SlideShare a Scribd company logo
Building Maintenance
    Documentation Process
                               Initial Idea



   The system would be a web based upload sight for equipment
    specification PDFs that are used to create OEM building manuals.

   Project assistants would upload the files and organize them.

   For turnover to the Building Owner, files could be printed out in a
    traditional OEM manner, a web site version could be hosted in the
    cloud, or a local site built.

   A smartphone app would be created so that QR Codes on
    equipment could be scanned to access the PDFs
Building Maintenance
    Documentation Process
                 Group Brainstorming Changes


   Engineer's drawings and documents could be used to create
    an initial list of equipment names and preliminary submittals.

   Coordinators could be leveraged to put files / information into
    the system.

   Maintenance record tracking would be added to the system.

   AutoDesk Navisworks Manage Models could be an alternate
    way to store / display the information
Engineer Response                            Interviewed: Ralph Stingo

• The engineer that was interviewed thought the idea showed
  promise and liked a lot of the original idea.

Positives:

• He thought there was value in the how the software would
  be able to track and help maintain equipment.
• Thought the application would help save money by
  keeping the scheduled maintenance stay on track to
  prevent major failures.
• Liked how the application would help keep all of the
  information passed between people working on the
  project.

Negatives:

• He was not sure that all of the trades would see the value
  in using one more piece of software to track different parts
Engineer Response
Negatives (cont.):

• Concerned Submittals would be missed without a system
  to inform the different trades about changes.

Improvements:

• Suggested we create some way to import information from
  systems like Prolog and Constructware.
• Have some method of showing if equipment has
  nonstandard parts included.
• Have a method of ordering parts from the equipment
  description page.
• Have the equipment screen send out alerts for scheduled
  maintenance.
General Contractor                            Interviewed: Bill Raymond,
Response                                                    Baker Glasgow

• The general contractor’s both noticed the benefit’s of the
  application but are currently using a product providing some of
  the same functions.
 Positives:

 • They liked the fact that some of the functions were automatic that
   were manual and time consuming in the current utility they were
   using.
 • They liked being able to pass on the information collected since the
   start of a project to the building owners and building maintenance.

 Negatives:

 •   They were not sure that the application would be enough to get
     them to leave the current application they use.

 Improvements:

 • Create a method to pass information back and forward to their
   current application and the new application.
Interviewed: Dan Mcdowell,
Mechanical Contractor                        Leigh Setzer, Rod Childress,
                                             Brandon Cobb, Shirley
Response                                     Manning


• The Mechanical Contractor ‘s were very interested in the
  application since it would cut a lot of work out at the end of the
  project and ensure all maintenance was performed during the
  warranty contract period.
Positives:

• They liked that some of the steps would be automated and would help
  reduce the labor cost setting up binders or CD’s.
• The fact that everything could be available online would take away the
  time searching for manuals online.
• They liked how equipment or parts could be searched for by name.
• They thought that the added features for servicing equipment would
  help them and the businesses they support provide the best support for
  equipment.

Negatives:

• Concerned the information on the site may not stay current.
Mechanical Contractor
Response
Negatives (cont.):

• Some equipment manufacturer’s will not provide information without
  contacting them.

Improvements

• Create a way to add old jobs to the system.
• Create a way to link equipment to some sort of asset database.
Building Maintenance
                                                Interviewed: Garden Freeman
Response
• The response from building maintenance was positive with
  interest in having access to so much of the information available
  online.
 Positives:

 • Easy to get to the maintenance records.
 • Quick access to the information.

 Improvements:

 • Creating a link with the existing systems.
Building Maintenance
Documentation Process

    Post-Value Proposition Interviews
Building Maintenance
Documentation Process
           MEP Engineers Input Equipment Info



                           Web Interface

                       CAD Software Tools

                     CAD Drawing Sweeper



 If the engineer can input preliminary information about the equipment
(designation and initial submittals), then system can implement checklists.
Building Maintenance
 Documentation Process
                  MEP Coordinators Input / Modify

                         Equipment Information


                                Web Interfaces

                             CAD Software Tools


Coordinators already have to download product info to draw equipment for fabrication
     and coordination. If they can input this information when they are drawing and
  placing the equipment in the drawing, it can eliminate project assistants from having
                                          to do it.
Building Maintenance
Documentation Process
         Project Manager / Project Assistants Confirm

