Behind the
Scene of a
Successful
     Event
an eBook by Certain Software
ii


Behind the Scene of a Successful Event
An eBook by Certain Software

Introduction
meet ing - An assembly or conference of persons for a specific purpose
e vent -   An occurence, especially one of some importance


A      successful event is more than a gathering of people at a specific time
and place; it is an opportunity to introduce new ideas, to learn new skills, to
meet new people and to build life-long relationships. Participants remember a
successful event because it enriches their lives.

Certain Software and our partners help our clients plan and execute the world’s
greatest events. This eBook compiles some of the lessons our expert authors
learned over 100 years of collective experience in the professional meeting
planning industry. Whether it is an executive board meeting, employee train-
ing course, incentive travel event, customer conference, association event, or
industry trade show, we hope to help you make your next event a success. If
we can be of assistance, please contact us or one of the authors.




Peter Micciche
CEO
Certain Software Inc.
petermicciche@certain.com




©2010 Certain Software, Inc. All rights protected and reserved.
iii

Table of Contents

Prepare to Plan Your Event	        				                              1
   The Roles of Event Host and Event Planner			                      1
   Define the Event’s Objectives					                                1
   Determine a Baseline Budget for Your Event			                     1
   Obtain Budgetary Approval and Funding for Your Event		            2

Site Selection							                                                3
   Selecting the Perfect Site for Your Event				                     3
   Site Inspection							                                            4
   Strategic Hotel & Contract Negotiations				                       5

Virtual Meetings							                                              11
   Telepresence Brings Together Disperse Groups in a Short Time	     11
   Webinars Deliver Targeted Content to an Interested Audience	      12
   Virtual Events Precede, Extend, or Replace Face-to-Face Events	   13

Marketing Your Event						                                           15
  The Event Web Site						                                           15
  E-mail Marketing and Event Invitations				                         17
  Event Notification Schedule					                                   18	

Online Registration						                                            19
  Pre-Registration						                                             19
  Housing Management						                                           21
  Payment Processing						                                           23
  Reports, Reports, Reports					                                     24

On-Site at Your Event: Registration and Check-in			                  26
  Before You Go							                                               26
  On-Site							                                                     28
  Technology and Check-in					                                       30

After You Event Ends						                                           31
   Closing Out Your Event						                                      31
   Prepare for the Next Event					                                   32




	
©2010 Certain Software, Inc. All rights protected and reserved.
iv   BEHIND THE SCENE OF A SUCCESSFUL EVENT




Strategic Meetings Management Programs (SMMP)			                    33
   How to Get Started						                                         33
   Begin the Standardization Process				                            34
   Organizing Site Selection for SMM Programs			                    35
   Complete SMMP						                                              36
   Embed SMMP in the Organization				                               37

Social Networks and Events					                                     38
  Viral Marketing - Linkedin, Facebook				                          38
  Twitter							                                                    41
  Online Communities						                                          42
  Pathable							                                                   43
  Social Networking Tips and Tricks				                             44

Planning a Sustainable Event					                                   45
   What is a Carbon Footprint for an Event?				                     45
   Travel Trumps All Others					                                    46
   Travel Footprint Reduction					                                  46
   Other Ways to Reduce Your Footprint				                          47
   Keeping Perspective, and the Role of Offsets			                  47
   Up and Coming Standards for Event Planners and Managers	         48

Definitions and Meeting Planner Terminology			                      49

Additional Resources						                                          50
  Certain Software						                                            50

About the Authors						                                             51
  Rick Borry, Certain Software					                                 51
  Jeff Rasco and Christina Rasco Adams, Attendee Management Inc.	   52
  Tim Brown, Meeting Sites Resource				                             53
  Jennifer Brown, Meeting Sites Resource				                        54
  Jordan Schwarz, Pathable					                                     55
  Dave Rochlin, ClimatePath					                                    56	




©2010 Certain Software, Inc. All rights protected and reserved.
1

Prepare to Plan Your Events
Planning an event is hard work; before starting the process, be sure that you,
your organization, and the attendees are ready to commit to a successful event.

The Roles of Event Host and Event Planner
The host is responsible for creating the event’s objectives and strategic vision,
and for procuring the funding to cover the event’s expenses. The planner is
responsible for organizing and executing the event in order to achieve the ob-
jectives with the highest economic value and lowest risk.

Define the Event’s Objectives
The host and planner work together to formulate concrete objectives for the
event. “Prepare the national sales team for the May 15 product launch” is an
objective, which can be measured with post-event surveys of participants and
post-product launch sales results. “Bring the national sales team together for 5
days in Dallas” is not a strategic objective, although after reviewing the number
of attendees and volume of content to be covered, it may be the best tactic to
achieve the desired result.

Determine the basic event format and structure
The host and planner must determine the best way to achieve the event’s
objectives. This decision should consider physical constraints, such as

	           1.   Number of participants
	           2.   Geographical distribution of participants
	           3.   External deadlines (e.g., a product launch date)
	           4.   Amount, type, and complexity of content
	           5.   Familiarity of the participants with each other
	           6.   Ballpark budgetary limits

After outlining the objectives and constraints of the event, the event structure
will often present itself. In order from least to most expensive and time-
consuming, the basic event formats are:

	           •    Conference call
	           •    Webinar
	           •    Virtual event / Telepresence
	           •    On-site meeting
	           •    Luncheon / Dinner
	           •    Off-site single-day meeting
	           •    Multi-day meeting




©2010 Certain Software, Inc. All rights protected and reserved.
2

establish a baseline budget for your event
If the chosen format requires services of an external supplier, then the event
will need to have a budget to pay for itself. Before spending time creating
an RFP and evaluating responses from several suppliers, we recommend first
establishing a preliminary estimate based on the type of event, number of
participants, services required (hotel rooms, catering, production), travel, and
auxiliary expenses. Planners can use software that aggregates their past experi-
ences into average unit costs, and then automatically creates a baseline budget
for financial approval of the event that is about to be planned.

Table 1. Sample sliding scale for meeting cancellation fees




Obtain budgetary approval and funding for your event.
If the event host (or manager) cannot obtain funding within the ballpark range
of the baseline budget, then the planner and host need to work together to
reduce the event’s scope and objectives until the budget is within reason, or
stop the event planning process altogether. It is better to stop at this point
rather than spending time and resources planning an event that has no chance
of happening.

Even if you plan to fund the event via fees per attendee and exhibitors, you
still need to approve a budget to determine the proper fees to break-even, and
whether you have enough money to conduct the event planning process while
you wait for payments to come in.



©2010 Certain Software, Inc. All rights protected and reserved.
3    BEHIND THE SCENE OF A SUCCESSFUL EVENT


Site Selection
Selecting the Perfect Site for Your Event
Jennifer W. Brown, CMP, President, Meeting Sites Resource

Researching and evaluating hotels for a meeting, convention, or incentive takes
considerable time; however, careful analysis is essential for a productive meeting.
Look beyond “dates, rates, and space” in order to achieve meeting goals, objec-
tives, and criteria. Here is a 12-step process to assure success:

1. Assess needs - What do you want attendees to take away?
2.  Gather information - Meeting requirements, history, expenses
3.  Define attendees – demographics, guests, expectations
4.  Consider additional requirements - Weather (related to time of year),
    accessibility (by air and ground), special needs (resort, golf)
5. Determine the budget – how much can you spend and can you be flexible?
6. Design the meeting specification – based on the agenda and data collected
7. Create a meeting profile or RFP – for hotels, based on the meeting
     specification
8. Begin site research – use one or more options to find the perfect match:
	        • Site Research company
	        • National and regional hotel sales offices
	        • Convention and visitors bureaus (CVB’s)
	        • Trade publications or Web search
9. Narrow your selections – select three or fewer preferred venues
10. Collect site proposals – each site should provide
	        • A description of the number and type of accommodations available
	        • Meeting space floor plans with dimensions/capacities
	        • List of technical equipment and support services
	        • Tentative meeting room assignments
	        • Complete description of property’s restaurants, sports facilities, 		
	              entertainment areas, and shops
	        • Information about insurance, licenses, taxes, beverage control, 		
	            union contracts, automatic charges, gratuities
	        • Food and beverage menus
11. Conduct site inspection – follow the site inspection guidelines in the next 		
     section to review your finalists.
12. Site inspection alternatives – if the planner cannot personally attend the
     venue, then ask the hotel for a conference packet, videos, and four refer-
     ences of organizations with a similar profile that held events there in the
    last year.


©2010 Certain Software, Inc. All rights protected and reserved.
4
SITE INSPECTION
A site inspection is an in-person, on-site review and evaluation of a potential
venue or location for an event. Before committing and going to contract, visit
your top choices and methodically evaluate whether each venue meets your
specific criteria and will lead to success, or perhaps is a candidate for a future
meeting or event.

Site Inspection Checklist
A detailed site inspection checklist runs several pages. In general, your site
inspection report should document the following:

1.  First impressions - pay attention to your attendees’ experiences from
    when they land at the airport to their arrival at the venue
2. General appearance - ask for specific dates of recent renovations, and
    make sure that no construction is planned during your event		
3. Front desk – look for the ability to handle crowds, and to speed check-in 		
    via self-service kiosks and preferred guest counters	
4. Accommodations - quality and size of rooms by type, in addition to the
    number of rooms
5. ADA requirements (Americans with Disabilities Act) – Most venues meet
    the minimum legal ADA requirements; however, this may not be sufficient
    for your group	
6. Meeting & event space – with your RFP, requirements and floor plans in
    hand, visit the specific meeting and event rooms for your event; check
    lighting, ceiling height, room shape and size, and beware of any pillars and
    other obstructions. Also check access to wireless internet and power, and
    ask about in-house A/V and technology support.
7. Food & beverage – review hotel catering menus and hotel F&B / theme
    capabilities. Inspect the size and location of restaurants, access to
    kitchen for meal functions, and additional catering support services. 	
8. Transportation – distance to airport, convention center, local attractions,
    transportation options (shuttle, train, taxi, bus, parking)
9. Sports & recreational facilities – availability and costs of golf, entertain-
    ment, dancing, spa, exercise room, tennis, etc.
10. Sustainability – venue policies and standards related to sustainability in
    general and carbon emission reduction, and overall hotel green initiatives
11. Neighborhood – pay attention to the facilities near the venue
12. Services – in-house or recommended vendors for Destination Manage-
    ment Company (DMC), decorating, audio/visual, etc.

Immediately after your site inspection, write down your overall impression
including strengths and weaknesses. Planners often visit multiple venues on a
single trip, and waiting until you return to the office to document an inspection
report is a good way to confuse properties.


©2010 Certain Software, Inc. All rights protected and reserved.
5    BEHIND THE SCENE OF A SUCCESSFUL EVENT

STRATEGIC HOTEL & cONTRACT NEGOTIATIONS
Tim Brown, CEO, Meeting Sites Resource

Change in economic conditions have a big impact on how meeting planners
plan and execute meetings and how hoteliers sell and provide service. This
includes conditions changing from a “buyer’s market” to a “seller’s market” and
vice versa. Regardless of shifts in the marketplace, the simple truth is that when
meeting planners evaluate each meeting, understanding their leverage and
flexibility and having a negotiation plan will add value to their meetings’ bottom
line and reduce contract risk.

The Strategic Request for Proposal (RFP)
The Request for Proposal (RFP) is a document that specifies all vendor-supplied
requirements for a meeting, in sufficient detail so that potential vendors can
provide bids for the proposed event.

In addition to the information collected in the pre-planning phase, the RFP
requires the meeting planner to:

	           •     Conduct a meeting needs assessment with all internal and external
	                 stakeholders in order to understand all meeting goals and objec-
	                 tives.
	           •     Evaluate the demographics of attendees: who are they, where are
	                 they located, age and gender, special interests and needs, and
                  meeting expectations.
	           •     Evaluate past meeting history including meeting budgets, meet-
                  ing and event agenda, number of attendees, F&B functions, A/V
                  spending, actual sleeping rooms - picked up versus contracted.
	           •     Create a strategic RFP that includes a day-by-day breakdown of 	
                  all meeting and event activity, including set-up and teardown.
                  List minimum square footage / ceiling heights for all meeting and
                  event space, including breakout rooms
	           •     Include all food and beverage functions, number of guests, off-site
                  events, and special needs
	           •     Based on a composite from above, determine best cities and type
                  of hotel (resort, downtown / conference center, airport, suburban)
                  that achieve stated goals and criteria

Web-based software is a valuable tool to help manage the process of creating
an RFP and selecting potential venues to receive it.



©2010 Certain Software, Inc. All rights protected and reserved.
6
Assess Your Leverage
By assessing the value of their meetings and understanding how hoteliers man-
age for profitability, planners can improve their leverage to achieve meeting
quality and bottom line results. All hotels utilize an on-line system to evaluate
and “rate your meeting” based on a multitude of qualitative and quantitative
factors. Knowing how (and if) your meeting fits into the hotel is an important
part of the negotiation process along with your overall meeting revenue mix.

Key issues that influence hotel pricing and availability for group business
include:

    •	      Transient (individual) demand                     •	    Other groups in house
    •	      Arrival / departure pattern                       •	    Season
    •	      Rooms to meeting space ratio                      •	    Meeting lead time
    •	      Group food and beverage                           • 	   Group history
    •	      Potential incremental revenue                     •	    Contract components

All hotels have different “best answers” for each of these parameters. For
example, is your peak night pattern (e.g. Monday-Friday or Friday-Sunday)
compatible with the hotel’s desired group arrival/departure? Pattern selling is
the cornerstone of hotel revenue management, and every hotel, whether big,
small, chain or independent, has desired patterns for all market segments. Flex-
ibility to shift your dates/pattern can be the difference in securing a first option
and can drive the rates, too.	

Analyze your Request for Proposal Details
Before you negotiate with the hotel for your meeting, look at your RFP from the
hotelier’s perspective and determine where you can be flexible, and where you
have leverage to use.

	           •     Meeting and event space - Calculate your total space needs for
     	            each meeting and heaviest day usage. What percentage of the
	                 hotel’s total space are you requesting? What other groups are con-
	                 tracted over your preferred dates? How much set up time did you
	                 ask for? Do you need 24-hour hold? Hotels use their space to sell
	                 their allotted group rooms and many use the rule of thumb “use
	                 40% of my group room inventory and you get 40% of my meeting
	                 space” (always negotiable, of course).
	           •     What is your group food and beverage contribution? Ask the hotel
	                 what their minimum F & B expectation is and if you are projecting
	                 an increased amount, that’s leverage. Ask the hotel if they do off-
	                 site catering and if so, capture that revenue, too.

©2010 Certain Software, Inc. All rights protected and reserved.
7    BEHIND THE SCENE OF A SUCCESSFUL EVENT

	           •     Calculate your total revenue based on your overall agenda, 		
	                 including sleeping rooms, F&B, AV, golf, spa, etc.
	           •     Check your meeting history...what did you contract/actual results.
	                 Hoteliers do reciprocate on providing specific group pick-up and
	                 revenue data.
	           •     What is the specific season for this destination...and is this a short,
	                 medium or long-term meeting? If you have multiple date options
	                 at a hotel, ask which date gives you the most flexibility with space,
	                 rates and concessions.
	
Negotiate a fair contract with the hotel
Contracts do not have to be complicated, but they are a “must” to protect your
company and to make expectations and responsibilities clear. Effective negotia-
tions go beyond “dates, rates, and space,” and all hotel contract components,
value added concessions, hotel fees and surcharges, and performance clauses
must be part of the negotiation process. Everything, however, is negotiable. It
is important to prioritize and have a specific game plan for each meeting (focus
on adding value and reducing risk).

Once you complete your hotel proposal and evaluation process, provide the
hotel of choice with all your contract requirements and clauses. Ideally, you
should create a custom hotel contract template for initial distribution. Key
hotel contract negotiation strategies include:

	 •              Adjustment for published rates - If, at any time after contract sign-
	                ing, the Hotel publishes, issues, or promotes a group room rate (for
	                any peak night during the Meeting Dates) that is less than your 		
	                group’s contracted rate, Hotel shall adjust the applicable group rate 	
	                          to equal such published rate.
		                     o Note: This rate adjustment does not include negotiated
	                           wholesale or corporate business travel rates, which are
		                          not publicly available.
	 •              Base attrition and cancellation damages on lost profit, not lost
	                revenue
		                     o “Total Room Profit” = 75% times (Room Rate)
		                     o “Total F&B Profit” = 35% times (F&B Guarantee)
	 •              Attrition is the difference between the number of rooms you
	                contract with the hotel and those you actually fill
		                     o Always include a resell clause so that any resold rooms/
		                          space/services are credited to your meeting
		                     o Also, if attendees book rooms around your block (e.g.,
		                          via travel discount websites), then these rooms are
		                          credited to your group
©2010 Certain Software, Inc. All rights protected and reserved.
8
	 •               Cancellation – damages should be based on a sliding scale, with
	                 percentages increasing as dates get closer
		                    o The ranges and percentages listed in Table 1 are
		                        examples; the contract should specify dates and amounts 	
		                        based on the actual meeting date and total amount
Table 1. Sample sliding scale for meeting cancellation fees
    Date Group Cancels:                                   Cancellation Fee:
    From signature to 180 days prior to                   25% of Total Room Profit
    arrival
    179 days – 90 days prior to arrival                   50% of Total Room Profit
    89 days – 30 days prior to arrival                    75% of Total Room Profit
    29 days or less prior to arrival                      100% of Total Room Profit + 35% of
                                                          F&B minimum

	 •               Reduce or eliminate hotel fees and surcharges, for example
		                      o Resort fee
		                      o Early departure fee
		                      o Parking
		                      o Health Club
		                      o Maid / Bellman
		                      o F&B surcharges
		                      o Telephone / Internet access
		                      o Meeting room set-up
	 •               Ask for complimentary meeting & event space based on 80% guest
	                 room pick-up (no sliding scale fees). No meeting space changes
	                 without written approval by group
	 •               Concessions - Everything is negotiable, but prioritize what you
	                 “must have” or would “like to have” based on the specific needs
	                 and value of each meeting
	 •               Force Majeure/Termination - Based on circumstances out of the
	                 control of either party, identify specific terms and conditions, 		
	                 which allow either party to cancel the meeting without financial
                  responsibilities. (Including anything that makes it impractical,
	                 illegal or impossible to perform)
	           •     In the event of performance damages, apply a credit for some or
	                 all damages to a future meeting
	           •     Breach by hotel - specify financial responsibilities if the hotel can-
	                 cels the group (other than Force Majeure). Hotel is liable to group
	                 for all damages, direct and indirect, including expense to resched-
	                 ule, increased room rates and F & B, administration and operation,
	                 legal fees, printing/marketing costs
©2010 Certain Software, Inc. All rights protected and reserved.
9    BEHIND THE SCENE OF A SUCCESSFUL EVENT


	           •     Construction and remodeling – allow none over specific meeting 	
	                 dates
	           •     In addition to addressing all hotel performance clauses to assure
	                 accountability and a clear path to dispute resolution, it is impor-
	                 tant to define responsibilities for indemnification (make mutual),
	                 arbitration, add insurance and successors and assigns. If you have
                  a legal department or representative, be sure to get their opinion
	                 on specific language to incorporate.	

Hotel Audit Process
In the event of attrition or cancellation damages, conduct a room audit and
include:

	           •     Request a hotel sleeping room inventory/occupancy report by
	                 night
	           •     Verify how many rooms were resold (individual or group), regard-
	                 less of the room rate
	           •     Verify how many rooms, by night, were out of service due to reno-
	                  vation or repair
	           •     If attendees make their own hotel reservations (vs. rooms on
	                 master), provide the hotel with an electronic registration list so
	                 they can cross reference against all in-house guests over the
	                 meeting dates
	           •     Capture any pre- or post-room nights
	
Contract Tips - Plan and “Think Before You Ink”
No meeting planner signs a hotel contract with the expectation that they will
pay performance damages, but it is important that planners be prepared in the
event “things change” and that they have a clear path to work with the hotel to
mitigate damages and minimize risk.

	           •     All hotel contracts are negotiable (plan and prioritize before you
                  negotiate)
	           •     A thorough and well designed contract is essential for a successful
	                 meeting
	           •     Stay away from vague phrases such as “ample”, “reasonable”, “to
	                 be assigned”, “appropriate”, etc.
	           •     All meeting and event space to be assigned by day (if a hotel will
	                 not assign specific space, they are not considered a candidate)
	           •     There is no contract until both parties have signed the document



©2010 Certain Software, Inc. All rights protected and reserved.
10

	 •	                     Written changes on the contract with date and initials repre-
		                       sent a counteroffer
	 •	                     Discuss areas of dispute and counter offers in an open and 		
		                       honest manner
	 •	                     Negotiate an option date to sign and return the contract
	 •	                     Do not rush into signing a contract if you do not understand
		                       or agree with its content

Meetings are big investments and when planners carefully evaluate each meet-
ing, understand their leverage and flexibility, and have a negotiations plan;
clearly they will add more value and ROI to their organization (and greatly
reduce risk).




