Kauai Community College, Office of Continuing Education       Sustainability Series                              Applied Sustainability on Kaua`i


        David Orr (4:30min) on “The Design Problem” [Riff on Tom Toles cartoon.] [Oct 06]
         3:51 – 7:00

        John R. Ehrenfeld (4min) on “Sustainabililty is Something Else” Author of “Sustainability by Design” [Apr 09]
         38:00 – 42:10  http/::collegerama.tudelft.nl:mediasite:Viewer:%3Fpeid=ef7d15a28e4e4d93a0262f14486283b7




The Kauaian Institute                                             Ken Stokes                                                        kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i



                                                  DESIGN PROBLEM




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education                 Sustainability Series                                  Applied Sustainability on Kaua`i




                                            A Lifecycle Assessment of U.S. Household Consumption, Christopher M. Jones, 2005
The Kauaian Institute                                                       Ken Stokes                                                            kauaian.net
Kauai Community College, Office of Continuing Education                Sustainability Series                              Applied Sustainability on Kaua`i




                                       A Lifecycle Assessment of U.S. Household Consumption, Christopher M. Jones, 2005

The Kauaian Institute                                                      Ken Stokes                                                        kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series                             Applied Sustainability on Kaua`i


         Dominant model                                                           Sustainable model
             infinite competitive growth                                            life cycle of the organism

                   MAXIMUM ENTROPY                                                        ZERO ENTROPY




             bigger fish swallowing the smaller                                       self-similar fractal structure
           laying waste to everything in its path                                     cycles turning within cycles

                            like a hurricane                                           the secret of sustainability


       no closed cycle to hold resources within                                         dynamically closed cycle
       or to build up stable organized structures                                  enables stable organized structures
                                                                                    to build up and in a balanced way

 from “Dream Farm” by physicist Mae-Wan Ho
The Kauaian Institute                                         Ken Stokes                                                       kauaian.net
Kauai Community College, Office of Continuing Education    Sustainability Series   Applied Sustainability on Kaua`i




                                                          ENERGY




The Kauaian Institute                                          Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education                Sustainability Series       Applied Sustainability on Kaua`i



                                         MORE HOCKEY STICKS




                                                          SOURCE: PLAN B 4.0, Lester Brown, 2009




The Kauaian Institute                                                      Ken Stokes                                 kauaian.net
Kauai Community College, Office of Continuing Education       Sustainability Series                           Applied Sustainability on Kaua`i


                                                          80% BY 2020?
                                                                                      Cutting CO2 emissions 80 percent by 2020
                                                                                      will take a worldwide mobilization at wartime
                                                                                      speed.

                                                                                      First, investing in energy efficiency will allow
                                                                                      us to keep global energy demand from
                                                                                      increasing.

                                                                                      Then we can cut carbon emissions by one
                                                                                      third by replacing fossil fuels with renewable
                                                                                      energy sources for electricity and heat
                                                                                      production.

                                                                                      A further 14 percent drop comes from
                                                                                      restructuring our transportation systems and
                                                                                      reducing coal and oil use in industry.

                                                                                      Ending net deforestation worldwide can cut
                                                                                      CO2 emissions another 16 percent.

                                                                                      Last, planting trees and managing soils to
                                                                                      sequester carbon can absorb 17 percent of
                                                                                      our current emissions.

                                                                                      None of these initiatives depends on new
                                                                                      technologies. We know what needs to be
                                                                                      done to reduce CO2 emissions 80 percent by
                                                                                      2020.

                                                                                      All that is needed now is leadership.




The Kauaian Institute                                             Ken Stokes                                                     kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i



                                      ENERGY TECH FOOTPRINTS




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education                 Sustainability Series                                       Applied Sustainability on Kaua`i


                                            COST OF ENERGY TECH




        Source: RE-AMP study of the Midwestern energy system. This map distills the inter-relationships of the Four Fronts. The systems needs to increase
        the stocks in blue and decrease the stocks in red in order to accomplish its goal of reducing GHG 80% by 2030. The blue arrows note positive flows

The Kauaian Institute                                                       Ken Stokes                                                                 kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education          Sustainability Series                    Applied Sustainability on Kaua`i



 KAUA`I’S RENEWABLE ENERGY POTENTIAL




                                       SOURCE: Black & Vietch, Renewable Energy Tech Assessment, Mar 05



The Kauaian Institute                                                Ken Stokes                                              kauaian.net
Kauai Community College, Office of Continuing Education         Sustainability Series                          Applied Sustainability on Kaua`i


  KAUA`I’S RENEWABLE ENERGY POTENTIAL




                        SOURCE: Presentations by McKinsey and Booze Hamilton for Hawaii Clean Energy Initiative, 2009

The Kauaian Institute                                               Ken Stokes                                                    kauaian.net
Kauai Community College, Office of Continuing Education             Sustainability Series                Applied Sustainability on Kaua`i



       NEED MORE FOSSIL FUEL GENERATION?



