BANKS ISLAND GOLD LTD.
                                       300-1055 W. Hastings St.
                                       Vancouver, BC V6E 2E9

                                             News Release

Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mountain
                                      PEA

   NI43-101 Preliminary Economic Assessment for 1,800tpd underground gold mine completed.
   PEA study contemplates gold equivalent production of 114,000oz per year at a cost of $459/oz.
   Banks Island Gold plans to initiate exploration, permitting and feasibility studies at Red Mountain.

June 18, 2012 – Vancouver, British Columbia. Banks Island Gold Ltd. (the “Company”) (TSX-
V:BOZ) announces results of a Preliminary Economic Assessment (PEA) for significant underground
gold mining operation at the Red Mountain Project, located 30km east of Stewart, British Columbia.

The NI43-101 compliant PEA study, dated June14th 2012, was prepared by independent consultants, Mr.
Robert Baldwin, P.Eng and Mr. Lyn Jones, P.Eng. The study considers a 1,800 tonne per day operation
based on the current Mineral Resource at the Red Mountain Gold Property. Underground mining methods
are proposed with the utilization of flotation and cyanidation for the production of gold dore onsite for
shipment to a refinery.

Pretax Financial Summary

The base case scenario, using the 3 year rolling average price of gold of $CDN 1,360 per troy oz, resulted
in a pretax NPV(8%) of $CDN 155M, an IRR of 43%, and a payback of initial capital of 1.2 years.

A scenario using the current price of gold of $CDN 1,700 per troy oz was also considered. The financial
summary for the base case and current price scenario is presented Table 1.
-2-


                                        Table 1 – Pretax Financial Summary
                                           FINANCIAL SUMMARY (PRETAX)
                                                        BASE CASE          CURRENT PRICE           UNITS
        PRICE OF GOLD                                      $1,360                   $1,700         $CDN/oz
        MINE LIFE                                                        4.3                       years
        TOTAL ORE MINED                                              2,845,000                     Tonnes
        GOLD PRODUCTION                                               474,382                      oz
        SILVER PRODUCTION                                            1,233,405                     oz

        GOLD EQ* PRODUCTION                                           499,050                      oz Aueq

        AVERAGE ANNUAL PRODUCTION                                     115,246                      oz Aueq / year

        OPERATING COST PER OZ**                             $459                     $471          $CDN/oz Aueq


        TOTAL REVENUE                                     $678,709,000              $848,386,000   $CDN
        TOTAL OPERATING COST                              $206,789,000              $206,789,000   $CDN
        ROYALTIES PAYABLE                                  $22,505,000               $28,444,000   $CDN
        OPERATING CASH FLOW                               $449,415,000              $613,153,000   $CDN


        CAPITAL COST                                      $162,671,000              $162,671,000   $CDN
        PROPERTY ACQUISITION                               $11,000,000               $11,000,000   $CDN
        INCOME AFTER CAPITAL                              $275,744,000              $439,482,000   $CDN


        NPV(8%)                                           $155,398,000              $264,134,000   $CDN
        NPV(5%)                                           $192,779,000              $318,980,000   $CDN
        NPV(0%)                                           $275,744,000              $439,482,000   $CDN
        IRR                                                 43%                      63%
        PAYBACK ON CAPITAL                                   1.2                      0.9          years
        *Gold Equivalent calculated by converting silver to gold at ratio of 1:50
        **Operating Cost per oz gold equivalent including royalties payable



The minable resource used in preparation of the preliminary assessment is partially based on an
Inferred Resource. The preliminary assessment is preliminary in nature and includes inferred mineral
resources that are considered too speculative geologically to have the economic considerations applied
to them that would enable them to be categorized as mineral reserves. Mineral resources that are not
mineral reserves do not have demonstrated economic viability. There is no certainty that the results
and conclusions presented in this preliminary assessment will be realized.

Mr. Mossman, President of the Company stated; “The Preliminary Economic Assessment on our newly
acquired Red Mountain Gold Property demonstrates its potential as a significant low-cost producing gold
mine. The excellent geometry and grade of the Red Mountains mineralized zones allow the use of highly
productive mining methods and the planned adit from the Bitter Creek valley allows year-round access to
the planned mine and a superior exploration platform in the depths of Red Mountain. The Company plans
to continue advancing the Red Mountain Project through exploration, environmental permitting, and
feasibility studies.”
-3-




Resource Estimate

Mr. Baldwin, P.Eng prepared a current Mineral Resource estimate for Red Mountain, which is presented
in the Technical Report & Preliminary Economic Assessment on the Red Mountain Gold Property on
June 14th 2012. Mr. Baldwin modeled the significant mineralized zones at Red Mountain and calculated
the Mineral Resource for gold and silver. Gold and silver assays used in the resource estimate were
capped to the 98th percentile, resulting in a top cap of 70gpt for gold and 348gpt for silver. The current
Mineral Resource is displayed in Table 2 and is effective as of June 14th 2012.

                                            Table 2 – Red Mountain Mineral Resource
                            Measured                                  Indicated                                   Inferred
     Zone                         Au           Ag                          Au         Ag                                Au       Ag
                 Tonnes          Grade        Grade       Tonnes          Grade      Grade           Tonnes            Grade    Grade
                                 (gpt)        (gpt)                       (gpt)      (gpt)                             (gpt)    (gpt)
     Marc        737,000             9.2       36        123,000            8.3        35             3,000             8.1      32
      AV         326,000             8         23        250,000            8.1        23            175,000            8.4      24
      JW         75,000              6.2       10        100,000            6          7             315,000            5.4       5
      141                                                                                            314,000            3.8       8
  Total         1,138,000            8.7       31        473,000            7.7        23            807,000            5.4      10

 Total Measured & Indicated:         1,611,000 tonnes @ 8.4gpt Au & 38gpt Ag        = 435,000oz Gold, 1,976,000oz Silver
              Total Inferred:          807,000 tonnes @ 5.4gpt Au & 10gpt Ag        = 140,000oz Gold, 259,000oz Silver



Based on the current Mineral Resource, a diluted minable resource was calculated for the purposes of the
PEA study. The Red Mountain mineralization is broken into four distinct zones for the purposes of mine
planning. The estimated diluted minable resource is presented in Table 3.

                                           Table 3 – Red Mountain “Minable Resource”
                               Insitu                              Mining                                      Diluted
                            Au Grade         Ag Grade                                                          Au Grade        Ag Grade
Zone         Tonnes                                        Dilution      Recovery           Tonnes
                              (g/t)            (g/t)                                                             (g/t)           (g/t)
Marc        863,000            9.1              36          20%             98%         1,015,000                7.8             31
AV          752,000            8.1              23          20%             98%            884,000               7.0             20
JW          491,000            5.7              6           20%             98%            577,000               4.9              5
141         314,000            3.8              8           20%             98%            369,000               3.3              7
Total       2,420,000          7.4              22          20%             98%         2,845,000                6.4             19



Mining Summary

The current mining methods proposed for the Red Mountain Project are transverse open stoping methods
with the use of cemented paste fill for the Marc, AV, and 141 Zones and longitudinal longhole retreat
method for the JW Zone.
-4-


Proposed access to the underground Red Mountain Project will be provided by a 7,190m adit, at a grade
of +15%, from the Bitter Creek Mill site. Based on the current mineral resource estimate, mine production
is planned to be 657,000 tonnes per year (1800tpd) over a mine life of 4.3 years (52 months).


