BERLIN HAUPTBAHNHOF 
ANUSHPRA SINGH A/2155/2009 | PRASHANT KUMAR A/2160/2009 SNEHALATA A/2150/2009
View of the station building from theSpree 
OVERVIEW : 
Largest crossing station in europe 
CATEGORY : 1 
Type : Bf 
DailyENTRY/EXIT: 300,000 
Station code : 1071 
CONSTRUCTION AND LOCATION : 
Levels : 2 
Platforms:14 
Shops in complex:: 80 
No of trains : 1,500 domestic 
and international trains. 
Year(s) of design: 1993 
Opened : 26 May 2006 
Architect: Meinhard von Gerkan 
Location: Berlin 
State : Berlin 
Country : Germany 
Germany : MITTE 
INTRODUCTION: 
The mega Berlin Train Station, Berlin Hauptbahnhof, architect Meinhard von Gerkanand JürgenHillmer, the STUDIO HAMBURG Gerkan, Marg& Partners, is capable of receiving more than 1,500daily trains and 25,000passengers. Its construction lasted ten years have meant that some conflicts between the German rail company Deutsche Bahnand the architect, in deciding to first shorten the time of execution of the work by modifying the project. It shortened the cover of the station at 100 meters and the lower floors that serve as the underground heat exchanger to be covered, causing no daylight arrived as planned in the initial project. 
overview
Construction 
The construction of the new Berlin Hauptbahnhofis a masterpiece of logistics. 
While conducting the excavations, groundwater levels were constantly monitored by monitors at once that they were going up the bridges and 1.5 million cubic meters of earth were removed in barges, which otherwise would have required a convoy 1300 trucks miles long. 
A complex part of the construction was related to the foundation, as the building rests on a sandy soil on the banks of the river Spree. To overcome this difficulty concrete ponds were constructed at a depth of 25 meters that were filled with groundwater. 
Another of the engineering feats that took place in this construction was the laying of a metal bridge that crosses the station across. Because of the risk posed by building it as the station was crowded with people, it was decided to run for a weekend in which the station was closedto the public for 54 hours. Then the structure was built in two parts vertically and 1,200 tons each, and then joined as a drawbridge. 
Image showing construction of structure in two parts and the joined as a drawbridge 
Image showing foundation concrete pond upper structure 
Image taken during construction phase ,from spree 
Showing construction of main pathway 
construction
CONCEPT : 
For architects of Hamburg Gerkan, Marg& Partners, the determinant of the architecture was developed to emphasize the importance of the new Berlin Hauptbahnhof"-LehrterBahnhofcrossing point in an increasingly integrated Europe. 
The lobby of the station is framed by two curved structures 46 feet high trying to highlight the scale of the place, the importance of the station as a crossing point between Europe and link the east and west. 
SPACES : 
Of its 175,000meters square 21,000are intended for rail transport, occupying two levels and has 14platforms, 15,000square meters are intended for shops and restaurants, office space 50,000buildings and 5,500bridge functional purposes of the railway. The platforms are spread over an area of 32,000square meters and the garage area occupies about 25,000square meters. 
CENTRAL NAVE 
Between two frames is the central nave that houses the station platforms, 430 meters long, oriented in the direction east -west, covered by a huge glass dome and light that extends over 321 meters 
The building with north-south orientation of 45 meters wide and 159 long, are situated between the two blocks of buildings and covered by a barrel vault, filigree and glass. 
