SlideShare a Scribd company logo
1 of 11
水力发电厂辅助设备
Auxiliary Equipment of
Hydropower Station
~0~
武汉大学 蔡维由 教授
Wuhan University Profesor Weiyou Cai
1 概述 Overview
(1)辅助设备的概念 Define of auxiliary equipment
辅助设备是相对于水电厂的主机设备而言的。辅助设备是指
为控制机组的启动、并网、调整负荷、保持转速恒定、工况转
换、停机、润滑、冷却、制动和防飞逸等服务的设备。辅助设
备对保证水电厂和水力机组的安全经济运行、机组出力和电能
质量等方面起着决定性作用。
Auxiliary equipment refers to those ones to serve the startup,
synchronization, load adjustment, maintaining of constant speed,
shifting of working conditions, shutdown, lubrication, cooling,
brake and anti-runaway of the units. It plays a key role in assuring
such aspects as safe and economic operation of hydropower
stations and hydropower sets.
(2)辅助设备的主要内容
The main content of auxiliary equipment
包括如下七部分:Includes the following 7 parts
 1)油系统 Oil system
 2)压缩空气系统 Compressed air system
 3)供水系统 Water supply system
 4)排水系统 Drainage system
 5)水轮机进水阀 Water turbine inlet valves
 6)通风空调系统 Ventilation and air conditioning system
 7)水力监测系统 Hydraulic measuring system
1 概述 Overview
1)油系统 Oil system
油系统是水电厂辅助设备中最基本的系统之一。水电厂的用油种类较多,但
主要的是透平油(润滑油)和绝缘油。其中透平油主要用于润滑、散热和液
压操作,绝缘油主要用于绝缘、散热和消弧。
Oil system is one of the most fundamental systems in the auxiliary
equipment of hydropower station. Among a variety of oil types in
hydropower station, turbine oil (lubricating oil) and insulating oil
are widely used, for the former is mainly used for lubrication,
cooling and hydraulic operation, while the latter is mainly used for
insulation, cooling and arc suppression.
1 概述 Overview
2)压缩空气系统 Compressed air system
水电厂的压缩空气系统一般包括中压和低压两个分系统。其中低压系统主要
用于机组调相、机组制动、水轮机检修密封、吹扫和风动工具等;而中压系
统主要用于油压操作系统中维持压力油的油压稳定和在配电装置中实现气动
操作等。
Compressed air system of hydropower station is composed of two
sub-systems in general: medium pressure and low pressure system.
The former one ( medium pressure system) is mainly used for
maintaining stable oil pressure in oil pressure operating system and
conducting pneumatic operation of distribution devices; and the
latter( low pressure system) is mostly applied for set phase
modulation, set braking, turbine maintenance sealing, set
maintenance purging and pneumatic tools, etc.
The medium pressure used for maintaining stable oil pressure in
oil pressure operating system and conducting pneumatic operation
of distribution devices, etc.
1 概述 Overview
3)供水系统 Water supply system
水电厂的供水包括技术供水、消防供水和生活供水三个部分。在辅助设备系
统中,一般只考虑技术供水和消防供水两部分。其中技术供水也称为生产供
水,主要用于对机组相关设备的润滑、冷却和水轮机主轴密封等,有时也做
操作能源用;消防供水主要用于发电机、主变、主厂房和油系统的消防。
Water supply in hydropower station includes three parts: technical
water system, fire fighting water system and living water system.
Often only the former two systems are considered for the auxiliary
equipment system. In which the technical water supply is also called
production water supply, and mainly used for lubrication, cooling
and sealing of turbine main shaft, etc., or occasionally as operating
power; and fire fighting water is mainly used for fire prevention of
generator, main transformer, main powerhouse and oil system.
1 概述 Overview
