SMEs need to adopt AI to gain a competitive advantage and survive in an increasingly digital economy transformed by AI. They should begin by mapping important economic networks and data flows to identify opportunities to create and capture value through AI at scale. An action plan includes evaluating each network's potential and strengthening values. While AI removes constraints, it also changes competition. Traditional businesses must understand how to leverage strengths in new ways and transform operating capabilities. Adopting cutting-edge technology ahead of competitors is important for SME survival in this new environment.
Entrepreneurs and small business owners are on the front lines, navigating the realities of automation. And they have unique advantages. The very fact that they are small and nimble makes small businesses well suited to the realities of the 21st century economy. They are able to quickly adapt, take advantage of new opportunities, and to pivot to serve customer expectations in a rapidly changing world.
To better understand how small businesses are adapting to the age of AI, Intuit conducted a survey examining attitudes towards automation technology today as well as perceptions on how automation technology will impact their business and lives over the next 5 years.
Conversational AI and Chatbot IntegrationsCristina Vidu
Conversational AI and Chatbots (or rather - and more extensively - Virtual Agents) offer great benefits, especially in combination with technologies like RPA or IDP. Corneliu Niculite (Presales Director - EMEA @DRUID AI) and Roman Tobler (CEO @Routinuum & UiPath MVP) are discussing Conversational AI and why Virtual Agents play a significant role in modern ways of working. Moreover, Corneliu will be displaying how to build a Workflow and showcase an Accounts Payable Use Case, integrating DRUID and UiPath Robots.
📙 Agenda:
The focus of our meetup is around the following areas - with a lot of room to discuss and share experiences:
- What is "Conversational AI" and why do we need Chatbots (Virtual Agents);
- Deep-Dive to a DRUID-UiPath Integration via an Accounts Payable Use Case;
- Discussion, Q&A
Speakers:
👨🏻💻 Corneliu Niculite, Presales Director - EMEA DRUID AI
👨🏼💻 Roman Tobler, UiPath MVP, Co-Founder & CEO Routinuum GmbH
This session streamed live on March 8, 2023, 16:00 PM CET.
Check out our upcoming events at: community.uipath.com
Contact us at: community@uipath.com
Our Industry X.0 demonstrations at Hannover Messe 2019 will showcase a five-step journey showing how our IX0 framework enables the transformation of entire industries, brought to life by real industry examples. Learn more.
This is an article about Generative AI. It discusses what it is and the different techniques used to create it. It also goes into the potential uses of Generative AI. Some of the important points from this article are that Generative AI is still in its early stages but has already shown promising results. It is also important to note that Generative AI can be used to create fake data that is indistinguishable from real data.
https://www.ltimindtree.com/wp-content/uploads/2023/01/DeepPoV-Generative-AI.pdf
Making KM Clickable: The Rapidly Changing State of Knowledge ManagementEnterprise Knowledge
Initially delivered for the Bangalore K-Community Zoom Meetup: “The Digital Edge: Tech Roadmaps and Impacts on KM on June 15th, this deck covers the key takeaways from the leading Knowledge Management book, 'Making Knowledge Management Clickable,' by Zach Wahl and Joe Hilger of Enterprise Knowledge. The presentation covers definitions and value of KM, offers best practices on KM systems, details key types of KM technologies, and discusses some of the common types of KM solutions such as KM Portals and Knowledge Graphs.
Generative AI: Redefining Creativity and Transforming Corporate LandscapeOsaka University
The advent of Generative AI is redefining the boundaries of creativity and markedly transforming the corporate landscape. One of the pioneering technologies in this domain is the Reinforcement Learning from Human Feedback (RLHF). Combined with advancements in LLM (Language Model) has emerged as a notable player. LLM offers two primary interpretations: firstly, as a machine capable of generating highly plausible texts in response to specific directives, and secondly, as a multi-lingual knowledge repository that responds to diverse inquiries.
