine. If you are applying for any of these jobs you are required to declare a conviction even if it is spent. You are also required to declare convictions when applying for vocational training relating to these jobs, such as courses in nursing, teaching or social work. If you are applying for a job or a type of work where Criminal Records Bureau (CRB) checks are required, it will be in your interests to disclose information about your convictions that may come to light. The Safeguarding Vulnerable Groups Act 2006 resulted in the Independent Safeguarding Authority and the Criminal Records Bureau checking individuals’ suitability to work with vulnerable people. It is illegal for an employer to refuse to employ you or to dismiss you on the grounds of a spent conviction. It is also illegal for anybody to reveal information about your conviction after the end of the rehabilitation period. 5.2.2 How to help yourself in the job market If you have unspent convictions (or spent convictions that have to be disclosed by law), it can seem a challenging task to seek employment. Here is a range of strategies to help you: • When making applications, focus the employers mind on your abilities, and don’t allow your criminal record to dominate your application. • You might choose to send a separate covering letter, if possible, that outlines and explains the circumstances of your conviction. However, make sure that it doesn’t sound as if you are making excuses or are not willing to accept responsibility for the offence. • If you have been in prison, you may feel you need to discuss your situation with a careers adviser about the process of applying for jobs early on in your studies. • Enhance your application by undertaking work experience or voluntary work. • Market yourself as positively as possible (see Section 4). • Be realistic about the employment area you wish to enter. Keep in mind that there are certain jobs for which convictions never become spent. Before you start studying for a specific career area, or applying for jobs, check the legal situation carefully. • Make use of other agencies that can help and advise you. They may be able to point you in the direction of opportunities from sympathetic employers, or support you with your applications. 5.2.3 Disclosing a criminal record The right way to disclose You will improve your chances by disclosing in the right way. You need to reassure employers that you are not a risk and that your crimes are in the past. Therefore, if your record is old, you can point this out. Unlock has excellent advice on disclosure: http://hub.unlock.org.uk/information/disclosing-to- employers/ They also have examples of disclosure statements in letters of application at: http://hub.unlock.org.uk/wp-content/uploads/Self- disclosure-statement-examples.pdf If you were found guilty when young and have grown up and taken on a family, home, job and other duties since then – meaning that you have much to lose by getting into trouble – you can point this out also. If the record is not relevant to the job, you should say so. If you owned up to the crime or pleaded guilty, then you could say so. If the crime sounds more serious than it is, you could explain this too. If the reasons behind the crime would help to minimise its seriousness, you could highlight this. You must not allow your record to take over an application, covering letter or interview. However, you must be careful to ensure that your explanation does not sound like an excuse. An employer will not want to know. You should try to put yourself in the employer’s position. When to disclose If an employer is going to ask about records, it is likely to be at the application stage. Where an application form asks about a criminal record or you are sending in a CV it might be best to put ‘See covering letter’, where you give a short account of the offence and your attitude to it. Alternatively, you can say that you will discuss this at the interview. If you have served a prison sentence that has left a gap in your work history, you can write on the form or your CV ‘Not in employment’ or ‘Unavailable for work due to personal circumstances’, and give details in the covering letter or at the interview. The advantage of disclosing at the interview is that the employer has the opportunity to see the person behind the conviction; but bear in mind that it takes a lot of confidence to disclose at this stage. However, the employer might unexpectedly ask about criminal records or require you to disclose at the job offer stage. If you have not already been asked, you should be prepared to deal with this to reduce the chances of a job offer being withdrawn.
  • 118.
    118 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 5.2.4 Example CV if you have a criminal record ‘Before’ including feedback from a careers adviser Name: Andrew Bailey Address: 100 No Road, Chatham, XY18 6AA Tel: 07123 456789 Email: a.bailey@nowhere.com You don’t need to put the words ‘name’ and ‘address’ on your CV. The address can go on one line rather than across 3 or 4 lines. If your CV is light on content elsewhere, then you need to develop a skills section, rather than filling space with your personal details. Put this section in the centre rather than having it on the left. Personal Profile I am a hard-working, motivated and responsible person who is seaking* to build on the experience I have gained working in a gym for the last 18 months. I am interested in undertaking further training to help me to start a career as a Personal Trainer. * Make sure you check for basic spelling errors – especially in your Personal Profile. It is the first item an employer will read after your name and personal details and mistakes do not make a good impression. If you have achieved something significant in the last year of which you are especially proud, record it here under a section called ‘Recent Achievement’. It will focus the attention of the employer. A ‘Skills Profile’ could be added here to enable a potential employer to see if your skills and competencies match with available opportunities. If you are an OU student then make sure it features on the first page of your CV. Qualifications Various courses from the 2009 - 2012 Open University: - E112 Introduction to Sport, Fitness and Management – 60 credits - E113 Working and Learning in Sport and Fitness – 60 credits - E217 Sport and Conditioning Science into Practice – 60 points - EXF224 Making your Exercise Instruction Count – 60 credits NVQ Level 2 Gym Instructor 2012 NVQ Level 1 & 2 Warehouse and Storage (Day Release) 2001 – 2003 In–Train Ltd, Leicester 2 GCSE passes (grades A-C) in Design Technology 2001 and ICT St. Gregory’s Comprehensive School, Sittingbourne Notice that in this section the dates have been placed on the right-hand side whereas in the next section they are on the left. Be consistent in your layout, and make it easy to read in order to make more impact. Listing OU modules is useful here, but you don’t need to put the codes in or the credits.
  • 119.