Mineral Processing

Mr. Jones, P.Eng is responsible for the engineering designs, calculations, and recommendations related to
mineral processing and metallurgical engineering, which is presented in the Technical Report &
Preliminary Economic Assessment on the Red Mountain Gold Property on June 14th 2012. The proposed
method of gold and silver recovery from the Red Mountain Gold Property consists of conventional
crushing and milling, followed by froth flotation and CIL cyanidation of the flotation concentrate. The
Red Mountain Project will produce gold/silver dore for shipment to a precious metal refinery.

Flotation and cyanidation recoveries were estimated from historical test work. Estimated metallurgical
recoveries of 82% gold and 72% silver were assumed for the Red Mountain PEA study.

The objective of the PEA study was to optimize the Red Mountain process flowsheet to provide
maximum gold and silver recoveries. Whereas previous flowsheets have included whole ore fine grinding
followed by CIL/CIP cyanidation, the process route recommended is to produce a sulfide concentrate for
fine grinding and subsequent CIL cyanidation. While there is some additional loss of cyanide recoverable
gold in the flotation tailings, this method offers the following advantages over the whole-ore cyanidation
flowsheet:

       Reduced plant capital costs in the areas of fine grinding and cyanidation.
       Lower operating costs associated with milling power and cyanide consumption.
       Low-sulfide and coarse particle size flotation tailings for surface deposition.

Non-acid generating tailings from the flotation circuit will be sent to a tailings storage facility proposed to
be located immediately south of the Bitter Creek Mill Site. A minor valley created by a series of outcrop
knobs is located in this area, which creates an excellent area for tailings storage. This valley only has
minor inflows from a branch of Otter Creek, which is separate from the large flows of Bitter Creek

Potentially acid generating tailings from the CIL circuit will be sent underground and utilized as
cemented paste backfill material to provide support for mining adjacent longhole stopes and to create
nearly impermeable material to reduce the acid generating potential.


Infrastructure

A 14km access road from Highway 37A to the Bitter Creek Mill Site requires significant repairs and
reconstruction. A 14km transmission line is planned to be constructed to connect the mine and mill to the
BC Hydro electrical grid.

The Bitter Creek Mill Site is planned to be located on a gently sloping terrace at the planned portal
location of the Bitter Creek Mine Adit. Water supply for the mill will be from groundwater, reclaimed
water from the settling ponds, and fresh water from Bitter Creek.
-5-


BC Hydro maintains a 138kV transmission line which runs along Highway 37A to Stewart, BC. It is
intended that a 14km transmission line will be built by the Company to connect the Bitter Creek Mill site
to the BC Hydro electrical grid.


Operating Costs

Based on the mine design and schedule, an estimate of operating costs was derived for the PEA study.
Costs are based on productivities, labour, and material costs obtained from supplier and contractor quotes,
cost data from other mines, first principle calculations, and experience.

A summary of operating cost estimates for the Red Mountain Gold Project are displayed in Table 4.
Operating costs have been estimated at $206,789,000 over the current 52 month mine life averaging
$72.68 per tonne milled.

                                   Table 4 – Operating Cost Summary
                                       OPERATING COST SUMMARY
                                                                 Total Cost    Cost per tonne
              MINING & SURFACE
                MATERIALS                                        $12,090,000           $4.25
                BACKFILL BINDER                                  $24,107,000           $8.47
                LUBE, TIRES, & PARTS                             $12,096,000           $4.25
                MINE ELECTRICITY                                  $2,639,000           $0.93
                DIESEL FUEL                                       $9,592,000           $3.37
                AVALANCHE CONTROL                                 $2,603,000           $0.91
                MINE AIR HEATING                                  $1,445,000           $0.51
                MINE, MAINTENANCE & SURFACE LABOUR               $49,750,000          $17.49
                                                                $114,322,000          $40.18
              MILL
                LABOUR                                           $26,857,000           $9.44
                SAFETY, SPARES, & ELECTRICAL                      $7,824,000           $2.75
                MILL ELECTRICITY                                  $5,861,000           $2.06
                REAGENTS                                         $12,973,000           $4.56
                BALLS & LINERS                                    $4,353,000           $1.53
                PIPING, LUBRICANTS, ASSAY                           $854,000           $0.30
                                                                 $58,722,000          $20.64
              MANAGEMENT, TECHNICAL & SUPERVISION
               STAFF SALARIES                                    $15,885,000           $5.58
               STAFF INCENTIVES                                   $2,542,000           $0.89
                                                                 $18,427,000           $6.48

              CONTINGENCY (8%)                                   $15,318,000           $5.38


              TOTAL OPERATING COSTS                             $206,789,000          $72.68
-6-


Capital Costs

Capital expenditures related to design, permitting, construction, and commissioning of the Red Mountain
Gold Property are modeled to occur in a 3-Year pre-production period. All expenditures that are expected
to occur after commercial production has commenced are treated as operating costs.

The estimated capital cost from feasibility through to commercial production is estimated at
$162,671,000, including cost contingencies. A summary of estimated capital costs is presented in Table 5.

                                 Table 5 – Initial Capital Cost Summary
                                        CAPITAL COST SUMMARY
                  FEASIBILITY STUDY                                            $6,477,000
                  ROAD BUILDING & POWER TRANSMISSION                           $8,386,000
                  MOBILE EQUIPMENT                                            $16,560,000
                  MINE STATIONARY EQUIPMENT                                    $2,383,000
                  MINE DEVELOPMENT & CONSTRUCTION                             $39,271,000
                  SURFACE STRUCTURES                                           $8,488,000
                  BACKFILL PLANT                                               $7,000,000
                  MILL EQUIPMENT & CONSTRUCTION                               $53,979,000
                  COST CONTINGENCY                                            $20,127,000
                  TOTAL                                                      $162,671,000


Based on the production schedule and expected operating costs, a working capital requirement of
$11,000,000 is anticipated. The working capital is adequate to cover all operating costs expected for the
first three months of production.


Environmental and Permitting

The Red Mountain Project will require a formal review under the BC Environmental Assessment Act
prior to being issued a Mines Act permit. The Environmental Assessment review process was initiated in
1996 by a previous Property owner but was subsequently withdrawn. The Environmental Assessment
information is available for future use. The most important waste management issue for the Red Mountain
Project is the prevention and control of ARD from the tailings and any potentially acid generating rock,
which is produced during mine development or operation.

Banks Island Gold places a high priority on minimizing environmental impacts, mine closure, and
reclamation of its projects without the creation of long-term environmental liabilities. The Red Mountain
PEA study incorporates sulphide flotation in the process flowsheet before cyanidation to produce a
coarse, non-acid generating tailings product for surface disposal and reduce grinding and cyanide use.

