Ashok kumar Verma
E-Mail:ashokkumarverma149@gmail.com
Contact: +91-09430101139, 07043132773
Career Objective:
Seeking a challenging position and working as a Deputy Manager in a company where my analytical
ability and analyzing quest are used maximum for growth of the organization and that offers
professional growth and ample opportunity to learn and enrich competencies in carrier path.
Summary:
Having total 28 years of experience, currently working as Deputy Manager in Punj Loyd.
Educational Qualification—B.Tech (Mechanical)—State Council for Engineering and Technical
Government College of West Bengal.
Software Skills—
Operating System, MS Office, Windows
Jobs And Responsibilities
 Total looking after inspections of structural steel like Material Inspection, fabrication,
alignment and final SSSSinspection of Power house, Mill Bunker.
 Preparing Monthly and weekly planning for Fabrication and Erection work of steel structure
as per priority of work sequence.
 Managing and looking after activities related to fabrication and erection with Staff/Engineers.
 Managing time to time records of raw material requirement of fabrication work.
 Discussing with staff related to updated shop and scope drawings.
 Looking after heavy erection work like erection of bunker structure (Approx 62 m height).
 Maintaining monthly material reconciliation statement like RA bill of sub-contractors and
own organization RA bill to client.
 Co-ordinating with Civil Clients, department, third party inspection to enhance the
productivity.
 Discussing with staff to resolve some critical problems at site ,some time discuss with the
Designers to resolve the site issues.
 Looking after monthly loading of sub-contractors for fabrication and erection work.
 Certifying sub-contractor’ RA bills and maintains the control register for certified bills.
 Preparing the SKETCH/DETAIL drawing from scope drawing in the absence of detail
drawing at site.
Attending weekly/monthly meeting with the Client.
Maintaining QA/QC and HSE Standard in the work site.
Work Experience—
Total Experience of 25 years in Fabrication and Erection of Structural Work in India& Onsite
(Dubai, Kuwait) with different Multi National Companies.
Project Details—
Project 1 Reliance IndustriesLimited Gujarat
Client: Reliance Industries Limited
Organization: Punj Lloyd Limited
Period: 1-Jan-2014---Till date
Responsibility: Erection of cryogenic (liquid oxygen& liquid nitrogen) storage tank.
Project 2 2*270 MWThermal Power Plant
Client: GVK Power Limited
Organization: Punj Lloyd Limited
Period: 1-March-2012---December 2013
Responsibility: Fabrication and Erection of 2* 250 Mill Bunker Building.
Project 3: Chabra Thermal Power Plant
Client: Rajasthan Rajya Vidyut Utpadan Nigam Limited
Organization: Punj Lloyd Limited
Period: 1-April-2007---February 2012
Responsibility: Fabrication and Erection of 2* 250 MW Power house Building &Mill Bunker Build.
Project 4: 4*250,Jindal Power Plant
Client: Jindal Power Plant Limited
Organization: Punj Lloyd Limited
Period: 1-January-2006---March 2007
Responsibility: Fabrication and Erection of 2* 250 MW Power house Building.
Project 5: 2*250,Guru Har Govind Thermal Power Project
Client: BHEL
Organization: UB Engineering
Period: 1-April-2005---March 2006
Designation: Assistant Resident Engineer
Responsibility: Pre Assembly & Erection of 250 MW Boiler.
Project 6: Metro Rail NewDelhi
Client: IMCC
Organization: UB Engineering
Period: 1-April-2002---March 2005
Designation: Senior Engineer
Responsibility: Fabrication& Erection.
Project 7: Erection ofCross Country Pipeline
Client: Nirma Limited Pipeline
Organization: UB Engineering
Period: 1-April-2000---April 2002
Designation: Senior Engineer
Responsibility: Erection of Cross Country Pipeline
Project 8: Kuwait Cement Company(Onsite Shore)
Client: Kuwait Cement Company
Organization: UB Engineering
Period: 1-April-1999---April 2000.
Designation: Senior Engineer
Responsibility: Fabrication and Erection of Row Mill Building.
Project 9: Reliance Petroleum Limited
Client: Reliance Petroleum Limited Gujarat
Organization: UB Engineering
Period: 1-April-1998---April 1999
Designation: Senior Engineer
Responsibility: Pre-Assembly and Erection of Steel Structure.
Project 10: Sabiya Power Plant Kuwait(Onsite)
Client: Hyundai Engineering and Construction Company Limited
Organization: UB Engineering
Period: 1-April-1996---April 1998
Designation: Senior Engineer
Responsibility: Pre-Assembly and Erection of 3*800 MW Main Turbine Building.
Project 11: Reliance Industries Limited Hazira Gujarat
Client: Reliance Industries Limited
Organization: UB Engineering
Period: 1-April-1994---December 1995
Designation: Senior Engineer
Responsibility: Pre-Assembly and Erection of Pipe Rack Structures, Compressor House Building
d Erection of CS Tank.
Project 12: 2*500MWNational Thermal Power Corporation,Bengal
Client: Ansaldo
Organization: UB Engineering
Period: 1-April-1989---April 1994
Designation: Assistant Engineer
Responsibility: Pre-Assembly and Erection of Boiler, Ducting, ESP.
Project 13: 2*500MWNational Thermal Power Corporation, Rihand Mirzapur
Client: Ansaldo
Organization: UB Engineering
Period: 1-April-1986---December 1988
Designation: Junior Engineer
Responsibility: Pre-Assembly and Erection of Boiler, Ducting, ESP.
Personal Profile:
Name : Ashok Kumar Verma
Date of Birth : 21 January1962
Gender : Male
Marital Status : Married
Nationality : Indian
I hereby declare that the above information furnished is true to the best of my knowledge and belief.
Ashok Kumar Verma