                  And Organize All Submittals



                           Web Interface

                       Navisworks Manage



   The web interface will allow for changing the equipment and
information about the equipment. It will also allow for organizing the
                equipment for display and printing
Building Maintenance
    Documentation Process
                    Building Owners / Building Maintenance



                                      Web Interface

                                    Smart Phone Apps

                             QR Codes On Equipment



    The web interface will include maintenance records, comments about special
    items used, links to the specifications, links to the manufacturer’s website and
                             routine maintenance schedule
Building Maintenance
 Documentation Process
     Still To Be Answered Implementation Questions



Should the system leverage existing products by tying together
     software already in use to handle different parts of the
  process? Or should it be a new comprehensive standalone
                            system?



 Should this be used as a comprehensive submittal tracking
              system for the General Contractor?

More Related Content

What's hot

Lecture 01 Introduction to Software Engineering
Lecture 01 Introduction to Software EngineeringLecture 01 Introduction to Software Engineering
Lecture 01 Introduction to Software Engineering
Achmad Solichin
 
Pankaj Singh_CV
Pankaj Singh_CVPankaj Singh_CV
Pankaj Singh_CV
Pankaj Singh
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrent
Jim Sundin
 
NeilBrittleton Current CV
NeilBrittleton Current CVNeilBrittleton Current CV
NeilBrittleton Current CV
Neil Brittleton
 
David Martin Resume
David Martin ResumeDavid Martin Resume
David Martin Resume
David Martin M.S., PMP
 
Chuck_Roden_Resume
Chuck_Roden_ResumeChuck_Roden_Resume
Chuck_Roden_Resume
Chuck Roden
 
Williams Joseph resume
Williams Joseph resumeWilliams Joseph resume
Williams Joseph resume
Ron Williams
 
Emergent architecture- a casestudy TREDS
Emergent architecture- a casestudy TREDSEmergent architecture- a casestudy TREDS
Emergent architecture- a casestudy TREDS
Syed Rayhan
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
tanni821216
 
PCB Design and Data Management
PCB Design and Data ManagementPCB Design and Data Management
PCB Design and Data Management
EMA Design Automation
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
Zahoor Khan
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
Aconex
 
SteveStaabsresumer2
SteveStaabsresumer2SteveStaabsresumer2
SteveStaabsresumer2
Steve Staabs
 
Argonne Win7 Closeout
Argonne Win7 CloseoutArgonne Win7 Closeout
Argonne Win7 Closeout
Chad Karkos
 
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
ASK EHS Engineering & Consultants
 
Resume_Serma_Professional (2)
Resume_Serma_Professional (2)Resume_Serma_Professional (2)
Resume_Serma_Professional (2)
Sermaselvan Uthirapandian
 
01 intro+
01 intro+01 intro+
01 intro+
im|s
 
Michael Grumbach PM Resume 2015
Michael Grumbach PM Resume 2015Michael Grumbach PM Resume 2015
Michael Grumbach PM Resume 2015
Michael Grumbach, PMP, CSM
 
Citrix AppDNA Management Overview v7.6
Citrix AppDNA Management Overview v7.6Citrix AppDNA Management Overview v7.6
Citrix AppDNA Management Overview v7.6
Kerry Dirks MCPS MS
 
DevOps for Enterprise Systems - Rosalind Radcliffe
DevOps for Enterprise Systems - Rosalind RadcliffeDevOps for Enterprise Systems - Rosalind Radcliffe
DevOps for Enterprise Systems - Rosalind Radcliffe
DevOps for Enterprise Systems
 

What's hot (20)

Lecture 01 Introduction to Software Engineering
Lecture 01 Introduction to Software EngineeringLecture 01 Introduction to Software Engineering
Lecture 01 Introduction to Software Engineering
 
Pankaj Singh_CV
Pankaj Singh_CVPankaj Singh_CV
Pankaj Singh_CV
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrent
 
NeilBrittleton Current CV
NeilBrittleton Current CVNeilBrittleton Current CV
NeilBrittleton Current CV
 
David Martin Resume
David Martin ResumeDavid Martin Resume
David Martin Resume
 
Chuck_Roden_Resume
Chuck_Roden_ResumeChuck_Roden_Resume
Chuck_Roden_Resume
 
Williams Joseph resume
Williams Joseph resumeWilliams Joseph resume
Williams Joseph resume
 