                                                                                                  GENX




                                                                                            BIOMASS
                                                                                            & HYDRO




                                                      SOURCE: KIUC Equity Management Plan, 2009
The Kauaian Institute                                                   Ken Stokes                                          kauaian.net
Kauai Community College, Office of Continuing Education            Sustainability Series                       Applied Sustainability on Kaua`i


          KAUA`I RENEWABLES COST SCENARIO




                                             NOTE: In 2008, KIUC emissions totaled 322,000 tons of GWP.

                                    SOURCE: Estimates by The Kauaian Institute based on 2008 U.S. cost data.


The Kauaian Institute                                                  Ken Stokes                                                 kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i


                        UTILITIES SYSTEMS ILLUSTRATED




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i



              Systems Thinking About Energy




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




                                                          FOOD




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education                 Sustainability Series             Applied Sustainability on Kaua`i




                                                     Source: National Renewable Energy Lab (NREL), 2008
The Kauaian Institute                                                       Ken Stokes                                       kauaian.net
Kauai Community College, Office of Continuing Education                   Sustainability Series                     Applied Sustainability on Kaua`i




                                                   Source: University of Michigan, Center for Sustainable Systems


The Kauaian Institute                                                         Ken Stokes                                               kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education                Sustainability Series                                Applied Sustainability on Kaua`i




                                                     Source: 2005 Honolulu Consumer Expenditure Survey
                                             NOTE: The Hawai`i median household spends 37% more than ‘Living Wage’ budget
The Kauaian Institute                                                      Ken Stokes                                                          kauaian.net
Kauai Community College, Office of Continuing Education                    Sustainability Series              Applied Sustainability on Kaua`i




                                                          Source: 2005 Honolulu Consumer Expenditure Survey
The Kauaian Institute                                                          Ken Stokes                                        kauaian.net
Kauai Community College, Office of Continuing Education                     Sustainability Series                    Applied Sustainability on Kaua`i




                                                   Ratio of Actual
                                                   to Thrifty Dollars




                                                              Source: USDA, Thrifty Food Plan Report 2006
                                                          NOTE: HI households spend 17% less than ‘Thrifty’ budget
The Kauaian Institute                                                           Ken Stokes                                              kauaian.net
Kauai Community College, Office of Continuing Education        Sustainability Series     Applied Sustainability on Kaua`i


                   KAUA`I FOOD SPENDING IN CONTEXT




                                                          SOURCE: 2002 Economic Census


The Kauaian Institute                                              Ken Stokes                               kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education             Sustainability Series                  Applied Sustainability on Kaua`i




                    ”Industrial farming does not have the biodiversity and reciprocity
              to hold the energy within and ends up generating a lot of waste and entropy
                       and depleting the soil. Entropy exported to the environment
                           will simply mean diminished environmental input.

   Anaerobic digestion of livestock and other wastes saves carbon emissions twice over,
      by preventing the serious greenhouse gases methane and nitrous oxide from
         reaching the atmosphere, and by methane substituting for fossil fuel use
                             to run vehicles and farm machinery.

         The thermodynamics of organisms and sustainable systems tells us not only
        why we must move away from the dominant environmental bubble economy,
    but especially how we can create a healthier, richer, more equitable and satisfying life
                     without fossil fuels, and we should start right now."