From the standpoint of architecture and urban planning, these structures, called building bridges form a unit with the glass vessels of the train station. 
The point of intersection of the two railway lines long distance is enhanced by the cruise ships of the two windows. 
Bridge Building 
Central nave 
BUILDING BRIDGE 
The two buildings of the station bridge are divided into two distinct functional areas. The areas for commercial uses, restaurants and service for rail users who occupy the lower levels and areas of 50 000 m² offices occupy nine of the ten floors of these buildings. They are functional and adaptable offices as required, by contacting the different spaces by stairs 
SHOPPING CENTER 
With its generous empty three floors of shops and restaurants between the two levels of terraces, the station also became the commercial and business centerof the future neighborhoodaround the station 
Total area: 175,000 m² 
Total retail area: 15,000 m² 
Parking spaces: 900 
Length hall station, north-south: 160 meters 
Longitude * hall station, east-west: 321 meters 
concept
FAÇADE PORTIONS : 
The large and bright area, was designed using a structure that uses space grids braced by cable networks. These grids allow free surfaces and extraordinarily transparent as glass directly, or whether the supporting structure and the glazing support are the same. 
ZOCALO: 
The station relies on a cruciform base, which simultaneously integrates the dominant diagonal blocks of buildings. The rectangular socket is accessible from all four sides by stairways and offers great public spaces to a height of 4.43 m above street level, clearly separate from the areas of circulation. 
LOBBY: 
The entrance hall has a glass roof that connects to the bridge that has buildings on the sides, serving outside the supporting structure the same as support beams in the shape of a fish's belly, with 4, 70 meters high on which rests the glass dome of the roof. 
THE GLASS roof 
Roof OF the new station in Berlin is a high-tech construction of the modern era. The roof running east to west from the station and covering the new commuter rail bridges was designed with CAD and advanced processing techniques 
The undersides of the last two floors are designed as cross vaults in order to create high quality spaces. 
VENTILATION TOWER 
Visible for miles, the four exhaust pipes rise well above the roof of the Hauptbahnhof, New Berlin, as are its tallest structure. 
Its underground part sinks about 20 meters below ground level, with a reinforced concrete structure from which emerges another steel with 60 meters high, which have been invested 250 tonnes of gold. Deutsche Bahn'slogo on each side of the vent pipe can be clearly seen through a wide area of central Berlin. 
View of an enrancelobby 
CRUCIFORM BASE 
elements
STANDS OUT FROM THE WHOLE CONTEXT, 
THE AREA IS A CLEAR GATEWAY, THUS REGARDING THE WHOLE AREA AS A HUB FOR BERLIN CITY 
THE AREA IS SURROUNDED BY ROADS THAT LEAD TO MOTORWAYS, AND WITH NO EVIDENCE OF LOCAL BUSINESSES OR IT BEING A RESIDENTIAL AREA, IT CAN BE SAID THAT THE AREA PURELY SERVES THE PURPOSE OF ACTING AS A GATEWAY AND A TRANSPORT NETWORK. 
THE STATION ALLOWS THE TRAVELLER TO VIEW FROM THE PLATFORM A GENERAL VIEW OF THE CITY CENTRE AS FROM THE EDGE OF THE PLATFORM A VIEW OF THE NEEDLE TOWER, AS WELL AS THE REICHSTAG AND RIVER CAN BE SEEN WHICH ARE FEATURES THAT ARE A FOCAL POINT FOR THE CITY 
NO SHOPS, RESTAURANTS OF TOURIST ATTRACTIONS IN THE IMMEDIATE AREA OUTSIDE HAUPTBAHNHOF STATION ,ALL THE SHOPS AND RESTAURANTS ARE INSIDE THE STATION 
THIS STATION IS GEOGRAPHICALLY VERY CENTRAL TO BERLIN AND HAS BEEN DESIGNED TO SERVE ALL BERLINERS AND TOURISTS. 
analysis
3D SECTION 
Plan and section
ELEVATION 1 
ELEVATION 2 
SERIES OF IMAGES SHOWING HOW BUILDING BEIDGE WAS MADE 
sections

