BACHELOR OF SCIENCE (HONOURS) IN ARCHITECTURE
BUILDING STRUCTURES (ARC 2522/2523)
GROUP MEMBERS: NIK AFIQ AMADI BINNIK ABDULLAH(0317749)
NG EE SHIUNG (0314228)
AMEER FARHAN BINRAMLAN (0319304)
PROJECT 2: STRUCTURAL ANALYSIS OF A BUNGALOW
LECTURER’S NAME: MISS ANN SEE PENG
SUBMISSION DATE: 28TH
NOVEMBER2016
Extension Proposal Architectural Plans (scale 1:200)
1. GROUNDFLOOR PLAN
2. FIRST FLOOR PLAN
3. ROOF PLAN
13400
20400
21282
7000
11400
Extension Proposal Structural Plans (Scale 1:200)
4. FOUNDATION LAYOUT PLAN
5. GROUND FLOOR STRUCTURAL PLAN
6. FIRST FLOOR STRUCTURAL PLAN
7. ROOF STRUCTURAL PLAN
QUANTITY DEAD LOADS ACTING ON STRUCTURE
BEAM SELF-WEIGHT
(Assume that initial beam size 200mm x 300mm)
= BeamSize x Concrete Density
=200mm x 300mm x 24kN/m²
= 1.44kN/m²
Ground Floor
Living Room:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Dining Room:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Store Room:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Kitchen:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Toilet:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Corridor:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²= 3.6kN/m²
First Floor
Living Room:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Toilet 1:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Corridor:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Bedroom 1:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Bedroom 2:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Master Bedroom:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
Toilet 2:
Slab Thickness = 150mm
Slab self-weight
= 150mm x 24kN/m²
= 3.6kN/m²
QUANTITY LIVE LOAD ACTING ON
STRUCTURE
(According to 4th schedule of UBBL for live
load according to the function of the space)
Ground Floor
Living Room: 4.0kN/m²
Store Room: 2.5kN/m²
Dining Room: 2.0kN/m²
Kitchen: 2.0kN/m²
Corridor: 2.0kN/m²
Toilet: 2.0kN/m²
First Floor
Living Room: 4.0kN/m²
Corridor: 2.0kN/m²
Toilet 1: 2.0kN/m²
Toilet 2: 2.0kN/m²
Master Bedroom: 1.5kN/m²
Bedroom 1: 1.5kN/m²
Bedroom 2: 1.5kN/m²
QUANTITY LIVE LOADS ACTING ON STRUCTURE VISUAL PLAN
GROUND FLOOR PLAN
2.0 kN/m²
2.5 kN/m²
2.0 kN/m²
4.0 kN/m²
2.0 kN/m² 2.0 kN/m²
FIRST FLOOR PLAN
2.0 kN/m²
2.0 kN/m²
2.0 kN/m²
4.0 kN/m²
1.5 kN/m²
1.5 kN/m²
2.0 kN/m²
1.5 kN/m²
GROUND FLOOR PLAN
FIRST FLOOR PLAN
LOAD DISTRIBUTION
DIAGRAM (SCALE 1:250)
To identifyhowmuchloadwouldbe
transferred from the slab to each
adjacent beam

More Related Content

Viewers also liked

Городской округ Баксан Кабардино-Балкария
Городской округ Баксан Кабардино-Балкария Городской округ Баксан Кабардино-Балкария
Городской округ Баксан Кабардино-Балкария a-dolgih
 
Микромаркет_ updated
Микромаркет_ updatedМикромаркет_ updated
Микромаркет_ updatedAlla Vorobyeva
 
Acoustic Analysis Project 1
Acoustic Analysis Project 1Acoustic Analysis Project 1
Acoustic Analysis Project 1J-Sern Phua
 
Город Дубна Московской области
Город Дубна Московской областиГород Дубна Московской области
Город Дубна Московской областиbsaward
 
2k kniga-po-chten-popova-lapshin-2002-1chast
2k kniga-po-chten-popova-lapshin-2002-1chast2k kniga-po-chten-popova-lapshin-2002-1chast
2k kniga-po-chten-popova-lapshin-2002-1chastshakhtarr00
 
