Smarter Computing: System z Analyst Summit



Building Innovative Industry Solutions
for System z

Jim Corgel, IBM General Manager, ISV and Developer Relations
Jacqueline D. Woods, Vice President, Global Industry and Solutions Marketing, STG
Luis H. Rodriguez, Director, IBM Innovation Centers

3/23/2011




1
Smarter Computing: System z Analyst Summit


We are entering a new era of computing



30 billion                                   300 million                        15 petabytes
The number of RFID tags                      The number of smart                The amount of information
in 2010, up from 1.3 billion                 meters to be deployed –            being generated daily –
in 2004                                      sending and receiving data         80% unstructured -- with
                                             – by 2015                          44x more in the next
                                                                                decade




                    80 exabytes                                   10 trillion
                     The storage capacity to be                    The computations per
                     shipped in 2015, up from                      second by 2015, up from
                     2.4 exabytes in 2005                          10 million in 2005

2
Smarter Computing: System z Analyst Summit


Smarter Computing can free up needed capital to
invest in new infrastructure and Smarter Planet
solutions
                            Traditional approach
                                                                                                                    tm ent
                                                                                                 in              ves
                                                                                           r re-
                                                                                   tial fo
                                                                               te n
Total IT cost




                                                                             Po                   Smarter Computing

                                                                                                                 Reduce:
                                                                                                                 Server acquisition cost by up to 56%
                                                                                                                 Database costs by 68%
                                                                                                                 Floor space by up to 90%
                                                                                                                 Power consumption by 80%
                                                                                                                 Total cost per workload 55%
            0
                                               Capability and capacity
                   Server configurations are based on consolidation ratios derived from IBM internal studies.
                   Server configuration based on IBM internal studies. Calculations for Intel servers based on
                   published power ratings and industry standard rates. Results may vary based on customer
  3                workload profiles/characteristics. Prices are in US currency, prices will vary by country.
Smarter Computing: System z Analyst Summit


Topics we will discuss


     Industry application focus

     New workloads and ROI

     Support for System z ecosystem




4
Smarter Computing: System z Analyst Summit


Technology is fueling innovation across industries




           Neonatal                          Law           Telecom         Fraud
           Care                              Enforcement                   Prevention




            Retail                           Traffic       Manufacturing   Banking
                                             Control



5
Smarter Computing: System z Analyst Summit


IBM zEnterprise System is uniquely positioned to
handle workloads on a smarter planet



            Transactional                     Lowest cost per unit of work
             Workloads                         for large scale workloads

        Business Analytics
                                              Hybrid Computing
           Workloads
                                              Revolutionary cost reductions
                                               for smaller scale workloads
      Business Application
           Workloads
                                              Data center simplification
              Web and                         Improve quality of service
            Collaboration
             Workloads



6
Smarter Computing: System z Analyst Summit


System z costs less industry by industry

    Retail                                   Financial Services
    25% lower IT cost per retail store       48% less IT spend for deposits
    59% less IT cost per square foot         65% less cost per teller transaction

    Healthcare provider                      Utilities
    24% lower IT cost per hospital bed       25% lower IT cost per mega watt hour
    62% lower IT cost per patient day
                                             Airlines
    Healthcare payer                         20% lower IT cost per airline passenger
    46% lower IT cost per member
                                             Automotive
    Insurance                                26% lower IT cost per new vehicle
    40% lower IT cost per policy
    56% lower IT cost per agent              Oil and Gas
                                             23% lower IT cost per barrel of oil
7                Source: Howard Rubin
Smarter Computing: System z Analyst Summit


Clients are leveraging System z to deliver new
innovations




               Trenitalia                              Trustmark                  Garanti Technology

 Enables multi-channel                       Extends key banking             Supports a growing
  ticket and reservation                       applications to a browser-       customer base while
  capabilities across web,                     based environment                delivering fast, reliable
  mobile and ticketing                                                          banking services 24 hours
                                              Leverages original
  agencies                                                                      day
                                               investment in reliable,
 Delivers travel options in                   business-tested applications    Uses central shared
  real-time based upon the                    Provides customers up-to-        services to reduce costs
  customer’s preferences                       the-minute account               and enables investment in
                                               information and handles          new customer acquisition
 Reduces time-to-market by
                                               most banking needs online.      Tripled IT capacity with the
  enabling sales and
  marketing staff to introduce                Enables high volume              same number of systems
  new offers and services                      transactions on a stable and     management staff.
  themselves                                   reliable platform

8
Smarter Computing: System z Analyst Summit


Industry frameworks are the foundation of IBM’s
industry solutions
         An Industry Framework is a solution platform that combines market leading technical
          capabilities with pre-built solution accelerators, best practices, and implementation
            patterns -- delivering speed flexibility and choice while reducing cost and risk!

