R


  G C B 

Crisis as Opportunity
The Boston Consulting Group (BCG) is a global manage-
ment consulting firm and the world’s leading advisor on
business strategy. We partner with clients in all sectors
and regions to identify their highest-value opportunities,
address their most critical challenges, and transform their
businesses. Our customized approach combines deep in-
sight into the dynamics of companies and markets with
close collaboration at all levels of the client organization.
This ensures that our clients achieve sustainable compet-
itive advantage, build more capable organizations, and
secure lasting results. Founded in 1963, BCG is a private
company with 69 offices in 40 countries. For more infor-
mation, please visit www.bcg.com.
Crisis as Opportunity

  G C B 



          Jürgen E. Schwarz
           Martin Buchar
           Gennaro Casale
            Oliver Dany
           Keith Halliday
            Nicolas Harlé
           Junichi Iwagami
           Duncan Martin
         Matthew Rogozinski
          Achim Schwetlick
             Tjun Tang


               June 2010




               bcg.com
© The Boston Consulting Group, Inc. 2010. All rights reserved.

For information or permission to reprint, please contact BCG at:
E-mail: bcg-info@bcg.com
Fax:     +1 617 850 3901, attention BCG/Permissions
Mail: BCG/Permissions
         The Boston Consulting Group, Inc.
         One Beacon Street
         Boston, MA 02108
         USA
Contents
Executive Summary                                                         5

Megatrends Shaping the Corporate Banking Landscape                        8
Globalization 2.0                                                         8
The New Economy                                                           9
Advancing Technology                                                     10
Fallout from the Crisis                                                  11
The Lessons of the Crisis                                                15
The New-Normal Regulatory Environment                                    17


The Blue-Chip Corporate Bank: How Top Institutions
Are Positioning Themselves to Win                                        18
Building Premium Client Relationships                                    18
Creating a Culture of Risk Awareness and Accountability                  19
Enhancing Transaction Banking Capabilities                               20
Forging the Next-Generation Operating Model                              22
Developing End-to-End Transparency and a High-Performance Organization   23


Conclusion: Asymmetric Competition and How the Leaders
Will Deepen Their Advantage                                              26

For Further Reading                                                      27

Note to the Reader                                                       28




C  O                                                     
   T B C G
Executive Summary




T
             he publication of Crisis as Opportunity, BCG’s       crisis or even those that enjoy modestly higher margins in the
             fourth report on the global corporate-banking        near term. The winners will be those that actually leverage
             industry, comes at a time when the priority of       the market dynamics brought on by the downturn to their ad-
             many corporate-banking leaders is shifting           vantage, internalizing the lessons and sharpening their strat-
             from damage control to finding ways to capital-       egies, processes, and value propositions for the long haul. This
ize on opportunities created by the global financial crisis.       report focuses on the steps that corporate banks must take to
                                                                  rise to this challenge.
The downturn has obviously been painful for the corporate
banking business. And difficulties stemming from slow eco-          As in the past, our report draws on BCG’s Global Corporate-
nomic growth in some countries, the financial distress of          Banking Benchmarking Database, covering more than 100
clients, and lagging corporate loan losses—which can              financial institutions around the world. The database tracks
peak months or years aer economic recovery begins—will           global trends and helps identify the best practices of the most
continue.                                                         sophisticated corporate banks operating in the most challeng-
                                                                  ing markets.
Nonetheless, the crisis has so far been surprisingly good to
many corporate-banking business units. Many of the partici-       In the postcrisis era, corporate banks must fully grasp
pants in our global benchmarking exercise conducted in early      the trends that will weigh heaviest on their industry.
2010 reported rising economic profit from the end of 2007          The most powerful forces (or “megatrends”) are the
through 2009, even in countries that were particularly hard-      continuing process of globalization, the shiing eco-
hit by the so-called Great Recession. This improvement was        nomic and industry structures of the new economy,
mostly attributable to significant increases in lending mar-       and technological progress. In addition to these inter-
gins (which will likely fade as the financial sector and real      connected forces, banks must also grapple with the
economy build on the progress they showed in the first quarter     harsh fallout from the crisis and with the evolving,
of 2010). Also, in many cases, loan losses have not thus far      stricter regulatory environment. All of these dynam-
been as bad as originally feared.                                 ics will determine how corporate banks navigate the
                                                                  next decade.
Yet one thing is certain: we are entering a new competitive
environment as banks try to seize the opportunities created       ◊ The effects of “globalization 2.0” on corporate banks
by the crisis. Success will oen come at the expense of weaker      will be significant. Even relatively small companies
rivals. Moreover, a key factor will be the strength of the par-     will participate, oen as part of intricate, far-reaching
ent bank’s balance sheet in supporting the growth ambitions         supply chains. Growing enterprises, such as those
of the corporate banking business unit. But having a strong         based in Brazil, Russia, India, and China (the BRIC
balance sheet will not be enough to succeed.                        countries), will need a full range of sophisticated bank-
                                                                    ing services. The potential revenues to be gained from
Indeed, the most successful corporate banks over the next few       these trends will be sizable, but capturing them will
years will not necessarily be those that have best survived the     require a nimble and creative approach.


C  O                                                                                                           
◊ Five key aspects of the new economy will exert the         banking executives, BCG has identified a number of
  greatest impact on corporate banks: increasing com-        axioms that corporate banks would do well to re-
  petitive intensity, industry-specific banking needs, on-    member.
  going consolidation, closer supply-chain integration,
  and the search for top talent.                             ◊ These axioms include: keep risk at the top of the agen-
                                                               da, manage your businesses to maintain a balanced
◊ Despite continuing advances in technology, very few          portfolio with an “over the cycle” point of view, be ex-
  corporate banks have the platforms in place to ensure        tra cautious in forays outside of home markets, and
  leading functionality and connectivity for clients, as       above all, cultivate deep client relationships.
  well as efficient and effective sales-to-service process-
  es. These shortcomings result from a variety of factors,   ◊ Our research with corporate banking clients indicates
  including investment limits and the low priority of the      that many are reviewing their banking relationships,
  corporate banking unit compared with the bank’s (usu-        seeking to “diversify their portfolio” with multiple
  ally larger) retail business unit. Corporate banks must      banks. Clients are also more conscious of the need to
  reverse this trend in order to become market leaders.        choose banks with strong balance sheets and reputa-
                                                               tions, so that they will not become collateral damage
The financial crisis has had a devastating effect on             in a bank’s next liquidity crunch.
many banks overall, but its impact on corporate bank-
ing business units has been more nuanced. There              The regulatory response to the crisis remains a work
have been winners and losers.                                in progress. But it is virtually certain that a climate of
                                                             greater conservatism and risk avoidance will prevail
◊ About one-third of business units in BCG’s Global Cor-     and that new regulations will have a material impact
  porate-Banking Benchmarking Database increased             on the corporate banking industry. Reporting require-
  their economic profit between the end of 2007 and the       ments will become increasingly onerous—placing an-
  end of 2009. Even as sister business units wrote down      other burden on finance and risk analysts serving the
  mortgage-backed securities or suffered severe consum-       corporate banking business unit, as well as on front-
  er-lending losses, many corporate banks successfully       line sales staff.
  repriced corporate loans, attracted new loan and de-
  posit volume, and increased investment-banking and         ◊ There are four interconnected issues whose regulation
  risk-management sales. Top performers enjoyed a prof-        will significantly affect corporate banking: risk mea-
  it surge.                                                    surement (including risk-weighted assets, or RWA),
                                                               capitalization, leverage ratio, and liquidity risk. The
◊ For the broader group of survey participants—com-            impact of changes in these areas will vary by product
  prising “typical” corporate banks—the crisis has             and segment.
  brought a difficult operating environment. Assuming
  a rough long-term pretax capital hurdle rate of 12 per-    ◊ It will be critical for corporate banking executives to
  cent, their economic profit is still well below 2007 lev-     monitor developments and ensure that their banks re-
  els. But it rebounded in 2009 from the lows of 2008.         tain the flexibility to respond to regulatory changes as
                                                               they become finalized.
◊ In terms of segment performance, in 2009, corporate
  banking business units serving the micro segment had       The postcrisis era will witness the emergence of the
  by far the highest average return on regulatory capital,   blue-chip corporate bank.
  followed by small- and mid-cap (at roughly the same
  level) and then by large-cap business units. The large-    ◊ These banks will be the jewels in the portfolios of lead-
  cap segment was the toughest environment overall in          ing universal financial institutions. They will generate
  which to create value.                                       steady long-term profit growth thanks to superior busi-
                                                               ness models, excellent risk-management capabilities,
Aer reviewing the experiences of top performers               and an overall approach that focuses on building a val-
during the crisis and speaking with senior corporate-          ue-creating corporate-banking franchise.


                                                                                        T B C G
◊ BCG’s case work and benchmarking efforts have iden-        ager of the global Wholesale Banking segment in BCG’s
  tified five core priorities of the blue-chip corporate      Toronto office. You may contact him by e-mail at halliday.
  bank that leading institutions are already embracing:     keith@bcg.com. Nicolas Harlé is a partner and manag-
  building premium client relationships, creating a cul-    ing director in the firm’s Paris office. You may contact him
  ture of risk awareness and accountability, enhancing      by e-mail at harle.nicolas@bcg.com. Junichi Iwagami is
  transaction banking capabilities, forging the next-gen-   a partner and managing director in BCG’s Tokyo office.
  eration operating model, and developing end-to-end        You may contact him by e-mail at iwagami.
  transparency and a high-performance organization.         junichi@bcg.com. Duncan Martin is a partner and man-
                                                            aging director in the firm’s London office. You may con-
About the Authors                                           tact him by e-mail at martin.duncan@bcg.com. Matthew
Jürgen E. Schwarz is a senior partner and managing          Rogozinski is a partner and managing director in BCG’s
director in the Toronto office of The Boston Consulting       Melbourne office. You may contact him by e-mail at
Group and the leader of the global Wholesale Banking        rogozinski.matthew@bcg.com. Achim Schwetlick is a
segment. You may contact him by e-mail at schwarz.          partner and managing director in the firm’s New York of-
juergen@bcg.com. Martin Buchar is a partner and man-        fice. You may contact him by e-mail at schwetlick.achim@
aging director in the firm’s Prague office. You may contact    bcg.com. Tjun Tang is a partner and managing director
him by e-mail at buchar.martin@bcg.com. Gennaro Ca-         in BCG’s Hong Kong office. You may contact him by e-
sale is a partner and managing director in BCG’s Milan      mail at tang.tjun@bcg.com.
office. You may contact him by e-mail at casale.gennaro@
bcg.com. Oliver Dany is a partner and managing director
in the firm’s Frankfurt office. You may contact him by e-
mail at dany.oliver@bcg.com. Keith Halliday is the man-




C  O                                                                                              
Megatrends Shaping
              the Corporate Banking
                    Landscape


R
              egardless of one’s views on what will hap-       sumers, and government resistance to offshoring will rein
              pen next as the global financial crisis          it in.
              evolves, it is clear that corporate banking
              executives face an altered landscape. Only       In our view, however, although market dynamics such as
              one thing is beyond doubt: amid a rapidly        those leading up to 2007 may never return, we are still
changing global economy, corporate banks must adapt            likely to see the emergence of “globalization 2.0.” For ex-
and forge insightful, long-term strategies if they hope to     ample, BCG forecasts that the share of global GDP gener-
gain competitive advantage.                                    ated in the Asia-Pacific region will rise to almost 40 per-
                                                               cent by 2020, from around 30 percent in 2010. Roughly as
Specifically, corporate banks must react to sweeping           much foreign direct investment is now flowing from
trends that are affecting how companies do business all         emerging markets into mature ones as in the other direc-
over the world. For example, many erstwhile emerging           tion—upending a multiyear trend. The number of com-
economies have moved into the mainstream. More and             panies from Brazil, Russia, India, and China (the BRIC
more companies—not just large multinationals—are in-           countries) in the Fortune 500 has more than doubled,
creasingly integrated into domestic and global supply          from 27 companies in 2005 to 58 in 2009. In terms of mar-
chains and are looking to their banks for “financial sup-       ket capitalization, four of the top ten banks in the world
ply chain” solutions to assist them. Technological advanc-     are now based in Asia-Pacific.1
es continue at a rapid pace.
                                                               The effects of globalization 2.0 on corporate banks will
Corporate banks must also fully grasp the trends that will     be significant. On the client side, more and more compa-
weigh heaviest on their industry. The most powerful forc-      nies will be internationally active. Even relatively small
es (or “megatrends”) are the continuing process of global-     companies will participate, oen as part of intricate, far-
ization, the shiing economic and industry structures of       reaching supply chains. Growing enterprises such as those
the new economy, and technological progress. In addition       based in the BRIC countries will need a full range of
to these interconnected forces, banks must grapple with        banking services as they sell automobiles, computers, and
the harsh fallout from the crisis and with the evolving,       myriad other goods in the United States, Europe, and
stricter regulatory environment. All of these dynamics         elsewhere. The potential revenues to be gained from
will determine how corporate banks navigate the next de-       these trends will be sizable, but capturing them will re-
cade.                                                          quire a nimble and creative approach. For example, ex-
                                                               actly what kind of innovative financial-supply-chain ser-
                                                               vices are needed? And how might the sales forces of
Globalization 2.0                                              domestic European or U.S. banks capture the business of
                                                               BRIC multinationals expanding abroad?
Some pundits claim that the crisis will curtail globaliza-
tion. They argue that factors such as protectionist policies   1. See After the Storm: Creating Value in Banking 2010, BCG report,
in countries with high unemployment, impoverished con-         February 2010.


                                                                                              T B C G
Globalization 2.0 will also affect the competitive land-           Increasing Competitive Intensity. The International
scape in corporate banking. For example, some new com-            Monetary Fund’s (IMF’s) April 2010 World Economic Out-
petitors may potentially emerge from the BRIC countries           look report predicts economic growth in the euro zone
to replicate in banking what aggressive companies such            and Japan of just 1 to 2 percent through 2015, with that
as Haier, ArcelorMittal, and Embraer have achieved in in-         of the United States being marginally higher at 2.4 to 3.1
dustries as diverse as appliances, steel, and aircra manu-       percent. Amid such relatively modest economic expan-
facturing. As BRIC banks follow their clients into estab-         sion, the race for clients, market share, and profits will be
lished markets, their rivalries with both                                         more frenzied than ever. The chief impli-
local and global-titan banks will unques-                                         cation for corporate banks is that clients
tionably heat up.                                    No large corporate           will be increasingly sensitive about mar-
                                                    bank will be immune           gins and fees. Weaker competitors will
On the operational side, banks will face in-                                      start to compete on prices, and clients will
                                                      to the effects of
creasing choices about how to internation-                                        pressure incumbent banks to lower theirs,
alize their back offices, which they must                globalization.             forcing these banks to become more effi-
do in order to capture scale and seamless-                                        cient. But clients will also be more open to
ly serve multicountry clients. For example,                                       banking solutions (such as industry-spe-
they can create “international product factories” that            cialized payment solutions) that help them cut costs and
serve clients in multiple countries. They can also emulate        compete more effectively.
many retail banks and pursue more offshoring and out-
sourcing solutions, although political and regulatory con-        Industry-Specific Banking Needs. Some industries are
siderations may block this path to some degree.                   sweet spots for corporate banks because of their relative-
                                                                  ly rapid growth rates and specific product needs. Such dy-
Ultimately, no large corporate bank will be immune to             namics are oen present in industries experiencing a
the effects of ongoing globalization. And growth-oriented          long-term shi from manufacturing to services, and thus
banks will be tempted by the rapidly developing econo-            from credit-heavy banking relationships to a greater mix
mies. BCG estimates that over 40 percent of total global          of transactions and deposits. Take health care as an ex-
revenue growth in corporate banking between 2009 and              ample. BCG’s research indicates that in the United States,
2019 will come from the BRIC nations.                             health care companies earning revenues from $10 million
                                                                  to $500 million grew at 17 percent annually from 2002
Still, banks must tread carefully if they wish to capitalize      through 2007. This was a much faster rate than that of
on this opportunity. Corporate banking is in many ways            most other industries, and these companies generated a
a local business with significant barriers to entry, espe-         more attractive mix of corporate banking revenues than
cially in the small- and mid-cap segments. There are nu-          the average client. Yet our 2009 benchmarking data show
merous examples of banks whose forays into internation-           that some banks have been much more successful than
al markets have ended in costly failure. These episodes,          their peers at penetrating these growth industries.
in addition to regulatory pressure and capital scarcity,
may result in fewer banks embarking on foreign growth             Ongoing Consolidation. Continuing globalization and in-
sprees. Rather than pursue credit-led expansion and take          creasing competitive intensity will continue to spur con-
on local players with superior local knowledge, some in-          solidation in many industries. Corporate banks that want
stitutions may find that focusing on their existing client         to serve top companies as well as up-and-coming midmar-
bases is a clearer, less risky path to growth.                    ket ones will need investment banking capabilities. In ad-
                                                                  dition, cross-border consolidation should increase the
                                                                  number of clients that look to their banks for multicoun-
The New Economy                                                   try solutions across payments and trade finance.

