Automated DeploymentBuilding a simple automated deployment platform with PHP and LinuxMichael Peacock@michaelpeacockmichaelpeacock.co.uk
whois?Senior / Lead Web DeveloperZend Certified EngineerPublished AuthorPHP 5 Social Networking, PHP 5 E-Commerce development & more
Deployment: (an) old style approachTake website offline / put into maintenance modeBackup everythingUpload new files - FTPUpgrade databasePut online, and hope for the bestDo it twice: once for staging and once for deployment
http://xkcd.com/303/
The problemDown time for upgradesManual processFTP takes time; forgot to CHMOD? Clients want to see progress now!Bugs and issues can lie dormant for some time
What about...Many existing solutions are geared towards large projectsWhat about...the little guy;the small agencythe web app start up on an entry level VPS?
What's in store?A few simple techniques, scripts and ideas that we currently use to make deployment easy
Deployment: the basicsGet your latest code from version control, and stick it onlineKeep a central record of all the CHMOD / CHOWNing that you need to doSwap around your database connection details and other suitable configuration files
SVN ExportStart with a simple svn exportStore the date/time in a variable Create two folders, named with the current date/time. One within the web root, one outside of itTwo exports: public and private (or one export, and some moving around of folders – up to you!)
#!/bin/bashDATE=`date +%H-%M-%e-%m-%y`mkdir  /var/www/staging/$DATE/mkdir /var/www/staging-private/$DATE/svn export --quiet --username phpne --password PhpN3 httP://localhost/svn/project/trunk /var/www/staging/$DATE/svn export --quiet --username phpne --password PhpN3 http://localhost/svn/project/private /var/www/staging-private/$DATE/
SVN ExportKeep your servers svn client happy! It will ask what to do with the svn password, and nobody will listen – so tell it!sudonano /var/www/.subversion/serversstore-plaintext-passwords = no
Autonomyln –s /staging /live
AutonomyWhen the latest code is checked out, tests have been run, uploads imported, configuration changed and database patched we need to swap this into place instantlyThe answer: symlinks
#!/bin/bashDATE=`date +%H-%M-%e-%m-%y`...rm /home/user/public_html/ln –s /var/www/staging/$DATE/ /home/user/public_html/Sadly, you can’t edit a symlink, hence rm
My user profile pictures aren’t in version control…
User contributed filesStore them elsewhere?On a content delivery network?On a sub-domainSymlink themCopy them in post svn export?A bit nasty and takes time, and what about new user uploads during the copying process?
The database
Photo of database table not found, or mysql gone away error messagehttp://www.flickr.com/photos/meandmybadself/165846637/
Database changes: patchesFor database changes to apply on deploy, you need some deploy aware code in your project.  Multi-query patch processingSchema compare; its easy to forget a database patch!Backup database before applying patches
public function updateDatabase( $patchID, $some=false ) { 	// look for the next patch 	if( file_exists( FRAMEWORK_PATH . '../database/patches/' . ++$patchID . '.php' ) ) 	{ 		$sql = file_get_contents( FRAMEWORK_PATH . 	'../database/patches/' . $patchID . '.php' );		// apply the changes from the patch mysqli_multi_query( $sql ); 		// lather, rinse and repeat		$this->updateDatabase( $patchID, true ); 	} 	else if( $some ) 	{ 		// All done? Update patch ID in databasemysqli_query(“UPDATE settings SET `value`=” . $patchID-1 . “ WHERE `key`=‘database-patch-id’ ” );		exit();  	} }Apply your database patches
$testTables = array();mysqli_select_db( $config['patched_db'] );$result = mysql_query("SHOW TABLES");while( $row = mysql_fetch_row($result) ) {	$testTables[ $row[0] ] = array();}foreach( $testTables as $table => $fields ){	$result = mysql_query("SHOW COLUMNS FROM " . $table );	while( $row = mysql_fetch_assoc( $result ) ) 	{		$tables[ $table ][ $row['Field'] ] = $row;	}}Turn your database schema into an array
Compare your patched database to what you expectedhttp://joefreeman.co.uk/blog/2009/07/php-script-to-compare-mysql-database-schemas/
Databases: Test DatabaseIf you are applying changes to your database structure, you will need another test databaseChanges are first applied to the test databaseComparisons run against itUnit testing run against code working with that databaseWhen all is clear, the live database can be patched and upgraded
Ask the audienceDatabase integration, patching, testing and deployment is probably the weakest link in this deployment chain
Unit testingWhile its good practice to only commit code which passes unit tests, sometimes a commit can break existing code if you are a lazy svn updaterRun the unit tests against sandboxed code before pushing the deployment liveDid the deployment fail?
