    It’s a crazy multimedia world!
       –  Network is everywhere… but very heterogeneous
       –  Terminals are “same same”… but different!
       –  Content must be designed with a priori knowledge of its future use
       –  Applications are platform-centric instead of user-centric
    Fragmented value chain

               Production            Transmission       Consumption
         Capturing    HW/SW                               Playback
                                       Networks
          devices     providers                           devices
                    INTEROPERABILITY NEEDED!!!
          Authoring     IPR                     Terminal
                               Providers
            tools     holders               manufacturers
                                Service
                                               End users
                               scenarios
MPEG has several names
   •  Common: MPEG = Moving Picture Experts Group
   •  Official: MPEG = ISO/IEC JTC1/SC29/WG11
                                         ISO        Over 224 technical committees



                                         JTC1       Joint Technical Committee with IEC




              SC24                                                        SC29
Computer graphics and image processing          Coding of audio, picture, multimedia and hypermedia information



       GKS, PHIGS                                                                                     WG1                     JPEG
      CGM, VRML, X3D                                                                           Coding of still pictures



                                                                                                     WG11                     MPEG
                                                                                        Coding of moving pictures and audio
MPEG has several subgroups
                         Video
                                                                ... and produced several
 Requirements            Audio        Systems                      successful standards
                      3D Graphics
                                                                         MPEG


   MPEG-1                 MPEG-2             MPEG-4               MPEG-7             MPEG-21
  ISO/IEC 11172 ’92     ISO/IEC 13818 ’94   ISO/IEC 14496 ’99    ISO/IEC 15938 ’01   ISO/IEC 21000 ’02
  Video & audio          Video & audio         Multimedia            Metadata            Terminal
   (CD-ROM)              (DVD & DVB)          & interactive         (description        & network
                                              applications           of content)       specification


MPEG-A MPEG-B MPEG-C MPEG-D MPEG-E MPEG-M MPEG-U MPEG-V
MPEG-4 Features
MPEG-4 Objects

Naturals – still images, audio, 2D/3D video
Synthetic - audio, 2D/3D objects and scenes

                                              Compression
                                                                    Compression
MPEG-4 Objectives                                     Compression


Provide technologies for efficient
compression and transmission


MPEG-4 Terminal
Composition, at end-user side, of natural
and synthetic objects, into hybrid and
interactive scenes
MPEG-4 Features
System architecture

                      Interactive Scene Description
                                                       Scene
                                                        layer

                                                       Object
                                                      descriptor
                                                        layer

MPEG-4
stream
                                                       Media
                                                       data
                                                       layer
    Video Compression
      –  MPEG-4 Visual and MPEG-4 AVC

    3D Graphics Compression
    No common representation
      –  Heterogeneous kind of data
          •  Different types of geometry, appearance and animation models
      –  Always easier to specify a new data representation format than
         learning an existent one

    Very different application domains
FAST
                      TRANSPORT
                       TROUGHT
                         THE
                       NETWORK




                      Size is of main   Size doesn’t matter
Size doesn’t matter    importance
FAST
                      TRANSPORT
                       TROUGHT
                         THE
                       NETWORK




                                        Size doesn’t matter
Size doesn’t matter
                      Size is of main
                       importance
To define a standard format for compressed 3D
   synthetic content. In other words to be for
   graphics what MP3 and AAC are for audio,
   MPEG-2 and MPEG-4 are for video and JPEG is
   for still images.
Additionally "MPEG 3D Graphics" aims at providing
  mechanisms such as APIs to enable easy
  integration and development of applications
  using its standard representation tools.
MPEG 3D Graphics within the MPEG standards family


Core technologies in MPEG 3D Graphics


Compressing other standards (COLLADA, X3D, …) with MPEG


Virtual Worlds Interoperability for avatars with MPEG
MPEG 3D Graphics within the MPEG standards family


Core technologies in MPEG 3D Graphics


Compressing other standards (COLLADA, X3D, …) with MPEG


Virtual Worlds Interoperability for avatars with MPEG
MPEG-4 3D chronology
MPEG-4 3D chronology
MPEG-4 3D chronology
MPEG 3D Graphics within the MPEG standards family


Core technologies in MPEG 3D Graphics


Compressing other standards (COLLADA, X3D, …) with MPEG


Virtual Worlds Interoperability for avatars with MPEG
  IFS surfaces
Approximation of target surface
•  Method: tesselation with planar facets
•  Quality: first order (linear) ⇒ no smoothness (C0 continuity)

Mesh definition: IFS (Indexed Face Set)
•  Connectivity: list of faces {…, Pn = {in0, in1, in2, …}, …}
   ⇒ arbitrary topology (non-manifold, open, higher genus, etc.)
•  Geometry: list of vertices {…, Vk = (xk, yk, zk), …}

Mesh coding
•  Connectivity (lossless): triangle strips, triangle+vertex trees, etc.
•  Geometry (lossy): coordinate quantisation + prediction from conn.
LOD concept
•  1976: Clark introduced the idea
•  Main interest: rendering efficiency

Taxonomy of LOD extraction techniques
•  Static vs. dynamic
•  Global vs. local
•  Progressive vs. hierarchical LODs

Successful simplification techniques
•  1996: Hoppe’s edge collapses
•  1997: Garland’s quadrics ⇒ qslim

Progressive 3D mesh coding
•  1996: Hoppe’s PM (Progressive Mesh)
•  1998: IBM’s PFS (Progressive Forest Split)
Triangles:   69451   vs.   29519
Triangles:   69451   vs.   9575
Triangles:   69451   vs.   1627
Triangles:   69451   vs.   238
MPEG-4 (1999): IFSs
•  Based on VRML97
•  Arbitrary topology meshes
•  “Properties” (normals, colours and textures)

MPEG-4 Amd.1 (2000): 3DMC (3D Mesh Coding)
•    40-50:1 compression of IFSs by IBM’s TS (Topological Surgery)
•    Incremental transmission and rendering
•    Progressive coding by IBM’s PFS
•    Error resilience by SAIT
MPEG-4 (1999): IFSs
•  Based on VRML97
•  Arbitrary topology meshes
•  “Properties” (normals, colours and textures)

MPEG-4 Amd.1 (2000): 3DMC (3D Mesh Coding)
•    40-50:1 compression of IFSs by IBM’s TS (Topological Surgery)
•    Incremental transmission and rendering
•    Progressive coding by IBM’s PFS
•    Error resilience by SAIT
  IFS surfaces
  IFS surfaces
  Patches
Approximation of target surface
•  Method: tesselation with predefined curved patches
•  Quality: higher order (polynomic/rational) ⇒ Cn continuity

Mesh definition
•  Connectivity: regular grid of quads. or triangles
   ⇒ planar topology
•  Geometry: list of control points {…, Pk = (xk, yk, zk), …}

Mesh coding
•  Connectivity (lossless): implicit
•  Geometry (lossy): coordinate quantisation + prediction from conn.
Tensor product of cubic Bézier curves



                           Single patch (4x4 control points)
                                          vs.
                           two patches (4x7 control points)



                                Compression


                          (3547 polygons; 1215 vertices)
                                        vs.
                         (86 patches; 212 control points)
MPEG-4 Part 16 (2003): NURBS
•  Based on VRML97 Amd., originally proposed by blaxxun
•  Support for NURBS curves and patches
     Specific nodes for Bézier’s curves and patches (for increased efficiency)
•  Support for free-form deformations
  IFS surfaces
  Patches
  Subdivision surfaces
SS = limit of recursive refinement of base control mesh
    NB: refinement affects both          Geometry smoothing achieved with
connectivity (of abstract graph) and     stencils particular to each scheme
   geometry (of 3D mapping)
                                        -1/16       -1/16

                                                ½           -1/16    9/16   9/16   -1/16


                                        1/8           1/8
                                                                 Border/sharp vs.
                      z                                        interior edge stencils
                                                ½
                                                                of “butterfly” scheme
                  x
                          y             -1/16       -1/16


         SS inherently define hierarchically nested LODs
Approximation of target surface
•  Method: tesselation with curved patches
•  Quality: higher order ⇒ Cn continuity

Mesh definition
•  Connectivity: list of triangles/quads., e.g., {…, Tn = {in0, in1, in2}, …}
   ⇒ arbitrary (manifold) topology
•  Geometry: list of control points {…, Pk = (xk, yk, zk), …}

Mesh coding
•  Connectivity (lossless): as for polygonal (manifold) mesh
•  Geometry (lossy): as for polygonal (manifold) mesh
Polygons
+ Are the simplest approach (linear approximation)
+ Can resolve fine details and handle arbitrary topologies
– Lead to unstructured, huge meshes

Patches
+ Are a more powerful approach (higher order approximation)
+ Are convenient for coarse and smooth models
– Need cumbersome trimming and stitching mechanisms

SSs
+ Connect and unify the two extremes above
++ Provide multi-resolution handles for hierarchical coding/editing
Catmull-Clark’s (1978): quadrilateral, primal, approximating, C2

      Loop’s (1987): triangular, primal, approximating, C2




Dyn++’s “butterfly” (1990): triangular, primal, interpolating, C1
  IFS surfaces
  Patches
  Subdivision surfaces
  Wavelet subdivision surfaces
Target surface
Base
mesh