    119Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers Work Experience May 2014 – Present Assisted in Blogg’s Gym. I helped take classes and maintained equipment, as well as keeping records. Put Employment and Work Experience together in one section. The layout of this could be better. Need to bullet point duties, so they are clearer.You completed this while in a Cat D prison and you are right not to put that, it is the experience which is important. Did you gain any other experience in prison? If so, it is worth adding this. Employment Aug. 2011 – May 2014 Serving my sentence at HMP Coldingley A CV is your chance to highlight your strengths. NACRO (charity offering resettlement advice), says: You should not include any information about your criminal record on your CV. If you have gaps in your employment history which are due to time in prison and you are not asked directly to write about your criminal record in your application, you could explain these gaps by stating that you were ‘unavailable for work’ at a certain period in time. Remember: if you are not asked for a criminal record declaration directly, then there is no need for you to disclose this information at this stage. But you must be prepared to answer fully and honestly if you are asked, at interview, to explain what you mean by ‘unavailable for work’. Highlight what you did during this time e.g. OU student, orderly work or other courses you have taken. 2001 – June 2009 Warehouse Assistant Wilson’s Wholesale, Maidstone Main duties involved taking delivery of goods and supplies and storing the goods. I moved stock ready for dispatch using a forklift truck. My duties also involved picking and packing orders and keeping records of stock. I also drove the delivery vans. Again the layout is not used in the best way. Use of bullet points here allows the reader to quickly scan this section rather than have to read it all. Additional Information: - I am a qualified Fork Lift Truck Operator (NTPC Level2) - I have a current First Aid Certificate - I have a full, clean driving licence Use proper bullet points here. Activities and Interests: I enjoy cycling and motocross. I am a local community volunteer for 10 hours per week. References: Available on request. Not necessary on a CV. Most employers only take references after interview.
  • 120.
    120 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 5.2.5 Example CV if you have a criminal record ‘After’ the feedback has been implemented Andrew Bailey 100 No Road, Chatham, XY18 6AA 07123 456789 a.bailey@nowhere.com Personal profile I am a hard-working, motivated and responsible person who is seeking to build on the experience I have gained as part of the personal training team at Blogg’s Gym for the last 18 months. I am interested in undertaking further training to help me to start a career as a Personal Trainer. I am studying towards a degree in Sports, Fitness and Coaching with The Open University. I also have a relevant NVQ Level 2 qualification. Recent Achievement In September I took part in The Great South Run in Portsmouth. I trained for the event for 8 months and raised over £1,100 in sponsorship for Crisis – the national charity for homeless young people. Skills Profile • Experience in setting realistic short and long term goals with clients • Delivered education programme about healthy lifestyles • Motivated clients with disabilities/ health issues in following programmes safely and effectively • Measured clients’ progress: measuring heart rate and body fat levels • Knowledge of Microsoft Office applications, including Word, Excel, and PowerPoint • Ability to manage my own time and workload – I have worked and studied at the same time • Self-motivation and commitment to own learning and development Qualifications 2013 – present The Open University Working towards a degree in Sports & Fitness Modules completed: • Introduction to sport, fitness and management • Working and learning in sport and fitness • Sport and conditioning science into practice • Making your exercise instruction certificate count 2012 Register of Exercise Professionals Level 2 Instructor (Gym) 2001 – 2003 In–Train Ltd, Maidstone NVQ Level 1 & 2 Warehouse and Storage (Day Release) 2001 St. Gregory’s Comprehensive School, Sittingbourne 2 GCSE passes (grades A-C) in Design Technology and ICT
  • 121.
    121Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers Employment & Work Experience May 2014 – Present Assistant Personal Trainer Blogg’s Gym, Chatham • Assisting in delivery of range of exercise classes • One to one support for clients • Assisting in induction programme for new clients • Ensuring equipment functional and clean • Administrative duties Aug 2011 – May 2014 Experience gained: • Open University student • Gym assistant • Initiated and ran 5 a side football competition • Listener (Samaritans) • Assistant in delivering adult literacy classes 2007 – 2011 Warehouse Assistant Wilson’s Wholesale, Maidstone Main Duties: • Taking delivery of goods and supplies • Storing goods • Moving stock using a forklift truck • Picking and packing orders • Loading goods for dispatch • Keeping records of stock • Driving delivery vehicles Additional information • I am a qualified Fork Lift Truck Operator (NTPC Level 2) • I have a current First Aid Certificate • I have a full, clean driving licence Activities and interests I enjoy cycling, running and play for my local football team. I am a local community volunteer for 5 hours per week.
  • 122.
    122 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Further resources Disclosure and Barring Service (England and Wales) at: https://www.gov.uk/government/organisations/ disclosure-and-barring-service Scottish Criminal Record Office (Scotland) at: www.disclosurescotland.co.uk Access Northern Ireland (Northern Ireland criminal records checking service) www.dojni.gov.uk/accessni The Apex Trust – support, information and advice for ex-offenders seeking work. It also works with employers to break down barriers. More information can be found at: www.apextrust.com The National Association for the Care and Resettlement of Offenders (NACRO) publishes a number of advice leaflets. You can access them at: www.nacro.org.uk Unlock – for people with convictions, is a charity that supports reformed offenders and helps them to achieve their potential by overcoming the barriers caused by a criminal record. The website contains an Information and Advice Service www.unlock.org.uk 5.3 Disability or additional requirements Many students and graduates with disabilities have the same skills and abilities to offer as anyone else, without the need for specific adjustments or support. For some students, additional support can help to enable access to work. The key starting point is to explore career areas that are relevant to your interests and skills, and then to consider the next steps as outlined below. 5.3.1 Your rights Equality law protects against discrimination, harassment and victimisation on the grounds of disability. It defines the rights for disabled people, particularly in relation to employment and access to goods, services and facilities. You are protected under the Act if you have ‘a physical or mental impairment which has a substantial and long-term adverse effect on your ability to carry out normal day-to-day activities’. This definition includes sensory impairments, learning disabilities and mental illness, as well as physical disabilities and medical conditions. This covers people who have had a disability, as defined by the Act, in the past; those who have recurring or progressive conditions; and people with severe disfigurements. You don’t have to register as a disabled person or even consider yourself to be disabled to be protected. Equality law prevents discrimination against disabled people at work and in recruitment and selection. All employers are covered except for the armed forces. Discrimination is unlawful in all aspects of employment, including recruitment, promotion, training and selection, redundancy or dismissal. Employers are also required to make reasonable adjustments to the workplace, working practices and the job description (provided they know, or could reasonably be expected to know that you have a disability). These may include adjusting premises, altering hours or buying equipment. The effectiveness of the adjustment in reducing the disadvantage must be taken into account, and so must the finances of the employer. Large companies will probably be expected to adapt the workplace, but smaller companies with lesser funds may not have to do so. Employers must show that they have looked into the costs of adaptations, and what funding is available from other sources. You can find out more from the Equality and Human Rights Commission: www.equalityhumanrights.com – go to Equality Act, Know your rights, Disability Discrimination In Northern Ireland you can find out more from the Equality Commission for Northern Ireland: www.equalityni.org 5.3.2 How to help yourself in the job market You may need to decide whether or not to tell an employer that you have a disability. If you do decide to declare your disability, you will need to consider the method and timing. Do you tell them on your application form? In a covering letter? Before or after an interview? There are no clear-cut answers to these questions. You must make your own judgement, though you may find it helpful to talk it over with a careers adviser. When you apply for jobs and you are considering whether to disclose your disability: • Always focus on what you can do, not what you can’t. • Don’t assume that an employer will view your disability in a negative way. There are now over 400 member companies in the Business Disability Forum http://www.businessdisabilityforum.org. uk/. Each is committed to creating and developing opportunities for people with disabilities.
