INDUSTRIAL TRAINING AT
BSES RAJDHANI, DELHI
ANUJ GUPTA
2K14-MRCE-ME(II)-09
BSES RAJDHANI POWER LIMITED
BSES Rajdhani Power Limited (BRPL), a joint venture between
BSES Limited and the government of NCT of Delhi had
taken over the distribution of electric power in the area of
South & West Delhi from Delhi Vidyut Board (DVB) on July
2002.
BRPL have invested about 1836 crores from 2002-03 to
2006-07 for infrastructural development to bring down the
losses and provide quality supply to the consumers. BRPL
have a plan for electrification of unauthorized colonies and
JJ cluster during 2007-08 to 2010-11. About 283000
colonies and JJ cluster will be covered in this program.
SUBSTATION
SUBSTATION - A station in the power transmission
system at which electric power is transformed to a
conveniently used form. The station may consist of
transformers, switches, circuit breakers and other
auxiliary equipment. Its main function is to receive
energy transmitted at high voltage from the
generating station, by either step-up or step-down
the voltage to a value appropriate for local use
and provide facilities for switching. Substations
have some additional functions.
ELECTRICAL POWER DISTRIBUTION FROM GENERATING PLANTS
TO CONSUMERS.
CLASSIFICATION OF SUBSTATIONS
CLASSIFICATION ON THE BASIS OF FUNCTION:
(1)Transformer substation: In this type of substation, electrical power is received at
one voltage and it is converted to the required voltage.
(2)Industrial substation: In this type of substation, power required for big industrial
estates is received from this substation.
(3)Switching substation: In such substation, voltage is not changed but switching
operation of power line is carried out.
(4)Frequency changer substation: In this type of substation, the power frequency is
changed. For A.C Traction, frequency is converted to 25Hz from 50Hz.
66/11KV OR 33/11KV DISTRIBUTION SUBSTATION:
66KV/11KV distribution substation:
• One 66KV line comes to the 66KV bus bars.
• From the same bus bars, outgoing line is taken which goes to the other substation.
• 66KV PT is connected to the 66KV bus bar through isolator.
• A 66 KV/33KV, star delta transformer is connected to the 66KV bus bars.
• Secondary winding is connected to 33KV tubular bus bars. Circuit breakers and isolators are connected on each side of
transformer.
• Substation gets 440KV supply through 33KV/440KV station transformer connected to 33KV bus bars.
• 33KV feeders are taken out from 33KV bus bars through isolators and circuit breakers.
• Two transformers each of 66KV/11KV,10MVA are connected to 66KV strain bus bars through isolators and circuit
breakers.
• 11KV is taken to the control room through underground cable.
• Number of 11KV feeders taken out from 11KV bus bars through isolators and circuit breakers
TYPICAL COMPONENTS OF A POWER PLANT
SUBSTATION (SWITCHYARD)
• CONNECT
• CONNECT & DIS-CONNECT
• CONNECT, DIS-CONNECT & DETECT
• DETECT & TRANSFORM
• DETECT & TRANSFORM
• PROTECT & SAFETY
• PROTECT
BUS BARS
Bus Bar is an over head parallel connections we use for a main bar or conductor carrying
an electric current to which many connections are connected.
Types : Single Bus Bar
 Double Bus Bar
 Ring Bus Bar
CIRCUIT BREAKER
They can be classified into:
• Oil circuit breaker
• Sulphur hexafluoride circuit breaker (SF6)
• Vacuum circuit breakers
A high-voltage circuit breaker in which the arc is drawn in oil to dissipate the heat and extinguish the arc; the
intense heat of the arc decomposes the oil, generating a gas whose high pressure produces a flow of fresh fluid
through the arc that furnishes the necessary insulation to prevent a restrike of the arc.
• Oil circuit breaker
Sulphur hexafluoride (SF6) gas is used as the arc quenching medium. The SF6 is an electronegative gas
and has a strong tendency to absorb free electrons. The SF6 circuit breaker have been found to a very
effective for high power and high voltage service.
• Sulphur hexafluoride circuit breaker (SF6)
• Vacuum circuit breakers
Vacuum circuit breakers are circuit breakers which are used to protect medium and high voltage circuits from
dangerous electrical situations. Like other types of circuit breakers, vacuum circuit breakers literally break the
circuit so that energy cannot continue flowing through it, thereby preventing fires, power surges, and other
problems which may emerge.
CURRENT TRANSFORMER
Current transformer are used for installation and maintaince of current relay in sub-
station for protection purpose which have normally low current rating.
A Current Transformer is also called as INSTRUMENT TRANSFORMER.
VOLTAGE TRANSFORMER
Voltage transformer are used with volt-meters, watt meters, watthour meters, power-factor
meters, frequency meters, synchro-scopes and synchronizing apparatus, protective and
regulating relays and the no-voltage and over-voltage trip coils of automatic circuit breakers.
Whenever lighting surge occur, then a high voltage passes through electrical
equipments which might cause damage to them.
Such devices are used to provide the necessary path to ground for such surges, yet
prevent any power current from following the surge.
SURGE ARRESTORS
Earth Switching is the process of completing a circuit path, thereby reducing the voltage
difference between the equipment and its surroundings.
EARTH SWITCHING
MISCELLANEOUS EQUIPMENTS
CAPICATOR BANK
Capacitor Bank is a set of many identical
capacitor connected in series or parallel enclosed
and is used for POWER FACTOR CORRECTION.
FUSE
A fuse is a short piece of wire or thin
strip which melts when excessive current
through it for sufficient time. It is
inserted in series with the circuit under
normal operating conditions.
RELAY
RELAY are used for disconnecting the circuit by
manual or automatic operation.
Relay consist of a coil which is excited or energized,
such that the contacts of relay are closed, which
breaks the connection with connected equipment.
LAJPAT NAGAR SUBSTATION
IN-HOUSE SUBSTATION
NO. OF TRANSFORMERS : 2 OF 25MVA EACH
SUPPLY MODE : UNDERGROUND SUPPLY
TYPE OF BREAKER USED : SF6 & VACCUM CIRCUIT
BREAKER
NO. OF CAPACITOR BANKS : 2 OF 5.4MVAR
KILOKARI SUBSTATION
OPEN-HOUSE SUBSTATION
NO. OF TRANSFORMERS : 2 - 25MVA & 16MVA
SUPPLY MODE : UNDERGROUND SUPPLY
OVER-HEAD SUPPLY
TYPE OF BREAKER USED : VACCUM CIRCUIT
BREAKER
NO. OF CAPACITOR BANKS : 3
5.4 MVAR
5.4 MVAR
10 MVAR
JAMIA SUBSTATION
OPEN-HOUSE SUBSTATION
NO. OF TRANSFORMERS : 3 OF 16MVA EACH
SUPPLY MODE : UNDERGROUND SUPPLY
TYPE OF BREAKER USED : VACCUM CIRCUIT
BREAKER
NO. OF CAPACITOR BANKS : 2
5.4 MVAR
7.2 MVAR
SARAI JULLENA SUBSTATION
OPEN-HOUSE SUBSTATION
NO. OF TRANSFORMERS : 3 OF 25MVA EACH
SUPPLY MODE : UNDER-GROUND SUPPLY
OPEN-HEAD SUPPLY
TYPE OF BREAKER USED : VACCUM CIRCUIT
BREAKER
NO. OF CAPACITOR BANKS : 2
7.2 MVAR
7.2 MVAR
THANK YOU

