SlideShare a Scribd company logo
Calibration Order Scenario: PM – QM Integration
Calibration Equipment
Generaltask List (IA06)
QM Data –Inspection points setup in theHeader as shown above
MIC assigned for the Operation as displayed.
Now create aMaintenance plan – For the Calibration Equipment (IP01)
Assign theGeneral task list for the Plan (We canalso Equipment task lists as well)
Scheduling overview: (IP24)
Now lets simulate Calibration orders for future dates for running IP30.
As I ran the simulation for 400 days – I had got the above order generated.
Lets view the scheduling overview…IP24
See orders generatedtill March 2018.
Lets releasethe order and do next steps.
IW32
Order is in createdstatus and I see no inspection lot generated.
Releasethe order now..
Save.
Open theorder again. An inspection lot should be generated. (PM-QMIntegration)
Lets view the inspection lot…
Inspection lot got generatedfor the order against theEquipment.
Now We need to do Result Recording and Usage Decision against the Inspection lot.
PM – QM Integration:
There areways to do theRR & UD:
QE51N
Result Recording…
Enter your results against each MIC
We see the lot status as Results confirmed.
Now lets do the UD:
Click Save
Click OK
Prompts to Order confirmation screen.
Enter work hours and save.
Lets go theorder and see thestatus.
Order got CNF  Confirmed.
See the Inspection Lot status:
RR & UD has been made.
CASE II : NegativeScenario Test (when my results areout of limits)
Lets takeorder with inspection lot – 140000000356
Lets do RR & UD
I had recorded failure results here. As we see above
Am selecting – Reject – Out of Tolerance
No do the UD
Save the order.
If you wanna rework on theOrder – As wesee PCNF.
We can add an another step to install an new Equipment in our operation
Now you can TECO this order.
Note: (order would not be copiedto Inspectionlot as we the results have failed)

More Related Content

Similar to CalibrationOrderScenario_ZPM5

Resources-Training-Order-To-Cash- ETON Technologies.pdf
Resources-Training-Order-To-Cash- ETON Technologies.pdfResources-Training-Order-To-Cash- ETON Technologies.pdf
Resources-Training-Order-To-Cash- ETON Technologies.pdf
ssuserf4597f
 
Sap sd configuration
Sap sd configurationSap sd configuration
Sap sd configuration
jo.gill2010
 
Oracle AWR baseline - Basic
Oracle AWR baseline - BasicOracle AWR baseline - Basic
Oracle AWR baseline - Basic
Monowar Mukul
 
Embedded wm qm integration setup 1709 in s4-hana
Embedded wm qm integration setup 1709 in s4-hanaEmbedded wm qm integration setup 1709 in s4-hana
Embedded wm qm integration setup 1709 in s4-hana
Muhammad Hafeez-ur-Rehman
 
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshotsSAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
Subhrajyoti (Subhra) Bhattacharjee
 
Productcostingsample
ProductcostingsampleProductcostingsample
Productcostingsample
jayaramreddy
 
Production order - Murali krishna nookella
Production order - Murali krishna nookellaProduction order - Murali krishna nookella
Production order - Murali krishna nookella
murali nookella
 
On receiving customer complaint or return component for repair process
On receiving customer complaint or return component for repair processOn receiving customer complaint or return component for repair process
On receiving customer complaint or return component for repair process
Bharat Rathod
 
Cin fi v1_by_guntupalliharikrishna
Cin fi v1_by_guntupalliharikrishnaCin fi v1_by_guntupalliharikrishna
Cin fi v1_by_guntupalliharikrishna
Hari Krishna
 
Mie Trak
Mie TrakMie Trak
Mie Trak
MIE Solutions
 
Manufacturing - User Manual v1
Manufacturing - User Manual v1Manufacturing - User Manual v1
Manufacturing - User Manual v1
Rohan Thushara
 
ZTE BSS Operation Quick Guide_Rev4.pptx
ZTE BSS Operation Quick Guide_Rev4.pptxZTE BSS Operation Quick Guide_Rev4.pptx
ZTE BSS Operation Quick Guide_Rev4.pptx
Vivi Gusti Anggraini
 
Six Sigma Project = Internet Sample
Six Sigma Project = Internet SampleSix Sigma Project = Internet Sample
Six Sigma Project = Internet Sample
antonioharenas
 