     Banking Industry Framework example:                  Industry Framework benefits:

                                                          Speed solution design
                                                          Industry-specific assets

              Customer                  Core Banking      Reduce risk
              Care and                 Transformation     Reusable implementation patterns and
               Insight
                                                          support for industry standards

                                                          Flexibility
                                                          Choice of business applications, technology,
                                                          and services from IBM and IBM Business
                                             Payments
                                                          Partners
             Integrated 
                                                and
          Risk Management
                                             Securities   Return on investments (ROI)
                                                          Build a differentiated industry capability and
                                                          business value – one project at a time
9
Smarter Computing: System z Analyst Summit


System z is a key capability within IBM’s Industry
Frameworks
Banking Industry Framework example
                                                              The core banking transformation domain
                                                              allows you to modernize and renovate the
                                                              legacy applications that support core banking
                                                              functions while aligning with the changing
                                                              needs of the business


                 Customer
                                                              The payments and securities domain helps
                                              Core Banking
                 Care and                    Transformation
                                                              you progressively transform your payments
                  Insight                                     operations to become more flexible and
                                                              efficient


                                                              The integrated risk management domain
                                                              supports taking a holistic approach to
                                                              managing financial risk, financial crimes,
                                               Payments
                                                              operational and IT risk, and compliance
                  Integrated
                                                  and
               Risk Management
                                               Securities
                                                              The customer care and insight domain helps
                                                              you build a foundation for creating a single
                                                              view of the customer and enabling more
                                                              effective and efficient sales and service


10
Smarter Computing: System z Analyst Summit


System z is a key capability within IBM’s Industry
Frameworks
Insurance Industry Framework example
                                                               The core insurance transformation domain
                                                               supports solutions that will transform insurers'
                                                               core capabilities to increase efficiency and
                                                               effectiveness of business and drive intelligent
                                                               growth

                  Customer                                     The distribution domain Supports solutions
                                             Core Insurance
                  Care and                                     for insured / agents -driven web portal that
                                             Transformation
                   Insight
                                                               enables greater sales effectiveness and
                                                               supporting better multi-channel coordination


                                                               The integrated risk management domain
                                                               Supports solutions for meeting regulatory
                                                               compliance needs as well as reducing risks –
                                                               cost effectively
                  Integrated
                                                Distribution
               Risk Management
                                                               The customer care and insight domain
                                                               supports solutions to enable a 360 degree
                                                               view of the customer & predicting customer
                                                               behavior patterns to drive profitability and
                                                               wallet share

11
Smarter Computing: System z Analyst Summit


System z is a key capability within IBM’s Industry
Frameworks
 Travel and Transportation
 Industry Framework example                                       The reservation system modernization
                                                                  domain allows you align with current standards
                                                                  and deliver new services.

                      Safety,             Reservation             The multi-channel sales and service domain
                    Security and            System
                    Surveillance         Modernization            helps you provide a seamless passenger
                                                                  experience across all channels and
                                                                  touchpoints

                                                                  The asset optimization domain helps you
             Operations                           Multi-channel   manage capital assets across their revenue
              Control                              Sales and
              Systems                               Service
                                                                  producing lifecycle

                                                                  The operations control systems domain
                                                                  helps you build a foundation for creating a
                             Asset Optimization                   single view of the customer and enabling more
                                                                  effective and efficient sales and service

                                                                  The reservation system modernization
                                                                  domain allows you to improve operational
                                                                  effectiveness and reduce environmental
12                                                                impact
Smarter Computing: System z Analyst Summit


1300+ ISVs are deploying applications on System z
— and the number of applications on System z is growing

     1,200 New & Upgraded Applications on System z in 2010
      More than 150 new applications enabled
                       •
      120+ new ISV partners on the platform

     7,000+ applications supported on z/OS & Linux for System z
      Over 4,000 z/OS applications
            – 2,500+ on z/OS 1.9 and later
         More than 3,000 Linux on System z applications




13
Smarter Computing: System z Analyst Summit


Partners show results on System z
                               Solution: WebFOCUS
                               A comprehensive, cross-industry platform that provides business
                               intelligence, performance management, data integrity & advanced
                               analytics

                               Solution: Exceed
                               Comprehensive software for the property and casualty/general
                               insurance industry. Exceed helps large insurers reduce costs, improve
                               service and react quickly to market changes.