Potentially acid generating tailings from the sulphide concentrate will be sent underground and utilized as
cemented paste backfill material to provide support for mining adjacent longhole stopes and to create
nearly impermeable material to reduce the acid generating potential.

Detailed metallurgical testwork is required to verify the assumptions and designs presented in the PEA.
-7-


Mine Life and Exploration Potential

There is high potential for expansion of minable resources at Red Mountain with a resulting increase in
the mine life. Historic drilling results suggest that mineralization at Red Mountain may continue past the
current minable resource at depth and mineralized intercepts exist outside the current resource at Red
Mountain. The 132 zone was not included in the current mineral resource. Based on historic resource
estimates by previous operators this area has a high potential for resource expansion through additional
diamond drilling.

Sensitivity Analysis

An analysis was performed to determine the sensitivity of the NPV (8%) to changes in key input
parameters. Gold price, ore grade, capital cost, and operating cost were varied from -60% to +140% and
the resulting NPV (8%) was calculated. The results of this analysis are displayed in Figure 1. The project
economics are highly sensitive to changes in the price of gold and the ore grade but significantly less
sensitive to changes in operating and capital costs.

                         Figure 1 – NPV Sensitivity to % Change in Input Value




Recommendations

The preliminary economic assessment presented in the PEA indicates an underground gold mining
operation at Red Mountain may be viable. It is recommended that the Project be advanced towards a pre-
feasibility or feasibility level study.
-8-


A feasibility level study is recommended at an estimated cost of $6,477,000. The recommended work is
comprised of a diamond drilling program with a budgeted cost of $4.2M and engineering and
environmental studies at a cost of $2.3M.

Diamond drilling is required to bring the current Inferred Mineral Resource into the Measured and
Indicated Mineral Resource categories. Detailed metallurgical testwork is required to verify the
assumptions and designs presented in the PEA and advanced fieldwork and engineering is required for
road design, electrical transmission lines, foundations, tailings facilities, and structures.

Mr. Robert Baldwin, P.Eng is the qualified person who reviewed and approved the contents of this news
release. The NI43-101 Technical Report & Preliminary Economic Assessment on the Red Mountain Gold
Property dated June 14th 2012 has been posted on SEDAR and will be available on the Company’s
website.

The Company is a junior mining resource exploration company focused on exploring for and developing
economically viable mineral resources. The Company’s mineral properties are located in British Columbia.
For more information, please refer to the Company’s website at www.banksislandgold.com.

        ON BEHALF OF THE BOARD OF DIRECTORS

        “Benjamin W. Mossman”

        Benjamin W. Mossman, P.Eng
        President, Director, & Chief Executive Officer

For further information, please contact:
Benjamin W. Mossman: 604-245-0066



The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this
release. Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release contains forward-looking statements. All statements, other than statements of historical fact,
constitute “forward-looking statements” and include any information that addresses activities, events or
developments that the Company believes, expects or anticipates will or may occur in the future including the
Company’s strategy, plans or future financial or operating performance and other statements that express
management’s expectations or estimates of future performance.

Forward-looking statements are generally identifiable by the use of the words “may”, “will”, “should”,
“continue”, “expect”, “anticipate”, “estimate”, “believe”, “intend”, “plan” or “project” or the negative of these
words or other variations on these words or comparable terminology. These statements, however, are subject to
known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity,
performance or achievements of the Company to be materially different from those expressed, implied by or
projected in the forward-looking information or statements. Important factors that could cause actual results to
differ from these forward-looking statements include but are not limited to: risks related to the exploration and
potential development of the Company’s project, the actual results of current exploration activities, conclusions of
economic evaluations, changes in project parameters as plans continue to be refined, future prices of gold, as well
as those factors discussed in the sections relating to risk factors of the Company prospectus dated September 30,
2011 filed on SEDAR.
-9-


There can be no assurance that any forward-looking statements will prove to be accurate, as actual results and
future events could differ materially from those anticipated in such statements. Accordingly, the reader should not
place any undue reliance on forward-looking information or statements. Except as required by law, the Company
does not intend to revise or update these forward-looking statements after the date of this document or to revise
them to reflect the occurrence of future unanticipated events.

More Related Content

What's hot

May 2010 Agnico Eagle Corporate Presentation
May 2010 Agnico Eagle Corporate PresentationMay 2010 Agnico Eagle Corporate Presentation
May 2010 Agnico Eagle Corporate Presentation
Agnico Eagle Mines
 
Vms presentation march 2012
Vms presentation march 2012Vms presentation march 2012
Vms presentation march 2012VMS Ventures
 
newmont mining May_1_Latin_American_Mining_Congress
newmont mining May_1_Latin_American_Mining_Congressnewmont mining May_1_Latin_American_Mining_Congress
newmont mining May_1_Latin_American_Mining_Congressfinance37
 
Claude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc.
 
Investor presentation november 2011
Investor presentation   november 2011Investor presentation   november 2011
Investor presentation november 2011FirstQuantum
 
Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Gold Corp
 
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Symposium
 
Tko Agm 16 June2010
Tko Agm 16 June2010Tko Agm 16 June2010
Tko Agm 16 June2010Monster12
 
Vms presentation january_2012_final
Vms presentation january_2012_finalVms presentation january_2012_final
Vms presentation january_2012_finalVMS Ventures
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate PresentationAvion Gold Corp
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationFirstQuantum
 
Q3 2012 Conference Call and Webcast Presentation
Q3  2012 Conference Call and Webcast PresentationQ3  2012 Conference Call and Webcast Presentation
Q3 2012 Conference Call and Webcast PresentationClaude Resources Inc.
 

What's hot (17)

May 2010 Agnico Eagle Corporate Presentation
May 2010 Agnico Eagle Corporate PresentationMay 2010 Agnico Eagle Corporate Presentation
May 2010 Agnico Eagle Corporate Presentation
 
Vms presentation march 2012
Vms presentation march 2012Vms presentation march 2012
Vms presentation march 2012
 
newmont mining May_1_Latin_American_Mining_Congress
newmont mining May_1_Latin_American_Mining_Congressnewmont mining May_1_Latin_American_Mining_Congress
newmont mining May_1_Latin_American_Mining_Congress
 
Claude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc. Corporate Update
Claude Resources Inc. Corporate Update
 
CIBC Institutional Investor Conference 2013
CIBC Institutional Investor Conference 2013CIBC Institutional Investor Conference 2013
CIBC Institutional Investor Conference 2013
 
Investor presentation november 2011
Investor presentation   november 2011Investor presentation   november 2011
Investor presentation november 2011
 
Impact Silver Corp. Presentation
Impact Silver Corp. PresentationImpact Silver Corp. Presentation
Impact Silver Corp. Presentation
 
Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Presentation Aug 2010
Avion Presentation Aug 2010
 
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
Gold Investment Symposium 2012 - Company presentation - Southern Cross Goldfi...
 