More Related Content

What's hot (20)

Project Engineer_Ravi
Project Engineer_RaviProject Engineer_Ravi
Project Engineer_Ravi
 
Updated Resume (1)
Updated Resume (1)Updated Resume (1)
Updated Resume (1)
 
prashant resume latest
prashant resume latestprashant resume latest
prashant resume latest
 
Ibrahim's Resume
Ibrahim's ResumeIbrahim's Resume
Ibrahim's Resume
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
New CV of VRB
New CV of VRBNew CV of VRB
New CV of VRB
 
SUJITH RESUME (1)
SUJITH RESUME (1)SUJITH RESUME (1)
SUJITH RESUME (1)
 
Satish (Planning engineer)
Satish (Planning engineer)Satish (Planning engineer)
Satish (Planning engineer)
 
CV-Goutam Sen
CV-Goutam SenCV-Goutam Sen
CV-Goutam Sen
 
BIODATA-CPE1
BIODATA-CPE1BIODATA-CPE1
BIODATA-CPE1
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Mudasar Resume-
Mudasar Resume-Mudasar Resume-
Mudasar Resume-
 
CV Wawan Setiawan
CV Wawan SetiawanCV Wawan Setiawan
CV Wawan Setiawan
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Resume_Jan 2017
Resume_Jan 2017Resume_Jan 2017
Resume_Jan 2017
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
MohammadShafique (1)
MohammadShafique (1)MohammadShafique (1)
MohammadShafique (1)
 
resume-01
resume-01resume-01
resume-01
 
Resume 06th March 2015
Resume 06th March 2015Resume 06th March 2015
Resume 06th March 2015
 

Viewers also liked

Strengthening Health Systems through the application of Wireless Technology
Strengthening Health Systems through the application of Wireless TechnologyStrengthening Health Systems through the application of Wireless Technology
Strengthening Health Systems through the application of Wireless Technology
OPS Colombia
 
Ochelari henry jullien
Ochelari henry jullienOchelari henry jullien
Ochelari henry jullien
Alexandra Sîrbu
 
New Mortgage Fraud Scheme and Highest and Best Use Issue By Dave Towne
New Mortgage Fraud Scheme and Highest and Best Use Issue By Dave TowneNew Mortgage Fraud Scheme and Highest and Best Use Issue By Dave Towne
New Mortgage Fraud Scheme and Highest and Best Use Issue By Dave Towne
Bill Cobb, Appraiser
 
Ordem de trabalhos 28 dez2011
Ordem de trabalhos 28 dez2011Ordem de trabalhos 28 dez2011
Ordem de trabalhos 28 dez2011pedroribeiro1973
 