                                                               Mae-Wan Ho
                                                         Physicist, Institute for Science in Society
                                             Inventor of the “Zero Emissions Food and Energy (ZEFE) Farm




The Kauaian Institute                                                   Ken Stokes                                            kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education               Sustainability Series           Applied Sustainability on Kaua`i


                                           ZEFE Farms on Kaua`i




                                                           Towns average 0.7 acres per person.
                                                      ZEFE land requirement = 0.36 acres per person
                                                      Kauai needs 116 ZEFE farms of 200 acres each.
                                                               Capital investment ~ $250M



The Kauaian Institute                                                     Ken Stokes                                     kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education                 Sustainability Series                                         Applied Sustainability on Kaua`i
                                                    THE THREE TRAPS OF COMMODITY SYSTEMS

                                                                    Resource Depletion Trap:
                                                                    The Production Growth Drivers lead to increases in Harvest rate. If Harvest
                                                                    rate is higher than Regeneration rate, then Resource level will decline.
                                                                    Although many people expect the Cost of acquiring the resource to limit Total
                                                                    production, this signal is often too weak or too delayed to do so.


                                                                    Community Decline Trap:
                                                                    The Production growth drivers push down Price—and a greater Producer-
                                                                    buyer power differential will drive down Price all the more. Falling price
                                                                    reduces the Producer’s income (even more so when the Producer-landlord or
                                                                    supplier power differential is great). Falling income increases the
                                                                    Consolidation rate of producers, decreasing the Number of producers and
                                                                    lowering Community well-being indicators. Feedback is missing however, that
                                                                    might solve the problem. Neither the falling Community well-being nor the
                                                                    falling Producer’s income affect Capacity.



Environmental Pollution Trap:
                                                          The Production growth drivers
                                                          push the rate of Waste
                                                          generation upwards. Over time,
                                                          if the Waste generation rate
                                                          surpasses the Purification rate,
                                                          the    Waste    level    builds.
                                                          However, the connection from
                                                          the Waste level to Capacity is
                                                          weak or missing in most
                                                          commodity systems.




                                                                                         Excerpted from: Commodity System Challenges, April 2003
                                                                                                www.sustainabilityinstitute.org/pubs/SustainableCommoditySys.2.1.pdf
The Kauaian Institute                                                       Ken Stokes                                                                   kauaian.net
Kauai Community College, Office of Continuing Education                 Sustainability Series                           Applied Sustainability on Kaua`i


                                    FOOD SYSTEM LEVERAGE




                                            SOURCE: Sustainable Food Lab, “Innovations for Healthy Value Chains, 2008


The Kauaian Institute                                                       Ken Stokes                                                     kauaian.net
Kauai Community College, Office of Continuing Education     Sustainability Series   Applied Sustainability on Kaua`i




                                                          TRANSPORT




The Kauaian Institute                                           Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education       Sustainability Series                            Applied Sustainability on Kaua`i




                           SOURCE: EcoLane, UK Life Cycle Assessment of Vehicle Fuels and Technologies, 2007
The Kauaian Institute                                             Ken Stokes                                                      kauaian.net
Kauai Community College, Office of Continuing Education      Sustainability Series                             Applied Sustainability on Kaua`i


               ELECTRIC VEHICLES DRIVE CHEAPER




    NOTE: American drivers spent $280 billion for gas last year, when the equivalent miles in an EV would have cost $66 billion.
                                  SOURCE: Lester Brown, Plan B, Earth Policy Institute, 2007
The Kauaian Institute                                            Ken Stokes                                                       kauaian.net
Kauai Community College, Office of Continuing Education              Sustainability Series                       Applied Sustainability on Kaua`i


                                           BIOFUEL FOOTPRINTS




                                             Source: Natural Logic, The Ecological Footprint of Biofuels, 2008


The Kauaian Institute                                                    Ken Stokes                                                 kauaian.net
Kauai Community College, Office of Continuing Education                  Sustainability Series            Applied Sustainability on Kaua`i


                                  VEHICLE MILES TRAVELED




                                                          SOURCE: KPAA Community Indicators 2008 Update


The Kauaian Institute                                                        Ken Stokes                                      kauaian.net
Kauai Community College, Office of Continuing Education             Sustainability Series       Applied Sustainability on Kaua`i


                                     KAUA`I ENERGY TRENDS




                                                          SOURCE: DBEDT Monthly Energy Trends
The Kauaian Institute                                                   Ken Stokes                                 kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net
Kauai Community College, Office of Continuing Education                Sustainability Series               Applied Sustainability on Kaua`i

                        KAUA`I DISTRIBUTION OF JOBS AND WORKERS




                                                          Source: Census 2000 & County Business Patterns


The Kauaian Institute                                                      Ken Stokes                                         kauaian.net
Kauai Community College, Office of Continuing Education                Sustainability Series               Applied Sustainability on Kaua`i




