Benchmarking Process
 If a company is to be successful, it needs to evaluate its performance in a
consistent manner.
 In order to do so, businesses need to set standards for themselves and measure
their processes and performance against recognized industry leaders or against
best practices from other industries, which operate in a similar environment.
 This is commonly referred to as benchmarking in management parlance.
 The benchmarking process is relatively uncomplicated. Some knowledge and a
practical dent is all that is needed to make such a process a success.
 Therefore, for the benefit of corporate executives, students and the interested
general populace, the key steps in the benchmarking process are highlighted
below.
11/19/2020 2
Contd..
A Step-by-Step Approach to Benchmarking
 Following are the steps involved in benchmarking process:
11/19/2020 3
Contd..
1.Planning
 Prior to engaging in benchmarking, it is imperative that corporate stakeholders
identify the activities that need to be benchmarked.
 For instance, the processes that merit such consideration would generally be
core activities that have the potential to give the business in question a
competitive edge.
 Such processes would generally command a high cost, volume or value. For the
optimal results of benchmarking to be reaped, the inputs and outputs need to be
redefined; the activities chosen should be measurable and thereby easily
comparable, and thus the benchmarking metrics needs to be arrived at.
11/19/2020 4
Contd..
 Prior to engaging in the benchmarking process, the total process flow needs to
be given due consideration. For instance, improving one core competency at the
detriment to another proves to be of little use.
 Therefore, many choose to document such processes in detail (a process flow
chart is deemed to be ideal for this purpose), so that omissions and errors are
minimized; thus enabling the company to obtain a clearer idea of its strategic
goals, its primary business processes, customer expectations and critical success
factors.
 An honest appraisal of the company's strengths, weaknesses and problem areas
would prove to be of immense use when fine-tuning such a process.
11/19/2020 5
Contd..
 The next step in the planning process would be for the company to choose an
appropriate benchmark against which their performance can be measured.
 The benchmark can be a single entity or a collective group of companies, which
operate at optimal efficiency.
 As stated before, if such a company operates in a similar environment or if it
adopts a comparable strategic approach to reach their goals, its relevance
would, indeed, be greater.
 Measures and practices used in such companies should be identified, so that
business process alternatives can be examined.
 Also, it is always prudent for a company to ascertain its objectives, prior to
commencement of the benchmarking process.
11/19/2020 6
Contd..
 The methodology adopted and the way in which output is documented should
be given due consideration too.
 On such instances, a capable team should be found in order to carry out the
benchmarking process, with a leader or leaders being duly appointed, so as to
ensure the smooth, timely implementation of the project.
2.Collection of Information
 Information can be broadly classified under the sub texts of primary data and
secondary data.
 To clarify further, here, primary data refers to collection of data directly from
the benchmarked company/companies itself, while secondary data refers to
information garnered from the press, publications or websites.
11/19/2020 7
Contd..
 Exploratory research, market research, quantitative research, informal
conversations, interviews and questionnaires, are still, some of the most popular
methods of collecting information.
 When engaging in primary research, the company that is due to undertake the
benchmarking process needs to redefine its data collection methodology.
 Drafting a questionnaire or a standardized interview format, carrying out
primary research via the telephone, e-mail or in face-to-face interviews, making
on-site observations, and documenting such data in a systematic manner is vital,
if the benchmarking process is to be a success.
11/19/2020 8
Contd..
3.Analysis of Data
 Once sufficient data is collected, the proper analysis of such information is of
foremost importance.
 Data analysis, data presentation (preferably in graphical format, for easy
reference), results projection, classifying the performance gaps in processes,
and identifying the root cause that leads to the creation of such gaps (commonly
referred to as enablers), need to be then carried out.
4.Implementation
 This is the stage in the benchmarking process where it becomes mandatory to
walk the talk. This generally means that far-reaching changes need to be made,
so that the performance gap between the ideal and the actual is narrowed and
eliminated wherever possible.
11/19/2020 9
Contd..
 A formal action plan that promotes change should ideally be formulated
keeping the organization's culture in mind, so that the resistance that usually
accompanies change is minimized.
 Ensuring that the management and staff are fully committed to the process and
that sufficient resources are in place to meet facilitate the necessary
improvements would be critical in making the benchmarking process, a success.
5.Monitoring
 As with most projects, in order to reap the maximum benefits of the
benchmarking process, a systematic evaluation should be carried out on a
regular basis.
11/19/2020 10
Contd..
 Assimilating the required information, evaluating the progress made, re-
iterating the impact of the changes and making any necessary adjustments, are
all part of the monitoring process.
Conclusion
 As is clearly apparent, benchmarking can add value to the organization's
workflow and structure by identifying areas for improvement and rectification.
 It is indeed invaluable in an organization's quest for continuous improvement.
11/19/2020 11
Thank You
11/19/2020 12