Programa de proyecto investigacion informatica_ 5º_2014_illia
Programa de proyecto investigacion informatica_ 5º_2014_illiaPrograma de proyecto investigacion informatica_ 5º_2014_illia
Programa de proyecto investigacion informatica_ 5º_2014_illiasandra_mariscal
 
Літо (картинки)
Літо (картинки)Літо (картинки)
Літо (картинки)
Semenuk
 
Україна - єдина країна
Україна - єдина країнаУкраїна - єдина країна
Україна - єдина країна
Semenuk
 
CALVIN KLEIN & TOMMY HILFIGER PORTFOLIO
CALVIN KLEIN & TOMMY HILFIGER PORTFOLIOCALVIN KLEIN & TOMMY HILFIGER PORTFOLIO
CALVIN KLEIN & TOMMY HILFIGER PORTFOLIOşafak kural
 
The Flying Egg Idea Journal
The Flying Egg Idea JournalThe Flying Egg Idea Journal
The Flying Egg Idea Journal
Carmen Chan
 
The Joint Learning Network in Action: Spotlight on Ghana
The Joint Learning Network in Action: Spotlight on GhanaThe Joint Learning Network in Action: Spotlight on Ghana
The Joint Learning Network in Action: Spotlight on Ghana
HFG Project
 
Essential Package of Health Services Country Snapshot: Nepal
Essential Package of Health Services Country Snapshot: NepalEssential Package of Health Services Country Snapshot: Nepal
Essential Package of Health Services Country Snapshot: Nepal
HFG Project
 
Programas Derecho
Programas DerechoProgramas Derecho
Programas Derecho
sandra_mariscal
 
Effective Strategies To Improve Maternal Health Among Refugee Women In Easter...
Effective Strategies To Improve Maternal Health Among Refugee Women In Easter...Effective Strategies To Improve Maternal Health Among Refugee Women In Easter...
Effective Strategies To Improve Maternal Health Among Refugee Women In Easter...IDDP UK
 
Strategic intent
Strategic intentStrategic intent
Strategic intent
Yash chanana
 

Viewers also liked (18)

Strengthening Health Systems through the application of Wireless Technology
Strengthening Health Systems through the application of Wireless TechnologyStrengthening Health Systems through the application of Wireless Technology
Strengthening Health Systems through the application of Wireless Technology
 
Tabla 2
Tabla 2Tabla 2
Tabla 2
 
Anna-Cellmercv
Anna-CellmercvAnna-Cellmercv
Anna-Cellmercv
 
Ochelari henry jullien
Ochelari henry jullienOchelari henry jullien
Ochelari henry jullien
 
Ost 1 90224 76
Ost 1 90224 76Ost 1 90224 76
Ost 1 90224 76
 
New Mortgage Fraud Scheme and Highest and Best Use Issue By Dave Towne
New Mortgage Fraud Scheme and Highest and Best Use Issue By Dave TowneNew Mortgage Fraud Scheme and Highest and Best Use Issue By Dave Towne
New Mortgage Fraud Scheme and Highest and Best Use Issue By Dave Towne
 
Certificate Part 145 Cloud Aero
Certificate Part 145 Cloud AeroCertificate Part 145 Cloud Aero
Certificate Part 145 Cloud Aero
 
Ordem de trabalhos 28 dez2011
Ordem de trabalhos 28 dez2011Ordem de trabalhos 28 dez2011
Ordem de trabalhos 28 dez2011
 
Programa de proyecto investigacion informatica_ 5º_2014_illia
Programa de proyecto investigacion informatica_ 5º_2014_illiaPrograma de proyecto investigacion informatica_ 5º_2014_illia
Programa de proyecto investigacion informatica_ 5º_2014_illia
 
Літо (картинки)
Літо (картинки)Літо (картинки)
Літо (картинки)
 
Україна - єдина країна
Україна - єдина країнаУкраїна - єдина країна
Україна - єдина країна
 