The ramifications of these technologies are widespread, with profound impacts on various industries. They are catalyzing digital transformation within enterprises, driving significant advancements in research and development, especially within the realms of drug discovery and healthcare. In countries like Japan, Generative AI is heralded for its potential to bolster creativity. The value generated by such AI-driven innovations is estimated to be several trillion dollars annually. Intriguingly, about 75% of this value, steered by creative AI applications, is predominantly concentrated within customer operations, marketing and sales, software engineering, and R&D. These applications are pivotal in enhancing customer interactions, generating innovative content for marketing campaigns, and even crafting computer code from natural language prompts. The ripple effect of these innovations is palpable in sectors like banking, high-tech, and life sciences.
However, as with every innovation, there are certain setbacks. For instance, the traditional business model of individualized instruction, as seen in the context of professors teaching basic actions, is on the brink of obsolescence.
Looking ahead, the next five years pose pertinent questions about humanity's role amidst this technological evolution. A salient skillset will encompass the adept utilization of generative AI, paired with the discernment to accept or critique AI-generated outputs. Education, as we know it, will be reimagined. The evaluative focus will transition from verifying a student's independent work to gauging their ability to produce content surpassing their AI tools. Generative AI's disruptive nature will compel us to re-evaluate human value, reshaping the paradigms of corporate management and educational methodologies
Entrepreneurs and small business owners are on the front lines, navigating the realities of automation. And they have unique advantages. The very fact that they are small and nimble makes small businesses well suited to the realities of the 21st century economy. They are able to quickly adapt, take advantage of new opportunities, and to pivot to serve customer expectations in a rapidly changing world.
To better understand how small businesses are adapting to the age of AI, Intuit conducted a survey examining attitudes towards automation technology today as well as perceptions on how automation technology will impact their business and lives over the next 5 years.
Conversational AI and Chatbot IntegrationsCristina Vidu
Conversational AI and Chatbots (or rather - and more extensively - Virtual Agents) offer great benefits, especially in combination with technologies like RPA or IDP. Corneliu Niculite (Presales Director - EMEA @DRUID AI) and Roman Tobler (CEO @Routinuum & UiPath MVP) are discussing Conversational AI and why Virtual Agents play a significant role in modern ways of working. Moreover, Corneliu will be displaying how to build a Workflow and showcase an Accounts Payable Use Case, integrating DRUID and UiPath Robots.
📙 Agenda:
The focus of our meetup is around the following areas - with a lot of room to discuss and share experiences:
- What is "Conversational AI" and why do we need Chatbots (Virtual Agents);
- Deep-Dive to a DRUID-UiPath Integration via an Accounts Payable Use Case;
- Discussion, Q&A
Speakers:
👨🏻💻 Corneliu Niculite, Presales Director - EMEA DRUID AI
👨🏼💻 Roman Tobler, UiPath MVP, Co-Founder & CEO Routinuum GmbH
This session streamed live on March 8, 2023, 16:00 PM CET.
Check out our upcoming events at: community.uipath.com
Contact us at: community@uipath.com
Our Industry X.0 demonstrations at Hannover Messe 2019 will showcase a five-step journey showing how our IX0 framework enables the transformation of entire industries, brought to life by real industry examples. Learn more.
This is an article about Generative AI. It discusses what it is and the different techniques used to create it. It also goes into the potential uses of Generative AI. Some of the important points from this article are that Generative AI is still in its early stages but has already shown promising results. It is also important to note that Generative AI can be used to create fake data that is indistinguishable from real data.
https://www.ltimindtree.com/wp-content/uploads/2023/01/DeepPoV-Generative-AI.pdf
Making KM Clickable: The Rapidly Changing State of Knowledge ManagementEnterprise Knowledge
Initially delivered for the Bangalore K-Community Zoom Meetup: “The Digital Edge: Tech Roadmaps and Impacts on KM on June 15th, this deck covers the key takeaways from the leading Knowledge Management book, 'Making Knowledge Management Clickable,' by Zach Wahl and Joe Hilger of Enterprise Knowledge. The presentation covers definitions and value of KM, offers best practices on KM systems, details key types of KM technologies, and discusses some of the common types of KM solutions such as KM Portals and Knowledge Graphs.