         Subdivide      Add details
Target surface
Base
mesh




                     Subdivide                  Add details




Price (requirements)
•  Base mesh extraction
•  Subdivision scheme = predictor
•  Details (3D vectors) = prediction errors ⇒ remeshing

Prize (advantages)
•  Predictive coding ⇒ immediate (if smooth target mesh)
Spatial partitioning
                              Adding details
                              in appearing
                              parts




                                               Removing details
                                               in disappearing
                                               parts
ZT    ZT     ZT        … ZT
by courtesy of FranceTelecom
MPEG-4 Part 16 (2003): “plain” + wavelet SSs
•  “Plain” SSs for mesh smoothing
     Considered schemes: Catmull-Clark, [extended] Loop, butterfly
     No details are added but…
     normal control achievable through edge/vertex tagging of initial control mesh
•  Wavelet/detailed SSs for surface approximation
       Possibly tagged base mesh
       Details are added after each subdivision step, which are…
       wavelet-transformed according to one of several possible schemes
       Most suited for multi-resolution editing/animation
       Most suited for view-dependent transmission
  IFS surfaces
  Patches
  Subdivision surfaces
  Wavelet subdivision surfaces
  Mesh Grid
CW (Connectivity-Wireframe)




RG (Reference-Grid)
Vertex offset is a relative value   Update vertex position when
                                    grid is deformed or animated
  IFS surfaces
  Patches
  Subdivision surfaces
  Wavelet subdivision surfaces
  Mesh Grid
  Solids
Solid primitives




Solid models: the “arithmetic of forms”
Implicit equation:




Quadrics (2nd order):




Quartics (4th order):
F1



                                                            *
                                                                   0    1   2

                                                            0      0    0   0
                                                      F0
                                                            1      0    1   2

                                                            2      0    2   4
A cube = multiplication of 3 degenerated quadrics

                                                      Multiplication of two forms




                                    Examples of solid operations
Architecture
                                      Mechanics




Biotechnology        Virtual models
Exact geometry




Compactness

                 21 Kb   37 Kb   407 Kb   1.1 Mb
  IFS surfaces
  Patches
  Subdivision surf.
  Wavelet SS
  Mesh Grid
  Solids
  SC-3DMC
MPEG 3DGC
 Scalable Complexity 3D Mesh Compression
 •  Not all 3DG applications have the same needs
 in compression
 •  Not all the 3DG applications can afford
 spending extra CPU/GPU for compression


            TFAN

          SVA
                                     SC3DMC

       QBCR                    Same Quantization and
                                 Binarization blocks



Towards the continuum model: enlarge the application domain
  where MPEG-4 3DG can be used
MPEG 3DGC
Scalable Complexity 3D Mesh Compression




   x, y, z (floats)      + normals (floats)
   x, y, z (floats)      + colors (floats)
   x, y, z (floats)      + … (floats)
    i, j, k (integers)                Attributes
        i, j, k (integers)
            i, j, k (integers)     Connectivity
SC-3DMC
 General Schema

Connectivity      TFAN                            BP          CABAC
                                  Delta
 (lossless)
                   SVA                           FLB            AC

                                                                BAC
               Connectivity    Prediction     Binarization    Entropy
  i, j, k       Analysis                                      Encoding


 Attributes                    Prediction                     Entropy
                                               Binarization
  (lossy)                                                     Encoding
                              Parallelogram
                                  Delta            BP         CABAC
  x, y, z      Quantization
                               Barycentre         FLB           AC

                                5 different paths with different performances
SC-3DMC
Connectivity Analysis: Empty

Do Nothing

                    3
             1           4


                    2          123234
SC-3DMC
Connectivity Analysis: SVA
                                                                      Previous Face
4 modes for encoding how consecutive                                  Current Face
   faces share vertices                                               Shared Vertex
                                             1                    5
                        3
 1, 2, 3,                                                                 1, 2, 3,
                1                4                   3
 2, 3, 4                                                                  3, 4, 5

  12304                 2                    2                    4          123245
                    Mode 0                       Mode 2


                1            4               1                1
1, 2, 3,                                                                      1, 2, 3,
4, 5, 6                                                                       1, 2, 3
                                         2       3        2              3
            2        3 5             6               OR
 1231 5             Mode 1                       Mode 3                        1233
SC-3DMC
Connectivity Analysis: TFAN

Split the mesh in set of triangle fans and encode each fan




                                         1675
                                        62937
                                         2984
                                    Transformed in local indices
SC-3DMC
What we measure?

Encoding performances but also complexity for decoder
  (and encoder)
                                         TFAN
Performances
                                SVA-AC
                                                   3DMC
                              SVA-BAC
                     SVA-BP



               NCA


                                            BIFS
                                                          Complexity
  IFS surfaces
  Patches
  Subdivision surf.
  Wavelet SS
  Mesh Grid
  Solids
  SC-3DMC
•    Visual Texture Coding       Generic compression tool

•    Synthesized Textures        Very Compact
                                 representation for
•    Procedural Textures         specific applications

•    Depth Image-based Representation             Less calculation
                                                     intensive
•  MPEG-4 3DMC
•  MPEG-4 MeshGrid
•  MPEG-4 Subdivision Surfaces




3D Mesh

     •  MPEG-4 VTC
     •  JPEG 2000


                                 3D object
     2D Texture
Zero-Tree



WT




     3D mipmaps
Multiple In Place mapping = multi-resolution textures




     Without mipmapping         With mipmapping
Zero-Tree



WT




Computational Graceful Degradation: Quality => processing power
Region of Interest with resolution/quality selection

                                                   Visual
                                                   importance
                                                   depends on
                                                   viewing
                                                   angle



                                                       Low
                                                       Resolution


                                                       High
                                                       Resolution
Packet selection by using error-resilience markers
  IFS surfaces          VTC
  Patches               Synthesized texture
  Subdivision surf.
  Wavelet SS
  Mesh Grid
  Solids
  SC-3DMC
Vector Graphics Primitives




                                                                                                           Color profile


                                                                                                             Line Color Profile ( LC )


                                                                                                             Area Color Point ( A C )
                                       Line ( LN ), bounded by 2 Terminal Points (   TP )     The image
                                                                                              cannot be
                                                                                              displayed.     Color Patch ( PA )
                                       Line Segment ( LS ), bounded by 2 Line Points ( LP )
                                                                                                             Sub -Texture ( ST )
                                       Line marked as control line (Skeleton)
      The image cannot be displayed.
65x96 pixels
10 seconds animation
1.35 kB
  IFS surfaces          VTC
  Patches               Synthesized texture
  Subdivision surf.     Procedural texture
  Wavelet SS
  Mesh Grid
  Solids
  SC-3DMC
DEF Fabric ProceduralTexture {
  type 2      width 256                height 256
              cellWidth 4              cellHeight 4
  roughness 1
  distortion 0.05
  seed 114300
  color [ 0.898 0.89418 0.95294, 0.34118 0.29418 0.70196, 0 0 0, 0 0 0 ]
  aWarpmap [ 0 0, 0.03 1, 0.88 1, 1 0 ]
  bWarpmap [ 0 0, 0.48 1, 1 0 ]
  aWeights [ 0, 0, 0, 0, 0, 0, 0.56, 0, 0, 0, 0, 0, 0, 0, 0.20, 0.24 ]
  bWeights [ 0, 0, 0, 0, 0, 0, 0, 1, 0, 0, 0, 0, 0, 0, 0, 0 ]
}
   DEF Marble ProceduralTexture {
     width 256               height 256
     roughness 1
     seed 22209
     color [ 0.8 0.7098 0.6902, 0.95686 0.8902 0.87451,
            0.87451 0.37255 0.23529, 0.95686 0.8902 0.87451 ]
     aWarpmap [ 0 1, 0.33 0, 1 1 ]
     bWarpmap [ 0 0, 0.55 0, 0.6 1, 0.65 0, 1 0 ]
     bWeights [ 0, 0, 0, 0, 0, 1, 0, 0, 0, 0, 0, 0,
                 0, 1, 0, 0 ]
   }
  IFS surfaces          VTC
  Patches               Synthesized texture
  Subdivision surf.     Procedural texture
  Wavelet SS            DIBR
  Mesh Grid
  Solids
  SC-3DMC
Reconstruct 3D representation from projections




                                                 Depth image



                                                 Projection
  IFS surfaces          VTC
  Patches               Synthesized texture
  Subdivision surf.     Procedural texture
  Wavelet SS            DIBR
  Mesh Grid             Point Texture
  Solids
  SC-3DMC
  IFS surfaces          VTC                   Interpolators
  Patches               Synthesized texture
  Subdivision surf.     Procedural texture
  Wavelet SS            DIBR
  Mesh Grid             Point Texture
  Solids
  SC-3DMC
Piece-wise linear functions defined
by a set of pairs time-value

   Standardized by MPEG-4 for:
   - position
   - orientation
   - scale

    - coordinate in IFS
    - normals in IFS



Straightforward animation based on key-frames
Large amount of data for high quality, smooth animation
Re-sampling, sub-sampling: two
methods supported by MPEG-4

    Path preserving mode
    Key preserving mode

Three schemes supported by
MPEG-4
    Orientation Interpolators
    Coordinate Interpolators
    Position Interpolators


