ARCO History
Our parent company, ARCO Construction
Company, Inc., was founded in 1992 in St.
Louis, Missouri and has continued to grow
by providing clients with a complete
design/build solution. The ARCO companies
currently consists of eight offices to serve the
United States.



                                                                                   Industry Focus
   Sacramento               Chicago                  Philadelphia    The ARCO construction experience has
                            St. Louis
                                        Cincinnati
                                                        Chesapeake
                                                                     served clients in the commercial and industrial
                                                                     markets extensively.      Our verifiable track
                                        Atlanta
                                                                     record of success is based on years of
                                                                     professional performance in manufacturing,
                                                  Tampa
                                                                     warehousing, distribution facilities and office
                                                                     buildings. This focus allows our associates to
                                                                     optimize your project cost and quality.


  Front End Service Provides You a
                                                                              A Single Source Design and
   Partner in Project Development
                                                                                 Construction Solution
The ARCO Proposal Process Provides a
                                                                        • Front End Project Development
thorough business solution.
                                                                        • Site Selection
• A complete and competitive proposal is
                                                                        • Complete Design Service
developed quickly with little or no gaps in
scope and no need for change orders.                                    • Up-Front Competitive Lump Sum Pricing
                                                                        • Value Engineering Throughout Project
• Site reconnaissance gives a clear
understanding of local codes, regulations,                              • Zoning, Permitting and Code Expertise
fees and permit process.                                                • General Contractor and Construction
                                                                          Services
• Civil design knowledge maximizes site
                                                                        • Warranty Follow-up
usage, layout options and site selection.
• A focus on the light industrial market
provides building cost and quality options
for layout and materials.
• The Design/Build program provides
accurate facility costs to assist in the
project funding process.
Relationships that Matter
                                                               Our commitment to building solid,
                                                               lasting relationships is evident in our
                                                               continued growth with customers
                                                               recognized in their respected industries.




  Manufacturing/                           Cold Storage/                      Warehouse/
  Technology                               Food Distribution                  Distribution
  •Hewlett-Packard                         •AmeriCold                         •Orgill
  •Sprint                                  •Merchants Terminal Corp.          •Staples
  •Jabil Circuits                          •US Food Service                   •Unilever
  •Seiler Plastics                         •MultiFoods-VSA                    •First Industrial
  •Lockheed Martin                         •United Natural Foods              •Johnson & Johnson
  •Alcan/Wheaton                           •Restaurant Depot                  •IDI

                                      Design/Build Advantage
Our comprehensive design/build approach means a direct relationship with just one company
instead of dealing with a multitude of organizations. This relationship provides the advantage
of clear lines of communication and responsibility for delivery of scope and costs. The result is
not only a smoother project, but significant cost saving and schedule.

  Design/Build Method

          Concept               Project Complete
                       Design

    Firm Price                                  33% Time Savings!
    Proposal

  Traditional Method
           Concept
                     Design                   Project Complete
                                Bid
                                                Construction
                           Firm Price
                           Proposal

Construction Industry Institute has proven that the design/build approach
saves money (15%), improves quality (8%) and reduces project schedule (33%).
INTEGRITY . SOLUTIONS . RELATIONSHIPS




                  Liberty Property Trust
                                                               Carlisle, PA




           UNDER CONSTRUCTION


    TO BE BUILT – 972,000 SF DISTRIBUTION FACILITY

•   32’ clear height
•   ESFR Sprinkler System
•   100 dock positions with seals and mechanical levelers
•   4 drive in ramps
•   2 featured entries
•   Tilt wall construction with interior rigid insulation
•   Pursuing LEED v3 Certification




        UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




                                           Ford HVC
                            Mebane, North Carolina
                            • 252,000 SF (420’ x 600’) Expandable to
                              750,000 SF
                            • 30’ Clear Height
                            • ESFR Fire Suppression System
                            • ESFR Sprinkler System
                            • 10,000 SF Material Picking Mezzanine
                            • Skylights (1 per bay) and Clerestory
                              Windows at 50’ O.C. at Perimeter
                            • 45 Mil EPDM, Mechanically Attached Roof
                              System
                            • Trailer Storage for 40 Trailers