Emergent architecture- a casestudy TREDS
Emergent architecture- a casestudy TREDSEmergent architecture- a casestudy TREDS
Emergent architecture- a casestudy TREDS
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
PCB Design and Data Management
PCB Design and Data ManagementPCB Design and Data Management
PCB Design and Data Management
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
 
SteveStaabsresumer2
SteveStaabsresumer2SteveStaabsresumer2
SteveStaabsresumer2
 
Argonne Win7 Closeout
Argonne Win7 CloseoutArgonne Win7 Closeout
Argonne Win7 Closeout
 
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
 
Resume_Serma_Professional (2)
Resume_Serma_Professional (2)Resume_Serma_Professional (2)
Resume_Serma_Professional (2)
 
01 intro+
01 intro+01 intro+
01 intro+
 
Michael Grumbach PM Resume 2015
Michael Grumbach PM Resume 2015Michael Grumbach PM Resume 2015
Michael Grumbach PM Resume 2015
 
Citrix AppDNA Management Overview v7.6
Citrix AppDNA Management Overview v7.6Citrix AppDNA Management Overview v7.6
Citrix AppDNA Management Overview v7.6
 
DevOps for Enterprise Systems - Rosalind Radcliffe
DevOps for Enterprise Systems - Rosalind RadcliffeDevOps for Enterprise Systems - Rosalind Radcliffe
DevOps for Enterprise Systems - Rosalind Radcliffe
 

Similar to Building maintenance documentation

lokesh_UX_Designer_v5
lokesh_UX_Designer_v5lokesh_UX_Designer_v5
lokesh_UX_Designer_v5
Lokesh S
 
Online Building Plan
Online Building PlanOnline Building Plan
Online Building Plan
Lakshmi Gottipati
 
Using Metrology Software to Capture Data for Reverse Engineering
Using Metrology Software to Capture Data for Reverse EngineeringUsing Metrology Software to Capture Data for Reverse Engineering
Using Metrology Software to Capture Data for Reverse Engineering
Design World
 
C bent01
C bent01C bent01
22_HBI_2016_SHOW_ISSUE
22_HBI_2016_SHOW_ISSUE22_HBI_2016_SHOW_ISSUE
22_HBI_2016_SHOW_ISSUE
Bryan Semple
 
Efficiency Unleashed_How As-Built Drawing Management Software Transforms Proj...
Efficiency Unleashed_How As-Built Drawing Management Software Transforms Proj...Efficiency Unleashed_How As-Built Drawing Management Software Transforms Proj...
Efficiency Unleashed_How As-Built Drawing Management Software Transforms Proj...
iFieldsmart Technologies
 
Resume July 2015
Resume July 2015Resume July 2015
Resume July 2015
Scott Nichol
 
Automated Application Integration with FME & Cityworks Webinar
Automated Application Integration with FME & Cityworks WebinarAutomated Application Integration with FME & Cityworks Webinar
Automated Application Integration with FME & Cityworks Webinar
Safe Software
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
Hasif Alias
 
Docweb Milestone 3 Report
Docweb Milestone 3 ReportDocweb Milestone 3 Report
Docweb Milestone 3 Report
Stephen Cain Jr.
 
G213538
G213538G213538
Four Essential Steps for Removing Risk and Downtime from POWER9 Migration
Four Essential Steps for Removing Risk and Downtime from POWER9 MigrationFour Essential Steps for Removing Risk and Downtime from POWER9 Migration
Four Essential Steps for Removing Risk and Downtime from POWER9 Migration
Precisely
 
Software app slides
Software app slidesSoftware app slides
Software app slides
Pui Chun Shian
 
Unit_1(Software and Software Engineering).pptx
Unit_1(Software and Software Engineering).pptxUnit_1(Software and Software Engineering).pptx
Unit_1(Software and Software Engineering).pptx
taxegap762
 
Se lec 3
Se lec 3Se lec 3
Se lec 3
Huda Alameen
 
Softweare Engieering
Softweare Engieering Softweare Engieering
Softweare Engieering
Huda Alameen
 
A Software Factory Integrating Rational & WebSphere Tools
A Software Factory Integrating Rational & WebSphere ToolsA Software Factory Integrating Rational & WebSphere Tools
A Software Factory Integrating Rational & WebSphere Tools
ghodgkinson
 