                               Solution:Cúram
                               A public sector / government solution that encompasses and integrates
                               human services, labor, health, social security, and military & veterans
                               agencies

                               Solution: OPS Center
                               A Homeland Security / Emergency Response solution for managing
                               collaborative processes such as organizing, training, monitoring and
                               information sharing, among diverse organizations.

14
Smarter Computing: System z Analyst Summit


Developers are collaborating around System z


 developerWorks counted 16,000
   unique visitors per month across
   communities with System z-related
   artifacts in 2010
        •    IBM’s premier information and
             collaboration site for Linux
        •    Over 200+ technical resources on
             system z - technical articles, wikis,
             blogs and more
        •    4,600 downloads, an increase of
             more than 20% from previous year

                                                     First My developerWorks
     http://www.ibm.com/developerworks/              App for iPhone launched

15
Smarter Computing: System z Analyst Summit


“Chiphopper” helps developers port their solutions
to Linux on System z
IBM Systems Application Advantage for Linux
                                                    From            Port To           Port To
 No charge access to remote IBM
  Systems with Linux - Red Hat & Suse           Application
                                                 Application
                                                  Application

 Technical assistance during the port
                                                 Linux               Linux             Linux
 18 months System Assurance
  Statement from IBM

 Ready for IBM Systems with Linux
  mark for marketing                           x86 & x86-64
                                                 Systems
                                                                IBM Power Systems   IBM System z

     Chiphopper has enabled 278 ISVs to create or update 1330
      applications for IBM Systems with Linux
     Chiphopper assisted 32 ISV’s with 105 applications in 2010
            42 for POWER Systems
          63 for System z
                                             www.ibm.com/isv/go/chiphopper
16
Smarter Computing: System z Analyst Summit


New programs are helping IBM Partners
accelerate industry and cloud transformation
                        IBM Industry Solutions
                              Specialty
                          ISVs and Innovation Partners

                                                         IBM Software Value Plus
            IBM Software Value Plus                        Industry Authorization
                                                         Resellers and Systems Integrators
              Security Authorization
              Resellers and Systems Integrators
                                                         “The combined strength of
                                                          Avnet and IBM's focus on
           IBM Cloud Computing                            industry-specific solutions
                Specialty                                 gives our partners a distinct
              Five types of cloud partners
                                                          advantage to better meet
                                                          customer requirements
               IBM Cloud Computing                        while accelerating their
                   Authorization                          success in high-growth
                            Resellers
                                                          markets.”
                                                            Tony Madden
                          IBM Cloud Service                 Avnet Technology Solutions
                           Provider Platform
                      Communications Service Providers
17
Smarter Computing: System z Analyst Summit


Ensuring the future smarter planet workforce
The IBM Academic Initiative helps educate millions of students


      814 schools in 61 countries participate in the System z Academic Initiative
      “Master the Mainframe” contest has reached 33,000 students, 4,000 schools, 17 countries
      IBM System z Mastery Test is offered at no cost to students globally in 2010
      Access to IBM Enterprise System and resources available globally for universities, colleges
      “Watson Watch” parties held in 58 U.S. universities during Jeopardy! challenge




                                                  www.ibm.com/academicinitiative

18
Smarter Computing: System z Analyst Summit


Introducing SystemzJobs.com

 The IBM System z Job Board at SystemzJobs.com is a new resource to connect IBM
 System z clients, partners, and businesses with students learning the mainframe and
 professionals seeking System z job opportunities.