  • 123.
    123Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers • Don’t restrict your applications only to employers who are keen to recruit disabled people. Here are some reasons why it might be a good idea to declare your disability: • Some employers are keen to employ people with disabilities and use the disability symbol – this shows they are positive about employing disabled staff. However, many employers do not use the symbol but there may be practical evidence that they are positive about disability – such as offering information in alternative formats and alternative ways of contacting them. So, look for employers who make these kinds of positive statements even if they don’t use the disability symbol. • You can control the way your disability is explained. You will be able to describe things in a positive light – your strengths, your coping strategies, determination to succeed, etc. • Many employers have equal opportunities policies and are open to recruitment and employment without prejudice. • Access to Work – a Jobcentre Plus programme (see 5.3.4) can provide support for you in a job. For instance, it may fund specialist equipment or transport costs. It’s worth pointing this out to employers as they may not be aware of the programme. • According to a Remploy survey, only one in five disabled people need any kind of adaptations to their workplace – and the vast majority of these can be carried out for as little as £50. • If you think you will need a reasonable adjustment to attend an interview or assessment centre, you will need to tell the employer in advance so that they can provide this for you. • If you declare your disability and believe that you have been discriminated against during the application process, equality law entitles you to take your case to an employment tribunal. Here are some reasons why it might be a good idea not to declare your disability: • You may believe that your disability has no effect on your ability to do the job. • You might feel that you will be discriminated against and rejected straight away. • You may think that an employer will automatically see you as a potential expense. • Perhaps you prefer not to discuss your disability with a stranger. 5.3.3 Declaring a disability This section deals with whether or not to declare a disability to a potential employer. Many people choose not to declare their disability because of fear or bad experiences in the past. It is often difficult to know whether to tell an employer and also to know when and how this information should be given. The decision is a personal one but the following points may help you to make your decision. Should you declare or not? • You may not want to declare having a disability as you may be concerned about being rejected automatically or facing discrimination. • You may feel that having a disability does not actually affect your ability to do the job that you have applied for. Reasons for declaring If you declare your disability during the application process, for example, when you send in your CV, and then you feel that you have been treated unfairly, you can make a complaint under equality law. However, if you have not told the employer about your disability, it may be possible for them to say that they did not know about it and could not have been expected to make any adjustments. By not declaring your disability it takes the emphasis away from the employer to make a reasonable adjustment. If you have disclosed a disability, the employer cannot lawfully refuse to employ you because of that disability without a genuine occupational reason. Forming a disclosure strategy If you decide to tell a potential employer about your disability, the next stage is to establish at what point in the application process you should tell them. Curriculum vitae It is not necessary to mention your disability on your CV. You may feel that an employer will see your disability as the most important thing about you or make assumptions about you on the basis of your disability. Also, there may not be room on your CV to qualify your disability or to highlight the range of positive adjustments that could be made. If the CV is speculative, or not followed by an application form, you need to decide if you would prefer for an employer to know about your disability before you are called for an interview. This may depend on whether you will need a reasonable adjustment to be made for you at the interview and in order for you to do the job satisfactorily.
  • 124.
    124 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Covering letter A covering letter should be sent with your CV to potential employers. You do not need to disclose your disability on the CV or covering letter. However, if your CV highlights that you have a disability (for example, you attended The Royal Blind School), the covering letter allows you the opportunity to explain your disability in more detail than on a CV. You can also highlight the range of adjustments that are available and that funding for these is available for these through the Access to Work scheme. Bear in mind that the focus of a covering letter should always be on your skills to do the job. Likewise you should focus at an interview on the way in which you fit the requirements for the job, rather than your disability. You may have done voluntary work, which may cause the employer to wonder if you have a disability. For example, you may be the secretary of your local voluntary society for the deaf and have gained skills that are relevant to the job you are applying for. In summary, you do not have to tell an employer about your disability. By not saying anything it may mean that you face less discrimination, but it also takes away some of the obligations of an employer. It may be an idea to form a disclosure strategy, where you plan how you tell an employer about your disability. This means that you can positively discuss your disability on your own terms and retain a focus on your own skills and abilities. Example of a covering letter declaring a disability Dear Mrs Bailey, I am responding to your advert in the Birmingham Evening Mail for a Trainee Advertising Executive. As you will see from my CV, I am about to complete a BA in Business with The Open University and I have extensive customer service and sales experience from working with some national employers. I also have strong administrative and IT skills, having worked as a secretary to the manager of a clothing manufacturing company. As a result of contracting meningitis when I was a child, I have limited use of my right leg, which affects my mobility. I am able to walk unaided and have significant experience of shop work, spending all day on my feet, but I am not able to climb stairs quickly or easily. This is the only limitation arising from my mobility impairment. I spent my teenage years coming to terms with my disability and developing my own ways of coping and solving problems. I believe that this attitude has developed a positive approach to life which I have been able to bring to my various job roles. I am an active and outgoing person who enjoys travel as well as keep fit activities such as swimming and Pilates. I also have a full driving licence. I would be happy to answer any questions you may have on my general fitness. I look forward to hearing from you in the near future. Yours sincerely, Samantha Williams
  • 125.