Ap test script
Ap test scriptAp test script
Ap test script
Ratankumar V
 
GCC VAT - 40 days to go
GCC VAT - 40 days to goGCC VAT - 40 days to go
GCC VAT - 40 days to go
Gnana Prakash
 
2nd day System Configuration & Basic Functions Control Functions Design Tools...
2nd day System Configuration & Basic Functions Control Functions Design Tools...2nd day System Configuration & Basic Functions Control Functions Design Tools...
2nd day System Configuration & Basic Functions Control Functions Design Tools...
ssuserd973fe
 
SAP-CO-PC - Product Cost Cycle
SAP-CO-PC - Product Cost CycleSAP-CO-PC - Product Cost Cycle
SAP-CO-PC - Product Cost Cycle
Intelligroup, Inc.
 
Instrumentation ppt original.pptx
Instrumentation ppt original.pptxInstrumentation ppt original.pptx
Instrumentation ppt original.pptx
nzugua michael evans
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
Malla Reddy College of Pharmacy
 
exp 15.docx
exp 15.docxexp 15.docx
exp 15.docx
MuhammadHaseebAshiq
 

Similar to CalibrationOrderScenario_ZPM5 (20)

Resources-Training-Order-To-Cash- ETON Technologies.pdf
Resources-Training-Order-To-Cash- ETON Technologies.pdfResources-Training-Order-To-Cash- ETON Technologies.pdf
Resources-Training-Order-To-Cash- ETON Technologies.pdf
 
Sap sd configuration
Sap sd configurationSap sd configuration
Sap sd configuration
 
Oracle AWR baseline - Basic
Oracle AWR baseline - BasicOracle AWR baseline - Basic
Oracle AWR baseline - Basic
 
Embedded wm qm integration setup 1709 in s4-hana
Embedded wm qm integration setup 1709 in s4-hanaEmbedded wm qm integration setup 1709 in s4-hana
Embedded wm qm integration setup 1709 in s4-hana
 
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshotsSAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
 
Productcostingsample
ProductcostingsampleProductcostingsample
Productcostingsample
 
Production order - Murali krishna nookella
Production order - Murali krishna nookellaProduction order - Murali krishna nookella
Production order - Murali krishna nookella
 
On receiving customer complaint or return component for repair process
On receiving customer complaint or return component for repair processOn receiving customer complaint or return component for repair process
On receiving customer complaint or return component for repair process
 
Cin fi v1_by_guntupalliharikrishna
Cin fi v1_by_guntupalliharikrishnaCin fi v1_by_guntupalliharikrishna
Cin fi v1_by_guntupalliharikrishna
 
Mie Trak
Mie TrakMie Trak
Mie Trak
 
Manufacturing - User Manual v1
Manufacturing - User Manual v1Manufacturing - User Manual v1
Manufacturing - User Manual v1
 
ZTE BSS Operation Quick Guide_Rev4.pptx
ZTE BSS Operation Quick Guide_Rev4.pptxZTE BSS Operation Quick Guide_Rev4.pptx
ZTE BSS Operation Quick Guide_Rev4.pptx
 
Six Sigma Project = Internet Sample
Six Sigma Project = Internet SampleSix Sigma Project = Internet Sample
Six Sigma Project = Internet Sample
 
Ap test script
Ap test scriptAp test script
Ap test script
 
GCC VAT - 40 days to go
GCC VAT - 40 days to goGCC VAT - 40 days to go
GCC VAT - 40 days to go
 
2nd day System Configuration & Basic Functions Control Functions Design Tools...
2nd day System Configuration & Basic Functions Control Functions Design Tools...2nd day System Configuration & Basic Functions Control Functions Design Tools...
2nd day System Configuration & Basic Functions Control Functions Design Tools...
 
SAP-CO-PC - Product Cost Cycle
SAP-CO-PC - Product Cost CycleSAP-CO-PC - Product Cost Cycle
SAP-CO-PC - Product Cost Cycle
 
Instrumentation ppt original.pptx
Instrumentation ppt original.pptxInstrumentation ppt original.pptx
Instrumentation ppt original.pptx
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
exp 15.docx
exp 15.docxexp 15.docx
exp 15.docx
 

CalibrationOrderScenario_ZPM5