Exploit temporal redundancy for the most common interpolators
Re-sampling, sub-sampling: two
methods supported by MPEG-4           Key value             Key value



    Path preserving mode                Key(time)             Key(time)

    Key preserving mode                     N key values        N-1 key values



Three schemes supported by
MPEG-4
                                       Key value            Key value

    Orientation Interpolators
    Coordinate Interpolators            Key(time)            Key(time)

    Position Interpolators                 N-2 key values       N-3 key values




Sub-sampling or re-sampling based on minimal distortion
A dedicated elementary stream for IC, multiplexed into an AFX stream
  IFS surfaces          VTC                     Interpolators
  Patches               Synthesized texture     Bone-Based
  Subdivision surf.     Procedural texture
  Wavelet SS            DIBR
  Mesh Grid             Point Texture
  Solids
  SC-3DMC
  Face, MPEG-4 V1,
   1999


  Body, MPEG-4 Amd1,
   2000



  Skinned Model, MPEG-4 Part 16,
   2003



  Two frameworks: human-like (FBA) and generic skeleton (BBA)
  Geometry:
    Seamless mesh: shapes sharing
    the same vertices list

  Texture:
    Image Mapping on vertices
    sub-set

  Hierarchy:
    Skeleton layer
    Muscle layer


  Seamless mesh affected by a hierarchical skeleton
  1D controllers: bone & muscle


  for each bone and each muscle
   - a list of affected vertices
   - a measure of affectedness
are provided




Right balance between control parameters and influence volume
Uncompressed                               Uncompressed                        Segment #n
                          Frame #n         BAP/FAP/BBA
BAP/FAP/BBA
                  Frame P                                         DCT


   Prediction                                       DC Coeff.             AC Coeff.
                                Frame I   Segment
                                          P                     Segment
                                           Prediction           I
   Quantization          Quantization

                                              DC Q              DC Q                  AC Q
    Arithmetic           Arithmetic
    coding               coding
                                             Huffman coding                    Huffman coding

                  Binary file                                    Binary file




Basic comp.: prediction, freq.transform, quantization and entropy encoding
  Face, MP4 V1,
   2kbps


  Body, MP4 Amd1,
   5-30 kbps



  Skinned Model, MP4 Part 16,
   5-30 kbps for a human like
   skeleton


  Very low bit-rate
  IFS surfaces          VTC                     Interpolators
  Patches               Synthesized texture     Bone-Based
  Subdivision surf.     Procedural texture      Morphing
  Wavelet SS            DIBR
  Mesh Grid             Point Texture
  Solids
  SC-3DMC
  Defined as a base mesh and
   a collection of target meshes

  Animation obtained by
   updating the weights of the
   target meshes

  BBA stream updated to
   include morph data

  Usable for any kind of 3D
   object

Local and precise control for shape deformation
  IFS surfaces          VTC                     Interpolators
  Patches               Synthesized texture     Bone-Based
  Subdivision surf.     Procedural texture      Morphing
  Wavelet SS            DIBR                    FAMC
  Mesh Grid             Point Texture
  Solids
  SC-3DMC
  Cluster the vertices with
respect to their motion

  Encode a cluster motion by
an affine transform

  Encode the residual error at
vertex level by traditional
approach (DCT/W,
quantization, entropy encoding)
  IFS surfaces          VTC                     Interpolators
  Patches               Synthesized texture     Bone-Based
  Subdivision surf.     Procedural texture      Morphing
  Wavelet SS            DIBR                    FAMC
                                                  Remote and
  Mesh Grid             Point Texture
                                                programmatic
  Solids
  SC-3DMC
Bifs-Anim
  Remote animation
    BIFS-Anim & BIFS Command          Bifs-Command    scene



  Programmatic animation             Script Node
   - ECMA Script                                      scene
     part of the scene description
   - Java Code
     standardized API for accessing   MPEG-J Stream
     the scene graph                                  scene



Complex application scenario can be built
  IFS surfaces          VTC                     Interpolators
  Patches               Synthesized texture     Bone-Based
  Subdivision surf.     Procedural texture      Morphing
  Wavelet SS            DIBR                    FAMC
  Mesh Grid                                      Remote and
                         Point Texture
                                                programmatic
  Solids
  SC-3DMC
MPEG 3DG
How measuring compression performances?

On-line benchmarking platform:
  www.MyMultimediaWorld.com

•  Allows easy integration of proprietary algorithms by using an
   API in C++
•  No need to disclaim the algorithm source code
•  Benchmark automatically updated for new content
•  Restricts and refines the benchmark by means of easy-to-
   control parameters.
MPEG 3DG
How measuring compression performances?
On-line benchmarking : www.MyMultimediaWorld.com
                                                              3D compression
                                              Web site          benchmark         Benchmark 2      Benchmark 3

                                                               Filter and Presentation
                                                                        Engine




                                                                                                              Benchmark manager 2
                        Benchmark manager 1

                                                                        Indexed
                                                                          MDB




                                                          3D Compression benchmark manager
                                                                  API

         MP4

         Extended MP7                           Algorithm 1   Algorithm 2
                                                                                  …             Algorithm n
MPEG 3DG
How measuring compression performances?
On-line benchmarking : www.MyMultimediaWorld.com


                                               GetNbBitstream
                                                                  n
   Vertex Buffer   Encoder    Proprietary
                             Coder library

                                               DumpBitSream

                                                                BitStream
                                                                (1,n)
      DumpCompressedVB
                              Proprietary
                                                 Decoder
                             Decoder library
  .Compressed_VB (1,n)
MPEG 3DG
How measuring compression performances?

Benchmarking platform, per-object visualization



                       - object properties (number of vertices/
                       triangles, number of components and files
                       size,
                       - distortion graph (linear or logarithmic),
                       - compression gain with respect to 3DMC.
                       -  encoding time
                       -  decoding times.
MPEG 3DG
How measuring compression performances?

Benchmarking platform, global visualization


                       Filters

                       - semantic category,
                       - average distortion,
                       - number of vertices,
                       - number of connected components in the
                       object,
                       - database subset.
MPEG 3DG
How measuring compression performances?

Benchmarking platform, global visualization
MPEG 3D Graphics within the MPEG standards family


Core technologies in MPEG 3D Graphics


Compressing other standards (COLLADA, X3D, …) with MPEG


Virtual Worlds Interoperability for avatars with MPEG
Geometry compression:
 -compression ratio 40:1




Animation compression:
-compression ratio 100:1
Any
               XML Scene Representation
XML


   XML
                                (Binary) XML
Binarisation


3D Graphics
Compression
Layer 1:
Any
               XML Scene Representation
XML
                                                         Textual XML
                                                         representation of the
XML                                                      scene
                                          (Binary) XML
Binarisation



3D Graphics
Compression
Layer 2:
Any
               XML Scene Representation
XML
                                                         Binarized XML layer

XML                                                      Contains the
                                          (Binary) XML
Binarisation                                             unclassified elements
                                                         of the scene graph
3D Graphics
Compression
Layer 3:
Any
               XML Scene Representation
XML
                                                         Compressed layer

XML                                                      Contains specific
                                          (Binary) XML
Binarisation                                             types of media
                                                         information
3D Graphics                                              (geometry,
Compression                                              animation, ...)
Result:
Any
               XML Scene Representation
XML
                                                         Multiplexed
XML
                                                         layers 2 and 3
                                          (Binary) XML
Binarisation



3D Graphics
Compression
MPEG-4 P25
  Encoder side: possible implementation (informative)


                                             Encoder Side



                                                        MP4
   XMT,
COLLADA,
   X3D


Comp ratio: 40-70:1
MPEG-4 P25
  Decoder side (normative)


                                                           Decoder Side


     MP4
                                                                        XMT,
                                                                     COLLADA,
                                                                        X3D




Lossless for the data structure, lossless or lossy for graphics primitives
MPEG 3D Graphics within the MPEG standards family


Core technologies in MPEG 3D Graphics


Compressing other standards (COLLADA, X3D, …) with MPEG


Virtual Worlds Interoperability for avatars with MPEG
Standards for Avatars as visualization support


     Standard           Generic Features                 Avatar
                                                     representation
COLLADA               3D objects/ scenes         Generic Object

VRML/ X3D             3D objects /scenes         H- Anim

                      Application behavior

MPEG-4                2D/3D objects/ scenes      A set of dedicated nodes

                      Application behavior       A dedicated      compressed
                                                 stream
                      Compression
Standards for Avatars as interaction support


  Representation                               Features
 HumanML              human physical description, emotion

 EmotionML            emotion, facial expressions, gestures

 BML                  speech, gesture, gaze
 MPML                 speech
 VHML                 facial and body animation, emotional representation

 CML                  character attribute and animation definition
Why none of the existing standards is solving the issue of avatar
 interoperability in Virtual Worlds?

   –  The Virtual Worlds are proprietary applications and the 3D assets including
      the avatars have economical value
   –  The Virtual Worlds and in general 3D applications have specific data format
      allowing rendering optimization


However, while maintaining a strict control for economic and technical
  reasons, Virtual Worlds allow users to personalize the avatars
Avatar
                                      Template

                                                  Attributes that can be
                                                   modified by the user




Specify the set of Personalization Parameters (PP) that transforms a
template of an arbitrary Virtual World into the user designed avatar
What avatar feature can be personalized?