©2010 Certain Software, Inc. All rights protected and reserved.
11 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Virtual Meetings
A successful virtual meeting will save travel time and costs, but still requires
careful planning, production, and execution. In general, a virtual meeting may
be the best value if:

	           •     The attendees are geographically dispersed, but know one another
	                 well from past experience
	           •     The content to deliver is brief and centered on a single topic
	           •     Or, the meeting is a short introduction used to determine if further
	                 discussions and face-to-face meetings are justified

Telepresence brings dispersed groups together quickly
Modern telepresence meetings offer a hybrid face-to-face and virtual format.
Typically, several people gather in one location and connect via high-definition
video and voice conference to groups in one or more other locations. These
high quality conference systems are expensive, so most telepresence meetings
are held in offices, hotels, or restaurants that have the technology available.

For example, a major pharmaceutical company arranged simultaneous din-
ners in restaurants in 50 cities, where physicians attended to hear a world-class
scientific seminar delivered via telepresence from the New Jersey headquarters.

Figure 2. Teliris VirtuaLive Telepresence System. Image from www.teliris.com




©2010 Certain Software, Inc. All rights protected and reserved.
12

Webinars deliver targeted content to an interested audience
Web-based meetings allow participants to view a shared presentation or desk-
top from their Web browser, in conjunction with a voice conference. Short team
meetings among dispersed colleagues can be successful with little forethought;
however, you must carefully plan a successful Webinar with professional speak-
ers and a diverse audience who is not required to attend.

Professional Webinars start at least 15 minutes prior to the scheduled time, and
require:

	            •    A moderator to manage the meeting, and occasionally serve as
                  another voice to engage the speaker in a conversation
	            •    Speakers experienced with the Web-based meeting platform
	            •    Participants should be instructed to ask questions via text chat,
                  instead of directly to the speaker
	            •    The moderator or an assistant should continually monitor and
	                 compile incoming questions, and present them to the speakers for
                  response
	            •    Back-up plans for faulty phone lines, Internet connections,
	                 computers
	            •    A call to action following the meeting
Figure 3. Webex meeting room. See Table 2 for a partial list of popular Web-based
meeting platforms.




Table 2. Partial list of popular Web-based meeting platforms
    Vendor                                      Web Site
    Adobe Acrobat Connect                       www.adobe.com/products/acrobatconnect/
    Cisco Webex                                 www.webex.com
    Citrix GoToMeeting                          www.gotomeeting.com
    Microsoft Office Live Meeting               office.microsoft.com/en-us/livemeeting/
                                                FX101729061033.aspx
©2010 Certain Software, Inc. All rights protected and reserved.
13 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Virtual Events precede, extend, or replace face-to-face events
A Virtual Event allows attendees to participate from their personal computer
in a theme-based combination of Webinars, voice and text chat, video on-de-
mand, and virtual exhibit halls. You should expect a successful Virtual Event to
have similar costs for meeting space (i.e., the Virtual Event software platform),
production, and pre-event management when compared to a face-to-face
event of equivalent size. Virtual events, however, will not have travel, housing,
or food & beverage costs; additionally, planners and participants save the travel
time associated with a face-to-face event. Accordingly, most Virtual Events
have lower registration fees, sponsorships, and exhibition fees than their face-
to-face counterparts.

A Virtual Event works well in conjunction with a face-to-face event (as an online
extension of the live event), or in complement with one (e.g., a Spring Virtual
Event can build on the audience from a Fall annual conference). Hewlitt-Pack-
ard has used Virtual Events for product marketing kick-offs with their global
reseller network, while College Week Live is a good example of a Virtual Event
designed to quickly review multiple options in order to narrow down selections
for later in-person meetings.

Figure 4. On24 Virtual Event convention lobby. See Table 2 for a partial list of popular
Virtual Event platforms.




©2010 Certain Software, Inc. All rights protected and reserved.
14

Table 2. Partial list of popular Web-based meeting platforms


 Vendor                                         Web Site
 6Connex                                        www.6connex.com
 Expos2                                         www.expos2.com
 InfoNeedle                                     www.infoneedle.com
 InXpo                                          www.inxpo.com
 On24                                           www.On24.com
 Unisfair                                       www.Unisfair.com
 VirtualEvents365                               www.cgsinc.com/solutions/virtualev-
                                                ents365.html




©2010 Certain Software, Inc. All rights protected and reserved.
15 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Marketing Your Event
All events need to communicate with their desired attendees; however, event
attendance falls into three broad categories:

	           •     Mandatory – invitees must attend the event, although they may 		
	                 have a choice of dates and/or locations (employee training)
	           •     Sponsored – invitees don’t have to attend, but the experience is
	                 highly desirable (incentive travel programs, sponsored buyer
	                 shows)
	           •     Optional – attendees must choose the event over everything else
	                 competing for their time and money (trade shows, conferences)

The optimum marketing strategy for your event ranges from informational to
promotional, depending on which category fits your intended audience.

The Event Web Site
The Web site is the foundation of most event marketing campaigns. At a mini-
mum, the Web site needs to answer these basic questions:

	           •	           What is the event about? (name, content, and agenda)
	           •	           When are the dates and times of the event and related meetings?
	           •	           Where is the event’s location and venue?
	           •	           Who should attend this event?
	           •	           How can one attend? (include invitation and fee requirements)

The event Web site may be a single page listing the event name, dates, location,
audience, and agenda, or it may be a series of Web sites with multiple tabs and
highly interactive content. Be sure that the What/When/Where information is
visible on the top of every page.
Figure 5. Sample event Web site with basic information




©2010 Certain Software, Inc. All rights protected and reserved.
16

Design the appropriate “Look & Feel” for your event
An attractive Web site is part art, and part personal preference. Nevertheless,
you can give your attendees a successful experience by following these guide-
lines:

	           • Consistent – the colors, graphics, fonts, page header and footer
	             should be consistent across every page of the event Web site, and
	             they should match the Web site of the event’s host organization.
	             Jumping between one “look & feel” for the organization, another
	             for the event, and a third for the registration process will confuse,
	             annoy, or scare some of your audience
	           • Clean – use a single font with a small number of sizes and colors
	             for all pages. Avoid use of moving images, especially on pages that
	             will be viewed often
	           • Concise – if a page has one section, then 100% of the reader’s
	             attention will be focused on that area. Each additional word, form
	             field, section, image, hyperlink, etc. competes for the reader’s focus
	           • Edit, re-edit, then edit again – the Web does not excuse your
	             eighth grade grammar lessons. Review your content multiple times
	             and from the viewpoint of other people

Decide what content to place online
In addition to the basic information, an event Web site should contain the in-
formation your audience needs to achieve success before, during, and after the
event. Think about what your audience needs to know, and then provide it.

	           •     How do I get to the event? What are the cheapest travel options?
	           •     Can I confirm, cancel, or modify my registration and travel?
	           •     Who should I meet at the event?
	           •     What will I do, and what do I need to wear?

As the event gets closer, attendees may ask for things you never considered
during your planning. When reasonable, put this information in a Frequently
Asked Questions (FAQs) area so that others may benefit from the knowledge.

Some events have multiple audiences, e.g. attendees, exhibitors, and speakers.
Consider having separate Web sites or separate areas in the event Web site for
each audience, where you can place content of specific interest to that group.




©2010 Certain Software, Inc. All rights protected and reserved.
17 BEHIND THE SCENE OF A SUCCESSFUL EVENT

E-mail Marketing and Event Invitations
The host and planner must draw attention to the event in order to generate
the audience needed for a successful event. Before the event, much of this at-
tention will direct attendees to the event Web site; however, in order to have a
successful Web site the audience needs to be drawn to it.

Different events will use a combination of marketing campaigns, including
mailed invitations, advertising (print, radio, TV, and Web), phone campaigns,
etc.

Who to send invitations and announcements to
The appropriate marketing campaign must consider the nature of the event’s
audience:

	           •     Repeat attendees – is this an annual or recurring event, and most
	                 of the invitees have attended a previous event recently?	
	           •     Existing organization – will most of the audience belong to an
	                 established group, e.g. association, company (employees or
	                 customers), community, etc.?
	           •     Recruiting focus – is one goal of the event to recruit new
	                 individuals to attend and perhaps join the established group?

The optimum marketing strategy for your event ranges from informational to
promotional, depending on which category fits your intended audience.

In all situations, event invitations should have an “Opt-out” option to remove
the recipient from your mailing list. Event marketing processes should be able
to track and separate the following groups of recipients:

	           •     Opt-out – want to be removed from future mailings
	           •     Undeliverable – addresses are invalid (bounce-back)
	           •     Views – looked at the message (address is valid, but no response)
	           •     Click-throughs – took action from the message to view the Website
	           •     Partial registrations – began the registration process but stopped
	           •     Registrations – complete registrations who intend to attend the event
	           •     Attendee – attended the event (or a previous event)

As the event marketing campaign proceeds, each new message should target
only individuals who remain in the intended group. For example, do not re-
send an invitation to registered attendees; this will confuse them and produce
questions and more work. An email list “gets old” rapidly, typically 20% or more
each year. Invest the time to remove opt-outs (this is the law), investigate and
update undeliverables, and find new prospects to invite.

©2010 Certain Software, Inc. All rights protected and reserved.
18

Event Notification Schedule
Events have widely varying timelines; however, below is a general schedule.

 Date (Before         Notification and Purpose
 Event)
 One Year             Save-the-Date
                      Send an advance notice to attendees immediately after the previous
                      year’s event, or as soon as you know dates and location of the new
                      event. The event Web site should have at least a placeholder page
 Six months           Event Web Site Open
                      Fill the event’s Web site with appropriate content (speakers, agenda,
                      travel options, etc.) and place it live as soon as possible. Once the
                      Web site is ready, send a notice to previous and required attendees.
 3-6 months           Event invitation (Registration open)
                      Send a short, targeted message to each group of invitees. Registration
                      should be open before sending the invitation, so that the attendee
                      can respond to the call to action.
 1-3 months           Alternate invitations
                      For optional attendees, send different messages and offers if the origi-
                      nal invitation did not lead to action. Do not spam or re-send the same
                      message repeatedly.
 1 month              Registration and Travel Reminder
                      Send short reminders to attendees who haven’t completed their
                      required information. Travel should be booked before room blocks fill
                      or are released and airfare rises (typically 21 days’ prior to travel).
 3 weeks              Event Reminder
                      Send a “Get Ready” message to attendees with any new updates.
 1 week               See you at the Event
                      Just before staff departs for the event, send a final message to at-
                      tendees. This serves as a final reminder for the event, and will trigger
                      last-minute questions from attendees while the staff is still in the
                      office and may be able to resolve issues more easily.
 0 days               Daily event update
                      Each morning during the event, send a newsletter to attendees with
                      an overview of the coming day and highlights from the previous day




©2010 Certain Software, Inc. All rights protected and reserved.
19 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Online Registration
The goal of the event Web site and marketing campaigns is to lead invitees
to attend the event. The registration process allows planners to manage the
resulting flood of information.

Pre-Registration
A good registration process captures attendee data early and accurately; this
allows planners to forecast budgets and make changes to the event before ma-
jor expenses incur. Conversely, late and inaccurate information results in long
hours, unhappy attendees, poor attendance, unused food, empty rooms, and
wasteful expenses.

Design your registration form
Hyperlinks and tabs allow readers to navigate between multiple areas of the
event Web site and quickly find the information they need. Registration pro-
cesses, however, should be linear - attendees need a simple path from start to
finish, or they are likely to become confused, make mistakes, and abandon the
registration. Key design points to consider include:

	           •     Minimum instructions – if the form requires paragraphs of expla-
	                 nations, it is doomed because people don’t read them. Use tool-
	                 tips, hints, and plain-English error messages to guide registrants	
	           •     Straightforward – once the registration process begins, reduce or
	                 eliminate navigation options. The best process is to complete one
	                 form, then submit and move on to the next page	
           	•     Reduce the data collected – only collect the minimum data re-
                  quired for each individual. For example, if your company’s fax ma-
                  chine broke three years ago and wasn’t replaced, then don’t col-
                  lect fax number. If the attendee picks golf over tennis, then collect
                  and require questions about club rentals and tee times, but skip
                  follow-up fields intended for tennis players	
            •      Review, Verify, Pay, and Confirm – registration processes may
                  need one page or ten, but they all should end with a review of the
                  data entered, an option to edit that information, a final checkout
                  (and payment, if applicable) page, and a printable and email
                  confirmation	

Planners sometimes spend days or weeks designing their event Web site and
registration process, but forget that an attendee will consider the effort a waste
if they spend more than five minutes learning about the event and registering
to attend.


©2010 Certain Software, Inc. All rights protected and reserved.
20

Create different forms for different purposes
Some events are complex. Exhibitors, speakers, staff, sponsors, and various
groups of attendees may all need to provide vastly different types and amounts
of information to the event planner. The result can be a very complex registra-
tion process, or it could be a number of fairly simple but specialized processes.
It is always better to choose multiple simple registration forms. This will im-
prove the front-end experience for both registrant and planner, however, don’t
forget that all of the information from multiple registration processes should
end up in one event database.
	         • Share inventory – if the event has physical limitations, e.g. number
	             of hotel rooms, seats in sessions, or ticketed activities, then this
              inventory must be shared (in real-time) among all registration pro-
              cesses. Otherwise the planner must maintain separate inventory
              for each group, and will likely undersell or oversell some items
	         •		 Dual-role attendees – a speaker may also be an exhibitor or at-
	             tendee. Make it clear where they should register, keep information
              for both of their roles, and watch out for duplicate registrations
	         •	 Guide people – people may not see themselves in the same “clas-
              sification” that the planner puts them into. Guide them to the
              correct form with plain-English labels, and provide links or a way to
              change forms if they selected the wrong process initially

Register guests and groups at the same time
If your event allows attendees to bring guests or groups of attendees, then let
these people register together. There are two ways to handle this:

	           • “Guests” – people who travel with the attendee and may attend
	             parts of the event, but they would not attend the event without
              the attendee.
	           •		
              “Colleagues” – people (co-workers, employees, etc.) who are full
	             equals as attendees, but prefer to register together for conve-
              nience or group benefits.

In general, the registration and reporting process should track guests as part
of the attendee’s registration record, while colleagues each receive a separate
registration record, unique identifier, and confirmation.




©2010 Certain Software, Inc. All rights protected and reserved.
21 BEHIND THE SCENE OF A SUCCESSFUL EVENT


Housing Management
Hotel rooms are typically two-thirds of the total meeting costs for overnight
face-to-face events. For most events, the hotel contract represents both the
greatest risk and best opportunity for cost control.

Let the hotel sell their rooms, when appropriate
With small meetings or events where your attendees are paying for their
rooms, the easiest solution may be to use the hotel’s group reservations Web
site for hotel reservations. In this case, be sure that your event Web site and
registration form are integrated with the hotel reservation form (via hyperlinks
and custom messaging), and ask for report-level access to the hotel’s group res-
ervation system so that you can keep track of who has made room reservations
and compare that to your attendance list.

Manage your hotel block to reduce attrition
If you have signed a contract committing to a large number of rooms, then of-
ten the best way to handle the risk of filling those rooms is to manage the room
reservation process yourself.

	           •     Make housing reservations part of the event registration process
	           •     Offer a registration discount to attendees staying in event hotel
	           •     Monitor public rates and re-negotiate your group rates if
	                 published rates drop below them (www.hotels.com, etc.)
	           •     During on-site check-in, ask people if they are staying at a local
	                 hotel and, if so, which one. Then compare to your registration list
	           •     Ask hotels for their guest list and compare to your attendance list
	                 to see which event attendees booked around the block.
Figure 5. Sample event Web site with basic information (Passkey)




©2010 Certain Software, Inc. All rights protected and reserved.
22
Match roommates without creating a big mess
Putting two people in one room can save about half of your event’s housing
costs, which could amount to a 1/3 savings overall for the event, and signifi-
cantly reduce your event carbon footprint. This isn’t for everyone, but can be a
valuable part of some event experiences:

	           •  Under-18 audiences – place 2-4 children per room or 1 adult and
	              two kids
	           •		 adults – “New hire” orientation events may intentionally
               Young
	              pair people from different offices and regions in order to encour-
               age interaction among attendees who might otherwise stay apart
	           •	 Employee-only events – if the company is paying the bill, then it
               has more justification to enforce room-sharing

While sharing rooms can save money, it can create logistic headaches if not
managed carefully. Some things to watch out for include:

	           • Roommate requests – can people request roommates by name,
	             and what is the policy for the selected person to approve the
              request
	             Matching criteria – typically gender and smoking preference are
            •		
	             used as matching criteria, but arrival/departure dates and demo-
              graphic information may also be relevant
	           • Handling exceptions – the roommate policy needs to be flexible,
              for example, with two married employees or those with special
              needs
Work with your hotel representative to prevent surprises
The event planner should work with the host and hotel representative in order
to keep everyone informed of pre-registration progress as the event date gets
closer.
	        • Deliver reports to the host and hotel on time, as stated in
	           contracts
	        •		Encourage early registration (via discounts, reminder emails, con-
	           tests) in order to gauge your room pickup early enough to release
            rooms without penalty or add them as needed
	        • Compare pre-registration to previous years’ events – if your au-
	           dience is similar, then their registration habits will typically follow
            patterns that indicate if the event will have more or fewer attend-
            ees than in the past
	        •	 Don’t take no for an answer – registration companies must be
            able to give you lists before the hotels need them, and hotels must
            be able to give you reports to cross-check for mistakes. Repeated
            delays and missed deadlines indicate larger problems
©2010 Certain Software, Inc. All rights protected and reserved.
23 BEHIND THE SCENE OF A SUCCESSFUL EVENT
Payment Processing
Collecting fees from attendees or exhibitors can be a good way to cover the
costs of an event; however, payment processing adds another area for the
event planner to manage. The event registration process should offer payment
options appropriate to the type of event and expectations of the audience, such
as:
	         • Credit cards
	         • Debit / ACH / e-Checking
	         • Check by mail
	         • Purchase order / invoice
	         • Payment plans
	         • Other methods – Paypal, Bill Me Later, etc.
Handle payments securely every time
Regardless of the payment method, financial transactions involve the exchange
of sensitive information between the attendee and event. Planners must
ensure that privacy safeguards and data security of the payment process meet
local laws and regulations. Events are fraud targets, and the loss of credit card
numbers or other financial information can be embarrassing or disastrous to an
event. Key points to consider include:
	
	         • Never email credit card or bank information – if a hotel needs
	             credit card guarantees from attendees, have them collect the
	             information in their secure system. Alternately, pass financial in-
              formation via a hyperlink to a secure, password-protected report-
              contracts
	         •		 store credit card numbers – use systems where the credit
              Don’t
	             card or bank information is only used during the original payment
              transaction. If data is not stored on your system, it cannot be
	             stolen
	         • Encrypt secure information – when you have to store secure infor-
              mation, be sure that it is both encrypted and access-controlled
	         •	 Control access – secure access to data using unique logins, pass-
              words, and employee background and credit checks

PCI - accept credit cards online, without headaches
Fortunately for event planners, many technology vendors offer registration sys-
tems with integrated credit card processing that is compliant with the Payment
Card Industry Data Security Standards (PCI DSS). Look for “PCI Level 1 Compli-
ance” with your vendor, and periodically review their required annual audit
report to make sure you can rest easy.



©2010 Certain Software, Inc. All rights protected and reserved.
24

Reports, Reports, Reports
While an event is typically a physical experience, the event planning process is
closer to an assembly line of information. Throughout the weeks leading up
to the event, the planner compiles more and more information from the host,
suppliers, speakers, hotels, attendees, etc. Before the event can succeed, the
planner must compile this mass of information and distribute it to the people
who need it. Thus, prior to the event itself, reports are the main output of the
planning process.