The coming years will be highly challenging for compa-            Closer Supply-Chain Integration. The trend we have
nies in virtually all industrial sectors—as well as for the       seen in recent years toward deeper integration along sup-
banks that serve them. Five key trends will exert the             ply chains will continue, although it will undoubtedly be
greatest impact.                                                  affected by other global trends, such as rising energy costs


C  O                                                                                                       
(which will increase transportation costs). As companies        However, in this age of ubiquitous connectivity, expand-
integrate with their business partners more closely (both       ing bandwidth, and massive computing power, corporate
domestically and across borders), they will be looking for      banking clients themselves continue to invest in better
parallel financial-supply-chain services from their banks.       financial systems. Companies of every size are trying to
                                                                connect more seamlessly with their banks, whether
The Search for Top Talent. BCG’s case work with corpo-          through more sophisticated online data-transfer functions
rate banking clients around the world has consistently          for small and midsize clients or through deeper integra-
identified talent management as a growing                                         tion with large corporate enterprise-re-
area of concern. Competition for top tal-                                        source-planning systems. This growing cli-
ent—such as senior relationship managers         Companies of all sizes          ent need will have important implications
(RMs), bad-loan workout specialists, and          are trying to connect          for banks trying to increase share in trans-
investment bankers who are experienced                                           action banking. Indeed, customers are
                                                  more seamlessly with
in priority emerging markets—is hotter                                           looking for a variety of benefits: better
than ever. Banks will also need managers               their banks.              ease of use (to reduce the amount of inter-
with skills in such areas as leveraging new                                      nal training that they need to provide),
IT capabilities and optimizing end-to-end                                        greater breadth in the products and servic-
loan processes. As banks reenter a growth mode and the          es they can access through self-service portals, better in-
baby-boom generation begins to retire, finding the talent        tegration and customization, and improved two-way com-
needed to navigate a large corporate bank through the           munication.
evolving megatrends will be more challenging than ever.
Corporate banks must meet this challenge by forging a           Moreover, banks that can build deep, rich, real-time data
clear strategy for talent acquisition, management, and re-      and analytics capabilities will be able to develop a holis-
tention.                                                        tic view of each client relationship—including product
                                                                utilization patterns and risk, liquidity, and capital factors.
                                                                Such banks will be able to significantly improve product
Advancing Technology                                            targeting, pricing, and risk management. They will also
                                                                improve client targeting through techniques such as cli-
Despite continuing advances in technology, very few cor-        ent clustering.
porate banks have the platforms in place to ensure lead-
ing functionality and connectivity for clients, as well as      Banks will continue to build more electronic platforms
efficient and effective sales-to-service processes. These          that automate core processes involving account opening,
shortcomings result from a variety of factors, including        lending, and transaction banking on an end-to-end basis
investment limits and the low priority of the corporate         from the customer to the back office. Automation and al-
banking unit compared with the bank’s (usually larger)          gorithms that catch and correct data-entry errors will re-
retail business unit.                                           sult in higher rates of straight-through processing, greater
                                                                client satisfaction, and lower costs. In areas where human
Indeed, while many retail institutions have powerful cus-       processing is still required, advances in data storage and
tomer-information platforms, numerous corporate banks           imaging technology will allow greater use of centralized
still have disjointed management-information systems in         and offshored processing centers, as well as skills-based
which applications for core businesses such as cash man-        routing techniques.
agement and trade finance exist on different platforms—
and contain different client information that is difficult to      In addition, advances in automated decision intelligence
compare. At some corporate banks, extensive manual              will allow more sophisticated treatment of loan applica-
processes are required to extract data from more than 20        tions and fraud detection, as well as improve ongoing cli-
different systems to create a “full wallet” view of any in-      ent monitoring and collections. Banks will, of course,
dividual client. Moreover, complex legacy sales tools hin-      need to remember that reliance on models and automat-
der sales force productivity. Lending processes remain pa-      ed tools can be dangerous if it replaces human judgment
per intensive. The result can be a long, error-prone            in critical areas. But advanced intelligence engines hold
experience for clients.                                         promise both as cost savers in simple decisions such as


                                                                                             T B C G
micro and small-business loans and as electronic aids to                            At numerous banks, these achievements have been more
prioritization that can help staff focus on the right client                         than enough to offset rising corporate loan losses, at least
files and risk decisions.                                                            at this point in the credit cycle. Loan volumes and mar-
                                                                                    gins spiked early in the crisis, although they started to
                                                                                    fade somewhat in the first quarter of this year in many
Fallout from the Crisis                                                             countries. Transaction payment volumes plummeted and,
                                                                                    given extremely low short-term interest rates, so did de-
The financial crisis has had a devastating effect on many                             posit margins. Yet investment banking, risk management,
banks overall. But its impact on corporate banking busi-                            and other fee revenues have been buoyant, if volatile, in
ness units has been more nuanced. There have been win-                              many areas. Despite higher loan losses overall and con-
ners and losers.                                                                    tinued cost pressure, the net result that we see for top
                                                                                    performers is a surge in economic profit. About one-third
In fact, many of the participating business units in BCG’s                          of corporate banks improved their economic profit from
Global Corporate-Banking Benchmarking Database                                      the end of 2007 to the end of 2009.2 (See Exhibit 1.)
managed to improve their economic profit in the course
of the crisis. Even as sister business units wrote down                             For the broader group of our survey participants, howev-
mortgage-backed securities or suffered severe consumer-                              er—comprising “typical” corporate banks—the crisis has
lending losses, many corporate banks successfully re-
priced corporate loans, attracted new loan and deposit
                                                                                    2. This refers to benchmarking participants based in developed
volume, and increased investment-banking and risk-man-                              markets. In emerging markets, a higher proportion of benchmark-
agement sales.                                                                      ing participants showed improving economic profit.


  Exhibit 1. About One-Third of Corporate Banks Improved Their Economic Profit
  from the End of 2007 Through 2009

                                 Economic profit growth of European, North American, and Australian
                                             corporate banks during the financial crisis

                                  Growing
                                                  Negative but improving                    Positive and growing

                                                  % of                                 % of
                                                  participants                         participants
                                                                                              51
                                                  50                                   50                                34% of banks
                                                                                                                         have improving
                                                                                                            23           economic profit
                                                  25                                   25
                                                           10            11
                                                   0                                    0
                                                       2005–2007 2008–2009                  2005–2007 2008–2009
             Economic profit trend
                                                   Negative and shrinking                Positive but shrinking
                                                  % of                                 % of
                                                  participants                         participants
                                                                                                            50
                                                  50                                   50
                                                                                                35
                                                  25                    17             25
                                                           4
                                                   0                                    0
                                                       2005–2007 2008–2009                  2005–2007 2008–2009
                                 Shrinking
                                               Negative                                                       Positive
                                                                Economic profit starting point
  Source: BCG Global Corporate-Banking Benchmarking Database.
  Note: Economic profit calculated based on regulatory capital of 8 percent of Basel II RWA, using a long-run pretax capital hurdle rate of 12 percent.




C  O                                                                                                                                     
brought a difficult operating environment. Assuming a                                     and then by large-cap business units. Let’s take a closer
rough long-term pretax capital hurdle rate of 12 percent,                               look at the segments.
their economic profit is still well below 2007 levels. None-
theless, it rebounded in 2009 from the lows of 2008. (See                               The Micro Segment (Serving Clients with Less Than
Exhibit 2.) Going forward, of course, scarcer capital and                               $2 Million in Annual Sales Revenue). It is clear that mi-
changes to capital regulations will likely drive rises in hur-                          cro segments can generate very high profitability. This is
dle rates, which will negatively affect economic profit.                                  oen driven by “transaction champion” strategies in
                                                                                        which more than 70 percent of revenues come from trans-
In terms of segment performance, in 2009, corporate                                     action fees and deposit products. (See Exhibit 3.) Com-
banking business units serving the micro segment had by                                 bined with scale economies from leveraging the retail
far the highest average return on regulatory capital, fol-                              bank’s branches and back office, this dynamic enables
lowed by small- and mid-cap (at roughly the same level)                                 most small-business segments to ride out even sharp rises


     Exhibit 2. The Typical Corporate Bank Saw Economic Profit Rebound in 2009


                                        Evolution of key drivers based on weighted averages for all
                                                 participants, 2007–2009 (indexed to 2007)

                                                                                                                                            Loan margin

                                                                                                                                         100       98      114


                                                                                                                                        2007     2008     2009


         Economic profit                         Pretax operating profit                              Revenue                                 Loan volume

                                       is a                                                                     122          is a       100       121      120
        100                 79                    100       99       102                      100      113
                   73               function                                    minus                                     function
                                        of                                                                                    of
        2007     2008     2009                    2007    2008      2009                     2007     2008     2009                     2007     2008     2009


                                                   Regulatory capital
                                                                           1
                                                                                                       Cost                               Transaction and
                                                                                                                                          deposit margin

                                                   100      123      122                      100      111      110                      100       99       82

                                                 2007       2008    2009                     2007     2008     2009                     2007     2008     2009

                                                  Pretax capital hurdle                      Actual loan losses                           Deposit volume
                                                        rate (%)2                                           472
                                                                                                     274
                                                                                             100                                        100       109      122
                                                    12      12        12

                                                  2007     2008     2009                     2007     2008     2009                     2007     2008     2009


                                                                                                                                        Other fee revenues

                                                                                                                                        100       104      123


                                                                                                                                        2007     2008     2009
     Source: BCG Global Corporate-Banking Benchmarking Database.
     Note: This analysis excludes a small number of participants with severe loan-loss crises (i.e., loan losses greater than 80 percent of their 2009 revenue).
     1
      Defined as 8 percent of Basel II RWA.
     2
      Assumed long-run pretax capital hurdle rate of 12 percent used for all years.




                                                                                                                            T B C G
Exhibit 3. High Deposit and Transaction Revenues Have Lifted the Micro Segment


                           All-participant average, 2009 (basis points per RWA unless otherwise noted)

                   Pretax return on                                    Revenue                              Loan revenue
                 regulatory capital (%)
                                                      1,500                                        600
          40                                    is a
                                             function 1,000                                plus    400
          20                                     of
                                                        500                                        200
           0                                              0                                          0

                                                                                                             Deposit and
                                                                Cost-to-income ratio (%)                 transaction revenue
                                                        80                                         800
                                                        60                                         600
                                                        40                                         400
                                                        20                                         200
                                                         0                                           0

                                                                                                        Investment banking
                                                                  Actual loan losses                risk-management revenue
                                                       400                                         200
                                                       200                                         100
                                                          0                                          0

                                                                                    1
                                                                  Regulatory capital                       Other revenue
                                                       1,000
                                                         750                                       400
               Micro           Mid-cap
                                                         500                                       200
                                                         250
               Small-cap       Large-cap                   0                                         0


  Source: BCG Global Corporate-Banking Benchmarking Database.
  1
   Defined as 8 percent of Basel II RWA.



in loan losses, which are quite common when recessions                      reducing unproductive sales resources were all themes
hit small business. However, some segments in hard-hit                      in 2009.
countries have seen losses that exceed 1,000 basis points,
driving them into the red.                                                  The Mid-Cap Segment (Serving Clients with More
                                                                            Than $25 Million to $250 Million in Annual Sales Rev-
The Small-Cap Segment (Serving Clients with $2 Mil-                         enue). Mid-cap business units can get caught in between
lion to $25 Million in Annual Sales Revenue). The tale                      the inherent profitability of the small-cap transaction-
is similar in the small-cap space, where transaction cham-                  dominant business and the fee-rich large-cap space. They
pion models have proven highly resilient during the crisis.                 have had less generous pricing and smaller deposit vol-
It is especially critical to manage small-cap costs and pro-                umes (compared with loans) than small-cap units. At the
ductivity in a disciplined way in both the RM organiza-                     same time, they have seen smaller margin increases than
tion and the back office. Cost cutting has been a priority                    large-cap units, while suffering higher loan losses and
in the small-cap segment, with many of our survey par-                      lower revenues from investment banking and risk man-
ticipants reporting cost reductions in absolute terms de-                   agement products. Mid-cap business units also face the
spite growing revenues. Redirecting small-business clients                  challenge of clients demanding relatively large loans
into branch channels, streamlining credit processes, and                    when the data and analytics on these companies can


C  O                                                                                                            
sometimes be sparse. So while mid-cap units have enjoyed                     Large-cap bankers have also succeeded in increasing sales
margin and volume improvements overall, it has been                          of investment banking and risk management products,
quite difficult to create value in this segment during the                     with half of our participants increasing revenues in these
crisis.                                                                      areas by more than 20 percent annually from 2007
                                                                             through 2009.
The Large-Cap Segment (Serving Clients with More
Than $250 Million in Annual Sales Revenue). The                              Differences Within Segments. Despite these general
large-cap segment has been the toughest environment                          trends, it is worth noting that within each segment there
overall in which to create value. However, the perfor-                       were wide differences in performance among individual
mance gap between typical large- and mid-cap units has                       banks in 2009. (See Exhibit 4.) These differences were
narrowed during the crisis. This is due to a relatively large                more pronounced than in previous surveys because the
increase in credit margins in the large-cap segment. A key                   crisis has more sharply divided top from bottom perform-
factor is the fact that these lenders in many cases had ex-                  ers. Moreover, these variations were not the result of dif-
tremely low lending margins before the crisis. Some ex-                      ferent economic conditions in different countries. We
ecutives we interviewed even described these thin mar-                       found multiple cases of business units in the same seg-
gins as “irrational.”                                                        ment and country with return on regulatory capital dif-
                                                                             ferences exceeding 20 percentage points.
In our 2007 survey, multiple business units had total cred-
it revenue per risk-weighted asset (RWA) well below 100                      Regional Views. Important variations also emerged
basis points, a level inconsistent with value creation on a                  among regions. In Western Europe, for example, revenue
standalone basis. In this year’s survey, many large-cap                      growth partly cushioned the blow of rising loan losses, at
participants reported margin increases since 2007 of this                    least for some banks. By contrast, our discussions with
amount or even more, effectively doubling their lending                       corporate banking executives revealed widespread wor-
margins.                                                                     ries about macroeconomic stability and a possible dou-


  Exhibit 4. There Were Wide Variations in Performance Within Segments in 2009

                                          Return on regulatory capital for top-, average-, and
                                         bottom-performing business units by segment, 2009
        Average pretax return on
        regulatory capital (%)1
        120                     115

        100

          80

          60
                                                                  44                              41
          40                –25                                                                                           33
          20
                                                            –8                           –6
           0                                                                                                         0
                                                                                                             –7
        –20                                       –17                            –15
                   –24
        –40
               Bottom three        Top three    Bottom three     Top three     Bottom three   Top three   Bottom three   Top three
                           Micro                           Small-cap                    Mid-cap                    Large-cap
                         Average 2007                   Average 2009

  Source: BCG Global Corporate-Banking Benchmarking Database.
  1
   Defined as 8 percent of Basel II RWA.




                                                                                                        T B C G
ble-dip recession. Some banks in Western Europe suf-              The Asia-Pacific region, in general, was relatively shel-
fered particularly severe loan losses from excessive              tered from the crisis despite the exposure of many com-
exposure to sectors like real estate or shipping, or too          panies (and their banks) to trade with Europe and the
much concentration in hard-hit markets like Spain.                United States. IMF data suggest that overall economic
                                                                  growth in the region—excluding Japan, Taiwan, Singa-
In Central and Eastern Europe, banks also saw revenue             pore, Hong Kong, and South Korea—did not dip below 6
growth of 15 percent or more, on average. Yet severe loan         percent from 2007 through 2009.
losses had a crippling effect on many busi-
ness units, jumping by more than 250 ba-                                        Observers continue to monitor issues re-
sis points of RWA at multiple players from      Many corporate banks            lating to macroeconomic stability in some
2007 through 2009.                                have not properly             countries in the region, and specific sec-
                                                                                tors (especially export-dependent compa-
                                                 factored risk into their
In the United States, the speed and sever-                                      nies) may pose loan-loss challenges to
ity of loan losses, especially in commercial             pricing.               banks. But the growth outlook in Asia- Pa-
real estate, were a surprise to many. Some                                      cific remains relatively optimistic. Our in-
banks suffered losses in 2009 that wiped                                         terviews with executives at both local and
out their pretax profits of the previous several years or        international banks in the region confirm that many in-
more. We also found that U.S. banks with highly sophisti-       stitutions are once again looking for growth.
cated product offerings across cash management and oth-
er fee-based products weathered the storm better, while
smaller banks that were more dependent on both lend-            The Lessons of the Crisis
ing and deposit-spread revenue suffered. How successful
these stronger banks will be at picking up strategic rela-      Aer reviewing the experiences of top performers during
tionships from damaged rivals will be a key issue going         the crisis and speaking with senior corporate-banking ex-
forward.                                                        ecutives, BCG has identified a number of axioms that
                                                                banks would do well to remember.
Meanwhile, Canadian banks and their Australian coun-
terparts came through the crisis in excellent condition.        The first is to always keep risk at the top of the agenda. Cor-
Some posted margin increases of over 100 basis points,          porate banks should fully factor risk, as well as liquidity
with loan losses staying below 25 basis points. Their suc-      and capital management, into their long-term strategies,
cess was partly due to relatively strong national econo-        operational planning, and day-to-day management. This
mies, but other factors—such as a sustained focus on the        fundamental rule was neglected by many of the lowest-
core commercial-banking business (instead of driving for        performing corporate banks.
growth in riskier sectors) and conservative risk-manage-
ment practices—suggest that choices by senior manage-           Indeed, too many bankers focused on revenue and
ment also played a major role.                                  market share—not factoring in the “real” costs of risk,
                                                                liquidity, and capital—when making lending and pricing
In Latin America—particularly in the region’s leading           decisions. Our 2008 corporate-banking report noted that
market, Brazil—the outlook for corporate banking is             from 2005 through 2007, at what turned out to be the
quite favorable. Aer facing sizable loan losses and re-        peak of a very positive run of economic growth, only
duced liquidity, Brazilian corporate banks are aggressive-      about half of corporate banks were generating positive
ly returning to loan growth. Most key players are focusing      (and rising ) economic profit. The economic climate hid
their efforts on the mid-cap segment. Capital markets            the fact that the revenue growth of many banks was the
should develop in line with Brazil’s generally favorable        result of more loans to relatively risky clients. Seen today
macroeconomic outlook, offering investment banking op-           through a prism of realistic liquidity premiums, risk costs,
portunities. Transaction banking will continue to play an       and capital charges, it is clear that many of these deals de-
extremely important role, leveraging the sophistication         stroyed value. Generally speaking, many corporate banks
and innovative electronic capabilities of the Brazilian         have not properly factored risk into their pricing. (See Ex-
payments system.                                                hibit 5.)


