Calculating the future
Value analysis predicts program progress!
An Excell tool for mid sized programs – no more runaways!
Programs realizestrategicchange
They are lengthy, defined in broad
terms, changing during execution
Programs are in runaway danger
• McKinsey: Only 30 percent of change programs succeed
• The Economist, a 2004 survey: 57% of the companies had
been unsuccessful in executing on strategic initiatives over
the previous three years.
Mid sized programs lack adequate
control
The control system relies on project
managers estimates and actual costs
No facts, no trends, no coherence
No facts: driving forward looking
back
Progress is based on the past, estimates are
based on opinions
Real progress is unknown
No trends: Finding the way one
inch before your feet
Most control systems show you data at a
specific time,
not time based trends
No coherence: Projects and
business will interfere
A program is not just a set of independent
projects, each on their way
It is the coherence that needs to be managed
Been there, did the tour, got the
T-shirt. Lets share!
If you manage by facts, have trend-
reporting, and make coherence visible
You can control a mid-sized program
Program Future Calculator
We have created a free Excel spreadsheet
for medium sized programs, for a program manager that needs to
create his own control, in a cost oriented environment
Example: Projects in a mid sized
program
The usual suspects: multiple
projects, startdates, budgets
See next sheet for some more usual data
demo
PROJECT ID PROJECT NAME STARTDATE PLANNED
FINISH DATE
BUDGETTED
COSTS
Integral
BUDGETTED
COSTS Time
Based
BUDGETTED
COSTS Cap
Inv
Project Totals € 16,948 € 11,750 € 5,198
7 Example, Finished on time in budget 2-jan-12 20-jun-12 € 1,215 € 810 € 405
31 Example, finished too late over budget 11-feb-12 21-mei-12 € 1,380 € 920 € 460
22 Example, cap invest overspent 22-mrt-12 7-nov-12 € 1,620 € 1,080 € 540
34 Example, too late on budget 1-apr-12 7-okt-12 € 1,418 € 945 € 473
56 Example, on time over budget 1-apr-12 8-sep-12 € 1,125 € 750 € 375
78 Example, premature close 11-mei-12 8-okt-12 € 1,013 € 675 € 338
65 Example, planned over the year 20-jun-12 25-feb-13 € 1,823 € 1,215 € 608
32 Example, running late over the year 21-mei-12 18-okt-12 € 1,088 € 725 € 363
23 Example, no Cap Inv 30-jun-12 27-nov-12 € 675 € 675 € -
5757 Example, capital investment underspent 22-mrt-12 7-nov-12 € 2,900 € 2,160 € 740
543 Future project 1 1-sep-12 10-dec-12 € 810 € 540 € 270
876 Future project 2 15-nov-12 23-feb-13 € 870 € 580 € 290
392923 Late project 1-mrt-12 29-jul-12 € 1,013 € 675 € 338
Example contd.: Actuals on these
projects
Nothing new so far, just a spreadsheet
But now we start the magic
Magic 1: % ready
% ready, as agreed upon up front, based on facts
This allows Value Analysis based predictions
Magic 2: trends
Excel at its best: time based graphs
So patterns are visible, based on actuals and Value Analysis
Magic 3: Coherence
Seeing where you are and where you are headed
To avoid collisions with others
Program control:
Facts, trends, coherence
Download this spreadsheet at www.dicuore.nl
Or at LinkedIn company page diCuore
The Program Future Calculator
Deliberately left blank
Some more screenshots of the
Program Future Calculator
In one fgure: the budget, actuals and a
prognosis
Project portfolio
Cash flowneed of the project portfolio
Addaptive Program Budget
Because budget cuts and creative funding exist
Program Budget
Source
TOTAL
PROGRAM
BUDGET
TOTAL PROGRAM
BUDGET THIS YEAR
TOTAL PROGRAM
BUDGET NEXT YEAR
TOTAL PROGRAM
BUDGET
€ 17,230 € 10,710 € 6,520
1 BUDGT SOURCE 1 19,350€ 12,000€ 7,350€
2 BUDGET SOURCE 2 630€ 210€ 420€
3 BUDGET SOURCE 3 300€ 300€ -€
4 BUDGET CUT 1 (1,500)€ (1,500)€ -€
5 BUDGET CUT 2 (300)€ (300)€ -€
6 Budget cut next year (1,250)€ -€ (1,250)€
Independent Program vs Projects
Portfolio budget
Because projects appear out of nowhere to enter
your program
Clear overview of status
Because Steering Committees are pressed for
time
Prognoses
To control in stead of to react andrepair
Facts, trends and coherence:
Program Future Calculator

