Stemashan Construction Civil Engineering Services Project Management Programme Management General Management Plant & Logistics Engineering Excellence through partnerships enhancing service delivery PROFILE Storm Water  Sanitation  Roads  Earthworks  Housing SC
General Information STEMASHAN CONSTRUCTION  was formed in 1995 after the founder Mr Stephen Bahula saw a major shortage of Construction firms from previously disadvantaged communities. The company has since grown significantly and is managed by highly multi-skilled professional team.  Stemashan  is a wholly  “Black” owned and managed company and, is able to deliver projects on time and within budget. Our level 6CEPE CIDB grading attests to our capacity, efficiency and quality of work. In view of the level and status of company’s profile it has converted from a Close Corporation to and Pty Ltd entity in 2008. Our vision is to provide excellent, cost effective services. Our mission is to support the social, economic and infrastructure development requirements of our country. We aim to grow our capacity to be able to engage the challenges of building sustainable communities. SC
General Information OUR CLIENTS We are committed to and consider our client as first priority. We believe that our Clients are key to our success and continued business innovation. It is for this reason that, we will continue to be advised by their needs and respond thereto by providing them with the very best service, in meeting their objectives within reasonable time, budget and quality. EMPLOYEES It is our aim to provide a sound employment opportunity to our employees, paying careful attention to the legal conditions of the country in which we operate, we further believe in the continuous development of our staff to full potential in response to the changing environment within which we operate.  CONTRACTOR’S DEVELOPMENT We transfer skills where needed during our operational activities to potential sub-contractors in all construction activities where possible depending on the Client’s needs, without sacrificing quality and standards. We will advice the Client’s on outsourcing, such activities as and when required during project planning and implementation – with the full engagement of the Client directly, in pursuant of the above objective. COMMUNITIES AND ENVIRONMENT Our company provides a safe environment at all times during and after the completed operations. Where need arises, and within reach, we will advice on the mechanisms that will ensure that, the environment is restored to its original state- General and selective skill will be provided free, during operations, to enable them to operate and maintain the infrastructure provided . In general, the firm provides a platform for needy student(s) of all races with a particular emphasis to previously disadvantaged groupings, by providing them with the following: Bursaries and loans scheme for higher education needs Practical experience in the engineering fields. Ensuring Local Economic Benefit. SC
General Information BUSINESS APPROACH AND PHILOSOPHY We are fully aware that projects do not only consist of an engineering component, but that financial - social and environmental, issues play a major role during planning and implementation stage. Therefore, we adopt  a holistic approach towards projects, incorporating the following: Suggest alternative construction methods where practically possible within Client’s economic affordability Formulating alternative solutions in terms   of affordable standards for the project . Project monitoring at all times with our qualified personnel to ensure product conformity to applicable standard.  COMMUNITY DEVELOPMENT AND INVOLVEMENT The firm has over the years gained valuable experience in the implementation of projects with maximum community involvement. The implementation of the projects supports the objective of economic and upliftment of the communities through the following: Maximum employment creation Provision of skills training where required Full community participation through their appointed representatives Maximum social and economic upliftment of the local communities LABOUR – INTENSIVE CONSTRUCTION The company has been involved in various projects with maximum use of local labour resulting in Local Economic Benefit.  SC
