John Boehms of Autodesk presents on the use of Integrated Practice Design on the Autodesk LEED-CI Platinum office in Massachusetts.
Presented at the 5th annual Green Building Festival in Toronto, Canada, 2009.
Most relevant achievements in my career.
More than 20 years applying solutions in different companies.
Working for multinational companies and also in startups
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
A BIM Execution Plan (BEP) is a valuable and necessary part of any project in the AEC sector. It is essential when the team needs to work in a collaborative process to ensure that everyone on the project is aligned with the project objectives. A correctly implemented BEP will ensure the project goals are clear and agreed by the wide project team. Communication is a key component of all construction projects. To be successful, it requires many different people working together to achieve the client requirements. A well-built BEP requires the project team to work together and communicate from the very beginning to the completion of the project. This class will explain the importance of the BEP and demonstrate how to create an efficient BEP for post-contract-award which will include the Model Production & Delivery Table (MPDT). The post-contract-award BEP sets out how the information required in the Employer's Information Requirements will be provided.
John Boehms of Autodesk presents on the use of Integrated Practice Design on the Autodesk LEED-CI Platinum office in Massachusetts.
Presented at the 5th annual Green Building Festival in Toronto, Canada, 2009.
Most relevant achievements in my career.
More than 20 years applying solutions in different companies.
Working for multinational companies and also in startups
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
A BIM Execution Plan (BEP) is a valuable and necessary part of any project in the AEC sector. It is essential when the team needs to work in a collaborative process to ensure that everyone on the project is aligned with the project objectives. A correctly implemented BEP will ensure the project goals are clear and agreed by the wide project team. Communication is a key component of all construction projects. To be successful, it requires many different people working together to achieve the client requirements. A well-built BEP requires the project team to work together and communicate from the very beginning to the completion of the project. This class will explain the importance of the BEP and demonstrate how to create an efficient BEP for post-contract-award which will include the Model Production & Delivery Table (MPDT). The post-contract-award BEP sets out how the information required in the Employer's Information Requirements will be provided.
https://gcomsolutions.co.uk/power-bi-proof-of-concept -
G Com Solutions’ one-week Power BI Proof of Concept helps IT departments and data analysts to demonstrate Power BI’s features and benefits to key stakeholders, enabling them to gauge how well Power BI addresses their business needs.
Leveraging Microsoft Power BI To Support Enterprise Business IntelligenceRightpoint
Take control over your data. View our presentation of end-to-end enterprise business intelligence leveraging Microsoft solutions including SQL Server, Power Pivot, and Power BI.
Demonstration includes:
• How to build a Tabular model by importing a Power Pivot workbook
• Connecting a Tabular model to Power BI
• Developing Power BI dashboards/reports connected to an on-premise Tabular model
• Refreshing Power BI dashboards/reports
Sustainability In Government - Bim Webinar4 All of Us
CROSS-WHITEHALL SUSTAINABILITY PRACTITIONERS FORUM
ADDRESSING THE BENEFITS OF BIM - SPONSORED BY FORGE TRACK LTD
We kick-started the series with a webinar for the Cross-Whitehall Sustainability Practitioners Forum. These webinars will provide the practitioners with the latest information, knowledge and policy announcements on a range of sustainability issues and was decided to launch this series by addressing BIM. BIM is a new requirement for government which Sustainability Practitioners will need to be aware of and one that will help Departments in the achievement of the mainstreaming commitments outlined below.
The Green Government Commitments require transparency and, in addition to the above requirements, must address the following areas: climate change adaptation; biodiversity and natural environment; procurement of food and catering services; sustainable construction; and staff wellbeing and quality of life. The Government Construction Strategy published May 2011, set out the framework for a range of workstreams, all of which have the ultimate aim of reducing the cost of government construction projects by 15-20 per cent by the end of the current Parliament.
The BIM task group are supporting and helping deliver the objectives of this strategy and the requirement to strengthen the public sector's capability in BIM implementation with the aim that all central government departments will be adopting, as a minimum, collaborative level 2 BIM 2016.
This webinar examined how BIM can support central government departments in their achievement of collaborative level 2 Bim by 2016 and highlight the great work already taking place within this field.
