Atkins Metro Division
Atki M t Di i i (ME&I)
Building Information Modeling (BIM)
       g                    g(    )
Benefits of BIM
• Better visualisation of the design, providing earlier, more
  accurate and more easily understood designs;

• Provides better quality design, which is integrated and
  optimised;
    ti i d

• Improves communication and collaboration across multiple
  design disciplines;

•R d
 Reduces risk th
          i k through d t ti of clashes and errors ;
                    h detection f l h     d

• Reduces rework resulting in reduced abortive material and
  time, thus reducing cost;

•R d
 Reduces errors and omissions i construction d
                  d   i i     in    t ti documents;
                                                t

• Reduces cycle time of specific workflows;
Benefits of BIM
• Brings forward clash detection within the design cycle,
  thereby introducing cost efficiencies to the project –
  earlier/faster design decisions/problem resolution;

• P id greater certainty th t th d i i f ll coordinated
  Provides     t   t i t that the design is fully di t d
  and design documentation is consistent;

• Improved project process outcomes, such as fewer RFIs and
  site coordination problems;

• Better multi-party communication and understanding from
  3D visualisation;

• Reduced construction cost through reduced changes during
  construction;
      t ti

• Fewer claims/litigation/disputes/conflicts;
BIM Projects
                               j
• Dubai Metro
   – G L Al Qusais 2 Station
     G.L.
   – G.L. Metro Entrance pods (27 No.)
• Mekkah Metro, KSA
   –   Arafat 1 station
   –   Muzadlifah 1 station (WIP)
   –   Jamarat St ti (WIP)
       J       t Station
   –   Operation and Control Centre (OCC)
• Kolkata Metro, India
          Metro
   – Howrah Maidan Station UG 2 Line
• Abu Dhabi Pumping Station
                 p g
• Lusail Metro, Qatar
Design Co-ordination and BIM
    g




                 External Façade view
BIM (Revit) – Ab
    (R it) Above ground station, Dubai M t
                          d t ti  D b i Metro
Design Co-ordination and BIM
    g




            Structures and E&M Services view
    BIM (Revit) – Ab
        (R it) Above ground station, Dubai M t
                           d t ti    D b i Metro
Design Coordination and BIM
       g




Metro Station Ground Floor Level 3D MEP View
Design Coordination and BIM
    g
Design Coordination and BIM
           g




Dubai Metro Entrance Pods
Better Co-ordination of all disciplines:
       Co ordination
Station Entrance Pod showing MEP Services with Architectural Envelope
Design Coordination and BIM
    g




Mecca Metro – Arafat 1 Station
Design Coordination and BIM
    g




Mecca Metro – Arafat 1 Station
Design Coordination and BIM
           g




Mecca Metro –
Arafat 1 Station MEP/Rail Systems Back-of-House area
M&E Combined Services Drawing
BIM generated 2D Co-ordinated Layout and Sections
                 Co ordinated
M&E Combined Services Drawing
BIM generated 2D Co-ordinated Layout and Sections
                 Co ordinated
Summary
                        y

Atkins BIM/Design Coordination capability

– 3 years experience using Revit BIM
  technology;
– Used on complex, fast track rail projects;
                     fast-track
– Proven design coordination capability;
– Delivered p j
            projects usingg
   – Revit Architecture,
   – Revit Structures and
   – Revit MEP;
– Adopted BS1192:2007
  project collaboration protocol;

Atkins BIM Capability

  • 1.
    Atkins Metro Division AtkiM t Di i i (ME&I) Building Information Modeling (BIM) g g( )
  • 2.
    Benefits of BIM •Better visualisation of the design, providing earlier, more accurate and more easily understood designs; • Provides better quality design, which is integrated and optimised; ti i d • Improves communication and collaboration across multiple design disciplines; •R d Reduces risk th i k through d t ti of clashes and errors ; h detection f l h d • Reduces rework resulting in reduced abortive material and time, thus reducing cost; •R d Reduces errors and omissions i construction d d i i in t ti documents; t • Reduces cycle time of specific workflows;
  • 3.
    Benefits of BIM •Brings forward clash detection within the design cycle, thereby introducing cost efficiencies to the project – earlier/faster design decisions/problem resolution; • P id greater certainty th t th d i i f ll coordinated Provides t t i t that the design is fully di t d and design documentation is consistent; • Improved project process outcomes, such as fewer RFIs and site coordination problems; • Better multi-party communication and understanding from 3D visualisation; • Reduced construction cost through reduced changes during construction; t ti • Fewer claims/litigation/disputes/conflicts;
  • 4.
    BIM Projects j • Dubai Metro – G L Al Qusais 2 Station G.L. – G.L. Metro Entrance pods (27 No.) • Mekkah Metro, KSA – Arafat 1 station – Muzadlifah 1 station (WIP) – Jamarat St ti (WIP) J t Station – Operation and Control Centre (OCC) • Kolkata Metro, India Metro – Howrah Maidan Station UG 2 Line • Abu Dhabi Pumping Station p g • Lusail Metro, Qatar
  • 5.
    Design Co-ordination andBIM g External Façade view BIM (Revit) – Ab (R it) Above ground station, Dubai M t d t ti D b i Metro
  • 6.
    Design Co-ordination andBIM g Structures and E&M Services view BIM (Revit) – Ab (R it) Above ground station, Dubai M t d t ti D b i Metro
  • 7.
    Design Coordination andBIM g Metro Station Ground Floor Level 3D MEP View
  • 8.
  • 9.
    Design Coordination andBIM g Dubai Metro Entrance Pods Better Co-ordination of all disciplines: Co ordination Station Entrance Pod showing MEP Services with Architectural Envelope
  • 10.
    Design Coordination andBIM g Mecca Metro – Arafat 1 Station
  • 11.
    Design Coordination andBIM g Mecca Metro – Arafat 1 Station
  • 12.
    Design Coordination andBIM g Mecca Metro – Arafat 1 Station MEP/Rail Systems Back-of-House area
  • 13.
    M&E Combined ServicesDrawing BIM generated 2D Co-ordinated Layout and Sections Co ordinated
  • 14.
    M&E Combined ServicesDrawing BIM generated 2D Co-ordinated Layout and Sections Co ordinated
  • 15.
    Summary y Atkins BIM/Design Coordination capability – 3 years experience using Revit BIM technology; – Used on complex, fast track rail projects; fast-track – Proven design coordination capability; – Delivered p j projects usingg – Revit Architecture, – Revit Structures and – Revit MEP; – Adopted BS1192:2007 project collaboration protocol;