Company Structure MD:  MR. STEPHEN BAHULA TECHNICAL MANAGER: MR. ELVIS NALEDZANE TECHNICAL: MR. LUDICK LEGONG TECHNICAL: MR. KOMANE MATHEBE OFFICE MANAGER/ Accounts: MS. BEVERLY SIBANYONI PROCUREMENT/ HR MANAGER: MR. ROBERT MATSEKE OPERATIONAL MANAGER: MR. MICHAEL LESHIKA SITE MANAGER: MR. ISAAC DUMELA SITE SAFETY MANAGER: MR. COLBERT MASHABA FOREMAN: MR. RICHARD THOFU FOREMAN: MR. EDWIN MUTSHINYALO RECEPTIONIST: MS. MATILDA KGATLE BUSINESS DEVELOPMENT MANAGER: MR. TSHAMANO NENGOVHELA HEALTH & SAFETY: MR. MOSSES RINGANE Quantity Survey Projects &  Coordination Lawrence Samson SC
Scope of Experience Since its inception, the company has gained experience in various projects and subsequently grown into a fully-fledged construction company capable of handling all projects of varying sizes, discipline and value. Stemashan Construction has provided project management services Gauteng, Kwazulu Natal, Freestate, North West Province and Mpumalanga focusing on infrastucture services to previously disadvantaged communities. The company works in close association with highly qualified engineers, quantity surveyors and designers. The company participates in the prestigious MIG Programme of government. The company enjoys the support of many esteemed civil engineering consulting companies. It draws on the expertise of the relevant professionals to ensure that the crucial elements of quantities and costs relating to quality are meticulously undertaken to guarantee on time – within budget services. Project Management Services Project management, including project management of multidisciplinary projects.  Procurement & contract documentation.  Cost engineering and estimating.  Construction management and site supervision.  Quality assurance management.  Contract administration.  Programming, scheduling and time-control management.  Engineering quantity surveying services and cost control.  SC
Statutory Compliances Registration Number Company Registration :2008/008432/07 VAT Registration Number :4490154509 Workman’s Compensation :0966-575-0500 Unemployment Insurance Fund :U620741522 PAYE :7620741522 SDL :L620741522 Construction Industry Development Board :103891 (6CE PE) National Home Builders Registration Council :3212 SC
Storm Water Ekhuruleni Metro Stemashan Construction  is active in township infrastructure and related municipal service initiatives. It is experienced in the design and implementation of projects utilising labour intensive methods. The company  successfully completed the construction of  concrete storm water channels for Ekhuruleni Metropolitan Council (formerly Eastern District Council) SC
Water Reticulation & Sanitation Kgetleng Local Municipality (Koster) Moses Kotane Municipality & Kanana Stemashan Construction participates in the provision of acceptable forms of ablution facilities to households through the Bucket Eradication Programme of Government. The company engages service providers and suppliers who are solutions based towards “closing the sanitation loop”, with eco-friendly and sustainable products.  VIP (Ventilated Improved Pit) toilets are constructed for the Rustenburg Local Municipality in the Kanana and Koster Districts. We have installed 4000 and 100 VIP’s respectively. Water borne ablution facilities were built. Sanitation and Water reticulation work was also successfully undertaken by the company. SC
Roads  Victor Khanye Municipality Western Area Municipality Stemashan Construction is involved in the provision of infrastructure services for previously disadvantaged communities. The company successfully completed the supply of roads for  Victor Khanye and Western Area Municipalities. One of our prestigious clients is the Joburg Roads Agency. Road construction using labour-intensive methods, creating employment through liaison with communities and the emerging contractor sector. Road improvements (conversion of gravel to tar roads) to increase capacity and safety of existing facilities, as well as routine road maintenance services.   Mamelodi The Taxi is the primary mode of transport for millions of South Africans. Inclement weather often makes waiting for a taxi uncomfortable. Stemashan Construction has upgraded the Denneboom taxi rank.  SC