More Related Content

What's hot

FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATION
Diaa Hilal
 
IIM kozhikode
IIM kozhikode IIM kozhikode
IIM kozhikode
Andhra University
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Gargee Ghosh
 

What's hot (20)

Beijing railway railway atation
Beijing railway railway atationBeijing railway railway atation
Beijing railway railway atation
 
Ved tranzcube plaza, Vadodara
Ved tranzcube plaza, VadodaraVed tranzcube plaza, Vadodara
Ved tranzcube plaza, Vadodara
 
Transit hub
Transit hub Transit hub
Transit hub
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATION
 
IIM kozhikode
IIM kozhikode IIM kozhikode
IIM kozhikode
 
Chennai mofussil bus terminal case study
Chennai mofussil bus terminal case studyChennai mofussil bus terminal case study
Chennai mofussil bus terminal case study
 
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
 
planning of central railway station
planning of central railway stationplanning of central railway station
planning of central railway station
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
 
PANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESH
PANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESHPANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESH
PANDIT NEHRU BUS STATION (PNBS) , VIJAYAWADA ,ANDHRA PRADESH
 
Isbt, kashmiri gate, delhi_a case study
Isbt, kashmiri gate, delhi_a case studyIsbt, kashmiri gate, delhi_a case study
Isbt, kashmiri gate, delhi_a case study
 
Ad bus terminal chennai
Ad bus terminal chennaiAd bus terminal chennai
Ad bus terminal chennai
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, Bangalore
 
Geeta mandir bus port
Geeta mandir bus portGeeta mandir bus port
Geeta mandir bus port
 
DESIGN STANDARDS FOR PLANNING A BUS TERMINUS
DESIGN STANDARDS FOR PLANNING A BUS TERMINUSDESIGN STANDARDS FOR PLANNING A BUS TERMINUS
DESIGN STANDARDS FOR PLANNING A BUS TERMINUS
 
CMRL - Urban Design Analysis
CMRL - Urban Design AnalysisCMRL - Urban Design Analysis
CMRL - Urban Design Analysis
 
CHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case studyCHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case study
 
casestudy.pptx
casestudy.pptxcasestudy.pptx
casestudy.pptx
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
 
Pandit Nehru Bus Terminal
Pandit Nehru Bus Terminal Pandit Nehru Bus Terminal
Pandit Nehru Bus Terminal
 

Similar to Berlin hauptbanhof central railway

REP_2011_Retail_Railways
REP_2011_Retail_RailwaysREP_2011_Retail_Railways
REP_2011_Retail_Railways
Connie Moser
 
FINAL PRESENTATION.pptx
FINAL PRESENTATION.pptxFINAL PRESENTATION.pptx
FINAL PRESENTATION.pptx
SharpEyu
 
HS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec ReportHS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec Report
Robert Keenan AIA, OAA
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
Abi Abagun
 

Similar to Berlin hauptbanhof central railway (20)

Subway Architecture
Subway ArchitectureSubway Architecture
Subway Architecture
 
REP_2011_Retail_Railways
REP_2011_Retail_RailwaysREP_2011_Retail_Railways
REP_2011_Retail_Railways
 
Brick viaduct
Brick viaductBrick viaduct
Brick viaduct
 
The Gherkin
The GherkinThe Gherkin
The Gherkin
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatrava
 
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, ChinaSoutheast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
 
Railway engineering 3-presentation
Railway engineering 3-presentationRailway engineering 3-presentation
Railway engineering 3-presentation
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
The Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case StudyThe Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case Study
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
%100
%100%100
%100
 
Herzog & de meuron,
Herzog & de meuron,Herzog & de meuron,
Herzog & de meuron,
 
Contemporary architecture of india
Contemporary architecture of indiaContemporary architecture of india
Contemporary architecture of india
 
2017 AEC Excellence Awards Finalists
2017 AEC Excellence Awards Finalists2017 AEC Excellence Awards Finalists
2017 AEC Excellence Awards Finalists
 
FINAL PRESENTATION.pptx
FINAL PRESENTATION.pptxFINAL PRESENTATION.pptx
FINAL PRESENTATION.pptx
 
HS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec ReportHS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec Report
 
High tech architecture
High tech architectureHigh tech architecture
High tech architecture
 
Shanghai Tower.pdf
Shanghai Tower.pdfShanghai Tower.pdf
Shanghai Tower.pdf
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 

Recently uploaded

Nehru Place Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Ahmedabad ...
Nehru Place Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Ahmedabad ...Nehru Place Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Ahmedabad ...
Nehru Place Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Ahmedabad ...
Call Girls Mumbai
 
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
nirzagarg
 
Call Girl in Faridabad | Whatsapp No 📞 8168257667 📞 VIP Escorts Service Avail...
Call Girl in Faridabad | Whatsapp No 📞 8168257667 📞 VIP Escorts Service Avail...Call Girl in Faridabad | Whatsapp No 📞 8168257667 📞 VIP Escorts Service Avail...
Call Girl in Faridabad | Whatsapp No 📞 8168257667 📞 VIP Escorts Service Avail...
Hyderabad Escorts Agency
 
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
gajnagarg
 
Faridabad * Call Girls Badarpur | Whatsapp No 📞 8168257667 📞 VIP Escorts Serv...
Faridabad * Call Girls Badarpur | Whatsapp No 📞 8168257667 📞 VIP Escorts Serv...Faridabad * Call Girls Badarpur | Whatsapp No 📞 8168257667 📞 VIP Escorts Serv...
Faridabad * Call Girls Badarpur | Whatsapp No 📞 8168257667 📞 VIP Escorts Serv...
Hyderabad Escorts Agency
 