                                                          Source: Census 2000 & County Business Patterns




                                                                     Source: Census 2000
The Kauaian Institute                                                      Ken Stokes                                         kauaian.net
Kauai Community College, Office of Continuing Education                    Sustainability Series                             Applied Sustainability on Kaua`i


                                         KAUAIAN                                   LANDLINES
                                                          GREENER, CHEAPER

                                  Commute Vehicle Substitution Scenario

        Households                                          20,183                                 Van cost (@ $40k)        $83 M
                                                                                                   EV replacement* (@ $20k) $404 M
       Employed                                         26,789                                     Total replacement cost $487 M
       Emp in town                                   5,920 (22%)                                    Fleet cost saving        12%
       Carpool                                       4,143 (16%)
                                                                                                   JTW Miles (@ 25 daily)          469,928
        JTW Trips (between towns) 18,797                                                            Miles w/ van                    65,214
                                                                                                    Fleet miles saving               86%
       Vehicles                                             36,800
                                                                                                   Gas ($4 @ 22mpg)                $84,587
       Fleet value (@ $15k)                                $552 M                                  Gas w/ van ($4 @ 11mpg)         $23,477
                                                                                                    Gas cost saving                 72%


                                                                                             * 1 per household


                                                          Source: The Kauaian Institute and Census 2000 data

The Kauaian Institute                                                          Ken Stokes                                                       kauaian.net
Kauai Community College, Office of Continuing Education                 Sustainability Series                    Applied Sustainability on Kaua`i


                                       FOOTPRINT REDUCTION




                                                                                                         Selected Scenario:
                                                                                                         50% reduced miles
                                                                                                         Triple mileage

                                                          Transport Scenarios for Footprint Reduction




                                                                                                        Transport target for achieving One
                                                                                                        Planet Living (0.23 gha)
 SOURCE: Scotland’s Footprint, Best Foot Forward, 2008
The Kauaian Institute                                                       Ken Stokes                                              kauaian.net
Kauai Community College, Office of Continuing Education   Sustainability Series   Applied Sustainability on Kaua`i




The Kauaian Institute                                         Ken Stokes                             kauaian.net