Roads  UGU District Municipality KZN One of the major challenges facing KZN is the large concentration of population in peri-urban districts. One of these is Port Shepstone which has a large population with a lack of road infrastructure supporting it’s peri-urban districts. Stemashan has participated  rehabilitation of the Node Access Road for the UGU District Municipality. Stemashan Construction is able to undertake upgrading projects relating to new roads construction, and gravel to concrete or black top surface road rehabilitation. Having made an entry in to the KZN Province, the company hopes to entrench it’s presence here so as to fast track service delivery to the local municipalities and districts.  SC
Water Pipelines & Pump Stations  Victor Khanye Municipality One of the biggest challenges facing communities is access to clean running water. Settlements for Previously Disadvantaged communities are characterised by low levels of bulk services. Stemashan Construction has the capacity for large water projects which contributes towards addressing the water and sanitation needs of poor communities.  Pipeline Project for Victor Khanye Municipality Pump Station for Victor Khanye Municipality SC
Residential & Commercial Buildings Our government’s biggest challenge is the provision of housing for poor communities. The huge housing backlog requires the concerted efforts of all roleplayers and stakeholders.  Stemashan Construction is experienced and is involved in the construction of bonded, rental and RDP housing. The company is also involved in commercial projects: Upgrading of campus Tshwane North College in Mamelodi Building of  chalets in Piet Retief (retention of aesthetic features in view of local surroundings) Building a community centre in Piet Retief   SC
Plant & Machinery Over the years Stemashan Construction has acquired an array of plant, machinery and vehicles to execute projects on-time and within-budget. All plant, machinery and vehicles are maintained and kept in readiness for projects that my arise. The company also hires plant and machinery to other smaller companies.  SC
Offices Head Offices Gauteng Tel.: - 087 808 3819 Fax: - 012-804 6134 [email_address] 646 PRESIDENT STREET SILVERTON  0127 POSTNET SUIT 92 PRIVATE BAG X 592 SILVERTON  0127 Kwazulu Natal Gateway Autocity 2 Jubilee Grove Umhlanga Rocks Durban Postal Address 16 Erythrina Avenue Croftdene Chatsworth 4092 SC
Completed Projects YEAR DESCRIPTION CLIENT CONSULTING ENGINEERS VALUE DURATION 1999 Taxi Rank City of Tshwane V & V Consulting Eng. (012) 323 9351 230 000.00 2 Months 2000 Water Supply Eastern District Council Eyethu Engineers (012) 717 6296 2 000 000.00 6 Months 2000 Rehabilitation of Stormwater Mogalakwena Municipality Dombo & Du Plessis (015) 491 3615 1 500 000.00 5 Months 2001 Upgrading of Sports Facility Nkangala District Municipality SCIP Pty Ltd (013) 656 3615 700 000.00 2 Months 2002 Rehabilitation of Roads Mpumalanga Provincial Govt Mathaka Engineers (012) 803 3398 2 500 000.00 6 Months 2003 Tarring of Roads Delmas Municipal Council Mathaka Engineers (012) 803 3398 2 500 000.00 3 Months 2004 Rehabilitation of Roads City of Tshwane Roads & Transport Dept. 24 000 000.00 24 Months 2004 Rehabilitation of Gullies City of Tshwane GVM Inc. (012) 549 0422 1 600 000.00 3 Months 2005 Water Supply Flinksdrift Moretele Minicipality Thebe-Lerumo Project Managers 073 4625469 1 600 000.00 4 Months 2006 Water/Sewer Reticulation Moretele Municipality Mkgalakwena Projects 083 301 5992 6 000 000.00 7 Months 2007 Sewer Rehabilitation Kungwini Municipality Tshwane Consulting (012) 349 1389 1 800 000.00 3 Months 2008 Upgrading of roads in simunye Westonaria Municipality Pro-plan Consulting (011) 954 4441 Mr. Botha 6 200 000.00 8 Months SC
Recently Completed & Current projects SC 2 months 6 000 000 Bigen Africa Diepsloot Upgrading of Roads 2010 6 months 24 000 000 Kanana Rustenburg VIP Toilets 2010 4 Months 3 358 116.83 Manes Consulting  (013) 656 3826 PS Thokwane Kungwini Local Municipality Upgrading from  gravel to tar of  internal streets in Zithibeni 2009 8 months 15 344 771.77 - Moses Kotane Local Municipality Reagile water & sanitation  2009 12 months 20 000 000.00 Tau Pride Projects (011) 465 1530 Mr. Cyril Ekhuruleni  Metropolitan municipality Ekhuruleni:  design, upgrading & constriction of gravel roads (2010 & special projects)  2008 6 months 32 194 013.90 Skip consulting engineers (011) 888 1425 Mr. K Booysen Gauteng Provincial Government Construction of  Link Roads, Bridge and Beautification  2008

Stemashan Construction Profile

  • 1.