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdfJohn Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
Excavator
 
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
wsppdmt
 
Shimla Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Shimla Call Gir...
Shimla Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Shimla Call Gir...Shimla Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Shimla Call Gir...
Shimla Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Shimla Call Gir...
Call Girls Mumbai
 

Recently uploaded (20)

Washim Call Girls 📞9332606886 Call Girls in Washim Escorts service book now C...
Washim Call Girls 📞9332606886 Call Girls in Washim Escorts service book now C...Washim Call Girls 📞9332606886 Call Girls in Washim Escorts service book now C...
Washim Call Girls 📞9332606886 Call Girls in Washim Escorts service book now C...
 
Nehru Place Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Ahmedabad ...
Nehru Place Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Ahmedabad ...Nehru Place Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Ahmedabad ...
Nehru Place Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Ahmedabad ...
 
👉 Agartala Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Agartala Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Agartala Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Agartala Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Darbhanga [ 7014168258 ] Call Me For Genuine Models...
 
Call Girl in Faridabad | Whatsapp No 📞 8168257667 📞 VIP Escorts Service Avail...
Call Girl in Faridabad | Whatsapp No 📞 8168257667 📞 VIP Escorts Service Avail...Call Girl in Faridabad | Whatsapp No 📞 8168257667 📞 VIP Escorts Service Avail...
Call Girl in Faridabad | Whatsapp No 📞 8168257667 📞 VIP Escorts Service Avail...
 
Call Girls Pimple Saudagar ( Pune ) 9352988975 Visit Shobha_De At ( beautiese...
Call Girls Pimple Saudagar ( Pune ) 9352988975 Visit Shobha_De At ( beautiese...Call Girls Pimple Saudagar ( Pune ) 9352988975 Visit Shobha_De At ( beautiese...
Call Girls Pimple Saudagar ( Pune ) 9352988975 Visit Shobha_De At ( beautiese...
 
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
 
Bhubaneswar🌹Vip Call Girls Odisha❤Heer 9777949614 💟 Full Trusted CALL GIRLS I...
Bhubaneswar🌹Vip Call Girls Odisha❤Heer 9777949614 💟 Full Trusted CALL GIRLS I...Bhubaneswar🌹Vip Call Girls Odisha❤Heer 9777949614 💟 Full Trusted CALL GIRLS I...
Bhubaneswar🌹Vip Call Girls Odisha❤Heer 9777949614 💟 Full Trusted CALL GIRLS I...
 
Premium Call Girls Nagpur Call Girls (Adult Only) 💯Call Us 🔝 6378878445 🔝 💃 E...
Premium Call Girls Nagpur Call Girls (Adult Only) 💯Call Us 🔝 6378878445 🔝 💃 E...Premium Call Girls Nagpur Call Girls (Adult Only) 💯Call Us 🔝 6378878445 🔝 💃 E...
Premium Call Girls Nagpur Call Girls (Adult Only) 💯Call Us 🔝 6378878445 🔝 💃 E...
 
Premium Call Girls Aurangabad Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class ...
Premium Call Girls Aurangabad Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class ...Premium Call Girls Aurangabad Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class ...
Premium Call Girls Aurangabad Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class ...
 
Housewife Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168...
Housewife Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168...Housewife Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168...
Housewife Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168...
 
Faridabad * Call Girls Badarpur | Whatsapp No 📞 8168257667 📞 VIP Escorts Serv...
Faridabad * Call Girls Badarpur | Whatsapp No 📞 8168257667 📞 VIP Escorts Serv...Faridabad * Call Girls Badarpur | Whatsapp No 📞 8168257667 📞 VIP Escorts Serv...
Faridabad * Call Girls Badarpur | Whatsapp No 📞 8168257667 📞 VIP Escorts Serv...
 