Data, BI and Advanced Analytics: where Microsoft Dynamics ends and Microsoft ...DXC Eclipse
Microsoft Dynamics 365: Continue Your Transformation Journey.
Data, BI and Advanced Analytics: where Microsoft Dynamics ends and Microsoft BI begins.
Achieve meaningful insight into your data by extending Dynamics’ out-of-the-box BI capabilities. Let us introduce the ‘Too Easy’ BI Proof of Concept.
Presented by Ramond Haynes - BI & Analytics Practice Director, DXC Eclipse
Camden Council, a top London borough, partnered with GrayMatter for Pentaho's data-driven solutions. Their challenge was providing real-time KPIs for visitor services, leading to improved efficiency and SLA compliance. With Pentaho, they gained access to timely KPIs and detailed reports, facilitating informed decisions. GrayMatter's expertise ensured seamless enhancement of their BI solution. This collaboration showcases how data analytics can transform service delivery.
The BIM execution plan is an indispensable tool for successful project completion. Use the BIM Execution Plan to visualize the flow of information on your construction projects for an effective outcome. Read more about it here in the presentation.
Developing a Solution for Improving Service Delivery
Nab Finance have a vision to improve the service they offer to their internal clients. This included offering self-service, communities of interest, business intelligence, knowledge management and collaboration. The SharePoint 2010 Platform was used to build a Proof of Concept for this vision and includes the use of dynamic dashboards and data visualization tools to improve the ability to discover knowledge.
Presented at the Australian SharePoint Conference 2011
AVEVA World Conference NA - Jim Purvis, WorleyParsonsAVEVA-Americas
This presentation explores how WorleyParsons focuses on asset optimization through building and leveraging operational data environments and capturing business value from emergent technologies.
https://gcomsolutions.co.uk/power-bi-proof-of-concept -
G Com Solutions’ one-week Power BI Proof of Concept helps IT departments and data analysts to demonstrate Power BI’s features and benefits to key stakeholders, enabling them to gauge how well Power BI addresses their business needs.
Leveraging Microsoft Power BI To Support Enterprise Business IntelligenceRightpoint
Take control over your data. View our presentation of end-to-end enterprise business intelligence leveraging Microsoft solutions including SQL Server, Power Pivot, and Power BI.
Demonstration includes:
• How to build a Tabular model by importing a Power Pivot workbook
• Connecting a Tabular model to Power BI
• Developing Power BI dashboards/reports connected to an on-premise Tabular model
• Refreshing Power BI dashboards/reports
Sustainability In Government - Bim Webinar4 All of Us
CROSS-WHITEHALL SUSTAINABILITY PRACTITIONERS FORUM
ADDRESSING THE BENEFITS OF BIM - SPONSORED BY FORGE TRACK LTD
We kick-started the series with a webinar for the Cross-Whitehall Sustainability Practitioners Forum. These webinars will provide the practitioners with the latest information, knowledge and policy announcements on a range of sustainability issues and was decided to launch this series by addressing BIM. BIM is a new requirement for government which Sustainability Practitioners will need to be aware of and one that will help Departments in the achievement of the mainstreaming commitments outlined below.
The Green Government Commitments require transparency and, in addition to the above requirements, must address the following areas: climate change adaptation; biodiversity and natural environment; procurement of food and catering services; sustainable construction; and staff wellbeing and quality of life. The Government Construction Strategy published May 2011, set out the framework for a range of workstreams, all of which have the ultimate aim of reducing the cost of government construction projects by 15-20 per cent by the end of the current Parliament.
The BIM task group are supporting and helping deliver the objectives of this strategy and the requirement to strengthen the public sector's capability in BIM implementation with the aim that all central government departments will be adopting, as a minimum, collaborative level 2 BIM 2016.
This webinar examined how BIM can support central government departments in their achievement of collaborative level 2 Bim by 2016 and highlight the great work already taking place within this field.
Data, BI and Advanced Analytics: where Microsoft Dynamics ends and Microsoft ...DXC Eclipse
Microsoft Dynamics 365: Continue Your Transformation Journey.
Data, BI and Advanced Analytics: where Microsoft Dynamics ends and Microsoft BI begins.
Achieve meaningful insight into your data by extending Dynamics’ out-of-the-box BI capabilities. Let us introduce the ‘Too Easy’ BI Proof of Concept.