    Stemashan Construction CivilEngineering Services Project Management Programme Management General Management Plant & Logistics Engineering Excellence through partnerships enhancing service delivery PROFILE Storm Water Sanitation Roads Earthworks Housing SC
  • 2.
    General Information STEMASHANCONSTRUCTION was formed in 1995 after the founder Mr Stephen Bahula saw a major shortage of Construction firms from previously disadvantaged communities. The company has since grown significantly and is managed by highly multi-skilled professional team. Stemashan is a wholly “Black” owned and managed company and, is able to deliver projects on time and within budget. Our level 6CEPE CIDB grading attests to our capacity, efficiency and quality of work. In view of the level and status of company’s profile it has converted from a Close Corporation to and Pty Ltd entity in 2008. Our vision is to provide excellent, cost effective services. Our mission is to support the social, economic and infrastructure development requirements of our country. We aim to grow our capacity to be able to engage the challenges of building sustainable communities. SC
  • 3.
    General Information OURCLIENTS We are committed to and consider our client as first priority. We believe that our Clients are key to our success and continued business innovation. It is for this reason that, we will continue to be advised by their needs and respond thereto by providing them with the very best service, in meeting their objectives within reasonable time, budget and quality. EMPLOYEES It is our aim to provide a sound employment opportunity to our employees, paying careful attention to the legal conditions of the country in which we operate, we further believe in the continuous development of our staff to full potential in response to the changing environment within which we operate. CONTRACTOR’S DEVELOPMENT We transfer skills where needed during our operational activities to potential sub-contractors in all construction activities where possible depending on the Client’s needs, without sacrificing quality and standards. We will advice the Client’s on outsourcing, such activities as and when required during project planning and implementation – with the full engagement of the Client directly, in pursuant of the above objective. COMMUNITIES AND ENVIRONMENT Our company provides a safe environment at all times during and after the completed operations. Where need arises, and within reach, we will advice on the mechanisms that will ensure that, the environment is restored to its original state- General and selective skill will be provided free, during operations, to enable them to operate and maintain the infrastructure provided . In general, the firm provides a platform for needy student(s) of all races with a particular emphasis to previously disadvantaged groupings, by providing them with the following: Bursaries and loans scheme for higher education needs Practical experience in the engineering fields. Ensuring Local Economic Benefit. SC
  • 4.
    General Information BUSINESSAPPROACH AND PHILOSOPHY We are fully aware that projects do not only consist of an engineering component, but that financial - social and environmental, issues play a major role during planning and implementation stage. Therefore, we adopt a holistic approach towards projects, incorporating the following: Suggest alternative construction methods where practically possible within Client’s economic affordability Formulating alternative solutions in terms of affordable standards for the project . Project monitoring at all times with our qualified personnel to ensure product conformity to applicable standard. COMMUNITY DEVELOPMENT AND INVOLVEMENT The firm has over the years gained valuable experience in the implementation of projects with maximum community involvement. The implementation of the projects supports the objective of economic and upliftment of the communities through the following: Maximum employment creation Provision of skills training where required Full community participation through their appointed representatives Maximum social and economic upliftment of the local communities LABOUR – INTENSIVE CONSTRUCTION The company has been involved in various projects with maximum use of local labour resulting in Local Economic Benefit. SC
  • 5.
    Company Structure MD: MR. STEPHEN BAHULA TECHNICAL MANAGER: MR. ELVIS NALEDZANE TECHNICAL: MR. LUDICK LEGONG TECHNICAL: MR. KOMANE MATHEBE OFFICE MANAGER/ Accounts: MS. BEVERLY SIBANYONI PROCUREMENT/ HR MANAGER: MR. ROBERT MATSEKE OPERATIONAL MANAGER: MR. MICHAEL LESHIKA SITE MANAGER: MR. ISAAC DUMELA SITE SAFETY MANAGER: MR. COLBERT MASHABA FOREMAN: MR. RICHARD THOFU FOREMAN: MR. EDWIN MUTSHINYALO RECEPTIONIST: MS. MATILDA KGATLE BUSINESS DEVELOPMENT MANAGER: MR. TSHAMANO NENGOVHELA HEALTH & SAFETY: MR. MOSSES RINGANE Quantity Survey Projects & Coordination Lawrence Samson SC
  • 6.