 Sponsored by the IBM Academic Initiative and System z
  Free, secure, and easy to use
  Specialized audience of mainframe educated students and experienced professionals
  Global pool of mainframe talent
                                          http://www.ibm.com/university/systemz

19
Smarter Computing: System z Analyst Summit


Our 39 worldwide IBM Innovation Centers help
Business Partners, IT professionals, and Academia
expand their network and expertise
                                                      Where innovation happens
                                                    Skills                       Technical
                                                 Development                    Enablement
                                              Education on key IBM        Support for building,
                                               capabilities                 porting, and testing
                                              Access to IBM hardware       applications
                                                                           Industry Framework
                                                                            Validations



                                                 Collaboration                 Go to Market

                                              Entrepreneur / Venture Firm  Support for expanding to
        IIC in Ho Chi Minh City, Vietnam       networking events             new countries
                                              Connect to Win events        Partner demand generation
                                              Academia / Partner            seminars
20                                             networking events
Smarter Computing: System z Analyst Summit




      Thank you!
      ibm.com/smartercomputing




21                                           © 2011 International Business Machines Corporation
      21
Smarter Computing: System z Analyst Summit



Trademarks and disclaimers
Intel, Intel logo, Intel Inside, Intel Inside logo, Intel Centrino, Intel Centrino logo, Celeron, Intel Xeon, Intel SpeedStep, Itanium, and Pentium are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the United States
and other countries./ Linux is a registered trademark of Linus Torvalds in the United States, other countries, or both. Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other
countries, or both. IT Infrastructure Library is a registered trademark of the Central Computer and Telecommunications Agency which is now part of the Office of Government Commerce. ITIL is a registered trademark, and a registered
community trademark of the Office of Government Commerce, and is registered in the U.S. Patent and Trademark Office. UNIX is a registered trademark of The Open Group in the United States and other countries. Java and all Java-based
trademarks and logos are trademarks or registered trademarks of Oracle and/or its affiliates. Other company, product, or service names may be trademarks or service marks of others. Information is provided "AS IS" without warranty of any
kind.

The customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer.

Information concerning non-IBM products was obtained from a supplier of these products, published announcement material, or other publicly available sources and does not constitute an endorsement of such products by IBM. Sources for
non-IBM list prices and performance numbers are taken from publicly available information, including vendor announcements and vendor worldwide homepages. IBM has not tested these products and cannot confirm the accuracy of
performance, capability, or any other claims related to non-IBM products. Questions on the capability of non-IBM products should be addressed to the supplier of those products.

All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.

Some information addresses anticipated future capabilities. Such information is not intended as a definitive statement of a commitment to specific levels of performance, function or delivery schedules with respect to any future products. Such
commitments are only made in IBM product announcements. The information is presented here to communicate IBM's current investment and development activities as a good faith effort to help with our customers' future planning.

Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon considerations such as the
amount of multiprogramming in the user's job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve throughput or performance
improvements equivalent to the ratios stated here.

Prices are suggested U.S. list prices and are subject to change without notice. Starting price may not include a hard drive, operating system or other features. Contact your IBM representative or Business Partner for the most current pricing in
your geography.

Photographs shown may be engineering prototypes. Changes may be incorporated in production models.

© IBM Corporation 2011. All rights reserved.
References in this document to IBM products or services do not imply that IBM intends to make them available in every country.

Trademarks of International Business Machines Corporation in the United States, other countries, or both can be found on the World Wide Web at http://www.ibm.com/legal/copytrade.shtml.




22                                                                                                                                                                                        © 2011 International Business Machines Corporation
           22