Presented by Ramond Haynes - BI & Analytics Practice Director, DXC Eclipse
Camden Council, a top London borough, partnered with GrayMatter for Pentaho's data-driven solutions. Their challenge was providing real-time KPIs for visitor services, leading to improved efficiency and SLA compliance. With Pentaho, they gained access to timely KPIs and detailed reports, facilitating informed decisions. GrayMatter's expertise ensured seamless enhancement of their BI solution. This collaboration showcases how data analytics can transform service delivery.
The BIM execution plan is an indispensable tool for successful project completion. Use the BIM Execution Plan to visualize the flow of information on your construction projects for an effective outcome. Read more about it here in the presentation.
Developing a Solution for Improving Service Delivery
Nab Finance have a vision to improve the service they offer to their internal clients. This included offering self-service, communities of interest, business intelligence, knowledge management and collaboration. The SharePoint 2010 Platform was used to build a Proof of Concept for this vision and includes the use of dynamic dashboards and data visualization tools to improve the ability to discover knowledge.
Presented at the Australian SharePoint Conference 2011
AVEVA World Conference NA - Jim Purvis, WorleyParsonsAVEVA-Americas
This presentation explores how WorleyParsons focuses on asset optimization through building and leveraging operational data environments and capturing business value from emergent technologies.
AVEVA World Conference NA - Jim Purvis, WorleyParsons
Breitburn Energy Winwire V4 (2)
1. Win Wire
BreitBurn Energy
October 2009
Business Problem
BreitBurn Energy Partners is an independent oil and gas limited
partnership, focused on the acquisition, exploitation and
development of hundreds of oil and gas properties.
After extensive company growth, an accounting system
consolidation in 2009, and rapidly changing commodity prices
BreitBurn was left with a P&L tool that no longer met the needs of
the company. The existing P&L reports were restrictive and only
available after hours of manual data extracts, summarization, and
“Senior management formatting into fixed, Excel based, reports. Overall the process
had a negative feeling was inefficient, laborious, and was not able to answer all the
towards Data questions presented by Operations. C-Level management
Warehousing based on requested a better, more flexible BI solution.
their prior experience
and feedback from Mike Dominick, Manager of Systems Integration and Development,
peers. The Pragmatic determined that a SQL Server 2008 data warehouse based BI
Works „Agile BI‟ solution would deliver the best results and provide long term
methodology helped us benefits. But first he needed to get his team up the BI learning
show results after a curve and show solid results to the management team early in the
week and deliver a investment cycle for the project.
production BI solution in
under 4 months.” Mike
Dominick, BreitBurn
Energy Solution
Pragmatic Works provided a one week, onsite “Business
Intelligence Quick Start” engagement in late June to build a proof
of concept Data Warehouse, and mentor the Breitburn technical
team on using the Microsoft BI stack technologies.
During July through September the BreitBurn team continued
working on the project. In August the Pragmatic Works BI
Consultant returned for a one week “Sprint” engagement to
continue mentoring the team and work on the more difficult BI
issues. A final week of reporting assistance in September pushed
the project across the finish line for BreitBurn. The new Data
Warehouse based property P&L reports were rolled out to business
users in October, less than 4 months after the project started.
2. Page 2 Win Wire – BreitBurn Energy
Value
Key elements of the value proposition for Breitburn Energy were:
KEYS TO SUCCESS
Pragmatic Works: Shorter time to value
o BI Quick Start Lower cost to value
for mentoring and Flexible P&L reporting now available to users on demand
Proof of Concept
Increased level of reporting detail
o Sprint week to Hours of manual summarization eliminated
drive project
towards finish BreitBurn team is now equipped to complete BI solutions
line rapidly for additional business problems
Microsoft Business The project flushed out, and addressed, data and
Intelligence nomenclature inconsistencies so that future projects will
technologies:
proceed even more quickly.
o SSIS
Rapid delivery of this initial BI application with C-level
o SSAS visibility has established credibility for the Microsoft SQL
o SSRS 2008 BI stack technology and the Breitburn BI team for
future projects
For additional information contact:
Sam Washburn, Technical
Director, Pragmatic Works
Consulting. +1.617.326.3846,
swashburn@pragmaticworks.com