    Scope of ExperienceSince its inception, the company has gained experience in various projects and subsequently grown into a fully-fledged construction company capable of handling all projects of varying sizes, discipline and value. Stemashan Construction has provided project management services Gauteng, Kwazulu Natal, Freestate, North West Province and Mpumalanga focusing on infrastucture services to previously disadvantaged communities. The company works in close association with highly qualified engineers, quantity surveyors and designers. The company participates in the prestigious MIG Programme of government. The company enjoys the support of many esteemed civil engineering consulting companies. It draws on the expertise of the relevant professionals to ensure that the crucial elements of quantities and costs relating to quality are meticulously undertaken to guarantee on time – within budget services. Project Management Services Project management, including project management of multidisciplinary projects. Procurement & contract documentation. Cost engineering and estimating. Construction management and site supervision. Quality assurance management. Contract administration. Programming, scheduling and time-control management. Engineering quantity surveying services and cost control. SC
  • 7.
    Statutory Compliances RegistrationNumber Company Registration :2008/008432/07 VAT Registration Number :4490154509 Workman’s Compensation :0966-575-0500 Unemployment Insurance Fund :U620741522 PAYE :7620741522 SDL :L620741522 Construction Industry Development Board :103891 (6CE PE) National Home Builders Registration Council :3212 SC
  • 8.
    Storm Water EkhuruleniMetro Stemashan Construction is active in township infrastructure and related municipal service initiatives. It is experienced in the design and implementation of projects utilising labour intensive methods. The company successfully completed the construction of concrete storm water channels for Ekhuruleni Metropolitan Council (formerly Eastern District Council) SC
  • 9.
    Water Reticulation &Sanitation Kgetleng Local Municipality (Koster) Moses Kotane Municipality & Kanana Stemashan Construction participates in the provision of acceptable forms of ablution facilities to households through the Bucket Eradication Programme of Government. The company engages service providers and suppliers who are solutions based towards “closing the sanitation loop”, with eco-friendly and sustainable products. VIP (Ventilated Improved Pit) toilets are constructed for the Rustenburg Local Municipality in the Kanana and Koster Districts. We have installed 4000 and 100 VIP’s respectively. Water borne ablution facilities were built. Sanitation and Water reticulation work was also successfully undertaken by the company. SC
  • 10.
    Roads VictorKhanye Municipality Western Area Municipality Stemashan Construction is involved in the provision of infrastructure services for previously disadvantaged communities. The company successfully completed the supply of roads for Victor Khanye and Western Area Municipalities. One of our prestigious clients is the Joburg Roads Agency. Road construction using labour-intensive methods, creating employment through liaison with communities and the emerging contractor sector. Road improvements (conversion of gravel to tar roads) to increase capacity and safety of existing facilities, as well as routine road maintenance services. Mamelodi The Taxi is the primary mode of transport for millions of South Africans. Inclement weather often makes waiting for a taxi uncomfortable. Stemashan Construction has upgraded the Denneboom taxi rank. SC
  • 11.
    Roads UGUDistrict Municipality KZN One of the major challenges facing KZN is the large concentration of population in peri-urban districts. One of these is Port Shepstone which has a large population with a lack of road infrastructure supporting it’s peri-urban districts. Stemashan has participated rehabilitation of the Node Access Road for the UGU District Municipality. Stemashan Construction is able to undertake upgrading projects relating to new roads construction, and gravel to concrete or black top surface road rehabilitation. Having made an entry in to the KZN Province, the company hopes to entrench it’s presence here so as to fast track service delivery to the local municipalities and districts. SC
  • 12.
    Water Pipelines &Pump Stations Victor Khanye Municipality One of the biggest challenges facing communities is access to clean running water. Settlements for Previously Disadvantaged communities are characterised by low levels of bulk services. Stemashan Construction has the capacity for large water projects which contributes towards addressing the water and sanitation needs of poor communities. Pipeline Project for Victor Khanye Municipality Pump Station for Victor Khanye Municipality SC
  • 13.