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdfJohn Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
 
Changodar Call Girls Book Now 7737669865 Top Class Escort Service Available
Changodar Call Girls Book Now 7737669865 Top Class Escort Service AvailableChangodar Call Girls Book Now 7737669865 Top Class Escort Service Available
Changodar Call Girls Book Now 7737669865 Top Class Escort Service Available
 
John deere 7200r 7230R 7260R Problems Repair Manual
John deere 7200r 7230R 7260R Problems Repair ManualJohn deere 7200r 7230R 7260R Problems Repair Manual
John deere 7200r 7230R 7260R Problems Repair Manual
 
Bhilai Escorts Service Girl ^ 8250092165, WhatsApp Anytime Bhilai
Bhilai Escorts Service Girl ^ 8250092165, WhatsApp Anytime BhilaiBhilai Escorts Service Girl ^ 8250092165, WhatsApp Anytime Bhilai
Bhilai Escorts Service Girl ^ 8250092165, WhatsApp Anytime Bhilai
 
Call Girls Kolkata +910000000000 call me Independent Escort Service Bengal
Call Girls Kolkata +910000000000 call me Independent Escort Service BengalCall Girls Kolkata +910000000000 call me Independent Escort Service Bengal
Call Girls Kolkata +910000000000 call me Independent Escort Service Bengal
 
Nangloi Jat Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nangloi Jat
Nangloi Jat Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nangloi JatNangloi Jat Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nangloi Jat
Nangloi Jat Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nangloi Jat
 
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
 
Shimla Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Shimla Call Gir...
Shimla Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Shimla Call Gir...Shimla Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Shimla Call Gir...
Shimla Call Girls 💯Call Us 🔝 9xx000xx09 🔝 💃 Top Class Russian Shimla Call Gir...
 