    125Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers Example CV Samantha Williams 51, Park Street, Edgbaston, XY31 5XX Tel: 04231 987234 Email: s.williams@nomail.co.uk Personal profile I am a hard-working and dependable business undergraduate with the ability to work both independently and in a team. I have extensive experience of working with the public in a sales and customer service capacity. This has made me develop excellent interpersonal skills and an ability to think on my feet. My experience to date has now given me the confidence and experience to embark on a career in advertising. Qualifications 2011–2014 BA (Hons) in Business Administration: Introduction to business studies; Introduction to bookkeeping and accounting; Understanding management; Professional communication skills for business The Open University 2006 NVQ level 3 in Business Administration Springfield Training, Birmingham 2005 6 GCSEs at grade A–C including English, Maths and I.T. All Saints High School, Birmingham Employment experience August 2011 – Secretary/PA to Sales Manager New Look Fashion Present • Providing secretarial and administrative support to the Sales Manager • Arranging meetings, diary management, dealing with appointment requests • Updating records using computer database and spreadsheet software • Liaising with other managers, suppliers and clients etc. • Writing reports and briefing papers and making presentations. May 2008 – Senior Sales Assistant New Look Fashion August 2011 • Responsible for driving sales • Supervising a small sales team • Ensuring good customer service • Building relationships with suppliers • Implementing agreed promotional activities July 2005 – Modern Apprentice (Retail Work) Dixons May 2008 • Dealing with customer enquiries and sales • Stock control including checking deliveries • Customer services including handling complaints • Promoting certain products under the guidance of management • Maintaining displays and visual standards within the store Additional information • I have a full, clean driving licence • I am actively involved with three children’s charities for which I have arranged fund-raising activities. Activities and interests I enjoy travel, swimming, Pilates and reading. References Available on request
  • 126.
    126 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 5.3.4 Resources for employment and training The majority of disabled jobseekers who find work through the Jobcentre are assisted by a disability employment adviser (DEA). Specialist DEAs can discuss your current employment situation with you to plan the best way into work. If you’re concerned about losing the job you’re already in for a reason associated with disability, the DEA can provide advice to you and your employer and explore practical ways to help you keep your job. Services the DEAs can offer include: • An employment assessment to identify what work or training suits you best. • Referral where appropriate to a work preparation programme. • Referral if needed to an occupational psychologist. • A job matching and referral service. • Information on employers in your area who are Disability Symbol users. • Referral where appropriate to specialist Jobcentre Plus programmes for disabled people, including: Access to Work – Can help you make the most of your opportunities in work by helping you to tackle some of the practical obstacles you may meet at work if you have a disability. The scheme can pay for the costs of adjustments for new members of staff, or contribute to the costs for existing staff. Work Choice – Helps people with disabilities who need more specialised support to find employment or keep a job once they have started work. The programme is in three different sections: – Work entry support – This will last for up to six months. You will receive help with personal skills and work-related advice. – In-work support – This will last for up to two years. You will receive help to start work and stay in your job. – Longer-term in-work support – You will receive help to progress in your job and where appropriate, help you move into unsupported work. • Details about work-based learning for adults. • Information on local and national disability organisations of and for disabled people. For more information, go to: www.gov.uk/looking-for-work-if-disabled Disabled students’ allowances (DSAs) Disabled students’ allowances (DSAs) are grants available to disabled students in higher education to help with the extra costs of services and facilities they need for their studies because of a disability or specific learning difficulty. The OU provides information about DSAs on the website at: www.open.ac.uk/disability Further resources Great with Disability, advice on employment issues and live vacancies www.greatwithdisability.com/recruitment-disability Association of Disabled Professionals provides advice, information and peer support to disabled people, focusing on employment related issues. For more details go to: www.adp.org.uk Disability Rights UK formed through the unification of Disability Alliance, Skill, Radar and the National Centre for Independent Living in 2012. It is the largest pan-disability organisation in the UK. It has a downloadable booklet called Doing Careers Differently, which is about how to make a success of your career while living with a disability or health condition. You can download it from: http://www.disabilityrightsuk.org/how-we-can-help/ publications/doing-life-differently-series/doing- careers-differently AHEAD (The Association for Higher Education Access and Disability) is an independent organisation working in the Republic of Ireland to promote full access to, and participation in, further and higher education for students with disabilities and to enhance their employment prospects on graduation: www.ahead.ie. Disabled Entrepreneurs Network: www.disabled-entrepreneurs.net The Business Disability Forum is an employers’ organisation focused on disability as it affects the workplace. You can check the site for support, but also to find any member companies who are likely to have a very positive attitude to those with disabilities. http://www.businessdisabilityforum.org.uk/ EmployAbility – A not-for-profit organisation that helps disabled people into employment: www.employ-ability.org.uk
  • 127.