    Residential & CommercialBuildings Our government’s biggest challenge is the provision of housing for poor communities. The huge housing backlog requires the concerted efforts of all roleplayers and stakeholders. Stemashan Construction is experienced and is involved in the construction of bonded, rental and RDP housing. The company is also involved in commercial projects: Upgrading of campus Tshwane North College in Mamelodi Building of chalets in Piet Retief (retention of aesthetic features in view of local surroundings) Building a community centre in Piet Retief SC
  • 14.
    Plant & MachineryOver the years Stemashan Construction has acquired an array of plant, machinery and vehicles to execute projects on-time and within-budget. All plant, machinery and vehicles are maintained and kept in readiness for projects that my arise. The company also hires plant and machinery to other smaller companies. SC
  • 15.
    Offices Head OfficesGauteng Tel.: - 087 808 3819 Fax: - 012-804 6134 [email_address] 646 PRESIDENT STREET SILVERTON 0127 POSTNET SUIT 92 PRIVATE BAG X 592 SILVERTON 0127 Kwazulu Natal Gateway Autocity 2 Jubilee Grove Umhlanga Rocks Durban Postal Address 16 Erythrina Avenue Croftdene Chatsworth 4092 SC
  • 16.
    Completed Projects YEARDESCRIPTION CLIENT CONSULTING ENGINEERS VALUE DURATION 1999 Taxi Rank City of Tshwane V & V Consulting Eng. (012) 323 9351 230 000.00 2 Months 2000 Water Supply Eastern District Council Eyethu Engineers (012) 717 6296 2 000 000.00 6 Months 2000 Rehabilitation of Stormwater Mogalakwena Municipality Dombo & Du Plessis (015) 491 3615 1 500 000.00 5 Months 2001 Upgrading of Sports Facility Nkangala District Municipality SCIP Pty Ltd (013) 656 3615 700 000.00 2 Months 2002 Rehabilitation of Roads Mpumalanga Provincial Govt Mathaka Engineers (012) 803 3398 2 500 000.00 6 Months 2003 Tarring of Roads Delmas Municipal Council Mathaka Engineers (012) 803 3398 2 500 000.00 3 Months 2004 Rehabilitation of Roads City of Tshwane Roads & Transport Dept. 24 000 000.00 24 Months 2004 Rehabilitation of Gullies City of Tshwane GVM Inc. (012) 549 0422 1 600 000.00 3 Months 2005 Water Supply Flinksdrift Moretele Minicipality Thebe-Lerumo Project Managers 073 4625469 1 600 000.00 4 Months 2006 Water/Sewer Reticulation Moretele Municipality Mkgalakwena Projects 083 301 5992 6 000 000.00 7 Months 2007 Sewer Rehabilitation Kungwini Municipality Tshwane Consulting (012) 349 1389 1 800 000.00 3 Months 2008 Upgrading of roads in simunye Westonaria Municipality Pro-plan Consulting (011) 954 4441 Mr. Botha 6 200 000.00 8 Months SC
  • 17.
    Recently Completed &Current projects SC 2 months 6 000 000 Bigen Africa Diepsloot Upgrading of Roads 2010 6 months 24 000 000 Kanana Rustenburg VIP Toilets 2010 4 Months 3 358 116.83 Manes Consulting (013) 656 3826 PS Thokwane Kungwini Local Municipality Upgrading from gravel to tar of internal streets in Zithibeni 2009 8 months 15 344 771.77 - Moses Kotane Local Municipality Reagile water & sanitation 2009 12 months 20 000 000.00 Tau Pride Projects (011) 465 1530 Mr. Cyril Ekhuruleni Metropolitan municipality Ekhuruleni: design, upgrading & constriction of gravel roads (2010 & special projects) 2008 6 months 32 194 013.90 Skip consulting engineers (011) 888 1425 Mr. K Booysen Gauteng Provincial Government Construction of Link Roads, Bridge and Beautification 2008