Building Innovative Industry Solutions for System z

  • 1.
    Smarter Computing: Systemz Analyst Summit Building Innovative Industry Solutions for System z Jim Corgel, IBM General Manager, ISV and Developer Relations Jacqueline D. Woods, Vice President, Global Industry and Solutions Marketing, STG Luis H. Rodriguez, Director, IBM Innovation Centers 3/23/2011 1
  • 2.
    Smarter Computing: Systemz Analyst Summit We are entering a new era of computing 30 billion 300 million 15 petabytes The number of RFID tags The number of smart The amount of information in 2010, up from 1.3 billion meters to be deployed – being generated daily – in 2004 sending and receiving data 80% unstructured -- with – by 2015 44x more in the next decade 80 exabytes 10 trillion The storage capacity to be The computations per shipped in 2015, up from second by 2015, up from 2.4 exabytes in 2005 10 million in 2005 2
  • 3.
    Smarter Computing: Systemz Analyst Summit Smarter Computing can free up needed capital to invest in new infrastructure and Smarter Planet solutions Traditional approach tm ent in ves r re- tial fo te n Total IT cost Po Smarter Computing Reduce: Server acquisition cost by up to 56% Database costs by 68% Floor space by up to 90% Power consumption by 80% Total cost per workload 55% 0 Capability and capacity Server configurations are based on consolidation ratios derived from IBM internal studies. Server configuration based on IBM internal studies. Calculations for Intel servers based on published power ratings and industry standard rates. Results may vary based on customer 3 workload profiles/characteristics. Prices are in US currency, prices will vary by country.
  • 4.
    Smarter Computing: Systemz Analyst Summit Topics we will discuss  Industry application focus  New workloads and ROI  Support for System z ecosystem 4
  • 5.
    Smarter Computing: Systemz Analyst Summit Technology is fueling innovation across industries Neonatal Law Telecom Fraud Care Enforcement Prevention Retail Traffic Manufacturing Banking Control 5
  • 6.
    Smarter Computing: Systemz Analyst Summit IBM zEnterprise System is uniquely positioned to handle workloads on a smarter planet Transactional  Lowest cost per unit of work Workloads for large scale workloads Business Analytics  Hybrid Computing Workloads  Revolutionary cost reductions for smaller scale workloads Business Application Workloads  Data center simplification Web and  Improve quality of service Collaboration Workloads 6
  • 7.
    Smarter Computing: Systemz Analyst Summit System z costs less industry by industry Retail Financial Services 25% lower IT cost per retail store 48% less IT spend for deposits 59% less IT cost per square foot 65% less cost per teller transaction Healthcare provider Utilities 24% lower IT cost per hospital bed 25% lower IT cost per mega watt hour 62% lower IT cost per patient day Airlines Healthcare payer 20% lower IT cost per airline passenger 46% lower IT cost per member Automotive Insurance 26% lower IT cost per new vehicle 40% lower IT cost per policy 56% lower IT cost per agent Oil and Gas 23% lower IT cost per barrel of oil 7 Source: Howard Rubin
  • 8.
    Smarter Computing: Systemz Analyst Summit Clients are leveraging System z to deliver new innovations Trenitalia Trustmark Garanti Technology  Enables multi-channel  Extends key banking  Supports a growing ticket and reservation applications to a browser- customer base while capabilities across web, based environment delivering fast, reliable mobile and ticketing banking services 24 hours  Leverages original agencies day investment in reliable,  Delivers travel options in business-tested applications  Uses central shared real-time based upon the  Provides customers up-to- services to reduce costs customer’s preferences the-minute account and enables investment in information and handles new customer acquisition  Reduces time-to-market by most banking needs online.  Tripled IT capacity with the enabling sales and marketing staff to introduce  Enables high volume same number of systems new offers and services transactions on a stable and management staff. themselves reliable platform 8
  • 9.
    Smarter Computing: Systemz Analyst Summit Industry frameworks are the foundation of IBM’s industry solutions An Industry Framework is a solution platform that combines market leading technical capabilities with pre-built solution accelerators, best practices, and implementation patterns -- delivering speed flexibility and choice while reducing cost and risk! Banking Industry Framework example: Industry Framework benefits: Speed solution design Industry-specific assets Customer Core Banking  Reduce risk Care and Transformation Reusable implementation patterns and Insight support for industry standards Flexibility Choice of business applications, technology, and services from IBM and IBM Business Payments Partners Integrated  and Risk Management Securities Return on investments (ROI) Build a differentiated industry capability and business value – one project at a time 9
  • 10.