Promoting Manchester
Promoting ManchesterPromoting Manchester
Promoting ManchesterJordan Robson
 
1k rusk-stativka-samonova-12
1k rusk-stativka-samonova-121k rusk-stativka-samonova-12
1k rusk-stativka-samonova-12pidruchnikiinua
 
Theories final
Theories finalTheories final
Theories finalwiibart
 

Viewers also liked (10)

Городской округ Баксан Кабардино-Балкария
Городской округ Баксан Кабардино-Балкария Городской округ Баксан Кабардино-Балкария
Городской округ Баксан Кабардино-Балкария
 
Ugur arkun kocadere_ab2016
Ugur arkun kocadere_ab2016Ugur arkun kocadere_ab2016
Ugur arkun kocadere_ab2016
 
Микромаркет_ updated
Микромаркет_ updatedМикромаркет_ updated
Микромаркет_ updated
 
Acoustic Analysis Project 1
Acoustic Analysis Project 1Acoustic Analysis Project 1
Acoustic Analysis Project 1
 
Город Дубна Московской области
Город Дубна Московской областиГород Дубна Московской области
Город Дубна Московской области
 
2k kniga-po-chten-popova-lapshin-2002-1chast
2k kniga-po-chten-popova-lapshin-2002-1chast2k kniga-po-chten-popova-lapshin-2002-1chast
2k kniga-po-chten-popova-lapshin-2002-1chast
 
Promoting Manchester
Promoting ManchesterPromoting Manchester
Promoting Manchester
 
1k rusk-stativka-samonova-12
1k rusk-stativka-samonova-121k rusk-stativka-samonova-12
1k rusk-stativka-samonova-12
 
1k chitanka-naumenko-12
1k chitanka-naumenko-121k chitanka-naumenko-12
1k chitanka-naumenko-12
 
Theories final
Theories finalTheories final
Theories final
 

Similar to Building structure final report

Bstruc final report
Bstruc final reportBstruc final report
Bstruc final reportLee Yih
 
B structure final_c
B structure final_cB structure final_c
B structure final_cleejanett3
 
B structure final final
B structure final finalB structure final final
B structure final final杉 江紫
 
B structure power point
B structure power pointB structure power point
B structure power pointAnderson Wong
 
BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT jolynnTJL
 
Building Structure Final report
Building Structure Final reportBuilding Structure Final report
Building Structure Final reportCanisius Bong
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2En Huey
 
Jj bstructure individual
Jj bstructure individual Jj bstructure individual
Jj bstructure individual J.j. Hayashi
 
Building Structure Project 2 Group report
Building Structure Project 2 Group reportBuilding Structure Project 2 Group report
Building Structure Project 2 Group reportsuzzanekan
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension junAh Jun
 
Building Structure Group Component
Building Structure Group ComponentBuilding Structure Group Component
Building Structure Group ComponentOng Shi Hui
 
Structure (30 th nov)
Structure (30 th nov)Structure (30 th nov)
Structure (30 th nov)Haroon Faleel
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Patch Yuen
 
BUILDING STRUCTURES 1 COLUMN AND BEAM ANALYSIS
BUILDING STRUCTURES 1 COLUMN AND BEAM ANALYSISBUILDING STRUCTURES 1 COLUMN AND BEAM ANALYSIS
BUILDING STRUCTURES 1 COLUMN AND BEAM ANALYSISYaseen Syed
 
B structure
B structure B structure
B structure Andy Heng
 
CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)Cyle Teal
 

Similar to Building structure final report (20)

Bstruc final report
Bstruc final reportBstruc final report
Bstruc final report
 
B structure final_c
B structure final_cB structure final_c
B structure final_c
 
B structure final final
B structure final finalB structure final final
B structure final final
 
Report
ReportReport
Report
 
B structure power point
B structure power pointB structure power point
B structure power point
 
BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT
 
Building Structure Final report
Building Structure Final reportBuilding Structure Final report
Building Structure Final report
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Jj bstructure individual
Jj bstructure individual Jj bstructure individual
Jj bstructure individual
 