CALVIN KLEIN & TOMMY HILFIGER PORTFOLIO
CALVIN KLEIN & TOMMY HILFIGER PORTFOLIOCALVIN KLEIN & TOMMY HILFIGER PORTFOLIO
CALVIN KLEIN & TOMMY HILFIGER PORTFOLIO
 
The Flying Egg Idea Journal
The Flying Egg Idea JournalThe Flying Egg Idea Journal
The Flying Egg Idea Journal
 
The Joint Learning Network in Action: Spotlight on Ghana
The Joint Learning Network in Action: Spotlight on GhanaThe Joint Learning Network in Action: Spotlight on Ghana
The Joint Learning Network in Action: Spotlight on Ghana
 
Essential Package of Health Services Country Snapshot: Nepal
Essential Package of Health Services Country Snapshot: NepalEssential Package of Health Services Country Snapshot: Nepal
Essential Package of Health Services Country Snapshot: Nepal
 
Programas Derecho
Programas DerechoProgramas Derecho
Programas Derecho
 
Effective Strategies To Improve Maternal Health Among Refugee Women In Easter...
Effective Strategies To Improve Maternal Health Among Refugee Women In Easter...Effective Strategies To Improve Maternal Health Among Refugee Women In Easter...
Effective Strategies To Improve Maternal Health Among Refugee Women In Easter...
 
Strategic intent
Strategic intentStrategic intent
Strategic intent
 

Similar to Ashok kumar Verma

CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16SHYAM NIKESH
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7Vipul Vichare
 
MANOGARN RESUMEN (3).pdf
MANOGARN RESUMEN (3).pdfMANOGARN RESUMEN (3).pdf
MANOGARN RESUMEN (3).pdf
manogaran16
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Surechandu52
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv
Venkatesh -
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
EHSAN ASGHAR, RE
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
ShahbazAhmad953994
 

Similar to Ashok kumar Verma (20)

DILKASH(resume)
DILKASH(resume)DILKASH(resume)
DILKASH(resume)
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
RAMESH_Resume
RAMESH_ResumeRAMESH_Resume
RAMESH_Resume
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Resume
ResumeResume
Resume
 
MANOGARN RESUMEN (3).pdf
MANOGARN RESUMEN (3).pdfMANOGARN RESUMEN (3).pdf
MANOGARN RESUMEN (3).pdf
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Resume 25-06-2016
Resume 25-06-2016Resume 25-06-2016
Resume 25-06-2016
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
CV-PM
CV-PMCV-PM
CV-PM
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 
UMA MAHESWAR RAO
UMA MAHESWAR RAOUMA MAHESWAR RAO
UMA MAHESWAR RAO
 
S.ROHILLA (2)
S.ROHILLA (2)S.ROHILLA (2)
S.ROHILLA (2)
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
RITESH cv
RITESH cvRITESH cv
RITESH cv
 