Standard reports and custom reports
Several organizations have compiled “standard” reports for event planners;
for example, see the Accepted Practices Exchange of the Convention Industry
Council (www.conventionindustry.org/apex/). While most events use the
same basic reports, each event typically requires some changes to the format.
Although no true standard exists, common reports include:

	           •  Attendee List – list of attendees with contact and demographic
	              information, separated by attendee type
	           •		 Block Pickup – summary of number of rooms reserved for
               Room
	              each hotel, room types, and nights as a percentage of the contract-
               ed number of room-nights
	           • Hotel Rooming List – list of attendees staying at each hotel, with
               arrival, departure, room type, special needs, and other housing
               data
	           •	 Arrival & Departure Manifest – list of attendees organized by their
               arrival (or departure) time at the event location (to allow ground
               transportation and hotels to avoid bottlenecks with large groups)
	           • Travel Itinerary – detailed list of attendees travel information from
               their departure point to their destination at the event. Typically
               used for VIPs and speakers to make sure planners know where key
               people are when travel delays occur.
	           • Session Attendance – basic list of attendees who have pre-regis-
               tered for breakout sessions (by topic, time, and room)
	           • Payment Reconciliation – daily summary of payments and refunds
               by payment method, used to compare totals to bank account
               statements for financial reconciliation
	           • Budget – detailed summary of event revenue and expenses by
               category, comparing actual to budgeted numbers
	           • Cost Savings – report outlining cost savings realized during the
               event planning process, when compared to the original proposal or
               a baseline average


©2010 Certain Software, Inc. All rights protected and reserved.
25 BEHIND THE SCENE OF A SUCCESSFUL EVENT

“Changes” reports: Communicating with suppliers
Events have multiple suppliers (hotels, ground transportation, tour operators,
food service, etc.) who need pre-registration information in order to plan their
services. A planner typically sends registration data to suppliers weeks to
months before the event, however, many changes occur after the initial report
as the host or attendees make additions, changes, and cancellations to the
original plans. Thus, event planners rely on “Changes” reports to update their
suppliers with the new information, without having to repeatedly send the
complete registration data.

“Changes reports” have multiple formats, but they should include:

	           •  A header with basic event information – most suppliers work on
	              multiple events simultaneously, so be sure the event name, date,
	              location, and contact are prominent in the report
	           •		Columns with all relevant information the supplier needs
	           • Sections for Additions (new records), Modifications (changed
               records), and Cancellations (records removed)
	           •	 Modifications should highlight the fields that changed using color,
               font, and text; reports are often copied and faxed thus color and
               bold can be unreliable indicators of changes

Changes reports apply to a range of dates, typically from the date the last
report was delivered to the current date. Mistakes occur, however, so be sure
that you can re-run reports from earlier periods or simply run the original
report again to reset the changes.

Figure 7. Sample “Hotel Changes Report” with Additions, Modifications, and Cancel-




©2010 Certain Software, Inc. All rights protected and reserved.
26

On-Site at Your Event: Registration
and Check-in
Christina Rasco Adams and Jeff Rasco, CMP, Attendee Management, Inc.

Onsite registration is certainly not rocket science, but it is the first impression
your attendees have of the actual event. And like the cliché goes, you never
get a second chance to make a first impression. As with the rest of your event,
check-in requires planning and attention to detail.

Before You Go
Onsite registration is highly variable depending on the size and type of event
you are handling. The key part in planning for check-in procedures is evaluating
the numbers and needs of your attendees. A few key points to address early in
the planning process to prepare for onsite include:

	           •     How many attendees?
	           •     What equipment is needed?
	           •     What materials will be supplied to attendees upon check-in?
	           •     What purpose will your Reg Desk serve?

Numbers
The total number of attendees will dictate your equipment and staffing needs
for onsite, so it is important to have a ballpark figure early on to help plan.
Smaller events may just
need a couple of draped
tables and chairs, while a
large event may require
a number of registration
stations. Note where the
registration area is and
whether the venue contains
a built in registration area
for your use, and if so, what
is included.

With so much activity going
on at the event, registration desk staffing is often overlooked. Consider the
hours that the desk will be open, and plan for who will man the desk during
those times. If manpower is an issue when the event team is busy with other
tasks, then outsourcing onsite support is a very valuable option.

©2010 Certain Software, Inc. All rights protected and reserved.
27 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Badges
Name badges are not only a way to convey attendees’ names, but they also
identify different attendee types and verify that participants are registered.

There are a number of techniques for producing name badges. Registration
software often includes a badge printing component that helps layout and
generate a printer-ready document, or spreadsheets can be merged into a label
document. Several vendors specialize in supplying everything you need for
badge printing – perforated cardstock, badge holders, and lanyards. In addition,
some companies will handle all your badging needs from designing and printing
to stuffing and shipping.

Badge reprints are inevitable once onsite, so whatever printing option you
choose, plan to have a quick way to recreate and reprint the badge onsite. One
of the simplest options is to pre-print badge stock and prepare a black-and-
white template for the actual badge information. When a reprint is needed
onsite, simply update the contact information in the template.

Registration Packets
In addition to badges, many events give the attendees a registration packet upon
check in. This packet typically includes the conference agenda and other general
event information, such as a location map, speaker and session descriptions, an
area for notes, etc. Sponsor information and giveaways are often included in the
packet.

Equipment
Many pieces make up the registration area. The checklist below covers some of
the items needed at nearly every registration desk.

	           •     Tables/booths
	           •     Chairs
	           •     Badges and packets
	           •     Extra badge stock for reprints
	           •     Computer
	           •     Printer
	           •     Internet
	           •     Location map
	           •     Conference agenda
	           •     Phone and/or radio for contact with other event staff
	           •     Pens and paper
	           •     Storage


©2010 Certain Software, Inc. All rights protected and reserved.
28

On-Site
Setting Up
The types of attendees and the total number play an important role in deter-
mining how the registration area should be set up. Your goal should always be
an efficient check-in process with minimal lines. Staff may include registrars for
pre-registered attendee check-in, helpers for on-site registrations, cashiers, VIP
check-in staff, greeter/information desk, and support for exhibitors and sponsors.
At least one senior registration manager should have no direct desk assignment,
but be available to troubleshoot and keep the process moving along.


Staff numbers depend entirely on the number of attendees and difficulty in the
registration process. Your tradeshow may allow for many onsite registrations,
so the ratio of staff to attendees may be 1:50 or lower. If most attendees pre-
registered, 1:150 or so could be perfectly adequate. Your event history is the best
guide to providing staff, but if in doubt, don’t skimp on personnel. Possible staffing
sources include your meeting management team, administrative assistants, vol-
unteers, and the CVB.
The physical set-up re-
lies on the facility, at-
tendee numbers, and
oftentimes budget. As
mentioned, you may
be at tables, supplied
registration booths, or
a built-in desk. Based
on your numbers, you
may choose a simple
line or serpentine ap-
proach, or it may be
advantageous to split
the group in alpha-
betical segments (A-
D, E-H, etc.) to speed
things along. If it helps to keep things organized, work with the facility or your
vendor to supply ropes and stanchions or other methods to keep people moving
in the right directions. And don’t forget proper directional signage.




©2010 Certain Software, Inc. All rights protected and reserved.
29 BEHIND THE SCENE OF A SUCCESSFUL EVENT


Prepping Staff
A successful registration process demands making registration desk staff prepa-
ration a priority. The prep session should cover:

           •	     What each attendee receives upon check in (badge, packet, etc.)
           •	     What information to convey to each attendee and attendee type
           •	     A basic understanding of the venue and location of meeting
                  rooms
           •	     Procedures for handling badge reprints, walk up registrations, and
                  emergency or security situations
           •	     How and when to contact other members of the event team

Covering every possible situation or question that the registration staff may en-
counter is impossible and not necessary, but providing the team with the tools
to help the attendee is crucial. Handheld radios, cell phones, and text messaging
are lifelines for the registration staff.

Since the planning team is often working behind the scenes, the registration staff
represents the entire event team and should understand the weight of this re-
sponsibility. The registration area can get stressful at times, and your registration
team will feel it. Never underestimate the power of a good attitude and a smile.

Meet Me at the Reg Desk
The Registration Desk often becomes the information center of the event. It’s
one of the first places attendees stop when they arrive, and it can continue to be
a place to meet up with other attendees, find out where a meeting room is, and
get other general information. Establishing the hours of the registration desk
and including them in the conference agenda will help attendees know when this
support will be available.

As the first face of the event, registration is a great place to relay the feeling and
theme. For instance, if going green is an important theme of the conference,
make sure that registration reflects this. Take advantage of the area to exhibit the
event or organization branding, promote special conference events, or recognize
sponsors.




©2010 Certain Software, Inc. All rights protected and reserved.
30


Technology and Check-in
We’ve come a long way since the days of sorting through index card catalogs to
find attendees and welcome them to our events. With powerful automated reg-
istration systems in place, most information is a click away, even on site.


                                                      With a basic Internet connection at the
                                                      event venue, you can access your com-
                                                      plete registration database with your on-
                                                      line system, such as Certain Meetings. You
                                                      may also opt for a server-based network,
                                                      if going online is an issue. With onsite reg-
                                                      istration kiosks, attendees can self-regis-
                                                      ter directly in the system, pay their fees,
                                                      and be queued up for their name badge
                                                      and tickets. Pre-registered attendees can
                                                      check themselves in by entering their reg-
                                                      istration code or scanning a bar code.


                                          Onsite technology can really work to speed
                                          up the check-in process and save money
on staff, postage and shipping, especially with larger meetings. With the addition
of on-demand printers for badges and tickets, advance mailings of those materi-
als are unnecessary. Because attendees simply check in at computer kiosks, and
have their badges, tickets, and other credentials automatically printed, there is
less need for staff to assist. It also reduces or eliminates the need for pre-event
“stuffing parties” and shipping badges to the event venue.

Digitized information is also transforming another manual process in registration
– the information packet. More and more, printed materials are giving way to
handouts provided in USB flash drives, CD/DVD format, or online. At worst, at-
tendees look up the materials they need and print on demand at stations placed
conveniently throughout the venue.

Registration truly makes the first impression on your attendees, and technology
has made a lasting impression on the registration and check-in processes.




©2010 Certain Software, Inc. All rights protected and reserved.
31 BEHIND THE SCENE OF A SUCCESSFUL EVENT

After Your Event Ends
The day an event ends successfully, most planners want to either hit the bar or
their bed. The next day, however, the professional meeting planner knows that
the end of the last event is only the start of the next event. The planner and host
should reserve time immediately after the event to review what worked, what
didn’t work, and where to make improvements.
Closing Out Your Event
The first post-event task is to close out the event. This includes:

      ••    Update the registration database with on-site changes, and mark pre-
            registrants who did not attend as “no-show”
      ••    If the event did not meet its hotel commitment, then compare the hotel
            guest list to the attendee list to make sure your event gets credit for all
            attendees
      ••    Compile all event invoices, and remind suppliers of deadlines to submit
            invoices not yet received
      ••    Review invoices for errors, and submit for payment
      ••    Update the event budget with the actual payment amounts, and calcu-
            late the variance between actual and budget or expected amounts
      ••    Conduct surveys of key team members (host, speakers, planners, sup-
            pliers) to evaluate each others’ performance and make suggestions for
            improvement
      ••    Compile attendee surveys, and distribute results to relevant parties
            (speakers, suppliers, etc.)

What to Keep
At a minimum, the planner should keep track of high-level financial and registra-
tion details for three years, in order to use in annual event consolidation reports
and preparations for future events. This includes:
      ••    Basic event details – Name, dates, locations, agenda, number of attendees
      ••    Signed contracts – in case of future audits or dispute
      ••    Actual expenses by major category (Housing, Food & Beverage, Audio/
            Visual & Production, Meeting Space, Travel, Registration)




©2010 Certain Software, Inc. All rights protected and reserved.
32


          •	    Actual registration numbers by attendee type and revenue
          •	    Registration and attendance proof for sessions granting Continuing
                Education Credits (some CE programs require this information to be
                archived for 7 years minimum)

    What to throw away
    Keeping everything from old events is almost as bad as keeping nothing, since
    important information becomes lost in the flood of the irrelevant and stor-
    age costs spiral upward. Each planner should determine a data deletion plan
    based on their organization’s applicable laws and regulations. Periodically
    (quarterly or annually) set aside time to “clean house” and remove irrelevant
    paperwork and data.


    Prepare for the Next Event
    Repeat events will have new dates, locations, speakers, attendees, and chal-
    lenges. A professional event planner can improve productivity and chances
    for success by constantly improving the planning process they follow.
          •	    Update the workflow used for the event with new “best practices”
                and lessons learned
          •	    Make a copy of the old event web site and registration form and set
                it up as a place holder for the next event, with a simple “Get Ready”
                message with any information known for the next year’s event
          •	    Review past supplier performance and consider adding or changing
                preferred suppliers in order to drive more business to the best ones
          •	    Use consolidated event spend information to negotiate discounts
                and better rates with preferred suppliers




©2010 Certain Software, Inc. All rights protected and reserved.
33 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Strategic Meetings Management
Programs (SMMP)
Large organizations sign hundreds of contracts that together commit huge sums
for meetings and events, without adequate controls on risk management or
measuring value obtained for the money. Accordingly, a well-designed Strategic
Meetings Management Program (SMMP) should be part of any enterprise travel
and expense control system.

How to Get Started
SMMP attempts to impose central controls on a geographically disperse and
highly variable behavior – planning meetings and events of different size, com-
plexity, and purpose. Some SMMP implementations fail because the problem is
too big to tackle all at once and management patience expires before the pro-
gram becomes demonstrably effective. It is critical to establish goals, priorities,
milestones, and expectations throughout the SMMP implementation process,
which typically requires at least two to three years to establish within a large
enterprise.
      •	    How big is the problem?
                   o	 Establish an area on the company Intranet for meetings, and
                      post a page explaining the initial SMMP goals, new policy re-
                      quirements, and a Meeting Request Form
                   o	 Require all events over 10 people or $10,000 to be registered
                      and receive a unique Meeting Id
                   o	 Do not yet implement a formal review/approval process – at
                      this point simply register events (even if they were in the past)
                      and collect basic information


      •	    Control your risk immediately
                   o	 Work with your legal department to create a standard contract
                      template for meetings and post this on your SMMP Intranet
                   o	 An advanced SMM program has pre-negotiated contracts with
                      major hotel chains and a process specifying required and op-
                      tional clauses for non-standard contract negotiation
                   o	 If practical, SMMP meeting professionals should review all
                      non-standard event contracts, otherwise at least post an stan-
                      dard contract with explanation of key clauses so that part-time
                      meeting planners know what to watch out for
                   o	 Store meeting contracts in a central location and associate
                      each contract with its Meeting (by unique Id)

©2010 Certain Software, Inc. All rights protected and reserved.
34


Begin the Standardization Process
Once each meeting has a unique Id and all contracts are in a central location
where a meeting professional can review their risks, your organization is ready to
begin standardizing meeting management processes.
      •	    Centralize payment by Meeting Id
                   o	 The best way to enforce meeting registration is to implement
                      a policy that event-related expenses are not paid without a
                      Meeting Id – be forgiving at first and allow registration of the
                      meeting even after it is over, while educating the event host
                      for next time
                   o	 Alternately, you may require event charge codes for every
                      meeting Id
                   o	 Require employees to use the Meeting Id or Charge Code for
                      event-related expenses, e.g. travel reservations, travel ex-
                      pense reimbursements, meeting expenses, etc.
                   o	 If practical, consider using a meeting charge card, at least for
                      smaller purchases. Otherwise, track payment by broad cat-
                      egories such as housing, food & beverage, travel, registration,
                      audio/visual production, and meeting space

      •	    Standardize client-facing tools
                   o	 Most employees’ pre-event experience is limited to the event
                      Web site and registration process
                   o	 If your central Attendee Management tool has major faults,
                      then the ultimate clients (attendees) will lose faith in the value
                      of the entire SMM program
                   o	 Custom-brand your event web sites, registration forms, and
                      email marketing within your Intranet to make the pre-event
                      experience seamless and fast for attendees

      •	    Set up a Request & Approval process
                   o	 After the event host completes a meeting request, it should
                      route to the appropriate budget manager for approval
                   o	 Some systems create automated budget estimates for “not-
                      to-exceed” approval limits, while others require at least one
                      response from a qualifying facility (hotel, etc.) before approval

©2010 Certain Software, Inc. All rights protected and reserved.
35 BEHIND THE SCENE OF A SUCCESSFUL EVENT


Organizing site selection for SMM Programs
Organizations have different requirements for selecting the event location and
facility. Single-source proposals are appropriate in some cases, such as when
events occur in the same location year-after-year, one facility is obviously more
convenient for the majority of attendees, or a repeating event rotates among
a fixed number of properties. In other cases, organizational rules or laws (e.g.,
Sarbanes-Oxley) require the meeting planner to consider multiple facilities and
obtain at least 3 proposals from qualified vendors. The site selection process
was discussed previously for a single event; additional considerations for a SMM
program include:
      •	    Centralize the site selection and RFP process – use a single system and
            workflow to create an RFP, select potential vendors to receive the RFP,
            collect responses from vendors, narrow the options, conduct site in-
            spections, negotiate with the selected facility, and prepare a contract
            with appropriate clauses for the event
      •	    Customize the site selection process to your organization’s specific
            needs, and allow further customization for each event’s unique require-
            ments
      •	    Use an extensive supplier database, and load it with your organization’s
            sales contacts, preferred suppliers, and past events
      •	    Track credits from cancelled meetings, volume discounts, promotions,
            etc. and consider these during the RFP process
      •	    Consolidate RFP reporting across all events – show suppliers (by chain,
            brand, and property) not only how much you spent with them each
            year, but also how many opportunities (RFPs) you offered them, and
            how often they bid, declined, or didn’t respond. Include their RFP re-
            sponse time in comparison to their competitors
      •	    Prepare Cost Savings Reports - Most cost savings in the event planning
            process occur during site selection and contract negotiation. Keep track
            of those savings by event and in aggregate




©2010 Certain Software, Inc. All rights protected and reserved.
36

Complete SMMP
Project management and creation of a detailed Event Specification Guide (ESG)
with a detailed budget are the central daily tasks of many meeting professionals.
In the context of SMMP, however, we consolidate these processes only after con-
trolling meeting registration, contracts, bill payments, attendee management,
and site selection.
      •	    Project management
                   o	 Define a “best practice” workflow for each process that you
                      repeat often, with due dates relative to key milestones (e.g.
                      the Event Start Date) and task assignment relative to roles (e.g.
                      host, approver, planner)
                   o	 Create a Master Schedule by applying the appropriate work-
                      flow to each event, so that tasks and milestones now have spe-
                      cific due dates and assigned persons. Remove tasks that are
                      not applicable to the specific event
                   o	 A Project Management Dashboard shows managers the prog-
                      ress of all current events and projects, including which tasks
                      are overdue and which are pending in the near term
      •	    Event Specification Guide (ESG) – also called “Meeting Resume”
                   o	 The event specification contains all of the details about an
                      event, for the vendor where the event will be held
                   o	 It includes “Function Setup Orders” (FSOs), which include
                      details for each meeting space and time slot. FSOs are the
                      meeting planner’s version of hotels’ “Banquet Event Orders”
                      (BEOs)
                   o	 For example, see the Accepted Practices Exchange (APEX)
                      standard at www.conventionindustry.org/apex
The ESG contains all information that the planner and event facility share. In ad-
dition, the planner should maintain a detailed budget for each event.
      •	    Event changes should reflect automatically in the budget details
      •	    Combine line item details into major spend categories, such as Housing,
            Travel, Food & Beverage, Audio/Visual, and Meeting Space
      •	    Consolidated budgeting reports should aggregate all expenses by event,
            spend category, and across multiple events over time



©2010 Certain Software, Inc. All rights protected and reserved.
37 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Embed SMMP in the Organization
Only after firmly establishing commitment to SMMP in the travel, procurement,
finance, and event management departments should an organization invest
in systems integration. Such integration, however, is essential to streamlining
SMMP and embedding it internally.

Integrate internal systems
Events are not a core profit center for most businesses, so most event manage-
ment systems must fill a support role to other primary systems. The key systems
most SMM programs integrate include:
      •	    Travel management – most corporate travel and expense (T&E) systems
            focus on individual (“transient”) travel, however, event-related (“group”)
            travel can account for 30% of total expenses and should be managed ac-
            cordingly
      •	    Customer Relationship Management (CRM) – for customer-facing events,
            the CRM application needs to know at least who was invited, who plans to
            attend, and who has attended past events
      •	    Human Resources (HR) – employee-facing events need to pull data from
            HR for registration and push data related to attendance in required events
      •	    Learning Management Systems (LMS) – many LMS applications don’t man-
            age physical events, however, course content, prerequisites, and Continu-
            ing Professional Education credits must be transferred between the event
            management system and LMS
      •	    Single Sign-On (SSO) – Single Sign-On allows employees, customers, etc. to
            sign on to a system (such as an Intranet or customer portal) once, and then
            have their profile information pass automatically to other systems such as
            event registration
      •	    Procurement – event site selection and contracting must work within the
            overall organizational procurement process
      •	    Accounting – event-related invoices, billing, and payments must comply
            with the overall organizational accounting system

Automate information exchange
Whenever practical, automate the exchange of event information (reports,
email, status pages) with suppliers and team members. In other cases, provid-
ing real-time access (via hyperlinks or system login) will allow parties who need
event-related information to retrieve it when they need it.


