®




smart energy
smart products
smart solutions
You could make over
                                             Carbonless provides businesses with the information and technology
                                             they need to reduce costs, be more environmentally friendly, and meet
                                             compliance standards. We can provide knowledge and access to in-
                                             house environmental consultancy, personnel, and training for a variety
                                             of roles. Our management team and key personnel possess over 20
                                             years experience in the environmental industry, having worked around
                                                                                                                                15,000
                                                                                                                                cups of tea, just by
                                                                                                                                turning off computers
                                             Europe on various projects in the renewable, retail, government,
                                             construction, and energy sectors.


                                             Our service offering lies in consultancy for organisations driven by the need or   in the office at night
                                                                                                                                and weekends.
                                             want to develop environmental standards. This may involve the development
                                             of an environmental managements system for ISO14001, or auditing as part
                                             of the carbon reduction commitment energy efficiency scheme. Specific
                                             services and areas of expertise include:


                                             • 	 Environmental Management Systems
                                             • 	 Energy Management
                                             • 	 Environmental and Social Auditing for Corporate Social responsibility
                                             •	 Strategic Environmental Assessment
                                             •	 Training and Support


                                             To aid us in this process we also provide technical capabilities to go with our
                                             services, including:


                                             •	 Building Modelling Software
                                             •	 Renewable Energy Planning Software
                                             •	 Smart Building Energy Management Systems (BEMS)


                                             Whatever your environmental energy needs, Carbonless can help.




                                  About us




3   www.carbonless-online.co.uk
Our services




    Carbonless offers a range of planning and consultancy services which will
    enable you to make the transformation towards a greener business. Our areas
    of expertise include sustainable policy development, strategic environmental




                                                                                               20%
    planning and effective integration of environmental management systems.
    The Carbonless team has experience of:


    •	 Strategic use of Building Energy Management Systems
    •	 Environmental Management Systems, such as ISO14001
    •	 Environmental Audits
    •	 Corporate Social Responsibility Reporting
    •	 Strategic Environmental Assessment
                                                                                               of water wastage in
    Whether you are looking to take the first steps towards a change of business
    operation or aiming to further develop an existing sustainable strategy, Carbonless will   buildings could be
    find a solution tailored to your organisational needs.
                                                                                               save by introducing
                                                                                               displacement
                                                                                               devices in the toilets.
5     www.carbonless-online.co.uk
Corporate Social Responsibility
                                                 Corporate Social Responsibility is becoming essential for organisations of all
                                                 sizes. Many organisations don’t fully understand the concept and can feel
                                                 daunted by the process. At Carbonless we can help devise key performance
                                                 indicators and measure and evaluate sustainability performance, as part of
                                                 your organisations CSR strategy.


                                                 Organisations will increasingly have to demonstrate ‘triple bottom line’
                                                 (environmental, social, economic) outcomes in order to both meet legislation
                                                 and to grow their business in a more environmentally and socially aware
                                                 consumer marketplace.


                                                 Whether your organisation requires a social or environmental audit as part of
                                                 a tender bid or a robust CSR report in an annual report, Carbonless are here
                                                 to help.


                                                 Environmental Management Systems
                                                 Environmental Management Systems are internationally recognised as an
                                                 effective way to create a greener business - increasing profits, reducing costs
                                                 and reducing your carbon footprint.


                                                 An effective EMS includes a written policy of the aims and objectives which
                                                 forms the basis of an environmental policy. Carbonless will assess and
                                                                                                                                   you could save
                                                 develop an overview of the organisational mission and ensure that this is
                                                 integrated with environmental strategy. This includes outlining motivational
                                                                                                                                   enough energy to print

                                                                                                                                   40 of paper, just
                                                                                                                                          million
                                                 objectives, the targets to be achieved and the future programme set forth by
                                                 management.


                                                 Contact us or visit our website for further information.


                                                                                                                                   sheets
                                                                                                                                   by turning down the
                                  Our services
                                                                                                                                   heating by 1 degree
7   www.carbonless-online.co.uk
Our services




    Strategic Environmental Assessments
    Carbonless have team members who work with the Scottish Government on the
    development of SEA as a strategic measurement tool. This will ensure that all SEA
    work carried out by Carbonless for our customers will always meet the required
    standards and adopt the most up-to-date practices. Our services in this area range




                                                                                               £300
    from consultation to the production of a full SEA report.