C  O                                                                                                      
A second lesson is that corporate banks should manage                       entrenched local banks that have superior market knowl-
their businesses like a portfolio, with an “over the cycle”                 edge and a less urgent need to quickly acquire clients to
point of view. Businesses such as commercial real estate                    cover the costs of a newly expanded sales force. This is a
and equipment finance can be profitable, but banks must                       lesson that banks must keep in mind as they consider
be disciplined enough to monitor the growth of such busi-                   how to take advantage of the rapid growth in corporate
nesses, especially during “good” years. It is also critical                 banking in rapidly developing economies.
not to let one or two sectors that appear to be highly lu-
crative grow too large in the portfolio. A collapse in these                Finally, and most important in the long run, corporate
areas can create painful loan losses as well as eliminate                   banks must cultivate deep client relationships. A salient
a significant portion of the bank’s overall revenue                         point, one that some institutions have had to learn the
stream.                                                                     hard way during the crisis, is that reputational risk is real.
                                                                            For example, selling clients inappropriate financial instru-
International or “out of footprint” expansion provides an-                  ments can result not only in costly litigation but also in
other lesson: corporate banks must be extra cautious outside                long-term damage to a bank’s franchise. Somewhat less
their home markets. It has always been extremely difficult                    severe damage can result from cutting credit lines with
to leverage a successful business model in one country                      long-standing clients or dramatically raising margins.
into a new environment. Credit-led expansion, in particu-
lar, can be dangerous, especially if competitors have ei-                   Our research with corporate banking clients indicates
ther superior knowledge of client risks or better capabili-                 that many are reviewing their banking relationships,
ties in valuing and managing collateral. It is all too easy                 seeking to “diversify their portfolio” with multiple banks.
for a new entrant to end up with the clients rejected by                    Clients are also more conscious of the need to choose


     Exhibit 5. Many Corporate Banks Have Not Properly Factored Risk into Their Pricing


                                       Comparable mid-caps: relative credit-revenue performance, 2007,
                                                 versus loan-loss deterioration, 2007–2009
                 Change in actual losses
                 per RWA, 2007–2009 (basis points)
                  –100         –80      –60         –40     –20      0        20        40       60       80       100      120
                  0


                 –20


                 –40     Banks with the lowest
                         pricing have faced the
                         biggest deterioration in
                 –60     loan losses


                 –80


                –100


                –120
                                                                  Average

                –140

                                                                                        Total credit revenue per loan volume
                                                                                       relative to average, 2007 (basis points)
     Source: BCG Corporate-Banking Benchmarking Database.




                                                                                                        T B C G
banks with strong balance sheets and reputations in or-           will also be affected by rule changes related to counter-
der to avoid becoming collateral damage in a bank’s next          party risk). Loan classes with sporadic heavy losses, such
liquidity crunch. Of course, corporate banking clients are        as those to large corporations, may also be severely af-
also more aware of the liquidity and risk challenges that         fected.
banks face. Many understand that banks extending cred-
it need to cross-sell to be viable, and that the low lending      Higher capitalization requirements will result in scarcer
rates of 2006 are not likely to return. Whether this new          and therefore more expensive capital. Not only will cor-
understanding withstands a return to more                                          porate banks have to compete with sister
normal economic-growth conditions, or cli-                                         business units for capital, but higher hur-
ents and their banks return to the heady
                                                          The regulatory           dle rates at many banks will mean that
precrisis mindset of low margins and high             response to the crisis       corporate units will have to work harder
risk tolerances, remains to be seen.                                               to generate economic profit from their
                                                        remains a work in
                                                                                   client bases.
                                                             progress.
The New-Normal Regulatory                                                         Leverage requirements, depending on
Environment                                                                       how they are structured, will have an im-
                                                                  pact on high-leverage businesses such as real estate and
The regulatory response to the crisis remains a work in           government finance, as well as on contingent liabilities
progress. But it is virtually certain that a climate of great-    and undrawn credit lines. The impact on products such
er conservatism and risk avoidance will prevail and that          as asset-based lending and small-business loans guaran-
new regulations will have a material impact on the cor-           teed by governments, where regulations may not fully
porate banking industry. Reporting requirements will be-          recognize the low-risk nature of the lending, will also
come increasingly onerous—placing another burden on               have to be carefully watched.
finance and risk analysts serving the corporate banking
business unit, as well as on frontline sales staff.                Rules on liquidity risk will make transaction banking and
                                                                  its pools of deposits attractive, although details on the
The regulatory agenda covers a vast array of highly com-          treatment of “sticky” core corporate deposits will have an
plex and interrelated issues. They range, for example,            effect on internal transfer pricing and therefore on trans-
from Basel III topics such as redesigned rules on RWA             action banking economics.
methodology, capital adequacy, leverage ratios, and li-
quidity risk, to areas such as “financial crisis responsibil-      Finally, new central counterparty rules may have an im-
ity fees,” inappropriate incentives, and central counter-         pact on sales of derivatives to mid- and large-cap business
party requirements for derivatives.                               units. Capital requirements for standard products should
                                                                  decline, but corporate banks will also face greater pricing
It will be critical for corporate banking executives to mon-      transparency and potential disintermediation from elec-
itor developments and ensure that their banks retain the          tronic platforms. Customized products—which will likely
flexibility to respond to regulatory changes as they be-           face significantly higher capital requirements—will be-
come finalized. In the coming months, bankers will need            come much more costly to provide.
to think two moves ahead to be ready for possible actions
by regulators.                                                    Overall, upcoming regulatory changes are sure to increase
                                                                  the cost of providing financial services to corporate cli-
More specifically, there are four interconnected factors           ents. It remains to be seen which banks will be most suc-
whose regulation will significantly affect corporate bank-          cessful at passing these extra costs on to their clients. Do-
ing: risk measurement (including RWA), capitalization, le-        ing so will require rigorous data and analytics to
verage ratio, and liquidity risk. The impact of changes in        incorporate true risk, liquidity, and capital costs into prod-
these areas will vary by product and segment.                     uct pricing. It will also require strong sales and communi-
                                                                  cations skills with clients, and discipline in competing
New RWA definitions will hit RWA-intensive products                with banks that continue to price below their true cost
hard, including client-driven trading businesses (which           levels.


C  O                                                                                                        
The Blue-Chip
                             Corporate Bank
       How Top Institutions Are Positioning Themselves to Win




S
           trong economic growth and low loan losses al-       Building Premium Client Relationships
           lowed many corporate banks to post strong
           profits in the years leading up to the crisis. But   Banks that outperformed both before and during the cri-
           the gap between top and bottom performers           sis tend to share three characteristics in their distribution
           from 2007 through 2009 was extremely wide.          models.
Given the megatrends in play and the new-normal eco-
nomic and regulatory environments, we expect this gap          First, their overall philosophy is driven by the develop-
not to narrow but to increase in the coming years. BCG’s       ment of deep client relationships as opposed to a focus
benchmarking data show that the gap between top and            on sales at any cost. Their sales capabilities are still very
bottom performers is so large that even a period of lower      high, but they place a premium on understanding the cli-
loan losses and recovering economic growth would not           ent and the client’s industry and providing superior ser-
allow low-performing banks to come close to the top per-       vice, expert advice, and solutions that help the client suc-
formers in terms of overall profitability.                      ceed. At a limited number of banks, we are seeing top
                                                               performers put a much greater emphasis on the corpo-
Indeed, in our view, the postcrisis era will witness the       rate “client experience”—defining what the target client
emergence of the blue-chip corporate bank. Such banks          experience is, training their RMs and client service teams
will be the jewels in the portfolios of leading universal fi-   on how to deliver it, and tracking client perceptions of
nancial institutions. They will generate steady long-term      how RMs and client service teams are succeeding.
profit growth thanks to superior business models, excel-
lent risk-management capabilities, and an overall ap-          Blue-chip banks also possess the analytics capability to
proach that focuses on building a value-creating corpo-        identify those client clusters with the highest long-term
rate-banking franchise. By this we mean a balanced             profit potential. Such banks have the richest mix of sta-
business that focuses on deep and profitable client rela-       ble, fee-based cash-management services, enabling the
tionships rather than growth in burgeoning (but risky)         credit needed for the relationship to be provided on a
products or sectors. Blue-chip banks will show greater dis-    sustainable, risk-adjusted basis. Analytical insights can
cipline in responding to economic recovery, while their        be used both by senior managers for strategic planning
bottom-quartile competitors may well return to aggres-         and by individual RMs or client service teams to better
sive deal making. Already in the first quarter of 2010 we       understand their clients’ needs and revenue potential.
saw falling lending margins as well as easier and longer
loan terms in some markets, trends that are reminiscent        Finally, blue-chip banks have rigorous relationship-man-
of 2006 and the circumstances that preceded the crisis.        agement, sales, and service processes. These feature struc-
                                                               tured and standardized client-planning methods, strong
In the course of our case work and benchmarking efforts,        teaming with product specialists, intense performance re-
we have identified five core priorities of the blue-chip cor-    views and coaching, and transparent data about sales
porate bank that leading institutions are already embrac-      pipelines and client service team performance. A few top
ing for the postcrisis era. Let’s examine each one.            banks have also implemented structured client feedback


                                                                                          T B C G
to ensure that RMs and client service teams are not just            rapidly growing markets constituted proof that their risk-
selling to clients but also bringing them the full relation-        management practices were adequate. There was oen a
ship value of the bank. The result of this approach is a su-        misplaced confidence that the boom would continue in-
perior client experience that generates loyalty—which, in           definitely, as well as a glaring lack of expertise concerning
turn, translates into deep wallet penetration of the most           corporate-lending risk assessment, liquidity pricing, the
attractive clients in each segment.                                 transfer of funding costs, and monitoring mechanisms
                                                                    needed to identify failing loans early.

Creating a Culture of Risk                                                          Blue-chip players create a culture of risk
Awareness and Accountability                           The risk function            awareness and accountability at every lev-
                                                       needs to get                 el. The first line of defense lies with the
As the financial crisis has evolved, atten-                                          front office—as opposed to having the
                                                         out of its
tion has shied from banks’ initial losses                                          front office push on the accelerator when
in subprime and related securities to more                ghetto.                   the risk department tries to step on the
traditional asset classes, including corpo-                                         brakes. The overall risk-management func-
rate loans, commercial real estate, and                                             tion regarding standards, infrastructure,
specialty finance activities that bolstered revenue growth        and methodologies is centralized, but every individual in
during the boom years. Many banks in Europe and the              every department is held responsible for any activity that
United States, for example, focused on fast-growing com-         involves risk.
mercial-real-estate markets instead of “bread and butter”
corporate-client relationships, sometimes ending up with         In our conversations with blue-chip banking executives,
greater exposure to commercial real estate than to all of        one of the most common words used was discipline. These
their core clients combined.                                     banks are prepared to lose market share rather than slash
                                                                 margins or end up with an unbalanced portfolio of assets
During the crisis, some banks’ transformation from as-           and businesses. Before the crisis, executives at more than
sumed profitability to a state of extreme distress was rap-       one high-performing bank told us about deals they had
id and stunning. Moreover, banks that were already show-         le to more aggressive international banks or commercial
ing high exposure to bad loans tended to get hit the             financing companies because they thought the risk-ad-
hardest. Even worse, the banks with the riskiest portfolios      justed pricing was too low. Now, having navigated the cri-
did not end up being compensated for that risk by suffi-           sis with strong financial performance, these blue-chip
cient additional revenue.                                        banks are using their balance sheets to grow—maintain-
                                                                 ing their discipline—while less careful banks retrench.
The revelation to the market—and to the banking indus-
try itself, to some degree—was that precious few financial        Overall, to build a strong risk culture, there are five basic
institutions had a true awareness of the need for rigorous       measures that corporate banks can take.
risk management. In fact, practices that oen paid off
handsomely in the short term—such as pushing large               Maintain the strong independence of risk control
loans to large corporate clients, concentrating on con-          functions. The risk function needs to get out of its ghet-
struction and other real-estate loans, and competing on          to. What’s needed is a culture of true risk management—
loan margins—fostered a culture of daring in which those         not just risk reporting and upward delegation. Risk man-
who threw caution to the wind were seen as great sales           agers must be properly compensated and recognized and
people rather than as reckless.  3
                                                                 their independence from the front office guaranteed.
                                                                 They must also be encouraged to be proactive. As one
Moreover, chief risk officers at many banks did not have           risk specialist observed, “Risk functions need to go look-
sufficient levers to influence credit allocation and pricing        ing for trouble rather than waiting for trouble to find
decisions. Compensation schemes were too closely linked          them.”
to top-line performance only, with no adjustments for
risk, liquidity, capital, and operating costs. Many banks        3. See Risk and Reward: What Banks Should Do About Evolving Finan-
mistakenly believed that their strong performance amid           cial Regulations, BCG White Paper, March 2010.


C  O                                                                                                           
Ensure senior-management competence in risk man-                   kets—and high profitability over the economic cycle. Pre-
agement. Those banks that have best weathered the cur-             vious BCG corporate-banking reports have documented
rent crisis typically possess a wealth of accumulated ex-          the tendency of transaction champion models to outper-
perience in risk management across sales, product                  form. This finding has held true during the crisis. (See Ex-
development, and general management functions. They                hibit 6). Moreover, our benchmarking revealed stark dif-
also tend to set aside time for thoughtful consideration of        ferences among competitors in areas such as deposit
risk trends and scenarios, with a premium placed on busi-          volume generation, revenue generation, and client pene-
ness judgment rather than having the risk                                         tration of transaction banking products.
analysts slice and dice the risk data into                                        (See Exhibit 7.)
lengthy and complex reports that go un-                Even deals with
read.                                                  prestige clients           To win at transaction banking in the post-
                                                                                  crisis era, institutions will certainly need
                                                       must be openly
Adopt incentives that take risk manage-                                           solid product capabilities—but even more
ment performance into account. The                        scrutinized.            important is a true sales and service men-
key issue is not bonus levels alone but the                                       tality. They will also need effective deliv-
need to explicitly link bonuses to risk-ad-                                       ery and operating models.
justed performance over a sufficient period of time. Some
banks rewarded RMs purely on the basis of loan volumes             Blue-chip corporate banks will improve their capabilities
and revenues rather than long-term economic profit.                 by moving beyond traditional product-centric cultures to
                                                                   more solution-oriented ones. A prime element of this
Encourage healthy debate. Deals, especially the most               transition is the gradual building of financial-supply-
complex ones, must be discussed in depth. Even deals               chain offerings that provide an integrated set of services
with prestige clients brought in by top-performing                 ranging from new products (such as e-invoicing) and val-
RMs must be openly scrutinized. The role of risk com-              ue adds (such as working-capital optimization and li-
mittees in fostering such discussions is essential, as is the      quidity management) to traditional payment services.
role of senior risk specialists. The latter are critical to        Products will span the supply chain, serving both sides
productive thought partnering with sales and other ex-             of the transaction—as illustrated by financing based on
ecutives. Banks whose risk analysts are junior staff lim-           the buyer’s credit rating that actually finances the buy-
ited to generating reports not only are missing a signifi-          er’s supplier.
cant opportunity but are putting the organization at
undue risk.                                                        Moreover, leading corporate banks will strengthen their
                                                                   online-access capabilities. Larger clients will increasingly
Improve risk data and analytics. Banks must invest to              access their bank’s services through their own enterprise-
improve their data gathering, reporting, and analytics on          resource-planning systems, allowing for far greater func-
their clients. Outside observers are oen startled to learn        tionality and the deepening of relationships at the same
that some well-known corporate banks struggle to com-              time. Smaller companies will use e-portals that offer
pile holistic relationship risk data on major clients, to          banking clients quick and easy access to a broad array of
match risk department data with finance department                  products and services, free up human resources for more
data on loans, or to quickly identify deteriorating loans          value-added activities, reduce errors, and improve the cli-
for handling by their special loans groups.                        ent experience.