Unit testingBoth PHPUnit and PHP SimpleTest have command line interfaceOptions:Parse the output and look for errors; then continue once its doneStore a report, and require manual approval before continuing with deploymentphpunit –testdox-text somefile.txt MyTests*this isn’t a stage I’ve actually implemented in our deployment pipeline, just something I’m working on
The problem with including Unit TestsRunning unit tests take timeWe need to log deployment attempts, and try and deploy them once the tests have been runWe need a central deployment system
Photo of USB “kill switch”http://www.flickr.com/photos/stevendepolo/3517227492/
Triggering deployment: PHPecho shell_exec( ‘/var/deploy/deploy.sh ’ . $project . ‘ ‘ . $environment );What about root?Deployment script requires root access? Update sudoers file
PHP Deploy as RootEdit the sudoers fileSudovisudoCreate an alias for your deployment scriptsCmnd_Alias DPLY = /var/deploy/script1, /var/deploy/script2Let the webserver execute as root, without requiring a passwordwww-data	ALL=(ALL)	NOPASSWD:	    DPLY
Automating deploymentCronPostcommit hooksDo this for your bleeding edge staging area; its good to continually test code in its live server environmentScheduled deployments
Deployment InfrastructureDeploying projects across multiple servers?Send your commands over SSH to a remote serverImplement a skeleton deployment system on each server, called from a central deployment area
Build a deployment platformProjectsDeployment areas:BleedingStagingProductionConfigurations, reports and deployment schedules
RecapExport your repositoryApply your permission changesSwap in/out the appropriate configuration filesBackup your (test) databasePatch your databaseUnit test validationSwap in/out your configuration filesPull in user contributed filesBackup your environment databasePatch your live databaseUpdate your symlinks
Rolling backShit! That last deployment didn’t go as planned!Symlinks let you keep copiesDatabase backup before patches were applied – just incaseDatabase patch rollback files – allows you to keep new data but undo structural changesMake an undo button in your deployment platform; if you don’t you will need it – if you do, you wont*!* OK, I lied, you probably will at some point
CaveatsQueue cheesy stock photo of confused bean figure
CaveatsSome useful pointers when having multiple versions online (bleeding, staging and production)Keep robots out (robots.txt meta_robots)You don’t want search engines taking your users to the staging environment, nor do you want to be peanalised for duplicate contentKeep unwanted users out (.htaccess or limited user database)Make it clear that the environment is non-production – in case a production user stumbles upon staging!
ConclusionDeployment needs to take into account a lot of thingsSmall and simple home-brew scripts, processes and techniques should help you outLook at pulling them together into a simple web-based deployment centre
Deploy your projects quickly!@michaelpeacockmkpeacock@gmail.commichaelpeacock.co.ukhttp://slidesha.re/phpdeploy http://www.flickr.com/photos/jurvetson/4853963652/sizes/m/in/photostream/

Automated Deployment

  • 1.
    Automated DeploymentBuilding asimple automated deployment platform with PHP and LinuxMichael Peacock@michaelpeacockmichaelpeacock.co.uk
  • 2.
    whois?Senior / LeadWeb DeveloperZend Certified EngineerPublished AuthorPHP 5 Social Networking, PHP 5 E-Commerce development & more
  • 3.