Mainly the appearance




 Analysis of SecondLife, IMVU, Entropia Universe, SonyPlaystation and HumanML
Very heterogeneous set of personalization parameters




                               Entropia      Nintendo
                               Universe         Wii

                                                           HumanML


        Second Life
                                                  PlayStation
“Appearance” element
                       <Appearance>

                             <Body>
                                       <BodyHeight value=165/>
                                       <BodyFat value=15/>
                             </Body>

                             <Head>
                                       <HeadShape value="oval"/>
                                       <EggHead value="true"/>
                             </Head>

                       </Appearance>
Interoperability at the Animation level

                                          <Animation>

                                                  <Greeting>
                                                  <Salute>salut</Salute>
                                                  <Cheer>cheer</Cheer>
                                                  </Greeting>

                                                  <Fighting>
                                                  <shoot>pousse</shoot>
                                                  <throw>throw</throw>
                                                  </Fighting>

                                          </Animation>
Motion retargeting




                                                            No “Walk”
    Avatar                                  Avatar          animation
                     “Walk” animation
Template in VW1                         Template in VW2   defined in VW2
                         In VW1
“Control” element
   Body            Face
  Control         Control   <Control>
                                         <BodyFeaturesControl >
                                                  <UpperBodyBones>
                                                            <LCalvicle>my_LCalvicle</LCalvicle>
            Control                                         <RClavicle>my_RCalvicle</RClavicle>
                                                  </UpperBodyBones>
                                         </BodyFeaturesControl>

                                         <FaceFeaturesControl>
                                                   <HeadOutline>
                                                             <Left X=0.23 Y=1.25 Z=7.26/>
                                                             <Right X=0.25 Y=1.25 Z=7.21/>
                                                   </HeadOutline>
                                         </FaceFeaturesControl>

                            </Control>
MPEG-V
                             (Personalization
                               Parameters)




                            MPEG-V + MPEG-4
The Avatar in                                   The Avatar in
    VW1                                             VW2

                The Avatar in an
                 external player
MPEG 3DGC
Ongoing work
MPEG 3DGC
Multi-Resolution 3DMC


                                    Current 3DG content in VW



© Samsung           © Second Life




                                    Tomorrow’s 3DG content in VW
                                         (100 times denser)
 © OTOY            © OTOY
MPEG 3DGC
Reconfigurable Graphics Coding




        A framework that allows to set up the decoder at run time
Thank you!




 www.MyMultimediaWorld.com
 www-artemis.it-sudparis.eu
 marius.preda@it-sudparis.eu
MPEG 3DGC
  Multi-resolution 3DMC




Progressive mesh [Hoppe’96]       Progressive Forest Split (PFS) [Taubin’98]        Patch coloring [Cohen-Or’99]




Valence-based decimation approach [Alliez’01]                    Octree-based compression [Peng’05]




                 Spectral coding [Karni’01]
MPEG 3DGC
 Multi-resolution 3DMC : two proposed methods

1. Progressive TFAN
                                                Original




                                                Interpolated with 1%
                                                of the vertices
MPEG 3DGC
 Multi-resolution 3DMC : two proposed methods

2. KLT encoder




                                                2
                                                            2

                                           2            1
                                                                1



                                                    1
MPEG 3DGC
 Multi-resolution 3DMC : two proposed methods



1. Work on
    -  document the use case scenarios (object examination, navigation, …)
    -  database
    -  comparison with other codecs
    -  comparison method (PSNR, Resolution)
    -  platform for testing

2. You are invited to contribute

More Related Content

What's hot

MIRU2016 チュートリアル
MIRU2016 チュートリアルMIRU2016 チュートリアル
MIRU2016 チュートリアルShunsuke Ono
 
GDC2019 - SEED - Towards Deep Generative Models in Game Development
GDC2019 - SEED - Towards Deep Generative Models in Game DevelopmentGDC2019 - SEED - Towards Deep Generative Models in Game Development
GDC2019 - SEED - Towards Deep Generative Models in Game DevelopmentElectronic Arts / DICE
 
[CVPR'22] Domain Generalization via Shuffled Style Assembly for Face Anti-Spo...
[CVPR'22] Domain Generalization via Shuffled Style Assembly for Face Anti-Spo...[CVPR'22] Domain Generalization via Shuffled Style Assembly for Face Anti-Spo...
[CVPR'22] Domain Generalization via Shuffled Style Assembly for Face Anti-Spo...KIMMINHA3
 
[DL輪読会]Deep Anomaly Detection Using Geometric Transformations
[DL輪読会]Deep Anomaly Detection Using Geometric Transformations[DL輪読会]Deep Anomaly Detection Using Geometric Transformations
[DL輪読会]Deep Anomaly Detection Using Geometric TransformationsDeep Learning JP
 
Jetson TK1でSemi-Global Matching
Jetson TK1でSemi-Global MatchingJetson TK1でSemi-Global Matching
Jetson TK1でSemi-Global MatchingRyo Sakamoto
 
Random Features Strengthen Graph Neural Networks
Random Features Strengthen Graph Neural NetworksRandom Features Strengthen Graph Neural Networks
Random Features Strengthen Graph Neural Networksjoisino
 
(文献紹介) 画像復元:Plug-and-Play ADMM
(文献紹介) 画像復元:Plug-and-Play ADMM(文献紹介) 画像復元:Plug-and-Play ADMM
(文献紹介) 画像復元:Plug-and-Play ADMMMorpho, Inc.
 
【DL輪読会】Investigating Tradeoffs in Real-World Video Super-Resolution
【DL輪読会】Investigating Tradeoffs in Real-World Video Super-Resolution【DL輪読会】Investigating Tradeoffs in Real-World Video Super-Resolution
【DL輪読会】Investigating Tradeoffs in Real-World Video Super-ResolutionDeep Learning JP
 
Learning to Resize Images for Computer Vision Tasks
Learning to Resize Images for Computer Vision TasksLearning to Resize Images for Computer Vision Tasks
Learning to Resize Images for Computer Vision Tasksharmonylab
 
ディープラーニングを用いた物体認識とその周辺 ~現状と課題~ (Revised on 18 July, 2018)
ディープラーニングを用いた物体認識とその周辺 ~現状と課題~ (Revised on 18 July, 2018)ディープラーニングを用いた物体認識とその周辺 ~現状と課題~ (Revised on 18 July, 2018)
ディープラーニングを用いた物体認識とその周辺 ~現状と課題~ (Revised on 18 July, 2018)Masakazu Iwamura
 
ダブリング
ダブリングダブリング
ダブリングsatanic
 
Recent Progress on Single-Image Super-Resolution
Recent Progress on Single-Image Super-ResolutionRecent Progress on Single-Image Super-Resolution
Recent Progress on Single-Image Super-ResolutionHiroto Honda
 
PRMU 201312 subpixel object detection survey
PRMU 201312 subpixel object detection surveyPRMU 201312 subpixel object detection survey
PRMU 201312 subpixel object detection surveyYoshihisa Ijiri
 
Particle swarm optimization
Particle swarm optimizationParticle swarm optimization
Particle swarm optimizationMahesh Tibrewal
 
第18回コンピュータビジョン勉強会@関東「ICCV祭り」発表資料(kanejaki)
第18回コンピュータビジョン勉強会@関東「ICCV祭り」発表資料(kanejaki)第18回コンピュータビジョン勉強会@関東「ICCV祭り」発表資料(kanejaki)
第18回コンピュータビジョン勉強会@関東「ICCV祭り」発表資料(kanejaki)kanejaki
 

What's hot (20)

MIRU2016 チュートリアル
MIRU2016 チュートリアルMIRU2016 チュートリアル
MIRU2016 チュートリアル
 
GDC2019 - SEED - Towards Deep Generative Models in Game Development
GDC2019 - SEED - Towards Deep Generative Models in Game DevelopmentGDC2019 - SEED - Towards Deep Generative Models in Game Development
GDC2019 - SEED - Towards Deep Generative Models in Game Development
 
[CVPR'22] Domain Generalization via Shuffled Style Assembly for Face Anti-Spo...
[CVPR'22] Domain Generalization via Shuffled Style Assembly for Face Anti-Spo...[CVPR'22] Domain Generalization via Shuffled Style Assembly for Face Anti-Spo...
[CVPR'22] Domain Generalization via Shuffled Style Assembly for Face Anti-Spo...
 