                                                                  E-portals not only migrate transaction volume from cost-
Enhancing Transaction Banking                                     ly branch and call-center channels but also enable what
Capabilities                                                      we call customer-initiated cross-selling. A client using an e-
                                                                  portal finds it easy to access added functionality—for ex-
The crisis has highlighted the attractiveness of transaction      ample, to lock in a forward exchange rate or sign up for a
banking. It is a business that can provide reliable (and          cash-flow forecasting service. And as clients become more
growing) fee and spread revenues, rich deposit volumes—           dependent on their banks’ online products and services,
critical to reducing reliance on wholesale funding mar-           they will find it much more onerous to change their bank-


                                                                                              T B C G
Exhibit 6. Transaction Champions Tend to Outperform, Even in a Climate of Depressed
  Deposit-Interest Margins

                                                               Mid-cap revenue mix, 2009
                                   %                       2                                                            2
                                   100
                                                                                Transaction volumes down                8
                                                          14                       in 2009 versus 2007                  3
                                    80
                                                                                 Deposit margins down
                                                          33
                                    60
                                                                                                                       87
                                    40                                          Loan interest margins up
                                                                                 but loan losses also up
                                                          51
                                    20


                                      0
                                              Transaction champions                                         Credit-heavy traditionalists
     Revenue per RWA (basis points)                     605                                                            249
     Return on regulatory capital (%)1                   31                                                             8
     Crisis impact since 2007                       ROE up for most                                               ROE down for all


          Investment banking, risk management, and asset management products
          Transaction fees       Deposit interest income    Loan interest and fees


  Source: BCG Global Corporate-Banking Benchmarking Database.
  1
   Based on the worst three-year average of actual or expected loan losses.




  Exhibit 7. In Transaction Banking, There Are Major Performance Gaps Between
  Competitors

                                                              Mid-cap peer group:
                                                  key transaction-banking performance drivers
           Deposit volume generation                               Revenue generation                            Client penetration
                                                            Transaction fees plus deposit                  Percentage of clients
          Deposit-to-loan                                   interest income/deposit volume                 using transaction
          ratio (%)                                         (basis points)                                 banking services
          80                                                220                                            100
                                                            200
                                                            180                                             80              30 percentage
          60                                                                                                                    points
                                                            160                    2.5X
                                                                                (9X fees)
                                                            140
                                                                                                            60
                                      4X                    120
          40
                                                            100
                                                             80                           Transaction       40
                                                                                          fees
          20                                                 60
                                                             40                           Deposit           20
                                                                                          interest
                                                             20                           income
           0                                                  0                                              0
                 Top three     Bottom three                         Top three     Bottom three                   Top three Bottom three
  Source: BCG Corporate-Banking Benchmarking Database.




C  O                                                                                                                       
ing relationship. But building a superior e-portal and cost-    teams and strategy discussions, so that there is positive
efficient back-end systems requires significant, continu-          feedback between strategy formulation and what is (and
ous investment.                                                 is not) possible on the IT and operations fronts.

Finally, to state the obvious, developing a winning            A key element of this interaction is oen the articulation
transaction-banking value proposition for clients is not       of a shared target operating model, based on a clear and
easy. It requires a long-term commitment to building           quantified view of the desired client experience for the
product platforms, optimizing operational                                      relevant client segment. This experience
processes, and embedding the concept of                                        must be linked to the bank’s business
the balanced product suite in the sales           Building a superior          strategy—whether it is trying to be, for ex-
force. In addition, it is worth stressing that     e-portal requires           ample, an “easy and convenient” transac-
merely developing product capabilities is                                      tion bank for small businesses or a “fast
                                                significant, continuing
not enough—the sales force must be fully                                       and flexible lender” for larger clients with
engaged and capable of selling the prod-              investment.              more sophisticated needs.
ucts to clients. Banks that focused on
these elements of their business before                                        Specific initiatives may vary by segment,
the crisis are now enjoying the dividends, generating the      product, and bank, but they generally have common
profits needed for further investment to make it even           themes, such as the following:
more difficult for latecomers to attack the market effec-
tively.                                                        ◊ Reducing redundant tasks and related errors that af-
                                                                  fect the customer experience, particularly in cash man-
                                                                  agement and lending processes
Forging the Next-Generation
Operating Model                                                 ◊ Moving operational work to central contact centers or
                                                                  online platforms to allow the sales force to concentrate
Now more than ever, corporate banks need to overcome              on selling products and managing relationships
the old-fashioned view that theirs is a purely “face to
face” business, requiring minimal investment in process         ◊ Improving data capture and quality, as well as analyt-
and technology. We have seen seriously outdated legacy            ics, in order to improve client insight
IT systems at some major institutions. In order to win in
the postcrisis era, corporate banks need to be proactive        ◊ Simplifying, standardizing, and automating core proc-
about remodeling their business processes and IT archi-           esses as much as possible (which requires careful con-
tecture.                                                          sideration of what should be standard and what should
                                                                  be customized when it can add value for clients)
The difficulty is that corporate banking back offices are
oen small compared with their retail-banking equiva-           ◊ Leveraging scale in operational activities and enabling
lents and can take longer to recover significant one-time          significant cost reduction
IT investments, resulting in more challenging project eco-
nomics. Consequently, corporate banking divisions some-         ◊ Capturing cross-border opportunities in order to build
times get short shri when IT and reengineering invest-           scale and seek lower factor costs (such as by offshoring
ments are decided each year.                                      or creating multicountry product factories)

Blue-chip corporate banks take a long-term view of the          In the course of our client work, we have seen some lead-
critical operations and IT enablers that support their suc-     ing corporate banks develop product factories where op-
cess. They continually implement projects to enhance ef-        erations and IT platforms serve customers in multiple
fectiveness and efficiency, taking a holistic “end to end”        countries. We have also witnessed the evolution of lean
perspective on their operating model, from the client           credit processes that segment loans according to their
through the sales force to the back office. They also in-         complexity. This allows applications to be handled more
volve IT and operations specialists in their management         efficiently through clean, quick, risk-appropriate decision


                                                                                          T B C G
processes, appropriately differentiated according to small-      for loan applications, and costs per transaction in cash
cap, mid-cap, and more complex loans.                           management.

Overall, next-generation operating models will need to          However, the benefits of end-to-end transparency are sig-
fulfill broader sets of requirements than in the past, ad-       nificant. Banks with strong capabilities in tracking and
dressing not only costs along the value chain but also cus-     reporting on a segment-specific basis across revenue,
tomer satisfaction and perception. The customer view on         costs, loan volume, RWA, and economic capital—as well
operational excellence will increasingly be a key driver of     as in tracking and reporting client, product, and sales
banks’ profitability levels.                                     force data—tend to significantly outperform banks with
                                                                weaker capabilities. (See Exhibit 8.)

Developing End-to-End Transparency                              Blue-chip corporate banks, where the mantra is oen
and a High-Performance Organization                             “what gets measured gets done,” are moving in this direc-
                                                                tion. We believe that the ongoing improvements in cheap-
Many corporate banks claim to be working on initiatives         er computing power and the constant availability of elec-
such as those discussed above. But corporate banking is         tronic data are bringing the industry to a tipping point
a highly complex business. It is no cakewalk to accom-          where leading banks will transform how they are man-
plish true change across organizational boundaries or           aged. Consider the following questions, which many cor-
along the value chain. Nor is it easy to build the underly-     porate banks have difficulty answering, but which are in-
ing data and analytics capability or to attract the sales       creasingly discussed at leading banks:
and managerial talent required to make a large, extreme-
ly complicated system hum along efficiently.                        Exhibit 8. Performance Is Strongly Linked
                                                                  to the Quality and Transparency of Data
In our experience, two key attributes drive the ability of
                                                                  and Reporting
high-performing banks to tie these complex elements to-
gether into a powerful corporate-banking business mod-
                                                                                   All participants, 2009
el: end-to-end transparency and a high-performance or-
                                                                  Average return
ganization.                                                       on regulatory
                                                                             1
                                                                  capital (%)
End-to-End Transparency. Given the amount of data                 30
tracking and monitoring that goes on in banks, it may sur-
prise those in other domains that corporate banks oen            25
struggle to measure the true profitability of individual cli-
ents. Even views by product, channel, or region can be dif-       20
                                                                                                        12 percentage points
ficult to obtain. Indeed, although it is relatively easy to
track overall loan volumes, revenues, and accounting prof-        15
it, some banks continue to struggle with primitive liquidi-
ty-pricing methodologies and inaccurate cost allocations.         10
It is a tall challenge to achieve the highly granular knowl-
edge of the risk and capital requirements of different prod-        5
ucts and clients that is needed to arrive at an accurate cal-
culation of economic profit, or to gather and maintain the          0
multiyear data needed to assess trends in client profitabil-              Transparency leaders          Weaker performers
ity, client experience, or RM productivity.                             ◊ High levels of transpar-   ◊ Significant gaps in such
                                                                          ency on revenue, cost,       areas as economic
                                                                          risk, liquidity, and         capital, deposit interest
Furthermore, on an operational basis, our case work                       capital                      income, RWA, and
                                                                                                       client data
shows that many banks find it daunting to produce the
                                                                 Source: BCG Global Corporate-Banking Benchmarking Database.
critical management metrics needed to track, for exam-           1
                                                                  Defined as 8 percent of Basel II RWA.
ple, their own sales-force productivity, turnaround times


C  O                                                                                                              
◊ Which client clusters buy the most profitable products,              As the postcrisis corporate-banking industry evolves, an-
  factoring in true liquidity, risk, and capital costs?               swers to such questions will gradually move from the
                                                                      realm of arduous, one-time finance-department studies
◊ How do any client’s purchases from the bank compare                 to that of routine, real-time accuracy. Institutions on the
  with those of similar clients, and are there specific op-            cutting edge of this development will gain a keen advan-
  portunities to cross-sell?                                          tage over their slow-moving rivals.

◊ How do pricing options affect the profitability of any                A High-Performance Organization. Corporate banks
  deal—and the RM’s compensation?                                     are remarkably complex organizations on multiple di-
                                                                      mensions: different client segments and distribution
◊ What sort of feedback from monitoring and workouts                  models; varied products; complex, multisilo value
  needs to be factored into new loan decisions?                       chains—all oen spread across far-flung locations.

◊ How long is the bank’s average turnaround time for a                BCG has developed a framework for a high-performance
  loan application, and which types of loans tend to get              organization in corporate banking. (See Exhibit 9.) In
  bottlenecked?                                                       brief, to achieve true organizational excellence, corporate
                                                                      banking leaders need to think holistically about a wide
◊ Which clients are the riskiest, and which consume the               range of levers. Just focusing on organization charts and
  most capital relative to their value to the bank?                   incentives, which is where many start, is not enough.


  Exhibit 9. BCG Has Developed a Framework for a High-Performance Organization
  in Corporate Banking


              Shared commitment to
            objectives at the top; clear
             commitment of leaders;
            alignment on credit versus
           other products, risk appetite,                                          Overall
              and segment priorities                                             engagement

                                                                                                     Staff engagement along the
                                                                                                       corporate banking value
                                                                                                        chain: sales, products,
                                                                                                         operations, and risk
                                                          Sense of purpose
                                                           and leadership


        Clear single-point
      accountabilities: roles,
     goals, and decision rights
              aligned
                                                                        Performance                  Hard-wired integration
                                             Accountabilities                                        of accountabilities into
                                                                       management and
                                            and collaboration                                      measurement, performance
 Collaboration mechanisms                                                recognition
                                                                                                   management, compensation,
   in place: planning and                                                                                and promotion
   budgeting; operational
         teams; trust
                                                   People management capability




                                              Managers who can break down silo behaviors
                                                   and coach sales staff to succeed


  Source: BCG analysis.




                                                                                                T B C G
Our framework has five key elements that provide a pow-        ◊ People Management Capability: Is there a climate of high
erful lens through which to review the organizational           expectations? Do managers have the capabilities to
alignment of both the overall business model and the            both coach their staffs effectively and work collabora-
specific teams and processes within it:                          tively with colleagues along the value chain in order to
                                                                optimize outcomes for both client and shareholder?
◊ A Sense of Purpose and Leadership: Is there a shared
  commitment to a clearly defined strategy, with specific       ◊ Overall Engagement: Finally, in an era when talent man-
  financial and client objectives? Or, as we have seen at        agement will be ever more important, are employees
  multiple banks, is the sales force focused on loan vol-       in every role engaged and aligned with the organiza-
  ume while the transaction banking division works in           tion’s objectives?
  isolation on cash management sales and the CFO asks
  about economic profit?                                       These are difficult challenges that cannot be dealt with
                                                              all at once or by a small, centralized team. They must be
◊ Accountabilities and Collaboration: Are there clear roles   tackled on an ongoing basis throughout the organization,
  defined for all members of the team regarding both in-       from the senior executive team to the frontline. Our cli-
  dividual and shared accountabilities? Or, for example,      ent experience shows that banks that think deeply and
  is it unclear what the respective roles of the RM, port-    oen about these issues build an organization that is
  folio-monitoring, and special-loans teams are with re-      highly capable of delivering value to clients and handily
  spect to “watch list” clients?                              surpassing competitors.

◊ Performance Management and Recognition: Is outperfor-
  mance on strategic objectives celebrated? Are the fi-
  nancial and operational metrics clearly understood
  and aligned with incentives? Is there a rigorous proc-
  ess in place for productive coaching and performance-
  management discussions?




C  O                                                                                                
Conclusion
                Asymmetric Competition and How the Leaders
                      Will Deepen Their Advantage




I
       n the boom years from 2004 to 2007, most corpo-         tract a premium franchise of first-rate clients that provide
       rate banks grew robustly. Amid surging econo-           a steady and increasingly diversified stream of revenues
       mies, low loan losses, and readily available cheap      from capital-light products. At the same time, these blue-
       capital, it did not really matter whether a bank        chip banks will be able to trim costs and place themselves
       had top- or bottom-quartile capabilities in prod-       in a better position for the next down-cycle. Lower-tier
ucts, cost management, or risk management. All that            banks will suffer from relatively weak profitability even
mattered were workable sales processes.                        in good market years. They will end up with a lower-qual-
                                                               ity client base and alarming losses during recessions. And
But the crisis rudely awakened legions of banks. While         they will not contribute much to total shareholder re-
some successfully navigated the crisis, others suddenly        turn—instead contributing all too much to enterprise risk
found themselves with devastating loan losses, client          levels and to capitalization and funding troubles.
portfolios whose quality profiles had deteriorated over-
night, and revenues that relied excessively on rapidly         Furthermore, the corporate bank is just one part of any
weakening sectors.                                             universal bank’s portfolio. As blue-chip corporate-bank
                                                               leaders are fêted as champions at the CEO’s off-site gath-
Today, looking ahead to the less exuberant business envi-      ering—and given virtually as much capital, funding, and
ronment that will characterize the next five to ten years,      IT resources as they want in order to further increase the
we will likely see a continuation of the recent pattern—       economic profit of the business—lower-tier corporate
high-capability corporate banks widening the perfor-           banks will oen be treated as scapegoats.
mance gap between themselves and the rest of the field.
Behind this dynamic is a virtuous cycle for leading
banks—and a vicious one for weaker institutions—that



                                                               T
the crisis has fueled. Simply put, when a strong bank puts             aking the long view, we offer the following con-
into play a focused, highly trained, and motivated sales               cluding thoughts. Major financial upheavals such
force—along with sharply calculated risk-based pricing                 as the one we have witnessed over the past 24 to
and a comprehensive transaction-banking offering—it             36 months—dire as they may seem for a time—present
captures the best clients. And it generates the profits need-   opportunities, not just threats, to institutions that develop
ed for further investments in products and other capabil-      the most robust business models and the most creative
ities, deepening the advantage. Meanwhile, its pricing acu-    strategies. Leading institutions use highly uncertain times
ity forces bad clients to weaker banks, which oen end up      to their advantage, gaining market share and a competi-
with higher (and sometimes crippling) loan losses—all of       tive edge over slower-moving rivals that simply try to en-
which helps reinforce and perpetuate the cycle.                dure crises and hope for the best. The leaders seize the
                                                               moment to begin the process of becoming a truly blue-
Taken as a whole, these dynamics will significantly ben-        chip player. In the end, corporate banks can largely con-
efit blue-chip banks and inflict varying degrees of dam-         trol their own destinies by determining which type of in-
age on lower-tier institutions. The former group will at-      stitution they aspire to be.