    Public sector cuts will create opportunities for private enterprise to win contracts for
    public services. This also means that private sector business needs to adapt to the
    legislation and processes demanded for certain public sector projects, with SEA one
    such requirement. The Scottish Government define SEA as “a method of considering
    and broadly evaluating the likely impact of a public plan, programme or strategy on the
    environment”. This in practice means that a public plan has to be assessed from an
    environmental context and an environmental report produced outlining the findings of
    this assessment.
                                                                                               million could be
    This ensures all SEA work carried out by Carbonless for our customers always meets
                                                                                               saved for businesses
    the required standards and adopts the most up-to-date practices.
                                                                                               by installing smart
    Contact us or visit our website for further information.
                                                                                               metering
9   www.carbonless-online.co.uk
Energy Management
                                             Carbonless offers independent straight forward advice on how to efficiently
                                             manage your energy consumption and utility costs. Through our experienced
                                             team of energy management consultants, we achieve the substantial benefits
                                             that an effective energy management system can present.


                                             •	 Develop an energy strategy that can exist separately or as part of a
                                               further reaching integrated environmental management systems
                                             •	 To lower utility costs, consumption and carbon emissions while
                                               identifying and reducing wastage
                                             •	 fulfilling legal obligations in energy, both present and forthcoming
                                             •	 Develop a digital building model to realise areas of improvement or for
                                               project planning including renewable energy developments
                                             •	 Optimise building energy and occupational performance (discover
                                               opportunities in certain areas)
                                             •	 Compliance & excellence against UK and EU environmental legislation
                                             •	 Introducing systems that raise awareness and develop corporate
                                               culture.


                                             A simple energy management solution can often require little capital expenditure
                                             with short payback periods. A larger solution may require planning and
                                             implementation of equipment, but incentives such as tax rebates and grants


 Energy saving
                                             which can substantially reduce the burden of capital expenditure make the whole
                                             process a lot easier and less of a burden on company finance.


 lightbulbs last up to 15                    Whatever it takes, Carbonless can provide everything you need for


 times longer and use
                                             successful energy management - the strategy, the technology, the



Energy saving lightbulbs                     motivation.




 80%
last up to 15 times longer
               less
  energy than 80%
and use standardless energy
                              Our services



  bulbs.
than standard bulbs.                                                                            www.carbonless-online.co.uk     12
Get in touch


                   Carbonless
                   Level 4 Graham Hills Building
                   50 Richmond Street
                   Glasgow
                   G1 1XP