More Related Content

What's hot

What's hot (20)

Job evaluation ppt
Job evaluation pptJob evaluation ppt
Job evaluation ppt
 
Responsibility centers final Prof Rishi Chourasia
Responsibility centers final Prof Rishi ChourasiaResponsibility centers final Prof Rishi Chourasia
Responsibility centers final Prof Rishi Chourasia
 
The System and Process of Controlling
The System and Process of ControllingThe System and Process of Controlling
The System and Process of Controlling
 
Potential Appraisal
Potential AppraisalPotential Appraisal
Potential Appraisal
 
Controlling 2 ppt
Controlling 2 pptControlling 2 ppt
Controlling 2 ppt
 
Budget Classification
Budget ClassificationBudget Classification
Budget Classification
 
Budgetary control (2)
Budgetary control (2)Budgetary control (2)
Budgetary control (2)
 
Elements of cost
Elements of costElements of cost
Elements of cost
 
MBO and MBE
MBO and MBEMBO and MBE
MBO and MBE
 
Ii unit irlw
Ii unit irlwIi unit irlw
Ii unit irlw
 
Performance appraisal
Performance appraisalPerformance appraisal
Performance appraisal
 
Wages and incentives
Wages and incentivesWages and incentives
Wages and incentives
 
Cost audit- Saloni Dhiman
Cost audit- Saloni DhimanCost audit- Saloni Dhiman
Cost audit- Saloni Dhiman
 
Structural intervention
Structural intervention Structural intervention
Structural intervention
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)
 
Challenges of organizational design
Challenges of organizational designChallenges of organizational design
Challenges of organizational design
 
Job evaluation its methods and advantages & dis-advatages
Job evaluation its methods and advantages & dis-advatagesJob evaluation its methods and advantages & dis-advatages
Job evaluation its methods and advantages & dis-advatages
 
Controlling
ControllingControlling
Controlling
 
Stages of career development by saba abbas
Stages of career development by saba abbasStages of career development by saba abbas
Stages of career development by saba abbas
 
Collective bargaining
Collective bargainingCollective bargaining
Collective bargaining
 

Similar to Benchmarking Process in Total Quality Management

Types of Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality ManagementTypes of Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality ManagementDr.Raja R
 
Benchmarking
BenchmarkingBenchmarking
BenchmarkingSaiBapat
 
Role of IT in supply chain management
Role of IT in supply chain managementRole of IT in supply chain management
Role of IT in supply chain managementNeelam Yadav
 
Unit IV-TQM Tools
Unit IV-TQM ToolsUnit IV-TQM Tools
Unit IV-TQM ToolsDr.Raja R
 
Wr bap program success metrics 28-june-2019 smc jc (v3)
Wr bap   program success metrics 28-june-2019 smc jc (v3)Wr bap   program success metrics 28-june-2019 smc jc (v3)
Wr bap program success metrics 28-june-2019 smc jc (v3)Jaime Brown
 
Study on Benchmarking with Respect to Recruitment Parameters
Study on Benchmarking with Respect to Recruitment ParametersStudy on Benchmarking with Respect to Recruitment Parameters
Study on Benchmarking with Respect to Recruitment ParametersIJMTST Journal
 