Generative AI: Redefining Creativity and Transforming Corporate LandscapeOsaka University
The advent of Generative AI is redefining the boundaries of creativity and markedly transforming the corporate landscape. One of the pioneering technologies in this domain is the Reinforcement Learning from Human Feedback (RLHF). Combined with advancements in LLM (Language Model) has emerged as a notable player. LLM offers two primary interpretations: firstly, as a machine capable of generating highly plausible texts in response to specific directives, and secondly, as a multi-lingual knowledge repository that responds to diverse inquiries.
The ramifications of these technologies are widespread, with profound impacts on various industries. They are catalyzing digital transformation within enterprises, driving significant advancements in research and development, especially within the realms of drug discovery and healthcare. In countries like Japan, Generative AI is heralded for its potential to bolster creativity. The value generated by such AI-driven innovations is estimated to be several trillion dollars annually. Intriguingly, about 75% of this value, steered by creative AI applications, is predominantly concentrated within customer operations, marketing and sales, software engineering, and R&D. These applications are pivotal in enhancing customer interactions, generating innovative content for marketing campaigns, and even crafting computer code from natural language prompts. The ripple effect of these innovations is palpable in sectors like banking, high-tech, and life sciences.
However, as with every innovation, there are certain setbacks. For instance, the traditional business model of individualized instruction, as seen in the context of professors teaching basic actions, is on the brink of obsolescence.
Looking ahead, the next five years pose pertinent questions about humanity's role amidst this technological evolution. A salient skillset will encompass the adept utilization of generative AI, paired with the discernment to accept or critique AI-generated outputs. Education, as we know it, will be reimagined. The evaluative focus will transition from verifying a student's independent work to gauging their ability to produce content surpassing their AI tools. Generative AI's disruptive nature will compel us to re-evaluate human value, reshaping the paradigms of corporate management and educational methodologies
Generative AI Use-cases for Enterprise - First SessionGene Leybzon
In this presentation, we will delve into the exciting applications of Generative AI across various business domains. Leveraging the capabilities of artificial intelligence and machine learning, Generative AI allows for dynamic, context-aware user interfaces that adapt in real-time to provide personalized user experiences. We will explore how this transformative technology can streamline design processes, facilitate user engagement, and open the doors to new forms of interactivity.
In this session, you'll get all the answers about how ChatGPT and other GPT-X models can be applied to your current or future project. First, we'll put in order all the terms – OpenAI, GPT-3, ChatGPT, Codex, Dall-E, etc., and explain why Microsoft and Azure are often mentioned in this context. Then, we'll go through the main capabilities of the Azure OpenAI and respective usecases that might inspire you to either optimize your product or build a completely new one.
Franck Cohen, chief commercial officer at SAP, discusses the impact of artificial intelligence (AI) on e-commerce. From in-store analytics to digital assistants, AI is transforming e-commerce. Since 2012, AI commerce companies have raised US$990 million across 201 deals in the United States and Canada, as well as India, France, the United Kingdom, Singapore, Israel, and others. Join us for a discussion on how retail giants and start-ups alike can benefit from using this new technology today. Learn more: https://www.hybris.com/commerce
The training content covers:
- Basics of Artificial Intelligence
- Penetration of AI in our daily lives
- Few examples and Use cases
- A brief on how future with AI looks like
In the rapidly advancing era of artificial intelligence (AI), these advancements offer your organization the means to fortify itself, create value, and adapt to evolving customer expectations and business models. These technologies contribute to establishing the necessary infrastructure, governance, and tools for enhanced resilience and autonomic activities. Read this presentation to explore Top 10 Strategic Technologies in 2024.
Thabo Ndlela- Leveraging AI for enhanced Customer Service and Experienceitnewsafrica
Thabo Ndlela, from Accenture, delivered a keynote on Leveraging AI for enhanced Customer Service and Experience at Digital Finance Africa 2023 on the 2nd of August 2023.
A brief overview of artificial intelligence (AI), followed by a few examples of practical use within small businesses, large enterprises, and nonprofits.