©2010 Certain Software, Inc. All rights protected and reserved.
38

Social Networks and Events
Jordan Schwartz, CEO, Pathable

Social networks have caught the imagination of meeting planners worldwide for
good reason: people attend face-to-face events to network; they want to meet
potential customers, vendors, employers, employees, and friends.
On-line social networks facilitate that goal by providing a means for attendees
to get to know each other prior to the meeting and to stay in touch afterwards.
In addition, social networks can help build attendance at events through viral
marketing.
Viral Marketing
Social networks can help get the word out about your event, at no cost beyond
your time invested. Social network marketing has two important advantages
over traditional marketing:
      •	    Exponential Effect: Remember that old shampoo commercial, where a
            woman says she told two friends about Faberge, “and they told two
            friends, and they told two friends…”? That’s a classic example of the
            ability of viral marketing to amplify a message
      •	    Trusted Source: People are more likely to listen to and trust something
            they hear from a friend than from a paid advertisement. Viral marketing
            is “advertising you can’t buy”
The accessibility of viral marketing has increased dramatically with the rise of
established social networks such as Facebook, LinkedIn, and Twitter, which have
formalized who is a “friend” and made easy the ability to share thoughts - (and
links) with them.

LinkedIn
LinkedIn (www.linkedin.com) is considered the most “professional” of the social
networks and provides several avenues for building a viral marketing campaign.
First, you can create a dedicated page on LinkedIn for your event where attend-
ees indicate they are “Attending”, “Interested” or “Not Attending”. If they choose
“Attending”, a message will appear in each attendee’s Feed letting their contacts
know. Attendees will also be able to leave messages for one another as “Com-
ments” on the page (which will also show up in their Feed).
Creating an Event page on LinkedIn is free: simply sign-in with your LinkedIn ac-
count, click Events from the left-hand navigation bar under Applications, then
click the Add an Event tab that will appear at the top of the page.

©2010 Certain Software, Inc. All rights protected and reserved.
39 BEHIND THE SCENE OF A SUCCESSFUL EVENT


                  Figure 8. Sample event page on LinkedIn (www.linkedin.com)




A second way to leverage LinkedIn’s viral marketing potential is through LinkedIn
Groups (http://learn.linkedin.com/groups). LinkedIn Groups are topic-based sub-
communities within the larger LinkedIn community. When people join a LinkedIn
Group, they generally consent to receive messages posted to that group as e-
mail, so Groups can be an effective way of getting a message out to targeted,
relevant people.
To get your message out to a LinkedIn Group:
      •	    Sign in or create an account if you don’t already have one
      •	    Find and join groups relevant to your event by visiting the LinkedIn
            Groups Directory: http://www.linkedin.com/groupsDirectory. Also, view
            the Groups that people involved in your event belong to.
      •	    Click “Start a Discussion” and enter your message
Important: Many Groups have rules restricting advertising messages, so read any
introductory messages and learn the etiquette before jumping in.
Even Groups that don’t explicitly disallow advertising won’t appreciate “spam”,
and you don’t want to alienate potential attendees. Be sure that you only send
your message to directly relevant Groups and that you phrase your message in
terms of sharing information, rather than marketing your event.




©2010 Certain Software, Inc. All rights protected and reserved.
40

Facebook
Like LinkedIn, Facebook (www.facebook.com) has “Events” pages that your at-
tendees can join. When they do, Facebook adds a message to their News Feed
letting all their friends know they are attending, a great viral marketing mecha-
nism.
While Facebook generally is regarded as more “social” and “personal” to Linke-
dIn’s “professional” feel, Facebook has a more active membership and a better
developed News Feed feature, meaning that even for professionally-oriented
events, it can be a more effective way to spread your message.
                Figure 9. Sample event page on Facebook (www.facebook.com)




To create an event on Facebook:
      •	    Sign in or create a Facebook account if you don’t already have one.
      •	    Click in the box labeled “What’s on your mind?”

      •	    Click the “calendar page” icon showing the 31st:
      •	    Enter your event details, then click Share
      •	    Click the name of the event, then click Edit Event
      •	    Enter any additional event details (notice the options on the left)
      •	    Click Invite People to Come to inform everyone in your social network
            that you’ve created an event page




©2010 Certain Software, Inc. All rights protected and reserved.
41 BEHIND THE SCENE OF A SUCCESSFUL EVENT


Twitter
Twitter is a fundamentally different type of social network from LinkedIn and
Facebook in that there are no “pages”, there is just your feed: a continuous list
of the messages that you’ve posted to the service. Anyone who is subscribed to
your feed (i.e., anyone who is “following you”, in Twitter terminology) might see
your messages (or “tweets”).
However, because each person sees a continuously updated list of all the tweets
of everyone they follow, if someone is following many people, they may overlook
some tweets as new tweets replace them in the feed.
One common behavior on Twitter is to “retweet” what someone else has
retweeted. This simply means that you repeat their message, preceding it with
the letters “RT” (for retweet) and their Twitter name (e.g., @pathable).
You can spread the word about your event on Twitter not only by tweeting it
yourself, but by encouraging others to retweet your message (thus spreading
it to all of their followers). Some common methods for encouraging retweeting
are:
      •	    Ask your followers to retweet your message explicitly (e.g., “Registra-
            tion open for EventCon 2001: http://bit.ly/oiweru (please RT)”
      •	    Include Twitter-only specials or discounts in your messages
      •	    Share breaking news or new and interesting developments (e.g., high
            profile speakers booked) on Twitter
Hint: Twitter restricts messages to 140 characters. That means that if you want
someone to be able to retweet your message, it must be less than 140 characters
long even after they add “RT @your_twitter_name” to the beginning!

Twitter Hash Tags
One way to mark tweets as being relevant to a particular topic (e.g., about an
event) is to include what’s called a “hash tag” in the body of the tweet. A hash tag
is simply a set of characters preceded by a hash mark, “#”. By including the hash
mark, you designate that word as a key word that can be more easily searched
for, and is distinguished from similar words. For example:
      •	    “I use certain software” might mean that the sender uses a particular
            piece of software.
      •	    “I use #Certain software” designates the word “Certain” as a special key-
            word, and thus more likely to reference the Certain Software service.


©2010 Certain Software, Inc. All rights protected and reserved.
42


Events typically have hash tags, as well. For example, the hash tag for South by
SouthWest is #sxsw. The hash tag for MeetDifferent 2010 is #MD10 (hash tags
are not case sensitive). You should choose a hash tag that is unique and relatively
short (ideally less than 8 characters), so that it won’t compete with your message
when keeping under the 140 character limit.
Hint: to make sure your desired hash tag isn’t already in use, visit http://search.
twitter.com/ and search for it. If it shows up in tweets about another topic, some-
one has already claimed it for another purpose.
Online Communities
When it comes to making a lasting, personal connection, nothing compares to
meeting someone face-to-face. Unfortunately, conference and event attendees
have a limited amount of time to take advantage of this opportunity. In a crowd-
ed room, most attendees must rely on luck or happenstance to bump into the
“right” people in the limited time they have.
Event-centric on-line communities can extend the time attendees have to net-
work months prior and after an event, and can make the time they have in the
same room more effective by allowing them to identify people they would like to
meet before they arrive.
LinkedIn, Twitter, and Facebook can all function as on-line communities for your
event, but experience has shown that building a dedicated community for your
event can be more effective:
      •	    Integrating the community experience with registration has been shown
            to increase adoption by up to 6x
      •	    When you create a custom community, you can control the look and
            feel and the brand of the site
      •	    When using a generic third party- service such as LinkedIn or Facebook,
            those services own the customer relationship. When you create a cus-
            tom network, you own the attendee data and can use it to build a high-
            er-value customer relationship




©2010 Certain Software, Inc. All rights protected and reserved.
43 BEHIND THE SCENE OF A SUCCESSFUL EVENT


Pathable
Pathable (www.pathable.com) is a social network service, similar in some ways
to Facebook or LinkedIn, that integrates with your Certain Meetings solution to
create a dedicated online community for your event. Unlike Facebook or Linke-
dIn, the site will “look and feel” like your event web site, embedding in your
navigation system, carrying your banner and URL, and only registered attendees
can participate in your event’s network.
When someone registers for your event, Pathable’s integration with Certain auto-
matically creates an account for that attendee based on the information they’ve
provided. The attendee can then fill out additional background information to
help other attendees get to know them, such as a photo, their interests, a short
bio and other relevant details.
                     Figure 10. Sample event community site using Pathable




Pathable helps your attendees network by:
      •	    identifying which of the attendee’s Twitter and LinkedIn contacts are
            also attending
      •	    recommending people to meet based on common interests
      •	    searching for attendees interested in any topic
      •	    supporting topical mailing list conversations, so attendees can start dis-
            cussions with other attendees around areas of mutual interest.

©2010 Certain Software, Inc. All rights protected and reserved.
44
In addition, Pathable’s scheduling feature allows attendees to sign up for edu-
cational sessions, download hand-outs, and then start conversations with the
speakers and attendees of particular sessions, creating ad hoc communities
around each talk.
By taking advantage of these social networking features, attendees can get to
know each other before the event, so that when they arrive they already have a
set of familiar names and faces and people they want to talk with.
Pathable includes iPhone and Blackberry interfaces, allowing attendees to access
their schedule and contacts on the go, and synchs with Outlook 2007 and above
as well as other common calendar programs, to allow its scheduling features to
integrate into attendees established workflows.
Pathable even allows attendees to schedule one-on-one meetings with each oth-
er, using their chosen session schedules to determine mutually free times.
           Figure 11. iPhone and Blackberry interfaces for Pathable community site.




When an event is complete, the Pathable community for event lives on, giving
attendees a place to return and continue the conversations they started. As a
result, they feel personally attached and committed to the event, increasing the
likelihood that they will return for the next one.
Social Networking Tips and Tricks
      •	    Choosing a social networking strategy need not be an either / or deci-
            sion. These solutions can often be used effectively side-by-side.
      •	    No matter which service you use, be sure to tell people about the pages
            you have created in every way you can: tweet about them, link to them
            from your web site and Facebook page, etc.
      •	    To make most effective use of Twitter, download one of the free support
            programs, such as TweetDeck (www.tweetdeck.com). These will allow
            you to have “search columns” that spotlight all the relevant tweets on a
            particular topic instantly and continuously.
      •	    Measure, measure, measure! Use tools like Google Analytics and HootSuite
            (www.hootsuite.com) to tell you how much of your traffic is coming from
            a particular source, which can help you focus your time and money on the
            most effective investments.

©2010 Certain Software, Inc. All rights protected and reserved.
45 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Planning a Sustainable Climate Friendly Event
Dave Rochlin, CEO, ClimatePath

The growing consensus is that reducing green house gas emissions is urgent
to avoid a variety of climate related, planetary crises. Whether you believe the
worst scenarios related to climate change projections or not, the specter of emis-
sions targets and reporting programs - either mandated or voluntary - has many
large organizations scrambling to understand, quantify, and reduce the carbon
emissions of their business activities.  Relying on “random acts” of green and
sustainability when planning meetings and events needs to be replaced with a
comprehensive approach to understanding and mitigating climate impact.

No two events are alike, so calculating and reducing a carbon footprint can be
complicated. The scope, sources, and solutions can also be surprising. The pur-
pose of this chapter is to remove some of the ambiguities and mysteries around
carbon foot-printing, identify general benchmarks and key variables, and assist
event organizers in developing a strategy for tackling this critical green issue.
What is a carbon footprint for an event? 
Carbon emissions are typically divided into 3 scopes to help determine organi-
zational boundaries. These three scopes can be applied to meetings and events,
and help you calculate your extended carbon footprint:
      •	    Scope 1 emissions are those directly occurring “from sources that are
            owned or controlled” by event planners, such as work vehicles. 
      •	    Scope 2 emissions are those generated in the production of electric-
            ity consumed by the event. This includes the energy consumed at the
            event location. 
      •	    Scope 3 emissions are all the other indirect emissions that are “a conse-
            quence of the activities of the event, but occur from sources not owned
            or controlled by the event organizer.” These include air and ground
            travel, hotel stays, emissions of the production and transportation of
            purchased goods, outsourced activities, and so forth.

Scope 3 emissions are the hardest to assess, track, and reduce because we have
the least control over them. Simply determining which scope 3 emissions to in-
clude within the boundary of the event can be an important and complex deci-
sion. The emerging event standards encourage event planners to take a holistic
look at everything from attendee travel to meals and paper usage when develop-
ing a sustainability plan and measuring their overall impact - or carbon footprint.
The confusing part is determining the event planner’s role in reducing the impact
versus simply encouraging attendees to mitigate.
©2010 Certain Software, Inc. All rights protected and reserved.
46

Whether you choose to follow a standard or your own best practices as part of
your emissions measurement and offsetting,  it is critical to be transparent, so
that claims can be understood and verified.
Travel trumps all others
Attendee travel to and from your event is particularly impactful. If a majority of
attendees are flying, these emissions account for up to 80% of your overall foot-
print. The airport transfers and in-town travel can be another 5%, as can hotel
stays. All together that means 90% or more emissions of an overall event can
be attributed to attendee travel. Of course face-to-face meetings can be valu-
able and highly productive, but it is important to select the right location for the
event, and reduce the miles flown. With 10,000 people attending, your choice of
location could mean as much as 5,000 tons of CO2 emission added or avoided!  
Outside of travel related emissions, an actual event’s footprint is in the range of
25-35 lb per day per person. A 10,000 person event is roughly 120 tons per day. 
Travel footprint reduction
      •	    Air travel:  When many attendees are flying, selecting a central location
            can cut your events carbon footprint in half. Keep in mind that direct
            flights tend to be 20-25% more efficient than flights with connections.
            Finding a central and direct location can save 1000 lbs of CO2 or more
            per attendee. 
      •	    Airport-to-event:  Airport transfer considerations can also have an im-
            pact. Cutting the travel distance and using vans can reduce this footprint
            by 80%, which can be 40 lbs of CO2 or more per attendee. Software can
            help coordinate logistics by pre-scheduling and providing manifests for
            shuttle drivers.
      •	    Drivers:  For events where driving will be the norm, optimizing the loca-
            tion and arranging for carpools can still have a large reduction impact.
            Cutting both drivers and mileage in half can save as much as 75 lbs of
            C02 per attendee. 




©2010 Certain Software, Inc. All rights protected and reserved.
47 BEHIND THE SCENE OF A SUCCESSFUL EVENT




Other ways to reduce your footprint and green your event
Outside of travel, making greener choices in areas such as lighting, venue selec-
tion, meals, water, paper, and recycling can also have a significant impact on your
overall ecological and carbon footprint. Let your attendees know about your ef-
forts, and ask for their cooperation. You’ll be surprised by their enthusiasm.
      •	    Set a waste goal and arrange for recycling
      •	    Watch your energy use
      •	    Think about transportation needs
      •	    Watch the paper!
      •	    Think local, organic, and vegetarian for food
Keeping perspective, and the role of offsets
Some emissions are unavoidable, and often it is simply too expensive to make
an “optimal” choice. As an example, should a location be ruled out if it results
in another 1/2 ton of CO2 per person, but saves $300 per person in travel and
other expenses?  Saving CO2 at a cost of $600 per ton may not be practical for
your organization. Planners also need to be aware of emissions shifting. Choos-
ing a venue which is more efficient for you, but causes traveler miles to go up
may lower your ‘scope 2’ event footprint while causing your attendees to raise
theirs.



©2010 Certain Software, Inc. All rights protected and reserved.
48


“Carbon Offsets” provide a mechanism to neutralize your impact and avoid being
forced into irrational trade-offs. A variety of offset projects from reforestation
to wind energy can deliver quantifiable carbon benefits that can mitigate your
impact. It is important to select projects that conform to a reputable third party
standard, and that the carbon credits are tracked and recorded through a public
registry. When you buy the credits (by the ton of CO2 reduced), you are essen-
tially purchasing shares in the project, to offset the carbon emissions generated
by your event. ClimatePath endorses the VCS (Voluntary Carbon Standard), CAR
(Climate Action Reserve), Gold Standard, Plan Vivo, and Green-e (for Renewable
Energy Certificates.)  These offsets generally cost $10-$20 per ton. A variety of
specific carbon credit generating projects can be viewed (and supported) on the
ClimatePath.org website. The non-profit ClimatePath Ecologic Fund will acquire,
register, and retire offsets on your behalf.


Up and Coming Standards for Event Planners and Managers
      •	    BS8901: British Standard developed by BSI specifically to move the
            events and planning industry in a more sustainable direction. Acts as
            a baseline and organizational framework for risk assessment, and puts
            measures in place to minimize negative effects of your events.
      •	    APEX Green Meeting Standards: Though under review, the APEX stan-
            dard critically assesses all aspects of an event from accommodations to
            communications to transportation, and scores your event on a green
            scale. The APEX standard is complex to implement and interpret, and is
            not recommended for the average meeting planner.
      •	    ISO14001: A more generic standard that provides requirements for en-
            vironmentally friendly management systems.




©2010 Certain Software, Inc. All rights protected and reserved.
49 BEHIND THE SCENE OF A SUCCESSFUL EVENT

Definitions and Meeting Planner Terminology
The “official” guide for professional meeting planner terminology is maintained
by the Convention Industry Council (CIC) via their Accepted Practices Exchange
(APEX) program. A searchable glossary is available at http://www.conventionin-
dustry.org/glossary/, and terms used in this eBook are defined below.

 Attrition             The difference between the actual number of
                       sleeping rooms picked-up (or food-and-beverage
                       covers or revenue projections) and the num-
                       ber or formulas agreed to in the terms of the
                       facility’s contract. Usually there is an allowable
                       shortfall before damages are assessed.
 Attrition             Contract wording that outlines potential dam-
 Clause                ages or fees that a party may be required to pay
                       in the event that it does not fulfill minimum com-
                       mitments in the contract.


 Audio/Visual          Equipment, materials, and teaching aids used in
 (A/V)                 sound and visual presentations, such as televi-
                       sion monitors, video, sound equipment, etc.


 Banquet Event A form most often used by hotels to provide de-
 Order (BEO)   tails to personnel concerned with a specific food
               and beverage function or event room set-up.
 Event Specifi-        The industry’s official term for the document
 cations Guide         used by an event organizer to convey information
 (ESG)                 clearly and accurately to appropriate venue(s)
                       and/or suppliers regarding all requirements for
                       an event.
 Food & Bever-         Any catered or concession service provided by a
 age (F&B)             facility.


 Request for    A document that stipulates what services the or-
 Proposal (RFP) ganization wants from an outside contractor and
                requests a bid to perform such services. Same as
                BID MANUAL/SPECIFICATIONS.




©2010 Certain Software, Inc. All rights protected and reserved.
50


Additional Resources
If you have any questions about planning your best event yet, please contact us
directly.

Certain Software
www.certain.com
info@certain.com


SAN FRANCISCO
Global Headquarters
75 Hawthorne Street Suite 300
San Francisco, CA 94105 USA
Toll-free in US: 	 1 888 CERTAIN	
		                 (1 888 237 8246)
Office:	           +1 415 353 5330
Fax: 	             +1 415 614 9192
BRISBANE
60 Brandl Street
Eight Mile Plains
QLD 4113
Australia
Office:	 +61 7 3457 0900
Fax: 	   +61 7 3457 0999
LONDON
5 Bucklersbury
Hitchin, Hertfordshire
SG5 1BB
United Kingdom
Office:	 +44 1462 420 780
Fax: 	   +44 1462 422 335




©2010 Certain Software, Inc. All rights protected and reserved.
51 BEHIND THE SCENE OF A SUCCESSFUL EVENT


About the Authors
Rick Borry, Certain Software




                                                  meetings and events solutions


Rick Borry founded Register123 in 1998 and grew it into one of the early leading
providers of online registration tools for the professional meeting planning indus-
try. He joined Certain Software after it acquired the online registration company
in 2001. Since 2005, Dr. Borry has been an active member of the APEX Technol-
ogy Advisory Committee, charged with developing XML standards for the group
travel industry through the Open Travel Alliance. In 2008, Dr. Borry chaired the
executive merger transition team after Certain Software and Amlink Technolo-
gies joined to create Certain, a global events management software company.
Dr. Borry earned a Ph.D. from the University of California at Berkeley and a Bach-
elor of Science degree in chemical engineering from Clemson University.
Rick Borry, Ph.D.
Certain Software
rborry@certain.com
www.certain.com
P: 415-345-2715




©2010 Certain Software, Inc. All rights protected and reserved.
52


Jeff Rasco and Christina Rasco Adams, Attendee Management Inc.