Advantages Of Benchmarking
Advantages Of BenchmarkingAdvantages Of Benchmarking
Advantages Of BenchmarkingKenHeitritter
 
The Balance Scorecard: Presentation to the Institute of Electrical Engineers
The Balance Scorecard: Presentation to the Institute of Electrical EngineersThe Balance Scorecard: Presentation to the Institute of Electrical Engineers
The Balance Scorecard: Presentation to the Institute of Electrical EngineersKinetik Solutions Ltd
 
Vodafone Business Performance Measures
Vodafone  Business Performance MeasuresVodafone  Business Performance Measures
Vodafone Business Performance MeasuresToru Sekiguchi
 
Business Process Management in IT company
Business Process Management  in IT company Business Process Management  in IT company
Business Process Management in IT company Dhrubaji Mandal ♛
 

Similar to Benchmarking Process in Total Quality Management (20)

Total Quality Management.ppt
Total Quality Management.pptTotal Quality Management.ppt
Total Quality Management.ppt
 
Types of Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality ManagementTypes of Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality Management
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Beanchmarketing
BeanchmarketingBeanchmarketing
Beanchmarketing
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Role of IT in supply chain management
Role of IT in supply chain managementRole of IT in supply chain management
Role of IT in supply chain management
 
Unit IV-TQM Tools
Unit IV-TQM ToolsUnit IV-TQM Tools
Unit IV-TQM Tools
 
Wr bap program success metrics 28-june-2019 smc jc (v3)
Wr bap   program success metrics 28-june-2019 smc jc (v3)Wr bap   program success metrics 28-june-2019 smc jc (v3)
Wr bap program success metrics 28-june-2019 smc jc (v3)
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Study on Benchmarking with Respect to Recruitment Parameters
Study on Benchmarking with Respect to Recruitment ParametersStudy on Benchmarking with Respect to Recruitment Parameters
Study on Benchmarking with Respect to Recruitment Parameters
 
Advantages Of Benchmarking
Advantages Of BenchmarkingAdvantages Of Benchmarking
Advantages Of Benchmarking
 
The Balance Scorecard: Presentation to the Institute of Electrical Engineers
The Balance Scorecard: Presentation to the Institute of Electrical EngineersThe Balance Scorecard: Presentation to the Institute of Electrical Engineers
The Balance Scorecard: Presentation to the Institute of Electrical Engineers
 
FastClose_EN
FastClose_ENFastClose_EN
FastClose_EN
 
Schofield - Using Benchmarks to Accelerate Process Improvement
Schofield - Using Benchmarks to Accelerate Process ImprovementSchofield - Using Benchmarks to Accelerate Process Improvement
Schofield - Using Benchmarks to Accelerate Process Improvement
 
Vodafone Business Performance Measures
Vodafone  Business Performance MeasuresVodafone  Business Performance Measures
Vodafone Business Performance Measures
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Business Process Management in IT company
Business Process Management  in IT company Business Process Management  in IT company
Business Process Management in IT company
 
94C94A923521.pdf
94C94A923521.pdf94C94A923521.pdf
94C94A923521.pdf
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 

More from Dr.Raja R

Advanced Electrical Drive Controls, Types and Implementation”
Advanced Electrical Drive Controls, Types   and Implementation”Advanced Electrical Drive Controls, Types   and Implementation”
Advanced Electrical Drive Controls, Types and Implementation”Dr.Raja R
 
Electrical Drives and Control Heating and Cooling Curves
Electrical Drives and Control Heating and Cooling CurvesElectrical Drives and Control Heating and Cooling Curves
Electrical Drives and Control Heating and Cooling CurvesDr.Raja R
 
Classification of electric drive with advantage and disadvantage
Classification of electric drive with advantage and disadvantageClassification of electric drive with advantage and disadvantage
Classification of electric drive with advantage and disadvantageDr.Raja R
 