排水系统包括两方面的内容,一是为防止厂房内部积水和潮湿而设置的渗漏
排水系统,二是为保证机组过水部分和厂房水下部分的检修而设立的检修排
水系统。排水系统相对较为简单,但也是水电厂中较容易发生事故的部位,
必须引起足够的重视。
Drainage system includes two parts, one is seepage drainage system
to prevent water accumulation and moisture inside the powerhouse,
and the other is maintenance drainage system to guarantee water-
carrying set parts and water-flooded station parts. The system has a
relatively simple structure while easily inducing an accident in
hydropower station, so enough attentions must be paid.
1 概述 Overview
4)排水系统 Drainage system
5)水轮机进水阀 Water turbine Inlet valve
水轮机进水阀是指设置在水轮机蜗壳与压力管道之间的阀门,主要用于停机
时减少机组的漏水量、岔管引水电厂的机组检修,以及管道较长和水头较高
的机组事故时防飞逸等。由于其投资昂贵,并不是所有的电厂都要设置进水
阀。
Water turbine Inlet valve refers to the valve installed between
turbine spiral case and penstock, and it is mainly used for water
leakage reduction of the turbine, set maintenance of hydropower
station connected to diversion bifurcation, and prevent possible
runaway of the sets with long pipe and high water head in an
accident, etc. However, as the valve is very expensive, not all the
hydropower stations are equipped with the inlet valve.
1 概述 Overview
6)通风空调系统 Ventilation and air conditioner system
通风系统用于排除在电力生产过程中产生的有害气体与灰尘,保证身处其中
的工作人员的身体健康,保证电力设备的正常安全运行。通风系统还用于排
除电力生产过程中产生的热量,避免温度过高。除设置通风系统外,在电厂
的部分区域还设置有空调系统,以便为电厂工作人员提供更加舒适的工作环
境。
The ventilation system is used to remove hazardous gases and dusts
generated in the power generation. This is for ensuring that the
staffs in the buildings are physically healthy and power equipment
can normally and safely operate. Also, it is used to reject heat
generated in power generation and avoiding the temperature from
being too high. In some areas of the hydropower station, Air
conditioner system is also arranged to provide a safer and more
comfortable working environment for staffs.
1 概述 Overview
7)水力量测系统 Hydraulic measuring system
水力量测系统是水电厂辅助设备的重要的系统之一,也是水电
厂自动化系统的重要组成部分。水力量测系统用于监测机组相
关设备运行状态,为相应设备的安全运行提供保障。
Hydraulic measuring system is an important system in the
auxiliary equipment and an important part of the automatic system
of hydropower station. It is used for monitoring operation status of
related set equipment and guaranteeing safe operation of the
equipment.
1 概述 Overview
为了进行厂内机电设备的安装与检修,水电厂需要配置起重设备与机修设备。
对起重设备,一般是在主厂房内装设桥式起重机,在上下游闸门或其它有起
重要求的地方可装设门式或半门式起重机。机修设备的的配置一般根据电厂
具体情况进行综合考虑,使之既能满足电厂检修工作的需要,又能节省投资。
Hoisting and maintenance equipment should be prepared in
hydropower station for the purpose of installation and maintenance
of electromechanical equipment. As for hoisting equipment,
overhead crane is generally set in main powerhouse. Aiming at
installation and maintenance of intake gate, gantry crane should be
erected on the top of dam, and tail water gate should be equipped
with tail water gate hoist or electric hoist. The layout of
maintenance equipment should be comprehensively considered
according to the specific conditions of hydropower station so as to
meet the needs of maintenance and save investments.
1 概述 Overview