[DL輪読会]Deep Anomaly Detection Using Geometric Transformations
[DL輪読会]Deep Anomaly Detection Using Geometric Transformations[DL輪読会]Deep Anomaly Detection Using Geometric Transformations
[DL輪読会]Deep Anomaly Detection Using Geometric Transformations
 
Jetson TK1でSemi-Global Matching
Jetson TK1でSemi-Global MatchingJetson TK1でSemi-Global Matching
Jetson TK1でSemi-Global Matching
 
Random Features Strengthen Graph Neural Networks
Random Features Strengthen Graph Neural NetworksRandom Features Strengthen Graph Neural Networks
Random Features Strengthen Graph Neural Networks
 
(文献紹介) 画像復元:Plug-and-Play ADMM
(文献紹介) 画像復元:Plug-and-Play ADMM(文献紹介) 画像復元:Plug-and-Play ADMM
(文献紹介) 画像復元:Plug-and-Play ADMM
 
【DL輪読会】Investigating Tradeoffs in Real-World Video Super-Resolution
【DL輪読会】Investigating Tradeoffs in Real-World Video Super-Resolution【DL輪読会】Investigating Tradeoffs in Real-World Video Super-Resolution
【DL輪読会】Investigating Tradeoffs in Real-World Video Super-Resolution
 
Learning to Resize Images for Computer Vision Tasks
Learning to Resize Images for Computer Vision TasksLearning to Resize Images for Computer Vision Tasks
Learning to Resize Images for Computer Vision Tasks
 
MobileViTv1
MobileViTv1MobileViTv1
MobileViTv1
 
Jpeg
JpegJpeg
Jpeg
 
ディープラーニングを用いた物体認識とその周辺 ~現状と課題~ (Revised on 18 July, 2018)
ディープラーニングを用いた物体認識とその周辺 ~現状と課題~ (Revised on 18 July, 2018)ディープラーニングを用いた物体認識とその周辺 ~現状と課題~ (Revised on 18 July, 2018)
ディープラーニングを用いた物体認識とその周辺 ~現状と課題~ (Revised on 18 July, 2018)
 
ダブリング
ダブリングダブリング
ダブリング
 
Unit 1 a notes
Unit 1 a notesUnit 1 a notes
Unit 1 a notes
 
Recent Progress on Single-Image Super-Resolution
Recent Progress on Single-Image Super-ResolutionRecent Progress on Single-Image Super-Resolution
Recent Progress on Single-Image Super-Resolution
 
PRMU 201312 subpixel object detection survey
PRMU 201312 subpixel object detection surveyPRMU 201312 subpixel object detection survey
PRMU 201312 subpixel object detection survey
 
Particle swarm optimization
Particle swarm optimizationParticle swarm optimization
Particle swarm optimization
 
第18回コンピュータビジョン勉強会@関東「ICCV祭り」発表資料(kanejaki)
第18回コンピュータビジョン勉強会@関東「ICCV祭り」発表資料(kanejaki)第18回コンピュータビジョン勉強会@関東「ICCV祭り」発表資料(kanejaki)
第18回コンピュータビジョン勉強会@関東「ICCV祭り」発表資料(kanejaki)
 
RM 701 Genetic Algorithm and Fuzzy Logic lecture
RM 701 Genetic Algorithm and Fuzzy Logic lectureRM 701 Genetic Algorithm and Fuzzy Logic lecture
RM 701 Genetic Algorithm and Fuzzy Logic lecture
 
Autodesk Mudbox
Autodesk MudboxAutodesk Mudbox
Autodesk Mudbox
 

Viewers also liked

3rd 3DDRESD: RC historical contextualization
3rd 3DDRESD: RC historical contextualization3rd 3DDRESD: RC historical contextualization
3rd 3DDRESD: RC historical contextualizationMarco Santambrogio
 
Basics of Mpeg 4 Video Compression
Basics of Mpeg 4 Video CompressionBasics of Mpeg 4 Video Compression
Basics of Mpeg 4 Video CompressionMarius Preda PhD
 
MPEG video compression standard
MPEG video compression standardMPEG video compression standard
MPEG video compression standardanuragjagetiya
 
Video Compression Basics - MPEG2
Video Compression Basics - MPEG2Video Compression Basics - MPEG2
Video Compression Basics - MPEG2VijayKumarArya
 

Viewers also liked (6)

RCW@DEI - Reconf Comp
RCW@DEI - Reconf CompRCW@DEI - Reconf Comp
RCW@DEI - Reconf Comp
 
3rd 3DDRESD: RC historical contextualization
3rd 3DDRESD: RC historical contextualization3rd 3DDRESD: RC historical contextualization
3rd 3DDRESD: RC historical contextualization
 
Basics of Mpeg 4 Video Compression
Basics of Mpeg 4 Video CompressionBasics of Mpeg 4 Video Compression
Basics of Mpeg 4 Video Compression
 
RCW@DEI - Design Flow 4 SoPc
RCW@DEI - Design Flow 4 SoPcRCW@DEI - Design Flow 4 SoPc
RCW@DEI - Design Flow 4 SoPc
 
MPEG video compression standard
MPEG video compression standardMPEG video compression standard
MPEG video compression standard
 
Video Compression Basics - MPEG2
Video Compression Basics - MPEG2Video Compression Basics - MPEG2
Video Compression Basics - MPEG2
 

Similar to Basics of Mpeg 4 3D Graphics Compression

Similar to Basics of Mpeg 4 3D Graphics Compression (20)

Tutorial MPEG 3D Graphics
Tutorial MPEG 3D GraphicsTutorial MPEG 3D Graphics
Tutorial MPEG 3D Graphics
 
MPEG Augmented Reality Tutorial
MPEG Augmented Reality TutorialMPEG Augmented Reality Tutorial
MPEG Augmented Reality Tutorial
 
MPEG Technologies and roadmap for Augmented Reality
MPEG Technologies and roadmap for Augmented RealityMPEG Technologies and roadmap for Augmented Reality
MPEG Technologies and roadmap for Augmented Reality
 
3DgraphicsAndAR
3DgraphicsAndAR3DgraphicsAndAR
3DgraphicsAndAR
 
MPEG 3D graphics compression offer
MPEG 3D graphics compression offerMPEG 3D graphics compression offer
MPEG 3D graphics compression offer
 
Compression
CompressionCompression
Compression
 
m4-out-20027
m4-out-20027m4-out-20027
m4-out-20027
 
m4-out-20027
m4-out-20027m4-out-20027
m4-out-20027
 
m4-out-20027
m4-out-20027m4-out-20027
m4-out-20027
 
The MPEG Extensible Middleware API
The MPEG Extensible Middleware APIThe MPEG Extensible Middleware API
The MPEG Extensible Middleware API
 
Mpeg 7-21
Mpeg 7-21Mpeg 7-21
Mpeg 7-21
 
JPEG2000 Alliance IBC 2009
JPEG2000 Alliance IBC 2009JPEG2000 Alliance IBC 2009
JPEG2000 Alliance IBC 2009
 
Hw2
Hw2Hw2
Hw2
 
Introduction to Video Compression Techniques - Anurag Jain
Introduction to Video Compression Techniques - Anurag JainIntroduction to Video Compression Techniques - Anurag Jain
Introduction to Video Compression Techniques - Anurag Jain
 
MPEG4 vs H.264
MPEG4 vs H.264MPEG4 vs H.264
MPEG4 vs H.264
 
Report
ReportReport
Report
 
video compression
video compressionvideo compression
video compression
 
video compression
video compressionvideo compression
video compression
 
video compression
video compressionvideo compression
video compression
 
MPEG-4 Developments
MPEG-4 DevelopmentsMPEG-4 Developments
MPEG-4 Developments
 

More from Marius Preda PhD

Point Cloud Compression in MPEG
Point Cloud Compression in MPEGPoint Cloud Compression in MPEG
Point Cloud Compression in MPEGMarius Preda PhD
 
Bridging the gap between web and television
Bridging the gap between web and televisionBridging the gap between web and television
Bridging the gap between web and televisionMarius Preda PhD
 
Mpeg ARAF tutorial @ ISMAR 2014
Mpeg ARAF tutorial @ ISMAR 2014Mpeg ARAF tutorial @ ISMAR 2014
Mpeg ARAF tutorial @ ISMAR 2014Marius Preda PhD
 
XLcloud 3-d remote rendering
XLcloud 3-d remote renderingXLcloud 3-d remote rendering
XLcloud 3-d remote renderingMarius Preda PhD
 
Augmented Reality: Connecting physical and digital worlds
Augmented Reality: Connecting physical and digital worldsAugmented Reality: Connecting physical and digital worlds
Augmented Reality: Connecting physical and digital worldsMarius Preda PhD
 
Games related research at Institut TELECOM
Games related research at Institut TELECOMGames related research at Institut TELECOM
Games related research at Institut TELECOMMarius Preda PhD
 

More from Marius Preda PhD (7)

Point Cloud Compression in MPEG
Point Cloud Compression in MPEGPoint Cloud Compression in MPEG
Point Cloud Compression in MPEG
 
Bridging the gap between web and television
Bridging the gap between web and televisionBridging the gap between web and television
Bridging the gap between web and television
 
Mpeg ARAF tutorial @ ISMAR 2014
Mpeg ARAF tutorial @ ISMAR 2014Mpeg ARAF tutorial @ ISMAR 2014
Mpeg ARAF tutorial @ ISMAR 2014
 
XLcloud 3-d remote rendering
XLcloud 3-d remote renderingXLcloud 3-d remote rendering
XLcloud 3-d remote rendering
 
Augmented Reality: Connecting physical and digital worlds
Augmented Reality: Connecting physical and digital worldsAugmented Reality: Connecting physical and digital worlds
Augmented Reality: Connecting physical and digital worlds
 
Games related research at Institut TELECOM
Games related research at Institut TELECOMGames related research at Institut TELECOM
Games related research at Institut TELECOM
 
Mpeg v-awareness event
Mpeg v-awareness eventMpeg v-awareness event
Mpeg v-awareness event
 

Recently uploaded

Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 

Recently uploaded (20)

Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 

Basics of Mpeg 4 3D Graphics Compression

  • 1. Marius Preda, PhD Chairman of MPEG 3DG Institut MINES TELECOM
  • 2.   It’s a crazy multimedia world! –  Network is everywhere… but very heterogeneous –  Terminals are “same same”… but different! –  Content must be designed with a priori knowledge of its future use –  Applications are platform-centric instead of user-centric   Fragmented value chain Production Transmission Consumption Capturing HW/SW Playback Networks devices providers devices INTEROPERABILITY NEEDED!!! Authoring IPR Terminal Providers tools holders manufacturers Service End users scenarios
  • 3. MPEG has several names •  Common: MPEG = Moving Picture Experts Group •  Official: MPEG = ISO/IEC JTC1/SC29/WG11 ISO Over 224 technical committees JTC1 Joint Technical Committee with IEC SC24 SC29 Computer graphics and image processing Coding of audio, picture, multimedia and hypermedia information GKS, PHIGS WG1 JPEG CGM, VRML, X3D Coding of still pictures WG11 MPEG Coding of moving pictures and audio
  • 4. MPEG has several subgroups Video ... and produced several Requirements Audio Systems successful standards 3D Graphics MPEG MPEG-1 MPEG-2 MPEG-4 MPEG-7 MPEG-21 ISO/IEC 11172 ’92 ISO/IEC 13818 ’94 ISO/IEC 14496 ’99 ISO/IEC 15938 ’01 ISO/IEC 21000 ’02 Video & audio Video & audio Multimedia Metadata Terminal (CD-ROM) (DVD & DVB) & interactive (description & network applications of content) specification MPEG-A MPEG-B MPEG-C MPEG-D MPEG-E MPEG-M MPEG-U MPEG-V
  • 5. MPEG-4 Features MPEG-4 Objects Naturals – still images, audio, 2D/3D video Synthetic - audio, 2D/3D objects and scenes Compression Compression MPEG-4 Objectives Compression Provide technologies for efficient compression and transmission MPEG-4 Terminal Composition, at end-user side, of natural and synthetic objects, into hybrid and interactive scenes
  • 6. MPEG-4 Features System architecture Interactive Scene Description Scene layer Object descriptor layer MPEG-4 stream Media data layer
  • 7.   Video Compression –  MPEG-4 Visual and MPEG-4 AVC   3D Graphics Compression
  • 8.   No common representation –  Heterogeneous kind of data •  Different types of geometry, appearance and animation models –  Always easier to specify a new data representation format than learning an existent one   Very different application domains
  • 9.
  • 10.
  • 11. FAST TRANSPORT TROUGHT THE NETWORK Size is of main Size doesn’t matter Size doesn’t matter importance
  • 12. FAST TRANSPORT TROUGHT THE NETWORK Size doesn’t matter Size doesn’t matter Size is of main importance
  • 13. To define a standard format for compressed 3D synthetic content. In other words to be for graphics what MP3 and AAC are for audio, MPEG-2 and MPEG-4 are for video and JPEG is for still images. Additionally "MPEG 3D Graphics" aims at providing mechanisms such as APIs to enable easy integration and development of applications using its standard representation tools.
  • 14. MPEG 3D Graphics within the MPEG standards family Core technologies in MPEG 3D Graphics Compressing other standards (COLLADA, X3D, …) with MPEG Virtual Worlds Interoperability for avatars with MPEG
  • 15. MPEG 3D Graphics within the MPEG standards family Core technologies in MPEG 3D Graphics Compressing other standards (COLLADA, X3D, …) with MPEG Virtual Worlds Interoperability for avatars with MPEG
  • 19. MPEG 3D Graphics within the MPEG standards family Core technologies in MPEG 3D Graphics Compressing other standards (COLLADA, X3D, …) with MPEG Virtual Worlds Interoperability for avatars with MPEG
  • 21. Approximation of target surface •  Method: tesselation with planar facets •  Quality: first order (linear) ⇒ no smoothness (C0 continuity) Mesh definition: IFS (Indexed Face Set) •  Connectivity: list of faces {…, Pn = {in0, in1, in2, …}, …} ⇒ arbitrary topology (non-manifold, open, higher genus, etc.) •  Geometry: list of vertices {…, Vk = (xk, yk, zk), …} Mesh coding •  Connectivity (lossless): triangle strips, triangle+vertex trees, etc. •  Geometry (lossy): coordinate quantisation + prediction from conn.
  • 22. LOD concept •  1976: Clark introduced the idea •  Main interest: rendering efficiency Taxonomy of LOD extraction techniques •  Static vs. dynamic •  Global vs. local •  Progressive vs. hierarchical LODs Successful simplification techniques •  1996: Hoppe’s edge collapses •  1997: Garland’s quadrics ⇒ qslim Progressive 3D mesh coding •  1996: Hoppe’s PM (Progressive Mesh) •  1998: IBM’s PFS (Progressive Forest Split)
  • 23. Triangles: 69451 vs. 29519
  • 24. Triangles: 69451 vs. 9575
  • 25. Triangles: 69451 vs. 1627
  • 26. Triangles: 69451 vs. 238
  • 27. MPEG-4 (1999): IFSs •  Based on VRML97 •  Arbitrary topology meshes •  “Properties” (normals, colours and textures) MPEG-4 Amd.1 (2000): 3DMC (3D Mesh Coding) •  40-50:1 compression of IFSs by IBM’s TS (Topological Surgery) •  Incremental transmission and rendering •  Progressive coding by IBM’s PFS •  Error resilience by SAIT
  • 28. MPEG-4 (1999): IFSs •  Based on VRML97 •  Arbitrary topology meshes •  “Properties” (normals, colours and textures) MPEG-4 Amd.1 (2000): 3DMC (3D Mesh Coding) •  40-50:1 compression of IFSs by IBM’s TS (Topological Surgery) •  Incremental transmission and rendering •  Progressive coding by IBM’s PFS •  Error resilience by SAIT
  • 31. Approximation of target surface •  Method: tesselation with predefined curved patches •  Quality: higher order (polynomic/rational) ⇒ Cn continuity Mesh definition •  Connectivity: regular grid of quads. or triangles ⇒ planar topology •  Geometry: list of control points {…, Pk = (xk, yk, zk), …} Mesh coding •  Connectivity (lossless): implicit •  Geometry (lossy): coordinate quantisation + prediction from conn.
  • 32. Tensor product of cubic Bézier curves Single patch (4x4 control points) vs. two patches (4x7 control points) Compression  (3547 polygons; 1215 vertices) vs. (86 patches; 212 control points)
  • 33. MPEG-4 Part 16 (2003): NURBS •  Based on VRML97 Amd., originally proposed by blaxxun •  Support for NURBS curves and patches   Specific nodes for Bézier’s curves and patches (for increased efficiency) •  Support for free-form deformations
  • 34.   IFS surfaces   Patches   Subdivision surfaces
  • 35. SS = limit of recursive refinement of base control mesh NB: refinement affects both Geometry smoothing achieved with connectivity (of abstract graph) and stencils particular to each scheme geometry (of 3D mapping) -1/16 -1/16 ½ -1/16 9/16 9/16 -1/16 1/8 1/8 Border/sharp vs. z interior edge stencils ½ of “butterfly” scheme x y -1/16 -1/16 SS inherently define hierarchically nested LODs
  • 36. Approximation of target surface •  Method: tesselation with curved patches •  Quality: higher order ⇒ Cn continuity Mesh definition •  Connectivity: list of triangles/quads., e.g., {…, Tn = {in0, in1, in2}, …} ⇒ arbitrary (manifold) topology •  Geometry: list of control points {…, Pk = (xk, yk, zk), …} Mesh coding •  Connectivity (lossless): as for polygonal (manifold) mesh •  Geometry (lossy): as for polygonal (manifold) mesh
  • 37. Polygons + Are the simplest approach (linear approximation) + Can resolve fine details and handle arbitrary topologies – Lead to unstructured, huge meshes Patches + Are a more powerful approach (higher order approximation) + Are convenient for coarse and smooth models – Need cumbersome trimming and stitching mechanisms SSs + Connect and unify the two extremes above ++ Provide multi-resolution handles for hierarchical coding/editing
  • 38. Catmull-Clark’s (1978): quadrilateral, primal, approximating, C2 Loop’s (1987): triangular, primal, approximating, C2 Dyn++’s “butterfly” (1990): triangular, primal, interpolating, C1
  • 39.   IFS surfaces   Patches   Subdivision surfaces   Wavelet subdivision surfaces
  • 40. Target surface Base mesh Subdivide Add details
  • 41. Target surface Base mesh Subdivide Add details Price (requirements) •  Base mesh extraction •  Subdivision scheme = predictor •  Details (3D vectors) = prediction errors ⇒ remeshing Prize (advantages) •  Predictive coding ⇒ immediate (if smooth target mesh)
  • 42. Spatial partitioning Adding details in appearing parts Removing details in disappearing parts ZT ZT ZT … ZT
  • 43. by courtesy of FranceTelecom