Presentation
PresentationPresentation
Presentation
 
Tko Agm 16 June2010
Tko Agm 16 June2010Tko Agm 16 June2010
Tko Agm 16 June2010
 
Vms presentation january_2012_final
Vms presentation january_2012_finalVms presentation january_2012_final
Vms presentation january_2012_final
 
20120912 ipt presentation
20120912 ipt presentation20120912 ipt presentation
20120912 ipt presentation
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate Presentation
 
20121029 ipt presentation
20121029 ipt presentation20121029 ipt presentation
20121029 ipt presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Q3 2012 Conference Call and Webcast Presentation
Q3  2012 Conference Call and Webcast PresentationQ3  2012 Conference Call and Webcast Presentation
Q3 2012 Conference Call and Webcast Presentation
 

Viewers also liked

Full Analyst Report: IntelGenx Tech. Rating: Buy. IntelGenx Looking Towards A...
Full Analyst Report: IntelGenx Tech. Rating: Buy. IntelGenx Looking Towards A...Full Analyst Report: IntelGenx Tech. Rating: Buy. IntelGenx Looking Towards A...
Full Analyst Report: IntelGenx Tech. Rating: Buy. IntelGenx Looking Towards A...
Viral Network Inc
 
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011Viral Network Inc
 
CPV - Copper Creek Gold Updated Overview
CPV - Copper  Creek  Gold Updated OverviewCPV - Copper  Creek  Gold Updated Overview
CPV - Copper Creek Gold Updated Overview
Viral Network Inc
 
Edgewater Exploration (TSX.V - EDW) Corporate Presentation
Edgewater Exploration (TSX.V - EDW) Corporate PresentationEdgewater Exploration (TSX.V - EDW) Corporate Presentation
Edgewater Exploration (TSX.V - EDW) Corporate Presentation
Viral Network Inc
 
Comparing the yields of Organic and Conventional Agriculture - Verena Seufert
Comparing the yields of Organic and Conventional Agriculture - Verena SeufertComparing the yields of Organic and Conventional Agriculture - Verena Seufert
Comparing the yields of Organic and Conventional Agriculture - Verena SeufertViral Network Inc
 
Altima Resources - Hart Energy Coverage
Altima Resources - Hart Energy CoverageAltima Resources - Hart Energy Coverage
Altima Resources - Hart Energy CoverageViral Network Inc
 
Levon Resources Investor Presentation
Levon Resources Investor PresentationLevon Resources Investor Presentation
Levon Resources Investor Presentation
Viral Network Inc
 
Ludovick Zone Extended Over a Length of 1.3 km
Ludovick Zone Extended Over a Length of 1.3 kmLudovick Zone Extended Over a Length of 1.3 km
Ludovick Zone Extended Over a Length of 1.3 km
Viral Network Inc
 
Andoni Eizagirre
Andoni EizagirreAndoni Eizagirre
Andoni Eizagirre
ekthuhezi
 
Els nous mitjans
Els nous mitjansEls nous mitjans
Els nous mitjansrickia06
 
Playing with Passion - LGBT Representations in Video Games
Playing with Passion - LGBT Representations in Video GamesPlaying with Passion - LGBT Representations in Video Games
Playing with Passion - LGBT Representations in Video Games
Rinat Korbet
 
Proposta de revisão estatutária da Comissão Política Distrital de Lisboa do PSD
Proposta de revisão estatutária da Comissão Política Distrital de Lisboa do PSDProposta de revisão estatutária da Comissão Política Distrital de Lisboa do PSD
Proposta de revisão estatutária da Comissão Política Distrital de Lisboa do PSDdistritallisboa
 
Module 2 IUT Bobigny : Automatisation de la chaîne de production logicielle
Module 2 IUT Bobigny : Automatisation de la chaîne de production logicielleModule 2 IUT Bobigny : Automatisation de la chaîne de production logicielle
Module 2 IUT Bobigny : Automatisation de la chaîne de production logicielle
Frédéric Rivain
 
Estrutura nome sen_enlaces
Estrutura nome sen_enlacesEstrutura nome sen_enlaces
Estrutura nome sen_enlacesXose_Diaz
 
Catalogo Rouse Accesorios Femeninos
Catalogo Rouse Accesorios FemeninosCatalogo Rouse Accesorios Femeninos
Catalogo Rouse Accesorios Femeninos
juvilox
 
텍스타일 자료
텍스타일 자료텍스타일 자료
텍스타일 자료Young Ok Joeng
 
_________________________________________
  _________________________________________  _________________________________________
_________________________________________madihashaukat
 
Propuesta de evaluación
Propuesta de evaluaciónPropuesta de evaluación
Propuesta de evaluación
Raul Lozada
 

Viewers also liked (20)

Full Analyst Report: IntelGenx Tech. Rating: Buy. IntelGenx Looking Towards A...
Full Analyst Report: IntelGenx Tech. Rating: Buy. IntelGenx Looking Towards A...Full Analyst Report: IntelGenx Tech. Rating: Buy. IntelGenx Looking Towards A...
Full Analyst Report: IntelGenx Tech. Rating: Buy. IntelGenx Looking Towards A...
 
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
 
CPV - Copper Creek Gold Updated Overview
CPV - Copper  Creek  Gold Updated OverviewCPV - Copper  Creek  Gold Updated Overview
CPV - Copper Creek Gold Updated Overview
 
Edgewater Exploration (TSX.V - EDW) Corporate Presentation
Edgewater Exploration (TSX.V - EDW) Corporate PresentationEdgewater Exploration (TSX.V - EDW) Corporate Presentation
Edgewater Exploration (TSX.V - EDW) Corporate Presentation
 
Comparing the yields of Organic and Conventional Agriculture - Verena Seufert
Comparing the yields of Organic and Conventional Agriculture - Verena SeufertComparing the yields of Organic and Conventional Agriculture - Verena Seufert
Comparing the yields of Organic and Conventional Agriculture - Verena Seufert
 
Altima Resources - Hart Energy Coverage
Altima Resources - Hart Energy CoverageAltima Resources - Hart Energy Coverage
Altima Resources - Hart Energy Coverage
 
Levon Resources Investor Presentation
Levon Resources Investor PresentationLevon Resources Investor Presentation
Levon Resources Investor Presentation
 
Ludovick Zone Extended Over a Length of 1.3 km
Ludovick Zone Extended Over a Length of 1.3 kmLudovick Zone Extended Over a Length of 1.3 km
Ludovick Zone Extended Over a Length of 1.3 km
 
Andoni Eizagirre
Andoni EizagirreAndoni Eizagirre
Andoni Eizagirre
 
Els nous mitjans
Els nous mitjansEls nous mitjans
Els nous mitjans
 
Japanese Currency (In Thai)
Japanese Currency (In Thai)Japanese Currency (In Thai)
Japanese Currency (In Thai)
 