Electric Drives and Controls Unit 1 Introduction
Electric Drives and Controls Unit 1 IntroductionElectric Drives and Controls Unit 1 Introduction
Electric Drives and Controls Unit 1 IntroductionDr.Raja R
 
Qualitative study of different renewable energy resources
Qualitative study of different renewable energy resourcesQualitative study of different renewable energy resources
Qualitative study of different renewable energy resourcesDr.Raja R
 
Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)Dr.Raja R
 
Applications of carbon materials in electrical engineering
Applications of carbon materials in electrical engineeringApplications of carbon materials in electrical engineering
Applications of carbon materials in electrical engineeringDr.Raja R
 
Circuit Theory: Nodes, Branches and Loops of a Circuit
Circuit Theory: Nodes, Branches and Loops of a CircuitCircuit Theory: Nodes, Branches and Loops of a Circuit
Circuit Theory: Nodes, Branches and Loops of a CircuitDr.Raja R
 
High voltage transformers
High voltage transformersHigh voltage transformers
High voltage transformersDr.Raja R
 
Making india non fossil fuel based
Making india non fossil fuel basedMaking india non fossil fuel based
Making india non fossil fuel basedDr.Raja R
 
Stepper motor in industrial applications
Stepper motor in industrial applicationsStepper motor in industrial applications
Stepper motor in industrial applicationsDr.Raja R
 
Advances in Solar Panel Technologies for Efficient Energy Production
Advances in Solar Panel Technologies for  Efficient Energy Production Advances in Solar Panel Technologies for  Efficient Energy Production
Advances in Solar Panel Technologies for Efficient Energy Production Dr.Raja R
 
Introduction to reactive power control in electrical power
Introduction to reactive power control in electrical powerIntroduction to reactive power control in electrical power
Introduction to reactive power control in electrical powerDr.Raja R
 
Basic Difference Between Wires and Cables
Basic Difference Between Wires and CablesBasic Difference Between Wires and Cables
Basic Difference Between Wires and CablesDr.Raja R
 
Residential Electrical Wiring Systems Basics
Residential Electrical Wiring Systems Basics Residential Electrical Wiring Systems Basics
Residential Electrical Wiring Systems Basics Dr.Raja R
 
Renewable energy and sustainable development
Renewable energy and sustainable developmentRenewable energy and sustainable development
Renewable energy and sustainable developmentDr.Raja R
 
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)
NAAC (Criterion-I : Curricular Aspects  for Autonomous Engineering Colleges)NAAC (Criterion-I : Curricular Aspects  for Autonomous Engineering Colleges)
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)Dr.Raja R
 
Benchmarking in Total Quality Management
Benchmarking in Total Quality ManagementBenchmarking in Total Quality Management
Benchmarking in Total Quality ManagementDr.Raja R
 
Reasons to Benchmark in Total Quality Management
Reasons to Benchmark in Total Quality ManagementReasons to Benchmark in Total Quality Management
Reasons to Benchmark in Total Quality ManagementDr.Raja R
 
House of Quality in Total Quality Management
House of Quality in Total Quality ManagementHouse of Quality in Total Quality Management
House of Quality in Total Quality ManagementDr.Raja R
 

More from Dr.Raja R (20)

Advanced Electrical Drive Controls, Types and Implementation”
Advanced Electrical Drive Controls, Types   and Implementation”Advanced Electrical Drive Controls, Types   and Implementation”
Advanced Electrical Drive Controls, Types and Implementation”
 
Electrical Drives and Control Heating and Cooling Curves
Electrical Drives and Control Heating and Cooling CurvesElectrical Drives and Control Heating and Cooling Curves
Electrical Drives and Control Heating and Cooling Curves
 
Classification of electric drive with advantage and disadvantage
Classification of electric drive with advantage and disadvantageClassification of electric drive with advantage and disadvantage
Classification of electric drive with advantage and disadvantage
 
Electric Drives and Controls Unit 1 Introduction
Electric Drives and Controls Unit 1 IntroductionElectric Drives and Controls Unit 1 Introduction
Electric Drives and Controls Unit 1 Introduction
 