Generative AI models, such as ChatGPT and Stable Diffusion, can create new and original content like text, images, video, audio, or other data from simple prompts, as well as handle complex dialogs and reason about problems with or without images. These models are disrupting traditional technologies, from search and content creation to automation and problem solving, and are fundamentally shaping the future user interface to computing devices. Generative AI can apply broadly across industries, providing significant enhancements for utility, productivity, and entertainment. As generative AI adoption grows at record-setting speeds and computing demands increase, on-device and hybrid processing are more important than ever. Just like traditional computing evolved from mainframes to today’s mix of cloud and edge devices, AI processing will be distributed between them for AI to scale and reach its full potential.
In this presentation you’ll learn about:
- Why on-device AI is key
- Full-stack AI optimizations to make on-device AI possible and efficient
- Advanced techniques like quantization, distillation, and speculative decoding
- How generative AI models can be run on device and examples of some running now
- Qualcomm Technologies’ role in scaling on-device generative AI
Governing Innovation: The recipe for portfolio growth | Accentureaccenture
Accenture reports that with innovation investments increasing, it's critical to invest in growth with an innovation portfolio management strategy. Read more.
🔹How will AI-based content-generating tools change your mission and products?
🔹This complimentary webinar [ON-DEMAND] explores multiple use cases that drive adoption in their early adopter customer base to provide product leaders with insights into the future of generative AI-powered businesses, and the potential generative AI holds for driving innovation and improving business processes.
“AI is the new electricity” proclaims Andrew Ng, co-founder of Google Brain. Just as we need to know how to safely harness electricity, we also need to know how to securely employ AI to power our businesses. In some scenarios, the security of AI systems can impact human safety. On the flip side, AI can also be misused by cyber-adversaries and so we need to understand how to counter them.
This talk will provide food for thought in 3 areas:
Security of AI systems
Use of AI in cybersecurity
Malicious use of AI
Do you know the business benefits of AI in the eCommerce as well as the retail Industry? In this article, we share some essential information about how you can increase your e-commerce & retail business sales with the help of AI.
Generative AI Use-cases for Enterprise - First SessionGene Leybzon
In this presentation, we will delve into the exciting applications of Generative AI across various business domains. Leveraging the capabilities of artificial intelligence and machine learning, Generative AI allows for dynamic, context-aware user interfaces that adapt in real-time to provide personalized user experiences. We will explore how this transformative technology can streamline design processes, facilitate user engagement, and open the doors to new forms of interactivity.
In this session, you'll get all the answers about how ChatGPT and other GPT-X models can be applied to your current or future project. First, we'll put in order all the terms – OpenAI, GPT-3, ChatGPT, Codex, Dall-E, etc., and explain why Microsoft and Azure are often mentioned in this context. Then, we'll go through the main capabilities of the Azure OpenAI and respective usecases that might inspire you to either optimize your product or build a completely new one.
Franck Cohen, chief commercial officer at SAP, discusses the impact of artificial intelligence (AI) on e-commerce. From in-store analytics to digital assistants, AI is transforming e-commerce. Since 2012, AI commerce companies have raised US$990 million across 201 deals in the United States and Canada, as well as India, France, the United Kingdom, Singapore, Israel, and others. Join us for a discussion on how retail giants and start-ups alike can benefit from using this new technology today. Learn more: https://www.hybris.com/commerce
The training content covers:
- Basics of Artificial Intelligence
- Penetration of AI in our daily lives
- Few examples and Use cases
- A brief on how future with AI looks like
In the rapidly advancing era of artificial intelligence (AI), these advancements offer your organization the means to fortify itself, create value, and adapt to evolving customer expectations and business models. These technologies contribute to establishing the necessary infrastructure, governance, and tools for enhanced resilience and autonomic activities. Read this presentation to explore Top 10 Strategic Technologies in 2024.
Thabo Ndlela- Leveraging AI for enhanced Customer Service and Experienceitnewsafrica
Thabo Ndlela, from Accenture, delivered a keynote on Leveraging AI for enhanced Customer Service and Experience at Digital Finance Africa 2023 on the 2nd of August 2023.
A brief overview of artificial intelligence (AI), followed by a few examples of practical use within small businesses, large enterprises, and nonprofits.