More Related Content

Similar to Auxiliary equipment 0-Overview gb3 hpp-1.ppt

Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantSWAPNILTRIVEDI6
 
Anti surge-control-concepts
Anti surge-control-conceptsAnti surge-control-concepts
Anti surge-control-conceptspakmek
 
Fluid power automation unit 1 introduction
Fluid power automation  unit 1 introductionFluid power automation  unit 1 introduction
Fluid power automation unit 1 introductionDineshS158
 
Operation and maintanance
Operation and maintananceOperation and maintanance
Operation and maintananceAnasMirza10
 
PLC Based Annunciation System Report
PLC Based Annunciation System ReportPLC Based Annunciation System Report
PLC Based Annunciation System ReportFasih Ahmed
 
CRITÉRIOS DE SEGURANÇA ADOTADOS PARA AS USINAS NUCLEARES BRASILEIRAS
CRITÉRIOS DE SEGURANÇA ADOTADOS PARA AS USINAS NUCLEARES BRASILEIRASCRITÉRIOS DE SEGURANÇA ADOTADOS PARA AS USINAS NUCLEARES BRASILEIRAS
CRITÉRIOS DE SEGURANÇA ADOTADOS PARA AS USINAS NUCLEARES BRASILEIRASLeonam Guimarães
 
Group2 loca to test
Group2 loca to testGroup2 loca to test
Group2 loca to testcongthan1
 
Techdoc hydraulic hoses
Techdoc hydraulic hosesTechdoc hydraulic hoses
Techdoc hydraulic hosesPhilip Ch
 
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfH15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfEMERSON EDUARDO RODRIGUES
 
369051174-Basic-of-Commissioning.pdf
369051174-Basic-of-Commissioning.pdf369051174-Basic-of-Commissioning.pdf
369051174-Basic-of-Commissioning.pdfPDVSA Petrodelta
 
Security analysis black and white 2007
Security analysis black and white 2007Security analysis black and white 2007
Security analysis black and white 2007Viren Pandya
 
Design of SCADA Failsafe Industrial Valves for Hazardous Chemicals from Chemi...
Design of SCADA Failsafe Industrial Valves for Hazardous Chemicals from Chemi...Design of SCADA Failsafe Industrial Valves for Hazardous Chemicals from Chemi...
Design of SCADA Failsafe Industrial Valves for Hazardous Chemicals from Chemi...YogeshIJTSRD
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16fidge72
 
Presentation on switchgear
Presentation on switchgear Presentation on switchgear
Presentation on switchgear Shubham Nagarale
 
Bản vẽ Thiết kế Bộ truyền động điện đa vòng cho tự động hóa các van công nghi...
Bản vẽ Thiết kế Bộ truyền động điện đa vòng cho tự động hóa các van công nghi...Bản vẽ Thiết kế Bộ truyền động điện đa vòng cho tự động hóa các van công nghi...
Bản vẽ Thiết kế Bộ truyền động điện đa vòng cho tự động hóa các van công nghi...CÔNG TY CỔ PHẦN WESTERNTECH VIỆT NAM
 
Electric Actuators for Industrial Valve Automation
Electric Actuators for Industrial Valve AutomationElectric Actuators for Industrial Valve Automation
Electric Actuators for Industrial Valve AutomationClassic Controls, Inc.
 
Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenancePatrick Volluz
 
PC Based Industrial Automation With AVR Atmega 16 - Project Report
PC Based Industrial Automation With AVR Atmega 16 - Project ReportPC Based Industrial Automation With AVR Atmega 16 - Project Report
PC Based Industrial Automation With AVR Atmega 16 - Project ReportRobo India
 

Similar to Auxiliary equipment 0-Overview gb3 hpp-1.ppt (20)

Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
 
Anti surge-control-concepts
Anti surge-control-conceptsAnti surge-control-concepts
Anti surge-control-concepts
 
Oil production3
Oil production3Oil production3
Oil production3
 
Fluid power automation unit 1 introduction
Fluid power automation  unit 1 introductionFluid power automation  unit 1 introduction
Fluid power automation unit 1 introduction
 
Operation and maintanance
Operation and maintananceOperation and maintanance
Operation and maintanance
 
PLC Based Annunciation System Report
PLC Based Annunciation System ReportPLC Based Annunciation System Report
PLC Based Annunciation System Report
 