ASOK 4

  • 1.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i  David Orr (4:30min) on “The Design Problem” [Riff on Tom Toles cartoon.] [Oct 06] 3:51 – 7:00  John R. Ehrenfeld (4min) on “Sustainabililty is Something Else” Author of “Sustainability by Design” [Apr 09] 38:00 – 42:10 http/::collegerama.tudelft.nl:mediasite:Viewer:%3Fpeid=ef7d15a28e4e4d93a0262f14486283b7 The Kauaian Institute Ken Stokes kauaian.net
  • 2.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i DESIGN PROBLEM The Kauaian Institute Ken Stokes kauaian.net
  • 3.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i A Lifecycle Assessment of U.S. Household Consumption, Christopher M. Jones, 2005 The Kauaian Institute Ken Stokes kauaian.net
  • 4.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i A Lifecycle Assessment of U.S. Household Consumption, Christopher M. Jones, 2005 The Kauaian Institute Ken Stokes kauaian.net
  • 5.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i Dominant model Sustainable model infinite competitive growth life cycle of the organism MAXIMUM ENTROPY ZERO ENTROPY bigger fish swallowing the smaller self-similar fractal structure laying waste to everything in its path cycles turning within cycles like a hurricane the secret of sustainability no closed cycle to hold resources within dynamically closed cycle or to build up stable organized structures enables stable organized structures to build up and in a balanced way from “Dream Farm” by physicist Mae-Wan Ho The Kauaian Institute Ken Stokes kauaian.net
  • 6.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i ENERGY The Kauaian Institute Ken Stokes kauaian.net
  • 7.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i MORE HOCKEY STICKS SOURCE: PLAN B 4.0, Lester Brown, 2009 The Kauaian Institute Ken Stokes kauaian.net
  • 8.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i 80% BY 2020? Cutting CO2 emissions 80 percent by 2020 will take a worldwide mobilization at wartime speed. First, investing in energy efficiency will allow us to keep global energy demand from increasing. Then we can cut carbon emissions by one third by replacing fossil fuels with renewable energy sources for electricity and heat production. A further 14 percent drop comes from restructuring our transportation systems and reducing coal and oil use in industry. Ending net deforestation worldwide can cut CO2 emissions another 16 percent. Last, planting trees and managing soils to sequester carbon can absorb 17 percent of our current emissions. None of these initiatives depends on new technologies. We know what needs to be done to reduce CO2 emissions 80 percent by 2020. All that is needed now is leadership. The Kauaian Institute Ken Stokes kauaian.net
  • 9.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i ENERGY TECH FOOTPRINTS The Kauaian Institute Ken Stokes kauaian.net
  • 10.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i COST OF ENERGY TECH Source: RE-AMP study of the Midwestern energy system. This map distills the inter-relationships of the Four Fronts. The systems needs to increase the stocks in blue and decrease the stocks in red in order to accomplish its goal of reducing GHG 80% by 2030. The blue arrows note positive flows The Kauaian Institute Ken Stokes kauaian.net
  • 11.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 12.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i KAUA`I’S RENEWABLE ENERGY POTENTIAL SOURCE: Black & Vietch, Renewable Energy Tech Assessment, Mar 05 The Kauaian Institute Ken Stokes kauaian.net
  • 13.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i KAUA`I’S RENEWABLE ENERGY POTENTIAL SOURCE: Presentations by McKinsey and Booze Hamilton for Hawaii Clean Energy Initiative, 2009 The Kauaian Institute Ken Stokes kauaian.net
  • 14.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i NEED MORE FOSSIL FUEL GENERATION? GENX BIOMASS & HYDRO SOURCE: KIUC Equity Management Plan, 2009 The Kauaian Institute Ken Stokes kauaian.net
  • 15.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i KAUA`I RENEWABLES COST SCENARIO NOTE: In 2008, KIUC emissions totaled 322,000 tons of GWP. SOURCE: Estimates by The Kauaian Institute based on 2008 U.S. cost data. The Kauaian Institute Ken Stokes kauaian.net
  • 16.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i UTILITIES SYSTEMS ILLUSTRATED The Kauaian Institute Ken Stokes kauaian.net
  • 17.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i Systems Thinking About Energy The Kauaian Institute Ken Stokes kauaian.net
  • 18.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i FOOD The Kauaian Institute Ken Stokes kauaian.net
  • 19.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i Source: National Renewable Energy Lab (NREL), 2008 The Kauaian Institute Ken Stokes kauaian.net
  • 20.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i Source: University of Michigan, Center for Sustainable Systems The Kauaian Institute Ken Stokes kauaian.net
  • 21.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 22.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 23.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i Source: 2005 Honolulu Consumer Expenditure Survey NOTE: The Hawai`i median household spends 37% more than ‘Living Wage’ budget The Kauaian Institute Ken Stokes kauaian.net
  • 24.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i Source: 2005 Honolulu Consumer Expenditure Survey The Kauaian Institute Ken Stokes kauaian.net
  • 25.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i Ratio of Actual to Thrifty Dollars Source: USDA, Thrifty Food Plan Report 2006 NOTE: HI households spend 17% less than ‘Thrifty’ budget The Kauaian Institute Ken Stokes kauaian.net
  • 26.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i KAUA`I FOOD SPENDING IN CONTEXT SOURCE: 2002 Economic Census The Kauaian Institute Ken Stokes kauaian.net