Generative AI models, such as ChatGPT and Stable Diffusion, can create new and original content like text, images, video, audio, or other data from simple prompts, as well as handle complex dialogs and reason about problems with or without images. These models are disrupting traditional technologies, from search and content creation to automation and problem solving, and are fundamentally shaping the future user interface to computing devices. Generative AI can apply broadly across industries, providing significant enhancements for utility, productivity, and entertainment. As generative AI adoption grows at record-setting speeds and computing demands increase, on-device and hybrid processing are more important than ever. Just like traditional computing evolved from mainframes to today’s mix of cloud and edge devices, AI processing will be distributed between them for AI to scale and reach its full potential.
In this presentation you’ll learn about:
- Why on-device AI is key
- Full-stack AI optimizations to make on-device AI possible and efficient
- Advanced techniques like quantization, distillation, and speculative decoding
- How generative AI models can be run on device and examples of some running now
- Qualcomm Technologies’ role in scaling on-device generative AI
Governing Innovation: The recipe for portfolio growth | Accentureaccenture
Accenture reports that with innovation investments increasing, it's critical to invest in growth with an innovation portfolio management strategy. Read more.
🔹How will AI-based content-generating tools change your mission and products?
🔹This complimentary webinar [ON-DEMAND] explores multiple use cases that drive adoption in their early adopter customer base to provide product leaders with insights into the future of generative AI-powered businesses, and the potential generative AI holds for driving innovation and improving business processes.
“AI is the new electricity” proclaims Andrew Ng, co-founder of Google Brain. Just as we need to know how to safely harness electricity, we also need to know how to securely employ AI to power our businesses. In some scenarios, the security of AI systems can impact human safety. On the flip side, AI can also be misused by cyber-adversaries and so we need to understand how to counter them.
This talk will provide food for thought in 3 areas:
Security of AI systems
Use of AI in cybersecurity
Malicious use of AI
Do you know the business benefits of AI in the eCommerce as well as the retail Industry? In this article, we share some essential information about how you can increase your e-commerce & retail business sales with the help of AI.
Contents
Discovery-Driven Digital Transformation by Rita McGrath and Ryan McManus
The Transformative Business Model by Stelios Kavadias, Kostas Ladas, and Christoph Loch
Digital Doesn’t Have to Be Disruptive by Nathan Furr and Andrew Shipilov
What’s Your Data Strategy? by Leandro DalleMule and Thomas H. Davenport
Competing in the Age of AI by Marco Iansiti and Karim R. Lakhani
Building the AI-Powered Organization by Tim Fountaine, Brian McCarthy, and Tamim Saleh How Smart,
Connected Products Are Transforming Companies by Michael E. Porter and James E. Heppelmann
The Age of Continuous Connection
The Problem with Legacy Ecosystems by Maxwell Wessel, Aaron Levie, and Robert Siegel
Your Workforce Is More Adaptable Than You Think by Joseph B. Fuller, Judith K. Wallenstein, Manjari Raman, and Alice de Chalendar
How Apple Is Organized for Innovation by Joel M. Podolny and Morten T. Hansen
Digital Transformation Comes Down to Talent in Four Key Areas
This presentation is about the innovative ideas that should be encouraged in various organizations for their positive progress. Also, it deals with the 5 most important patterns for Innovation.
Management Information Systems,
Popular MIS cases,
MIS,
Lectures,
Case study,
MIS Case study,
MIS Lectures,
MBA MIS course,
Management Information Systems lectures,
MIS lectures,
What is Management Information Systems,
Understanding Management Information System,
Overview of Management Information Systems,
bai giang he thong thong tin quan ly,
bai tap tinh huong,
bai giang,
HTTTQL,
MIS Movies,
Suggested IT related movies for MIS students,
Ecommerce Managers
Chapter 1: Current SMBs and IT scenario in INDIA
Chapter 2: IT adoption Scenario in India’s SMBs
Chapter 3: Usages of IT in SMBs
Chapter 4: Barriers to Technology Adoption and its Remedies
Why New-age IT Operating Models are Necessary for Enhanced Operational AgilityCognizant
IT organizations need a new operating model consisting of automated tools, refined thinking around operating discipline, and more relevant talent acquisition and management strategies. This new model will not only help IT deliver tailored services to a new generation of users, but it will also unlock the vast potential of emerging digital business opportunities made possible by the quickly maturing SMAC Stack.