    127Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers Remploy provides a comprehensive range of employment services to support disabled people and those experiencing complex barriers to work into gaining and retaining sustainable employment. They work with many UK employers to help them understand disability, and to recruit people into all types of jobs. Their Employability Programme is a free course for finalists and recent graduates who have a disability, learning difference or health condition. www.remploy.co.uk The Shaw Trust is a national charity that supports disabled and disadvantaged people to prepare for work, find jobs and live more independently. It offers a service for students and graduates with disabilities, dyslexia or a specific learning difficulty. They work in partnership with top employers to offer a variety of opportunities within a range of sectors. www.shaw-trust.org.uk Blind in Business is a charity that helps visually impaired students and graduates of all ages into work, through CV coaching, help with filling out application forms, interview practice and other advice and support. www.blindinbusiness.co.uk The OU Careers website contains useful information on equality and diversity issues at: http://www2.open.ac.uk/students/help/equality-and- diversity Equality and Diversity: Information for jobseekers on how to challenge unfair discrimination in the workplace is available on the Targetjobs website at: https://Targetjobs.co.uk/careers-advice/equality- and-diversity. 5.4 Gender Does it make a difference if you are a man or a woman when applying for a job? Unfortunately, yes: despite the legislation we still find gender discrimination in the workplace. There is a lot of discussion about the ‘glass ceiling’ that prevents women from achieving ‘top jobs’, and in fact, there is still evidence of a pay gap between male and female employees (particularly over the age of 40) – even when they have the same qualifications in the same subject. To see if an organisation is the right fit for you as a place to work you could consider looking for examples of support provided by employers such as childcare facilities and flexible working policies and practices. You could also try to find out what arrangements they have in place to develop women to work at senior and board level. It’s important that you are aware of the issues concerning gender discrimination – at both recruitment stage, and in employment. If you check on the legal situation, this can help you in presenting yourself in your application for work, and in ongoing communication with your employer. (You might also want to check whether a prospective employer has an equal opportunities policy.) Other equality issues that you might encounter include harassment at work, needing time off work for parenting or caring duties, and looking for flexible working arrangements. Times are changing: for instance, in the UK mothers and fathers of children under 17, or of disabled children under 18, have the right to request flexible working. If you live outside the UK you will need to check the legal position for your country of residence. 5.4.1 Your rights Equality law provides protection against discrimination, harassment and victimisation on the grounds of sex, and gives an individual a right to the same contractual pay and benefits as a person of the opposite sex in the same employment, where the man and the woman are doing: • like work; or • work rated as equivalent under an analytical job evaluation study; or • work that is proved to be of equal value. Employers are not required to provide the same pay and benefits if they can prove that the difference in pay or benefits is genuinely due to a reason other than one related to gender. The Act applies to England, Wales and Scotland. It covers indirect sex discrimination as well as direct discrimination.
  • 128.
    128 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Equality law prohibits sex discrimination against individuals in the areas of employment, education, and the provision of goods, facilities and services and in the disposal or management of premises. It also prohibits discrimination in employment against married people. Victimisation because someone has tried to exercise their rights under the Act is also prohibited. There are a few exceptions to the Act surrounding recruitment, if the gender of the worker is considered a genuine occupational requirement (GOR). This defence is likely to apply in very limited circumstances. The Act applies to women and men of any age, including children and prohibits direct and indirect sex discrimination. There are special provisions about discrimination on the grounds of gender reassignment (see page 5.4.4 below). The Act applies to all public services, requiring them to promote gender equality and eliminate sex discrimination. All organisations serving the public must show their policies and procedures comply with gender discrimination legislation. 5.4.2 Direct sex discrimination This is where someone is treated less favourably than a person of the opposite sex in comparable circumstances because of their sex. For instance, one type of direct sex discrimination is sexual harassment; another is treating a woman adversely because she is pregnant. 5.4.3 Indirect sex discrimination This is where a condition or practice is applied to both sexes but it adversely affects a considerably larger proportion of one sex than the other. For instance, an unnecessary requirement to be under 5’ 10” could discriminate against men; a requirement to work full-time might be unlawful discrimination against women. 5.4.4 Transgender and gender reassignment ‘Transgender’ is an umbrella term used by people whose gender identity and/or gender expression differs from their birth sex. The term includes, but is not limited to, transsexual people and others who define as gender-variant. ‘Trans’ as an umbrella term includes transsexual people, transgender people, people who cross-dress and a range of other distinct forms of identity and expression. People perceive and express their gender identity in different ways, so trans people are therefore quite clearly diverse. The experience of discrimination, harassment, victimisation or adverse outcomes is common to all trans people, though. Equality law provides protection against discrimination on the grounds of gender reassignment in recruitment, employment or training, the provision of goods, facilities and services, and education. This is a protected characteristic under the Act, and it protects people at any stage of having their sex reassigned and without the need to be under any medical supervision. Employment-related claims are brought in an employment tribunal. Strict time limits can apply from the act of the discrimination for employment tribunal cases, so get advice as soon as possible. 5.4.5 How to help yourself in the job market Here are a few suggestions to help prevent discrimination against yourself in the job market: • Plan your application effectively to minimise the possibility of unfair discrimination. This is especially important if you are looking to enter a field of employment that is traditionally dominated by one sex or the other. • Provide clear evidence of your ability to do the job, and this will help to counter any negative stereotypes that may exist. • Concentrate on your strengths. • Discuss your application with a careers adviser. Returning to the labour market after a career break can be difficult, especially if you have spent a long time away. If this reflects your situation, there are a number of issues and strategies you can consider: • Think about your future goals. • Research the careers that appeal to you in some depth. • Consider the skills and experience you have. • Do some work experience or voluntary work if you need to enhance this. • Find support networks to boost your confidence. • Market yourself effectively in your applications. For more help and advice visit: www.open.ac.uk/careers
  • 129.