                            McDonough, Georgia
                            • 252,000 SF
                            • Expandable to 400,000 SF
                            • 32’ Clear Height
                            • ESFR Fire Protection
                            • 13 Dock Equipment Positions
                            • 11,000 SF of Office Space
                            • 15’ Trailer Storage Position


                            Winchester, Virginia
                            • 252,000 SF
                            • Expandable to 452,000 SF
                            • 32’ Clear Height
                            • ESFR Fire Protection
                            • 13 Dock Equipment Positions
                            • 11,000 SF of Office Space


UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS



                   IDI
                             South Brunswick, NJ
                             • 600,000 SF Speculative Warehouse
                             • 36’ Clear
                             • ESFR Fire Suppression System
                             • 120 Available Dock Positions
                             • Fully Adhered TPO Roof System
                             • Internal Roof Drains




                             South Brunswick, NJ
                             • 750,000 SF Speculative Warehouse
                             •36’ Clear
                             • Fully Adhered TPO Roof System
                             •ESFR Fire Suppression System
                             • Internal Roof Drains
                             • 151 Available Dock Positions




                             Palmer, PA
                             • 130,000 SF BTS for Porsche
                             •26,000 SF Office and Training Center
                             •18 Dock Positions
                             •Achieved LEED Gold Certification




UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




                                                           IDI
                                                  New Jersey

                             Shipco – Elizabeth, NJ

                             • 196,663 SF Tenant Improvements

                             • 12,352 SF Main Office Fitout

                             • 2,000 SF Shipping Office




                             Williams Sonoma
                             South Brunswick, NJ
                             • 1,300,000 SF Tenant Improvement

                             • Installation of 127 new dock
                               positions

                             • 10,000 SF office space




                            Exel – Medtronic
                            Elizabeth, NJ
                            • 130,000 SF air conditioned warehouse
                              for temperature sensitive medical product

                            • Installation of medical device sterilization
                              system

                            • Design and installation of second electrical
                              service and backup generators

                            • 10,000 SF office space




UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




Liberty Property Trust
                          Chambersburg, Pennsylvania
                          • 837,540 SF Distribution Center
                          • T-5 Lighting
                          • 45,000 LB Dock Levelers
                          • 75’ Dock Bays
                          • 32’ Clear Height
                          • 196 Trailer Storage Positions
                          • Under Construction



                          Suffolk, Virginia
                          • 168,000 SF Speculative Warehouse
                          • 28’ Clear
                          • 4 Entrance Features for 8 Tenants
                          • 40 Dock Doors




                          Greensboro, North Carolina
                          • 350,000 SF Distribution Center
                          • America’s first LEED Certified Speculative
                            Warehouse




 UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




Merchants Terminal Corporation
             Baltimore, Maryland




      150,000SF
      25,000 SF Office with Mezzanine
      6 Blast Cells
      -20 Degree Freezer
      Future Rail Dock
      Plans for Future Expansion Area




 UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




              Orgill, Inc.
                         Tifton, Georgia
                         • 330,000 SF Warehouse Expansion
                         • 9,600 SF Aerosol Cage
                         • 8,000 SF Flammables Room Expansion
                         • ESFR Sprinkler System
                         • 32’ Clear Height
                         • Five Month Project Schedule
                         • New Truck Court with Secured Entrance
                         • Existing Building Retrofit

                         Hurricane, Utah
                         • 523,770 of Distribution Center expandable
                           to 800,000SF
                         • K-17 ESFR Sprinkler System
                         • 32,000 of Hazardous Storage Room
                         • 2 Story, 65,000 SF Mezzanine Pick Module
                         • 43 Dock Positions and 11 Future Positions
                         • 150,000 SF Exterior Storage Area with a
                           Drive Up Ramp, 2 Dock Positions, and a
                           Slip Dock
                         • Trailer Storage for 77 Trailers
                         • Automated Materials Handling Systems
                           (by Owner)


                         Inwood, West Virginia
                         • 267,000 Distribution Center expansion
                         • ESFR Sprinkler System
                         • Building uses Energy Efficient Florescent
                           High-Bay Lighting
                         • 150 Space Employee Parking Expansion
                         • 22 Space Addition to Trailer Parking


UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




                                                   ProLogis
                                                         New Jersey


                         South Brunswick, New Jersey
                         751,000 SF Distribution Facility
                         36’ Clear Height
                         Insulated Precast Wall Panels
                         Mechanically Fastened EPDM
                           Roof
                         Internal Roof Drains
                         ESFR Fire Protection
                         Cross-Dock




                         Carteret, New Jersey
                         359,965 SF Warehouse
                         32’ Clear Height
                         Load Bearing Tilt-Up Wall Panels
                         ESFR Sprinkler System
                         45 Mil Reinforced TPO Roofing
                           System
                         Internal Roof Drains
                         68 Dock Door Positions




UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




                                        Trammell Crow
                                     South Brunswick, New Jersey




• 208,899 SF Distribution Center
• 32’ Clear Height
• 124 Parking Spaces
• 20 Trailer Parking Spaces
• 35 Dock Door Positions
• 7” Thick Concrete Floor Slab
• Load Bearing Tilt-up Wall Panels with Textured Paint
• Finish ESFR Sprinkler System, 1500 Booster Pump
• Ballasted EPDM Roofing System
• Interior Stick-Pin Batt Insulation to Meet Energy Code
• Internal Roof Drains



            UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




United Natural Foods, Inc.
                            York, PA
                           • 705,000 SF Distribution Center
                           • 38,000 SF of Cooler
                           • 53,800 SF of -20°Freezer
                           • 23,000 SF of Office
                           • 64 Dock Positions
                           • 33 Trailer Storage Positions
                           • Pick Mezzanine & Conveyor System
                           • LEED Certified

                            Moreno Valley, CA
                         • 613,000 Total SQ FT
                         • 115,000 SF of Cold Dock, Cooler & Freezer
                           Area
                         • 20,000 SF Two-Story Pick Module with
                           Carousel System
                         • ESFR Fire Protection With Double-Interlock
                           Preaction System, Dry Pendent System &
                           In-Rack Sprinklers
                         • 32’ Clear Height
                         • 112 Dock Positions Total, 38 With Levelers
                         Title 24 Energy Compliance


                            Ridgefield, WA
                          • 780,000 Distribution Center
                          • 15,000 SF Office
                          • 75 Dock Positions
                          • Automated Conveyor Systems and Pick
                            Modules
                          • Flammable Liquids and Aerosol Rooms




UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
INTEGRITY . SOLUTIONS . RELATIONSHIPS




                                                              USAA
                                             Cranbury, New Jersey




Howard Berger
• 240,000 SF Fit-Out
• 8,000 SF Mezzanine
• 17,000 SF Office
• Additional Dock Positions With
  Levelers and Dock Seals
• Upgraded mechanical systems
• Completed 2 weeks early

Kuehne and Nagel
• 90,000 SF Fit-Out for Louis Vuitton
• Install 600 Amp emergency
  generator including two 300A
  transfer switches
• Refurbish existing shipping office
             UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS

Arco Design Build Intro

  • 1.
    ARCO History Our parentcompany, ARCO Construction Company, Inc., was founded in 1992 in St. Louis, Missouri and has continued to grow by providing clients with a complete design/build solution. The ARCO companies currently consists of eight offices to serve the United States. Industry Focus Sacramento Chicago Philadelphia The ARCO construction experience has St. Louis Cincinnati Chesapeake served clients in the commercial and industrial markets extensively. Our verifiable track Atlanta record of success is based on years of professional performance in manufacturing, Tampa warehousing, distribution facilities and office buildings. This focus allows our associates to optimize your project cost and quality. Front End Service Provides You a A Single Source Design and Partner in Project Development Construction Solution The ARCO Proposal Process Provides a • Front End Project Development thorough business solution. • Site Selection • A complete and competitive proposal is • Complete Design Service developed quickly with little or no gaps in scope and no need for change orders. • Up-Front Competitive Lump Sum Pricing • Value Engineering Throughout Project • Site reconnaissance gives a clear understanding of local codes, regulations, • Zoning, Permitting and Code Expertise fees and permit process. • General Contractor and Construction Services • Civil design knowledge maximizes site • Warranty Follow-up usage, layout options and site selection. • A focus on the light industrial market provides building cost and quality options for layout and materials. • The Design/Build program provides accurate facility costs to assist in the project funding process.
  • 2.
    Relationships that Matter Our commitment to building solid, lasting relationships is evident in our continued growth with customers recognized in their respected industries. Manufacturing/ Cold Storage/ Warehouse/ Technology Food Distribution Distribution •Hewlett-Packard •AmeriCold •Orgill •Sprint •Merchants Terminal Corp. •Staples •Jabil Circuits •US Food Service •Unilever •Seiler Plastics •MultiFoods-VSA •First Industrial •Lockheed Martin •United Natural Foods •Johnson & Johnson •Alcan/Wheaton •Restaurant Depot •IDI Design/Build Advantage Our comprehensive design/build approach means a direct relationship with just one company instead of dealing with a multitude of organizations. This relationship provides the advantage of clear lines of communication and responsibility for delivery of scope and costs. The result is not only a smoother project, but significant cost saving and schedule. Design/Build Method Concept Project Complete Design Firm Price 33% Time Savings! Proposal Traditional Method Concept Design Project Complete Bid Construction Firm Price Proposal Construction Industry Institute has proven that the design/build approach saves money (15%), improves quality (8%) and reduces project schedule (33%).
  • 3.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS Liberty Property Trust Carlisle, PA UNDER CONSTRUCTION TO BE BUILT – 972,000 SF DISTRIBUTION FACILITY • 32’ clear height • ESFR Sprinkler System • 100 dock positions with seals and mechanical levelers • 4 drive in ramps • 2 featured entries • Tilt wall construction with interior rigid insulation • Pursuing LEED v3 Certification UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 4.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS Ford HVC Mebane, North Carolina • 252,000 SF (420’ x 600’) Expandable to 750,000 SF • 30’ Clear Height • ESFR Fire Suppression System • ESFR Sprinkler System • 10,000 SF Material Picking Mezzanine • Skylights (1 per bay) and Clerestory Windows at 50’ O.C. at Perimeter • 45 Mil EPDM, Mechanically Attached Roof System • Trailer Storage for 40 Trailers McDonough, Georgia • 252,000 SF • Expandable to 400,000 SF • 32’ Clear Height • ESFR Fire Protection • 13 Dock Equipment Positions • 11,000 SF of Office Space • 15’ Trailer Storage Position Winchester, Virginia • 252,000 SF • Expandable to 452,000 SF • 32’ Clear Height • ESFR Fire Protection • 13 Dock Equipment Positions • 11,000 SF of Office Space UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 5.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS IDI South Brunswick, NJ • 600,000 SF Speculative Warehouse • 36’ Clear • ESFR Fire Suppression System • 120 Available Dock Positions • Fully Adhered TPO Roof System • Internal Roof Drains South Brunswick, NJ • 750,000 SF Speculative Warehouse •36’ Clear • Fully Adhered TPO Roof System •ESFR Fire Suppression System • Internal Roof Drains • 151 Available Dock Positions Palmer, PA • 130,000 SF BTS for Porsche •26,000 SF Office and Training Center •18 Dock Positions •Achieved LEED Gold Certification UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 6.