BLACKSPOT 7 – BANDUNGAN
TOURIST ROAD
T junction serving an alternative route to a tourist
destination
Crash Number            1            2            3            4

      Date
                     09/04/2011   31/03/2012   01/03/2012   11/01/2012

      Time
                       21:30        20:30        23:45        17:00

      Fatal
                         0            0            0            0

 Serious Injury
                         0            0            0            0

   Light Injury
                         3            0            1            2

Light Condition          3            3            3            2

    Weather             fine       cloudy        foggy         rain

Road Condition
                       Good         Good         Good         Good
    Vehicle 1           m/c          m/c          m/c          m/c

    Vehicle 2           m/c          m/c          car       pedestrian

    Vehicle 3

    Vehicle 4

 Accident type          52           52           52            4

Traffic controller
                         1            1            1            1
   Type Jalan
                         1            1            1            1
  Bentuk Jalan
                         1            1            1            1
RECOMMENDATIONS FOR BANDUNTAN:
 Speed restriction signs at 1km spacing's along NH
  14 from Semarang to Bawen
 Make the Y junction more conspicuous
       Renew advanced direction signs on each approach to
        show the diagrammatic layout of the intersection.
       Re line mark each approach.
       On north approach, mark three lanes – the left lane two
        lanes for through traffic only, and the right lane for right
        turn only.
       Pavement arrows – 3 pairs – on each approach
       Construct a median (semi mountable kerbs) along the
        northern centre line all the way north to 100m passed
        Citron crossing. Leave gaps for turns at critical
        businesses
RECOMMENDATIONS FOR BANDUNTAN:
 Install intersection signals.
 Use a three phase system

Blackspot 7 tourist road

  • 1.
    BLACKSPOT 7 –BANDUNGAN TOURIST ROAD T junction serving an alternative route to a tourist destination
  • 2.
    Crash Number 1 2 3 4 Date 09/04/2011 31/03/2012 01/03/2012 11/01/2012 Time 21:30 20:30 23:45 17:00 Fatal 0 0 0 0 Serious Injury 0 0 0 0 Light Injury 3 0 1 2 Light Condition 3 3 3 2 Weather fine cloudy foggy rain Road Condition Good Good Good Good Vehicle 1 m/c m/c m/c m/c Vehicle 2 m/c m/c car pedestrian Vehicle 3 Vehicle 4 Accident type 52 52 52 4 Traffic controller 1 1 1 1 Type Jalan 1 1 1 1 Bentuk Jalan 1 1 1 1
  • 14.
    RECOMMENDATIONS FOR BANDUNTAN: Speed restriction signs at 1km spacing's along NH 14 from Semarang to Bawen  Make the Y junction more conspicuous  Renew advanced direction signs on each approach to show the diagrammatic layout of the intersection.  Re line mark each approach.  On north approach, mark three lanes – the left lane two lanes for through traffic only, and the right lane for right turn only.  Pavement arrows – 3 pairs – on each approach  Construct a median (semi mountable kerbs) along the northern centre line all the way north to 100m passed Citron crossing. Leave gaps for turns at critical businesses
  • 15.
    RECOMMENDATIONS FOR BANDUNTAN: Install intersection signals.  Use a three phase system