  • 44. MPEG-4 Part 16 (2003): “plain” + wavelet SSs •  “Plain” SSs for mesh smoothing   Considered schemes: Catmull-Clark, [extended] Loop, butterfly   No details are added but…   normal control achievable through edge/vertex tagging of initial control mesh •  Wavelet/detailed SSs for surface approximation   Possibly tagged base mesh   Details are added after each subdivision step, which are…   wavelet-transformed according to one of several possible schemes   Most suited for multi-resolution editing/animation   Most suited for view-dependent transmission
  • 45.   IFS surfaces   Patches   Subdivision surfaces   Wavelet subdivision surfaces   Mesh Grid
  • 47. Vertex offset is a relative value Update vertex position when grid is deformed or animated
  • 48.
  • 49.   IFS surfaces   Patches   Subdivision surfaces   Wavelet subdivision surfaces   Mesh Grid   Solids
  • 50. Solid primitives Solid models: the “arithmetic of forms”
  • 51. Implicit equation: Quadrics (2nd order): Quartics (4th order):
  • 52. F1 * 0 1 2 0 0 0 0 F0 1 0 1 2 2 0 2 4 A cube = multiplication of 3 degenerated quadrics Multiplication of two forms Examples of solid operations
  • 53. Architecture Mechanics Biotechnology Virtual models
  • 54. Exact geometry Compactness 21 Kb 37 Kb 407 Kb 1.1 Mb
  • 55.   IFS surfaces   Patches   Subdivision surf.   Wavelet SS   Mesh Grid   Solids   SC-3DMC
  • 56. MPEG 3DGC Scalable Complexity 3D Mesh Compression •  Not all 3DG applications have the same needs in compression •  Not all the 3DG applications can afford spending extra CPU/GPU for compression TFAN SVA SC3DMC QBCR Same Quantization and Binarization blocks Towards the continuum model: enlarge the application domain where MPEG-4 3DG can be used
  • 57. MPEG 3DGC Scalable Complexity 3D Mesh Compression x, y, z (floats) + normals (floats) x, y, z (floats) + colors (floats) x, y, z (floats) + … (floats) i, j, k (integers) Attributes i, j, k (integers) i, j, k (integers) Connectivity
  • 58. SC-3DMC General Schema Connectivity TFAN BP CABAC Delta (lossless) SVA FLB AC BAC Connectivity Prediction Binarization Entropy i, j, k Analysis Encoding Attributes Prediction Entropy Binarization (lossy) Encoding Parallelogram Delta BP CABAC x, y, z Quantization Barycentre FLB AC 5 different paths with different performances
  • 59. SC-3DMC Connectivity Analysis: Empty Do Nothing 3 1 4 2 123234
  • 60. SC-3DMC Connectivity Analysis: SVA Previous Face 4 modes for encoding how consecutive Current Face faces share vertices Shared Vertex 1 5 3 1, 2, 3, 1, 2, 3, 1 4 3 2, 3, 4 3, 4, 5 12304 2 2 4 123245 Mode 0 Mode 2 1 4 1 1 1, 2, 3, 1, 2, 3, 4, 5, 6 1, 2, 3 2 3 2 3 2 3 5 6 OR 1231 5 Mode 1 Mode 3 1233
  • 61. SC-3DMC Connectivity Analysis: TFAN Split the mesh in set of triangle fans and encode each fan 1675 62937 2984 Transformed in local indices
  • 62. SC-3DMC What we measure? Encoding performances but also complexity for decoder (and encoder) TFAN Performances SVA-AC 3DMC SVA-BAC SVA-BP NCA BIFS Complexity
  • 63.   IFS surfaces   Patches   Subdivision surf.   Wavelet SS   Mesh Grid   Solids   SC-3DMC
  • 64. •  Visual Texture Coding Generic compression tool •  Synthesized Textures Very Compact representation for •  Procedural Textures specific applications •  Depth Image-based Representation Less calculation intensive
  • 65. •  MPEG-4 3DMC •  MPEG-4 MeshGrid •  MPEG-4 Subdivision Surfaces 3D Mesh •  MPEG-4 VTC •  JPEG 2000 3D object 2D Texture
  • 66. Zero-Tree WT 3D mipmaps
  • 67. Multiple In Place mapping = multi-resolution textures Without mipmapping With mipmapping
  • 69. Region of Interest with resolution/quality selection Visual importance depends on viewing angle Low Resolution High Resolution
  • 70. Packet selection by using error-resilience markers
  • 71.   IFS surfaces   VTC   Patches   Synthesized texture   Subdivision surf.   Wavelet SS   Mesh Grid   Solids   SC-3DMC
  • 72. Vector Graphics Primitives Color profile Line Color Profile ( LC ) Area Color Point ( A C ) Line ( LN ), bounded by 2 Terminal Points ( TP ) The image cannot be displayed. Color Patch ( PA ) Line Segment ( LS ), bounded by 2 Line Points ( LP ) Sub -Texture ( ST ) Line marked as control line (Skeleton) The image cannot be displayed.
  • 73. 65x96 pixels 10 seconds animation 1.35 kB
  • 74.   IFS surfaces   VTC   Patches   Synthesized texture   Subdivision surf.   Procedural texture   Wavelet SS   Mesh Grid   Solids   SC-3DMC
  • 75. DEF Fabric ProceduralTexture { type 2 width 256 height 256 cellWidth 4 cellHeight 4 roughness 1 distortion 0.05 seed 114300 color [ 0.898 0.89418 0.95294, 0.34118 0.29418 0.70196, 0 0 0, 0 0 0 ] aWarpmap [ 0 0, 0.03 1, 0.88 1, 1 0 ] bWarpmap [ 0 0, 0.48 1, 1 0 ] aWeights [ 0, 0, 0, 0, 0, 0, 0.56, 0, 0, 0, 0, 0, 0, 0, 0.20, 0.24 ] bWeights [ 0, 0, 0, 0, 0, 0, 0, 1, 0, 0, 0, 0, 0, 0, 0, 0 ] } DEF Marble ProceduralTexture { width 256 height 256 roughness 1 seed 22209 color [ 0.8 0.7098 0.6902, 0.95686 0.8902 0.87451, 0.87451 0.37255 0.23529, 0.95686 0.8902 0.87451 ] aWarpmap [ 0 1, 0.33 0, 1 1 ] bWarpmap [ 0 0, 0.55 0, 0.6 1, 0.65 0, 1 0 ] bWeights [ 0, 0, 0, 0, 0, 1, 0, 0, 0, 0, 0, 0, 0, 1, 0, 0 ] }
  • 76.   IFS surfaces   VTC   Patches   Synthesized texture   Subdivision surf.   Procedural texture   Wavelet SS   DIBR   Mesh Grid   Solids   SC-3DMC
  • 77. Reconstruct 3D representation from projections Depth image Projection
  • 78.   IFS surfaces   VTC   Patches   Synthesized texture   Subdivision surf.   Procedural texture   Wavelet SS   DIBR   Mesh Grid   Point Texture   Solids   SC-3DMC
  • 79.   IFS surfaces   VTC   Interpolators   Patches   Synthesized texture   Subdivision surf.   Procedural texture   Wavelet SS   DIBR   Mesh Grid   Point Texture   Solids   SC-3DMC
  • 80. Piece-wise linear functions defined by a set of pairs time-value Standardized by MPEG-4 for: - position - orientation - scale - coordinate in IFS - normals in IFS Straightforward animation based on key-frames
  • 81. Large amount of data for high quality, smooth animation
  • 82. Re-sampling, sub-sampling: two methods supported by MPEG-4 Path preserving mode Key preserving mode Three schemes supported by MPEG-4 Orientation Interpolators Coordinate Interpolators Position Interpolators Exploit temporal redundancy for the most common interpolators
  • 83. Re-sampling, sub-sampling: two methods supported by MPEG-4 Key value Key value Path preserving mode Key(time) Key(time) Key preserving mode N key values N-1 key values Three schemes supported by MPEG-4 Key value Key value Orientation Interpolators Coordinate Interpolators Key(time) Key(time) Position Interpolators N-2 key values N-3 key values Sub-sampling or re-sampling based on minimal distortion
  • 84. A dedicated elementary stream for IC, multiplexed into an AFX stream
  • 85.   IFS surfaces   VTC   Interpolators   Patches   Synthesized texture   Bone-Based   Subdivision surf.   Procedural texture   Wavelet SS   DIBR   Mesh Grid   Point Texture   Solids   SC-3DMC
  • 86.   Face, MPEG-4 V1, 1999   Body, MPEG-4 Amd1, 2000   Skinned Model, MPEG-4 Part 16, 2003 Two frameworks: human-like (FBA) and generic skeleton (BBA)
  • 87.   Geometry: Seamless mesh: shapes sharing the same vertices list   Texture: Image Mapping on vertices sub-set   Hierarchy: Skeleton layer Muscle layer Seamless mesh affected by a hierarchical skeleton
  • 88.   1D controllers: bone & muscle   for each bone and each muscle - a list of affected vertices - a measure of affectedness are provided Right balance between control parameters and influence volume
  • 89. Uncompressed Uncompressed Segment #n Frame #n BAP/FAP/BBA BAP/FAP/BBA Frame P DCT Prediction DC Coeff. AC Coeff. Frame I Segment P Segment Prediction I Quantization Quantization DC Q DC Q AC Q Arithmetic Arithmetic coding coding Huffman coding Huffman coding Binary file Binary file Basic comp.: prediction, freq.transform, quantization and entropy encoding
  • 90.   Face, MP4 V1, 2kbps   Body, MP4 Amd1, 5-30 kbps   Skinned Model, MP4 Part 16, 5-30 kbps for a human like skeleton Very low bit-rate
  • 91.   IFS surfaces   VTC   Interpolators   Patches   Synthesized texture   Bone-Based   Subdivision surf.   Procedural texture   Morphing   Wavelet SS   DIBR   Mesh Grid   Point Texture   Solids   SC-3DMC
