Train-like Cycling through Brussels
50 km of Cycling Express Lanes next to the railway lines
UrbanmovementConnecting Brussels
Demographicgrowth&traffic jams
Cycling is fast, cheap and environmentallyfriendly
A needfor a Coalition of the willing:
Obstacles to cycling in Brussels
Safety: cyclingbetweencars, the quality of cyclingpaths…
Discontinuouscycling: trafficlights, cyclingpathsending…
Bicycletheft
Gradients
Cycle Express Lanes in Brussels
Commutersfrom the periphery do nottaketrains and do notcycle
Cycle Express Lanes in Brussels
Commuters to Brussels:
Bike: 1,9%
Red: train
Yellow: other (mainlycar)
Commuters to Copenhagen:
Bike: 37%
Flattrack = Flat Biking in Brussels
- on approach roads
- near railway lines
- bicycle bridges and elevators
Cycle Express Lanes in Brussels
facebook.com/FlattrackBrussels
Cycling on flat lanes on approach roads
… but cars take up 80% of the space
=> cancelling one traffic lane for cars
Cycle Express Lanes in Brussels
Flat biking near railway lines
… 6 priority cycling fast lanes
… 6 priority bridges and elevators
€ 10 to 20 million
L50
L50a
L28
L161
L36
L26
line length cost
L50 10 km € 6 miljoen
L36 7,5 km € 5 miljoen
L50a 5 km € 3 miljoen
L28 7,5 km € 4 miljoen
L26 7,5 km € 5 miljoen
L161 12,5 km € 7 miljoen
50 km € 30 miljoen
Realistic and affordable: € 50 million (5 timesannualbiking budget Brussels Region)
Cycle Express Lanes in Brussels
Flat biking near railway lines
… 6 priority cycling fast lanes
… 6 priority bridges and elevators
€ 10 to 20 million
L50
L50a
L28
L161
L36
L26
line length cost
L50 10 km € 6 miljoen
L36 7,5 km € 5 miljoen
L50a 5 km € 3 miljoen
L28 7,5 km € 4 miljoen
L26 7,5 km € 5 miljoen
L161 12,5 km € 7 miljoen
50 km € 30 miljoen
Realistic and affordable: € 50 million (5 timesannualbiking budget Brussels Region)
Cycle Express Lanes in Brussels
Bridge
CycleTrampe
Elevator
Cycle Express Lanes in Brussels
Today 60’
-dangerous
-trafficlights
-cyclelanes stop
-slopes
Future 40’
-nice and safe
-gender gap and age gap
Cycle Express Lanes in Brussels
RER vélo Fiets GEN A.M. ARTGINEERING – URBAN PLATFORM
A.M. ARTGINEERING – URBAN PLATFORM
Cycle Express Lanes in Brussels
T1
T2
T3
T4
T5
T6
T7
A.M. ARTGINEERING – URBAN PLATFORM
A.M. ARTGINEERING – URBAN PLATFORM
T1 1.859.500 €
T2 958.000 €
T3 72.900 €
T4 1.451.800 €
T5 819.000 €
T6 852.900 €
T7 1.171.800 €
= 6.285.000 €
Budget indicatif Indicatief budget
20.000 €/m
20.000 €/m
10.000 €/m
10.000 €/m
1.500 €/m
300 €/m
100 €/m
20 €/m
A.M. ARTGINEERING – URBAN PLATFORM
A.M. ARTGINEERING – URBAN PLATFORM
Tronçon 6: Ancienne gare - Chambon Traject 6: Voormalig station - Chambon
T6 // 852.900 € (budget indicatif)
Ancienne gare
Voormalig station
Passage Chambon
Chambon passage
A.M. ARTGINEERING – URBAN PLATFORM
A.M. ARTGINEERING – URBAN PLATFORM
Tronçon 6: Ancienne gare - Chambon Traject 6: Voormalig station - Chambon
T6 // 852.900 € (budget indicatif)
A.M. ARTGINEERING – URBAN PLATFORM
A.M. ARTGINEERING – URBAN PLATFORM
Cycle Express Lanes in Brussels
L’ancienne gare et ses abords (EP7) Voormalig station en zijn omgeving (EP7) A.M. ARTGINEERING – URBAN PLATFORM
A.M. ARTGINEERING – URBAN PLATFORM
L’ancienne gare et ses abords (EP7) Voormalig station en zijn omgeving (EP7) A.M. ARTGINEERING – URBAN PLATFORM
A.M. ARTGINEERING – URBAN PLATFORM
RER vélo Fiets GEN A.M. ARTGINEERING – URBAN PLATFORM
A.M. ARTGINEERING – URBAN PLATFORM
ACTION PLAN FOR CYCLING
1. 50 km of cycling paths near railway lines
2. 50 km of cycling paths on approach roads
3. Taking care of missing links
4. 14 bike elevators
5. 8 bridges across the canal
6. Cycling streets in reduced speed limit areas
7. 250 bike boxes in every neighbourhood
8. Electrical Villo rental bikes
9. 100% registered and 100 decoy bikes
10. 30% cycling security patrol
Fietssnelwegen in Brussel
Train-like Cycling through Brussels
Evaluation by Klaus Bondam
BIO
1985 – 2005: Actor and Manager
2006 – 2008: Chairman of EurocitiesMobility Forum
2002 – 2010: Elected to the City Council in the City of Copenhagen
Bike Mayorembracing the biking culture:
“Investing in bicycleinfrastructurecombinedwithcampaigningfor more
cycling was the right combination”
2014 – …: Director of DanishCyclists’ Federation

Bicycle Express Lanes Brussels

  • 1.