More Related Content

What's hot

sub-station training report
sub-station training reportsub-station training report
sub-station training reportsitesh95074
 
Presentation topic is transmission line
Presentation topic is transmission linePresentation topic is transmission line
Presentation topic is transmission linemd muzahidul haque
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...Vikram Rawani
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Sakshi Rastogi
 
Neutral point clamped inverter
Neutral point clamped inverterNeutral point clamped inverter
Neutral point clamped inverterZunAib Ali
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Thorne & Derrick International
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipurramesh kumawat
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipurmonga786
 
Representation of short & medium transmission lines
Representation of short & medium transmission linesRepresentation of short & medium transmission lines
Representation of short & medium transmission linesvishalgohel12195
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 
Indoor & outdoor substations, an overview
Indoor & outdoor substations, an overviewIndoor & outdoor substations, an overview
Indoor & outdoor substations, an overviewH. Kheir
 
Electrical substation (grid station)
Electrical substation (grid station)Electrical substation (grid station)
Electrical substation (grid station)Sufi Nouman Riaz
 
Fixed and variable speed turbine
Fixed and variable speed turbineFixed and variable speed turbine
Fixed and variable speed turbineSonuKumarBairwa
 
30, 31st July 2012 - The India Blackout
30, 31st July 2012 - The India Blackout30, 31st July 2012 - The India Blackout
30, 31st July 2012 - The India Blackoutgiridaran123
 

What's hot (20)

sub-station training report
sub-station training reportsub-station training report
sub-station training report
 
132kv G.S.S. Jalore
132kv G.S.S. Jalore132kv G.S.S. Jalore
132kv G.S.S. Jalore
 
Presentation topic is transmission line
Presentation topic is transmission linePresentation topic is transmission line
Presentation topic is transmission line
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
Neutral point clamped inverter
Neutral point clamped inverterNeutral point clamped inverter
Neutral point clamped inverter
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
 