The Case for Automated Network Diagramming a NetBrain WhitePaper
The Case for Automated Network Diagramming a NetBrain WhitePaperThe Case for Automated Network Diagramming a NetBrain WhitePaper
The Case for Automated Network Diagramming a NetBrain WhitePaper
Ken Flott
 
Interconnect Presentation
Interconnect PresentationInterconnect Presentation
Interconnect Presentation
Eric Deitrick
 
Sam segal resume
Sam segal resumeSam segal resume
Sam segal resume
samuel segal
 

Similar to Building maintenance documentation (20)

lokesh_UX_Designer_v5
lokesh_UX_Designer_v5lokesh_UX_Designer_v5
lokesh_UX_Designer_v5
 
Online Building Plan
Online Building PlanOnline Building Plan
Online Building Plan
 
Using Metrology Software to Capture Data for Reverse Engineering
Using Metrology Software to Capture Data for Reverse EngineeringUsing Metrology Software to Capture Data for Reverse Engineering
Using Metrology Software to Capture Data for Reverse Engineering
 
C bent01
C bent01C bent01
C bent01
 
22_HBI_2016_SHOW_ISSUE
22_HBI_2016_SHOW_ISSUE22_HBI_2016_SHOW_ISSUE
22_HBI_2016_SHOW_ISSUE
 
Efficiency Unleashed_How As-Built Drawing Management Software Transforms Proj...
Efficiency Unleashed_How As-Built Drawing Management Software Transforms Proj...Efficiency Unleashed_How As-Built Drawing Management Software Transforms Proj...
Efficiency Unleashed_How As-Built Drawing Management Software Transforms Proj...
 
Resume July 2015
Resume July 2015Resume July 2015
Resume July 2015
 
Automated Application Integration with FME & Cityworks Webinar
Automated Application Integration with FME & Cityworks WebinarAutomated Application Integration with FME & Cityworks Webinar
Automated Application Integration with FME & Cityworks Webinar
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
 
Docweb Milestone 3 Report
Docweb Milestone 3 ReportDocweb Milestone 3 Report
Docweb Milestone 3 Report
 
G213538
G213538G213538
G213538
 
Four Essential Steps for Removing Risk and Downtime from POWER9 Migration
Four Essential Steps for Removing Risk and Downtime from POWER9 MigrationFour Essential Steps for Removing Risk and Downtime from POWER9 Migration
Four Essential Steps for Removing Risk and Downtime from POWER9 Migration
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Unit_1(Software and Software Engineering).pptx
Unit_1(Software and Software Engineering).pptxUnit_1(Software and Software Engineering).pptx
Unit_1(Software and Software Engineering).pptx
 
Se lec 3
Se lec 3Se lec 3
Se lec 3
 
Softweare Engieering
Softweare Engieering Softweare Engieering
Softweare Engieering
 
A Software Factory Integrating Rational & WebSphere Tools
A Software Factory Integrating Rational & WebSphere ToolsA Software Factory Integrating Rational & WebSphere Tools
A Software Factory Integrating Rational & WebSphere Tools
 
The Case for Automated Network Diagramming a NetBrain WhitePaper
The Case for Automated Network Diagramming a NetBrain WhitePaperThe Case for Automated Network Diagramming a NetBrain WhitePaper
The Case for Automated Network Diagramming a NetBrain WhitePaper
 
Interconnect Presentation
Interconnect PresentationInterconnect Presentation
Interconnect Presentation
 
Sam segal resume
Sam segal resumeSam segal resume
Sam segal resume
 

Recently uploaded

How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
ssuser13ffe4
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
สมใจ จันสุกสี
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
Chevonnese Chevers Whyte, MBA, B.Sc.
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
Wahiba Chair Training & Consulting
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 

Recently uploaded (20)

How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
math operations ued in python and all used
math operations ued in python and all usedmath operations ued in python and all used
math operations ued in python and all used
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 