Playing with Passion - LGBT Representations in Video Games
Playing with Passion - LGBT Representations in Video GamesPlaying with Passion - LGBT Representations in Video Games
Playing with Passion - LGBT Representations in Video Games
 
Proposta de revisão estatutária da Comissão Política Distrital de Lisboa do PSD
Proposta de revisão estatutária da Comissão Política Distrital de Lisboa do PSDProposta de revisão estatutária da Comissão Política Distrital de Lisboa do PSD
Proposta de revisão estatutária da Comissão Política Distrital de Lisboa do PSD
 
Wilder precentacion
Wilder precentacionWilder precentacion
Wilder precentacion
 
Module 2 IUT Bobigny : Automatisation de la chaîne de production logicielle
Module 2 IUT Bobigny : Automatisation de la chaîne de production logicielleModule 2 IUT Bobigny : Automatisation de la chaîne de production logicielle
Module 2 IUT Bobigny : Automatisation de la chaîne de production logicielle
 
Estrutura nome sen_enlaces
Estrutura nome sen_enlacesEstrutura nome sen_enlaces
Estrutura nome sen_enlaces
 
Catalogo Rouse Accesorios Femeninos
Catalogo Rouse Accesorios FemeninosCatalogo Rouse Accesorios Femeninos
Catalogo Rouse Accesorios Femeninos
 
텍스타일 자료
텍스타일 자료텍스타일 자료
텍스타일 자료
 
_________________________________________
  _________________________________________  _________________________________________
_________________________________________
 
Propuesta de evaluación
Propuesta de evaluaciónPropuesta de evaluación
Propuesta de evaluación
 

Similar to Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mountain PEA

20110711 minera agm
20110711 minera agm20110711 minera agm
20110711 minera agmMineraandres
 
News Release: Resource Update for Blue River Rare Metals Project
News Release: Resource Update for Blue River Rare Metals ProjectNews Release: Resource Update for Blue River Rare Metals Project
News Release: Resource Update for Blue River Rare Metals Project
Commerce Resources Corp. (TSXv:CCE)
 
Avion Corporate Presentation 2012 03-26
Avion Corporate Presentation 2012 03-26Avion Corporate Presentation 2012 03-26
Avion Corporate Presentation 2012 03-26Avion Gold Corporation
 
Avion Corporate Presentation 2012 02-27
Avion Corporate Presentation 2012 02-27Avion Corporate Presentation 2012 02-27
Avion Corporate Presentation 2012 02-27Avion Gold Corporation
 
Avion corporate presentation 2012 02-27
Avion corporate presentation 2012 02-27Avion corporate presentation 2012 02-27
Avion corporate presentation 2012 02-27Avion Gold Corporation
 
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold LimitedGold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Symposium
 
Great pantherfeb13presentation
Great pantherfeb13presentationGreat pantherfeb13presentation
Great pantherfeb13presentationCompany Spotlight
 
Great pantherfeb13presentation
Great pantherfeb13presentationGreat pantherfeb13presentation
Great pantherfeb13presentationCompany Spotlight
 
Claude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc.
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate PresentationAvion Gold Corp
 
Gqc corporate presentation sept 2016
Gqc corporate presentation sept 2016Gqc corporate presentation sept 2016
Gqc corporate presentation sept 2016
GoldQuest Mining Corp.
 
Great panthersilverjan2013presentation
Great panthersilverjan2013presentationGreat panthersilverjan2013presentation
Great panthersilverjan2013presentationnabarnes
 
Mine Development in the Americas
Mine Development in the AmericasMine Development in the Americas
Mine Development in the AmericasSagegold
 
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Symposium
 
Cobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary ReportCobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary ReportDogger2000
 
Pele Mountain Investor Presentation
Pele Mountain Investor PresentationPele Mountain Investor Presentation
Pele Mountain Investor PresentationCompany Spotlight
 
Sage december ppt_2011
Sage december ppt_2011Sage december ppt_2011
Sage december ppt_2011Sagegold
 
Cannacord Genuity - Bluestone Resources Report
Cannacord Genuity - Bluestone Resources ReportCannacord Genuity - Bluestone Resources Report
Cannacord Genuity - Bluestone Resources Report
MomentumPR
 

Similar to Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mountain PEA (20)

20110711 minera agm
20110711 minera agm20110711 minera agm
20110711 minera agm
 
News Release: Resource Update for Blue River Rare Metals Project
News Release: Resource Update for Blue River Rare Metals ProjectNews Release: Resource Update for Blue River Rare Metals Project
News Release: Resource Update for Blue River Rare Metals Project
 
Avion Corporate Presentation 2012 03-26
Avion Corporate Presentation 2012 03-26Avion Corporate Presentation 2012 03-26
Avion Corporate Presentation 2012 03-26
 
Avion Corporate Presentation 2012 02-27
Avion Corporate Presentation 2012 02-27Avion Corporate Presentation 2012 02-27
Avion Corporate Presentation 2012 02-27
 
Avion corporate presentation 2012 02-27
Avion corporate presentation 2012 02-27Avion corporate presentation 2012 02-27
Avion corporate presentation 2012 02-27
 
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold LimitedGold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
 
AGM Presentation
AGM PresentationAGM Presentation
AGM Presentation
 
Great pantherfeb13presentation
Great pantherfeb13presentationGreat pantherfeb13presentation
Great pantherfeb13presentation
 
Great pantherfeb13presentation
Great pantherfeb13presentationGreat pantherfeb13presentation
Great pantherfeb13presentation
 
Claude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc. Corporate Update
Claude Resources Inc. Corporate Update
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate Presentation
 
Gqc corporate presentation sept 2016
Gqc corporate presentation sept 2016Gqc corporate presentation sept 2016
Gqc corporate presentation sept 2016
 
Great panthersilverjan2013presentation
Great panthersilverjan2013presentationGreat panthersilverjan2013presentation
Great panthersilverjan2013presentation
 
Avion Gold Corporate Presentation
Avion Gold Corporate PresentationAvion Gold Corporate Presentation
Avion Gold Corporate Presentation
 
Mine Development in the Americas
Mine Development in the AmericasMine Development in the Americas
Mine Development in the Americas
 
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
 
Cobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary ReportCobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary Report
 
Pele Mountain Investor Presentation
Pele Mountain Investor PresentationPele Mountain Investor Presentation
Pele Mountain Investor Presentation
 
Sage december ppt_2011
Sage december ppt_2011Sage december ppt_2011
Sage december ppt_2011
 
Cannacord Genuity - Bluestone Resources Report
Cannacord Genuity - Bluestone Resources ReportCannacord Genuity - Bluestone Resources Report
Cannacord Genuity - Bluestone Resources Report
 

More from Viral Network Inc

IntelGenx Corporate Presentation
IntelGenx Corporate PresentationIntelGenx Corporate Presentation
IntelGenx Corporate Presentation
Viral Network Inc
 
Calyx News Release April 9/14
Calyx News Release April 9/14Calyx News Release April 9/14
Calyx News Release April 9/14Viral Network Inc
 