  • 92.   Defined as a base mesh and a collection of target meshes   Animation obtained by updating the weights of the target meshes   BBA stream updated to include morph data   Usable for any kind of 3D object Local and precise control for shape deformation
  • 93.   IFS surfaces   VTC   Interpolators   Patches   Synthesized texture   Bone-Based   Subdivision surf.   Procedural texture   Morphing   Wavelet SS   DIBR   FAMC   Mesh Grid   Point Texture   Solids   SC-3DMC
  • 94.   Cluster the vertices with respect to their motion   Encode a cluster motion by an affine transform   Encode the residual error at vertex level by traditional approach (DCT/W, quantization, entropy encoding)
  • 95.   IFS surfaces   VTC   Interpolators   Patches   Synthesized texture   Bone-Based   Subdivision surf.   Procedural texture   Morphing   Wavelet SS   DIBR   FAMC   Remote and   Mesh Grid   Point Texture programmatic   Solids   SC-3DMC
  • 96. Bifs-Anim   Remote animation BIFS-Anim & BIFS Command Bifs-Command scene   Programmatic animation Script Node - ECMA Script scene part of the scene description - Java Code standardized API for accessing MPEG-J Stream the scene graph scene Complex application scenario can be built
  • 97.   IFS surfaces   VTC   Interpolators   Patches   Synthesized texture   Bone-Based   Subdivision surf.   Procedural texture   Morphing   Wavelet SS   DIBR   FAMC   Mesh Grid   Remote and   Point Texture programmatic   Solids   SC-3DMC
  • 98. MPEG 3DG How measuring compression performances? On-line benchmarking platform: www.MyMultimediaWorld.com •  Allows easy integration of proprietary algorithms by using an API in C++ •  No need to disclaim the algorithm source code •  Benchmark automatically updated for new content •  Restricts and refines the benchmark by means of easy-to- control parameters.
  • 99. MPEG 3DG How measuring compression performances? On-line benchmarking : www.MyMultimediaWorld.com 3D compression Web site benchmark Benchmark 2 Benchmark 3 Filter and Presentation Engine Benchmark manager 2 Benchmark manager 1 Indexed MDB 3D Compression benchmark manager API MP4 Extended MP7 Algorithm 1 Algorithm 2 … Algorithm n
  • 100. MPEG 3DG How measuring compression performances? On-line benchmarking : www.MyMultimediaWorld.com GetNbBitstream n Vertex Buffer Encoder Proprietary Coder library DumpBitSream BitStream (1,n) DumpCompressedVB Proprietary Decoder Decoder library .Compressed_VB (1,n)
  • 101. MPEG 3DG How measuring compression performances? Benchmarking platform, per-object visualization - object properties (number of vertices/ triangles, number of components and files size, - distortion graph (linear or logarithmic), - compression gain with respect to 3DMC. -  encoding time -  decoding times.
  • 102. MPEG 3DG How measuring compression performances? Benchmarking platform, global visualization Filters - semantic category, - average distortion, - number of vertices, - number of connected components in the object, - database subset.
  • 103. MPEG 3DG How measuring compression performances? Benchmarking platform, global visualization
  • 104. MPEG 3D Graphics within the MPEG standards family Core technologies in MPEG 3D Graphics Compressing other standards (COLLADA, X3D, …) with MPEG Virtual Worlds Interoperability for avatars with MPEG
  • 105.
  • 106.
  • 107. Geometry compression: -compression ratio 40:1 Animation compression: -compression ratio 100:1
  • 108. Any XML Scene Representation XML XML (Binary) XML Binarisation 3D Graphics Compression
  • 109. Layer 1: Any XML Scene Representation XML Textual XML representation of the XML scene (Binary) XML Binarisation 3D Graphics Compression
  • 110. Layer 2: Any XML Scene Representation XML Binarized XML layer XML Contains the (Binary) XML Binarisation unclassified elements of the scene graph 3D Graphics Compression
  • 111. Layer 3: Any XML Scene Representation XML Compressed layer XML Contains specific (Binary) XML Binarisation types of media information 3D Graphics (geometry, Compression animation, ...)
  • 112. Result: Any XML Scene Representation XML Multiplexed XML layers 2 and 3 (Binary) XML Binarisation 3D Graphics Compression
  • 113. MPEG-4 P25 Encoder side: possible implementation (informative) Encoder Side MP4 XMT, COLLADA, X3D Comp ratio: 40-70:1
  • 114. MPEG-4 P25 Decoder side (normative) Decoder Side MP4 XMT, COLLADA, X3D Lossless for the data structure, lossless or lossy for graphics primitives
  • 115. MPEG 3D Graphics within the MPEG standards family Core technologies in MPEG 3D Graphics Compressing other standards (COLLADA, X3D, …) with MPEG Virtual Worlds Interoperability for avatars with MPEG
  • 116. Standards for Avatars as visualization support Standard Generic Features Avatar representation COLLADA 3D objects/ scenes Generic Object VRML/ X3D 3D objects /scenes H- Anim Application behavior MPEG-4 2D/3D objects/ scenes A set of dedicated nodes Application behavior A dedicated compressed stream Compression
  • 117. Standards for Avatars as interaction support Representation Features HumanML human physical description, emotion EmotionML emotion, facial expressions, gestures BML speech, gesture, gaze MPML speech VHML facial and body animation, emotional representation CML character attribute and animation definition
  • 118. Why none of the existing standards is solving the issue of avatar interoperability in Virtual Worlds? –  The Virtual Worlds are proprietary applications and the 3D assets including the avatars have economical value –  The Virtual Worlds and in general 3D applications have specific data format allowing rendering optimization However, while maintaining a strict control for economic and technical reasons, Virtual Worlds allow users to personalize the avatars
  • 119. Avatar Template Attributes that can be modified by the user Specify the set of Personalization Parameters (PP) that transforms a template of an arbitrary Virtual World into the user designed avatar
  • 120. What avatar feature can be personalized? Mainly the appearance Analysis of SecondLife, IMVU, Entropia Universe, SonyPlaystation and HumanML
  • 121. Very heterogeneous set of personalization parameters Entropia Nintendo Universe Wii HumanML Second Life PlayStation
  • 122. “Appearance” element <Appearance> <Body> <BodyHeight value=165/> <BodyFat value=15/> </Body> <Head> <HeadShape value="oval"/> <EggHead value="true"/> </Head> </Appearance>
  • 123. Interoperability at the Animation level <Animation> <Greeting> <Salute>salut</Salute> <Cheer>cheer</Cheer> </Greeting> <Fighting> <shoot>pousse</shoot> <throw>throw</throw> </Fighting> </Animation>
  • 124. Motion retargeting No “Walk” Avatar Avatar animation “Walk” animation Template in VW1 Template in VW2 defined in VW2 In VW1
  • 125. “Control” element Body Face Control Control <Control> <BodyFeaturesControl > <UpperBodyBones> <LCalvicle>my_LCalvicle</LCalvicle> Control <RClavicle>my_RCalvicle</RClavicle> </UpperBodyBones> </BodyFeaturesControl> <FaceFeaturesControl> <HeadOutline> <Left X=0.23 Y=1.25 Z=7.26/> <Right X=0.25 Y=1.25 Z=7.21/> </HeadOutline> </FaceFeaturesControl> </Control>
  • 126. MPEG-V (Personalization Parameters) MPEG-V + MPEG-4 The Avatar in The Avatar in VW1 VW2 The Avatar in an external player
  • 128. MPEG 3DGC Multi-Resolution 3DMC Current 3DG content in VW © Samsung © Second Life Tomorrow’s 3DG content in VW (100 times denser) © OTOY © OTOY
  • 129. MPEG 3DGC Reconfigurable Graphics Coding A framework that allows to set up the decoder at run time
  • 130. Thank you! www.MyMultimediaWorld.com www-artemis.it-sudparis.eu marius.preda@it-sudparis.eu
  • 131. MPEG 3DGC Multi-resolution 3DMC Progressive mesh [Hoppe’96] Progressive Forest Split (PFS) [Taubin’98] Patch coloring [Cohen-Or’99] Valence-based decimation approach [Alliez’01] Octree-based compression [Peng’05] Spectral coding [Karni’01]
  • 132. MPEG 3DGC Multi-resolution 3DMC : two proposed methods 1. Progressive TFAN Original Interpolated with 1% of the vertices
  • 133. MPEG 3DGC Multi-resolution 3DMC : two proposed methods 2. KLT encoder 2 2 2 1 1 1
  • 134. MPEG 3DGC Multi-resolution 3DMC : two proposed methods 1. Work on -  document the use case scenarios (object examination, navigation, …) -  database -  comparison with other codecs -  comparison method (PSNR, Resolution) -  platform for testing 2. You are invited to contribute