    Train-like Cycling throughBrussels 50 km of Cycling Express Lanes next to the railway lines
  • 2.
    UrbanmovementConnecting Brussels Demographicgrowth&traffic jams Cyclingis fast, cheap and environmentallyfriendly A needfor a Coalition of the willing: Obstacles to cycling in Brussels Safety: cyclingbetweencars, the quality of cyclingpaths… Discontinuouscycling: trafficlights, cyclingpathsending… Bicycletheft Gradients Cycle Express Lanes in Brussels
  • 3.
    Commutersfrom the peripherydo nottaketrains and do notcycle Cycle Express Lanes in Brussels Commuters to Brussels: Bike: 1,9% Red: train Yellow: other (mainlycar) Commuters to Copenhagen: Bike: 37%
  • 5.
    Flattrack = FlatBiking in Brussels - on approach roads - near railway lines - bicycle bridges and elevators Cycle Express Lanes in Brussels facebook.com/FlattrackBrussels
  • 6.
    Cycling on flatlanes on approach roads … but cars take up 80% of the space => cancelling one traffic lane for cars Cycle Express Lanes in Brussels
  • 7.
    Flat biking nearrailway lines … 6 priority cycling fast lanes … 6 priority bridges and elevators € 10 to 20 million L50 L50a L28 L161 L36 L26 line length cost L50 10 km € 6 miljoen L36 7,5 km € 5 miljoen L50a 5 km € 3 miljoen L28 7,5 km € 4 miljoen L26 7,5 km € 5 miljoen L161 12,5 km € 7 miljoen 50 km € 30 miljoen Realistic and affordable: € 50 million (5 timesannualbiking budget Brussels Region) Cycle Express Lanes in Brussels
  • 8.
    Flat biking nearrailway lines … 6 priority cycling fast lanes … 6 priority bridges and elevators € 10 to 20 million L50 L50a L28 L161 L36 L26 line length cost L50 10 km € 6 miljoen L36 7,5 km € 5 miljoen L50a 5 km € 3 miljoen L28 7,5 km € 4 miljoen L26 7,5 km € 5 miljoen L161 12,5 km € 7 miljoen 50 km € 30 miljoen Realistic and affordable: € 50 million (5 timesannualbiking budget Brussels Region) Cycle Express Lanes in Brussels
  • 9.
  • 10.
    Today 60’ -dangerous -trafficlights -cyclelanes stop -slopes Future40’ -nice and safe -gender gap and age gap Cycle Express Lanes in Brussels
  • 11.
    RER vélo FietsGEN A.M. ARTGINEERING – URBAN PLATFORM A.M. ARTGINEERING – URBAN PLATFORM
  • 12.
  • 13.
    T1 T2 T3 T4 T5 T6 T7 A.M. ARTGINEERING –URBAN PLATFORM A.M. ARTGINEERING – URBAN PLATFORM T1 1.859.500 € T2 958.000 € T3 72.900 € T4 1.451.800 € T5 819.000 € T6 852.900 € T7 1.171.800 € = 6.285.000 €
  • 14.
    Budget indicatif Indicatiefbudget 20.000 €/m 20.000 €/m 10.000 €/m 10.000 €/m 1.500 €/m 300 €/m 100 €/m 20 €/m A.M. ARTGINEERING – URBAN PLATFORM A.M. ARTGINEERING – URBAN PLATFORM
  • 15.
    Tronçon 6: Anciennegare - Chambon Traject 6: Voormalig station - Chambon T6 // 852.900 € (budget indicatif) Ancienne gare Voormalig station Passage Chambon Chambon passage A.M. ARTGINEERING – URBAN PLATFORM A.M. ARTGINEERING – URBAN PLATFORM
  • 16.
    Tronçon 6: Anciennegare - Chambon Traject 6: Voormalig station - Chambon T6 // 852.900 € (budget indicatif) A.M. ARTGINEERING – URBAN PLATFORM A.M. ARTGINEERING – URBAN PLATFORM
  • 17.
  • 18.
    L’ancienne gare etses abords (EP7) Voormalig station en zijn omgeving (EP7) A.M. ARTGINEERING – URBAN PLATFORM A.M. ARTGINEERING – URBAN PLATFORM
  • 19.
    L’ancienne gare etses abords (EP7) Voormalig station en zijn omgeving (EP7) A.M. ARTGINEERING – URBAN PLATFORM A.M. ARTGINEERING – URBAN PLATFORM
  • 20.
    RER vélo FietsGEN A.M. ARTGINEERING – URBAN PLATFORM A.M. ARTGINEERING – URBAN PLATFORM
  • 21.
    ACTION PLAN FORCYCLING 1. 50 km of cycling paths near railway lines 2. 50 km of cycling paths on approach roads 3. Taking care of missing links 4. 14 bike elevators 5. 8 bridges across the canal 6. Cycling streets in reduced speed limit areas 7. 250 bike boxes in every neighbourhood 8. Electrical Villo rental bikes 9. 100% registered and 100 decoy bikes 10. 30% cycling security patrol Fietssnelwegen in Brussel
  • 22.
    Train-like Cycling throughBrussels Evaluation by Klaus Bondam
  • 23.
    BIO 1985 – 2005:Actor and Manager 2006 – 2008: Chairman of EurocitiesMobility Forum 2002 – 2010: Elected to the City Council in the City of Copenhagen Bike Mayorembracing the biking culture: “Investing in bicycleinfrastructurecombinedwithcampaigningfor more cycling was the right combination” 2014 – …: Director of DanishCyclists’ Federation