    Deployment: (an) oldstyle approachTake website offline / put into maintenance modeBackup everythingUpload new files - FTPUpgrade databasePut online, and hope for the bestDo it twice: once for staging and once for deployment
  • 4.
  • 5.
    The problemDown timefor upgradesManual processFTP takes time; forgot to CHMOD? Clients want to see progress now!Bugs and issues can lie dormant for some time
  • 6.
    What about...Many existingsolutions are geared towards large projectsWhat about...the little guy;the small agencythe web app start up on an entry level VPS?
  • 7.
    What's in store?Afew simple techniques, scripts and ideas that we currently use to make deployment easy
  • 8.
    Deployment: the basicsGetyour latest code from version control, and stick it onlineKeep a central record of all the CHMOD / CHOWNing that you need to doSwap around your database connection details and other suitable configuration files
  • 9.
    SVN ExportStart witha simple svn exportStore the date/time in a variable Create two folders, named with the current date/time. One within the web root, one outside of itTwo exports: public and private (or one export, and some moving around of folders – up to you!)
  • 10.
    #!/bin/bashDATE=`date +%H-%M-%e-%m-%y`mkdir /var/www/staging/$DATE/mkdir /var/www/staging-private/$DATE/svn export --quiet --username phpne --password PhpN3 httP://localhost/svn/project/trunk /var/www/staging/$DATE/svn export --quiet --username phpne --password PhpN3 http://localhost/svn/project/private /var/www/staging-private/$DATE/
  • 11.
    SVN ExportKeep yourservers svn client happy! It will ask what to do with the svn password, and nobody will listen – so tell it!sudonano /var/www/.subversion/serversstore-plaintext-passwords = no
  • 12.
  • 13.
    AutonomyWhen the latestcode is checked out, tests have been run, uploads imported, configuration changed and database patched we need to swap this into place instantlyThe answer: symlinks
  • 14.
    #!/bin/bashDATE=`date +%H-%M-%e-%m-%y`...rm /home/user/public_html/ln–s /var/www/staging/$DATE/ /home/user/public_html/Sadly, you can’t edit a symlink, hence rm
  • 15.
    My user profilepictures aren’t in version control…
  • 16.
    User contributed filesStorethem elsewhere?On a content delivery network?On a sub-domainSymlink themCopy them in post svn export?A bit nasty and takes time, and what about new user uploads during the copying process?
  • 17.
  • 18.
    Photo of databasetable not found, or mysql gone away error messagehttp://www.flickr.com/photos/meandmybadself/165846637/
  • 19.
    Database changes: patchesFordatabase changes to apply on deploy, you need some deploy aware code in your project. Multi-query patch processingSchema compare; its easy to forget a database patch!Backup database before applying patches
  • 20.
    public function updateDatabase($patchID, $some=false ) { // look for the next patch if( file_exists( FRAMEWORK_PATH . '../database/patches/' . ++$patchID . '.php' ) ) { $sql = file_get_contents( FRAMEWORK_PATH . '../database/patches/' . $patchID . '.php' ); // apply the changes from the patch mysqli_multi_query( $sql ); // lather, rinse and repeat $this->updateDatabase( $patchID, true ); } else if( $some ) { // All done? Update patch ID in databasemysqli_query(“UPDATE settings SET `value`=” . $patchID-1 . “ WHERE `key`=‘database-patch-id’ ” ); exit(); } }Apply your database patches
  • 21.
    $testTables = array();mysqli_select_db($config['patched_db'] );$result = mysql_query("SHOW TABLES");while( $row = mysql_fetch_row($result) ) { $testTables[ $row[0] ] = array();}foreach( $testTables as $table => $fields ){ $result = mysql_query("SHOW COLUMNS FROM " . $table ); while( $row = mysql_fetch_assoc( $result ) ) { $tables[ $table ][ $row['Field'] ] = $row; }}Turn your database schema into an array
  • 22.