Thanks for the videos! Management Information Systems. http://toptenmba.com
See full list of MIS Videos: https://www.youtube.com/watch?v=51uGOkJrqD8&list=PLRYuVYJhTowQx144mVepzY_ZEL5-frcBh
Free MIS Ebooks 2016: https://drive.google.com/drive/u/1/folders/0ByL8IO2RG9cVZDZ6QWhiWVI0bms
Free Case Study Guides and Suggested Answers:http://www.topten.edu.vn/mba-cases/54-mba-management-information-systems
Management Information Systems,
Popular MIS cases,
MIS,
Lectures,
Case study,
MIS Case study,
MIS Lectures,
MBA MIS course,
Management Information Systems lectures,
MIS lectures,
What is Management Information Systems,
Understanding Management Information System,
Overview of Management Information Systems,
MIS Movies,
business intelligence,
SCM, CRM, ERP,
building information systems,
clouds,
knowledge management,
IS development,
e-government,
Industry 4.0,
mobile commerce,
toptenmba,
local commerce,
social commerce,
emarketing,
has gone Google,
digital marketing,
laudon,
what is electronic commerce,
overview of ecommerce,
ecommerce lectures,
ecommerce case study,
IT Project management,
Agile methodology,
Waterfall,
IS Management,
IS Security,
Social media,
Managing Global Systems,
Managing IT Projects,
bai giang he thong thong tin quan ly,
bai giang HTTT,
bai giang HTTTQL,
bai tap tinh huong,
bai giang,
HTTTQL,
bai tap tinh huong,
giai thich thuat ngu,
Ecommerce Managers,
nguyen van thoan,
http://toptenmba.com
http://topten.edu.vn
www.toptenmba.com
www.topten.edu.vn
Thanks for the videos! Management Information Systems. http://toptenmba.com
See full list of MIS Videos: https://www.youtube.com/watch?v=51uGOkJrqD8&list=PLRYuVYJhTowQx144mVepzY_ZEL5-frcBh
Free MIS Ebooks 2016: https://drive.google.com/drive/u/1/folders/0ByL8IO2RG9cVZDZ6QWhiWVI0bms
Free Case Study Guides and Suggested Answers:http://www.topten.edu.vn/mba-cases/54-mba-management-information-systems
Management Information Systems,
Popular MIS cases,
MIS,
Lectures,
Case study,
MIS Case study,
MIS Lectures,
MBA MIS course,
Management Information Systems lectures,
MIS lectures,
What is Management Information Systems,
Understanding Management Information System,
Overview of Management Information Systems,
MIS Movies,
business intelligence,
SCM, CRM, ERP,
building information systems,
clouds,
knowledge management,
IS development,
e-government,
Industry 4.0,
mobile commerce,
toptenmba,
local commerce,
social commerce,
emarketing,
has gone Google,
digital marketing,
laudon,
what is electronic commerce,
overview of ecommerce,
ecommerce lectures,
ecommerce case study,
IT Project management,
Agile methodology,
Waterfall,
IS Management,
IS Security,
Social media,
Managing Global Systems,
Managing IT Projects,
bai giang he thong thong tin quan ly,
bai giang HTTT,
bai giang HTTTQL,
bai tap tinh huong,
bai giang,
HTTTQL,
bai tap tinh huong,
giai thich thuat ngu,
Ecommerce Managers,
nguyen van thoan,
http://toptenmba.com
http://topten.edu.vn
www.toptenmba.com
www.topten.edu.vn
Operating Model Design in a Digital WorldRobert Cade
Operating Models have defined the way that we work and operate for centuries. A good set of architectural blueprints are essential to successfully build a new office. The same is true if you want to build a successful business; you need a good set of blueprints on which to lay the foundations and undertake the detailed design and implementation. In other words you need an Operating Model.