CRITÉRIOS DE SEGURANÇA ADOTADOS PARA AS USINAS NUCLEARES BRASILEIRAS
CRITÉRIOS DE SEGURANÇA ADOTADOS PARA AS USINAS NUCLEARES BRASILEIRASCRITÉRIOS DE SEGURANÇA ADOTADOS PARA AS USINAS NUCLEARES BRASILEIRAS
CRITÉRIOS DE SEGURANÇA ADOTADOS PARA AS USINAS NUCLEARES BRASILEIRAS
 
Group2 loca to test
Group2 loca to testGroup2 loca to test
Group2 loca to test
 
Techdoc hydraulic hoses
Techdoc hydraulic hosesTechdoc hydraulic hoses
Techdoc hydraulic hoses
 
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdfH15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
H15 POWER SYSTEM PROTECTION EMERSON EDUARDO RODRIGUES.pdf
 
369051174-Basic-of-Commissioning.pdf
369051174-Basic-of-Commissioning.pdf369051174-Basic-of-Commissioning.pdf
369051174-Basic-of-Commissioning.pdf
 
Security analysis black and white 2007
Security analysis black and white 2007Security analysis black and white 2007
Security analysis black and white 2007
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Design of SCADA Failsafe Industrial Valves for Hazardous Chemicals from Chemi...
Design of SCADA Failsafe Industrial Valves for Hazardous Chemicals from Chemi...Design of SCADA Failsafe Industrial Valves for Hazardous Chemicals from Chemi...
Design of SCADA Failsafe Industrial Valves for Hazardous Chemicals from Chemi...
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16
 
Presentation on switchgear
Presentation on switchgear Presentation on switchgear
Presentation on switchgear
 
Bản vẽ Thiết kế Bộ truyền động điện đa vòng cho tự động hóa các van công nghi...
Bản vẽ Thiết kế Bộ truyền động điện đa vòng cho tự động hóa các van công nghi...Bản vẽ Thiết kế Bộ truyền động điện đa vòng cho tự động hóa các van công nghi...
Bản vẽ Thiết kế Bộ truyền động điện đa vòng cho tự động hóa các van công nghi...
 
Electric Actuators for Industrial Valve Automation
Electric Actuators for Industrial Valve AutomationElectric Actuators for Industrial Valve Automation
Electric Actuators for Industrial Valve Automation
 
Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenance
 
PC Based Industrial Automation With AVR Atmega 16 - Project Report
PC Based Industrial Automation With AVR Atmega 16 - Project ReportPC Based Industrial Automation With AVR Atmega 16 - Project Report
PC Based Industrial Automation With AVR Atmega 16 - Project Report
 

More from million22

Auxiliary equipment 01-Oil system(修改1)-4.ppt
Auxiliary equipment 01-Oil system(修改1)-4.pptAuxiliary equipment 01-Oil system(修改1)-4.ppt
Auxiliary equipment 01-Oil system(修改1)-4.pptmillion22
 
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...million22
 
control3.pptx
control3.pptxcontrol3.pptx
control3.pptxmillion22
 
Chapter_3-Transformers[1]-1.pdf
Chapter_3-Transformers[1]-1.pdfChapter_3-Transformers[1]-1.pdf
Chapter_3-Transformers[1]-1.pdfmillion22
 
CH 4 DC Machines.pptx
CH 4 DC Machines.pptxCH 4 DC Machines.pptx
CH 4 DC Machines.pptxmillion22
 
CH 4 DC Machines - Copy.pptx
CH 4 DC Machines - Copy.pptxCH 4 DC Machines - Copy.pptx
CH 4 DC Machines - Copy.pptxmillion22
 

More from million22 (6)

Auxiliary equipment 01-Oil system(修改1)-4.ppt
Auxiliary equipment 01-Oil system(修改1)-4.pptAuxiliary equipment 01-Oil system(修改1)-4.ppt
Auxiliary equipment 01-Oil system(修改1)-4.ppt
 
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
 
control3.pptx
control3.pptxcontrol3.pptx
control3.pptx
 
Chapter_3-Transformers[1]-1.pdf
Chapter_3-Transformers[1]-1.pdfChapter_3-Transformers[1]-1.pdf
Chapter_3-Transformers[1]-1.pdf
 