  • 27.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 28.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i ”Industrial farming does not have the biodiversity and reciprocity to hold the energy within and ends up generating a lot of waste and entropy and depleting the soil. Entropy exported to the environment will simply mean diminished environmental input. Anaerobic digestion of livestock and other wastes saves carbon emissions twice over, by preventing the serious greenhouse gases methane and nitrous oxide from reaching the atmosphere, and by methane substituting for fossil fuel use to run vehicles and farm machinery. The thermodynamics of organisms and sustainable systems tells us not only why we must move away from the dominant environmental bubble economy, but especially how we can create a healthier, richer, more equitable and satisfying life without fossil fuels, and we should start right now." Mae-Wan Ho Physicist, Institute for Science in Society Inventor of the “Zero Emissions Food and Energy (ZEFE) Farm The Kauaian Institute Ken Stokes kauaian.net
  • 29.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 30.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 31.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i ZEFE Farms on Kaua`i Towns average 0.7 acres per person. ZEFE land requirement = 0.36 acres per person Kauai needs 116 ZEFE farms of 200 acres each. Capital investment ~ $250M The Kauaian Institute Ken Stokes kauaian.net
  • 32.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 33.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i THE THREE TRAPS OF COMMODITY SYSTEMS Resource Depletion Trap: The Production Growth Drivers lead to increases in Harvest rate. If Harvest rate is higher than Regeneration rate, then Resource level will decline. Although many people expect the Cost of acquiring the resource to limit Total production, this signal is often too weak or too delayed to do so. Community Decline Trap: The Production growth drivers push down Price—and a greater Producer- buyer power differential will drive down Price all the more. Falling price reduces the Producer’s income (even more so when the Producer-landlord or supplier power differential is great). Falling income increases the Consolidation rate of producers, decreasing the Number of producers and lowering Community well-being indicators. Feedback is missing however, that might solve the problem. Neither the falling Community well-being nor the falling Producer’s income affect Capacity. Environmental Pollution Trap: The Production growth drivers push the rate of Waste generation upwards. Over time, if the Waste generation rate surpasses the Purification rate, the Waste level builds. However, the connection from the Waste level to Capacity is weak or missing in most commodity systems. Excerpted from: Commodity System Challenges, April 2003 www.sustainabilityinstitute.org/pubs/SustainableCommoditySys.2.1.pdf The Kauaian Institute Ken Stokes kauaian.net
  • 34.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i FOOD SYSTEM LEVERAGE SOURCE: Sustainable Food Lab, “Innovations for Healthy Value Chains, 2008 The Kauaian Institute Ken Stokes kauaian.net
  • 35.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i TRANSPORT The Kauaian Institute Ken Stokes kauaian.net
  • 36.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 37.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i SOURCE: EcoLane, UK Life Cycle Assessment of Vehicle Fuels and Technologies, 2007 The Kauaian Institute Ken Stokes kauaian.net
  • 38.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i ELECTRIC VEHICLES DRIVE CHEAPER NOTE: American drivers spent $280 billion for gas last year, when the equivalent miles in an EV would have cost $66 billion. SOURCE: Lester Brown, Plan B, Earth Policy Institute, 2007 The Kauaian Institute Ken Stokes kauaian.net
  • 39.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i BIOFUEL FOOTPRINTS Source: Natural Logic, The Ecological Footprint of Biofuels, 2008 The Kauaian Institute Ken Stokes kauaian.net
  • 40.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i VEHICLE MILES TRAVELED SOURCE: KPAA Community Indicators 2008 Update The Kauaian Institute Ken Stokes kauaian.net
  • 41.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i KAUA`I ENERGY TRENDS SOURCE: DBEDT Monthly Energy Trends The Kauaian Institute Ken Stokes kauaian.net
  • 42.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net
  • 43.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i KAUA`I DISTRIBUTION OF JOBS AND WORKERS Source: Census 2000 & County Business Patterns The Kauaian Institute Ken Stokes kauaian.net
  • 44.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i Source: Census 2000 & County Business Patterns Source: Census 2000 The Kauaian Institute Ken Stokes kauaian.net
  • 45.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i KAUAIAN LANDLINES GREENER, CHEAPER Commute Vehicle Substitution Scenario Households 20,183 Van cost (@ $40k) $83 M EV replacement* (@ $20k) $404 M Employed 26,789 Total replacement cost $487 M Emp in town 5,920 (22%) Fleet cost saving 12% Carpool 4,143 (16%) JTW Miles (@ 25 daily) 469,928 JTW Trips (between towns) 18,797 Miles w/ van 65,214 Fleet miles saving 86% Vehicles 36,800 Gas ($4 @ 22mpg) $84,587 Fleet value (@ $15k) $552 M Gas w/ van ($4 @ 11mpg) $23,477 Gas cost saving 72% * 1 per household Source: The Kauaian Institute and Census 2000 data The Kauaian Institute Ken Stokes kauaian.net
  • 46.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i FOOTPRINT REDUCTION Selected Scenario: 50% reduced miles Triple mileage Transport Scenarios for Footprint Reduction Transport target for achieving One Planet Living (0.23 gha) SOURCE: Scotland’s Footprint, Best Foot Forward, 2008 The Kauaian Institute Ken Stokes kauaian.net
  • 47.
    Kauai Community College,Office of Continuing Education Sustainability Series Applied Sustainability on Kaua`i The Kauaian Institute Ken Stokes kauaian.net