    129Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers 5.4.6 Resources for employment and training The Equality and Human Rights Commission (EHRC) is the leading agency working to eliminate discrimination in the UK. The EHRC campaigns to: • Close the pay gap between women and men. • Make it easier for parents to balance work with family responsibilities. • Increase the number of women in public life. • Break free of male and female stereotypes. • End sexual harassment at work. • Make public services relevant to the differing needs of men and women. • Secure comprehensive equality legislation in Europe, England, Scotland and Wales. Go to their website and click on ‘Advice and Guidance’: www.equalityhumanrights.com In Northern Ireland you can find out more from the Equality Commission for Northern Ireland: www.equalityni.org Press for Change is a political lobbying and educational organisation that campaigns to achieve equal civil rights and liberties for all transgender people in the UK, through legislation and social change. www.pfc.org.uk Gender Identity Research and Education Society (GIRES) provides helpful information for trans people, their families and the professionals who care for them. www.gires.org.uk The Gender Trust offers support and information for trans people and all those affected by gender identity issues. www.gendertrust.org.uk Further resources Work Life Balance Centre – available at: www.worklifebalancecentre.org Business in the Community offer schemes such as ‘Opportunity Now’, which empowers employers to accelerate change for women in the workplace. http://workplace.bitc.org.uk/ Equality and Diversity – Information for jobseekers on how to challenge unfair discrimination in the workplace is available on the Targetjobs website at: https://Targetjobs.co.uk/careers-advice/equality- and-diversity. 5.5 Race A Parliamentary Briefing Paper ‘Unemployment and Ethnic Background’, using data provided by the Office for National Statistics, states that: The UK unemployment rate (the proportion of the economically active population who are unemployed) was 5.1% in December 2015-February 2016. The unemployment rate was 4.3% for white people compared to 9.6% for people from other ethnic backgrounds, although the rate varied between different ethnic minority groups. Theresa May is including employment in official audit of racial inequality in public services, which she launched in August 2016. 5.5.1 Your rights Equality law protects against discrimination, harassment and victimisation on the grounds of race. This covers race, colour, nationality (including citizenship), and national or ethnic origin. In practice, most racial discrimination in Britain is against ethnic minorities, but people of every background, race, colour and nationality are protected by the law. If you think you have been discriminated against on racial grounds, equality law gives you the right to take your complaint before an employment tribunal. Keep in mind that there are strict time limits for filing your case at an employment tribunal or court, so don’t delay. In general, you have three months to file an employment case. The Equality Act identifies three main types of racial discrimination: • direct racial discrimination • indirect racial discrimination • victimisation. 5.5.2 Direct racial discrimination Direct racial discrimination occurs when a person is treated less favourably on racial grounds than others in similar circumstances. If you think this has happened to you, and you want to prove it, it will help if you can give an example of someone from a different racial group who, in similar circumstances, has been treated more favourably than you. Racist abuse and harassment are also forms of direct discrimination.
  • 130.
    130 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 5.5.3 Indirect racial discrimination Indirect racial discrimination occurs when a person from a particular racial group is less likely to be able to comply with a requirement or condition that applies to everyone but which cannot be justified. 5.5.4 Victimisation Victimisation has a special legal meaning in the Equality Act. This happens when a person is treated less favourably because they have complained about racial discrimination or supported someone else who has. If you think you have been discriminated against at work, or when applying for work, you have the right under the Act to take your complaint before an employment tribunal. If you are thinking of bringing a case of racial discrimination, you can apply to the Equality and Human Rights Commission (EHRC), or to one of a number of other organisations such as trade unions, racial equality councils, law centres, citizens advice bureaux and other advice agencies, for help. 5.5.5 How to help yourself in the job market So what can and should you do to market yourself, to target employers, and to challenge unfair discrimination? Here are some suggestions: • Think about your future goals and research the careers that appeal to you in some depth. • Make use of Section 4 ‘Getting the job’ to prepare your marketing tools, your CV, application forms and covering letters. • Consider your unique selling points and market yourself in a positive way that shows employers your skills. This can challenge any stereotypical ideas employers might have. • Discuss your plans and approach with a careers adviser. • Many employers have staff networks for minority ethnic groups. Target employers with a reputation for good equality and diversity policy and practice • Understand the relevant legal situation. • Develop contacts and make the most of your networking skills. • Check if the organisation is a member of Business in the Community (BITC) at www.bitc.org.uk. Race for Opportunity is a programme, run by BITC, that is dedicated to advancing racial equality. • Be proud of who you are and what you have achieved. Many employers are keen to recruit from a wide pool of talent as they recognise that different opinions, experiences and backgrounds allow for better quality decision making. 5.5.6 Resources for employment and training Equality and Human Rights Commission (EHRC) The EHRC is the national organisation for monitoring racial equality (as well as other equality issues). Contact them for information on legal issues, campaigns and services as well as vacancies in the commission: www.equalityhumanrights.com Equality Commission for Northern Ireland The Equality Commission for Northern Ireland is responsible for promoting awareness of, and enforcing, anti-discrimination law. For more information see: www.equalityni.org Equality and Diversity – information for jobseekers on how to challenge unfair discrimination in the workplace is available on the Targetjobs website at: https://Targetjobs.co.uk/careers-advice/equality- and-diversity National Mentoring Consortium The National Mentoring Consortium aims to promote equality and diversity in graduate recruitment, and works with employers and universities to enhance the employability of students from minority ethnic groups. The Ethnic Minority Undergraduate Scheme lasts six months and links undergraduates with mentors in order to help them prepare for entry into the world of work. Find out more about the scheme at: http://www.nmc-online.com/schemes/ethnic.htm TeacherWorld UK TeacherWorld UK provides information and support for teachers (and those intending to teach) particularly those from minority ethnic backgrounds. You can log onto its website at: www.teacherworld.org.uk Windsor Fellowship The Windsor Fellowship is a charitable organisation that offers skills development programmes to undergraduates and graduates from minority ethnic groups. Their website is: www.windsor-fellowship.org Business in the Community Business in the Community has a campaign ‘Race for Opportunity’ which is committed to improving employment opportunities for ethnic minorities across the UK. It is the only race diversity campaign that has access to and influence over the leaders of the UK’s best known organisations. http://workplace.bitc.org.uk/
  • 131.