                                                                                          T B C G
For Further Reading
The Boston Consulting Group pub-         Regaining Lost Ground: Global            Retail Banking: Winning
lishes other reports and articles that   Wealth 2010                              Strategies and Business Models
                                         A report by The Boston Consulting        Revisited
may be of interest to senior financial    Group, June 2010                         A White Paper by The Boston Consulting
executives. Recent examples include:                                              Group, January 2010
                                         Life Insurance in Asia: New
                                         Realities and Emerging                   The Near-Perfect Retail Bank
                                         Opportunities                            A White Paper by The Boston Consulting
                                         A White Paper by The Boston Consulting   Group, November 2009
                                         Group, April 2010
                                                                                  Come Out a Winner in Retail
                                         Building a High-Powered Branch           Banking
                                         Network in Retail Banking                A White Paper by The Boston Consulting
                                         A White Paper by The Boston Consulting   Group, September 2009
                                         Group, March 2010
                                                                                  Value Creation in Insurance:
                                         Risk and Reward: What Banks              Laying a Foundation for
                                         Should Do About Evolving                 Successful M&A
                                         Financial Regulations                    A White Paper by The Boston Consulting
                                         A White Paper by The Boston Consulting   Group, September 2009
                                         Group, March 2010
                                                                                  Weathering the Storm: Global
                                         Aer the Storm: Creating Value in        Payments 2009
                                         Banking 2010                             A report by The Boston Consulting
                                         A report by The Boston Consulting        Group, March 2009
                                         Group, February 2010

                                         Leveraging Consumer Insights in
                                         Insurance
                                         A White Paper by The Boston Consulting
                                         Group, February 2010




C  O                                                                                                 
Note to the Reader
Acknowledgments                            Keith Halliday             Nicolas Harlé
We would like to thank the financial        BCG Toronto                BCG Paris
institutions that participated in our      +1 416 955 4200            +33 1 40 17 10 10
benchmarking survey. Their contri-         halliday.keith@bcg.com     harle.nicolas@bcg.com
butions provided invaluable insights
into the drivers of performance in         Achim Schwetlick           Jonas Lagerstedt
the industry. We would also like to        BCG New York               BCG Stockholm
thank our colleagues in BCG’s Finan-       +1 212 446 2800            +46 8 402 44 00
cial Institutions practice for their       schwetlick.achim@bcg.com   lagerstedt.jonas@bcg.com
contributions to this report—particu-
larly Carlos Barradas, Carsten             Europe                     Duncan Martin
Baumgärtner, Douglas Beal, Amy             Carlos Barradas            BCG London
Chou, Jeffrey Chua, Allard Creyghton,       BCG Lisbon                 +44 207 753 5353
Stefan Dab, Alenka Grealish, Carina        +351 21 321 4800           martin.duncan@bcg.com
Hellak, Jonas Lagerstedt, KC Li, Holg-     barradas.carlos@bcg.com
er Michaelis, Stefan Mohr, Peter Neu,                                 Asia-Pacific
Alison Sander, Shubh Saumya, Rob           Martin Buchar              Douglas Beal
Sims, Niclas Storz, Masao Ukon, Ra-        BCG Prague                 BCG Dubai
hul Wadhawan, and Andre Xavier—            +420 227 060 111           +971 4 509 6700
as well as David Rhodes and Daniel         buchar.martin@bcg.com      beal.douglas@bcg.com
Stelter for their analysis of the global
economic climate in their book Accel-      Gennaro Casale             Jeffrey Chua
erating Out of The Great Recession.        BCG Milan                  BCG Singapore
                                           + 39 0 2 65 59 91          + 65 6429 2500
Finally, we would like to thank Philip     casale.gennaro@bcg.com     chua.jeffrey@bcg.com
Crawford for his editorial direction,
as well as other members of the edi-       Allard Creyghton           Junichi Iwagami
torial and production teams, includ-       BCG Amsterdam              BCG Tokyo
ing Gary Callahan, Kim Friedman,           +31 20 548 4000            +81 3 5211 0300
and Gina Goldstein.                        creyghton.allard@bcg.com   iwagami.junichi@bcg.com

For Further Contact                        Stefan Dab                 Holger Michaelis
For further information about this         BCG Brussels               BCG Beijing
report or BCG’s capabilities in corpo-     +32 2 289 02 02            +86 10 8527 9000
rate banking, please contact one of        dab.stefan@bcg.com         michaelis.holger@bcg.com
the following BCG experts:
                                           Oliver Dany                Matthew Rogozinski
The Americas                               BCG Frankfurt              BCG Melbourne
Jürgen E. Schwarz                          +49 69 9 15 02 0           +61 3 9656 2100
BCG Toronto                                dany.oliver@bcg.com        rogozinski.matthew@bcg.com
+1 416 955 4200
schwarz.juergen@bcg.com


                                                                           T B C G
For a complete list of BCG publications and information about how to obtain copies, please visit our Web site at
www.bcg.com/publications.

To receive future publications in electronic form about this topic or others, please visit our subscription Web site at
www.bcg.com/subscribe.

6/10
Abu Dhabi      Chicago      Kuala Lumpur   New Delhi       Stuttgart
Amsterdam      Cologne      Lisbon         New Jersey      Sydney
Athens         Copenhagen   London         New York        Taipei
Atlanta        Dallas       Los Angeles    Oslo            Tokyo
Auckland       Detroit      Madrid         Paris           Toronto
Bangkok        Dubai        Melbourne      Philadelphia    Vienna
Barcelona      Düsseldorf   Mexico City    Prague          Warsaw
Beijing        Frankfurt    Miami          Rome            Washington
Berlin         Hamburg      Milan          San Francisco   Zurich
Boston         Helsinki     Minneapolis    Santiago
Brussels       Hong Kong    Monterrey      São Paulo
Budapest       Houston      Moscow         Seoul
Buenos Aires   Istanbul     Mumbai         Shanghai
Canberra       Jakarta      Munich         Singapore
Casablanca     Kiev         Nagoya         Stockholm       bcg.com