Jeffrey W. Rasco, CMP is the founding partner and CEO of Attendee Manage-
ment, Inc. (AMi), providers of state-of-the-art, customer-focused, comprehen-
sive registration, housing, travel, and e-marketing services. Jeff has nearly thirty
years experience as a meeting and event manager with a strong focus on man-
agement and technology. He was recognized in 1996 as Meeting Professionals
International’s Meeting Planner of the Year. Christina Rasco Adams is partner
and Chief Creative Officer, leading the design team and acting as primary con-
sultant to AMi’s customers. Their goal is to increase the quality of meetings and
elevate the strategic value of meeting professionals through the intelligent use
of technology.
Jeffrey W. Rasco, CMP, Partner/Chief Executive Officer
Christina Rasco Adams, Partner/Chief Creative Officer
Attendee Management, Inc.
jrasco@attendeenet.com / christina@attendeenet.com
www.attendeenet.com
P: 512-877-947-5174


©2010 Certain Software, Inc. All rights protected and reserved.
53 BEHIND THE SCENE OF A SUCCESSFUL EVENT


Tim Brown, Meeting Sites Resource




Tim Brown has been the CEO of Meeting Sites Resource since he founded the
company in 1993. MSR is a global specialist in meeting site research and hotel
/ contract negotiations. The company also offers professional meeting support
services and advanced meeting technology solutions.
Tim has spent his entire career in the meeting, convention and hospitality in-
dustries and has been both a planner and supplier. He has been in hotel sales,
marketing and management and a business owner in the meeting, convention
and incentives industry for 30 years.
He also contributes articles in major trade publications and speaks at many in-
dustry events, including Meeting Professionals International (MPI), Affordable
Meetings and Financial & Insurance Conference Planners (FICP). Tim also pres-
ents custom educational workshops for meeting and Procurement Department
planning teams. He has served on MPI’s International Board, has been President
of two different MPI chapters and in 1994 was Supplier of the Year. Tim also
sponsors the MPIOC Educational Scholarship. During his Presidency of MPIOC, he
launched the California State University, Fullerton (CSUF) Professional Meeting
Planning Curriculum which is now in its 14th year.
Tim is a graduate of San Diego State University with a BS degree in Marketing.
Tim Brown, CEO
Meeting Sites Resource
tbrown@meetingsites.net
www.meetingsites.net
P: 949-250-7483 x312




©2010 Certain Software, Inc. All rights protected and reserved.
54


Jennifer Brown, Meeting Sites Resource




Jennifer W. Brown, CMP, is President of Meeting Sites Resource, a global specialist
in meeting site research and hotel / contract negotiations. The company also offers
professional meeting support services and advanced meeting technology solutions.
Jennifer speaks at many meeting industry events including Meeting Professionals
International, Affordable Meetings, Financial & Insurance Conference Planners and
NYU. She has been a faculty member for MPI’s Platinum Series Workshops and pres-
ents custom workshops for meeting and Procurement Department planning teams.
She earned her CMP in 1992 and has won such awards as MPI’s Planner of the Year
and was a recognition recipient of MPI’s Global Paragon Award. She is a graduate of
Woodbury College.
For a complimentary copy of “Hotel Site Inspection Checklist”, contact:
Jennifer Brown, President
Meeting Sites Resource
jbrown@meetingsites.net
www.meetingsites.net
P: 949-250-7483 x315




©2010 Certain Software, Inc. All rights protected and reserved.
55 BEHIND THE SCENE OF A SUCCESSFUL EVENT


Jordan Schwartz, Pathable




Jordan Schwartz is President and co-founder of Pathable, a social networking ser-
vice for conferences. He earned his B.S. from Brown University, his M.S. in Social
Psychology from the University of Washington and spent over 10 years at Micro-
soft building consumer-focused products, including several versions of Windows
and MSN. In addition to making conference experiences better, Jordan has a pas-
sion for mobile technologies and indulges his love of community by authoring
the Wallingford, Seattle neighborhood blog, Wallyhood. He also leads a team of
60,000 bees in the manufacture and production of a delicious, organic honey.
Jordan Schwartz, CEO
Pathable
jordan@pathable.com
www.pathable.com
P: (866) 809-0252 x702




©2010 Certain Software, Inc. All rights protected and reserved.
56


Dave Rochlin, Founder, ClimatePath




Dave Rochlin is a founding partner of ClimatePath, a leading provider of industry
solutions to help meeting and event planners, consumer brands, travel providers,
and other businesses measure and reduce the climate and other impact of their
business activities. He has an extensive background in the NGO sector and social
enterprise, as well as technology, consumer products, and ‘big four’ consulting.


Dave speaks and writes frequently on green business, corporate social responsi-
bility, and sustainability. He has an MBA from the Kellogg School at Northwest-
ern, teaches innovation strategy and ethics in the executive MBA program at St.
Mary’s College, and has published a textbook on technology strategy. He is a also
on the board of directors of both the Lindsay Wildlife Museum, and the Climate-
Path Ecologic Fund.
David Rochlin, Founder
ClimatePath
info@climatepath.org
www.climatepath.org
P: 925 297-6017




©2010 Certain Software, Inc. All rights protected and reserved.