    131Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers Further resources Recruitment websites – sites such as Ethnic Jobsite (www.ethnicjobsite.co.uk), Asian Jobsite (www.asian jobsite.co.uk) all offer vacancies, advice on job hunting and applications for ethnic minority students and graduates looking for employment. 5.6 Religion or belief Equality law provides protection against discrimination, harassment and victimisation on the grounds of religion or belief, which includes discrimination because of a lack of religion or belief. It is unlawful to discriminate against anyone on the grounds of religion or belief. There are exemptions for religious institutions, but they need to be able to show that a particular religion or belief is a requirement, and this is likely to be justifiable only for particular roles (for example, for ministers or priests, but not for administrators, managers or technicians). There are also some occupational requirements that may require particular dress codes, but most good employers will have alternatives to allow for particular religious observance. The most likely ways in which employers may discriminate might be around the way in which they recruit new staff, where they advertise, days when they choose to interview, staff development and promotion, dress codes, or training days clashing with days of worship or important festivals. You should be aware that many organisations now do take proactive measures to promote flexible and integrated working through surveys and staff development and training to promote inclusion and raise awareness. The Equality Act (2010) also makes it illegal to discriminate because of a lack of religion or belief. 5.6.1 How to help yourself in the job market If this is an area that is of concern to you, it is important (as is the case with all job applications and career decisions) to research jobs and organisations to ensure that they are right for you. Here are some suggestions to look for in an employer: • facilities for prayer or contemplation • catering for different dietary requirements • leave policies that allow for people to take leave at times of festivals/pilgrimages related to different religions – not just that they can request leave but that there is an expectation for managers to grant permission • awareness and promotion of dates and times to avoid scheduling meetings and work activities which coincide with practices related to different religions • dress codes that accommodate different requirements and preferences • dignity at work or bullying and harassment policies that make explicit that inappropriate behaviour related to religion or belief is unacceptable. You may find it helpful to discuss some of these issues with the equality and diversity officer if the organisation has one. Alternatively, someone from human resources may be able to help. 5.6.2 Disclosure There is no requirement for individuals to tell an employer or prospective employer about their religion or belief. Disclosure is a personal decision that will be influenced by a number of factors (you may want some reassurance before you apply or before you accept a job) and you may want to discuss in more detail with a careers adviser before you decide what to do. It is unlikely that you will find questions relating to religion or belief on an application form (other than for equal opportunity monitoring) or that you would come across it in an interview, unless it is a genuine occupational requirement (GOR). This defence is likely to apply in very limited circumstances. In the meantime, if this is a concern for you, keep up to date on the law and your rights. Further resources Equality and Human Rights Commission. Great Britain’s national equality body: www.equalityhumanrights.com Equality Commission for Northern Ireland works towards equality of opportunity and the elimination of discrimination in Northern Ireland: www.equalityni.org Equality and Diversity – information for jobseekers on how to challenge unfair discrimination in the workplace is available on the Targetjobs website at: https://Targetjobs.co.uk/careers-advice/equality- and-diversity Business in the Community is a group of more than 800 companies that are committed to improving their positive impact on society. www.bitc.org.uk
  • 132.
    132 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers 5.7 Sexuality and sexual orientation Are you worried about possible discrimination in the workplace because of your sexuality? Whether to, when to, and how much to declare to a potential employer and to work colleagues is of course a matter of personal choice. You will need to consider how comfortable you will be in an area of work where you are not open about your sexuality, and this will depend on your own experience and lifestyle. 5.7.1 Your rights Equality law provides protection against discrimination, harassment and victimisation on the grounds of sexual orientation. Unlawful sexual orientation discrimination happens when someone is treated less favourably due to their sexual orientation, their perceived sexual orientation or the sexual orientation of those they associate with. 5.7.2 How to help yourself in the job market There are a number of measures that you can take to help yourself in the job market: • Many employers now have Equality and Diversity Policies that include lesbian, gay and bisexual people, especially the public sector and large private employers. You can ask for a copy of the policy before applying for a job. If there is a statement about equality and diversity in your contract you might be able to directly rely upon it. • Consider joining a trade union where you will receive support and legal advice. If you encounter discrimination, the support of a trade union can protect you. A number of motions passed at TUC conferences have made it clear that all affiliated unions should adhere to equal opportunities for lesbians and gay men. • If your employer recognises more than one union, contact their headquarters to check which is the most progressive on lesbian and gay issues: some produce specific material and some have lesbian, gay and bisexual groups. • Find out about employers who belong to the Diversity Champions Programme managed by Stonewall. They have also produced a Corporate Equality Index, which identifies the top 100 gay- friendly employers. 5.7.3 Resources for employment and training Stonewall Stonewall works to achieve legal equality and social justice for lesbians, gay men and bisexual people and launched Diversity Champions in 2001. This is a forum in which more than 600 employers work with Stonewall to encourage diversity in the workplace. Usually, these employers are at the cutting edge of innovation in business and public service, and Diversity Champions allows employers to focus on the new challenges and opportunities for addressing issues of diversity in the workplace. www.stonewall.org.uk ‘Starting Out’ is Stonewall’s directory of gay-friendly employers. It also contains tips for job search and how to develop your career. You can find the current edition at: http://www.stonewall.org.uk/sites/default/files/ starting_out.pdf Being a Stonewall Diversity Champion means that The Open University is committed to providing an inclusive workplace for lesbian, gay and bisexual staff, and an inclusive learning environment for our students. In practice, this means we are working to enable our staff and students to be as open as they want to be, and to bring their whole selves to work and study, without fear of any negative consequences. Honest and open relationships at work and in learning lead to greater trust and engagement, which in turn leads to a high performing work culture and students that are more likely to achieve their study goals. As Stonewall rightly says, ‘people perform better when they can be themselves’. Tony O’Shea-Poon, former Head of Equality and Diversity, The Open University.
  • 133.
    133Equality and diversityissues To find out more, visit our website at www.open.ac.uk/careers Notes Further resources Equality and Human Rights Commission www.equalityhumanrights.com Equality Commission for Northern Ireland www.equalityni.org Equality and Diversity – information for jobseekers on how to challenge unfair discrimination in the workplace is available on the Targetjobs website at: https://Targetjobs.co.uk/careers-advice/equality- and-diversity Gay Business Association provides networking opportunities to make business contacts and offers training for professionals in legal, marketing and business development, and employment issues. www.gba.org.uk
  • 134.
    134 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers
  • 135.