Berlin hauptbanhof central railway

  • 1. BERLIN HAUPTBAHNHOF ANUSHPRA SINGH A/2155/2009 | PRASHANT KUMAR A/2160/2009 SNEHALATA A/2150/2009
  • 2. View of the station building from theSpree OVERVIEW : Largest crossing station in europe CATEGORY : 1 Type : Bf DailyENTRY/EXIT: 300,000 Station code : 1071 CONSTRUCTION AND LOCATION : Levels : 2 Platforms:14 Shops in complex:: 80 No of trains : 1,500 domestic and international trains. Year(s) of design: 1993 Opened : 26 May 2006 Architect: Meinhard von Gerkan Location: Berlin State : Berlin Country : Germany Germany : MITTE INTRODUCTION: The mega Berlin Train Station, Berlin Hauptbahnhof, architect Meinhard von Gerkanand JürgenHillmer, the STUDIO HAMBURG Gerkan, Marg& Partners, is capable of receiving more than 1,500daily trains and 25,000passengers. Its construction lasted ten years have meant that some conflicts between the German rail company Deutsche Bahnand the architect, in deciding to first shorten the time of execution of the work by modifying the project. It shortened the cover of the station at 100 meters and the lower floors that serve as the underground heat exchanger to be covered, causing no daylight arrived as planned in the initial project. overview
  • 3. Construction The construction of the new Berlin Hauptbahnhofis a masterpiece of logistics. While conducting the excavations, groundwater levels were constantly monitored by monitors at once that they were going up the bridges and 1.5 million cubic meters of earth were removed in barges, which otherwise would have required a convoy 1300 trucks miles long. A complex part of the construction was related to the foundation, as the building rests on a sandy soil on the banks of the river Spree. To overcome this difficulty concrete ponds were constructed at a depth of 25 meters that were filled with groundwater. Another of the engineering feats that took place in this construction was the laying of a metal bridge that crosses the station across. Because of the risk posed by building it as the station was crowded with people, it was decided to run for a weekend in which the station was closedto the public for 54 hours. Then the structure was built in two parts vertically and 1,200 tons each, and then joined as a drawbridge. Image showing construction of structure in two parts and the joined as a drawbridge Image showing foundation concrete pond upper structure Image taken during construction phase ,from spree Showing construction of main pathway construction
  • 4. CONCEPT : For architects of Hamburg Gerkan, Marg& Partners, the determinant of the architecture was developed to emphasize the importance of the new Berlin Hauptbahnhof"-LehrterBahnhofcrossing point in an increasingly integrated Europe. The lobby of the station is framed by two curved structures 46 feet high trying to highlight the scale of the place, the importance of the station as a crossing point between Europe and link the east and west. SPACES : Of its 175,000meters square 21,000are intended for rail transport, occupying two levels and has 14platforms, 15,000square meters are intended for shops and restaurants, office space 50,000buildings and 5,500bridge functional purposes of the railway. The platforms are spread over an area of 32,000square meters and the garage area occupies about 25,000square meters. CENTRAL NAVE Between two frames is the central nave that houses the station platforms, 430 meters long, oriented in the direction east -west, covered by a huge glass dome and light that extends over 321 meters The building with north-south orientation of 45 meters wide and 159 long, are situated between the two blocks of buildings and covered by a barrel vault, filigree and glass. From the standpoint of architecture and urban planning, these structures, called building bridges form a unit with the glass vessels of the train station. The point of intersection of the two railway lines long distance is enhanced by the cruise ships of the two windows. Bridge Building Central nave BUILDING BRIDGE The two buildings of the station bridge are divided into two distinct functional areas. The areas for commercial uses, restaurants and service for rail users who occupy the lower levels and areas of 50 000 m² offices occupy nine of the ten floors of these buildings. They are functional and adaptable offices as required, by contacting the different spaces by stairs SHOPPING CENTER With its generous empty three floors of shops and restaurants between the two levels of terraces, the station also became the commercial and business centerof the future neighborhoodaround the station Total area: 175,000 m² Total retail area: 15,000 m² Parking spaces: 900 Length hall station, north-south: 160 meters Longitude * hall station, east-west: 321 meters concept
  • 5. FAÇADE PORTIONS : The large and bright area, was designed using a structure that uses space grids braced by cable networks. These grids allow free surfaces and extraordinarily transparent as glass directly, or whether the supporting structure and the glazing support are the same. ZOCALO: The station relies on a cruciform base, which simultaneously integrates the dominant diagonal blocks of buildings. The rectangular socket is accessible from all four sides by stairways and offers great public spaces to a height of 4.43 m above street level, clearly separate from the areas of circulation. LOBBY: The entrance hall has a glass roof that connects to the bridge that has buildings on the sides, serving outside the supporting structure the same as support beams in the shape of a fish's belly, with 4, 70 meters high on which rests the glass dome of the roof. THE GLASS roof Roof OF the new station in Berlin is a high-tech construction of the modern era. The roof running east to west from the station and covering the new commuter rail bridges was designed with CAD and advanced processing techniques The undersides of the last two floors are designed as cross vaults in order to create high quality spaces. VENTILATION TOWER Visible for miles, the four exhaust pipes rise well above the roof of the Hauptbahnhof, New Berlin, as are its tallest structure. Its underground part sinks about 20 meters below ground level, with a reinforced concrete structure from which emerges another steel with 60 meters high, which have been invested 250 tonnes of gold. Deutsche Bahn'slogo on each side of the vent pipe can be clearly seen through a wide area of central Berlin. View of an enrancelobby CRUCIFORM BASE elements
  • 6. STANDS OUT FROM THE WHOLE CONTEXT, THE AREA IS A CLEAR GATEWAY, THUS REGARDING THE WHOLE AREA AS A HUB FOR BERLIN CITY THE AREA IS SURROUNDED BY ROADS THAT LEAD TO MOTORWAYS, AND WITH NO EVIDENCE OF LOCAL BUSINESSES OR IT BEING A RESIDENTIAL AREA, IT CAN BE SAID THAT THE AREA PURELY SERVES THE PURPOSE OF ACTING AS A GATEWAY AND A TRANSPORT NETWORK. THE STATION ALLOWS THE TRAVELLER TO VIEW FROM THE PLATFORM A GENERAL VIEW OF THE CITY CENTRE AS FROM THE EDGE OF THE PLATFORM A VIEW OF THE NEEDLE TOWER, AS WELL AS THE REICHSTAG AND RIVER CAN BE SEEN WHICH ARE FEATURES THAT ARE A FOCAL POINT FOR THE CITY NO SHOPS, RESTAURANTS OF TOURIST ATTRACTIONS IN THE IMMEDIATE AREA OUTSIDE HAUPTBAHNHOF STATION ,ALL THE SHOPS AND RESTAURANTS ARE INSIDE THE STATION THIS STATION IS GEOGRAPHICALLY VERY CENTRAL TO BERLIN AND HAS BEEN DESIGNED TO SERVE ALL BERLINERS AND TOURISTS. analysis
  • 7. 3D SECTION Plan and section
  • 8. ELEVATION 1 ELEVATION 2 SERIES OF IMAGES SHOWING HOW BUILDING BEIDGE WAS MADE sections