Behind the scene_successful_event

  • 1.
    Behind the Scene ofa Successful Event an eBook by Certain Software
  • 2.
    ii Behind the Sceneof a Successful Event An eBook by Certain Software Introduction meet ing - An assembly or conference of persons for a specific purpose e vent - An occurence, especially one of some importance A successful event is more than a gathering of people at a specific time and place; it is an opportunity to introduce new ideas, to learn new skills, to meet new people and to build life-long relationships. Participants remember a successful event because it enriches their lives. Certain Software and our partners help our clients plan and execute the world’s greatest events. This eBook compiles some of the lessons our expert authors learned over 100 years of collective experience in the professional meeting planning industry. Whether it is an executive board meeting, employee train- ing course, incentive travel event, customer conference, association event, or industry trade show, we hope to help you make your next event a success. If we can be of assistance, please contact us or one of the authors. Peter Micciche CEO Certain Software Inc. petermicciche@certain.com ©2010 Certain Software, Inc. All rights protected and reserved.
  • 3.
    iii Table of Contents Prepareto Plan Your Event 1 The Roles of Event Host and Event Planner 1 Define the Event’s Objectives 1 Determine a Baseline Budget for Your Event 1 Obtain Budgetary Approval and Funding for Your Event 2 Site Selection 3 Selecting the Perfect Site for Your Event 3 Site Inspection 4 Strategic Hotel & Contract Negotiations 5 Virtual Meetings 11 Telepresence Brings Together Disperse Groups in a Short Time 11 Webinars Deliver Targeted Content to an Interested Audience 12 Virtual Events Precede, Extend, or Replace Face-to-Face Events 13 Marketing Your Event 15 The Event Web Site 15 E-mail Marketing and Event Invitations 17 Event Notification Schedule 18 Online Registration 19 Pre-Registration 19 Housing Management 21 Payment Processing 23 Reports, Reports, Reports 24 On-Site at Your Event: Registration and Check-in 26 Before You Go 26 On-Site 28 Technology and Check-in 30 After You Event Ends 31 Closing Out Your Event 31 Prepare for the Next Event 32 ©2010 Certain Software, Inc. All rights protected and reserved.
  • 4.
    iv BEHIND THE SCENE OF A SUCCESSFUL EVENT Strategic Meetings Management Programs (SMMP) 33 How to Get Started 33 Begin the Standardization Process 34 Organizing Site Selection for SMM Programs 35 Complete SMMP 36 Embed SMMP in the Organization 37 Social Networks and Events 38 Viral Marketing - Linkedin, Facebook 38 Twitter 41 Online Communities 42 Pathable 43 Social Networking Tips and Tricks 44 Planning a Sustainable Event 45 What is a Carbon Footprint for an Event? 45 Travel Trumps All Others 46 Travel Footprint Reduction 46 Other Ways to Reduce Your Footprint 47 Keeping Perspective, and the Role of Offsets 47 Up and Coming Standards for Event Planners and Managers 48 Definitions and Meeting Planner Terminology 49 Additional Resources 50 Certain Software 50 About the Authors 51 Rick Borry, Certain Software 51 Jeff Rasco and Christina Rasco Adams, Attendee Management Inc. 52 Tim Brown, Meeting Sites Resource 53 Jennifer Brown, Meeting Sites Resource 54 Jordan Schwarz, Pathable 55 Dave Rochlin, ClimatePath 56 ©2010 Certain Software, Inc. All rights protected and reserved.
  • 5.
    1 Prepare to PlanYour Events Planning an event is hard work; before starting the process, be sure that you, your organization, and the attendees are ready to commit to a successful event. The Roles of Event Host and Event Planner The host is responsible for creating the event’s objectives and strategic vision, and for procuring the funding to cover the event’s expenses. The planner is responsible for organizing and executing the event in order to achieve the ob- jectives with the highest economic value and lowest risk. Define the Event’s Objectives The host and planner work together to formulate concrete objectives for the event. “Prepare the national sales team for the May 15 product launch” is an objective, which can be measured with post-event surveys of participants and post-product launch sales results. “Bring the national sales team together for 5 days in Dallas” is not a strategic objective, although after reviewing the number of attendees and volume of content to be covered, it may be the best tactic to achieve the desired result. Determine the basic event format and structure The host and planner must determine the best way to achieve the event’s objectives. This decision should consider physical constraints, such as 1. Number of participants 2. Geographical distribution of participants 3. External deadlines (e.g., a product launch date) 4. Amount, type, and complexity of content 5. Familiarity of the participants with each other 6. Ballpark budgetary limits After outlining the objectives and constraints of the event, the event structure will often present itself. In order from least to most expensive and time- consuming, the basic event formats are: • Conference call • Webinar • Virtual event / Telepresence • On-site meeting • Luncheon / Dinner • Off-site single-day meeting • Multi-day meeting ©2010 Certain Software, Inc. All rights protected and reserved.
  • 6.
    2 establish a baselinebudget for your event If the chosen format requires services of an external supplier, then the event will need to have a budget to pay for itself. Before spending time creating an RFP and evaluating responses from several suppliers, we recommend first establishing a preliminary estimate based on the type of event, number of participants, services required (hotel rooms, catering, production), travel, and auxiliary expenses. Planners can use software that aggregates their past experi- ences into average unit costs, and then automatically creates a baseline budget for financial approval of the event that is about to be planned. Table 1. Sample sliding scale for meeting cancellation fees Obtain budgetary approval and funding for your event. If the event host (or manager) cannot obtain funding within the ballpark range of the baseline budget, then the planner and host need to work together to reduce the event’s scope and objectives until the budget is within reason, or stop the event planning process altogether. It is better to stop at this point rather than spending time and resources planning an event that has no chance of happening. Even if you plan to fund the event via fees per attendee and exhibitors, you still need to approve a budget to determine the proper fees to break-even, and whether you have enough money to conduct the event planning process while you wait for payments to come in. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 7.
    3 BEHIND THE SCENE OF A SUCCESSFUL EVENT Site Selection Selecting the Perfect Site for Your Event Jennifer W. Brown, CMP, President, Meeting Sites Resource Researching and evaluating hotels for a meeting, convention, or incentive takes considerable time; however, careful analysis is essential for a productive meeting. Look beyond “dates, rates, and space” in order to achieve meeting goals, objec- tives, and criteria. Here is a 12-step process to assure success: 1. Assess needs - What do you want attendees to take away? 2. Gather information - Meeting requirements, history, expenses 3. Define attendees – demographics, guests, expectations 4. Consider additional requirements - Weather (related to time of year), accessibility (by air and ground), special needs (resort, golf) 5. Determine the budget – how much can you spend and can you be flexible? 6. Design the meeting specification – based on the agenda and data collected 7. Create a meeting profile or RFP – for hotels, based on the meeting specification 8. Begin site research – use one or more options to find the perfect match: • Site Research company • National and regional hotel sales offices • Convention and visitors bureaus (CVB’s) • Trade publications or Web search 9. Narrow your selections – select three or fewer preferred venues 10. Collect site proposals – each site should provide • A description of the number and type of accommodations available • Meeting space floor plans with dimensions/capacities • List of technical equipment and support services • Tentative meeting room assignments • Complete description of property’s restaurants, sports facilities, entertainment areas, and shops • Information about insurance, licenses, taxes, beverage control, union contracts, automatic charges, gratuities • Food and beverage menus 11. Conduct site inspection – follow the site inspection guidelines in the next section to review your finalists. 12. Site inspection alternatives – if the planner cannot personally attend the venue, then ask the hotel for a conference packet, videos, and four refer- ences of organizations with a similar profile that held events there in the last year. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 8.
    4 SITE INSPECTION A siteinspection is an in-person, on-site review and evaluation of a potential venue or location for an event. Before committing and going to contract, visit your top choices and methodically evaluate whether each venue meets your specific criteria and will lead to success, or perhaps is a candidate for a future meeting or event. Site Inspection Checklist A detailed site inspection checklist runs several pages. In general, your site inspection report should document the following: 1. First impressions - pay attention to your attendees’ experiences from when they land at the airport to their arrival at the venue 2. General appearance - ask for specific dates of recent renovations, and make sure that no construction is planned during your event 3. Front desk – look for the ability to handle crowds, and to speed check-in via self-service kiosks and preferred guest counters 4. Accommodations - quality and size of rooms by type, in addition to the number of rooms 5. ADA requirements (Americans with Disabilities Act) – Most venues meet the minimum legal ADA requirements; however, this may not be sufficient for your group 6. Meeting & event space – with your RFP, requirements and floor plans in hand, visit the specific meeting and event rooms for your event; check lighting, ceiling height, room shape and size, and beware of any pillars and other obstructions. Also check access to wireless internet and power, and ask about in-house A/V and technology support. 7. Food & beverage – review hotel catering menus and hotel F&B / theme capabilities. Inspect the size and location of restaurants, access to kitchen for meal functions, and additional catering support services. 8. Transportation – distance to airport, convention center, local attractions, transportation options (shuttle, train, taxi, bus, parking) 9. Sports & recreational facilities – availability and costs of golf, entertain- ment, dancing, spa, exercise room, tennis, etc. 10. Sustainability – venue policies and standards related to sustainability in general and carbon emission reduction, and overall hotel green initiatives 11. Neighborhood – pay attention to the facilities near the venue 12. Services – in-house or recommended vendors for Destination Manage- ment Company (DMC), decorating, audio/visual, etc. Immediately after your site inspection, write down your overall impression including strengths and weaknesses. Planners often visit multiple venues on a single trip, and waiting until you return to the office to document an inspection report is a good way to confuse properties. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 9.
    5 BEHIND THE SCENE OF A SUCCESSFUL EVENT STRATEGIC HOTEL & cONTRACT NEGOTIATIONS Tim Brown, CEO, Meeting Sites Resource Change in economic conditions have a big impact on how meeting planners plan and execute meetings and how hoteliers sell and provide service. This includes conditions changing from a “buyer’s market” to a “seller’s market” and vice versa. Regardless of shifts in the marketplace, the simple truth is that when meeting planners evaluate each meeting, understanding their leverage and flexibility and having a negotiation plan will add value to their meetings’ bottom line and reduce contract risk. The Strategic Request for Proposal (RFP) The Request for Proposal (RFP) is a document that specifies all vendor-supplied requirements for a meeting, in sufficient detail so that potential vendors can provide bids for the proposed event. In addition to the information collected in the pre-planning phase, the RFP requires the meeting planner to: • Conduct a meeting needs assessment with all internal and external stakeholders in order to understand all meeting goals and objec- tives. • Evaluate the demographics of attendees: who are they, where are they located, age and gender, special interests and needs, and meeting expectations. • Evaluate past meeting history including meeting budgets, meet- ing and event agenda, number of attendees, F&B functions, A/V spending, actual sleeping rooms - picked up versus contracted. • Create a strategic RFP that includes a day-by-day breakdown of all meeting and event activity, including set-up and teardown. List minimum square footage / ceiling heights for all meeting and event space, including breakout rooms • Include all food and beverage functions, number of guests, off-site events, and special needs • Based on a composite from above, determine best cities and type of hotel (resort, downtown / conference center, airport, suburban) that achieve stated goals and criteria Web-based software is a valuable tool to help manage the process of creating an RFP and selecting potential venues to receive it. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 10.
    6 Assess Your Leverage Byassessing the value of their meetings and understanding how hoteliers man- age for profitability, planners can improve their leverage to achieve meeting quality and bottom line results. All hotels utilize an on-line system to evaluate and “rate your meeting” based on a multitude of qualitative and quantitative factors. Knowing how (and if) your meeting fits into the hotel is an important part of the negotiation process along with your overall meeting revenue mix. Key issues that influence hotel pricing and availability for group business include: • Transient (individual) demand • Other groups in house • Arrival / departure pattern • Season • Rooms to meeting space ratio • Meeting lead time • Group food and beverage • Group history • Potential incremental revenue • Contract components All hotels have different “best answers” for each of these parameters. For example, is your peak night pattern (e.g. Monday-Friday or Friday-Sunday) compatible with the hotel’s desired group arrival/departure? Pattern selling is the cornerstone of hotel revenue management, and every hotel, whether big, small, chain or independent, has desired patterns for all market segments. Flex- ibility to shift your dates/pattern can be the difference in securing a first option and can drive the rates, too. Analyze your Request for Proposal Details Before you negotiate with the hotel for your meeting, look at your RFP from the hotelier’s perspective and determine where you can be flexible, and where you have leverage to use. • Meeting and event space - Calculate your total space needs for each meeting and heaviest day usage. What percentage of the hotel’s total space are you requesting? What other groups are con- tracted over your preferred dates? How much set up time did you ask for? Do you need 24-hour hold? Hotels use their space to sell their allotted group rooms and many use the rule of thumb “use 40% of my group room inventory and you get 40% of my meeting space” (always negotiable, of course). • What is your group food and beverage contribution? Ask the hotel what their minimum F & B expectation is and if you are projecting an increased amount, that’s leverage. Ask the hotel if they do off- site catering and if so, capture that revenue, too. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 11.
    7 BEHIND THE SCENE OF A SUCCESSFUL EVENT • Calculate your total revenue based on your overall agenda, including sleeping rooms, F&B, AV, golf, spa, etc. • Check your meeting history...what did you contract/actual results. Hoteliers do reciprocate on providing specific group pick-up and revenue data. • What is the specific season for this destination...and is this a short, medium or long-term meeting? If you have multiple date options at a hotel, ask which date gives you the most flexibility with space, rates and concessions. Negotiate a fair contract with the hotel Contracts do not have to be complicated, but they are a “must” to protect your company and to make expectations and responsibilities clear. Effective negotia- tions go beyond “dates, rates, and space,” and all hotel contract components, value added concessions, hotel fees and surcharges, and performance clauses must be part of the negotiation process. Everything, however, is negotiable. It is important to prioritize and have a specific game plan for each meeting (focus on adding value and reducing risk). Once you complete your hotel proposal and evaluation process, provide the hotel of choice with all your contract requirements and clauses. Ideally, you should create a custom hotel contract template for initial distribution. Key hotel contract negotiation strategies include: • Adjustment for published rates - If, at any time after contract sign- ing, the Hotel publishes, issues, or promotes a group room rate (for any peak night during the Meeting Dates) that is less than your group’s contracted rate, Hotel shall adjust the applicable group rate to equal such published rate. o Note: This rate adjustment does not include negotiated wholesale or corporate business travel rates, which are not publicly available. • Base attrition and cancellation damages on lost profit, not lost revenue o “Total Room Profit” = 75% times (Room Rate) o “Total F&B Profit” = 35% times (F&B Guarantee) • Attrition is the difference between the number of rooms you contract with the hotel and those you actually fill o Always include a resell clause so that any resold rooms/ space/services are credited to your meeting o Also, if attendees book rooms around your block (e.g., via travel discount websites), then these rooms are credited to your group ©2010 Certain Software, Inc. All rights protected and reserved.
  • 12.
    8 • Cancellation – damages should be based on a sliding scale, with percentages increasing as dates get closer o The ranges and percentages listed in Table 1 are examples; the contract should specify dates and amounts based on the actual meeting date and total amount Table 1. Sample sliding scale for meeting cancellation fees Date Group Cancels: Cancellation Fee: From signature to 180 days prior to 25% of Total Room Profit arrival 179 days – 90 days prior to arrival 50% of Total Room Profit 89 days – 30 days prior to arrival 75% of Total Room Profit 29 days or less prior to arrival 100% of Total Room Profit + 35% of F&B minimum • Reduce or eliminate hotel fees and surcharges, for example o Resort fee o Early departure fee o Parking o Health Club o Maid / Bellman o F&B surcharges o Telephone / Internet access o Meeting room set-up • Ask for complimentary meeting & event space based on 80% guest room pick-up (no sliding scale fees). No meeting space changes without written approval by group • Concessions - Everything is negotiable, but prioritize what you “must have” or would “like to have” based on the specific needs and value of each meeting • Force Majeure/Termination - Based on circumstances out of the control of either party, identify specific terms and conditions, which allow either party to cancel the meeting without financial responsibilities. (Including anything that makes it impractical, illegal or impossible to perform) • In the event of performance damages, apply a credit for some or all damages to a future meeting • Breach by hotel - specify financial responsibilities if the hotel can- cels the group (other than Force Majeure). Hotel is liable to group for all damages, direct and indirect, including expense to resched- ule, increased room rates and F & B, administration and operation, legal fees, printing/marketing costs ©2010 Certain Software, Inc. All rights protected and reserved.
  • 13.
    9 BEHIND THE SCENE OF A SUCCESSFUL EVENT • Construction and remodeling – allow none over specific meeting dates • In addition to addressing all hotel performance clauses to assure accountability and a clear path to dispute resolution, it is impor- tant to define responsibilities for indemnification (make mutual), arbitration, add insurance and successors and assigns. If you have a legal department or representative, be sure to get their opinion on specific language to incorporate. Hotel Audit Process In the event of attrition or cancellation damages, conduct a room audit and include: • Request a hotel sleeping room inventory/occupancy report by night • Verify how many rooms were resold (individual or group), regard- less of the room rate • Verify how many rooms, by night, were out of service due to reno- vation or repair • If attendees make their own hotel reservations (vs. rooms on master), provide the hotel with an electronic registration list so they can cross reference against all in-house guests over the meeting dates • Capture any pre- or post-room nights Contract Tips - Plan and “Think Before You Ink” No meeting planner signs a hotel contract with the expectation that they will pay performance damages, but it is important that planners be prepared in the event “things change” and that they have a clear path to work with the hotel to mitigate damages and minimize risk. • All hotel contracts are negotiable (plan and prioritize before you negotiate) • A thorough and well designed contract is essential for a successful meeting • Stay away from vague phrases such as “ample”, “reasonable”, “to be assigned”, “appropriate”, etc. • All meeting and event space to be assigned by day (if a hotel will not assign specific space, they are not considered a candidate) • There is no contract until both parties have signed the document ©2010 Certain Software, Inc. All rights protected and reserved.
  • 14.
    10 • Written changes on the contract with date and initials repre- sent a counteroffer • Discuss areas of dispute and counter offers in an open and honest manner • Negotiate an option date to sign and return the contract • Do not rush into signing a contract if you do not understand or agree with its content Meetings are big investments and when planners carefully evaluate each meet- ing, understand their leverage and flexibility, and have a negotiations plan; clearly they will add more value and ROI to their organization (and greatly reduce risk). ©2010 Certain Software, Inc. All rights protected and reserved.
  • 15.
    11 BEHIND THESCENE OF A SUCCESSFUL EVENT Virtual Meetings A successful virtual meeting will save travel time and costs, but still requires careful planning, production, and execution. In general, a virtual meeting may be the best value if: • The attendees are geographically dispersed, but know one another well from past experience • The content to deliver is brief and centered on a single topic • Or, the meeting is a short introduction used to determine if further discussions and face-to-face meetings are justified Telepresence brings dispersed groups together quickly Modern telepresence meetings offer a hybrid face-to-face and virtual format. Typically, several people gather in one location and connect via high-definition video and voice conference to groups in one or more other locations. These high quality conference systems are expensive, so most telepresence meetings are held in offices, hotels, or restaurants that have the technology available. For example, a major pharmaceutical company arranged simultaneous din- ners in restaurants in 50 cities, where physicians attended to hear a world-class scientific seminar delivered via telepresence from the New Jersey headquarters. Figure 2. Teliris VirtuaLive Telepresence System. Image from www.teliris.com ©2010 Certain Software, Inc. All rights protected and reserved.
  • 16.
    12 Webinars deliver targetedcontent to an interested audience Web-based meetings allow participants to view a shared presentation or desk- top from their Web browser, in conjunction with a voice conference. Short team meetings among dispersed colleagues can be successful with little forethought; however, you must carefully plan a successful Webinar with professional speak- ers and a diverse audience who is not required to attend. Professional Webinars start at least 15 minutes prior to the scheduled time, and require: • A moderator to manage the meeting, and occasionally serve as another voice to engage the speaker in a conversation • Speakers experienced with the Web-based meeting platform • Participants should be instructed to ask questions via text chat, instead of directly to the speaker • The moderator or an assistant should continually monitor and compile incoming questions, and present them to the speakers for response • Back-up plans for faulty phone lines, Internet connections, computers • A call to action following the meeting Figure 3. Webex meeting room. See Table 2 for a partial list of popular Web-based meeting platforms. Table 2. Partial list of popular Web-based meeting platforms Vendor Web Site Adobe Acrobat Connect www.adobe.com/products/acrobatconnect/ Cisco Webex www.webex.com Citrix GoToMeeting www.gotomeeting.com Microsoft Office Live Meeting office.microsoft.com/en-us/livemeeting/ FX101729061033.aspx ©2010 Certain Software, Inc. All rights protected and reserved.
  • 17.
    13 BEHIND THESCENE OF A SUCCESSFUL EVENT Virtual Events precede, extend, or replace face-to-face events A Virtual Event allows attendees to participate from their personal computer in a theme-based combination of Webinars, voice and text chat, video on-de- mand, and virtual exhibit halls. You should expect a successful Virtual Event to have similar costs for meeting space (i.e., the Virtual Event software platform), production, and pre-event management when compared to a face-to-face event of equivalent size. Virtual events, however, will not have travel, housing, or food & beverage costs; additionally, planners and participants save the travel time associated with a face-to-face event. Accordingly, most Virtual Events have lower registration fees, sponsorships, and exhibition fees than their face- to-face counterparts. A Virtual Event works well in conjunction with a face-to-face event (as an online extension of the live event), or in complement with one (e.g., a Spring Virtual Event can build on the audience from a Fall annual conference). Hewlitt-Pack- ard has used Virtual Events for product marketing kick-offs with their global reseller network, while College Week Live is a good example of a Virtual Event designed to quickly review multiple options in order to narrow down selections for later in-person meetings. Figure 4. On24 Virtual Event convention lobby. See Table 2 for a partial list of popular Virtual Event platforms. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 18.
    14 Table 2. Partiallist of popular Web-based meeting platforms Vendor Web Site 6Connex www.6connex.com Expos2 www.expos2.com InfoNeedle www.infoneedle.com InXpo www.inxpo.com On24 www.On24.com Unisfair www.Unisfair.com VirtualEvents365 www.cgsinc.com/solutions/virtualev- ents365.html ©2010 Certain Software, Inc. All rights protected and reserved.
  • 19.
    15 BEHIND THESCENE OF A SUCCESSFUL EVENT Marketing Your Event All events need to communicate with their desired attendees; however, event attendance falls into three broad categories: • Mandatory – invitees must attend the event, although they may have a choice of dates and/or locations (employee training) • Sponsored – invitees don’t have to attend, but the experience is highly desirable (incentive travel programs, sponsored buyer shows) • Optional – attendees must choose the event over everything else competing for their time and money (trade shows, conferences) The optimum marketing strategy for your event ranges from informational to promotional, depending on which category fits your intended audience. The Event Web Site The Web site is the foundation of most event marketing campaigns. At a mini- mum, the Web site needs to answer these basic questions: • What is the event about? (name, content, and agenda) • When are the dates and times of the event and related meetings? • Where is the event’s location and venue? • Who should attend this event? • How can one attend? (include invitation and fee requirements) The event Web site may be a single page listing the event name, dates, location, audience, and agenda, or it may be a series of Web sites with multiple tabs and highly interactive content. Be sure that the What/When/Where information is visible on the top of every page. Figure 5. Sample event Web site with basic information ©2010 Certain Software, Inc. All rights protected and reserved.
  • 20.
    16 Design the appropriate“Look & Feel” for your event An attractive Web site is part art, and part personal preference. Nevertheless, you can give your attendees a successful experience by following these guide- lines: • Consistent – the colors, graphics, fonts, page header and footer should be consistent across every page of the event Web site, and they should match the Web site of the event’s host organization. Jumping between one “look & feel” for the organization, another for the event, and a third for the registration process will confuse, annoy, or scare some of your audience • Clean – use a single font with a small number of sizes and colors for all pages. Avoid use of moving images, especially on pages that will be viewed often • Concise – if a page has one section, then 100% of the reader’s attention will be focused on that area. Each additional word, form field, section, image, hyperlink, etc. competes for the reader’s focus • Edit, re-edit, then edit again – the Web does not excuse your eighth grade grammar lessons. Review your content multiple times and from the viewpoint of other people Decide what content to place online In addition to the basic information, an event Web site should contain the in- formation your audience needs to achieve success before, during, and after the event. Think about what your audience needs to know, and then provide it. • How do I get to the event? What are the cheapest travel options? • Can I confirm, cancel, or modify my registration and travel? • Who should I meet at the event? • What will I do, and what do I need to wear? As the event gets closer, attendees may ask for things you never considered during your planning. When reasonable, put this information in a Frequently Asked Questions (FAQs) area so that others may benefit from the knowledge. Some events have multiple audiences, e.g. attendees, exhibitors, and speakers. Consider having separate Web sites or separate areas in the event Web site for each audience, where you can place content of specific interest to that group. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 21.
    17 BEHIND THESCENE OF A SUCCESSFUL EVENT E-mail Marketing and Event Invitations The host and planner must draw attention to the event in order to generate the audience needed for a successful event. Before the event, much of this at- tention will direct attendees to the event Web site; however, in order to have a successful Web site the audience needs to be drawn to it. Different events will use a combination of marketing campaigns, including mailed invitations, advertising (print, radio, TV, and Web), phone campaigns, etc. Who to send invitations and announcements to The appropriate marketing campaign must consider the nature of the event’s audience: • Repeat attendees – is this an annual or recurring event, and most of the invitees have attended a previous event recently? • Existing organization – will most of the audience belong to an established group, e.g. association, company (employees or customers), community, etc.? • Recruiting focus – is one goal of the event to recruit new individuals to attend and perhaps join the established group? The optimum marketing strategy for your event ranges from informational to promotional, depending on which category fits your intended audience. In all situations, event invitations should have an “Opt-out” option to remove the recipient from your mailing list. Event marketing processes should be able to track and separate the following groups of recipients: • Opt-out – want to be removed from future mailings • Undeliverable – addresses are invalid (bounce-back) • Views – looked at the message (address is valid, but no response) • Click-throughs – took action from the message to view the Website • Partial registrations – began the registration process but stopped • Registrations – complete registrations who intend to attend the event • Attendee – attended the event (or a previous event) As the event marketing campaign proceeds, each new message should target only individuals who remain in the intended group. For example, do not re- send an invitation to registered attendees; this will confuse them and produce questions and more work. An email list “gets old” rapidly, typically 20% or more each year. Invest the time to remove opt-outs (this is the law), investigate and update undeliverables, and find new prospects to invite. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 22.