Building Structure Project 2 Group report
Building Structure Project 2 Group reportBuilding Structure Project 2 Group report
Building Structure Project 2 Group report
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension jun
 
Pdfjoiner
PdfjoinerPdfjoiner
Pdfjoiner
 
Building Structure Group Component
Building Structure Group ComponentBuilding Structure Group Component
Building Structure Group Component
 
Structure (30 th nov)
Structure (30 th nov)Structure (30 th nov)
Structure (30 th nov)
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
3. Foundation. Examples.pdf
3. Foundation. Examples.pdf3. Foundation. Examples.pdf
3. Foundation. Examples.pdf
 
BUILDING STRUCTURES 1 COLUMN AND BEAM ANALYSIS
BUILDING STRUCTURES 1 COLUMN AND BEAM ANALYSISBUILDING STRUCTURES 1 COLUMN AND BEAM ANALYSIS
BUILDING STRUCTURES 1 COLUMN AND BEAM ANALYSIS
 
B structure
B structure B structure
B structure
 
CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)
 
Report
ReportReport
Report
 

More from Afiq Knick

Project 1a (pre design analysis)
Project 1a (pre design analysis)Project 1a (pre design analysis)
Project 1a (pre design analysis)Afiq Knick
 
Project management report project 1
Project management report project 1Project management report project 1
Project management report project 1Afiq Knick
 
Theories final 5 n 6
Theories final 5 n 6Theories final 5 n 6
Theories final 5 n 6Afiq Knick
 
Theories final 3
Theories final 3Theories final 3
Theories final 3Afiq Knick
 
Theories final 1
Theories final 1Theories final 1
Theories final 1Afiq Knick
 
Urbanism comparative essay final
Urbanism comparative essay finalUrbanism comparative essay final
Urbanism comparative essay finalAfiq Knick
 
Ibs case study
Ibs case studyIbs case study
Ibs case studyAfiq Knick
 
Conservation essay finale
Conservation essay finaleConservation essay finale
Conservation essay finaleAfiq Knick
 
Bscience project 1 (slides)
Bscience project 1 (slides)Bscience project 1 (slides)
Bscience project 1 (slides)Afiq Knick
 
Bscience project 1 (report)
Bscience project 1 (report)Bscience project 1 (report)
Bscience project 1 (report)Afiq Knick
 
Initial proposal form
Initial proposal formInitial proposal form
Initial proposal formAfiq Knick
 
Csi individual journal
Csi individual journalCsi individual journal
Csi individual journalAfiq Knick
 
Arc2625 log sheet nik afiq amadi 0317749 final.pdf
Arc2625 log sheet nik afiq amadi 0317749 final.pdfArc2625 log sheet nik afiq amadi 0317749 final.pdf
Arc2625 log sheet nik afiq amadi 0317749 final.pdfAfiq Knick
 
Arc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdfArc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdfAfiq Knick
 
Internship training report
Internship training reportInternship training report
Internship training reportAfiq Knick
 
Asian architecture final report
Asian architecture final reportAsian architecture final report
Asian architecture final reportAfiq Knick
 
Building services final report
Building services final reportBuilding services final report
Building services final reportAfiq Knick
 

More from Afiq Knick (20)

Project 1a (pre design analysis)
Project 1a (pre design analysis)Project 1a (pre design analysis)
Project 1a (pre design analysis)
 
Project management report project 1
Project management report project 1Project management report project 1
Project management report project 1
 
Theories final 5 n 6
Theories final 5 n 6Theories final 5 n 6
Theories final 5 n 6
 
Theories final 3
Theories final 3Theories final 3
Theories final 3
 
Theories final 1
Theories final 1Theories final 1
Theories final 1
 
Urbanism comparative essay final
Urbanism comparative essay finalUrbanism comparative essay final
Urbanism comparative essay final
 
Ibs score
Ibs scoreIbs score
Ibs score
 
Ibs case study
Ibs case studyIbs case study
Ibs case study
 
Conservation essay finale
Conservation essay finaleConservation essay finale
Conservation essay finale
 
Bscience project 1 (slides)
Bscience project 1 (slides)Bscience project 1 (slides)
Bscience project 1 (slides)
 