Representation of short & medium transmission lines
Representation of short & medium transmission linesRepresentation of short & medium transmission lines
Representation of short & medium transmission lines
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
Indoor & outdoor substations, an overview
Indoor & outdoor substations, an overviewIndoor & outdoor substations, an overview
Indoor & outdoor substations, an overview
 
Electrical substation (grid station)
Electrical substation (grid station)Electrical substation (grid station)
Electrical substation (grid station)
 
Fixed and variable speed turbine
Fixed and variable speed turbineFixed and variable speed turbine
Fixed and variable speed turbine
 
DC MICROGRID PPT.pptx
DC MICROGRID PPT.pptxDC MICROGRID PPT.pptx
DC MICROGRID PPT.pptx
 
30, 31st July 2012 - The India Blackout
30, 31st July 2012 - The India Blackout30, 31st July 2012 - The India Blackout
30, 31st July 2012 - The India Blackout
 
Maximum power point tracking algorithms for solar(pv) systems
Maximum power point tracking algorithms for solar(pv) systemsMaximum power point tracking algorithms for solar(pv) systems
Maximum power point tracking algorithms for solar(pv) systems
 

Similar to Bses powerpoint presentation

fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxAkshaiSai2
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
Presentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationPresentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationRahul Prajapati
 
Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
132 kv substation
132 kv substation132 kv substation
132 kv substationWipro
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 
the substation components study
the substation components study the substation components study
the substation components study Krishnaveni Reddy
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Md Hasan
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation Madeen Kumar
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYRohitashav Goyal
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf Ishan Khandelwal
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving stationH.C.Naveen Kumar
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)Pankaj Rawal
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Rahul Prajapati
 

Similar to Bses powerpoint presentation (20)

fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
Presentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationPresentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-Station
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Design of substation
Design of substationDesign of substation
Design of substation
 
132 kv substation
132 kv substation132 kv substation
132 kv substation
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
the substation components study
the substation components study the substation components study
the substation components study
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
Internship doc 33 11 kv substation
Internship doc 33 11 kv substation  Internship doc 33 11 kv substation
Internship doc 33 11 kv substation
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITY
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 

Recently uploaded

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 

Recently uploaded (20)