More Related Content

Similar to Calculating the future value analysis in programs preventing runaways

ch09 project communication, tracking.ppt
ch09 project communication, tracking.pptch09 project communication, tracking.ppt
ch09 project communication, tracking.pptShivaniArgulwarBachu
 
L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1ghulam MUSTAFA
 
How to set realistic priorities for it budget planning it-toolkits
How to set realistic priorities for it budget planning   it-toolkitsHow to set realistic priorities for it budget planning   it-toolkits
How to set realistic priorities for it budget planning it-toolkitsIT-Toolkits.org
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxDr. ABEER KHALID MANSOUR
 
Project summary report 1 3 proj
Project summary report  1     3 projProject summary report  1     3 proj
Project summary report 1 3 projDIPESH30
 
Chap 5 Estimating Project Times
Chap 5 Estimating Project TimesChap 5 Estimating Project Times
Chap 5 Estimating Project Timesproject management
 
12 Ways to Budget Better
12 Ways to Budget Better12 Ways to Budget Better
12 Ways to Budget BetterKimberly Palmer
 
Cashflow+Spreadsheet
Cashflow+SpreadsheetCashflow+Spreadsheet
Cashflow+Spreadsheetstefaneen13
 
chapter-4 cost mngt.pptx
chapter-4 cost mngt.pptxchapter-4 cost mngt.pptx
chapter-4 cost mngt.pptxBekiTube
 
System Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptSystem Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptAynetuTerefe2
 
-Project-Management.ppt
-Project-Management.ppt-Project-Management.ppt
-Project-Management.pptTecnicoItca
 
Proposed project plan template
Proposed project plan templateProposed project plan template
Proposed project plan templateMichelle Joja
 
Training pm jan 11 part b
Training pm jan 11 part bTraining pm jan 11 part b
Training pm jan 11 part bSiep Littooij
 
Digitalize Your PMO: How to Build a Strategic Enterprise PMO
Digitalize Your PMO: How to Build a Strategic Enterprise PMODigitalize Your PMO: How to Build a Strategic Enterprise PMO
Digitalize Your PMO: How to Build a Strategic Enterprise PMOUMT360
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 

Similar to Calculating the future value analysis in programs preventing runaways (20)

About metacost
About metacostAbout metacost
About metacost
 
ch09 project communication, tracking.ppt
ch09 project communication, tracking.pptch09 project communication, tracking.ppt
ch09 project communication, tracking.ppt
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1
 
How to set realistic priorities for it budget planning it-toolkits
How to set realistic priorities for it budget planning   it-toolkitsHow to set realistic priorities for it budget planning   it-toolkits
How to set realistic priorities for it budget planning it-toolkits
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptx
 
PM using P6
PM using P6PM using P6
PM using P6
 
abate and h.pptx
abate and h.pptxabate and h.pptx
abate and h.pptx
 
Project summary report 1 3 proj
Project summary report  1     3 projProject summary report  1     3 proj
Project summary report 1 3 proj
 
Chap 5 Estimating Project Times
Chap 5 Estimating Project TimesChap 5 Estimating Project Times
Chap 5 Estimating Project Times
 
12 Ways to Budget Better
12 Ways to Budget Better12 Ways to Budget Better
12 Ways to Budget Better
 
Cashflow+Spreadsheet
Cashflow+SpreadsheetCashflow+Spreadsheet
Cashflow+Spreadsheet
 
chapter-4 cost mngt.pptx
chapter-4 cost mngt.pptxchapter-4 cost mngt.pptx
chapter-4 cost mngt.pptx
 
Escaping the Waterfall: Reducing Risk with Agile Development with Scrum
Escaping the Waterfall: Reducing Risk with Agile Development with ScrumEscaping the Waterfall: Reducing Risk with Agile Development with Scrum
Escaping the Waterfall: Reducing Risk with Agile Development with Scrum
 
System Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptSystem Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).ppt
 
-Project-Management.ppt
-Project-Management.ppt-Project-Management.ppt
-Project-Management.ppt
 
Proposed project plan template
Proposed project plan templateProposed project plan template
Proposed project plan template
 
Training pm jan 11 part b
Training pm jan 11 part bTraining pm jan 11 part b
Training pm jan 11 part b
 
Digitalize Your PMO: How to Build a Strategic Enterprise PMO
Digitalize Your PMO: How to Build a Strategic Enterprise PMODigitalize Your PMO: How to Build a Strategic Enterprise PMO
Digitalize Your PMO: How to Build a Strategic Enterprise PMO
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 

Recently uploaded

GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 

Recently uploaded (20)

GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 

Calculating the future value analysis in programs preventing runaways

  • 1. Calculating the future Value analysis predicts program progress! An Excell tool for mid sized programs – no more runaways!
  • 2. Programs realizestrategicchange They are lengthy, defined in broad terms, changing during execution
  • 3. Programs are in runaway danger • McKinsey: Only 30 percent of change programs succeed • The Economist, a 2004 survey: 57% of the companies had been unsuccessful in executing on strategic initiatives over the previous three years.
  • 4. Mid sized programs lack adequate control The control system relies on project managers estimates and actual costs No facts, no trends, no coherence
  • 5. No facts: driving forward looking back Progress is based on the past, estimates are based on opinions Real progress is unknown
  • 6. No trends: Finding the way one inch before your feet Most control systems show you data at a specific time, not time based trends
  • 7. No coherence: Projects and business will interfere A program is not just a set of independent projects, each on their way It is the coherence that needs to be managed
  • 8. Been there, did the tour, got the T-shirt. Lets share! If you manage by facts, have trend- reporting, and make coherence visible You can control a mid-sized program
  • 9. Program Future Calculator We have created a free Excel spreadsheet for medium sized programs, for a program manager that needs to create his own control, in a cost oriented environment
  • 10. Example: Projects in a mid sized program The usual suspects: multiple projects, startdates, budgets See next sheet for some more usual data demo PROJECT ID PROJECT NAME STARTDATE PLANNED FINISH DATE BUDGETTED COSTS Integral BUDGETTED COSTS Time Based BUDGETTED COSTS Cap Inv Project Totals € 16,948 € 11,750 € 5,198 7 Example, Finished on time in budget 2-jan-12 20-jun-12 € 1,215 € 810 € 405 31 Example, finished too late over budget 11-feb-12 21-mei-12 € 1,380 € 920 € 460 22 Example, cap invest overspent 22-mrt-12 7-nov-12 € 1,620 € 1,080 € 540 34 Example, too late on budget 1-apr-12 7-okt-12 € 1,418 € 945 € 473 56 Example, on time over budget 1-apr-12 8-sep-12 € 1,125 € 750 € 375 78 Example, premature close 11-mei-12 8-okt-12 € 1,013 € 675 € 338 65 Example, planned over the year 20-jun-12 25-feb-13 € 1,823 € 1,215 € 608 32 Example, running late over the year 21-mei-12 18-okt-12 € 1,088 € 725 € 363 23 Example, no Cap Inv 30-jun-12 27-nov-12 € 675 € 675 € - 5757 Example, capital investment underspent 22-mrt-12 7-nov-12 € 2,900 € 2,160 € 740 543 Future project 1 1-sep-12 10-dec-12 € 810 € 540 € 270 876 Future project 2 15-nov-12 23-feb-13 € 870 € 580 € 290 392923 Late project 1-mrt-12 29-jul-12 € 1,013 € 675 € 338
  • 11. Example contd.: Actuals on these projects Nothing new so far, just a spreadsheet But now we start the magic
  • 12. Magic 1: % ready % ready, as agreed upon up front, based on facts This allows Value Analysis based predictions
  • 13. Magic 2: trends Excel at its best: time based graphs So patterns are visible, based on actuals and Value Analysis
  • 14. Magic 3: Coherence Seeing where you are and where you are headed To avoid collisions with others
  • 15. Program control: Facts, trends, coherence Download this spreadsheet at www.dicuore.nl Or at LinkedIn company page diCuore The Program Future Calculator
  • 17. Some more screenshots of the Program Future Calculator In one fgure: the budget, actuals and a prognosis
  • 18. Project portfolio Cash flowneed of the project portfolio
  • 19. Addaptive Program Budget Because budget cuts and creative funding exist Program Budget Source TOTAL PROGRAM BUDGET TOTAL PROGRAM BUDGET THIS YEAR TOTAL PROGRAM BUDGET NEXT YEAR TOTAL PROGRAM BUDGET € 17,230 € 10,710 € 6,520 1 BUDGT SOURCE 1 19,350€ 12,000€ 7,350€ 2 BUDGET SOURCE 2 630€ 210€ 420€ 3 BUDGET SOURCE 3 300€ 300€ -€ 4 BUDGET CUT 1 (1,500)€ (1,500)€ -€ 5 BUDGET CUT 2 (300)€ (300)€ -€ 6 Budget cut next year (1,250)€ -€ (1,250)€
  • 20. Independent Program vs Projects Portfolio budget Because projects appear out of nowhere to enter your program
  • 21. Clear overview of status Because Steering Committees are pressed for time
  • 22. Prognoses To control in stead of to react andrepair
  • 23. Facts, trends and coherence: Program Future Calculator