Bcg Banking 2020

  • 1.
    R GC B  Crisis as Opportunity
  • 2.
    The Boston ConsultingGroup (BCG) is a global manage- ment consulting firm and the world’s leading advisor on business strategy. We partner with clients in all sectors and regions to identify their highest-value opportunities, address their most critical challenges, and transform their businesses. Our customized approach combines deep in- sight into the dynamics of companies and markets with close collaboration at all levels of the client organization. This ensures that our clients achieve sustainable compet- itive advantage, build more capable organizations, and secure lasting results. Founded in 1963, BCG is a private company with 69 offices in 40 countries. For more infor- mation, please visit www.bcg.com.
  • 3.
    Crisis as Opportunity G C B  Jürgen E. Schwarz Martin Buchar Gennaro Casale Oliver Dany Keith Halliday Nicolas Harlé Junichi Iwagami Duncan Martin Matthew Rogozinski Achim Schwetlick Tjun Tang June 2010 bcg.com
  • 4.
    © The BostonConsulting Group, Inc. 2010. All rights reserved. For information or permission to reprint, please contact BCG at: E-mail: bcg-info@bcg.com Fax: +1 617 850 3901, attention BCG/Permissions Mail: BCG/Permissions The Boston Consulting Group, Inc. One Beacon Street Boston, MA 02108 USA
  • 5.
    Contents Executive Summary 5 Megatrends Shaping the Corporate Banking Landscape 8 Globalization 2.0 8 The New Economy 9 Advancing Technology 10 Fallout from the Crisis 11 The Lessons of the Crisis 15 The New-Normal Regulatory Environment 17 The Blue-Chip Corporate Bank: How Top Institutions Are Positioning Themselves to Win 18 Building Premium Client Relationships 18 Creating a Culture of Risk Awareness and Accountability 19 Enhancing Transaction Banking Capabilities 20 Forging the Next-Generation Operating Model 22 Developing End-to-End Transparency and a High-Performance Organization 23 Conclusion: Asymmetric Competition and How the Leaders Will Deepen Their Advantage 26 For Further Reading 27 Note to the Reader 28 C  O 
  • 6.
    T B C G
  • 7.
    Executive Summary T he publication of Crisis as Opportunity, BCG’s crisis or even those that enjoy modestly higher margins in the fourth report on the global corporate-banking near term. The winners will be those that actually leverage industry, comes at a time when the priority of the market dynamics brought on by the downturn to their ad- many corporate-banking leaders is shifting vantage, internalizing the lessons and sharpening their strat- from damage control to finding ways to capital- egies, processes, and value propositions for the long haul. This ize on opportunities created by the global financial crisis. report focuses on the steps that corporate banks must take to rise to this challenge. The downturn has obviously been painful for the corporate banking business. And difficulties stemming from slow eco- As in the past, our report draws on BCG’s Global Corporate- nomic growth in some countries, the financial distress of Banking Benchmarking Database, covering more than 100 clients, and lagging corporate loan losses—which can financial institutions around the world. The database tracks peak months or years aer economic recovery begins—will global trends and helps identify the best practices of the most continue. sophisticated corporate banks operating in the most challeng- ing markets. Nonetheless, the crisis has so far been surprisingly good to many corporate-banking business units. Many of the partici- In the postcrisis era, corporate banks must fully grasp pants in our global benchmarking exercise conducted in early the trends that will weigh heaviest on their industry. 2010 reported rising economic profit from the end of 2007 The most powerful forces (or “megatrends”) are the through 2009, even in countries that were particularly hard- continuing process of globalization, the shiing eco- hit by the so-called Great Recession. This improvement was nomic and industry structures of the new economy, mostly attributable to significant increases in lending mar- and technological progress. In addition to these inter- gins (which will likely fade as the financial sector and real connected forces, banks must also grapple with the economy build on the progress they showed in the first quarter harsh fallout from the crisis and with the evolving, of 2010). Also, in many cases, loan losses have not thus far stricter regulatory environment. All of these dynam- been as bad as originally feared. ics will determine how corporate banks navigate the next decade. Yet one thing is certain: we are entering a new competitive environment as banks try to seize the opportunities created ◊ The effects of “globalization 2.0” on corporate banks by the crisis. Success will oen come at the expense of weaker will be significant. Even relatively small companies rivals. Moreover, a key factor will be the strength of the par- will participate, oen as part of intricate, far-reaching ent bank’s balance sheet in supporting the growth ambitions supply chains. Growing enterprises, such as those of the corporate banking business unit. But having a strong based in Brazil, Russia, India, and China (the BRIC balance sheet will not be enough to succeed. countries), will need a full range of sophisticated bank- ing services. The potential revenues to be gained from Indeed, the most successful corporate banks over the next few these trends will be sizable, but capturing them will years will not necessarily be those that have best survived the require a nimble and creative approach. C  O 
  • 8.
    ◊ Five keyaspects of the new economy will exert the banking executives, BCG has identified a number of greatest impact on corporate banks: increasing com- axioms that corporate banks would do well to re- petitive intensity, industry-specific banking needs, on- member. going consolidation, closer supply-chain integration, and the search for top talent. ◊ These axioms include: keep risk at the top of the agen- da, manage your businesses to maintain a balanced ◊ Despite continuing advances in technology, very few portfolio with an “over the cycle” point of view, be ex- corporate banks have the platforms in place to ensure tra cautious in forays outside of home markets, and leading functionality and connectivity for clients, as above all, cultivate deep client relationships. well as efficient and effective sales-to-service process- es. These shortcomings result from a variety of factors, ◊ Our research with corporate banking clients indicates including investment limits and the low priority of the that many are reviewing their banking relationships, corporate banking unit compared with the bank’s (usu- seeking to “diversify their portfolio” with multiple ally larger) retail business unit. Corporate banks must banks. Clients are also more conscious of the need to reverse this trend in order to become market leaders. choose banks with strong balance sheets and reputa- tions, so that they will not become collateral damage The financial crisis has had a devastating effect on in a bank’s next liquidity crunch. many banks overall, but its impact on corporate bank- ing business units has been more nuanced. There The regulatory response to the crisis remains a work have been winners and losers. in progress. But it is virtually certain that a climate of greater conservatism and risk avoidance will prevail ◊ About one-third of business units in BCG’s Global Cor- and that new regulations will have a material impact porate-Banking Benchmarking Database increased on the corporate banking industry. Reporting require- their economic profit between the end of 2007 and the ments will become increasingly onerous—placing an- end of 2009. Even as sister business units wrote down other burden on finance and risk analysts serving the mortgage-backed securities or suffered severe consum- corporate banking business unit, as well as on front- er-lending losses, many corporate banks successfully line sales staff. repriced corporate loans, attracted new loan and de- posit volume, and increased investment-banking and ◊ There are four interconnected issues whose regulation risk-management sales. Top performers enjoyed a prof- will significantly affect corporate banking: risk mea- it surge. surement (including risk-weighted assets, or RWA), capitalization, leverage ratio, and liquidity risk. The ◊ For the broader group of survey participants—com- impact of changes in these areas will vary by product prising “typical” corporate banks—the crisis has and segment. brought a difficult operating environment. Assuming a rough long-term pretax capital hurdle rate of 12 per- ◊ It will be critical for corporate banking executives to cent, their economic profit is still well below 2007 lev- monitor developments and ensure that their banks re- els. But it rebounded in 2009 from the lows of 2008. tain the flexibility to respond to regulatory changes as they become finalized. ◊ In terms of segment performance, in 2009, corporate banking business units serving the micro segment had The postcrisis era will witness the emergence of the by far the highest average return on regulatory capital, blue-chip corporate bank. followed by small- and mid-cap (at roughly the same level) and then by large-cap business units. The large- ◊ These banks will be the jewels in the portfolios of lead- cap segment was the toughest environment overall in ing universal financial institutions. They will generate which to create value. steady long-term profit growth thanks to superior busi- ness models, excellent risk-management capabilities, Aer reviewing the experiences of top performers and an overall approach that focuses on building a val- during the crisis and speaking with senior corporate- ue-creating corporate-banking franchise.  T B C G
  • 9.
    ◊ BCG’s casework and benchmarking efforts have iden- ager of the global Wholesale Banking segment in BCG’s tified five core priorities of the blue-chip corporate Toronto office. You may contact him by e-mail at halliday. bank that leading institutions are already embracing: keith@bcg.com. Nicolas Harlé is a partner and manag- building premium client relationships, creating a cul- ing director in the firm’s Paris office. You may contact him ture of risk awareness and accountability, enhancing by e-mail at harle.nicolas@bcg.com. Junichi Iwagami is transaction banking capabilities, forging the next-gen- a partner and managing director in BCG’s Tokyo office. eration operating model, and developing end-to-end You may contact him by e-mail at iwagami. transparency and a high-performance organization. junichi@bcg.com. Duncan Martin is a partner and man- aging director in the firm’s London office. You may con- About the Authors tact him by e-mail at martin.duncan@bcg.com. Matthew Jürgen E. Schwarz is a senior partner and managing Rogozinski is a partner and managing director in BCG’s director in the Toronto office of The Boston Consulting Melbourne office. You may contact him by e-mail at Group and the leader of the global Wholesale Banking rogozinski.matthew@bcg.com. Achim Schwetlick is a segment. You may contact him by e-mail at schwarz. partner and managing director in the firm’s New York of- juergen@bcg.com. Martin Buchar is a partner and man- fice. You may contact him by e-mail at schwetlick.achim@ aging director in the firm’s Prague office. You may contact bcg.com. Tjun Tang is a partner and managing director him by e-mail at buchar.martin@bcg.com. Gennaro Ca- in BCG’s Hong Kong office. You may contact him by e- sale is a partner and managing director in BCG’s Milan mail at tang.tjun@bcg.com. office. You may contact him by e-mail at casale.gennaro@ bcg.com. Oliver Dany is a partner and managing director in the firm’s Frankfurt office. You may contact him by e- mail at dany.oliver@bcg.com. Keith Halliday is the man- C  O 
  • 10.
    Megatrends Shaping the Corporate Banking Landscape R egardless of one’s views on what will hap- sumers, and government resistance to offshoring will rein pen next as the global financial crisis it in. evolves, it is clear that corporate banking executives face an altered landscape. Only In our view, however, although market dynamics such as one thing is beyond doubt: amid a rapidly those leading up to 2007 may never return, we are still changing global economy, corporate banks must adapt likely to see the emergence of “globalization 2.0.” For ex- and forge insightful, long-term strategies if they hope to ample, BCG forecasts that the share of global GDP gener- gain competitive advantage. ated in the Asia-Pacific region will rise to almost 40 per- cent by 2020, from around 30 percent in 2010. Roughly as Specifically, corporate banks must react to sweeping much foreign direct investment is now flowing from trends that are affecting how companies do business all emerging markets into mature ones as in the other direc- over the world. For example, many erstwhile emerging tion—upending a multiyear trend. The number of com- economies have moved into the mainstream. More and panies from Brazil, Russia, India, and China (the BRIC more companies—not just large multinationals—are in- countries) in the Fortune 500 has more than doubled, creasingly integrated into domestic and global supply from 27 companies in 2005 to 58 in 2009. In terms of mar- chains and are looking to their banks for “financial sup- ket capitalization, four of the top ten banks in the world ply chain” solutions to assist them. Technological advanc- are now based in Asia-Pacific.1 es continue at a rapid pace. The effects of globalization 2.0 on corporate banks will Corporate banks must also fully grasp the trends that will be significant. On the client side, more and more compa- weigh heaviest on their industry. The most powerful forc- nies will be internationally active. Even relatively small es (or “megatrends”) are the continuing process of global- companies will participate, oen as part of intricate, far- ization, the shiing economic and industry structures of reaching supply chains. Growing enterprises such as those the new economy, and technological progress. In addition based in the BRIC countries will need a full range of to these interconnected forces, banks must grapple with banking services as they sell automobiles, computers, and the harsh fallout from the crisis and with the evolving, myriad other goods in the United States, Europe, and stricter regulatory environment. All of these dynamics elsewhere. The potential revenues to be gained from will determine how corporate banks navigate the next de- these trends will be sizable, but capturing them will re- cade. quire a nimble and creative approach. For example, ex- actly what kind of innovative financial-supply-chain ser- vices are needed? And how might the sales forces of Globalization 2.0 domestic European or U.S. banks capture the business of BRIC multinationals expanding abroad? Some pundits claim that the crisis will curtail globaliza- tion. They argue that factors such as protectionist policies 1. See After the Storm: Creating Value in Banking 2010, BCG report, in countries with high unemployment, impoverished con- February 2010.  T B C G
  • 11.
    Globalization 2.0 willalso affect the competitive land- Increasing Competitive Intensity. The International scape in corporate banking. For example, some new com- Monetary Fund’s (IMF’s) April 2010 World Economic Out- petitors may potentially emerge from the BRIC countries look report predicts economic growth in the euro zone to replicate in banking what aggressive companies such and Japan of just 1 to 2 percent through 2015, with that as Haier, ArcelorMittal, and Embraer have achieved in in- of the United States being marginally higher at 2.4 to 3.1 dustries as diverse as appliances, steel, and aircra manu- percent. Amid such relatively modest economic expan- facturing. As BRIC banks follow their clients into estab- sion, the race for clients, market share, and profits will be lished markets, their rivalries with both more frenzied than ever. The chief impli- local and global-titan banks will unques- cation for corporate banks is that clients tionably heat up. No large corporate will be increasingly sensitive about mar- bank will be immune gins and fees. Weaker competitors will On the operational side, banks will face in- start to compete on prices, and clients will to the effects of creasing choices about how to internation- pressure incumbent banks to lower theirs, alize their back offices, which they must globalization. forcing these banks to become more effi- do in order to capture scale and seamless- cient. But clients will also be more open to ly serve multicountry clients. For example, banking solutions (such as industry-spe- they can create “international product factories” that cialized payment solutions) that help them cut costs and serve clients in multiple countries. They can also emulate compete more effectively. many retail banks and pursue more offshoring and out- sourcing solutions, although political and regulatory con- Industry-Specific Banking Needs. Some industries are siderations may block this path to some degree. sweet spots for corporate banks because of their relative- ly rapid growth rates and specific product needs. Such dy- Ultimately, no large corporate bank will be immune to namics are oen present in industries experiencing a the effects of ongoing globalization. And growth-oriented long-term shi from manufacturing to services, and thus banks will be tempted by the rapidly developing econo- from credit-heavy banking relationships to a greater mix mies. BCG estimates that over 40 percent of total global of transactions and deposits. Take health care as an ex- revenue growth in corporate banking between 2009 and ample. BCG’s research indicates that in the United States, 2019 will come from the BRIC nations. health care companies earning revenues from $10 million to $500 million grew at 17 percent annually from 2002 Still, banks must tread carefully if they wish to capitalize through 2007. This was a much faster rate than that of on this opportunity. Corporate banking is in many ways most other industries, and these companies generated a a local business with significant barriers to entry, espe- more attractive mix of corporate banking revenues than cially in the small- and mid-cap segments. There are nu- the average client. Yet our 2009 benchmarking data show merous examples of banks whose forays into internation- that some banks have been much more successful than al markets have ended in costly failure. These episodes, their peers at penetrating these growth industries. in addition to regulatory pressure and capital scarcity, may result in fewer banks embarking on foreign growth Ongoing Consolidation. Continuing globalization and in- sprees. Rather than pursue credit-led expansion and take creasing competitive intensity will continue to spur con- on local players with superior local knowledge, some in- solidation in many industries. Corporate banks that want stitutions may find that focusing on their existing client to serve top companies as well as up-and-coming midmar- bases is a clearer, less risky path to growth. ket ones will need investment banking capabilities. In ad- dition, cross-border consolidation should increase the number of clients that look to their banks for multicoun- The New Economy try solutions across payments and trade finance. The coming years will be highly challenging for compa- Closer Supply-Chain Integration. The trend we have nies in virtually all industrial sectors—as well as for the seen in recent years toward deeper integration along sup- banks that serve them. Five key trends will exert the ply chains will continue, although it will undoubtedly be greatest impact. affected by other global trends, such as rising energy costs C  O 
  • 12.
    (which will increasetransportation costs). As companies However, in this age of ubiquitous connectivity, expand- integrate with their business partners more closely (both ing bandwidth, and massive computing power, corporate domestically and across borders), they will be looking for banking clients themselves continue to invest in better parallel financial-supply-chain services from their banks. financial systems. Companies of every size are trying to connect more seamlessly with their banks, whether The Search for Top Talent. BCG’s case work with corpo- through more sophisticated online data-transfer functions rate banking clients around the world has consistently for small and midsize clients or through deeper integra- identified talent management as a growing tion with large corporate enterprise-re- area of concern. Competition for top tal- source-planning systems. This growing cli- ent—such as senior relationship managers Companies of all sizes ent need will have important implications (RMs), bad-loan workout specialists, and are trying to connect for banks trying to increase share in trans- investment bankers who are experienced action banking. Indeed, customers are more seamlessly with in priority emerging markets—is hotter looking for a variety of benefits: better than ever. Banks will also need managers their banks. ease of use (to reduce the amount of inter- with skills in such areas as leveraging new nal training that they need to provide), IT capabilities and optimizing end-to-end greater breadth in the products and servic- loan processes. As banks reenter a growth mode and the es they can access through self-service portals, better in- baby-boom generation begins to retire, finding the talent tegration and customization, and improved two-way com- needed to navigate a large corporate bank through the munication. evolving megatrends will be more challenging than ever. Corporate banks must meet this challenge by forging a Moreover, banks that can build deep, rich, real-time data clear strategy for talent acquisition, management, and re- and analytics capabilities will be able to develop a holis- tention. tic view of each client relationship—including product utilization patterns and risk, liquidity, and capital factors. Such banks will be able to significantly improve product Advancing Technology targeting, pricing, and risk management. They will also improve client targeting through techniques such as cli- Despite continuing advances in technology, very few cor- ent clustering. porate banks have the platforms in place to ensure lead- ing functionality and connectivity for clients, as well as Banks will continue to build more electronic platforms efficient and effective sales-to-service processes. These that automate core processes involving account opening, shortcomings result from a variety of factors, including lending, and transaction banking on an end-to-end basis investment limits and the low priority of the corporate from the customer to the back office. Automation and al- banking unit compared with the bank’s (usually larger) gorithms that catch and correct data-entry errors will re- retail business unit. sult in higher rates of straight-through processing, greater client satisfaction, and lower costs. In areas where human Indeed, while many retail institutions have powerful cus- processing is still required, advances in data storage and tomer-information platforms, numerous corporate banks imaging technology will allow greater use of centralized still have disjointed management-information systems in and offshored processing centers, as well as skills-based which applications for core businesses such as cash man- routing techniques. agement and trade finance exist on different platforms— and contain different client information that is difficult to In addition, advances in automated decision intelligence compare. At some corporate banks, extensive manual will allow more sophisticated treatment of loan applica- processes are required to extract data from more than 20 tions and fraud detection, as well as improve ongoing cli- different systems to create a “full wallet” view of any in- ent monitoring and collections. Banks will, of course, dividual client. Moreover, complex legacy sales tools hin- need to remember that reliance on models and automat- der sales force productivity. Lending processes remain pa- ed tools can be dangerous if it replaces human judgment per intensive. The result can be a long, error-prone in critical areas. But advanced intelligence engines hold experience for clients. promise both as cost savers in simple decisions such as  T B C G
  • 13.
    micro and small-businessloans and as electronic aids to At numerous banks, these achievements have been more prioritization that can help staff focus on the right client than enough to offset rising corporate loan losses, at least files and risk decisions. at this point in the credit cycle. Loan volumes and mar- gins spiked early in the crisis, although they started to fade somewhat in the first quarter of this year in many Fallout from the Crisis countries. Transaction payment volumes plummeted and, given extremely low short-term interest rates, so did de- The financial crisis has had a devastating effect on many posit margins. Yet investment banking, risk management, banks overall. But its impact on corporate banking busi- and other fee revenues have been buoyant, if volatile, in ness units has been more nuanced. There have been win- many areas. Despite higher loan losses overall and con- ners and losers. tinued cost pressure, the net result that we see for top performers is a surge in economic profit. About one-third In fact, many of the participating business units in BCG’s of corporate banks improved their economic profit from Global Corporate-Banking Benchmarking Database the end of 2007 to the end of 2009.2 (See Exhibit 1.) managed to improve their economic profit in the course of the crisis. Even as sister business units wrote down For the broader group of our survey participants, howev- mortgage-backed securities or suffered severe consumer- er—comprising “typical” corporate banks—the crisis has lending losses, many corporate banks successfully re- priced corporate loans, attracted new loan and deposit 2. This refers to benchmarking participants based in developed volume, and increased investment-banking and risk-man- markets. In emerging markets, a higher proportion of benchmark- agement sales. ing participants showed improving economic profit. Exhibit 1. About One-Third of Corporate Banks Improved Their Economic Profit from the End of 2007 Through 2009 Economic profit growth of European, North American, and Australian corporate banks during the financial crisis Growing Negative but improving Positive and growing % of % of participants participants 51 50 50 34% of banks have improving 23 economic profit 25 25 10 11 0 0 2005–2007 2008–2009 2005–2007 2008–2009 Economic profit trend Negative and shrinking Positive but shrinking % of % of participants participants 50 50 50 35 25 17 25 4 0 0 2005–2007 2008–2009 2005–2007 2008–2009 Shrinking Negative Positive Economic profit starting point Source: BCG Global Corporate-Banking Benchmarking Database. Note: Economic profit calculated based on regulatory capital of 8 percent of Basel II RWA, using a long-run pretax capital hurdle rate of 12 percent. C  O 