Theralase Corporate Presentation
Theralase Corporate PresentationTheralase Corporate Presentation
Theralase Corporate PresentationViral Network Inc
 
PTP Feb. 2014 Factsheet
PTP Feb. 2014 FactsheetPTP Feb. 2014 Factsheet
PTP Feb. 2014 Factsheet
Viral Network Inc
 
Altima Resources - 2 Pager
Altima Resources - 2 PagerAltima Resources - 2 Pager
Altima Resources - 2 Pager
Viral Network Inc
 
PTP News - Nov. 14
PTP News - Nov. 14PTP News - Nov. 14
PTP News - Nov. 14
Viral Network Inc
 
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Viral Network Inc
 
Highbank Resources August Corporate Presentation
Highbank Resources August Corporate PresentationHighbank Resources August Corporate Presentation
Highbank Resources August Corporate Presentation
Viral Network Inc
 
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Viral Network Inc
 
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel Specifica...
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel  Specifica...Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel  Specifica...
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel Specifica...Viral Network Inc
 
TNR Gold Investor Presentation
TNR Gold Investor PresentationTNR Gold Investor Presentation
TNR Gold Investor PresentationViral Network Inc
 
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Viral Network Inc
 
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Viral Network Inc
 
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver ProjectGolden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Viral Network Inc
 
Highbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationHighbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationViral Network Inc
 
Sierra Metals Fact Sheet
Sierra Metals Fact SheetSierra Metals Fact Sheet
Sierra Metals Fact Sheet
Viral Network Inc
 
IntelGenx Corporate Presentation
IntelGenx Corporate PresentationIntelGenx Corporate Presentation
IntelGenx Corporate Presentation
Viral Network Inc
 
Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Sierra Metals announces first proven and probable ore reserves at the Bolivar...Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Viral Network Inc
 
Sierra Metals (TSX.V: SMT) Investor Presentation
Sierra Metals (TSX.V: SMT) Investor PresentationSierra Metals (TSX.V: SMT) Investor Presentation
Sierra Metals (TSX.V: SMT) Investor Presentation
Viral Network Inc
 

More from Viral Network Inc (20)

IntelGenx Corporate Presentation
IntelGenx Corporate PresentationIntelGenx Corporate Presentation
IntelGenx Corporate Presentation
 
Calyx News Release April 9/14
Calyx News Release April 9/14Calyx News Release April 9/14
Calyx News Release April 9/14
 
Theralase Corporate Presentation
Theralase Corporate PresentationTheralase Corporate Presentation
Theralase Corporate Presentation
 
PTP Feb. 2014 Factsheet
PTP Feb. 2014 FactsheetPTP Feb. 2014 Factsheet
PTP Feb. 2014 Factsheet
 
SponsorsOne Investor Deck
SponsorsOne Investor DeckSponsorsOne Investor Deck
SponsorsOne Investor Deck
 
Altima Resources - 2 Pager
Altima Resources - 2 PagerAltima Resources - 2 Pager
Altima Resources - 2 Pager
 
PTP News - Nov. 14
PTP News - Nov. 14PTP News - Nov. 14
PTP News - Nov. 14
 
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
 
Highbank Resources August Corporate Presentation
Highbank Resources August Corporate PresentationHighbank Resources August Corporate Presentation
Highbank Resources August Corporate Presentation
 
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
 
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel Specifica...
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel  Specifica...Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel  Specifica...
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel Specifica...
 
TNR Gold Investor Presentation
TNR Gold Investor PresentationTNR Gold Investor Presentation
TNR Gold Investor Presentation
 
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
 
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
 
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver ProjectGolden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
 
Highbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationHighbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate Presentation
 
Sierra Metals Fact Sheet
Sierra Metals Fact SheetSierra Metals Fact Sheet
Sierra Metals Fact Sheet
 
IntelGenx Corporate Presentation
IntelGenx Corporate PresentationIntelGenx Corporate Presentation
IntelGenx Corporate Presentation
 
Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Sierra Metals announces first proven and probable ore reserves at the Bolivar...Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Sierra Metals announces first proven and probable ore reserves at the Bolivar...
 
Sierra Metals (TSX.V: SMT) Investor Presentation
Sierra Metals (TSX.V: SMT) Investor PresentationSierra Metals (TSX.V: SMT) Investor Presentation
Sierra Metals (TSX.V: SMT) Investor Presentation
 

Recently uploaded

Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 

Recently uploaded (20)

Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 

Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mountain PEA

  • 1. BANKS ISLAND GOLD LTD. 300-1055 W. Hastings St. Vancouver, BC V6E 2E9 News Release Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mountain PEA  NI43-101 Preliminary Economic Assessment for 1,800tpd underground gold mine completed.  PEA study contemplates gold equivalent production of 114,000oz per year at a cost of $459/oz.  Banks Island Gold plans to initiate exploration, permitting and feasibility studies at Red Mountain. June 18, 2012 – Vancouver, British Columbia. Banks Island Gold Ltd. (the “Company”) (TSX- V:BOZ) announces results of a Preliminary Economic Assessment (PEA) for significant underground gold mining operation at the Red Mountain Project, located 30km east of Stewart, British Columbia. The NI43-101 compliant PEA study, dated June14th 2012, was prepared by independent consultants, Mr. Robert Baldwin, P.Eng and Mr. Lyn Jones, P.Eng. The study considers a 1,800 tonne per day operation based on the current Mineral Resource at the Red Mountain Gold Property. Underground mining methods are proposed with the utilization of flotation and cyanidation for the production of gold dore onsite for shipment to a refinery. Pretax Financial Summary The base case scenario, using the 3 year rolling average price of gold of $CDN 1,360 per troy oz, resulted in a pretax NPV(8%) of $CDN 155M, an IRR of 43%, and a payback of initial capital of 1.2 years. A scenario using the current price of gold of $CDN 1,700 per troy oz was also considered. The financial summary for the base case and current price scenario is presented Table 1.
  • 2. -2- Table 1 – Pretax Financial Summary FINANCIAL SUMMARY (PRETAX) BASE CASE CURRENT PRICE UNITS PRICE OF GOLD $1,360 $1,700 $CDN/oz MINE LIFE 4.3 years TOTAL ORE MINED 2,845,000 Tonnes GOLD PRODUCTION 474,382 oz SILVER PRODUCTION 1,233,405 oz GOLD EQ* PRODUCTION 499,050 oz Aueq AVERAGE ANNUAL PRODUCTION 115,246 oz Aueq / year OPERATING COST PER OZ** $459 $471 $CDN/oz Aueq TOTAL REVENUE $678,709,000 $848,386,000 $CDN TOTAL OPERATING COST $206,789,000 $206,789,000 $CDN ROYALTIES PAYABLE $22,505,000 $28,444,000 $CDN OPERATING CASH FLOW $449,415,000 $613,153,000 $CDN CAPITAL COST $162,671,000 $162,671,000 $CDN PROPERTY ACQUISITION $11,000,000 $11,000,000 $CDN INCOME AFTER CAPITAL $275,744,000 $439,482,000 $CDN NPV(8%) $155,398,000 $264,134,000 $CDN NPV(5%) $192,779,000 $318,980,000 $CDN NPV(0%) $275,744,000 $439,482,000 $CDN IRR 43% 63% PAYBACK ON CAPITAL 1.2 0.9 years *Gold Equivalent calculated by converting silver to gold at ratio of 1:50 **Operating Cost per oz gold equivalent including royalties payable The minable resource used in preparation of the preliminary assessment is partially based on an Inferred Resource. The preliminary assessment is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that the results and conclusions presented in this preliminary assessment will be realized. Mr. Mossman, President of the Company stated; “The Preliminary Economic Assessment on our newly acquired Red Mountain Gold Property demonstrates its potential as a significant low-cost producing gold mine. The excellent geometry and grade of the Red Mountains mineralized zones allow the use of highly productive mining methods and the planned adit from the Bitter Creek valley allows year-round access to the planned mine and a superior exploration platform in the depths of Red Mountain. The Company plans to continue advancing the Red Mountain Project through exploration, environmental permitting, and feasibility studies.”
  • 3. -3- Resource Estimate Mr. Baldwin, P.Eng prepared a current Mineral Resource estimate for Red Mountain, which is presented in the Technical Report & Preliminary Economic Assessment on the Red Mountain Gold Property on June 14th 2012. Mr. Baldwin modeled the significant mineralized zones at Red Mountain and calculated the Mineral Resource for gold and silver. Gold and silver assays used in the resource estimate were capped to the 98th percentile, resulting in a top cap of 70gpt for gold and 348gpt for silver. The current Mineral Resource is displayed in Table 2 and is effective as of June 14th 2012. Table 2 – Red Mountain Mineral Resource Measured Indicated Inferred Zone Au Ag Au Ag Au Ag Tonnes Grade Grade Tonnes Grade Grade Tonnes Grade Grade (gpt) (gpt) (gpt) (gpt) (gpt) (gpt) Marc 737,000 9.2 36 123,000 8.3 35 3,000 8.1 32 AV 326,000 8 23 250,000 8.1 23 175,000 8.4 24 JW 75,000 6.2 10 100,000 6 7 315,000 5.4 5 141 314,000 3.8 8 Total 1,138,000 8.7 31 473,000 7.7 23 807,000 5.4 10 Total Measured & Indicated: 1,611,000 tonnes @ 8.4gpt Au & 38gpt Ag = 435,000oz Gold, 1,976,000oz Silver Total Inferred: 807,000 tonnes @ 5.4gpt Au & 10gpt Ag = 140,000oz Gold, 259,000oz Silver Based on the current Mineral Resource, a diluted minable resource was calculated for the purposes of the PEA study. The Red Mountain mineralization is broken into four distinct zones for the purposes of mine planning. The estimated diluted minable resource is presented in Table 3. Table 3 – Red Mountain “Minable Resource” Insitu Mining Diluted Au Grade Ag Grade Au Grade Ag Grade Zone Tonnes Dilution Recovery Tonnes (g/t) (g/t) (g/t) (g/t) Marc 863,000 9.1 36 20% 98% 1,015,000 7.8 31 AV 752,000 8.1 23 20% 98% 884,000 7.0 20 JW 491,000 5.7 6 20% 98% 577,000 4.9 5 141 314,000 3.8 8 20% 98% 369,000 3.3 7 Total 2,420,000 7.4 22 20% 98% 2,845,000 6.4 19 Mining Summary The current mining methods proposed for the Red Mountain Project are transverse open stoping methods with the use of cemented paste fill for the Marc, AV, and 141 Zones and longitudinal longhole retreat method for the JW Zone.
  • 4. -4- Proposed access to the underground Red Mountain Project will be provided by a 7,190m adit, at a grade of +15%, from the Bitter Creek Mill site. Based on the current mineral resource estimate, mine production is planned to be 657,000 tonnes per year (1800tpd) over a mine life of 4.3 years (52 months). Mineral Processing Mr. Jones, P.Eng is responsible for the engineering designs, calculations, and recommendations related to mineral processing and metallurgical engineering, which is presented in the Technical Report & Preliminary Economic Assessment on the Red Mountain Gold Property on June 14th 2012. The proposed method of gold and silver recovery from the Red Mountain Gold Property consists of conventional crushing and milling, followed by froth flotation and CIL cyanidation of the flotation concentrate. The Red Mountain Project will produce gold/silver dore for shipment to a precious metal refinery. Flotation and cyanidation recoveries were estimated from historical test work. Estimated metallurgical recoveries of 82% gold and 72% silver were assumed for the Red Mountain PEA study. The objective of the PEA study was to optimize the Red Mountain process flowsheet to provide maximum gold and silver recoveries. Whereas previous flowsheets have included whole ore fine grinding followed by CIL/CIP cyanidation, the process route recommended is to produce a sulfide concentrate for fine grinding and subsequent CIL cyanidation. While there is some additional loss of cyanide recoverable gold in the flotation tailings, this method offers the following advantages over the whole-ore cyanidation flowsheet:  Reduced plant capital costs in the areas of fine grinding and cyanidation.  Lower operating costs associated with milling power and cyanide consumption.  Low-sulfide and coarse particle size flotation tailings for surface deposition. Non-acid generating tailings from the flotation circuit will be sent to a tailings storage facility proposed to be located immediately south of the Bitter Creek Mill Site. A minor valley created by a series of outcrop knobs is located in this area, which creates an excellent area for tailings storage. This valley only has minor inflows from a branch of Otter Creek, which is separate from the large flows of Bitter Creek Potentially acid generating tailings from the CIL circuit will be sent underground and utilized as cemented paste backfill material to provide support for mining adjacent longhole stopes and to create nearly impermeable material to reduce the acid generating potential. Infrastructure A 14km access road from Highway 37A to the Bitter Creek Mill Site requires significant repairs and reconstruction. A 14km transmission line is planned to be constructed to connect the mine and mill to the BC Hydro electrical grid. The Bitter Creek Mill Site is planned to be located on a gently sloping terrace at the planned portal location of the Bitter Creek Mine Adit. Water supply for the mill will be from groundwater, reclaimed water from the settling ponds, and fresh water from Bitter Creek.