Ashok kumar Verma

  • 1. Ashok kumar Verma E-Mail:ashokkumarverma149@gmail.com Contact: +91-09430101139, 07043132773 Career Objective: Seeking a challenging position and working as a Deputy Manager in a company where my analytical ability and analyzing quest are used maximum for growth of the organization and that offers professional growth and ample opportunity to learn and enrich competencies in carrier path. Summary: Having total 28 years of experience, currently working as Deputy Manager in Punj Loyd. Educational Qualification—B.Tech (Mechanical)—State Council for Engineering and Technical Government College of West Bengal. Software Skills— Operating System, MS Office, Windows Jobs And Responsibilities  Total looking after inspections of structural steel like Material Inspection, fabrication, alignment and final SSSSinspection of Power house, Mill Bunker.  Preparing Monthly and weekly planning for Fabrication and Erection work of steel structure as per priority of work sequence.  Managing and looking after activities related to fabrication and erection with Staff/Engineers.  Managing time to time records of raw material requirement of fabrication work.  Discussing with staff related to updated shop and scope drawings.  Looking after heavy erection work like erection of bunker structure (Approx 62 m height).  Maintaining monthly material reconciliation statement like RA bill of sub-contractors and own organization RA bill to client.  Co-ordinating with Civil Clients, department, third party inspection to enhance the productivity.  Discussing with staff to resolve some critical problems at site ,some time discuss with the Designers to resolve the site issues.  Looking after monthly loading of sub-contractors for fabrication and erection work.  Certifying sub-contractor’ RA bills and maintains the control register for certified bills.  Preparing the SKETCH/DETAIL drawing from scope drawing in the absence of detail drawing at site. Attending weekly/monthly meeting with the Client.
  • 2. Maintaining QA/QC and HSE Standard in the work site. Work Experience— Total Experience of 25 years in Fabrication and Erection of Structural Work in India& Onsite (Dubai, Kuwait) with different Multi National Companies. Project Details— Project 1 Reliance IndustriesLimited Gujarat Client: Reliance Industries Limited Organization: Punj Lloyd Limited Period: 1-Jan-2014---Till date Responsibility: Erection of cryogenic (liquid oxygen& liquid nitrogen) storage tank. Project 2 2*270 MWThermal Power Plant Client: GVK Power Limited Organization: Punj Lloyd Limited Period: 1-March-2012---December 2013 Responsibility: Fabrication and Erection of 2* 250 Mill Bunker Building. Project 3: Chabra Thermal Power Plant Client: Rajasthan Rajya Vidyut Utpadan Nigam Limited Organization: Punj Lloyd Limited Period: 1-April-2007---February 2012 Responsibility: Fabrication and Erection of 2* 250 MW Power house Building &Mill Bunker Build. Project 4: 4*250,Jindal Power Plant Client: Jindal Power Plant Limited Organization: Punj Lloyd Limited Period: 1-January-2006---March 2007 Responsibility: Fabrication and Erection of 2* 250 MW Power house Building. Project 5: 2*250,Guru Har Govind Thermal Power Project Client: BHEL Organization: UB Engineering Period: 1-April-2005---March 2006 Designation: Assistant Resident Engineer Responsibility: Pre Assembly & Erection of 250 MW Boiler. Project 6: Metro Rail NewDelhi Client: IMCC Organization: UB Engineering Period: 1-April-2002---March 2005 Designation: Senior Engineer Responsibility: Fabrication& Erection. Project 7: Erection ofCross Country Pipeline Client: Nirma Limited Pipeline Organization: UB Engineering Period: 1-April-2000---April 2002 Designation: Senior Engineer Responsibility: Erection of Cross Country Pipeline
  • 3. Project 8: Kuwait Cement Company(Onsite Shore) Client: Kuwait Cement Company Organization: UB Engineering Period: 1-April-1999---April 2000. Designation: Senior Engineer Responsibility: Fabrication and Erection of Row Mill Building. Project 9: Reliance Petroleum Limited Client: Reliance Petroleum Limited Gujarat Organization: UB Engineering Period: 1-April-1998---April 1999 Designation: Senior Engineer Responsibility: Pre-Assembly and Erection of Steel Structure. Project 10: Sabiya Power Plant Kuwait(Onsite) Client: Hyundai Engineering and Construction Company Limited Organization: UB Engineering Period: 1-April-1996---April 1998 Designation: Senior Engineer Responsibility: Pre-Assembly and Erection of 3*800 MW Main Turbine Building. Project 11: Reliance Industries Limited Hazira Gujarat Client: Reliance Industries Limited Organization: UB Engineering Period: 1-April-1994---December 1995 Designation: Senior Engineer Responsibility: Pre-Assembly and Erection of Pipe Rack Structures, Compressor House Building d Erection of CS Tank. Project 12: 2*500MWNational Thermal Power Corporation,Bengal Client: Ansaldo Organization: UB Engineering Period: 1-April-1989---April 1994 Designation: Assistant Engineer Responsibility: Pre-Assembly and Erection of Boiler, Ducting, ESP. Project 13: 2*500MWNational Thermal Power Corporation, Rihand Mirzapur Client: Ansaldo Organization: UB Engineering Period: 1-April-1986---December 1988 Designation: Junior Engineer Responsibility: Pre-Assembly and Erection of Boiler, Ducting, ESP. Personal Profile: Name : Ashok Kumar Verma Date of Birth : 21 January1962 Gender : Male Marital Status : Married Nationality : Indian
  • 4. I hereby declare that the above information furnished is true to the best of my knowledge and belief. Ashok Kumar Verma