Like modern office designs, businesses are responding to digital stimuli and the changing needs of their customers. Digital is taking the world by storm, transforming everything in its path. Those who transform reap the benefits; those that don’t get left behind. So, just as the blueprints for offices have changed in the digital age, the blueprints for businesses – their Operating Models – also need to evolve.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
4. The Age of AI
1. AI is becoming the new operational foundation of business—the core of a company’s
operating model, defining how the company drives the execution of tasks.
2. AI is not only displacing human activity, it is changing the very concept of the firm
3. When a business is driven by AI, software instructions and algorithms make up the
critical path in the way the firm delivers value
• Strong AI: capable of simulating human reasoning
• Weak AI: perform tasks that were traditionally performed by human being
4. AI have three magic words: Scalability, Scope, Learning
• Scalability: deliver as much value at the lowest cost (order taking is digitized)
• Scope: range of activities it performs (e.g. centralized warehouse, etc)
• Learning: to improve and innovate
• The system do not incur human complexity cost (communication and coordination), decrease in efficiency
and tireless
5. Transforming Competition
1. As we enter the age of artificial intelligence, the emergence of digital operating models
is transforming competition
2. This digital representation of human activity can learn and improve itself transform
the ways a firm can (and should) operate
3. Digital operating modes:
• Improve scalability, scope and learning of business VS Introduce set of challenges
4. As it collides with traditional company the digital operating model can overwhelm the
status quo
6. Traditional Business
1. Traditional business needs to understand how to leverage existing strengths in new
ways and transform operating capabilities to support new strategies
2. Size = double-edge swords
• As it grows:
• deliver more value at cheaper price
• operating model becomes more complex – come all kind of problem
• In other words: complexity becomes the downfall of traditional company
• Increase operational cost
• Decrease service levels
7. The Consequences of Digitalization
1. Business Model: firm promises to create and capture value
• In traditional companies à value creation and value capture created from same
resources
• In fully digital firms à value creation and value capture can be separated much more
easily and often come from different stakeholders (Google Ads)
2. Operating Model: deliver the values
• The goal is to deliver the values at scale, to achieve sufficient scope and to respond
to changes by engaging in sufficient learning.
8. Parameters Reflecting the External
Technological Environment
1. Availability of latest technologies à In a country, to what
extent are the latest technologies available?
2. Firm-level technology absorption à In a country, to what
extent do businesses adopt the latest technologies?
3. Foreign Direct Investment (FDI) and technology transfer à
To what extent does FDI bring new technology in the
country?
4. Individuals using Internet à Percentage of individuals using
the Internet
5. Fixed broadband Internet subscriptions à Fixedbroadband
Internet subscriptions per 100 population
6. International Internet bandwidth à International bandwidth
is the contracted capacity of international connection
between countries for transmitting internet traffic.
Source : Supriyo Das, Amit Kundu, Arabinda Bhattacharya, 2020
Both institutional capabilities
and external capabilities
emerged as significant factors
toward creating sustainable
technological environments for
entrepreneurs.
10. Competitive Advantage in Digital Economies
1. The ability:
• To shape and control the network (digital connections, carry data, powerful software
algorithm, ignore traditional boundaries, growing economy and social system)
• To harvest the volume and variety of the transaction carry.
2. Moves toward to most central in connecting business, aggregating data that flows
between and extracting value through powerful analytic and AI
11. Traditional Business Issues
1. Diseconomies of scale
• Small networks and little data
• And learning effect
• The stronger the network and
learning, the sharper the increase in
value with scale
2. Digital operating models will take
quite time to generate value by
traditional operating models à
why executives ensconced in
traditional model have difficult time
at first believing that digital model
will ever catch up
Scale
Scope
Learning
Diseconomies of scale:
- Small networks
& little data
- Learning effect
Traditional Business
12. Characteristics of SME in ASEAN
1. Productivity
2. Foreign ownership
3. Financial characteristics
4. Innovation efforts
5. Managerial/entrepreneurial attitude
13. UMKM Indonesia Issues
General Issues :
1. Low adoption of information technology among ultra-micro entrepreneurs
2. Low awareness of the benefits of SME IT applications
3. Intention to use advanced IT system is very low, however the usage of social media is
quite massive
4. Internal Factors
• Insufficient working capital for business development
• Human resources issues - entrepreneurs do not yet have an adequate entrepreneurial spirit
• Weak business networks and market penetration capabilities
5. External Factors
• The business climate (business ecosystem) is not yet fully conducive
• Limited business facilities and infrastructure
• Implications free trade act
15. Machine Learning (ML)
is one of the branches
of AI that is being
increasingly applied to
real world problems and
systems
Machine
Learning
One of cloud offerings: a fully managed service that
enables any developer and data scientist to build,
train, and deploy machine learning (ML) models at
scale. By removing complexity at each stage of the
ML workflow, you can easily deploy machine learning
use cases such as predictive maintenance, computer
vision, and customer behavior prediction
20. IT Adoption in SME cont’d
• IT adoption by SMEs differs from larger organizations because of their specific
characteristics, such as resources constraints.