Qualitative study of different renewable energy resources
Qualitative study of different renewable energy resourcesQualitative study of different renewable energy resources
Qualitative study of different renewable energy resources
 
Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)
 
Applications of carbon materials in electrical engineering
Applications of carbon materials in electrical engineeringApplications of carbon materials in electrical engineering
Applications of carbon materials in electrical engineering
 
Circuit Theory: Nodes, Branches and Loops of a Circuit
Circuit Theory: Nodes, Branches and Loops of a CircuitCircuit Theory: Nodes, Branches and Loops of a Circuit
Circuit Theory: Nodes, Branches and Loops of a Circuit
 
High voltage transformers
High voltage transformersHigh voltage transformers
High voltage transformers
 
Making india non fossil fuel based
Making india non fossil fuel basedMaking india non fossil fuel based
Making india non fossil fuel based
 
Stepper motor in industrial applications
Stepper motor in industrial applicationsStepper motor in industrial applications
Stepper motor in industrial applications
 
Advances in Solar Panel Technologies for Efficient Energy Production
Advances in Solar Panel Technologies for  Efficient Energy Production Advances in Solar Panel Technologies for  Efficient Energy Production
Advances in Solar Panel Technologies for Efficient Energy Production
 
Introduction to reactive power control in electrical power
Introduction to reactive power control in electrical powerIntroduction to reactive power control in electrical power
Introduction to reactive power control in electrical power
 
Basic Difference Between Wires and Cables
Basic Difference Between Wires and CablesBasic Difference Between Wires and Cables
Basic Difference Between Wires and Cables
 
Residential Electrical Wiring Systems Basics
Residential Electrical Wiring Systems Basics Residential Electrical Wiring Systems Basics
Residential Electrical Wiring Systems Basics
 
Renewable energy and sustainable development
Renewable energy and sustainable developmentRenewable energy and sustainable development
Renewable energy and sustainable development
 
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)
NAAC (Criterion-I : Curricular Aspects  for Autonomous Engineering Colleges)NAAC (Criterion-I : Curricular Aspects  for Autonomous Engineering Colleges)
NAAC (Criterion-I : Curricular Aspects for Autonomous Engineering Colleges)
 
Benchmarking in Total Quality Management
Benchmarking in Total Quality ManagementBenchmarking in Total Quality Management
Benchmarking in Total Quality Management
 
Reasons to Benchmark in Total Quality Management
Reasons to Benchmark in Total Quality ManagementReasons to Benchmark in Total Quality Management
Reasons to Benchmark in Total Quality Management
 
House of Quality in Total Quality Management
House of Quality in Total Quality ManagementHouse of Quality in Total Quality Management
House of Quality in Total Quality Management
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 

Recently uploaded (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Benchmarking Process in Total Quality Management