    18 Event Notification Schedule Eventshave widely varying timelines; however, below is a general schedule. Date (Before Notification and Purpose Event) One Year Save-the-Date Send an advance notice to attendees immediately after the previous year’s event, or as soon as you know dates and location of the new event. The event Web site should have at least a placeholder page Six months Event Web Site Open Fill the event’s Web site with appropriate content (speakers, agenda, travel options, etc.) and place it live as soon as possible. Once the Web site is ready, send a notice to previous and required attendees. 3-6 months Event invitation (Registration open) Send a short, targeted message to each group of invitees. Registration should be open before sending the invitation, so that the attendee can respond to the call to action. 1-3 months Alternate invitations For optional attendees, send different messages and offers if the origi- nal invitation did not lead to action. Do not spam or re-send the same message repeatedly. 1 month Registration and Travel Reminder Send short reminders to attendees who haven’t completed their required information. Travel should be booked before room blocks fill or are released and airfare rises (typically 21 days’ prior to travel). 3 weeks Event Reminder Send a “Get Ready” message to attendees with any new updates. 1 week See you at the Event Just before staff departs for the event, send a final message to at- tendees. This serves as a final reminder for the event, and will trigger last-minute questions from attendees while the staff is still in the office and may be able to resolve issues more easily. 0 days Daily event update Each morning during the event, send a newsletter to attendees with an overview of the coming day and highlights from the previous day ©2010 Certain Software, Inc. All rights protected and reserved.
  • 23.
    19 BEHIND THESCENE OF A SUCCESSFUL EVENT Online Registration The goal of the event Web site and marketing campaigns is to lead invitees to attend the event. The registration process allows planners to manage the resulting flood of information. Pre-Registration A good registration process captures attendee data early and accurately; this allows planners to forecast budgets and make changes to the event before ma- jor expenses incur. Conversely, late and inaccurate information results in long hours, unhappy attendees, poor attendance, unused food, empty rooms, and wasteful expenses. Design your registration form Hyperlinks and tabs allow readers to navigate between multiple areas of the event Web site and quickly find the information they need. Registration pro- cesses, however, should be linear - attendees need a simple path from start to finish, or they are likely to become confused, make mistakes, and abandon the registration. Key design points to consider include: • Minimum instructions – if the form requires paragraphs of expla- nations, it is doomed because people don’t read them. Use tool- tips, hints, and plain-English error messages to guide registrants • Straightforward – once the registration process begins, reduce or eliminate navigation options. The best process is to complete one form, then submit and move on to the next page • Reduce the data collected – only collect the minimum data re- quired for each individual. For example, if your company’s fax ma- chine broke three years ago and wasn’t replaced, then don’t col- lect fax number. If the attendee picks golf over tennis, then collect and require questions about club rentals and tee times, but skip follow-up fields intended for tennis players • Review, Verify, Pay, and Confirm – registration processes may need one page or ten, but they all should end with a review of the data entered, an option to edit that information, a final checkout (and payment, if applicable) page, and a printable and email confirmation Planners sometimes spend days or weeks designing their event Web site and registration process, but forget that an attendee will consider the effort a waste if they spend more than five minutes learning about the event and registering to attend. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 24.
    20 Create different formsfor different purposes Some events are complex. Exhibitors, speakers, staff, sponsors, and various groups of attendees may all need to provide vastly different types and amounts of information to the event planner. The result can be a very complex registra- tion process, or it could be a number of fairly simple but specialized processes. It is always better to choose multiple simple registration forms. This will im- prove the front-end experience for both registrant and planner, however, don’t forget that all of the information from multiple registration processes should end up in one event database. • Share inventory – if the event has physical limitations, e.g. number of hotel rooms, seats in sessions, or ticketed activities, then this inventory must be shared (in real-time) among all registration pro- cesses. Otherwise the planner must maintain separate inventory for each group, and will likely undersell or oversell some items • Dual-role attendees – a speaker may also be an exhibitor or at- tendee. Make it clear where they should register, keep information for both of their roles, and watch out for duplicate registrations • Guide people – people may not see themselves in the same “clas- sification” that the planner puts them into. Guide them to the correct form with plain-English labels, and provide links or a way to change forms if they selected the wrong process initially Register guests and groups at the same time If your event allows attendees to bring guests or groups of attendees, then let these people register together. There are two ways to handle this: • “Guests” – people who travel with the attendee and may attend parts of the event, but they would not attend the event without the attendee. • “Colleagues” – people (co-workers, employees, etc.) who are full equals as attendees, but prefer to register together for conve- nience or group benefits. In general, the registration and reporting process should track guests as part of the attendee’s registration record, while colleagues each receive a separate registration record, unique identifier, and confirmation. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 25.
    21 BEHIND THESCENE OF A SUCCESSFUL EVENT Housing Management Hotel rooms are typically two-thirds of the total meeting costs for overnight face-to-face events. For most events, the hotel contract represents both the greatest risk and best opportunity for cost control. Let the hotel sell their rooms, when appropriate With small meetings or events where your attendees are paying for their rooms, the easiest solution may be to use the hotel’s group reservations Web site for hotel reservations. In this case, be sure that your event Web site and registration form are integrated with the hotel reservation form (via hyperlinks and custom messaging), and ask for report-level access to the hotel’s group res- ervation system so that you can keep track of who has made room reservations and compare that to your attendance list. Manage your hotel block to reduce attrition If you have signed a contract committing to a large number of rooms, then of- ten the best way to handle the risk of filling those rooms is to manage the room reservation process yourself. • Make housing reservations part of the event registration process • Offer a registration discount to attendees staying in event hotel • Monitor public rates and re-negotiate your group rates if published rates drop below them (www.hotels.com, etc.) • During on-site check-in, ask people if they are staying at a local hotel and, if so, which one. Then compare to your registration list • Ask hotels for their guest list and compare to your attendance list to see which event attendees booked around the block. Figure 5. Sample event Web site with basic information (Passkey) ©2010 Certain Software, Inc. All rights protected and reserved.
  • 26.
    22 Match roommates withoutcreating a big mess Putting two people in one room can save about half of your event’s housing costs, which could amount to a 1/3 savings overall for the event, and signifi- cantly reduce your event carbon footprint. This isn’t for everyone, but can be a valuable part of some event experiences: • Under-18 audiences – place 2-4 children per room or 1 adult and two kids • adults – “New hire” orientation events may intentionally Young pair people from different offices and regions in order to encour- age interaction among attendees who might otherwise stay apart • Employee-only events – if the company is paying the bill, then it has more justification to enforce room-sharing While sharing rooms can save money, it can create logistic headaches if not managed carefully. Some things to watch out for include: • Roommate requests – can people request roommates by name, and what is the policy for the selected person to approve the request Matching criteria – typically gender and smoking preference are • used as matching criteria, but arrival/departure dates and demo- graphic information may also be relevant • Handling exceptions – the roommate policy needs to be flexible, for example, with two married employees or those with special needs Work with your hotel representative to prevent surprises The event planner should work with the host and hotel representative in order to keep everyone informed of pre-registration progress as the event date gets closer. • Deliver reports to the host and hotel on time, as stated in contracts • Encourage early registration (via discounts, reminder emails, con- tests) in order to gauge your room pickup early enough to release rooms without penalty or add them as needed • Compare pre-registration to previous years’ events – if your au- dience is similar, then their registration habits will typically follow patterns that indicate if the event will have more or fewer attend- ees than in the past • Don’t take no for an answer – registration companies must be able to give you lists before the hotels need them, and hotels must be able to give you reports to cross-check for mistakes. Repeated delays and missed deadlines indicate larger problems ©2010 Certain Software, Inc. All rights protected and reserved.
  • 27.
    23 BEHIND THESCENE OF A SUCCESSFUL EVENT Payment Processing Collecting fees from attendees or exhibitors can be a good way to cover the costs of an event; however, payment processing adds another area for the event planner to manage. The event registration process should offer payment options appropriate to the type of event and expectations of the audience, such as: • Credit cards • Debit / ACH / e-Checking • Check by mail • Purchase order / invoice • Payment plans • Other methods – Paypal, Bill Me Later, etc. Handle payments securely every time Regardless of the payment method, financial transactions involve the exchange of sensitive information between the attendee and event. Planners must ensure that privacy safeguards and data security of the payment process meet local laws and regulations. Events are fraud targets, and the loss of credit card numbers or other financial information can be embarrassing or disastrous to an event. Key points to consider include: • Never email credit card or bank information – if a hotel needs credit card guarantees from attendees, have them collect the information in their secure system. Alternately, pass financial in- formation via a hyperlink to a secure, password-protected report- contracts • store credit card numbers – use systems where the credit Don’t card or bank information is only used during the original payment transaction. If data is not stored on your system, it cannot be stolen • Encrypt secure information – when you have to store secure infor- mation, be sure that it is both encrypted and access-controlled • Control access – secure access to data using unique logins, pass- words, and employee background and credit checks PCI - accept credit cards online, without headaches Fortunately for event planners, many technology vendors offer registration sys- tems with integrated credit card processing that is compliant with the Payment Card Industry Data Security Standards (PCI DSS). Look for “PCI Level 1 Compli- ance” with your vendor, and periodically review their required annual audit report to make sure you can rest easy. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 28.
    24 Reports, Reports, Reports Whilean event is typically a physical experience, the event planning process is closer to an assembly line of information. Throughout the weeks leading up to the event, the planner compiles more and more information from the host, suppliers, speakers, hotels, attendees, etc. Before the event can succeed, the planner must compile this mass of information and distribute it to the people who need it. Thus, prior to the event itself, reports are the main output of the planning process. Standard reports and custom reports Several organizations have compiled “standard” reports for event planners; for example, see the Accepted Practices Exchange of the Convention Industry Council (www.conventionindustry.org/apex/). While most events use the same basic reports, each event typically requires some changes to the format. Although no true standard exists, common reports include: • Attendee List – list of attendees with contact and demographic information, separated by attendee type • Block Pickup – summary of number of rooms reserved for Room each hotel, room types, and nights as a percentage of the contract- ed number of room-nights • Hotel Rooming List – list of attendees staying at each hotel, with arrival, departure, room type, special needs, and other housing data • Arrival & Departure Manifest – list of attendees organized by their arrival (or departure) time at the event location (to allow ground transportation and hotels to avoid bottlenecks with large groups) • Travel Itinerary – detailed list of attendees travel information from their departure point to their destination at the event. Typically used for VIPs and speakers to make sure planners know where key people are when travel delays occur. • Session Attendance – basic list of attendees who have pre-regis- tered for breakout sessions (by topic, time, and room) • Payment Reconciliation – daily summary of payments and refunds by payment method, used to compare totals to bank account statements for financial reconciliation • Budget – detailed summary of event revenue and expenses by category, comparing actual to budgeted numbers • Cost Savings – report outlining cost savings realized during the event planning process, when compared to the original proposal or a baseline average ©2010 Certain Software, Inc. All rights protected and reserved.
  • 29.
    25 BEHIND THESCENE OF A SUCCESSFUL EVENT “Changes” reports: Communicating with suppliers Events have multiple suppliers (hotels, ground transportation, tour operators, food service, etc.) who need pre-registration information in order to plan their services. A planner typically sends registration data to suppliers weeks to months before the event, however, many changes occur after the initial report as the host or attendees make additions, changes, and cancellations to the original plans. Thus, event planners rely on “Changes” reports to update their suppliers with the new information, without having to repeatedly send the complete registration data. “Changes reports” have multiple formats, but they should include: • A header with basic event information – most suppliers work on multiple events simultaneously, so be sure the event name, date, location, and contact are prominent in the report • Columns with all relevant information the supplier needs • Sections for Additions (new records), Modifications (changed records), and Cancellations (records removed) • Modifications should highlight the fields that changed using color, font, and text; reports are often copied and faxed thus color and bold can be unreliable indicators of changes Changes reports apply to a range of dates, typically from the date the last report was delivered to the current date. Mistakes occur, however, so be sure that you can re-run reports from earlier periods or simply run the original report again to reset the changes. Figure 7. Sample “Hotel Changes Report” with Additions, Modifications, and Cancel- ©2010 Certain Software, Inc. All rights protected and reserved.
  • 30.
    26 On-Site at YourEvent: Registration and Check-in Christina Rasco Adams and Jeff Rasco, CMP, Attendee Management, Inc. Onsite registration is certainly not rocket science, but it is the first impression your attendees have of the actual event. And like the cliché goes, you never get a second chance to make a first impression. As with the rest of your event, check-in requires planning and attention to detail. Before You Go Onsite registration is highly variable depending on the size and type of event you are handling. The key part in planning for check-in procedures is evaluating the numbers and needs of your attendees. A few key points to address early in the planning process to prepare for onsite include: • How many attendees? • What equipment is needed? • What materials will be supplied to attendees upon check-in? • What purpose will your Reg Desk serve? Numbers The total number of attendees will dictate your equipment and staffing needs for onsite, so it is important to have a ballpark figure early on to help plan. Smaller events may just need a couple of draped tables and chairs, while a large event may require a number of registration stations. Note where the registration area is and whether the venue contains a built in registration area for your use, and if so, what is included. With so much activity going on at the event, registration desk staffing is often overlooked. Consider the hours that the desk will be open, and plan for who will man the desk during those times. If manpower is an issue when the event team is busy with other tasks, then outsourcing onsite support is a very valuable option. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 31.
    27 BEHIND THESCENE OF A SUCCESSFUL EVENT Badges Name badges are not only a way to convey attendees’ names, but they also identify different attendee types and verify that participants are registered. There are a number of techniques for producing name badges. Registration software often includes a badge printing component that helps layout and generate a printer-ready document, or spreadsheets can be merged into a label document. Several vendors specialize in supplying everything you need for badge printing – perforated cardstock, badge holders, and lanyards. In addition, some companies will handle all your badging needs from designing and printing to stuffing and shipping. Badge reprints are inevitable once onsite, so whatever printing option you choose, plan to have a quick way to recreate and reprint the badge onsite. One of the simplest options is to pre-print badge stock and prepare a black-and- white template for the actual badge information. When a reprint is needed onsite, simply update the contact information in the template. Registration Packets In addition to badges, many events give the attendees a registration packet upon check in. This packet typically includes the conference agenda and other general event information, such as a location map, speaker and session descriptions, an area for notes, etc. Sponsor information and giveaways are often included in the packet. Equipment Many pieces make up the registration area. The checklist below covers some of the items needed at nearly every registration desk. • Tables/booths • Chairs • Badges and packets • Extra badge stock for reprints • Computer • Printer • Internet • Location map • Conference agenda • Phone and/or radio for contact with other event staff • Pens and paper • Storage ©2010 Certain Software, Inc. All rights protected and reserved.
  • 32.
    28 On-Site Setting Up The typesof attendees and the total number play an important role in deter- mining how the registration area should be set up. Your goal should always be an efficient check-in process with minimal lines. Staff may include registrars for pre-registered attendee check-in, helpers for on-site registrations, cashiers, VIP check-in staff, greeter/information desk, and support for exhibitors and sponsors. At least one senior registration manager should have no direct desk assignment, but be available to troubleshoot and keep the process moving along. Staff numbers depend entirely on the number of attendees and difficulty in the registration process. Your tradeshow may allow for many onsite registrations, so the ratio of staff to attendees may be 1:50 or lower. If most attendees pre- registered, 1:150 or so could be perfectly adequate. Your event history is the best guide to providing staff, but if in doubt, don’t skimp on personnel. Possible staffing sources include your meeting management team, administrative assistants, vol- unteers, and the CVB. The physical set-up re- lies on the facility, at- tendee numbers, and oftentimes budget. As mentioned, you may be at tables, supplied registration booths, or a built-in desk. Based on your numbers, you may choose a simple line or serpentine ap- proach, or it may be advantageous to split the group in alpha- betical segments (A- D, E-H, etc.) to speed things along. If it helps to keep things organized, work with the facility or your vendor to supply ropes and stanchions or other methods to keep people moving in the right directions. And don’t forget proper directional signage. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 33.
    29 BEHIND THESCENE OF A SUCCESSFUL EVENT Prepping Staff A successful registration process demands making registration desk staff prepa- ration a priority. The prep session should cover: • What each attendee receives upon check in (badge, packet, etc.) • What information to convey to each attendee and attendee type • A basic understanding of the venue and location of meeting rooms • Procedures for handling badge reprints, walk up registrations, and emergency or security situations • How and when to contact other members of the event team Covering every possible situation or question that the registration staff may en- counter is impossible and not necessary, but providing the team with the tools to help the attendee is crucial. Handheld radios, cell phones, and text messaging are lifelines for the registration staff. Since the planning team is often working behind the scenes, the registration staff represents the entire event team and should understand the weight of this re- sponsibility. The registration area can get stressful at times, and your registration team will feel it. Never underestimate the power of a good attitude and a smile. Meet Me at the Reg Desk The Registration Desk often becomes the information center of the event. It’s one of the first places attendees stop when they arrive, and it can continue to be a place to meet up with other attendees, find out where a meeting room is, and get other general information. Establishing the hours of the registration desk and including them in the conference agenda will help attendees know when this support will be available. As the first face of the event, registration is a great place to relay the feeling and theme. For instance, if going green is an important theme of the conference, make sure that registration reflects this. Take advantage of the area to exhibit the event or organization branding, promote special conference events, or recognize sponsors. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 34.
    30 Technology and Check-in We’vecome a long way since the days of sorting through index card catalogs to find attendees and welcome them to our events. With powerful automated reg- istration systems in place, most information is a click away, even on site. With a basic Internet connection at the event venue, you can access your com- plete registration database with your on- line system, such as Certain Meetings. You may also opt for a server-based network, if going online is an issue. With onsite reg- istration kiosks, attendees can self-regis- ter directly in the system, pay their fees, and be queued up for their name badge and tickets. Pre-registered attendees can check themselves in by entering their reg- istration code or scanning a bar code. Onsite technology can really work to speed up the check-in process and save money on staff, postage and shipping, especially with larger meetings. With the addition of on-demand printers for badges and tickets, advance mailings of those materi- als are unnecessary. Because attendees simply check in at computer kiosks, and have their badges, tickets, and other credentials automatically printed, there is less need for staff to assist. It also reduces or eliminates the need for pre-event “stuffing parties” and shipping badges to the event venue. Digitized information is also transforming another manual process in registration – the information packet. More and more, printed materials are giving way to handouts provided in USB flash drives, CD/DVD format, or online. At worst, at- tendees look up the materials they need and print on demand at stations placed conveniently throughout the venue. Registration truly makes the first impression on your attendees, and technology has made a lasting impression on the registration and check-in processes. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 35.
    31 BEHIND THESCENE OF A SUCCESSFUL EVENT After Your Event Ends The day an event ends successfully, most planners want to either hit the bar or their bed. The next day, however, the professional meeting planner knows that the end of the last event is only the start of the next event. The planner and host should reserve time immediately after the event to review what worked, what didn’t work, and where to make improvements. Closing Out Your Event The first post-event task is to close out the event. This includes: •• Update the registration database with on-site changes, and mark pre- registrants who did not attend as “no-show” •• If the event did not meet its hotel commitment, then compare the hotel guest list to the attendee list to make sure your event gets credit for all attendees •• Compile all event invoices, and remind suppliers of deadlines to submit invoices not yet received •• Review invoices for errors, and submit for payment •• Update the event budget with the actual payment amounts, and calcu- late the variance between actual and budget or expected amounts •• Conduct surveys of key team members (host, speakers, planners, sup- pliers) to evaluate each others’ performance and make suggestions for improvement •• Compile attendee surveys, and distribute results to relevant parties (speakers, suppliers, etc.) What to Keep At a minimum, the planner should keep track of high-level financial and registra- tion details for three years, in order to use in annual event consolidation reports and preparations for future events. This includes: •• Basic event details – Name, dates, locations, agenda, number of attendees •• Signed contracts – in case of future audits or dispute •• Actual expenses by major category (Housing, Food & Beverage, Audio/ Visual & Production, Meeting Space, Travel, Registration) ©2010 Certain Software, Inc. All rights protected and reserved.
  • 36.
    32 • Actual registration numbers by attendee type and revenue • Registration and attendance proof for sessions granting Continuing Education Credits (some CE programs require this information to be archived for 7 years minimum) What to throw away Keeping everything from old events is almost as bad as keeping nothing, since important information becomes lost in the flood of the irrelevant and stor- age costs spiral upward. Each planner should determine a data deletion plan based on their organization’s applicable laws and regulations. Periodically (quarterly or annually) set aside time to “clean house” and remove irrelevant paperwork and data. Prepare for the Next Event Repeat events will have new dates, locations, speakers, attendees, and chal- lenges. A professional event planner can improve productivity and chances for success by constantly improving the planning process they follow. • Update the workflow used for the event with new “best practices” and lessons learned • Make a copy of the old event web site and registration form and set it up as a place holder for the next event, with a simple “Get Ready” message with any information known for the next year’s event • Review past supplier performance and consider adding or changing preferred suppliers in order to drive more business to the best ones • Use consolidated event spend information to negotiate discounts and better rates with preferred suppliers ©2010 Certain Software, Inc. All rights protected and reserved.
  • 37.
    33 BEHIND THESCENE OF A SUCCESSFUL EVENT Strategic Meetings Management Programs (SMMP) Large organizations sign hundreds of contracts that together commit huge sums for meetings and events, without adequate controls on risk management or measuring value obtained for the money. Accordingly, a well-designed Strategic Meetings Management Program (SMMP) should be part of any enterprise travel and expense control system. How to Get Started SMMP attempts to impose central controls on a geographically disperse and highly variable behavior – planning meetings and events of different size, com- plexity, and purpose. Some SMMP implementations fail because the problem is too big to tackle all at once and management patience expires before the pro- gram becomes demonstrably effective. It is critical to establish goals, priorities, milestones, and expectations throughout the SMMP implementation process, which typically requires at least two to three years to establish within a large enterprise. • How big is the problem? o Establish an area on the company Intranet for meetings, and post a page explaining the initial SMMP goals, new policy re- quirements, and a Meeting Request Form o Require all events over 10 people or $10,000 to be registered and receive a unique Meeting Id o Do not yet implement a formal review/approval process – at this point simply register events (even if they were in the past) and collect basic information • Control your risk immediately o Work with your legal department to create a standard contract template for meetings and post this on your SMMP Intranet o An advanced SMM program has pre-negotiated contracts with major hotel chains and a process specifying required and op- tional clauses for non-standard contract negotiation o If practical, SMMP meeting professionals should review all non-standard event contracts, otherwise at least post an stan- dard contract with explanation of key clauses so that part-time meeting planners know what to watch out for o Store meeting contracts in a central location and associate each contract with its Meeting (by unique Id) ©2010 Certain Software, Inc. All rights protected and reserved.
  • 38.
    34 Begin the StandardizationProcess Once each meeting has a unique Id and all contracts are in a central location where a meeting professional can review their risks, your organization is ready to begin standardizing meeting management processes. • Centralize payment by Meeting Id o The best way to enforce meeting registration is to implement a policy that event-related expenses are not paid without a Meeting Id – be forgiving at first and allow registration of the meeting even after it is over, while educating the event host for next time o Alternately, you may require event charge codes for every meeting Id o Require employees to use the Meeting Id or Charge Code for event-related expenses, e.g. travel reservations, travel ex- pense reimbursements, meeting expenses, etc. o If practical, consider using a meeting charge card, at least for smaller purchases. Otherwise, track payment by broad cat- egories such as housing, food & beverage, travel, registration, audio/visual production, and meeting space • Standardize client-facing tools o Most employees’ pre-event experience is limited to the event Web site and registration process o If your central Attendee Management tool has major faults, then the ultimate clients (attendees) will lose faith in the value of the entire SMM program o Custom-brand your event web sites, registration forms, and email marketing within your Intranet to make the pre-event experience seamless and fast for attendees • Set up a Request & Approval process o After the event host completes a meeting request, it should route to the appropriate budget manager for approval o Some systems create automated budget estimates for “not- to-exceed” approval limits, while others require at least one response from a qualifying facility (hotel, etc.) before approval ©2010 Certain Software, Inc. All rights protected and reserved.
  • 39.
    35 BEHIND THESCENE OF A SUCCESSFUL EVENT Organizing site selection for SMM Programs Organizations have different requirements for selecting the event location and facility. Single-source proposals are appropriate in some cases, such as when events occur in the same location year-after-year, one facility is obviously more convenient for the majority of attendees, or a repeating event rotates among a fixed number of properties. In other cases, organizational rules or laws (e.g., Sarbanes-Oxley) require the meeting planner to consider multiple facilities and obtain at least 3 proposals from qualified vendors. The site selection process was discussed previously for a single event; additional considerations for a SMM program include: • Centralize the site selection and RFP process – use a single system and workflow to create an RFP, select potential vendors to receive the RFP, collect responses from vendors, narrow the options, conduct site in- spections, negotiate with the selected facility, and prepare a contract with appropriate clauses for the event • Customize the site selection process to your organization’s specific needs, and allow further customization for each event’s unique require- ments • Use an extensive supplier database, and load it with your organization’s sales contacts, preferred suppliers, and past events • Track credits from cancelled meetings, volume discounts, promotions, etc. and consider these during the RFP process • Consolidate RFP reporting across all events – show suppliers (by chain, brand, and property) not only how much you spent with them each year, but also how many opportunities (RFPs) you offered them, and how often they bid, declined, or didn’t respond. Include their RFP re- sponse time in comparison to their competitors • Prepare Cost Savings Reports - Most cost savings in the event planning process occur during site selection and contract negotiation. Keep track of those savings by event and in aggregate ©2010 Certain Software, Inc. All rights protected and reserved.