• To come up with more an organized and efficient deployment and application of IT, SMEs
must precisely realize their need for it and the proportionate advantages of IT for their
business.
• SMEs ought to judge costs and benefits associated with utilizing IT.
In general, IS/IT is regarded as a crucial resource required for better communication
and integrating business functions
21. Failure and Dissatisfaction of IT Adoption in SME
• Inappropriate connection between adopted IT and enterprise strategies,
• Inadequate realization of organizational issues,
• Inadequate realization of end user necessities,
• Lack of manager and employee involvement in different stages of IT adoption,
• Lack of required resources (knowledge, skills, finance, management),
• Inadequate teaching and preparation of end users,
• Business size and fund limitations to employ IT specialists,
• Unqualified management in highly centralized CEO structures,
• Inappropriate government assistance role and supportive regulation,
• Dissatisfaction with IT-created competitive advantages due to improper interactions with
competitors, suppliers and customers, and
• The particular characteristics of organizations, their culture and family involvement in the
business.
23. What should SME do?
1. Knowing their current position in IT adoption ?
2. Challenge the industry standards ?
3. Work with them and become their chosen, best suppliers ?
24. Action Plan to Adopt AI
1. Implementation of cutting edge technology ahead of other firms is an important
mechanism for firms to achieve competitive advantage
2. AI allows an organisation to obtain a competitive advantage, reduce costs (Press,
2016) and opportunities to transfer into new businesses (Ransbotham et al. 2017),
raise top-line profits, increase efficiency and amplify human intelligence (Curran &
Purcel, 2017).
3. Begins by mapping the most important economic networks connected to a business
and examining the flows of valuable data and the opportunities that exist to gain CA
through AI.
4. Evaluate the potential of each major network for value creation and capture at scale à
will strengthen or weaken the values
25. Conclusion
01
Artificial intelligence is transforming
the way firms function and is
restructuring the economy
02
Software, along with data- and AI-
centric architecture, is removing
traditional operational constraints
and enabling a new generation of
business models that cut across
industries.
03
This is transforming competition,
and we already see evidence of a
more concentrated, winner-take-all
world emerging in some traditional
market.
04
There is no many choices for SME
to survive: adopt new technology (AI)
or extinct!
27. References
1. Marco Iansiti & Karim R. Lakhani (2020). Competing In The Age Of Ai. Harvard
Business Review Pres, Boston, MA
2. Morteza Ghobakhloo, Tang Sai Hong, Mohammad Sadegh Sabouri and Norzima
Zulkifli (2012). Strategies for Successful Information Technology Adoption in Small and
Medium-sized Enterprises. Information journal
3. Supriyo Das, Amit Kundu, Arabinda Bhattacharya (2020). Technology Adaptation and
Survival of SMEs: A Longitudinal Study of Developing Countries. Technology
Innovation Management Review
4. Junghee Han & Chang-min Park (2017). Case study on adoption of new technology for
innovation Perspective of institutional and corporate entrepreneurship
5. C. Harvie & D. Narjoko & S. Oum (2010). Firm Characteristic Determinants of SME
Participation in Production Networks. ERIA discussion paper series
6. Sulaiman AlSheibani, Yen Cheung, Chris Messom (2018). Artificial Intelligence
Adoption: AI-readiness at Firm-Level (Research-in-Progress)