  • 5. -5- BC Hydro maintains a 138kV transmission line which runs along Highway 37A to Stewart, BC. It is intended that a 14km transmission line will be built by the Company to connect the Bitter Creek Mill site to the BC Hydro electrical grid. Operating Costs Based on the mine design and schedule, an estimate of operating costs was derived for the PEA study. Costs are based on productivities, labour, and material costs obtained from supplier and contractor quotes, cost data from other mines, first principle calculations, and experience. A summary of operating cost estimates for the Red Mountain Gold Project are displayed in Table 4. Operating costs have been estimated at $206,789,000 over the current 52 month mine life averaging $72.68 per tonne milled. Table 4 – Operating Cost Summary OPERATING COST SUMMARY Total Cost Cost per tonne MINING & SURFACE MATERIALS $12,090,000 $4.25 BACKFILL BINDER $24,107,000 $8.47 LUBE, TIRES, & PARTS $12,096,000 $4.25 MINE ELECTRICITY $2,639,000 $0.93 DIESEL FUEL $9,592,000 $3.37 AVALANCHE CONTROL $2,603,000 $0.91 MINE AIR HEATING $1,445,000 $0.51 MINE, MAINTENANCE & SURFACE LABOUR $49,750,000 $17.49 $114,322,000 $40.18 MILL LABOUR $26,857,000 $9.44 SAFETY, SPARES, & ELECTRICAL $7,824,000 $2.75 MILL ELECTRICITY $5,861,000 $2.06 REAGENTS $12,973,000 $4.56 BALLS & LINERS $4,353,000 $1.53 PIPING, LUBRICANTS, ASSAY $854,000 $0.30 $58,722,000 $20.64 MANAGEMENT, TECHNICAL & SUPERVISION STAFF SALARIES $15,885,000 $5.58 STAFF INCENTIVES $2,542,000 $0.89 $18,427,000 $6.48 CONTINGENCY (8%) $15,318,000 $5.38 TOTAL OPERATING COSTS $206,789,000 $72.68
  • 6. -6- Capital Costs Capital expenditures related to design, permitting, construction, and commissioning of the Red Mountain Gold Property are modeled to occur in a 3-Year pre-production period. All expenditures that are expected to occur after commercial production has commenced are treated as operating costs. The estimated capital cost from feasibility through to commercial production is estimated at $162,671,000, including cost contingencies. A summary of estimated capital costs is presented in Table 5. Table 5 – Initial Capital Cost Summary CAPITAL COST SUMMARY FEASIBILITY STUDY $6,477,000 ROAD BUILDING & POWER TRANSMISSION $8,386,000 MOBILE EQUIPMENT $16,560,000 MINE STATIONARY EQUIPMENT $2,383,000 MINE DEVELOPMENT & CONSTRUCTION $39,271,000 SURFACE STRUCTURES $8,488,000 BACKFILL PLANT $7,000,000 MILL EQUIPMENT & CONSTRUCTION $53,979,000 COST CONTINGENCY $20,127,000 TOTAL $162,671,000 Based on the production schedule and expected operating costs, a working capital requirement of $11,000,000 is anticipated. The working capital is adequate to cover all operating costs expected for the first three months of production. Environmental and Permitting The Red Mountain Project will require a formal review under the BC Environmental Assessment Act prior to being issued a Mines Act permit. The Environmental Assessment review process was initiated in 1996 by a previous Property owner but was subsequently withdrawn. The Environmental Assessment information is available for future use. The most important waste management issue for the Red Mountain Project is the prevention and control of ARD from the tailings and any potentially acid generating rock, which is produced during mine development or operation. Banks Island Gold places a high priority on minimizing environmental impacts, mine closure, and reclamation of its projects without the creation of long-term environmental liabilities. The Red Mountain PEA study incorporates sulphide flotation in the process flowsheet before cyanidation to produce a coarse, non-acid generating tailings product for surface disposal and reduce grinding and cyanide use. Potentially acid generating tailings from the sulphide concentrate will be sent underground and utilized as cemented paste backfill material to provide support for mining adjacent longhole stopes and to create nearly impermeable material to reduce the acid generating potential. Detailed metallurgical testwork is required to verify the assumptions and designs presented in the PEA.
  • 7. -7- Mine Life and Exploration Potential There is high potential for expansion of minable resources at Red Mountain with a resulting increase in the mine life. Historic drilling results suggest that mineralization at Red Mountain may continue past the current minable resource at depth and mineralized intercepts exist outside the current resource at Red Mountain. The 132 zone was not included in the current mineral resource. Based on historic resource estimates by previous operators this area has a high potential for resource expansion through additional diamond drilling. Sensitivity Analysis An analysis was performed to determine the sensitivity of the NPV (8%) to changes in key input parameters. Gold price, ore grade, capital cost, and operating cost were varied from -60% to +140% and the resulting NPV (8%) was calculated. The results of this analysis are displayed in Figure 1. The project economics are highly sensitive to changes in the price of gold and the ore grade but significantly less sensitive to changes in operating and capital costs. Figure 1 – NPV Sensitivity to % Change in Input Value Recommendations The preliminary economic assessment presented in the PEA indicates an underground gold mining operation at Red Mountain may be viable. It is recommended that the Project be advanced towards a pre- feasibility or feasibility level study.
  • 8. -8- A feasibility level study is recommended at an estimated cost of $6,477,000. The recommended work is comprised of a diamond drilling program with a budgeted cost of $4.2M and engineering and environmental studies at a cost of $2.3M. Diamond drilling is required to bring the current Inferred Mineral Resource into the Measured and Indicated Mineral Resource categories. Detailed metallurgical testwork is required to verify the assumptions and designs presented in the PEA and advanced fieldwork and engineering is required for road design, electrical transmission lines, foundations, tailings facilities, and structures. Mr. Robert Baldwin, P.Eng is the qualified person who reviewed and approved the contents of this news release. The NI43-101 Technical Report & Preliminary Economic Assessment on the Red Mountain Gold Property dated June 14th 2012 has been posted on SEDAR and will be available on the Company’s website. The Company is a junior mining resource exploration company focused on exploring for and developing economically viable mineral resources. The Company’s mineral properties are located in British Columbia. For more information, please refer to the Company’s website at www.banksislandgold.com. ON BEHALF OF THE BOARD OF DIRECTORS “Benjamin W. Mossman” Benjamin W. Mossman, P.Eng President, Director, & Chief Executive Officer For further information, please contact: Benjamin W. Mossman: 604-245-0066 The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release. Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This press release contains forward-looking statements. All statements, other than statements of historical fact, constitute “forward-looking statements” and include any information that addresses activities, events or developments that the Company believes, expects or anticipates will or may occur in the future including the Company’s strategy, plans or future financial or operating performance and other statements that express management’s expectations or estimates of future performance. Forward-looking statements are generally identifiable by the use of the words “may”, “will”, “should”, “continue”, “expect”, “anticipate”, “estimate”, “believe”, “intend”, “plan” or “project” or the negative of these words or other variations on these words or comparable terminology. These statements, however, are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed, implied by or projected in the forward-looking information or statements. Important factors that could cause actual results to differ from these forward-looking statements include but are not limited to: risks related to the exploration and potential development of the Company’s project, the actual results of current exploration activities, conclusions of economic evaluations, changes in project parameters as plans continue to be refined, future prices of gold, as well as those factors discussed in the sections relating to risk factors of the Company prospectus dated September 30, 2011 filed on SEDAR.
  • 9. -9- There can be no assurance that any forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader should not place any undue reliance on forward-looking information or statements. Except as required by law, the Company does not intend to revise or update these forward-looking statements after the date of this document or to revise them to reflect the occurrence of future unanticipated events.