  • 14.
    brought a difficultoperating environment. Assuming a and then by large-cap business units. Let’s take a closer rough long-term pretax capital hurdle rate of 12 percent, look at the segments. their economic profit is still well below 2007 levels. None- theless, it rebounded in 2009 from the lows of 2008. (See The Micro Segment (Serving Clients with Less Than Exhibit 2.) Going forward, of course, scarcer capital and $2 Million in Annual Sales Revenue). It is clear that mi- changes to capital regulations will likely drive rises in hur- cro segments can generate very high profitability. This is dle rates, which will negatively affect economic profit. oen driven by “transaction champion” strategies in which more than 70 percent of revenues come from trans- In terms of segment performance, in 2009, corporate action fees and deposit products. (See Exhibit 3.) Com- banking business units serving the micro segment had by bined with scale economies from leveraging the retail far the highest average return on regulatory capital, fol- bank’s branches and back office, this dynamic enables lowed by small- and mid-cap (at roughly the same level) most small-business segments to ride out even sharp rises Exhibit 2. The Typical Corporate Bank Saw Economic Profit Rebound in 2009 Evolution of key drivers based on weighted averages for all participants, 2007–2009 (indexed to 2007) Loan margin 100 98 114 2007 2008 2009 Economic profit Pretax operating profit Revenue Loan volume is a 122 is a 100 121 120 100 79 100 99 102 100 113 73 function minus function of of 2007 2008 2009 2007 2008 2009 2007 2008 2009 2007 2008 2009 Regulatory capital 1 Cost Transaction and deposit margin 100 123 122 100 111 110 100 99 82 2007 2008 2009 2007 2008 2009 2007 2008 2009 Pretax capital hurdle Actual loan losses Deposit volume rate (%)2 472 274 100 100 109 122 12 12 12 2007 2008 2009 2007 2008 2009 2007 2008 2009 Other fee revenues 100 104 123 2007 2008 2009 Source: BCG Global Corporate-Banking Benchmarking Database. Note: This analysis excludes a small number of participants with severe loan-loss crises (i.e., loan losses greater than 80 percent of their 2009 revenue). 1 Defined as 8 percent of Basel II RWA. 2 Assumed long-run pretax capital hurdle rate of 12 percent used for all years.  T B C G
  • 15.
    Exhibit 3. HighDeposit and Transaction Revenues Have Lifted the Micro Segment All-participant average, 2009 (basis points per RWA unless otherwise noted) Pretax return on Revenue Loan revenue regulatory capital (%) 1,500 600 40 is a function 1,000 plus 400 20 of 500 200 0 0 0 Deposit and Cost-to-income ratio (%) transaction revenue 80 800 60 600 40 400 20 200 0 0 Investment banking Actual loan losses risk-management revenue 400 200 200 100 0 0 1 Regulatory capital Other revenue 1,000 750 400 Micro Mid-cap 500 200 250 Small-cap Large-cap 0 0 Source: BCG Global Corporate-Banking Benchmarking Database. 1 Defined as 8 percent of Basel II RWA. in loan losses, which are quite common when recessions reducing unproductive sales resources were all themes hit small business. However, some segments in hard-hit in 2009. countries have seen losses that exceed 1,000 basis points, driving them into the red. The Mid-Cap Segment (Serving Clients with More Than $25 Million to $250 Million in Annual Sales Rev- The Small-Cap Segment (Serving Clients with $2 Mil- enue). Mid-cap business units can get caught in between lion to $25 Million in Annual Sales Revenue). The tale the inherent profitability of the small-cap transaction- is similar in the small-cap space, where transaction cham- dominant business and the fee-rich large-cap space. They pion models have proven highly resilient during the crisis. have had less generous pricing and smaller deposit vol- It is especially critical to manage small-cap costs and pro- umes (compared with loans) than small-cap units. At the ductivity in a disciplined way in both the RM organiza- same time, they have seen smaller margin increases than tion and the back office. Cost cutting has been a priority large-cap units, while suffering higher loan losses and in the small-cap segment, with many of our survey par- lower revenues from investment banking and risk man- ticipants reporting cost reductions in absolute terms de- agement products. Mid-cap business units also face the spite growing revenues. Redirecting small-business clients challenge of clients demanding relatively large loans into branch channels, streamlining credit processes, and when the data and analytics on these companies can C  O 
  • 16.
    sometimes be sparse.So while mid-cap units have enjoyed Large-cap bankers have also succeeded in increasing sales margin and volume improvements overall, it has been of investment banking and risk management products, quite difficult to create value in this segment during the with half of our participants increasing revenues in these crisis. areas by more than 20 percent annually from 2007 through 2009. The Large-Cap Segment (Serving Clients with More Than $250 Million in Annual Sales Revenue). The Differences Within Segments. Despite these general large-cap segment has been the toughest environment trends, it is worth noting that within each segment there overall in which to create value. However, the perfor- were wide differences in performance among individual mance gap between typical large- and mid-cap units has banks in 2009. (See Exhibit 4.) These differences were narrowed during the crisis. This is due to a relatively large more pronounced than in previous surveys because the increase in credit margins in the large-cap segment. A key crisis has more sharply divided top from bottom perform- factor is the fact that these lenders in many cases had ex- ers. Moreover, these variations were not the result of dif- tremely low lending margins before the crisis. Some ex- ferent economic conditions in different countries. We ecutives we interviewed even described these thin mar- found multiple cases of business units in the same seg- gins as “irrational.” ment and country with return on regulatory capital dif- ferences exceeding 20 percentage points. In our 2007 survey, multiple business units had total cred- it revenue per risk-weighted asset (RWA) well below 100 Regional Views. Important variations also emerged basis points, a level inconsistent with value creation on a among regions. In Western Europe, for example, revenue standalone basis. In this year’s survey, many large-cap growth partly cushioned the blow of rising loan losses, at participants reported margin increases since 2007 of this least for some banks. By contrast, our discussions with amount or even more, effectively doubling their lending corporate banking executives revealed widespread wor- margins. ries about macroeconomic stability and a possible dou- Exhibit 4. There Were Wide Variations in Performance Within Segments in 2009 Return on regulatory capital for top-, average-, and bottom-performing business units by segment, 2009 Average pretax return on regulatory capital (%)1 120 115 100 80 60 44 41 40 –25 33 20 –8 –6 0 0 –7 –20 –17 –15 –24 –40 Bottom three Top three Bottom three Top three Bottom three Top three Bottom three Top three Micro Small-cap Mid-cap Large-cap Average 2007 Average 2009 Source: BCG Global Corporate-Banking Benchmarking Database. 1 Defined as 8 percent of Basel II RWA.  T B C G
  • 17.
    ble-dip recession. Somebanks in Western Europe suf- The Asia-Pacific region, in general, was relatively shel- fered particularly severe loan losses from excessive tered from the crisis despite the exposure of many com- exposure to sectors like real estate or shipping, or too panies (and their banks) to trade with Europe and the much concentration in hard-hit markets like Spain. United States. IMF data suggest that overall economic growth in the region—excluding Japan, Taiwan, Singa- In Central and Eastern Europe, banks also saw revenue pore, Hong Kong, and South Korea—did not dip below 6 growth of 15 percent or more, on average. Yet severe loan percent from 2007 through 2009. losses had a crippling effect on many busi- ness units, jumping by more than 250 ba- Observers continue to monitor issues re- sis points of RWA at multiple players from Many corporate banks lating to macroeconomic stability in some 2007 through 2009. have not properly countries in the region, and specific sec- tors (especially export-dependent compa- factored risk into their In the United States, the speed and sever- nies) may pose loan-loss challenges to ity of loan losses, especially in commercial pricing. banks. But the growth outlook in Asia- Pa- real estate, were a surprise to many. Some cific remains relatively optimistic. Our in- banks suffered losses in 2009 that wiped terviews with executives at both local and out their pretax profits of the previous several years or international banks in the region confirm that many in- more. We also found that U.S. banks with highly sophisti- stitutions are once again looking for growth. cated product offerings across cash management and oth- er fee-based products weathered the storm better, while smaller banks that were more dependent on both lend- The Lessons of the Crisis ing and deposit-spread revenue suffered. How successful these stronger banks will be at picking up strategic rela- Aer reviewing the experiences of top performers during tionships from damaged rivals will be a key issue going the crisis and speaking with senior corporate-banking ex- forward. ecutives, BCG has identified a number of axioms that banks would do well to remember. Meanwhile, Canadian banks and their Australian coun- terparts came through the crisis in excellent condition. The first is to always keep risk at the top of the agenda. Cor- Some posted margin increases of over 100 basis points, porate banks should fully factor risk, as well as liquidity with loan losses staying below 25 basis points. Their suc- and capital management, into their long-term strategies, cess was partly due to relatively strong national econo- operational planning, and day-to-day management. This mies, but other factors—such as a sustained focus on the fundamental rule was neglected by many of the lowest- core commercial-banking business (instead of driving for performing corporate banks. growth in riskier sectors) and conservative risk-manage- ment practices—suggest that choices by senior manage- Indeed, too many bankers focused on revenue and ment also played a major role. market share—not factoring in the “real” costs of risk, liquidity, and capital—when making lending and pricing In Latin America—particularly in the region’s leading decisions. Our 2008 corporate-banking report noted that market, Brazil—the outlook for corporate banking is from 2005 through 2007, at what turned out to be the quite favorable. Aer facing sizable loan losses and re- peak of a very positive run of economic growth, only duced liquidity, Brazilian corporate banks are aggressive- about half of corporate banks were generating positive ly returning to loan growth. Most key players are focusing (and rising ) economic profit. The economic climate hid their efforts on the mid-cap segment. Capital markets the fact that the revenue growth of many banks was the should develop in line with Brazil’s generally favorable result of more loans to relatively risky clients. Seen today macroeconomic outlook, offering investment banking op- through a prism of realistic liquidity premiums, risk costs, portunities. Transaction banking will continue to play an and capital charges, it is clear that many of these deals de- extremely important role, leveraging the sophistication stroyed value. Generally speaking, many corporate banks and innovative electronic capabilities of the Brazilian have not properly factored risk into their pricing. (See Ex- payments system. hibit 5.) C  O 
  • 18.
    A second lessonis that corporate banks should manage entrenched local banks that have superior market knowl- their businesses like a portfolio, with an “over the cycle” edge and a less urgent need to quickly acquire clients to point of view. Businesses such as commercial real estate cover the costs of a newly expanded sales force. This is a and equipment finance can be profitable, but banks must lesson that banks must keep in mind as they consider be disciplined enough to monitor the growth of such busi- how to take advantage of the rapid growth in corporate nesses, especially during “good” years. It is also critical banking in rapidly developing economies. not to let one or two sectors that appear to be highly lu- crative grow too large in the portfolio. A collapse in these Finally, and most important in the long run, corporate areas can create painful loan losses as well as eliminate banks must cultivate deep client relationships. A salient a significant portion of the bank’s overall revenue point, one that some institutions have had to learn the stream. hard way during the crisis, is that reputational risk is real. For example, selling clients inappropriate financial instru- International or “out of footprint” expansion provides an- ments can result not only in costly litigation but also in other lesson: corporate banks must be extra cautious outside long-term damage to a bank’s franchise. Somewhat less their home markets. It has always been extremely difficult severe damage can result from cutting credit lines with to leverage a successful business model in one country long-standing clients or dramatically raising margins. into a new environment. Credit-led expansion, in particu- lar, can be dangerous, especially if competitors have ei- Our research with corporate banking clients indicates ther superior knowledge of client risks or better capabili- that many are reviewing their banking relationships, ties in valuing and managing collateral. It is all too easy seeking to “diversify their portfolio” with multiple banks. for a new entrant to end up with the clients rejected by Clients are also more conscious of the need to choose Exhibit 5. Many Corporate Banks Have Not Properly Factored Risk into Their Pricing Comparable mid-caps: relative credit-revenue performance, 2007, versus loan-loss deterioration, 2007–2009 Change in actual losses per RWA, 2007–2009 (basis points) –100 –80 –60 –40 –20 0 20 40 60 80 100 120 0 –20 –40 Banks with the lowest pricing have faced the biggest deterioration in –60 loan losses –80 –100 –120 Average –140 Total credit revenue per loan volume relative to average, 2007 (basis points) Source: BCG Corporate-Banking Benchmarking Database.  T B C G
  • 19.
    banks with strongbalance sheets and reputations in or- will also be affected by rule changes related to counter- der to avoid becoming collateral damage in a bank’s next party risk). Loan classes with sporadic heavy losses, such liquidity crunch. Of course, corporate banking clients are as those to large corporations, may also be severely af- also more aware of the liquidity and risk challenges that fected. banks face. Many understand that banks extending cred- it need to cross-sell to be viable, and that the low lending Higher capitalization requirements will result in scarcer rates of 2006 are not likely to return. Whether this new and therefore more expensive capital. Not only will cor- understanding withstands a return to more porate banks have to compete with sister normal economic-growth conditions, or cli- business units for capital, but higher hur- ents and their banks return to the heady The regulatory dle rates at many banks will mean that precrisis mindset of low margins and high response to the crisis corporate units will have to work harder risk tolerances, remains to be seen. to generate economic profit from their remains a work in client bases. progress. The New-Normal Regulatory Leverage requirements, depending on Environment how they are structured, will have an im- pact on high-leverage businesses such as real estate and The regulatory response to the crisis remains a work in government finance, as well as on contingent liabilities progress. But it is virtually certain that a climate of great- and undrawn credit lines. The impact on products such er conservatism and risk avoidance will prevail and that as asset-based lending and small-business loans guaran- new regulations will have a material impact on the cor- teed by governments, where regulations may not fully porate banking industry. Reporting requirements will be- recognize the low-risk nature of the lending, will also come increasingly onerous—placing another burden on have to be carefully watched. finance and risk analysts serving the corporate banking business unit, as well as on frontline sales staff. Rules on liquidity risk will make transaction banking and its pools of deposits attractive, although details on the The regulatory agenda covers a vast array of highly com- treatment of “sticky” core corporate deposits will have an plex and interrelated issues. They range, for example, effect on internal transfer pricing and therefore on trans- from Basel III topics such as redesigned rules on RWA action banking economics. methodology, capital adequacy, leverage ratios, and li- quidity risk, to areas such as “financial crisis responsibil- Finally, new central counterparty rules may have an im- ity fees,” inappropriate incentives, and central counter- pact on sales of derivatives to mid- and large-cap business party requirements for derivatives. units. Capital requirements for standard products should decline, but corporate banks will also face greater pricing It will be critical for corporate banking executives to mon- transparency and potential disintermediation from elec- itor developments and ensure that their banks retain the tronic platforms. Customized products—which will likely flexibility to respond to regulatory changes as they be- face significantly higher capital requirements—will be- come finalized. In the coming months, bankers will need come much more costly to provide. to think two moves ahead to be ready for possible actions by regulators. Overall, upcoming regulatory changes are sure to increase the cost of providing financial services to corporate cli- More specifically, there are four interconnected factors ents. It remains to be seen which banks will be most suc- whose regulation will significantly affect corporate bank- cessful at passing these extra costs on to their clients. Do- ing: risk measurement (including RWA), capitalization, le- ing so will require rigorous data and analytics to verage ratio, and liquidity risk. The impact of changes in incorporate true risk, liquidity, and capital costs into prod- these areas will vary by product and segment. uct pricing. It will also require strong sales and communi- cations skills with clients, and discipline in competing New RWA definitions will hit RWA-intensive products with banks that continue to price below their true cost hard, including client-driven trading businesses (which levels. C  O 
  • 20.
    The Blue-Chip Corporate Bank How Top Institutions Are Positioning Themselves to Win S trong economic growth and low loan losses al- Building Premium Client Relationships lowed many corporate banks to post strong profits in the years leading up to the crisis. But Banks that outperformed both before and during the cri- the gap between top and bottom performers sis tend to share three characteristics in their distribution from 2007 through 2009 was extremely wide. models. Given the megatrends in play and the new-normal eco- nomic and regulatory environments, we expect this gap First, their overall philosophy is driven by the develop- not to narrow but to increase in the coming years. BCG’s ment of deep client relationships as opposed to a focus benchmarking data show that the gap between top and on sales at any cost. Their sales capabilities are still very bottom performers is so large that even a period of lower high, but they place a premium on understanding the cli- loan losses and recovering economic growth would not ent and the client’s industry and providing superior ser- allow low-performing banks to come close to the top per- vice, expert advice, and solutions that help the client suc- formers in terms of overall profitability. ceed. At a limited number of banks, we are seeing top performers put a much greater emphasis on the corpo- Indeed, in our view, the postcrisis era will witness the rate “client experience”—defining what the target client emergence of the blue-chip corporate bank. Such banks experience is, training their RMs and client service teams will be the jewels in the portfolios of leading universal fi- on how to deliver it, and tracking client perceptions of nancial institutions. They will generate steady long-term how RMs and client service teams are succeeding. profit growth thanks to superior business models, excel- lent risk-management capabilities, and an overall ap- Blue-chip banks also possess the analytics capability to proach that focuses on building a value-creating corpo- identify those client clusters with the highest long-term rate-banking franchise. By this we mean a balanced profit potential. Such banks have the richest mix of sta- business that focuses on deep and profitable client rela- ble, fee-based cash-management services, enabling the tionships rather than growth in burgeoning (but risky) credit needed for the relationship to be provided on a products or sectors. Blue-chip banks will show greater dis- sustainable, risk-adjusted basis. Analytical insights can cipline in responding to economic recovery, while their be used both by senior managers for strategic planning bottom-quartile competitors may well return to aggres- and by individual RMs or client service teams to better sive deal making. Already in the first quarter of 2010 we understand their clients’ needs and revenue potential. saw falling lending margins as well as easier and longer loan terms in some markets, trends that are reminiscent Finally, blue-chip banks have rigorous relationship-man- of 2006 and the circumstances that preceded the crisis. agement, sales, and service processes. These feature struc- tured and standardized client-planning methods, strong In the course of our case work and benchmarking efforts, teaming with product specialists, intense performance re- we have identified five core priorities of the blue-chip cor- views and coaching, and transparent data about sales porate bank that leading institutions are already embrac- pipelines and client service team performance. A few top ing for the postcrisis era. Let’s examine each one. banks have also implemented structured client feedback  T B C G
  • 21.
    to ensure thatRMs and client service teams are not just rapidly growing markets constituted proof that their risk- selling to clients but also bringing them the full relation- management practices were adequate. There was oen a ship value of the bank. The result of this approach is a su- misplaced confidence that the boom would continue in- perior client experience that generates loyalty—which, in definitely, as well as a glaring lack of expertise concerning turn, translates into deep wallet penetration of the most corporate-lending risk assessment, liquidity pricing, the attractive clients in each segment. transfer of funding costs, and monitoring mechanisms needed to identify failing loans early. Creating a Culture of Risk Blue-chip players create a culture of risk Awareness and Accountability The risk function awareness and accountability at every lev- needs to get el. The first line of defense lies with the As the financial crisis has evolved, atten- front office—as opposed to having the out of its tion has shied from banks’ initial losses front office push on the accelerator when in subprime and related securities to more ghetto. the risk department tries to step on the traditional asset classes, including corpo- brakes. The overall risk-management func- rate loans, commercial real estate, and tion regarding standards, infrastructure, specialty finance activities that bolstered revenue growth and methodologies is centralized, but every individual in during the boom years. Many banks in Europe and the every department is held responsible for any activity that United States, for example, focused on fast-growing com- involves risk. mercial-real-estate markets instead of “bread and butter” corporate-client relationships, sometimes ending up with In our conversations with blue-chip banking executives, greater exposure to commercial real estate than to all of one of the most common words used was discipline. These their core clients combined. banks are prepared to lose market share rather than slash margins or end up with an unbalanced portfolio of assets During the crisis, some banks’ transformation from as- and businesses. Before the crisis, executives at more than sumed profitability to a state of extreme distress was rap- one high-performing bank told us about deals they had id and stunning. Moreover, banks that were already show- le to more aggressive international banks or commercial ing high exposure to bad loans tended to get hit the financing companies because they thought the risk-ad- hardest. Even worse, the banks with the riskiest portfolios justed pricing was too low. Now, having navigated the cri- did not end up being compensated for that risk by suffi- sis with strong financial performance, these blue-chip cient additional revenue. banks are using their balance sheets to grow—maintain- ing their discipline—while less careful banks retrench. The revelation to the market—and to the banking indus- try itself, to some degree—was that precious few financial Overall, to build a strong risk culture, there are five basic institutions had a true awareness of the need for rigorous measures that corporate banks can take. risk management. In fact, practices that oen paid off handsomely in the short term—such as pushing large Maintain the strong independence of risk control loans to large corporate clients, concentrating on con- functions. The risk function needs to get out of its ghet- struction and other real-estate loans, and competing on to. What’s needed is a culture of true risk management— loan margins—fostered a culture of daring in which those not just risk reporting and upward delegation. Risk man- who threw caution to the wind were seen as great sales agers must be properly compensated and recognized and people rather than as reckless. 3 their independence from the front office guaranteed. They must also be encouraged to be proactive. As one Moreover, chief risk officers at many banks did not have risk specialist observed, “Risk functions need to go look- sufficient levers to influence credit allocation and pricing ing for trouble rather than waiting for trouble to find decisions. Compensation schemes were too closely linked them.” to top-line performance only, with no adjustments for risk, liquidity, capital, and operating costs. Many banks 3. See Risk and Reward: What Banks Should Do About Evolving Finan- mistakenly believed that their strong performance amid cial Regulations, BCG White Paper, March 2010. C  O 