                   Tel. +44 (0) 141 303 8455
                   Mob. +44 (0) 7540 370527

                   email. enquiries@carbonless-online.co.uk




               ®


                                                              Copyright Carbonless 2011

Carbonless Brochure

  • 1.
  • 2.
    You could makeover Carbonless provides businesses with the information and technology they need to reduce costs, be more environmentally friendly, and meet compliance standards. We can provide knowledge and access to in- house environmental consultancy, personnel, and training for a variety of roles. Our management team and key personnel possess over 20 years experience in the environmental industry, having worked around 15,000 cups of tea, just by turning off computers Europe on various projects in the renewable, retail, government, construction, and energy sectors. Our service offering lies in consultancy for organisations driven by the need or in the office at night and weekends. want to develop environmental standards. This may involve the development of an environmental managements system for ISO14001, or auditing as part of the carbon reduction commitment energy efficiency scheme. Specific services and areas of expertise include: • Environmental Management Systems • Energy Management • Environmental and Social Auditing for Corporate Social responsibility • Strategic Environmental Assessment • Training and Support To aid us in this process we also provide technical capabilities to go with our services, including: • Building Modelling Software • Renewable Energy Planning Software • Smart Building Energy Management Systems (BEMS) Whatever your environmental energy needs, Carbonless can help. About us 3 www.carbonless-online.co.uk
  • 3.
    Our services Carbonless offers a range of planning and consultancy services which will enable you to make the transformation towards a greener business. Our areas of expertise include sustainable policy development, strategic environmental 20% planning and effective integration of environmental management systems. The Carbonless team has experience of: • Strategic use of Building Energy Management Systems • Environmental Management Systems, such as ISO14001 • Environmental Audits • Corporate Social Responsibility Reporting • Strategic Environmental Assessment of water wastage in Whether you are looking to take the first steps towards a change of business operation or aiming to further develop an existing sustainable strategy, Carbonless will buildings could be find a solution tailored to your organisational needs. save by introducing displacement devices in the toilets. 5 www.carbonless-online.co.uk
  • 4.
    Corporate Social Responsibility Corporate Social Responsibility is becoming essential for organisations of all sizes. Many organisations don’t fully understand the concept and can feel daunted by the process. At Carbonless we can help devise key performance indicators and measure and evaluate sustainability performance, as part of your organisations CSR strategy. Organisations will increasingly have to demonstrate ‘triple bottom line’ (environmental, social, economic) outcomes in order to both meet legislation and to grow their business in a more environmentally and socially aware consumer marketplace. Whether your organisation requires a social or environmental audit as part of a tender bid or a robust CSR report in an annual report, Carbonless are here to help. Environmental Management Systems Environmental Management Systems are internationally recognised as an effective way to create a greener business - increasing profits, reducing costs and reducing your carbon footprint. An effective EMS includes a written policy of the aims and objectives which forms the basis of an environmental policy. Carbonless will assess and you could save develop an overview of the organisational mission and ensure that this is integrated with environmental strategy. This includes outlining motivational enough energy to print 40 of paper, just million objectives, the targets to be achieved and the future programme set forth by management. Contact us or visit our website for further information. sheets by turning down the Our services heating by 1 degree 7 www.carbonless-online.co.uk
  • 5.
    Our services Strategic Environmental Assessments Carbonless have team members who work with the Scottish Government on the development of SEA as a strategic measurement tool. This will ensure that all SEA work carried out by Carbonless for our customers will always meet the required standards and adopt the most up-to-date practices. Our services in this area range £300 from consultation to the production of a full SEA report. Public sector cuts will create opportunities for private enterprise to win contracts for public services. This also means that private sector business needs to adapt to the legislation and processes demanded for certain public sector projects, with SEA one such requirement. The Scottish Government define SEA as “a method of considering and broadly evaluating the likely impact of a public plan, programme or strategy on the environment”. This in practice means that a public plan has to be assessed from an environmental context and an environmental report produced outlining the findings of this assessment. million could be This ensures all SEA work carried out by Carbonless for our customers always meets saved for businesses the required standards and adopts the most up-to-date practices. by installing smart Contact us or visit our website for further information. metering 9 www.carbonless-online.co.uk
  • 6.
    Energy Management Carbonless offers independent straight forward advice on how to efficiently manage your energy consumption and utility costs. Through our experienced team of energy management consultants, we achieve the substantial benefits that an effective energy management system can present. • Develop an energy strategy that can exist separately or as part of a further reaching integrated environmental management systems • To lower utility costs, consumption and carbon emissions while identifying and reducing wastage • fulfilling legal obligations in energy, both present and forthcoming • Develop a digital building model to realise areas of improvement or for project planning including renewable energy developments • Optimise building energy and occupational performance (discover opportunities in certain areas) • Compliance & excellence against UK and EU environmental legislation • Introducing systems that raise awareness and develop corporate culture. A simple energy management solution can often require little capital expenditure with short payback periods. A larger solution may require planning and implementation of equipment, but incentives such as tax rebates and grants Energy saving which can substantially reduce the burden of capital expenditure make the whole process a lot easier and less of a burden on company finance. lightbulbs last up to 15 Whatever it takes, Carbonless can provide everything you need for times longer and use successful energy management - the strategy, the technology, the Energy saving lightbulbs motivation. 80% last up to 15 times longer less energy than 80% and use standardless energy Our services bulbs. than standard bulbs. www.carbonless-online.co.uk 12
  • 7.
    Get in touch Carbonless Level 4 Graham Hills Building 50 Richmond Street Glasgow G1 1XP Tel. +44 (0) 141 303 8455 Mob. +44 (0) 7540 370527 email. enquiries@carbonless-online.co.uk ® Copyright Carbonless 2011