    135The next steps Tofind out more, visit our website at www.open.ac.uk/careers your needs. You may need to allow some time for the appropriate arrangements to be made. 6.1.1 Open University Careers website Visit our website at: www.open.ac.uk/careers The site takes you through the various stages of planning your career, from analysing your potential to applying for jobs. You will also find information on career opportunities linked to relevant OU subjects and qualifications. In addition the site includes: • careers and employability news items • an online vacancy service • information about employers interested in recruiting from the OU • clips of employers talking about the recruitment process and the skills they value • an interview simulation. [The careers adviser] was amazingly professional, helpful and resourceful. I am very impressed by how she dealt with my issues, I was very concerned that I wouldn’t get much help as I was very confused about what to do next but [the CA] asked the right questions to map my academic and personal situation and was tremendously helpful OU Student 6.1.2 Open University Careers forums and webinars All OU students have access to our online Careers forums and webinars. For details, follow the link from our website: www.open.ac.uk/careers 06 The next steps 6.1 Open University Careers and Employability Services 135 6.3 Other sources of help 137 When you’ve worked through this book there’s a lot to gain not only by reflecting and reconsidering things, but also by discussing them either informally with a trusted friend or formally with a careers adviser. You can contact a careers adviser via the careers website at: http://www2.open.ac.uk/students/help/contact-a- careers-adviser As you clarify your objectives, you’ll be able to develop a plan of action. In order to achieve what you want, you may need to go through several smaller steps such as gaining particular experience or qualifications, gathering information or getting access to a particular resource. Look through the information and resources that we recommend. Remember that many of the resources listed are concerned primarily with the UK job market. Readers outside the UK should look at: https://targetjobs.co.uk/careers-advice/working- abroad 6.1 Open University Careers and Employability Services We provide access to appropriate careers and employability information, advice and guidance for prospective and current students and recent graduates. You can view our statement of service outlining the range of services available to you at: http://www.open.ac.uk/students/charter/essential- documents/our-statements-of-service You may want to request an individual consultation with one of our careers advisers. This can be conducted by telephone, Skype or email. You can contact a careers adviser via the Careers website at: www.open.ac.uk/careers If you have additional requirements that may lead to difficulties accessing any of our services, we will be happy to take reasonable steps to accommodate
  • 136.
    136 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers I would say that the careers forums are brilliant. My questions were answered by the Careers Adviser, and the information I was given answered my points specifically rather than being vague. As a student still deciding what I want to do it is really helpful as I am looking into various career paths, and other people bring up questions that I would never have thought of. Social Sciences student Excellent advice, not pointing to one role but encouraging [me] to look at different options. Motivating and encouraging – just what was needed! OU student 6.1.3 Publications and information There are a number of useful publications and sources of careers information available to all students of The Open University: Becoming a teacher – This publication contains information on routes into teaching; entry requirements; and the implications for planning your OU study. It is available in hard copy or online at: to http://www2.open.ac.uk/students/help/starting- points-teaching Association of Graduate Careers Advisory Services (AGCAS) Information You can look at and/or download careers information, written by members of AGCAS who are careers guidance staff from UK universities, on the Prospects website at: www.prospects.ac.uk This includes information such as: • What can I do with my degree?: www.prospects.ac.uk/careers-advice/what-can-i-do- with-my-degree • Information about specific jobs: www.prospects.ac.uk/job-profiles • An overview of job sectors (for example education, information technology, law and social care): https://www.prospects.ac.uk/jobs-and-work- experience/job-sectors You can also find information on special interest topics such as: Prospects website also includes a free online career planning tool ”What job would suit me”. This asks users questions on a range of factors related to their career choice and a list of potential occupations is generated according to their responses. OU students may find it helpful to discuss their results with a careers adviser. You can access this at: www.prospects.ac.uk/planner Graduate Careers Ireland (GCI) information GCI careers information is researched and written by members of Graduate Careers Ireland specifically for graduates wanting to work in Ireland. It includes the following: Sector guides – Information on opportunities in a range of careers, e.g. computing and IT, social work, teaching and education, and law. You can view or download this information at: www.gradireland.com/publications Students and graduates in Ireland will also find careers information and help with career planning at: www.careersportal.ie Your Student Support Team may also be able to provide or suggest other sources of information. 6.1.4 Social Media You can connect with OU Careers and Employability Services on Facebook, Twitter and LinkedIn to find out more about: • Where your OU study can take you • Starting out in a new career or developing in your current one • Your career options • How to sell your OU study to employers • What you can do with what you’ve already achieved • News from Careers & Employability Services • Upcoming forums, webinars and live Facebook chats • Careers resources, advice, motivation and inspiration • The latest jobs from JobZone, our online vacancy service. Facebook: www.facebook.com/OpenUniCareers Twitter: https://twitter.com/OpenUniCareers LinkedIn: www.linkedin.com/groups/3871260
  • 137.
    137The next steps Tofind out more, visit our website at www.open.ac.uk/careers 6.2 Other sources of help 6.3.1 External guidance providers Other university careers services may allow OU students to use their information rooms. You are advised to ring first. For details of adult advice and guidance services in the following countries, look at these websites: England https://nationalcareersservice.direct.gov.uk Northern Ireland and Republic of Ireland www.nidirect.gov.uk/careers www.gradireland.com Scotland www.myworldofwork.co.uk/ Wales www.careerswales.com Keep in mind that the extent of advice and guidance provided for adults varies and there may be charges for some services. Further resources A list of further resources is given at the end of each section of this book. To find out about services offered by The Open University library at Walton Hall, go to: www.open.ac.uk/library Finally You may have to cope with setbacks and frustrations, but remember that you’re setting out on an exciting journey, taking the first steps towards a new or resumed working life, with all its potential for improvement and advancement. Good luck and best wishes for your future!
  • 138.
    138 Career planningand job-seeking workbook To find out more, visit our website at www.open.ac.uk/careers Notes
  • 139.
    139The next steps Tofind out more, visit our website at www.open.ac.uk/careers
  • 140.
    To find outmore, visit our website at: www.open.ac.uk/careers WEB 047607 Careersplanningand jobseekingworkbook