Building Process
ENGAGE
•Architect • Building consultant
• Designer • Draughtsman
• Interior designer
SKETCHPLANS
• Refine ideas
• Preliminary elevations and plans
• Select finishes and fittings
• Discuss plans:neighbours,Council
• Determine budget
PREPARECONSTRUCTIONCERTIFICATE
• Plans
• Specifications and schedules
LODGECONSTRUCTIONCERTIFICATE
CONSTRUCTIONCERTIFICATEAPPROVED
CHOOSEANDCHECKCONTRACT
• Prime cost items • Retention
• Schedules • Liquidated damages
• Inclusions • Defect liability period
SIGNCONTRACTS
COMMENCECONSTRUCTION
CONSTRUCTIONCOMPLETE
INSPECTCONSTRUCTION
• Footings and main structures by engineer
•Waterproof/DPCs
•Timber pest prevention
•Troubleshoot misunderstandings
and problems
Obtainrelevant
Certfication
Seeklegaladvice
Choosecontractor
Documentandagreevariations
andextras
Insurancetocover
contractor’sworkpaid
Checkinsurance:
•Publicliablity
•Workerscompensation
•Contractworks
ObtainOwner-Builder’s
Licence
Selectpossiblecontractors:
•Checkreferences
•Checkcontractor’slicence
•Obtainquotes
PrepareandsubmitDA
CheckCouncilforsimultaneous
lodgmentwithConstruction
Certificate
IsDevelopmentApplication
(DA)required?
YES
NO
AreEngineeringorother
specialistdrawingsrequired?
ObtainWaterandSewerage
AuthorityApproval
PrepareEngineeringdrawings
Amendcontracts
If dispute
occurs
Go to
DISPUTES
OBTAINPLANCHECK
Addmissinginformationand
correctdrawings
Surveyortoconfirmcorrect
locationandheightofworks
FINALINSPECTION
Beforepayingfinalclaim
Contractorrectifiesor
completesthework
DEFECTLIABILITYINSPECTION
Beforepayingfinalretention
If Owner
Builder
© Tyrrells IT Proprietary Limited
������������
������������
������������
������������
������������
������������
Assessexistingstructuresfor
latentdefects ������������
������������
ObtainDilapidationReportof
surroundingproperties������������
tyrrells.com

building process Flowchart

  • 1.
    Building Process ENGAGE •Architect •Building consultant • Designer • Draughtsman • Interior designer SKETCHPLANS • Refine ideas • Preliminary elevations and plans • Select finishes and fittings • Discuss plans:neighbours,Council • Determine budget PREPARECONSTRUCTIONCERTIFICATE • Plans • Specifications and schedules LODGECONSTRUCTIONCERTIFICATE CONSTRUCTIONCERTIFICATEAPPROVED CHOOSEANDCHECKCONTRACT • Prime cost items • Retention • Schedules • Liquidated damages • Inclusions • Defect liability period SIGNCONTRACTS COMMENCECONSTRUCTION CONSTRUCTIONCOMPLETE INSPECTCONSTRUCTION • Footings and main structures by engineer •Waterproof/DPCs •Timber pest prevention •Troubleshoot misunderstandings and problems Obtainrelevant Certfication Seeklegaladvice Choosecontractor Documentandagreevariations andextras Insurancetocover contractor’sworkpaid Checkinsurance: •Publicliablity •Workerscompensation •Contractworks ObtainOwner-Builder’s Licence Selectpossiblecontractors: •Checkreferences •Checkcontractor’slicence •Obtainquotes PrepareandsubmitDA CheckCouncilforsimultaneous lodgmentwithConstruction Certificate IsDevelopmentApplication (DA)required? YES NO AreEngineeringorother specialistdrawingsrequired? ObtainWaterandSewerage AuthorityApproval PrepareEngineeringdrawings Amendcontracts If dispute occurs Go to DISPUTES OBTAINPLANCHECK Addmissinginformationand correctdrawings Surveyortoconfirmcorrect locationandheightofworks FINALINSPECTION Beforepayingfinalclaim Contractorrectifiesor completesthework DEFECTLIABILITYINSPECTION Beforepayingfinalretention If Owner Builder © Tyrrells IT Proprietary Limited ������������ ������������ ������������ ������������ ������������ ������������ Assessexistingstructuresfor latentdefects ������������ ������������ ObtainDilapidationReportof surroundingproperties������������ tyrrells.com