Bscience project 1 (report)
Bscience project 1 (report)Bscience project 1 (report)
Bscience project 1 (report)
 
Csi slide
Csi slideCsi slide
Csi slide
 
Initial proposal form
Initial proposal formInitial proposal form
Initial proposal form
 
Csi individual journal
Csi individual journalCsi individual journal
Csi individual journal
 
Arc2625 log sheet nik afiq amadi 0317749 final.pdf
Arc2625 log sheet nik afiq amadi 0317749 final.pdfArc2625 log sheet nik afiq amadi 0317749 final.pdf
Arc2625 log sheet nik afiq amadi 0317749 final.pdf
 
Arc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdfArc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdf
 
Internship training report
Internship training reportInternship training report
Internship training report
 
Presentation1
Presentation1Presentation1
Presentation1
 
Asian architecture final report
Asian architecture final reportAsian architecture final report
Asian architecture final report
 
Building services final report
Building services final reportBuilding services final report
Building services final report
 

Recently uploaded

Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsAndrey Dotsenko
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 

Building structure final report

  • 1. BACHELOR OF SCIENCE (HONOURS) IN ARCHITECTURE BUILDING STRUCTURES (ARC 2522/2523) GROUP MEMBERS: NIK AFIQ AMADI BINNIK ABDULLAH(0317749) NG EE SHIUNG (0314228) AMEER FARHAN BINRAMLAN (0319304) PROJECT 2: STRUCTURAL ANALYSIS OF A BUNGALOW LECTURER’S NAME: MISS ANN SEE PENG SUBMISSION DATE: 28TH NOVEMBER2016
  • 2. Extension Proposal Architectural Plans (scale 1:200) 1. GROUNDFLOOR PLAN
  • 5. Extension Proposal Structural Plans (Scale 1:200) 4. FOUNDATION LAYOUT PLAN
  • 6. 5. GROUND FLOOR STRUCTURAL PLAN
  • 7. 6. FIRST FLOOR STRUCTURAL PLAN
  • 9. QUANTITY DEAD LOADS ACTING ON STRUCTURE BEAM SELF-WEIGHT (Assume that initial beam size 200mm x 300mm) = BeamSize x Concrete Density =200mm x 300mm x 24kN/m² = 1.44kN/m² Ground Floor Living Room: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Dining Room: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Store Room: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Kitchen: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m²
  • 10. Toilet: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Corridor: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m²= 3.6kN/m² First Floor Living Room: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Toilet 1: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Corridor: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Bedroom 1: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Bedroom 2: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Master Bedroom: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m² Toilet 2: Slab Thickness = 150mm Slab self-weight = 150mm x 24kN/m² = 3.6kN/m²
  • 11. QUANTITY LIVE LOAD ACTING ON STRUCTURE (According to 4th schedule of UBBL for live load according to the function of the space) Ground Floor Living Room: 4.0kN/m² Store Room: 2.5kN/m² Dining Room: 2.0kN/m² Kitchen: 2.0kN/m² Corridor: 2.0kN/m² Toilet: 2.0kN/m² First Floor Living Room: 4.0kN/m² Corridor: 2.0kN/m² Toilet 1: 2.0kN/m² Toilet 2: 2.0kN/m² Master Bedroom: 1.5kN/m² Bedroom 1: 1.5kN/m² Bedroom 2: 1.5kN/m²
  • 12. QUANTITY LIVE LOADS ACTING ON STRUCTURE VISUAL PLAN GROUND FLOOR PLAN 2.0 kN/m² 2.5 kN/m² 2.0 kN/m² 4.0 kN/m² 2.0 kN/m² 2.0 kN/m²
  • 13. FIRST FLOOR PLAN 2.0 kN/m² 2.0 kN/m² 2.0 kN/m² 4.0 kN/m² 1.5 kN/m² 1.5 kN/m² 2.0 kN/m² 1.5 kN/m²
  • 14. GROUND FLOOR PLAN FIRST FLOOR PLAN LOAD DISTRIBUTION DIAGRAM (SCALE 1:250) To identifyhowmuchloadwouldbe transferred from the slab to each adjacent beam