This webinar was presented by Stephen Jones, Chair of the APM Planning, Monitoring and Control SIG and Simon Taylor, Vice-Chair of the same SIG on Thursday 11th December 2014.
Earned value management is a project control process based on a structured approach to planning, cost collection and performance measurement.
Earned value helps us manage a project by:
providing data to enable objective measurement of project status;
providing a basis for estimating final cost;
predicting when the project will be complete;
supporting the effective management of resources;
providing a means of managing and controlling change.
Earned value provides information which enables effective decision making by knowing:
what has been achieved of the plan;
what it has cost to achieve the planned work;
if the work achieved is costing more or less than was planned;
if the project is ahead of or behind the planned schedule.
Good planning leads to good project execution and good management information.
Introduction
Overview of Key Performance Indicators ( KPI )
What Is The Earned Value Management ?
Why Project Managers Use EVM ?
Earned Value Management Terms and Formulas
Planned value (PV)
Earned value (EV)
Actual cost (AC)
Variance
Schedule Variance ( SV )
Cost Variance ( CV )
Performance Index
Schedule Performance Index (SPI)
Cost Performance Index (CPI)
Example ( Case Study )
Project Forecasting
Budget at Completion (BAC)
Estimate at Completion (EAC)
Estimate to Complete (ETC).
Variance at Completion (VAC)
To Complete Performance Index (TCPI)
In defining a project accounting system for an organisation, the needs of both project management and the finance function have to be met. However their needs differ. By combining project and programme management techniques with financial and management accounting methods, a more holistic approach to capturing metrics is possible. Analysis of this will enable focused effort to improve project efficiency and effectiveness.
Earned value management (EVM) is a methodology that combines scope, schedule, and resource measurements to assess project performance and progress.
It is a commonly used method of performance measurement for projects.
It integrates the scope baseline with the cost baseline, along with the schedule baseline, to form the performance baseline, which helps the project management team assess and measure project performance and progress
By Er.Nikhil Raj, Senior Planning Enginner, Navig Solution Pvt Ltd
Earned Value AnalysisTracking Project ProgressWh.docxsagarlesley
Earned Value Analysis
Tracking Project Progress
What Is Earned Value?The dollar amount you planned to spend for the work actually completed
Earned Value is the budgeted cost of the work that has actually been performed/completed
Earned Value = Budgeted Cost of the Work Performed (BCWP)
What Is Earned Value Analysis (EVA)?
EVA enables the project progress to be tracked in terms of:
The work that has actually been completed
--- Compared To ---
The work that was scheduled to be completed
Why Is Earned Value Analysis Important?EVA enables the project team to know:If the project is ahead of, or behind schedule
How far the project is ahead of, or behind schedule
If the project is over or under budget
How much the project is over or under budget
Why Is Earned Value Analysis Important?EVA enables the team to address the project’s triple constraints earlier rather than later Scope – re-prioritize/reduce requirements
--- and/or ---
Schedule – adjust the timeline
--- and/or ---
Cost – request additional funding
The Components of Earned Value Analysis WBS – Work Breakdown StructureIdentifies products to be delivered by the project Products or sub-products should be broken down to what can be completed in 80 hours (“80-hour rule”), when applicable
Provides the basis for Distinct products or sub-products – which help to provideValid estimates – which enableTracking earned value / project progress
The Components of Earned Value Analysis Earned Value (EV) ---- or BCWPThe budgeted cost of the work actually performed How much work was actually completed
Planned Value (PV) ---- or BCWSThe budgeted cost of the work scheduled to be performed How much work should have been completed
Actual Cost (AC) ------- or ACWPThe actual cost of the work performedHow much money has been actually spent
The Components of Earned Value AnalysisBudget at Completion (BAC)Dollar amount originally budgeted to complete the project
Estimate at Completion (EAC)Estimate of dollar amount needed to complete the project
Variance at Completion (VAC)Estimate of the dollar amount projected above or below budget
Schedule at Completion (SAC)Projection of the time needed to complete the project
The Components of Earned Value Analysis
Schedule Variance (SV)The work completed vs. the work planned to be completed
SV = (Earned Value – Planned Value)
Tells us if the project is ahead of, or behind schedule
Negative value means the project is behind schedule
The Components of Earned ValueSchedule Performance Index (SPI)Utilized to forecast how long it will take to complete the project
SPI = (Earned Value / Planned Value)
Tells us if the project is ahead of, or behind schedule
Less than 1.00 means the project is behind schedule
The Components of Earned Value
Cost Variance (CV)What we planned to spend on the work completed vs. what was actually spent on the work completed
CV = (Earned Value – Actual Cost)
Tells us if the project is over or under budget ...
project control using earned value analysis - Part 01 waleed hamdy
Project control using earned value analysis - Part 01
Mission of the projects control division
Why the earned value management?