CH 4 DC Machines.pptx
CH 4 DC Machines.pptxCH 4 DC Machines.pptx
CH 4 DC Machines.pptx
 
CH 4 DC Machines - Copy.pptx
CH 4 DC Machines - Copy.pptxCH 4 DC Machines - Copy.pptx
CH 4 DC Machines - Copy.pptx
 

Recently uploaded

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Recently uploaded (20)

(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Auxiliary equipment 0-Overview gb3 hpp-1.ppt

  • 1. 水力发电厂辅助设备 Auxiliary Equipment of Hydropower Station ~0~ 武汉大学 蔡维由 教授 Wuhan University Profesor Weiyou Cai
  • 2. 1 概述 Overview (1)辅助设备的概念 Define of auxiliary equipment 辅助设备是相对于水电厂的主机设备而言的。辅助设备是指 为控制机组的启动、并网、调整负荷、保持转速恒定、工况转 换、停机、润滑、冷却、制动和防飞逸等服务的设备。辅助设 备对保证水电厂和水力机组的安全经济运行、机组出力和电能 质量等方面起着决定性作用。 Auxiliary equipment refers to those ones to serve the startup, synchronization, load adjustment, maintaining of constant speed, shifting of working conditions, shutdown, lubrication, cooling, brake and anti-runaway of the units. It plays a key role in assuring such aspects as safe and economic operation of hydropower stations and hydropower sets.
  • 3. (2)辅助设备的主要内容 The main content of auxiliary equipment 包括如下七部分:Includes the following 7 parts  1)油系统 Oil system  2)压缩空气系统 Compressed air system  3)供水系统 Water supply system  4)排水系统 Drainage system  5)水轮机进水阀 Water turbine inlet valves  6)通风空调系统 Ventilation and air conditioning system  7)水力监测系统 Hydraulic measuring system 1 概述 Overview
  • 4. 1)油系统 Oil system 油系统是水电厂辅助设备中最基本的系统之一。水电厂的用油种类较多,但 主要的是透平油(润滑油)和绝缘油。其中透平油主要用于润滑、散热和液 压操作,绝缘油主要用于绝缘、散热和消弧。 Oil system is one of the most fundamental systems in the auxiliary equipment of hydropower station. Among a variety of oil types in hydropower station, turbine oil (lubricating oil) and insulating oil are widely used, for the former is mainly used for lubrication, cooling and hydraulic operation, while the latter is mainly used for insulation, cooling and arc suppression. 1 概述 Overview
  • 5. 2)压缩空气系统 Compressed air system 水电厂的压缩空气系统一般包括中压和低压两个分系统。其中低压系统主要 用于机组调相、机组制动、水轮机检修密封、吹扫和风动工具等;而中压系 统主要用于油压操作系统中维持压力油的油压稳定和在配电装置中实现气动 操作等。 Compressed air system of hydropower station is composed of two sub-systems in general: medium pressure and low pressure system. The former one ( medium pressure system) is mainly used for maintaining stable oil pressure in oil pressure operating system and conducting pneumatic operation of distribution devices; and the latter( low pressure system) is mostly applied for set phase modulation, set braking, turbine maintenance sealing, set maintenance purging and pneumatic tools, etc. The medium pressure used for maintaining stable oil pressure in oil pressure operating system and conducting pneumatic operation of distribution devices, etc. 1 概述 Overview
  • 6. 3)供水系统 Water supply system 水电厂的供水包括技术供水、消防供水和生活供水三个部分。在辅助设备系 统中,一般只考虑技术供水和消防供水两部分。其中技术供水也称为生产供 水,主要用于对机组相关设备的润滑、冷却和水轮机主轴密封等,有时也做 操作能源用;消防供水主要用于发电机、主变、主厂房和油系统的消防。 Water supply in hydropower station includes three parts: technical water system, fire fighting water system and living water system. Often only the former two systems are considered for the auxiliary equipment system. In which the technical water supply is also called production water supply, and mainly used for lubrication, cooling and sealing of turbine main shaft, etc., or occasionally as operating power; and fire fighting water is mainly used for fire prevention of generator, main transformer, main powerhouse and oil system. 1 概述 Overview