Building maintenance documentation

  • 1. Building Maintenance Documentation Process Initial Idea  The system would be a web based upload sight for equipment specification PDFs that are used to create OEM building manuals.  Project assistants would upload the files and organize them.  For turnover to the Building Owner, files could be printed out in a traditional OEM manner, a web site version could be hosted in the cloud, or a local site built.  A smartphone app would be created so that QR Codes on equipment could be scanned to access the PDFs
  • 2. Building Maintenance Documentation Process Group Brainstorming Changes  Engineer's drawings and documents could be used to create an initial list of equipment names and preliminary submittals.  Coordinators could be leveraged to put files / information into the system.  Maintenance record tracking would be added to the system.  AutoDesk Navisworks Manage Models could be an alternate way to store / display the information
  • 3. Engineer Response Interviewed: Ralph Stingo • The engineer that was interviewed thought the idea showed promise and liked a lot of the original idea. Positives: • He thought there was value in the how the software would be able to track and help maintain equipment. • Thought the application would help save money by keeping the scheduled maintenance stay on track to prevent major failures. • Liked how the application would help keep all of the information passed between people working on the project. Negatives: • He was not sure that all of the trades would see the value in using one more piece of software to track different parts
  • 4. Engineer Response Negatives (cont.): • Concerned Submittals would be missed without a system to inform the different trades about changes. Improvements: • Suggested we create some way to import information from systems like Prolog and Constructware. • Have some method of showing if equipment has nonstandard parts included. • Have a method of ordering parts from the equipment description page. • Have the equipment screen send out alerts for scheduled maintenance.
  • 5. General Contractor Interviewed: Bill Raymond, Response Baker Glasgow • The general contractor’s both noticed the benefit’s of the application but are currently using a product providing some of the same functions. Positives: • They liked the fact that some of the functions were automatic that were manual and time consuming in the current utility they were using. • They liked being able to pass on the information collected since the start of a project to the building owners and building maintenance. Negatives: • They were not sure that the application would be enough to get them to leave the current application they use. Improvements: • Create a method to pass information back and forward to their current application and the new application.
  • 6. Interviewed: Dan Mcdowell, Mechanical Contractor Leigh Setzer, Rod Childress, Brandon Cobb, Shirley Response Manning • The Mechanical Contractor ‘s were very interested in the application since it would cut a lot of work out at the end of the project and ensure all maintenance was performed during the warranty contract period. Positives: • They liked that some of the steps would be automated and would help reduce the labor cost setting up binders or CD’s. • The fact that everything could be available online would take away the time searching for manuals online. • They liked how equipment or parts could be searched for by name. • They thought that the added features for servicing equipment would help them and the businesses they support provide the best support for equipment. Negatives: • Concerned the information on the site may not stay current.
  • 7. Mechanical Contractor Response Negatives (cont.): • Some equipment manufacturer’s will not provide information without contacting them. Improvements • Create a way to add old jobs to the system. • Create a way to link equipment to some sort of asset database.
  • 8. Building Maintenance Interviewed: Garden Freeman Response • The response from building maintenance was positive with interest in having access to so much of the information available online. Positives: • Easy to get to the maintenance records. • Quick access to the information. Improvements: • Creating a link with the existing systems.
  • 9. Building Maintenance Documentation Process Post-Value Proposition Interviews
  • 10. Building Maintenance Documentation Process MEP Engineers Input Equipment Info Web Interface CAD Software Tools CAD Drawing Sweeper If the engineer can input preliminary information about the equipment (designation and initial submittals), then system can implement checklists.
  • 11. Building Maintenance Documentation Process MEP Coordinators Input / Modify Equipment Information Web Interfaces CAD Software Tools Coordinators already have to download product info to draw equipment for fabrication and coordination. If they can input this information when they are drawing and placing the equipment in the drawing, it can eliminate project assistants from having to do it.
  • 12. Building Maintenance Documentation Process  Project Manager / Project Assistants Confirm  And Organize All Submittals  Web Interface  Navisworks Manage  The web interface will allow for changing the equipment and information about the equipment. It will also allow for organizing the equipment for display and printing
  • 13. Building Maintenance Documentation Process  Building Owners / Building Maintenance  Web Interface  Smart Phone Apps  QR Codes On Equipment  The web interface will include maintenance records, comments about special items used, links to the specifications, links to the manufacturer’s website and routine maintenance schedule
  • 14. Building Maintenance Documentation Process Still To Be Answered Implementation Questions Should the system leverage existing products by tying together software already in use to handle different parts of the process? Or should it be a new comprehensive standalone system? Should this be used as a comprehensive submittal tracking system for the General Contractor?