Establishment of the Performance Measurement Baseline
EVM Analysis & Forecasting
This webinar was presented by Stephen Jones, Chair of the APM Planning, Monitoring and Control SIG and Simon Taylor, Vice-Chair of the same SIG on Thursday 11th December 2014.
Earned value management is a project control process based on a structured approach to planning, cost collection and performance measurement.
Earned value helps us manage a project by:
providing data to enable objective measurement of project status;
providing a basis for estimating final cost;
predicting when the project will be complete;
supporting the effective management of resources;
providing a means of managing and controlling change.
Earned value provides information which enables effective decision making by knowing:
what has been achieved of the plan;
what it has cost to achieve the planned work;
if the work achieved is costing more or less than was planned;
if the project is ahead of or behind the planned schedule.
Good planning leads to good project execution and good management information.
Introduction
Overview of Key Performance Indicators ( KPI )
What Is The Earned Value Management ?
Why Project Managers Use EVM ?
Earned Value Management Terms and Formulas
Planned value (PV)
Earned value (EV)
Actual cost (AC)
Variance
Schedule Variance ( SV )
Cost Variance ( CV )
Performance Index
Schedule Performance Index (SPI)
Cost Performance Index (CPI)
Example ( Case Study )
Project Forecasting
Budget at Completion (BAC)
Estimate at Completion (EAC)
Estimate to Complete (ETC).
Variance at Completion (VAC)
To Complete Performance Index (TCPI)
In defining a project accounting system for an organisation, the needs of both project management and the finance function have to be met. However their needs differ. By combining project and programme management techniques with financial and management accounting methods, a more holistic approach to capturing metrics is possible. Analysis of this will enable focused effort to improve project efficiency and effectiveness.
Earned value management (EVM) is a methodology that combines scope, schedule, and resource measurements to assess project performance and progress.
It is a commonly used method of performance measurement for projects.
It integrates the scope baseline with the cost baseline, along with the schedule baseline, to form the performance baseline, which helps the project management team assess and measure project performance and progress
By Er.Nikhil Raj, Senior Planning Enginner, Navig Solution Pvt Ltd
Earned Value AnalysisTracking Project ProgressWh.docxsagarlesley
Earned Value Analysis
Tracking Project Progress
What Is Earned Value?The dollar amount you planned to spend for the work actually completed
Earned Value is the budgeted cost of the work that has actually been performed/completed
Earned Value = Budgeted Cost of the Work Performed (BCWP)
What Is Earned Value Analysis (EVA)?
EVA enables the project progress to be tracked in terms of:
The work that has actually been completed
--- Compared To ---
The work that was scheduled to be completed
Why Is Earned Value Analysis Important?EVA enables the project team to know:If the project is ahead of, or behind schedule
How far the project is ahead of, or behind schedule
If the project is over or under budget
How much the project is over or under budget
Why Is Earned Value Analysis Important?EVA enables the team to address the project’s triple constraints earlier rather than later Scope – re-prioritize/reduce requirements
--- and/or ---
Schedule – adjust the timeline
--- and/or ---
Cost – request additional funding
The Components of Earned Value Analysis WBS – Work Breakdown StructureIdentifies products to be delivered by the project Products or sub-products should be broken down to what can be completed in 80 hours (“80-hour rule”), when applicable
Provides the basis for Distinct products or sub-products – which help to provideValid estimates – which enableTracking earned value / project progress
The Components of Earned Value Analysis Earned Value (EV) ---- or BCWPThe budgeted cost of the work actually performed How much work was actually completed
Planned Value (PV) ---- or BCWSThe budgeted cost of the work scheduled to be performed How much work should have been completed
Actual Cost (AC) ------- or ACWPThe actual cost of the work performedHow much money has been actually spent
The Components of Earned Value AnalysisBudget at Completion (BAC)Dollar amount originally budgeted to complete the project
Estimate at Completion (EAC)Estimate of dollar amount needed to complete the project
Variance at Completion (VAC)Estimate of the dollar amount projected above or below budget
Schedule at Completion (SAC)Projection of the time needed to complete the project
The Components of Earned Value Analysis
Schedule Variance (SV)The work completed vs. the work planned to be completed
SV = (Earned Value – Planned Value)
Tells us if the project is ahead of, or behind schedule
Negative value means the project is behind schedule
The Components of Earned ValueSchedule Performance Index (SPI)Utilized to forecast how long it will take to complete the project
SPI = (Earned Value / Planned Value)
Tells us if the project is ahead of, or behind schedule
Less than 1.00 means the project is behind schedule
The Components of Earned Value
Cost Variance (CV)What we planned to spend on the work completed vs. what was actually spent on the work completed
CV = (Earned Value – Actual Cost)
Tells us if the project is over or under budget ...
project control using earned value analysis - Part 01 waleed hamdy
Project control using earned value analysis - Part 01
Mission of the projects control division
Why the earned value management?
Establishment of the Performance Measurement Baseline
EVM Analysis & Forecasting
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
2. 2
Why use Earned Value
Management Systems?