  • 7. 排水系统包括两方面的内容,一是为防止厂房内部积水和潮湿而设置的渗漏 排水系统,二是为保证机组过水部分和厂房水下部分的检修而设立的检修排 水系统。排水系统相对较为简单,但也是水电厂中较容易发生事故的部位, 必须引起足够的重视。 Drainage system includes two parts, one is seepage drainage system to prevent water accumulation and moisture inside the powerhouse, and the other is maintenance drainage system to guarantee water- carrying set parts and water-flooded station parts. The system has a relatively simple structure while easily inducing an accident in hydropower station, so enough attentions must be paid. 1 概述 Overview 4)排水系统 Drainage system
  • 8. 5)水轮机进水阀 Water turbine Inlet valve 水轮机进水阀是指设置在水轮机蜗壳与压力管道之间的阀门,主要用于停机 时减少机组的漏水量、岔管引水电厂的机组检修,以及管道较长和水头较高 的机组事故时防飞逸等。由于其投资昂贵,并不是所有的电厂都要设置进水 阀。 Water turbine Inlet valve refers to the valve installed between turbine spiral case and penstock, and it is mainly used for water leakage reduction of the turbine, set maintenance of hydropower station connected to diversion bifurcation, and prevent possible runaway of the sets with long pipe and high water head in an accident, etc. However, as the valve is very expensive, not all the hydropower stations are equipped with the inlet valve. 1 概述 Overview
  • 9. 6)通风空调系统 Ventilation and air conditioner system 通风系统用于排除在电力生产过程中产生的有害气体与灰尘,保证身处其中 的工作人员的身体健康,保证电力设备的正常安全运行。通风系统还用于排 除电力生产过程中产生的热量,避免温度过高。除设置通风系统外,在电厂 的部分区域还设置有空调系统,以便为电厂工作人员提供更加舒适的工作环 境。 The ventilation system is used to remove hazardous gases and dusts generated in the power generation. This is for ensuring that the staffs in the buildings are physically healthy and power equipment can normally and safely operate. Also, it is used to reject heat generated in power generation and avoiding the temperature from being too high. In some areas of the hydropower station, Air conditioner system is also arranged to provide a safer and more comfortable working environment for staffs. 1 概述 Overview
  • 10. 7)水力量测系统 Hydraulic measuring system 水力量测系统是水电厂辅助设备的重要的系统之一,也是水电 厂自动化系统的重要组成部分。水力量测系统用于监测机组相 关设备运行状态,为相应设备的安全运行提供保障。 Hydraulic measuring system is an important system in the auxiliary equipment and an important part of the automatic system of hydropower station. It is used for monitoring operation status of related set equipment and guaranteeing safe operation of the equipment. 1 概述 Overview
  • 11. 为了进行厂内机电设备的安装与检修,水电厂需要配置起重设备与机修设备。 对起重设备,一般是在主厂房内装设桥式起重机,在上下游闸门或其它有起 重要求的地方可装设门式或半门式起重机。机修设备的的配置一般根据电厂 具体情况进行综合考虑,使之既能满足电厂检修工作的需要,又能节省投资。 Hoisting and maintenance equipment should be prepared in hydropower station for the purpose of installation and maintenance of electromechanical equipment. As for hoisting equipment, overhead crane is generally set in main powerhouse. Aiming at installation and maintenance of intake gate, gantry crane should be erected on the top of dam, and tail water gate should be equipped with tail water gate hoist or electric hoist. The layout of maintenance equipment should be comprehensively considered according to the specific conditions of hydropower station so as to meet the needs of maintenance and save investments. 1 概述 Overview