  • 1. Presented by Dr. R. RAJA, M.E., Ph.D., Assistant Professor, Department of EEE, Muthayammal Engineering College, (Autonomous) Namakkal (Dt), Rasipuram – 637408 MUTHAYAMMAL ENGINEERING COLLEGE (An Autonomous Institution) (Approved by AICTE, New Delhi, Accredited by NAAC, NBA & Affiliated to Anna University), Rasipuram - 637 408, Namakkal Dist., Tamil Nadu. Benchmarking Process in Total Quality Management
  • 2. Benchmarking Process  If a company is to be successful, it needs to evaluate its performance in a consistent manner.  In order to do so, businesses need to set standards for themselves and measure their processes and performance against recognized industry leaders or against best practices from other industries, which operate in a similar environment.  This is commonly referred to as benchmarking in management parlance.  The benchmarking process is relatively uncomplicated. Some knowledge and a practical dent is all that is needed to make such a process a success.  Therefore, for the benefit of corporate executives, students and the interested general populace, the key steps in the benchmarking process are highlighted below. 11/19/2020 2
  • 3. Contd.. A Step-by-Step Approach to Benchmarking  Following are the steps involved in benchmarking process: 11/19/2020 3
  • 4. Contd.. 1.Planning  Prior to engaging in benchmarking, it is imperative that corporate stakeholders identify the activities that need to be benchmarked.  For instance, the processes that merit such consideration would generally be core activities that have the potential to give the business in question a competitive edge.  Such processes would generally command a high cost, volume or value. For the optimal results of benchmarking to be reaped, the inputs and outputs need to be redefined; the activities chosen should be measurable and thereby easily comparable, and thus the benchmarking metrics needs to be arrived at. 11/19/2020 4
  • 5. Contd..  Prior to engaging in the benchmarking process, the total process flow needs to be given due consideration. For instance, improving one core competency at the detriment to another proves to be of little use.  Therefore, many choose to document such processes in detail (a process flow chart is deemed to be ideal for this purpose), so that omissions and errors are minimized; thus enabling the company to obtain a clearer idea of its strategic goals, its primary business processes, customer expectations and critical success factors.  An honest appraisal of the company's strengths, weaknesses and problem areas would prove to be of immense use when fine-tuning such a process. 11/19/2020 5
  • 6. Contd..  The next step in the planning process would be for the company to choose an appropriate benchmark against which their performance can be measured.  The benchmark can be a single entity or a collective group of companies, which operate at optimal efficiency.  As stated before, if such a company operates in a similar environment or if it adopts a comparable strategic approach to reach their goals, its relevance would, indeed, be greater.  Measures and practices used in such companies should be identified, so that business process alternatives can be examined.  Also, it is always prudent for a company to ascertain its objectives, prior to commencement of the benchmarking process. 11/19/2020 6
  • 7. Contd..  The methodology adopted and the way in which output is documented should be given due consideration too.  On such instances, a capable team should be found in order to carry out the benchmarking process, with a leader or leaders being duly appointed, so as to ensure the smooth, timely implementation of the project. 2.Collection of Information  Information can be broadly classified under the sub texts of primary data and secondary data.  To clarify further, here, primary data refers to collection of data directly from the benchmarked company/companies itself, while secondary data refers to information garnered from the press, publications or websites. 11/19/2020 7
  • 8. Contd..  Exploratory research, market research, quantitative research, informal conversations, interviews and questionnaires, are still, some of the most popular methods of collecting information.  When engaging in primary research, the company that is due to undertake the benchmarking process needs to redefine its data collection methodology.  Drafting a questionnaire or a standardized interview format, carrying out primary research via the telephone, e-mail or in face-to-face interviews, making on-site observations, and documenting such data in a systematic manner is vital, if the benchmarking process is to be a success. 11/19/2020 8
  • 9. Contd.. 3.Analysis of Data  Once sufficient data is collected, the proper analysis of such information is of foremost importance.  Data analysis, data presentation (preferably in graphical format, for easy reference), results projection, classifying the performance gaps in processes, and identifying the root cause that leads to the creation of such gaps (commonly referred to as enablers), need to be then carried out. 4.Implementation  This is the stage in the benchmarking process where it becomes mandatory to walk the talk. This generally means that far-reaching changes need to be made, so that the performance gap between the ideal and the actual is narrowed and eliminated wherever possible. 11/19/2020 9
  • 10. Contd..  A formal action plan that promotes change should ideally be formulated keeping the organization's culture in mind, so that the resistance that usually accompanies change is minimized.  Ensuring that the management and staff are fully committed to the process and that sufficient resources are in place to meet facilitate the necessary improvements would be critical in making the benchmarking process, a success. 5.Monitoring  As with most projects, in order to reap the maximum benefits of the benchmarking process, a systematic evaluation should be carried out on a regular basis. 11/19/2020 10
  • 11. Contd..  Assimilating the required information, evaluating the progress made, re- iterating the impact of the changes and making any necessary adjustments, are all part of the monitoring process. Conclusion  As is clearly apparent, benchmarking can add value to the organization's workflow and structure by identifying areas for improvement and rectification.  It is indeed invaluable in an organization's quest for continuous improvement. 11/19/2020 11