“The Bottom Line”
• EVM can focus program management attention on
critical issues and risks during the “project” life
cycle
• How are you doing, and how do you know how you
are doing?
– Early problem identification
• Completion Estimates
– How far along are you? (64%, 50%, >40%)
– What is your productivity/efficiency?
– Work remaining
3. 3
Five Basic Elements
BCWS Budgeted Cost of Work Scheduled
BCWP Budgeted Cost of Work Performed
ACWP Actual Cost of Work Performed
4. 4
5 Basic Performance Data
Questions & Answers
QUESTION ANSWER ACRONYM
How much work should Budgeted Cost for BCWS
be done? Work Scheduled
How much work is done? Budgeted Cost for BCWP
Work Performed
How much did the is done Actual Cost of ACWP
work cost? Work Performed
5. 5
What do we measure progress against?
and Why?
• Performance measurement baseline
– Budget that is spread over . . .
– Time, to accomplish the scope of
– Work, against which progress can be measured
• Earned Value is key concept
– how much progress did I make against my original
plan?
– expressed in dollars or hours
– Why? – early warning
$
time
baseline
earned value
6. 6
Why do we need
Early Warning?
Small course corrections are
easier when made early…
… If you wait until you reach
the Iceberg, its too late!!!
7. 7
Work Budgeted and Earned
• The value of the budgeted work is called:
Budgeted Cost of Work Scheduled
(BCWS)
• The value of work earned is called:
Budgeted Cost of Work Performed
(BCWP)
– BCWP is also called Earned Value (EV)
8. Budgeted Cost of Work Scheduled
(BCWS)
Total Budget = $5,000
to be spent over 5 months
I plan to lay 1 section
of track each month at an
estimated cost of $1,000.
BCWS each month = $1,000
Total BCWS = $5,000
Month 1
BCWS = $1,000
Month 4
BCWS = $1,000
Month 3
BCWS = $1,000
Month 5
BCWS = $1,000
Month 2
BCWS = $1,000
sum of all BCWS = performance baseline
9. 9
Budgeted Cost of Work Performed
(BCWP)
aka. Earned Value
We’re at the end of
February, Track 1 is
complete and track 2 is ½
done.
BCWS = $1,000
Track 1
Track 2
BCWS = $1,000
50% done
Value of work
performed = $1,500
10. 10
Schedule Variance
BC WS
BC WP
of the work I scheduled to have done,
how much did I budget for it to cost?
of the work I actually performed,
how much did I budget for it to cost?
SCHEDULE VARIANCE is the difference between work scheduled
and work performed (expressed in terms of budget dollars)
formula: SV $ = BCWP - BCWS
BUDGET
BASED
example: SV = BCWP - BCWS = $1,500 - $2,000
SV= -$500 (negative = behind schedule)
12. 12
Actual Cost of Work Performed
(ACWP)
Track 1 Cost = $1,500!
Track 2 Cost = $750 cost to
date
Total Cost to Date = $2,250
13. 13
Cost Variance
BC WP
AC WP
of the work I actually performed,
how much did I budget for it to cost?
of the work I actually performed,
how much did it actually cost?
COST VARIANCE is the difference between budgeted cost
and actual cost
formula: CV $ = BCWP - ACWP
PERFORMANCE
BASED
example: CV = BCWP - ACWP = $1,500 - $2,250
CV= -$750 (negative = cost overrun)
15. 15
Variance Summary
• The difference between the BCWP and the
ACWP is called a cost variance
• The difference between the BCWP and
BCWS is called schedule variance and is
provided in terms of dollars
16. 16
Trend Analysis
Cost Performance Index (CPI) measure of cost efficiency
CPI = Value of Work Completed (BCWP)
Cost of Work Completed (ACWP)
Schedule Performance Index (SPI) measure of schedule efficiency
SPI = Value of Work Completed (BCWP)
Value of Work Planned (BCWS)
Closer to “1” the better
Less than 1 = overrun (CPI); behind schedule (SPI)
Greater than 1 = underrun (CPI); ahead of schedule (SPI)
17. 17
• DO I THINK THE CONTRACTOR WILL COME IN ON BUDGET?
COST PERFORMANCE INDEX:
CPI = cost efficiency for work performed to date
(The value of work accomplished for each dollar spent)
SCHEDULE PERFORMANCE INDEX:
SPI = schedule efficiency with which work has been accomplished
(The rate at which work is being accomplished)
Performance Efficiencies
WORK
= ACCOMPLISHED
ACTUALS
WORK
= ACCOMPLISHED
WORK
SCHEDULED
WORK
BCWP ACCOMPLISHED $1500
= BCWS = WORK = $2000 = .75
SCHEDULED
WORK
BCWP ACCOMPLISHED $1500
= ACWP = ACTUAL = $2250 = .67
COST
19. 19
Solution
Cost Variance = -10
Schedule Variance = + 20
CPI = .97
SPI = 1.07
• How would you describe this project?
Over budget, ahead of schedule