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 

Bses powerpoint presentation

  • 1. INDUSTRIAL TRAINING AT BSES RAJDHANI, DELHI ANUJ GUPTA 2K14-MRCE-ME(II)-09
  • 2. BSES RAJDHANI POWER LIMITED BSES Rajdhani Power Limited (BRPL), a joint venture between BSES Limited and the government of NCT of Delhi had taken over the distribution of electric power in the area of South & West Delhi from Delhi Vidyut Board (DVB) on July 2002. BRPL have invested about 1836 crores from 2002-03 to 2006-07 for infrastructural development to bring down the losses and provide quality supply to the consumers. BRPL have a plan for electrification of unauthorized colonies and JJ cluster during 2007-08 to 2010-11. About 283000 colonies and JJ cluster will be covered in this program.
  • 3. SUBSTATION SUBSTATION - A station in the power transmission system at which electric power is transformed to a conveniently used form. The station may consist of transformers, switches, circuit breakers and other auxiliary equipment. Its main function is to receive energy transmitted at high voltage from the generating station, by either step-up or step-down the voltage to a value appropriate for local use and provide facilities for switching. Substations have some additional functions.
  • 4. ELECTRICAL POWER DISTRIBUTION FROM GENERATING PLANTS TO CONSUMERS.
  • 5. CLASSIFICATION OF SUBSTATIONS CLASSIFICATION ON THE BASIS OF FUNCTION: (1)Transformer substation: In this type of substation, electrical power is received at one voltage and it is converted to the required voltage. (2)Industrial substation: In this type of substation, power required for big industrial estates is received from this substation. (3)Switching substation: In such substation, voltage is not changed but switching operation of power line is carried out. (4)Frequency changer substation: In this type of substation, the power frequency is changed. For A.C Traction, frequency is converted to 25Hz from 50Hz.
  • 6.
  • 7. 66/11KV OR 33/11KV DISTRIBUTION SUBSTATION: 66KV/11KV distribution substation: • One 66KV line comes to the 66KV bus bars. • From the same bus bars, outgoing line is taken which goes to the other substation. • 66KV PT is connected to the 66KV bus bar through isolator. • A 66 KV/33KV, star delta transformer is connected to the 66KV bus bars. • Secondary winding is connected to 33KV tubular bus bars. Circuit breakers and isolators are connected on each side of transformer. • Substation gets 440KV supply through 33KV/440KV station transformer connected to 33KV bus bars. • 33KV feeders are taken out from 33KV bus bars through isolators and circuit breakers. • Two transformers each of 66KV/11KV,10MVA are connected to 66KV strain bus bars through isolators and circuit breakers. • 11KV is taken to the control room through underground cable. • Number of 11KV feeders taken out from 11KV bus bars through isolators and circuit breakers
  • 8. TYPICAL COMPONENTS OF A POWER PLANT SUBSTATION (SWITCHYARD) • CONNECT • CONNECT & DIS-CONNECT • CONNECT, DIS-CONNECT & DETECT • DETECT & TRANSFORM • DETECT & TRANSFORM • PROTECT & SAFETY • PROTECT
  • 9.
  • 10. BUS BARS Bus Bar is an over head parallel connections we use for a main bar or conductor carrying an electric current to which many connections are connected. Types : Single Bus Bar  Double Bus Bar  Ring Bus Bar CIRCUIT BREAKER They can be classified into: • Oil circuit breaker • Sulphur hexafluoride circuit breaker (SF6) • Vacuum circuit breakers
  • 11. A high-voltage circuit breaker in which the arc is drawn in oil to dissipate the heat and extinguish the arc; the intense heat of the arc decomposes the oil, generating a gas whose high pressure produces a flow of fresh fluid through the arc that furnishes the necessary insulation to prevent a restrike of the arc. • Oil circuit breaker Sulphur hexafluoride (SF6) gas is used as the arc quenching medium. The SF6 is an electronegative gas and has a strong tendency to absorb free electrons. The SF6 circuit breaker have been found to a very effective for high power and high voltage service. • Sulphur hexafluoride circuit breaker (SF6) • Vacuum circuit breakers Vacuum circuit breakers are circuit breakers which are used to protect medium and high voltage circuits from dangerous electrical situations. Like other types of circuit breakers, vacuum circuit breakers literally break the circuit so that energy cannot continue flowing through it, thereby preventing fires, power surges, and other problems which may emerge.
  • 12. CURRENT TRANSFORMER Current transformer are used for installation and maintaince of current relay in sub- station for protection purpose which have normally low current rating. A Current Transformer is also called as INSTRUMENT TRANSFORMER. VOLTAGE TRANSFORMER Voltage transformer are used with volt-meters, watt meters, watthour meters, power-factor meters, frequency meters, synchro-scopes and synchronizing apparatus, protective and regulating relays and the no-voltage and over-voltage trip coils of automatic circuit breakers.
  • 13. Whenever lighting surge occur, then a high voltage passes through electrical equipments which might cause damage to them. Such devices are used to provide the necessary path to ground for such surges, yet prevent any power current from following the surge. SURGE ARRESTORS Earth Switching is the process of completing a circuit path, thereby reducing the voltage difference between the equipment and its surroundings. EARTH SWITCHING
  • 14.
  • 15. MISCELLANEOUS EQUIPMENTS CAPICATOR BANK Capacitor Bank is a set of many identical capacitor connected in series or parallel enclosed and is used for POWER FACTOR CORRECTION.
  • 16. FUSE A fuse is a short piece of wire or thin strip which melts when excessive current through it for sufficient time. It is inserted in series with the circuit under normal operating conditions.
  • 17. RELAY RELAY are used for disconnecting the circuit by manual or automatic operation. Relay consist of a coil which is excited or energized, such that the contacts of relay are closed, which breaks the connection with connected equipment.
  • 18. LAJPAT NAGAR SUBSTATION IN-HOUSE SUBSTATION NO. OF TRANSFORMERS : 2 OF 25MVA EACH SUPPLY MODE : UNDERGROUND SUPPLY TYPE OF BREAKER USED : SF6 & VACCUM CIRCUIT BREAKER NO. OF CAPACITOR BANKS : 2 OF 5.4MVAR
  • 19. KILOKARI SUBSTATION OPEN-HOUSE SUBSTATION NO. OF TRANSFORMERS : 2 - 25MVA & 16MVA SUPPLY MODE : UNDERGROUND SUPPLY OVER-HEAD SUPPLY TYPE OF BREAKER USED : VACCUM CIRCUIT BREAKER NO. OF CAPACITOR BANKS : 3 5.4 MVAR 5.4 MVAR 10 MVAR
  • 20. JAMIA SUBSTATION OPEN-HOUSE SUBSTATION NO. OF TRANSFORMERS : 3 OF 16MVA EACH SUPPLY MODE : UNDERGROUND SUPPLY TYPE OF BREAKER USED : VACCUM CIRCUIT BREAKER NO. OF CAPACITOR BANKS : 2 5.4 MVAR 7.2 MVAR
  • 21. SARAI JULLENA SUBSTATION OPEN-HOUSE SUBSTATION NO. OF TRANSFORMERS : 3 OF 25MVA EACH SUPPLY MODE : UNDER-GROUND SUPPLY OPEN-HEAD SUPPLY TYPE OF BREAKER USED : VACCUM CIRCUIT BREAKER NO. OF CAPACITOR BANKS : 2 7.2 MVAR 7.2 MVAR
  • 22.