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS IDI New Jersey Shipco – Elizabeth, NJ • 196,663 SF Tenant Improvements • 12,352 SF Main Office Fitout • 2,000 SF Shipping Office Williams Sonoma South Brunswick, NJ • 1,300,000 SF Tenant Improvement • Installation of 127 new dock positions • 10,000 SF office space Exel – Medtronic Elizabeth, NJ • 130,000 SF air conditioned warehouse for temperature sensitive medical product • Installation of medical device sterilization system • Design and installation of second electrical service and backup generators • 10,000 SF office space UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 7.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS Liberty Property Trust Chambersburg, Pennsylvania • 837,540 SF Distribution Center • T-5 Lighting • 45,000 LB Dock Levelers • 75’ Dock Bays • 32’ Clear Height • 196 Trailer Storage Positions • Under Construction Suffolk, Virginia • 168,000 SF Speculative Warehouse • 28’ Clear • 4 Entrance Features for 8 Tenants • 40 Dock Doors Greensboro, North Carolina • 350,000 SF Distribution Center • America’s first LEED Certified Speculative Warehouse UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 8.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS Merchants Terminal Corporation Baltimore, Maryland 150,000SF 25,000 SF Office with Mezzanine 6 Blast Cells -20 Degree Freezer Future Rail Dock Plans for Future Expansion Area UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 9.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS Orgill, Inc. Tifton, Georgia • 330,000 SF Warehouse Expansion • 9,600 SF Aerosol Cage • 8,000 SF Flammables Room Expansion • ESFR Sprinkler System • 32’ Clear Height • Five Month Project Schedule • New Truck Court with Secured Entrance • Existing Building Retrofit Hurricane, Utah • 523,770 of Distribution Center expandable to 800,000SF • K-17 ESFR Sprinkler System • 32,000 of Hazardous Storage Room • 2 Story, 65,000 SF Mezzanine Pick Module • 43 Dock Positions and 11 Future Positions • 150,000 SF Exterior Storage Area with a Drive Up Ramp, 2 Dock Positions, and a Slip Dock • Trailer Storage for 77 Trailers • Automated Materials Handling Systems (by Owner) Inwood, West Virginia • 267,000 Distribution Center expansion • ESFR Sprinkler System • Building uses Energy Efficient Florescent High-Bay Lighting • 150 Space Employee Parking Expansion • 22 Space Addition to Trailer Parking UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 10.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS ProLogis New Jersey South Brunswick, New Jersey 751,000 SF Distribution Facility 36’ Clear Height Insulated Precast Wall Panels Mechanically Fastened EPDM Roof Internal Roof Drains ESFR Fire Protection Cross-Dock Carteret, New Jersey 359,965 SF Warehouse 32’ Clear Height Load Bearing Tilt-Up Wall Panels ESFR Sprinkler System 45 Mil Reinforced TPO Roofing System Internal Roof Drains 68 Dock Door Positions UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 11.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS Trammell Crow South Brunswick, New Jersey • 208,899 SF Distribution Center • 32’ Clear Height • 124 Parking Spaces • 20 Trailer Parking Spaces • 35 Dock Door Positions • 7” Thick Concrete Floor Slab • Load Bearing Tilt-up Wall Panels with Textured Paint • Finish ESFR Sprinkler System, 1500 Booster Pump • Ballasted EPDM Roofing System • Interior Stick-Pin Batt Insulation to Meet Energy Code • Internal Roof Drains UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 12.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS United Natural Foods, Inc. York, PA • 705,000 SF Distribution Center • 38,000 SF of Cooler • 53,800 SF of -20°Freezer • 23,000 SF of Office • 64 Dock Positions • 33 Trailer Storage Positions • Pick Mezzanine & Conveyor System • LEED Certified Moreno Valley, CA • 613,000 Total SQ FT • 115,000 SF of Cold Dock, Cooler & Freezer Area • 20,000 SF Two-Story Pick Module with Carousel System • ESFR Fire Protection With Double-Interlock Preaction System, Dry Pendent System & In-Rack Sprinklers • 32’ Clear Height • 112 Dock Positions Total, 38 With Levelers Title 24 Energy Compliance Ridgefield, WA • 780,000 Distribution Center • 15,000 SF Office • 75 Dock Positions • Automated Conveyor Systems and Pick Modules • Flammable Liquids and Aerosol Rooms UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS
  • 13.
    INTEGRITY . SOLUTIONS. RELATIONSHIPS USAA Cranbury, New Jersey Howard Berger • 240,000 SF Fit-Out • 8,000 SF Mezzanine • 17,000 SF Office • Additional Dock Positions With Levelers and Dock Seals • Upgraded mechanical systems • Completed 2 weeks early Kuehne and Nagel • 90,000 SF Fit-Out for Louis Vuitton • Install 600 Amp emergency generator including two 300A transfer switches • Refurbish existing shipping office UNDERSTAND OUR CUSTOMER’S BUSINESS AND SOLVE THEIR PROBLEMS