  • 40.
    36 Complete SMMP Project managementand creation of a detailed Event Specification Guide (ESG) with a detailed budget are the central daily tasks of many meeting professionals. In the context of SMMP, however, we consolidate these processes only after con- trolling meeting registration, contracts, bill payments, attendee management, and site selection. • Project management o Define a “best practice” workflow for each process that you repeat often, with due dates relative to key milestones (e.g. the Event Start Date) and task assignment relative to roles (e.g. host, approver, planner) o Create a Master Schedule by applying the appropriate work- flow to each event, so that tasks and milestones now have spe- cific due dates and assigned persons. Remove tasks that are not applicable to the specific event o A Project Management Dashboard shows managers the prog- ress of all current events and projects, including which tasks are overdue and which are pending in the near term • Event Specification Guide (ESG) – also called “Meeting Resume” o The event specification contains all of the details about an event, for the vendor where the event will be held o It includes “Function Setup Orders” (FSOs), which include details for each meeting space and time slot. FSOs are the meeting planner’s version of hotels’ “Banquet Event Orders” (BEOs) o For example, see the Accepted Practices Exchange (APEX) standard at www.conventionindustry.org/apex The ESG contains all information that the planner and event facility share. In ad- dition, the planner should maintain a detailed budget for each event. • Event changes should reflect automatically in the budget details • Combine line item details into major spend categories, such as Housing, Travel, Food & Beverage, Audio/Visual, and Meeting Space • Consolidated budgeting reports should aggregate all expenses by event, spend category, and across multiple events over time ©2010 Certain Software, Inc. All rights protected and reserved.
  • 41.
    37 BEHIND THESCENE OF A SUCCESSFUL EVENT Embed SMMP in the Organization Only after firmly establishing commitment to SMMP in the travel, procurement, finance, and event management departments should an organization invest in systems integration. Such integration, however, is essential to streamlining SMMP and embedding it internally. Integrate internal systems Events are not a core profit center for most businesses, so most event manage- ment systems must fill a support role to other primary systems. The key systems most SMM programs integrate include: • Travel management – most corporate travel and expense (T&E) systems focus on individual (“transient”) travel, however, event-related (“group”) travel can account for 30% of total expenses and should be managed ac- cordingly • Customer Relationship Management (CRM) – for customer-facing events, the CRM application needs to know at least who was invited, who plans to attend, and who has attended past events • Human Resources (HR) – employee-facing events need to pull data from HR for registration and push data related to attendance in required events • Learning Management Systems (LMS) – many LMS applications don’t man- age physical events, however, course content, prerequisites, and Continu- ing Professional Education credits must be transferred between the event management system and LMS • Single Sign-On (SSO) – Single Sign-On allows employees, customers, etc. to sign on to a system (such as an Intranet or customer portal) once, and then have their profile information pass automatically to other systems such as event registration • Procurement – event site selection and contracting must work within the overall organizational procurement process • Accounting – event-related invoices, billing, and payments must comply with the overall organizational accounting system Automate information exchange Whenever practical, automate the exchange of event information (reports, email, status pages) with suppliers and team members. In other cases, provid- ing real-time access (via hyperlinks or system login) will allow parties who need event-related information to retrieve it when they need it. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 42.
    38 Social Networks andEvents Jordan Schwartz, CEO, Pathable Social networks have caught the imagination of meeting planners worldwide for good reason: people attend face-to-face events to network; they want to meet potential customers, vendors, employers, employees, and friends. On-line social networks facilitate that goal by providing a means for attendees to get to know each other prior to the meeting and to stay in touch afterwards. In addition, social networks can help build attendance at events through viral marketing. Viral Marketing Social networks can help get the word out about your event, at no cost beyond your time invested. Social network marketing has two important advantages over traditional marketing: • Exponential Effect: Remember that old shampoo commercial, where a woman says she told two friends about Faberge, “and they told two friends, and they told two friends…”? That’s a classic example of the ability of viral marketing to amplify a message • Trusted Source: People are more likely to listen to and trust something they hear from a friend than from a paid advertisement. Viral marketing is “advertising you can’t buy” The accessibility of viral marketing has increased dramatically with the rise of established social networks such as Facebook, LinkedIn, and Twitter, which have formalized who is a “friend” and made easy the ability to share thoughts - (and links) with them. LinkedIn LinkedIn (www.linkedin.com) is considered the most “professional” of the social networks and provides several avenues for building a viral marketing campaign. First, you can create a dedicated page on LinkedIn for your event where attend- ees indicate they are “Attending”, “Interested” or “Not Attending”. If they choose “Attending”, a message will appear in each attendee’s Feed letting their contacts know. Attendees will also be able to leave messages for one another as “Com- ments” on the page (which will also show up in their Feed). Creating an Event page on LinkedIn is free: simply sign-in with your LinkedIn ac- count, click Events from the left-hand navigation bar under Applications, then click the Add an Event tab that will appear at the top of the page. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 43.
    39 BEHIND THESCENE OF A SUCCESSFUL EVENT Figure 8. Sample event page on LinkedIn (www.linkedin.com) A second way to leverage LinkedIn’s viral marketing potential is through LinkedIn Groups (http://learn.linkedin.com/groups). LinkedIn Groups are topic-based sub- communities within the larger LinkedIn community. When people join a LinkedIn Group, they generally consent to receive messages posted to that group as e- mail, so Groups can be an effective way of getting a message out to targeted, relevant people. To get your message out to a LinkedIn Group: • Sign in or create an account if you don’t already have one • Find and join groups relevant to your event by visiting the LinkedIn Groups Directory: http://www.linkedin.com/groupsDirectory. Also, view the Groups that people involved in your event belong to. • Click “Start a Discussion” and enter your message Important: Many Groups have rules restricting advertising messages, so read any introductory messages and learn the etiquette before jumping in. Even Groups that don’t explicitly disallow advertising won’t appreciate “spam”, and you don’t want to alienate potential attendees. Be sure that you only send your message to directly relevant Groups and that you phrase your message in terms of sharing information, rather than marketing your event. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 44.
    40 Facebook Like LinkedIn, Facebook(www.facebook.com) has “Events” pages that your at- tendees can join. When they do, Facebook adds a message to their News Feed letting all their friends know they are attending, a great viral marketing mecha- nism. While Facebook generally is regarded as more “social” and “personal” to Linke- dIn’s “professional” feel, Facebook has a more active membership and a better developed News Feed feature, meaning that even for professionally-oriented events, it can be a more effective way to spread your message. Figure 9. Sample event page on Facebook (www.facebook.com) To create an event on Facebook: • Sign in or create a Facebook account if you don’t already have one. • Click in the box labeled “What’s on your mind?” • Click the “calendar page” icon showing the 31st: • Enter your event details, then click Share • Click the name of the event, then click Edit Event • Enter any additional event details (notice the options on the left) • Click Invite People to Come to inform everyone in your social network that you’ve created an event page ©2010 Certain Software, Inc. All rights protected and reserved.
  • 45.
    41 BEHIND THESCENE OF A SUCCESSFUL EVENT Twitter Twitter is a fundamentally different type of social network from LinkedIn and Facebook in that there are no “pages”, there is just your feed: a continuous list of the messages that you’ve posted to the service. Anyone who is subscribed to your feed (i.e., anyone who is “following you”, in Twitter terminology) might see your messages (or “tweets”). However, because each person sees a continuously updated list of all the tweets of everyone they follow, if someone is following many people, they may overlook some tweets as new tweets replace them in the feed. One common behavior on Twitter is to “retweet” what someone else has retweeted. This simply means that you repeat their message, preceding it with the letters “RT” (for retweet) and their Twitter name (e.g., @pathable). You can spread the word about your event on Twitter not only by tweeting it yourself, but by encouraging others to retweet your message (thus spreading it to all of their followers). Some common methods for encouraging retweeting are: • Ask your followers to retweet your message explicitly (e.g., “Registra- tion open for EventCon 2001: http://bit.ly/oiweru (please RT)” • Include Twitter-only specials or discounts in your messages • Share breaking news or new and interesting developments (e.g., high profile speakers booked) on Twitter Hint: Twitter restricts messages to 140 characters. That means that if you want someone to be able to retweet your message, it must be less than 140 characters long even after they add “RT @your_twitter_name” to the beginning! Twitter Hash Tags One way to mark tweets as being relevant to a particular topic (e.g., about an event) is to include what’s called a “hash tag” in the body of the tweet. A hash tag is simply a set of characters preceded by a hash mark, “#”. By including the hash mark, you designate that word as a key word that can be more easily searched for, and is distinguished from similar words. For example: • “I use certain software” might mean that the sender uses a particular piece of software. • “I use #Certain software” designates the word “Certain” as a special key- word, and thus more likely to reference the Certain Software service. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 46.
    42 Events typically havehash tags, as well. For example, the hash tag for South by SouthWest is #sxsw. The hash tag for MeetDifferent 2010 is #MD10 (hash tags are not case sensitive). You should choose a hash tag that is unique and relatively short (ideally less than 8 characters), so that it won’t compete with your message when keeping under the 140 character limit. Hint: to make sure your desired hash tag isn’t already in use, visit http://search. twitter.com/ and search for it. If it shows up in tweets about another topic, some- one has already claimed it for another purpose. Online Communities When it comes to making a lasting, personal connection, nothing compares to meeting someone face-to-face. Unfortunately, conference and event attendees have a limited amount of time to take advantage of this opportunity. In a crowd- ed room, most attendees must rely on luck or happenstance to bump into the “right” people in the limited time they have. Event-centric on-line communities can extend the time attendees have to net- work months prior and after an event, and can make the time they have in the same room more effective by allowing them to identify people they would like to meet before they arrive. LinkedIn, Twitter, and Facebook can all function as on-line communities for your event, but experience has shown that building a dedicated community for your event can be more effective: • Integrating the community experience with registration has been shown to increase adoption by up to 6x • When you create a custom community, you can control the look and feel and the brand of the site • When using a generic third party- service such as LinkedIn or Facebook, those services own the customer relationship. When you create a cus- tom network, you own the attendee data and can use it to build a high- er-value customer relationship ©2010 Certain Software, Inc. All rights protected and reserved.
  • 47.
    43 BEHIND THESCENE OF A SUCCESSFUL EVENT Pathable Pathable (www.pathable.com) is a social network service, similar in some ways to Facebook or LinkedIn, that integrates with your Certain Meetings solution to create a dedicated online community for your event. Unlike Facebook or Linke- dIn, the site will “look and feel” like your event web site, embedding in your navigation system, carrying your banner and URL, and only registered attendees can participate in your event’s network. When someone registers for your event, Pathable’s integration with Certain auto- matically creates an account for that attendee based on the information they’ve provided. The attendee can then fill out additional background information to help other attendees get to know them, such as a photo, their interests, a short bio and other relevant details. Figure 10. Sample event community site using Pathable Pathable helps your attendees network by: • identifying which of the attendee’s Twitter and LinkedIn contacts are also attending • recommending people to meet based on common interests • searching for attendees interested in any topic • supporting topical mailing list conversations, so attendees can start dis- cussions with other attendees around areas of mutual interest. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 48.
    44 In addition, Pathable’sscheduling feature allows attendees to sign up for edu- cational sessions, download hand-outs, and then start conversations with the speakers and attendees of particular sessions, creating ad hoc communities around each talk. By taking advantage of these social networking features, attendees can get to know each other before the event, so that when they arrive they already have a set of familiar names and faces and people they want to talk with. Pathable includes iPhone and Blackberry interfaces, allowing attendees to access their schedule and contacts on the go, and synchs with Outlook 2007 and above as well as other common calendar programs, to allow its scheduling features to integrate into attendees established workflows. Pathable even allows attendees to schedule one-on-one meetings with each oth- er, using their chosen session schedules to determine mutually free times. Figure 11. iPhone and Blackberry interfaces for Pathable community site. When an event is complete, the Pathable community for event lives on, giving attendees a place to return and continue the conversations they started. As a result, they feel personally attached and committed to the event, increasing the likelihood that they will return for the next one. Social Networking Tips and Tricks • Choosing a social networking strategy need not be an either / or deci- sion. These solutions can often be used effectively side-by-side. • No matter which service you use, be sure to tell people about the pages you have created in every way you can: tweet about them, link to them from your web site and Facebook page, etc. • To make most effective use of Twitter, download one of the free support programs, such as TweetDeck (www.tweetdeck.com). These will allow you to have “search columns” that spotlight all the relevant tweets on a particular topic instantly and continuously. • Measure, measure, measure! Use tools like Google Analytics and HootSuite (www.hootsuite.com) to tell you how much of your traffic is coming from a particular source, which can help you focus your time and money on the most effective investments. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 49.
    45 BEHIND THESCENE OF A SUCCESSFUL EVENT Planning a Sustainable Climate Friendly Event Dave Rochlin, CEO, ClimatePath The growing consensus is that reducing green house gas emissions is urgent to avoid a variety of climate related, planetary crises. Whether you believe the worst scenarios related to climate change projections or not, the specter of emis- sions targets and reporting programs - either mandated or voluntary - has many large organizations scrambling to understand, quantify, and reduce the carbon emissions of their business activities.  Relying on “random acts” of green and sustainability when planning meetings and events needs to be replaced with a comprehensive approach to understanding and mitigating climate impact. No two events are alike, so calculating and reducing a carbon footprint can be complicated. The scope, sources, and solutions can also be surprising. The pur- pose of this chapter is to remove some of the ambiguities and mysteries around carbon foot-printing, identify general benchmarks and key variables, and assist event organizers in developing a strategy for tackling this critical green issue. What is a carbon footprint for an event?  Carbon emissions are typically divided into 3 scopes to help determine organi- zational boundaries. These three scopes can be applied to meetings and events, and help you calculate your extended carbon footprint: • Scope 1 emissions are those directly occurring “from sources that are owned or controlled” by event planners, such as work vehicles.  • Scope 2 emissions are those generated in the production of electric- ity consumed by the event. This includes the energy consumed at the event location.  • Scope 3 emissions are all the other indirect emissions that are “a conse- quence of the activities of the event, but occur from sources not owned or controlled by the event organizer.” These include air and ground travel, hotel stays, emissions of the production and transportation of purchased goods, outsourced activities, and so forth. Scope 3 emissions are the hardest to assess, track, and reduce because we have the least control over them. Simply determining which scope 3 emissions to in- clude within the boundary of the event can be an important and complex deci- sion. The emerging event standards encourage event planners to take a holistic look at everything from attendee travel to meals and paper usage when develop- ing a sustainability plan and measuring their overall impact - or carbon footprint. The confusing part is determining the event planner’s role in reducing the impact versus simply encouraging attendees to mitigate. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 50.
    46 Whether you chooseto follow a standard or your own best practices as part of your emissions measurement and offsetting,  it is critical to be transparent, so that claims can be understood and verified. Travel trumps all others Attendee travel to and from your event is particularly impactful. If a majority of attendees are flying, these emissions account for up to 80% of your overall foot- print. The airport transfers and in-town travel can be another 5%, as can hotel stays. All together that means 90% or more emissions of an overall event can be attributed to attendee travel. Of course face-to-face meetings can be valu- able and highly productive, but it is important to select the right location for the event, and reduce the miles flown. With 10,000 people attending, your choice of location could mean as much as 5,000 tons of CO2 emission added or avoided!   Outside of travel related emissions, an actual event’s footprint is in the range of 25-35 lb per day per person. A 10,000 person event is roughly 120 tons per day.  Travel footprint reduction • Air travel:  When many attendees are flying, selecting a central location can cut your events carbon footprint in half. Keep in mind that direct flights tend to be 20-25% more efficient than flights with connections. Finding a central and direct location can save 1000 lbs of CO2 or more per attendee.  • Airport-to-event:  Airport transfer considerations can also have an im- pact. Cutting the travel distance and using vans can reduce this footprint by 80%, which can be 40 lbs of CO2 or more per attendee. Software can help coordinate logistics by pre-scheduling and providing manifests for shuttle drivers. • Drivers:  For events where driving will be the norm, optimizing the loca- tion and arranging for carpools can still have a large reduction impact. Cutting both drivers and mileage in half can save as much as 75 lbs of C02 per attendee.  ©2010 Certain Software, Inc. All rights protected and reserved.
  • 51.
    47 BEHIND THESCENE OF A SUCCESSFUL EVENT Other ways to reduce your footprint and green your event Outside of travel, making greener choices in areas such as lighting, venue selec- tion, meals, water, paper, and recycling can also have a significant impact on your overall ecological and carbon footprint. Let your attendees know about your ef- forts, and ask for their cooperation. You’ll be surprised by their enthusiasm. • Set a waste goal and arrange for recycling • Watch your energy use • Think about transportation needs • Watch the paper! • Think local, organic, and vegetarian for food Keeping perspective, and the role of offsets Some emissions are unavoidable, and often it is simply too expensive to make an “optimal” choice. As an example, should a location be ruled out if it results in another 1/2 ton of CO2 per person, but saves $300 per person in travel and other expenses?  Saving CO2 at a cost of $600 per ton may not be practical for your organization. Planners also need to be aware of emissions shifting. Choos- ing a venue which is more efficient for you, but causes traveler miles to go up may lower your ‘scope 2’ event footprint while causing your attendees to raise theirs. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 52.
    48 “Carbon Offsets” providea mechanism to neutralize your impact and avoid being forced into irrational trade-offs. A variety of offset projects from reforestation to wind energy can deliver quantifiable carbon benefits that can mitigate your impact. It is important to select projects that conform to a reputable third party standard, and that the carbon credits are tracked and recorded through a public registry. When you buy the credits (by the ton of CO2 reduced), you are essen- tially purchasing shares in the project, to offset the carbon emissions generated by your event. ClimatePath endorses the VCS (Voluntary Carbon Standard), CAR (Climate Action Reserve), Gold Standard, Plan Vivo, and Green-e (for Renewable Energy Certificates.)  These offsets generally cost $10-$20 per ton. A variety of specific carbon credit generating projects can be viewed (and supported) on the ClimatePath.org website. The non-profit ClimatePath Ecologic Fund will acquire, register, and retire offsets on your behalf. Up and Coming Standards for Event Planners and Managers • BS8901: British Standard developed by BSI specifically to move the events and planning industry in a more sustainable direction. Acts as a baseline and organizational framework for risk assessment, and puts measures in place to minimize negative effects of your events. • APEX Green Meeting Standards: Though under review, the APEX stan- dard critically assesses all aspects of an event from accommodations to communications to transportation, and scores your event on a green scale. The APEX standard is complex to implement and interpret, and is not recommended for the average meeting planner. • ISO14001: A more generic standard that provides requirements for en- vironmentally friendly management systems. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 53.
    49 BEHIND THESCENE OF A SUCCESSFUL EVENT Definitions and Meeting Planner Terminology The “official” guide for professional meeting planner terminology is maintained by the Convention Industry Council (CIC) via their Accepted Practices Exchange (APEX) program. A searchable glossary is available at http://www.conventionin- dustry.org/glossary/, and terms used in this eBook are defined below. Attrition The difference between the actual number of sleeping rooms picked-up (or food-and-beverage covers or revenue projections) and the num- ber or formulas agreed to in the terms of the facility’s contract. Usually there is an allowable shortfall before damages are assessed. Attrition Contract wording that outlines potential dam- Clause ages or fees that a party may be required to pay in the event that it does not fulfill minimum com- mitments in the contract. Audio/Visual Equipment, materials, and teaching aids used in (A/V) sound and visual presentations, such as televi- sion monitors, video, sound equipment, etc. Banquet Event A form most often used by hotels to provide de- Order (BEO) tails to personnel concerned with a specific food and beverage function or event room set-up. Event Specifi- The industry’s official term for the document cations Guide used by an event organizer to convey information (ESG) clearly and accurately to appropriate venue(s) and/or suppliers regarding all requirements for an event. Food & Bever- Any catered or concession service provided by a age (F&B) facility. Request for A document that stipulates what services the or- Proposal (RFP) ganization wants from an outside contractor and requests a bid to perform such services. Same as BID MANUAL/SPECIFICATIONS. ©2010 Certain Software, Inc. All rights protected and reserved.
  • 54.
    50 Additional Resources If youhave any questions about planning your best event yet, please contact us directly. Certain Software www.certain.com info@certain.com SAN FRANCISCO Global Headquarters 75 Hawthorne Street Suite 300 San Francisco, CA 94105 USA Toll-free in US: 1 888 CERTAIN (1 888 237 8246) Office: +1 415 353 5330 Fax: +1 415 614 9192 BRISBANE 60 Brandl Street Eight Mile Plains QLD 4113 Australia Office: +61 7 3457 0900 Fax: +61 7 3457 0999 LONDON 5 Bucklersbury Hitchin, Hertfordshire SG5 1BB United Kingdom Office: +44 1462 420 780 Fax: +44 1462 422 335 ©2010 Certain Software, Inc. All rights protected and reserved.
  • 55.
    51 BEHIND THESCENE OF A SUCCESSFUL EVENT About the Authors Rick Borry, Certain Software meetings and events solutions Rick Borry founded Register123 in 1998 and grew it into one of the early leading providers of online registration tools for the professional meeting planning indus- try. He joined Certain Software after it acquired the online registration company in 2001. Since 2005, Dr. Borry has been an active member of the APEX Technol- ogy Advisory Committee, charged with developing XML standards for the group travel industry through the Open Travel Alliance. In 2008, Dr. Borry chaired the executive merger transition team after Certain Software and Amlink Technolo- gies joined to create Certain, a global events management software company. Dr. Borry earned a Ph.D. from the University of California at Berkeley and a Bach- elor of Science degree in chemical engineering from Clemson University. Rick Borry, Ph.D. Certain Software rborry@certain.com www.certain.com P: 415-345-2715 ©2010 Certain Software, Inc. All rights protected and reserved.
  • 56.
    52 Jeff Rasco andChristina Rasco Adams, Attendee Management Inc. Jeffrey W. Rasco, CMP is the founding partner and CEO of Attendee Manage- ment, Inc. (AMi), providers of state-of-the-art, customer-focused, comprehen- sive registration, housing, travel, and e-marketing services. Jeff has nearly thirty years experience as a meeting and event manager with a strong focus on man- agement and technology. He was recognized in 1996 as Meeting Professionals International’s Meeting Planner of the Year. Christina Rasco Adams is partner and Chief Creative Officer, leading the design team and acting as primary con- sultant to AMi’s customers. Their goal is to increase the quality of meetings and elevate the strategic value of meeting professionals through the intelligent use of technology. Jeffrey W. Rasco, CMP, Partner/Chief Executive Officer Christina Rasco Adams, Partner/Chief Creative Officer Attendee Management, Inc. jrasco@attendeenet.com / christina@attendeenet.com www.attendeenet.com P: 512-877-947-5174 ©2010 Certain Software, Inc. All rights protected and reserved.
  • 57.
    53 BEHIND THESCENE OF A SUCCESSFUL EVENT Tim Brown, Meeting Sites Resource Tim Brown has been the CEO of Meeting Sites Resource since he founded the company in 1993. MSR is a global specialist in meeting site research and hotel / contract negotiations. The company also offers professional meeting support services and advanced meeting technology solutions. Tim has spent his entire career in the meeting, convention and hospitality in- dustries and has been both a planner and supplier. He has been in hotel sales, marketing and management and a business owner in the meeting, convention and incentives industry for 30 years. He also contributes articles in major trade publications and speaks at many in- dustry events, including Meeting Professionals International (MPI), Affordable Meetings and Financial & Insurance Conference Planners (FICP). Tim also pres- ents custom educational workshops for meeting and Procurement Department planning teams. He has served on MPI’s International Board, has been President of two different MPI chapters and in 1994 was Supplier of the Year. Tim also sponsors the MPIOC Educational Scholarship. During his Presidency of MPIOC, he launched the California State University, Fullerton (CSUF) Professional Meeting Planning Curriculum which is now in its 14th year. Tim is a graduate of San Diego State University with a BS degree in Marketing. Tim Brown, CEO Meeting Sites Resource tbrown@meetingsites.net www.meetingsites.net P: 949-250-7483 x312 ©2010 Certain Software, Inc. All rights protected and reserved.
  • 58.
    54 Jennifer Brown, MeetingSites Resource Jennifer W. Brown, CMP, is President of Meeting Sites Resource, a global specialist in meeting site research and hotel / contract negotiations. The company also offers professional meeting support services and advanced meeting technology solutions. Jennifer speaks at many meeting industry events including Meeting Professionals International, Affordable Meetings, Financial & Insurance Conference Planners and NYU. She has been a faculty member for MPI’s Platinum Series Workshops and pres- ents custom workshops for meeting and Procurement Department planning teams. She earned her CMP in 1992 and has won such awards as MPI’s Planner of the Year and was a recognition recipient of MPI’s Global Paragon Award. She is a graduate of Woodbury College. For a complimentary copy of “Hotel Site Inspection Checklist”, contact: Jennifer Brown, President Meeting Sites Resource jbrown@meetingsites.net www.meetingsites.net P: 949-250-7483 x315 ©2010 Certain Software, Inc. All rights protected and reserved.
  • 59.
    55 BEHIND THESCENE OF A SUCCESSFUL EVENT Jordan Schwartz, Pathable Jordan Schwartz is President and co-founder of Pathable, a social networking ser- vice for conferences. He earned his B.S. from Brown University, his M.S. in Social Psychology from the University of Washington and spent over 10 years at Micro- soft building consumer-focused products, including several versions of Windows and MSN. In addition to making conference experiences better, Jordan has a pas- sion for mobile technologies and indulges his love of community by authoring the Wallingford, Seattle neighborhood blog, Wallyhood. He also leads a team of 60,000 bees in the manufacture and production of a delicious, organic honey. Jordan Schwartz, CEO Pathable jordan@pathable.com www.pathable.com P: (866) 809-0252 x702 ©2010 Certain Software, Inc. All rights protected and reserved.
  • 60.
    56 Dave Rochlin, Founder,ClimatePath Dave Rochlin is a founding partner of ClimatePath, a leading provider of industry solutions to help meeting and event planners, consumer brands, travel providers, and other businesses measure and reduce the climate and other impact of their business activities. He has an extensive background in the NGO sector and social enterprise, as well as technology, consumer products, and ‘big four’ consulting. Dave speaks and writes frequently on green business, corporate social responsi- bility, and sustainability. He has an MBA from the Kellogg School at Northwest- ern, teaches innovation strategy and ethics in the executive MBA program at St. Mary’s College, and has published a textbook on technology strategy. He is a also on the board of directors of both the Lindsay Wildlife Museum, and the Climate- Path Ecologic Fund. David Rochlin, Founder ClimatePath info@climatepath.org www.climatepath.org P: 925 297-6017 ©2010 Certain Software, Inc. All rights protected and reserved.