    Compare your patcheddatabase to what you expectedhttp://joefreeman.co.uk/blog/2009/07/php-script-to-compare-mysql-database-schemas/
  • 23.
    Databases: Test DatabaseIfyou are applying changes to your database structure, you will need another test databaseChanges are first applied to the test databaseComparisons run against itUnit testing run against code working with that databaseWhen all is clear, the live database can be patched and upgraded
  • 24.
    Ask the audienceDatabaseintegration, patching, testing and deployment is probably the weakest link in this deployment chain
  • 25.
    Unit testingWhile itsgood practice to only commit code which passes unit tests, sometimes a commit can break existing code if you are a lazy svn updaterRun the unit tests against sandboxed code before pushing the deployment liveDid the deployment fail?
  • 26.
    Unit testingBoth PHPUnitand PHP SimpleTest have command line interfaceOptions:Parse the output and look for errors; then continue once its doneStore a report, and require manual approval before continuing with deploymentphpunit –testdox-text somefile.txt MyTests*this isn’t a stage I’ve actually implemented in our deployment pipeline, just something I’m working on
  • 27.
    The problem withincluding Unit TestsRunning unit tests take timeWe need to log deployment attempts, and try and deploy them once the tests have been runWe need a central deployment system
  • 28.
    Photo of USB“kill switch”http://www.flickr.com/photos/stevendepolo/3517227492/
  • 29.
    Triggering deployment: PHPechoshell_exec( ‘/var/deploy/deploy.sh ’ . $project . ‘ ‘ . $environment );What about root?Deployment script requires root access? Update sudoers file
  • 30.
    PHP Deploy asRootEdit the sudoers fileSudovisudoCreate an alias for your deployment scriptsCmnd_Alias DPLY = /var/deploy/script1, /var/deploy/script2Let the webserver execute as root, without requiring a passwordwww-data ALL=(ALL) NOPASSWD: DPLY
  • 31.
    Automating deploymentCronPostcommit hooksDothis for your bleeding edge staging area; its good to continually test code in its live server environmentScheduled deployments
  • 32.
    Deployment InfrastructureDeploying projectsacross multiple servers?Send your commands over SSH to a remote serverImplement a skeleton deployment system on each server, called from a central deployment area
  • 33.
    Build a deploymentplatformProjectsDeployment areas:BleedingStagingProductionConfigurations, reports and deployment schedules
  • 34.
    RecapExport your repositoryApplyyour permission changesSwap in/out the appropriate configuration filesBackup your (test) databasePatch your databaseUnit test validationSwap in/out your configuration filesPull in user contributed filesBackup your environment databasePatch your live databaseUpdate your symlinks
  • 35.
    Rolling backShit! Thatlast deployment didn’t go as planned!Symlinks let you keep copiesDatabase backup before patches were applied – just incaseDatabase patch rollback files – allows you to keep new data but undo structural changesMake an undo button in your deployment platform; if you don’t you will need it – if you do, you wont*!* OK, I lied, you probably will at some point
  • 36.
    CaveatsQueue cheesy stockphoto of confused bean figure
  • 37.
    CaveatsSome useful pointerswhen having multiple versions online (bleeding, staging and production)Keep robots out (robots.txt meta_robots)You don’t want search engines taking your users to the staging environment, nor do you want to be peanalised for duplicate contentKeep unwanted users out (.htaccess or limited user database)Make it clear that the environment is non-production – in case a production user stumbles upon staging!
  • 38.
    ConclusionDeployment needs totake into account a lot of thingsSmall and simple home-brew scripts, processes and techniques should help you outLook at pulling them together into a simple web-based deployment centre
  • 39.
    Deploy your projectsquickly!@michaelpeacockmkpeacock@gmail.commichaelpeacock.co.ukhttp://slidesha.re/phpdeploy http://www.flickr.com/photos/jurvetson/4853963652/sizes/m/in/photostream/

Editor's Notes

  • #22 Store expected schema, and generate schema array from applied patches.