3. Solid Waste Management Balıkesir- BSWMP
BSWMP
December 2013
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
4. Solid Waste Management Balıkesir- BSWMP
EC Delegation ECD- Ministry of Environment and Forestry MoEF
Benificiary-BAÇEYÖB
5. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
6.
7. Solid Waste Management Balıkesir- BSWMP
Items to be Included in the Investment Programme
* Waste Storage Containers, Collection Vehicles & Bring
banks
* A sanitary landfill for disposal of non-hazardous wastes with
gas collection system, leachate treatment plant, etc.
* Rehabilitation of the 7 current dump sites.
* Pilot scale composting plant (5,000 tons/year) at the landfill
site.
* Materials recovery facility (MRF) at the landfill site.
* Two transfer stations in Bigadic and Susurluk .
* Sterilisation Facility for medical wastes at the landfill site.
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
8. Solid Waste Management Balıkesir- BSWMP
The contractor shall on basis of
given
process specifications and conceptual
designs carry out the detailed design of
general, process, architectural, mechanical,
electrical and structural drawings for:
•
Transfer stations
•
Rehabilitation of existing dump sites
•
Medical Waste Sterilization Unit
•
Material Recovery Facility
Further the Contractor shall prepare:
•
detailed
design
for
all
concrete
structures comprising retaining walls
ramps, inspection pump shafts, light pole
foundations etc.
•
layouts,
structural,
electrical
and
mechanical drawings in accordance with
the requirements given in these
Particular Technical Specifications for all
buildings.
9. Solid Waste Management Balıkesir- BSWMP
All detailed designs shall be performed by
the Contractor and submitted to Engineer
and Contracting Authority for approval.
All necessary surveying and mapping
studies,
geological
and
geotechnical
investigations shall be made by Contractor
in the beginning.
The Contractor shall further obtain all
relevant approvals and permits from local
authorities, owners, etc.
Power supply overhead lines will be brought
to the Landfill sites by the local electric
distribution company and located in
accordance with instructions of the
municipality. The Contractor has to prepare
drawings for correct location of electrical
overhead line poles.
All detailed designs shall comply with
relevant Turkish legislation and regulations
and shall be made according to the
specifications and requirements given in this
document.
10. Solid Waste Management Balıkesir- BSWMP
The Contractor shall perform the works
at:
1. Landfill Site;
2. Transfer Station Sites
3. Rehabilitation Sites
The types of works are involved are
listed below:
1. Landfill, including
-
Preparatory Works
-
Earthworks
-
Bottom Sealing System
-
Leachate Drainage System
-
Leachate Collection Lagoon
-
Leachate Treatment Plant
-
Internal Roads
-
Administrative Building
11. Solid Waste Management Balıkesir- BSWMP
-
Battery Storage Tank
-
Wheel Washing Unit
-
Gas Collection System(Only supply
of gas pipes and other equipment)
-
Transformer and generator buildings
-
Observation Wells
-
Water supply and fire water system
-
Sewage system
-
Stormwater ditches
-
Water tank
-
Landscaping
-
Other civil works as per tender
dossier
-
Mechanical & Installation works
-
Plumping works, and
-
Electrical works
12. Solid Waste Management Balıkesir- BSWMP
2. Material Recovery Facility
-
Civil Works
-
Mechanical Works
-
Electrical Works
3. Medical Waste Sterilization Unit
-
Civil Works
-
Mechanical Works
-
Electrical Works
4. Pilot Compost Plant, including
-
Civil Works
-
Mechanical Works
-
Electrical Works
13. Solid Waste Management Balıkesir- BSWMP
5. Leachate Treatment Plant
*Civil Works
o Aerobic and facultative lagoons
o Sludge (Operation) Building
o Leachate Pumping Station
o Sludge Tank
o Auxiliary Structures
o Roads
*Piping & Field Works
*Mechanical and Electrical
* Equipment & Instruments
14. Solid Waste Management Balıkesir- BSWMP
Transfer Stations for Susurluk and Bigadiç (2 nos.)
Rehabilitation of Existing Dump Sites (Balıkesir
central, Susurluk 1 & 2, Bigadiç, İvrindi, and
Savaştepe)
Transfer of wastes deposited outside the property
boundary
Compaction and leveling of waste body
Formation of capping system layers
Construction of interior roads, if any
Fence
Construction of drainage channel
Plantation works
Gas collection and degassing system
Observation wells
Leachate Pond
Transportation of Existing Wastes from Kepsut
Existing Dump Site to Balıkesir Existing Dump Site
before rehabilitation
Transportation of Existing Wastes from Pamukçu
Existing Dump Site to Balıkesir Existing Dump Site
before rehabilitation
15. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
16. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
17. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
18.
19. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
20. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
21. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
22. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
23. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
24. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis
26. Solid Waste Management Balıkesir- BSWMP
Project Steering Commitee-MoEF -CFCU-İller Bankası-SPO-BAÇEYÖB-ECD-TAWorks Contractor-Representatives of Other realed Ministries-Institutions on ad hoc basis