  • 22.
    Ensure senior-management competencein risk man- kets—and high profitability over the economic cycle. Pre- agement. Those banks that have best weathered the cur- vious BCG corporate-banking reports have documented rent crisis typically possess a wealth of accumulated ex- the tendency of transaction champion models to outper- perience in risk management across sales, product form. This finding has held true during the crisis. (See Ex- development, and general management functions. They hibit 6). Moreover, our benchmarking revealed stark dif- also tend to set aside time for thoughtful consideration of ferences among competitors in areas such as deposit risk trends and scenarios, with a premium placed on busi- volume generation, revenue generation, and client pene- ness judgment rather than having the risk tration of transaction banking products. analysts slice and dice the risk data into (See Exhibit 7.) lengthy and complex reports that go un- Even deals with read. prestige clients To win at transaction banking in the post- crisis era, institutions will certainly need must be openly Adopt incentives that take risk manage- solid product capabilities—but even more ment performance into account. The scrutinized. important is a true sales and service men- key issue is not bonus levels alone but the tality. They will also need effective deliv- need to explicitly link bonuses to risk-ad- ery and operating models. justed performance over a sufficient period of time. Some banks rewarded RMs purely on the basis of loan volumes Blue-chip corporate banks will improve their capabilities and revenues rather than long-term economic profit. by moving beyond traditional product-centric cultures to more solution-oriented ones. A prime element of this Encourage healthy debate. Deals, especially the most transition is the gradual building of financial-supply- complex ones, must be discussed in depth. Even deals chain offerings that provide an integrated set of services with prestige clients brought in by top-performing ranging from new products (such as e-invoicing) and val- RMs must be openly scrutinized. The role of risk com- ue adds (such as working-capital optimization and li- mittees in fostering such discussions is essential, as is the quidity management) to traditional payment services. role of senior risk specialists. The latter are critical to Products will span the supply chain, serving both sides productive thought partnering with sales and other ex- of the transaction—as illustrated by financing based on ecutives. Banks whose risk analysts are junior staff lim- the buyer’s credit rating that actually finances the buy- ited to generating reports not only are missing a signifi- er’s supplier. cant opportunity but are putting the organization at undue risk. Moreover, leading corporate banks will strengthen their online-access capabilities. Larger clients will increasingly Improve risk data and analytics. Banks must invest to access their bank’s services through their own enterprise- improve their data gathering, reporting, and analytics on resource-planning systems, allowing for far greater func- their clients. Outside observers are oen startled to learn tionality and the deepening of relationships at the same that some well-known corporate banks struggle to com- time. Smaller companies will use e-portals that offer pile holistic relationship risk data on major clients, to banking clients quick and easy access to a broad array of match risk department data with finance department products and services, free up human resources for more data on loans, or to quickly identify deteriorating loans value-added activities, reduce errors, and improve the cli- for handling by their special loans groups. ent experience. E-portals not only migrate transaction volume from cost- Enhancing Transaction Banking ly branch and call-center channels but also enable what Capabilities we call customer-initiated cross-selling. A client using an e- portal finds it easy to access added functionality—for ex- The crisis has highlighted the attractiveness of transaction ample, to lock in a forward exchange rate or sign up for a banking. It is a business that can provide reliable (and cash-flow forecasting service. And as clients become more growing) fee and spread revenues, rich deposit volumes— dependent on their banks’ online products and services, critical to reducing reliance on wholesale funding mar- they will find it much more onerous to change their bank-  T B C G
  • 23.
    Exhibit 6. TransactionChampions Tend to Outperform, Even in a Climate of Depressed Deposit-Interest Margins Mid-cap revenue mix, 2009 % 2 2 100 Transaction volumes down 8 14 in 2009 versus 2007 3 80 Deposit margins down 33 60 87 40 Loan interest margins up but loan losses also up 51 20 0 Transaction champions Credit-heavy traditionalists Revenue per RWA (basis points) 605 249 Return on regulatory capital (%)1 31 8 Crisis impact since 2007 ROE up for most ROE down for all Investment banking, risk management, and asset management products Transaction fees Deposit interest income Loan interest and fees Source: BCG Global Corporate-Banking Benchmarking Database. 1 Based on the worst three-year average of actual or expected loan losses. Exhibit 7. In Transaction Banking, There Are Major Performance Gaps Between Competitors Mid-cap peer group: key transaction-banking performance drivers Deposit volume generation Revenue generation Client penetration Transaction fees plus deposit Percentage of clients Deposit-to-loan interest income/deposit volume using transaction ratio (%) (basis points) banking services 80 220 100 200 180 80 30 percentage 60 points 160 2.5X (9X fees) 140 60 4X 120 40 100 80 Transaction 40 fees 20 60 40 Deposit 20 interest 20 income 0 0 0 Top three Bottom three Top three Bottom three Top three Bottom three Source: BCG Corporate-Banking Benchmarking Database. C  O 
  • 24.
    ing relationship. Butbuilding a superior e-portal and cost- teams and strategy discussions, so that there is positive efficient back-end systems requires significant, continu- feedback between strategy formulation and what is (and ous investment. is not) possible on the IT and operations fronts. Finally, to state the obvious, developing a winning A key element of this interaction is oen the articulation transaction-banking value proposition for clients is not of a shared target operating model, based on a clear and easy. It requires a long-term commitment to building quantified view of the desired client experience for the product platforms, optimizing operational relevant client segment. This experience processes, and embedding the concept of must be linked to the bank’s business the balanced product suite in the sales Building a superior strategy—whether it is trying to be, for ex- force. In addition, it is worth stressing that e-portal requires ample, an “easy and convenient” transac- merely developing product capabilities is tion bank for small businesses or a “fast significant, continuing not enough—the sales force must be fully and flexible lender” for larger clients with engaged and capable of selling the prod- investment. more sophisticated needs. ucts to clients. Banks that focused on these elements of their business before Specific initiatives may vary by segment, the crisis are now enjoying the dividends, generating the product, and bank, but they generally have common profits needed for further investment to make it even themes, such as the following: more difficult for latecomers to attack the market effec- tively. ◊ Reducing redundant tasks and related errors that af- fect the customer experience, particularly in cash man- agement and lending processes Forging the Next-Generation Operating Model ◊ Moving operational work to central contact centers or online platforms to allow the sales force to concentrate Now more than ever, corporate banks need to overcome on selling products and managing relationships the old-fashioned view that theirs is a purely “face to face” business, requiring minimal investment in process ◊ Improving data capture and quality, as well as analyt- and technology. We have seen seriously outdated legacy ics, in order to improve client insight IT systems at some major institutions. In order to win in the postcrisis era, corporate banks need to be proactive ◊ Simplifying, standardizing, and automating core proc- about remodeling their business processes and IT archi- esses as much as possible (which requires careful con- tecture. sideration of what should be standard and what should be customized when it can add value for clients) The difficulty is that corporate banking back offices are oen small compared with their retail-banking equiva- ◊ Leveraging scale in operational activities and enabling lents and can take longer to recover significant one-time significant cost reduction IT investments, resulting in more challenging project eco- nomics. Consequently, corporate banking divisions some- ◊ Capturing cross-border opportunities in order to build times get short shri when IT and reengineering invest- scale and seek lower factor costs (such as by offshoring ments are decided each year. or creating multicountry product factories) Blue-chip corporate banks take a long-term view of the In the course of our client work, we have seen some lead- critical operations and IT enablers that support their suc- ing corporate banks develop product factories where op- cess. They continually implement projects to enhance ef- erations and IT platforms serve customers in multiple fectiveness and efficiency, taking a holistic “end to end” countries. We have also witnessed the evolution of lean perspective on their operating model, from the client credit processes that segment loans according to their through the sales force to the back office. They also in- complexity. This allows applications to be handled more volve IT and operations specialists in their management efficiently through clean, quick, risk-appropriate decision  T B C G
  • 25.
    processes, appropriately differentiatedaccording to small- for loan applications, and costs per transaction in cash cap, mid-cap, and more complex loans. management. Overall, next-generation operating models will need to However, the benefits of end-to-end transparency are sig- fulfill broader sets of requirements than in the past, ad- nificant. Banks with strong capabilities in tracking and dressing not only costs along the value chain but also cus- reporting on a segment-specific basis across revenue, tomer satisfaction and perception. The customer view on costs, loan volume, RWA, and economic capital—as well operational excellence will increasingly be a key driver of as in tracking and reporting client, product, and sales banks’ profitability levels. force data—tend to significantly outperform banks with weaker capabilities. (See Exhibit 8.) Developing End-to-End Transparency Blue-chip corporate banks, where the mantra is oen and a High-Performance Organization “what gets measured gets done,” are moving in this direc- tion. We believe that the ongoing improvements in cheap- Many corporate banks claim to be working on initiatives er computing power and the constant availability of elec- such as those discussed above. But corporate banking is tronic data are bringing the industry to a tipping point a highly complex business. It is no cakewalk to accom- where leading banks will transform how they are man- plish true change across organizational boundaries or aged. Consider the following questions, which many cor- along the value chain. Nor is it easy to build the underly- porate banks have difficulty answering, but which are in- ing data and analytics capability or to attract the sales creasingly discussed at leading banks: and managerial talent required to make a large, extreme- ly complicated system hum along efficiently. Exhibit 8. Performance Is Strongly Linked to the Quality and Transparency of Data In our experience, two key attributes drive the ability of and Reporting high-performing banks to tie these complex elements to- gether into a powerful corporate-banking business mod- All participants, 2009 el: end-to-end transparency and a high-performance or- Average return ganization. on regulatory 1 capital (%) End-to-End Transparency. Given the amount of data 30 tracking and monitoring that goes on in banks, it may sur- prise those in other domains that corporate banks oen 25 struggle to measure the true profitability of individual cli- ents. Even views by product, channel, or region can be dif- 20 12 percentage points ficult to obtain. Indeed, although it is relatively easy to track overall loan volumes, revenues, and accounting prof- 15 it, some banks continue to struggle with primitive liquidi- ty-pricing methodologies and inaccurate cost allocations. 10 It is a tall challenge to achieve the highly granular knowl- edge of the risk and capital requirements of different prod- 5 ucts and clients that is needed to arrive at an accurate cal- culation of economic profit, or to gather and maintain the 0 multiyear data needed to assess trends in client profitabil- Transparency leaders Weaker performers ity, client experience, or RM productivity. ◊ High levels of transpar- ◊ Significant gaps in such ency on revenue, cost, areas as economic risk, liquidity, and capital, deposit interest Furthermore, on an operational basis, our case work capital income, RWA, and client data shows that many banks find it daunting to produce the Source: BCG Global Corporate-Banking Benchmarking Database. critical management metrics needed to track, for exam- 1 Defined as 8 percent of Basel II RWA. ple, their own sales-force productivity, turnaround times C  O 
  • 26.
    ◊ Which clientclusters buy the most profitable products, As the postcrisis corporate-banking industry evolves, an- factoring in true liquidity, risk, and capital costs? swers to such questions will gradually move from the realm of arduous, one-time finance-department studies ◊ How do any client’s purchases from the bank compare to that of routine, real-time accuracy. Institutions on the with those of similar clients, and are there specific op- cutting edge of this development will gain a keen advan- portunities to cross-sell? tage over their slow-moving rivals. ◊ How do pricing options affect the profitability of any A High-Performance Organization. Corporate banks deal—and the RM’s compensation? are remarkably complex organizations on multiple di- mensions: different client segments and distribution ◊ What sort of feedback from monitoring and workouts models; varied products; complex, multisilo value needs to be factored into new loan decisions? chains—all oen spread across far-flung locations. ◊ How long is the bank’s average turnaround time for a BCG has developed a framework for a high-performance loan application, and which types of loans tend to get organization in corporate banking. (See Exhibit 9.) In bottlenecked? brief, to achieve true organizational excellence, corporate banking leaders need to think holistically about a wide ◊ Which clients are the riskiest, and which consume the range of levers. Just focusing on organization charts and most capital relative to their value to the bank? incentives, which is where many start, is not enough. Exhibit 9. BCG Has Developed a Framework for a High-Performance Organization in Corporate Banking Shared commitment to objectives at the top; clear commitment of leaders; alignment on credit versus other products, risk appetite, Overall and segment priorities engagement Staff engagement along the corporate banking value chain: sales, products, operations, and risk Sense of purpose and leadership Clear single-point accountabilities: roles, goals, and decision rights aligned Performance Hard-wired integration Accountabilities of accountabilities into management and and collaboration measurement, performance Collaboration mechanisms recognition management, compensation, in place: planning and and promotion budgeting; operational teams; trust People management capability Managers who can break down silo behaviors and coach sales staff to succeed Source: BCG analysis.  T B C G
  • 27.
    Our framework hasfive key elements that provide a pow- ◊ People Management Capability: Is there a climate of high erful lens through which to review the organizational expectations? Do managers have the capabilities to alignment of both the overall business model and the both coach their staffs effectively and work collabora- specific teams and processes within it: tively with colleagues along the value chain in order to optimize outcomes for both client and shareholder? ◊ A Sense of Purpose and Leadership: Is there a shared commitment to a clearly defined strategy, with specific ◊ Overall Engagement: Finally, in an era when talent man- financial and client objectives? Or, as we have seen at agement will be ever more important, are employees multiple banks, is the sales force focused on loan vol- in every role engaged and aligned with the organiza- ume while the transaction banking division works in tion’s objectives? isolation on cash management sales and the CFO asks about economic profit? These are difficult challenges that cannot be dealt with all at once or by a small, centralized team. They must be ◊ Accountabilities and Collaboration: Are there clear roles tackled on an ongoing basis throughout the organization, defined for all members of the team regarding both in- from the senior executive team to the frontline. Our cli- dividual and shared accountabilities? Or, for example, ent experience shows that banks that think deeply and is it unclear what the respective roles of the RM, port- oen about these issues build an organization that is folio-monitoring, and special-loans teams are with re- highly capable of delivering value to clients and handily spect to “watch list” clients? surpassing competitors. ◊ Performance Management and Recognition: Is outperfor- mance on strategic objectives celebrated? Are the fi- nancial and operational metrics clearly understood and aligned with incentives? Is there a rigorous proc- ess in place for productive coaching and performance- management discussions? C  O 
  • 28.
    Conclusion Asymmetric Competition and How the Leaders Will Deepen Their Advantage I n the boom years from 2004 to 2007, most corpo- tract a premium franchise of first-rate clients that provide rate banks grew robustly. Amid surging econo- a steady and increasingly diversified stream of revenues mies, low loan losses, and readily available cheap from capital-light products. At the same time, these blue- capital, it did not really matter whether a bank chip banks will be able to trim costs and place themselves had top- or bottom-quartile capabilities in prod- in a better position for the next down-cycle. Lower-tier ucts, cost management, or risk management. All that banks will suffer from relatively weak profitability even mattered were workable sales processes. in good market years. They will end up with a lower-qual- ity client base and alarming losses during recessions. And But the crisis rudely awakened legions of banks. While they will not contribute much to total shareholder re- some successfully navigated the crisis, others suddenly turn—instead contributing all too much to enterprise risk found themselves with devastating loan losses, client levels and to capitalization and funding troubles. portfolios whose quality profiles had deteriorated over- night, and revenues that relied excessively on rapidly Furthermore, the corporate bank is just one part of any weakening sectors. universal bank’s portfolio. As blue-chip corporate-bank leaders are fêted as champions at the CEO’s off-site gath- Today, looking ahead to the less exuberant business envi- ering—and given virtually as much capital, funding, and ronment that will characterize the next five to ten years, IT resources as they want in order to further increase the we will likely see a continuation of the recent pattern— economic profit of the business—lower-tier corporate high-capability corporate banks widening the perfor- banks will oen be treated as scapegoats. mance gap between themselves and the rest of the field. Behind this dynamic is a virtuous cycle for leading banks—and a vicious one for weaker institutions—that T the crisis has fueled. Simply put, when a strong bank puts aking the long view, we offer the following con- into play a focused, highly trained, and motivated sales cluding thoughts. Major financial upheavals such force—along with sharply calculated risk-based pricing as the one we have witnessed over the past 24 to and a comprehensive transaction-banking offering—it 36 months—dire as they may seem for a time—present captures the best clients. And it generates the profits need- opportunities, not just threats, to institutions that develop ed for further investments in products and other capabil- the most robust business models and the most creative ities, deepening the advantage. Meanwhile, its pricing acu- strategies. Leading institutions use highly uncertain times ity forces bad clients to weaker banks, which oen end up to their advantage, gaining market share and a competi- with higher (and sometimes crippling) loan losses—all of tive edge over slower-moving rivals that simply try to en- which helps reinforce and perpetuate the cycle. dure crises and hope for the best. The leaders seize the moment to begin the process of becoming a truly blue- Taken as a whole, these dynamics will significantly ben- chip player. In the end, corporate banks can largely con- efit blue-chip banks and inflict varying degrees of dam- trol their own destinies by determining which type of in- age on lower-tier institutions. The former group will at- stitution they aspire to be.  T B C G
  • 29.
    For Further Reading TheBoston Consulting Group pub- Regaining Lost Ground: Global Retail Banking: Winning lishes other reports and articles that Wealth 2010 Strategies and Business Models A report by The Boston Consulting Revisited may be of interest to senior financial Group, June 2010 A White Paper by The Boston Consulting executives. Recent examples include: Group, January 2010 Life Insurance in Asia: New Realities and Emerging The Near-Perfect Retail Bank Opportunities A White Paper by The Boston Consulting A White Paper by The Boston Consulting Group, November 2009 Group, April 2010 Come Out a Winner in Retail Building a High-Powered Branch Banking Network in Retail Banking A White Paper by The Boston Consulting A White Paper by The Boston Consulting Group, September 2009 Group, March 2010 Value Creation in Insurance: Risk and Reward: What Banks Laying a Foundation for Should Do About Evolving Successful M&A Financial Regulations A White Paper by The Boston Consulting A White Paper by The Boston Consulting Group, September 2009 Group, March 2010 Weathering the Storm: Global Aer the Storm: Creating Value in Payments 2009 Banking 2010 A report by The Boston Consulting A report by The Boston Consulting Group, March 2009 Group, February 2010 Leveraging Consumer Insights in Insurance A White Paper by The Boston Consulting Group, February 2010 C  O 
  • 30.
    Note to theReader Acknowledgments Keith Halliday Nicolas Harlé We would like to thank the financial BCG Toronto BCG Paris institutions that participated in our +1 416 955 4200 +33 1 40 17 10 10 benchmarking survey. Their contri- halliday.keith@bcg.com harle.nicolas@bcg.com butions provided invaluable insights into the drivers of performance in Achim Schwetlick Jonas Lagerstedt the industry. We would also like to BCG New York BCG Stockholm thank our colleagues in BCG’s Finan- +1 212 446 2800 +46 8 402 44 00 cial Institutions practice for their schwetlick.achim@bcg.com lagerstedt.jonas@bcg.com contributions to this report—particu- larly Carlos Barradas, Carsten Europe Duncan Martin Baumgärtner, Douglas Beal, Amy Carlos Barradas BCG London Chou, Jeffrey Chua, Allard Creyghton, BCG Lisbon +44 207 753 5353 Stefan Dab, Alenka Grealish, Carina +351 21 321 4800 martin.duncan@bcg.com Hellak, Jonas Lagerstedt, KC Li, Holg- barradas.carlos@bcg.com er Michaelis, Stefan Mohr, Peter Neu, Asia-Pacific Alison Sander, Shubh Saumya, Rob Martin Buchar Douglas Beal Sims, Niclas Storz, Masao Ukon, Ra- BCG Prague BCG Dubai hul Wadhawan, and Andre Xavier— +420 227 060 111 +971 4 509 6700 as well as David Rhodes and Daniel buchar.martin@bcg.com beal.douglas@bcg.com Stelter for their analysis of the global economic climate in their book Accel- Gennaro Casale Jeffrey Chua erating Out of The Great Recession. BCG Milan BCG Singapore + 39 0 2 65 59 91 + 65 6429 2500 Finally, we would like to thank Philip casale.gennaro@bcg.com chua.jeffrey@bcg.com Crawford for his editorial direction, as well as other members of the edi- Allard Creyghton Junichi Iwagami torial and production teams, includ- BCG Amsterdam BCG Tokyo ing Gary Callahan, Kim Friedman, +31 20 548 4000 +81 3 5211 0300 and Gina Goldstein. creyghton.allard@bcg.com iwagami.junichi@bcg.com For Further Contact Stefan Dab Holger Michaelis For further information about this BCG Brussels BCG Beijing report or BCG’s capabilities in corpo- +32 2 289 02 02 +86 10 8527 9000 rate banking, please contact one of dab.stefan@bcg.com michaelis.holger@bcg.com the following BCG experts: Oliver Dany Matthew Rogozinski The Americas BCG Frankfurt BCG Melbourne Jürgen E. Schwarz +49 69 9 15 02 0 +61 3 9656 2100 BCG Toronto dany.oliver@bcg.com rogozinski.matthew@bcg.com +1 416 955 4200 schwarz.juergen@bcg.com  T B C G
  • 31.
    For a completelist of BCG publications and information about how to obtain copies, please visit our Web site at www.bcg.com/publications. To receive future publications in electronic form about this topic or others, please visit our subscription Web site at www.bcg.com/subscribe. 6/10
  • 32.
    Abu Dhabi Chicago Kuala Lumpur New Delhi Stuttgart Amsterdam Cologne Lisbon New Jersey Sydney Athens Copenhagen London New York Taipei Atlanta Dallas Los Angeles Oslo Tokyo Auckland Detroit Madrid Paris Toronto Bangkok Dubai Melbourne Philadelphia Vienna Barcelona Düsseldorf Mexico City Prague Warsaw Beijing Frankfurt Miami Rome Washington Berlin Hamburg Milan San Francisco Zurich Boston Helsinki Minneapolis Santiago Brussels Hong Kong Monterrey São Paulo Budapest Houston Moscow Seoul Buenos Aires Istanbul Mumbai Shanghai Canberra Jakarta Munich Singapore Casablanca Kiev Nagoya Stockholm bcg.com