    Smarter Computing: Systemz Analyst Summit System z is a key capability within IBM’s Industry Frameworks Banking Industry Framework example The core banking transformation domain allows you to modernize and renovate the legacy applications that support core banking functions while aligning with the changing needs of the business Customer The payments and securities domain helps Core Banking Care and Transformation you progressively transform your payments Insight operations to become more flexible and efficient The integrated risk management domain supports taking a holistic approach to managing financial risk, financial crimes, Payments operational and IT risk, and compliance Integrated and Risk Management Securities The customer care and insight domain helps you build a foundation for creating a single view of the customer and enabling more effective and efficient sales and service 10
  • 11.
    Smarter Computing: Systemz Analyst Summit System z is a key capability within IBM’s Industry Frameworks Insurance Industry Framework example The core insurance transformation domain supports solutions that will transform insurers' core capabilities to increase efficiency and effectiveness of business and drive intelligent growth Customer The distribution domain Supports solutions Core Insurance Care and for insured / agents -driven web portal that Transformation Insight enables greater sales effectiveness and supporting better multi-channel coordination The integrated risk management domain Supports solutions for meeting regulatory compliance needs as well as reducing risks – cost effectively Integrated Distribution Risk Management The customer care and insight domain supports solutions to enable a 360 degree view of the customer & predicting customer behavior patterns to drive profitability and wallet share 11
  • 12.
    Smarter Computing: Systemz Analyst Summit System z is a key capability within IBM’s Industry Frameworks Travel and Transportation Industry Framework example The reservation system modernization domain allows you align with current standards and deliver new services. Safety, Reservation The multi-channel sales and service domain Security and System Surveillance Modernization helps you provide a seamless passenger experience across all channels and touchpoints The asset optimization domain helps you Operations Multi-channel manage capital assets across their revenue Control Sales and Systems Service producing lifecycle The operations control systems domain helps you build a foundation for creating a Asset Optimization single view of the customer and enabling more effective and efficient sales and service The reservation system modernization domain allows you to improve operational effectiveness and reduce environmental 12 impact
  • 13.
    Smarter Computing: Systemz Analyst Summit 1300+ ISVs are deploying applications on System z — and the number of applications on System z is growing 1,200 New & Upgraded Applications on System z in 2010  More than 150 new applications enabled •  120+ new ISV partners on the platform 7,000+ applications supported on z/OS & Linux for System z  Over 4,000 z/OS applications – 2,500+ on z/OS 1.9 and later  More than 3,000 Linux on System z applications 13
  • 14.
    Smarter Computing: Systemz Analyst Summit Partners show results on System z Solution: WebFOCUS A comprehensive, cross-industry platform that provides business intelligence, performance management, data integrity & advanced analytics Solution: Exceed Comprehensive software for the property and casualty/general insurance industry. Exceed helps large insurers reduce costs, improve service and react quickly to market changes. Solution:Cúram A public sector / government solution that encompasses and integrates human services, labor, health, social security, and military & veterans agencies Solution: OPS Center A Homeland Security / Emergency Response solution for managing collaborative processes such as organizing, training, monitoring and information sharing, among diverse organizations. 14
  • 15.
    Smarter Computing: Systemz Analyst Summit Developers are collaborating around System z developerWorks counted 16,000 unique visitors per month across communities with System z-related artifacts in 2010 • IBM’s premier information and collaboration site for Linux • Over 200+ technical resources on system z - technical articles, wikis, blogs and more • 4,600 downloads, an increase of more than 20% from previous year First My developerWorks http://www.ibm.com/developerworks/ App for iPhone launched 15
  • 16.
    Smarter Computing: Systemz Analyst Summit “Chiphopper” helps developers port their solutions to Linux on System z IBM Systems Application Advantage for Linux From Port To Port To  No charge access to remote IBM Systems with Linux - Red Hat & Suse Application Application Application  Technical assistance during the port Linux Linux Linux  18 months System Assurance Statement from IBM  Ready for IBM Systems with Linux mark for marketing x86 & x86-64 Systems IBM Power Systems IBM System z  Chiphopper has enabled 278 ISVs to create or update 1330 applications for IBM Systems with Linux  Chiphopper assisted 32 ISV’s with 105 applications in 2010  42 for POWER Systems  63 for System z www.ibm.com/isv/go/chiphopper 16
  • 17.
    Smarter Computing: Systemz Analyst Summit New programs are helping IBM Partners accelerate industry and cloud transformation IBM Industry Solutions Specialty ISVs and Innovation Partners IBM Software Value Plus IBM Software Value Plus Industry Authorization Resellers and Systems Integrators Security Authorization Resellers and Systems Integrators “The combined strength of Avnet and IBM's focus on IBM Cloud Computing industry-specific solutions Specialty gives our partners a distinct Five types of cloud partners advantage to better meet customer requirements IBM Cloud Computing while accelerating their Authorization success in high-growth Resellers markets.” Tony Madden IBM Cloud Service Avnet Technology Solutions Provider Platform Communications Service Providers 17
  • 18.
    Smarter Computing: Systemz Analyst Summit Ensuring the future smarter planet workforce The IBM Academic Initiative helps educate millions of students  814 schools in 61 countries participate in the System z Academic Initiative  “Master the Mainframe” contest has reached 33,000 students, 4,000 schools, 17 countries  IBM System z Mastery Test is offered at no cost to students globally in 2010  Access to IBM Enterprise System and resources available globally for universities, colleges  “Watson Watch” parties held in 58 U.S. universities during Jeopardy! challenge www.ibm.com/academicinitiative 18
  • 19.
    Smarter Computing: Systemz Analyst Summit Introducing SystemzJobs.com The IBM System z Job Board at SystemzJobs.com is a new resource to connect IBM System z clients, partners, and businesses with students learning the mainframe and professionals seeking System z job opportunities. Sponsored by the IBM Academic Initiative and System z  Free, secure, and easy to use  Specialized audience of mainframe educated students and experienced professionals  Global pool of mainframe talent http://www.ibm.com/university/systemz 19
  • 20.
    Smarter Computing: Systemz Analyst Summit Our 39 worldwide IBM Innovation Centers help Business Partners, IT professionals, and Academia expand their network and expertise Where innovation happens Skills Technical Development Enablement  Education on key IBM  Support for building, capabilities porting, and testing  Access to IBM hardware applications  Industry Framework Validations Collaboration Go to Market  Entrepreneur / Venture Firm  Support for expanding to IIC in Ho Chi Minh City, Vietnam networking events new countries  Connect to Win events  Partner demand generation  Academia / Partner seminars 20 networking events
  • 21.
    Smarter Computing: Systemz Analyst Summit Thank you! ibm.com/smartercomputing 21 © 2011 International Business Machines Corporation 21
  • 22.
    Smarter Computing: Systemz Analyst Summit Trademarks and disclaimers Intel, Intel logo, Intel Inside, Intel Inside logo, Intel Centrino, Intel Centrino logo, Celeron, Intel Xeon, Intel SpeedStep, Itanium, and Pentium are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the United States and other countries./ Linux is a registered trademark of Linus Torvalds in the United States, other countries, or both. Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both. IT Infrastructure Library is a registered trademark of the Central Computer and Telecommunications Agency which is now part of the Office of Government Commerce. ITIL is a registered trademark, and a registered community trademark of the Office of Government Commerce, and is registered in the U.S. Patent and Trademark Office. UNIX is a registered trademark of The Open Group in the United States and other countries. Java and all Java-based trademarks and logos are trademarks or registered trademarks of Oracle and/or its affiliates. Other company, product, or service names may be trademarks or service marks of others. Information is provided "AS IS" without warranty of any kind. The customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer. Information concerning non-IBM products was obtained from a supplier of these products, published announcement material, or other publicly available sources and does not constitute an endorsement of such products by IBM. Sources for non-IBM list prices and performance numbers are taken from publicly available information, including vendor announcements and vendor worldwide homepages. IBM has not tested these products and cannot confirm the accuracy of performance, capability, or any other claims related to non-IBM products. Questions on the capability of non-IBM products should be addressed to the supplier of those products. All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. Some information addresses anticipated future capabilities. Such information is not intended as a definitive statement of a commitment to specific levels of performance, function or delivery schedules with respect to any future products. Such commitments are only made in IBM product announcements. The information is presented here to communicate IBM's current investment and development activities as a good faith effort to help with our customers' future planning. Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon considerations such as the amount of multiprogramming in the user's job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve throughput or performance improvements equivalent to the ratios stated here. Prices are suggested U.S. list prices and are subject to change without notice. Starting price may not include a hard drive, operating system or other features. Contact your IBM representative or Business Partner for the most current pricing in your geography. Photographs shown may be engineering prototypes. Changes may be incorporated in production models. © IBM Corporation 2011. All rights reserved. References in this document to IBM products or services do not imply that IBM intends to make them available in every country. Trademarks of International Business Machines Corporation in the United States, other countries, or both can be found on the World Wide Web at http://www.ibm.com/legal/copytrade.shtml. 22 © 2011 International Business Machines Corporation 22